PT.

BATU INTI MORAMO (BIM)


STONE CRUSHER
Desa Lamokula – Kab. Konawe Selatan
Telp. 0812 4485 9910
KENDARI

LAPORAN KEGIATAN STONE CRUSHER PT. BIM


DESA LAMOKULA KEC. MORAMO UTARA KAB. KONAWE SELATAN - SULTRA
A. LAPORAN PRODUKSI

VOLUME STOCKPILE YANG VOLUME INPUT (PRODUKSI PER


MASUK PER HARI HARI)
No TANGGAL (RETASE/TON) (RETASE/TON) WAKTU KENDALA KETERANGAN
. (ASUMSI 5 KUBIK PER RETASE) (ASUMSI 5 KUBIK PER RETASE) PRODUKSI
N x 5 x 1,35 TON N x 5 x 1,35 TON (JAM)

1. 20/09/2019 25 RET x 5 x 1,35 = 168,75 TON 45 RET x 5 x 1,35 = 303,75 TON 4 JAM BEARING VIDER PECAH MASIH ADA SISA
STOCKPILE
SEBELUMNYA
2. 21/09/2019 27 RET X 5 X 1,35 = 182,25 TON 55 RET X 5 X 1,35 = 371,25 TON 5 JAM JAM MASIH ADA SISA
STOCKPILE
SEBELUMNYA
3. 22/09/2019 76 RET X 5 1,35 = 513 TON MINGGU LIBUR - - LIBUR HARI
MINGGU
4. 23/09/2019 30 RET x 5 x 1,35 = 202,5 TON 19,5 RET x 5 x 1,35 = 131,625 TON 1,5 JAM SUDAH HARUS
DIGANTI
5. 24/09/2019 30 RET x 5 x 1,35 = 202,5 TON TIDAK PRODUKSI - - PERBAIKAN
6. 25/09/2019 68 RET X 5 X 1,35 = 459 TON 112 RET X 5 X 1,35 = 756 TON 8,5 JAM - -
7. 26/09/2019 43 RET x 5 x 1,35 = 290,25 TON 62 RET x 5 x 1,35 = 418,5 TON 5,5 JAM - -
8. 27/09/2019 24 RET x 5 x 1,35 = 162 TON 85 RET x 5 x 1,35 = 573,75 TON 6 JAM - -
9 28/09/2019 45 RET x 5 x 1,35 = 303,75 TON 82 RET x 5 x 1,35 = 553,5 TON 6 JAM - -
10. 29/09/2019 95 RET x 5 x 1,35 = 641,25 TON 31 RET x 5 1,35 = 209,25 TON 5,5 JAM - -
11. 30/09/2019 30 RET x 5 x 1,35 = 202,5 TON 86 RET x 5 1,35 = 580,5 TON 7,5 JAM - -
TOTAL 3.327,75 TON 3.898,075 TON 49,5 JAM
CATATAN : UNTUK MENDAPATAKAN PERHITUNGAN YANG AKURAT DIBUTUHKAN TIMBANGAN
PT. BATU INTI MORAMO (BIM)
STONE CRUSHER
Desa Lamokula – Kab. Konawe Selatan
Telp. 0812 4485 9910
KENDARI

B. LAPORAN BIAYA

A. BIAYA
1. PERAWATAN STONE CRUSHER
TANGGAL DESKRIPSI VOLUME HARGA SATUAN JUMLAH
23/09/2019  NOTA KONTA 3 PLY 2 PAK 35.000 70.000
24/09/2019  GREASE STATES 1 PAIL 750.000 750.000
 GREASE KYODO YOSHI 1 PAIL 1.150.000 1.150.000
 KOBE STEEL KAWAT LAS LB52-U 3,2 MM 1 DOZ 275.000 275.000
 OLI SEAL UK. 85-105-13 2 PCS 150.000 300.000
20/09/2019  SERVIS DINAMO 3 PHASE – 5 HP 1 PCS 1.000.000 1.000.000
SUB TOTAL 3.545.000

2. PERAWATAN ALAT/EXCA
24/09/2019  MATA TAP ½ 1 SET 135.000 135.000
 OLI 10 30 LITER 26.500 795.000
 RELAY TIKTOK KOMATSU PC-200-7 1 PCS 475.000 475.000
29/09/2019  FILTER UDARA KOMATSU PC-200-7 1 SET 525.000 525.000
 FILTER SOLAR KOMATSU PC 200-7 1 PCS 130.000 130.000
 TALI PTO 4,5 M 150.000 150.000
 SELANG SOLAR 3M 35.000 105.000
 OLI TOP 90 3 LITER 65.000 195.000
SUB TOTAL 2.510.000

3. BELANJA RUTIN
21/09/2019  KONSUMSI MEKANIK 4 ORANG 30.000 120.000
24/09/2019  MATA GERINDA POTONG 2 DOZ 80.000 160.000
 GAS ELPIJI 12 KG 1 TABUNG 150.000 150.000
 BUSI PIJAR KENDARAAN OPERASIONAL 4 PCS 175.000 700.000
25/09/2019  BUSI PIJAR KENDARAAN OPERASIONAL 6 PCS 100.000 600.000
 KONSUMSI MEKANIK 4 ORANG 30.000 120.000
 G-BLOK FORD KENDARAAN OPERASIONAL 2 PCS 120.000 240.000
 OLI 40 UNTUK KