Anda di halaman 1dari 5

PT.

RIDLATAMA BAHTERA CONSTRUCTION


GENERAL CONTRACTOR & TRADING

REKAPITULASI JAM KERJA ALAT


NAMA ALAT : BULDOZER D31 CATERPILLAR Periode : OKTOBER 2017

SOPIR/ JAM ALAT(HM/KM) JAM KERJA HASIL SOLAR


NO. TANGGAL JUMLAH JUMLAH KETERANGAN
OPERATOR MULAI SELESAI MULAI SELESAI (M³/Rit) (Ltr)

1 1-Oct-17 - 0.0 0.0 0.0 perbaikan akses jalan

2 2-Oct-17 - 4107.0 4110.0 3.0 30 Timbunan

3 3-Oct-17 - 4110.0 4116.0 6.0 60 stanbay

4 4-Oct-17 - 4116.0 4119.0 3.0 30 Timbunan

5 5-Oct-17 - 4119.0 4124.0 5.0 30 Timbunan

6 6-Oct-17 - 4124.0 4125.0 1.0 Timbunan

7 7-Oct-17 - 4125.0 4127.0 2.0 30 Timbunan

8 8-Oct-17 - 0.0 0.0 0.0 Timbunan

9 9-Oct-17 - 4127.0 4129.0 2.0 30 Timbunan

10 10-Oct-17 - 4129.0 4133.0 4.0 30 Timbunan

11 11-Oct-17 - 4133.0 4135.0 2.0 30 Timbunan

12 12-Oct-17 - 4135.0 4137.0 2.0 30 Timbunan

13 13-Oct-17 - 4137.0 4140.0 3.0 30 Timbunan

14 14-Oct-17 - 4140.0 4143.0 3.0 30 Timbunan

15 15-Oct-17 - 0.0 0.0 0.0 stanbay

16 16-Oct-17 - 4143.0 4145.0 2.0 20 Timbunan

17 17-Oct-17 - 4145.0 0.0 -4145.0 Timbunan

18 18-Oct-17 - 0.0 0.0 0.0 Timbunan

19 19-Oct-17 - 0.0 0.0 0.0 Timbunan

20 20-Oct-17 - 0.0 0.0 0.0 Timbunan

21 21-Oct-17 - 0.0 0.0 0.0 Timbunan

22 22-Oct-17 - 0.0 0.0 8.0 Timbunan

23 23-Oct-17 - 0.0 0.0 0.0 Timbunan

24 24-Oct-17 - 0.0 0.0 0.0 Timbunan

25 25-Oct-17 - 0.0 0.0 0.0 Timbunan

26 26-Oct-17 - 0.0 0.0 0.0

27 27-Oct-17 - 0.0 0.0 0.0 Timbunan

28 28-Oct-17 - 0.0 0.0 0.0 Timbunan

29 29-Oct-17 - 0.0 0.0 0.0 Timbunan

30 30-Oct-17 - 0.0 0.0 0.0

31 31-Oct-17 - 0.0 0.0 0.0

Total -4099.0 0:00 0 380

Singosari,

Menyetujui, Mengetahui, Dibuat,

_______________ _______________ _______________

file:///conversion/tmp/scratch/383547944.xls
PT. RIDLATAMA BAHTERA CONSTRUCTION

GENERAL CONTRACTOR & TRADING

REKAPITULASI JAM KERJA ALAT


NAMA ALAT : EXAVATOR KOMATSU (25) Periode : OKTOBER 2017

SOPIR/ JAM ALAT(HM/KM) JAM KERJA HASIL SOLAR


NO. TANGGAL JUMLAH JUMLAH KETERANGAN
OPERATOR MULAI SELESAI MULAI SELESAI (M³/Rit) (Ltr)

1 1-Oct-17 - 0.0 0.0 0.0

2 2-Oct-17 - 2985.0 2992.0 7.0

3 3-Oct-17 - 2992.0 3000.0 8.0

4 4-Oct-17 - 3000.0 3006.0 6.0 120 Loading DT

5 5-Oct-17 - 3006.0 3012.0 6.0 120 Loading DT

6 6-Oct-17 - 3012.0 3014.0 2.0 180 Loading DT

7 7-Oct-17 - 3014.0 3020.0 6.0 Loading DT

8 8-Oct-17 - 0.0 0.0 0.0 Loading DT

9 9-Oct-17 - 3020.0 3024.0 4.0 90 Loading DT

10 10-Oct-17 - 3024.0 3030.0 6.0 120 Loading DT

11 11-Oct-17 - 3030.0 3037.0 7.0 30 Loading DT

12 12-Oct-17 - 3037.0 3041.0 4.0 120 Loading DT

13 13-Oct-17 - 3041.0 3048.0 7.0 60 Loading DT

14 14-Oct-17 - 3048.0 3055.0 7.0 120 Loading DT

15 15-Oct-17 - 0.0 0.0 0.0 Loading DT

16 16-Oct-17 - 3055.0 3059.0 4.0 90 Loading DT

17 17-Oct-17 - 3059.0 0.0 -3059.0

18 18-Oct-17 - 0.0 0.0 0.0 Loading DT

19 19-Oct-17 - 0.0 0.0 0.0 Loading DT

20 20-Oct-17 - 0.0 0.0 0.0 Loading DT

21 21-Oct-17 - 0.0 0.0 0.0

22 22-Oct-17 - 0.0 0.0 0.0

23 23-Oct-17 - 0.0 0.0 0.0 Loading DT

24 24-Oct-17 - 0.0 0.0 0.0 Loading DT

25 25-Oct-17 - 0.0 0.0 0.0 Loading DT

26 26-Oct-17 - 0.0 0.0 0.0

27 27-Oct-17 - 0.0 0.0 0.0

28 28-Oct-17 - 0.0 0.0 0.0 Loading DT

29 29-Oct-17 - 0.0 0.0 0.0 Loading DT

30 30-Oct-17 - 0.0 0.0 0.0

31 31-Oct-17 - 0.0 0.0 0.0

Total -2985.0 0:00 0 1050

Singosari,

Menyetujui, Mengetahui, Dibuat,


_______________ _______________ _______________
PT. RIDLATAMA BAHTERA CONSTRUCTION
GENERAL CONTRACTOR & TRADING

REKAPITULASI JAM KERJA ALAT


NAMA ALAT : EXCAVATOR HAYUNDAI Periode : OKTOBER 2017

SOPIR/ JAM ALAT(HM/KM) JAM KERJA HASIL SOLAR


NO. TANGGAL JUMLAH JUMLAH KETERANGAN
OPERATOR MULAI SELESAI MULAI SELESAI (M³/Rit) (Ltr)

1 1-Oct-17 Adi - - - 0.00 0.00 0.00


0.00 0.00 0.00
2 2-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
3 3-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
4 4-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
5 5-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
6 6-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
7 7-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
8 8-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
9 9-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
10 10-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
11 11-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
12 12-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
13 13-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
14 14-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
15 15-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00
16 16-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00 (trobel)
17 17-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
18 18-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
19 19-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
20 20-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00
21 21-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00
22 22-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00
23 23-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00
24 24-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00
25 25-Oct-17 Adi - - - 0.00 0.00 0.00 perapian disposal
0.00 0.00 0.00
26 26-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
27 27-Oct-17 Adi - - - 0.00 0.00 0.00 galian
0.00 0.00 0.00
28 28-Oct-17 Adi - - - 0.00 0.00 0.00 galian
0.00 0.00 0.00
29 29-Oct-17 Adi - - - 0.00 0.00 0.00 galian
0.00 0.00 0.00
30 30-Oct-17 Adi - - - 0.00 0.00 0.00 galian
0.00 0.00 0.00
31 31-Oct-17 Adi - - - 0.00 0.00 0.00
0.00 0.00 0.00
Total 0 0

Singosari,

Menyetujui, Mengetahui, Dibuat,

_______________ _______________ _______________

file:///conversion/tmp/scratch/383547944.xls
PT. RIDLATAMA BAHTERA CONSTRUCTION
GENERAL CONTRACTOR & TRADING

REKAPITULASI JAM KERJA ALAT


NAMA ALAT : VIBRO SHEEP FOOT AMMAN Periode : OKTOBER 2017

SOPIR/ JAM ALAT(HM/KM) JAM KERJA HASIL SOLAR


NO. TANGGAL JUMLAH JUMLAH KETERANGAN
OPERATOR MULAI SELESAI MULAI SELESAI (M³/Rit) (Ltr)

1 1-Oct-17 Budi 0.0 0.0 0.0

2 2-Oct-17 Budi 0.0 0.0 0.0

3 3-Oct-17 Budi 0.0 0.0 0.0

4 4-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

5 5-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

6 6-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

7 7-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

8 8-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

9 9-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

10 10-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

11 11-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

12 12-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

13 13-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

14 14-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

15 15-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

16 16-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

17 17-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

18 18-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

19 19-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

20 20-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

21 21-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

22 22-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

23 23-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

24 24-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

25 25-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

26 26-Oct-17 Budi 0.0 0.0 0.0

27 27-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

28 28-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

29 29-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

30 30-Oct-17 Budi 0.0 0.0 0.0 Pemadatan

31 31-Oct-17 Budi 0.0 0.0 0.0

Total 0.0 0:00 0 0

Singosari,

Menyetujui, Mengetahui, Dibuat,

_______________ _______________ _______________

file:///conversion/tmp/scratch/383547944.xls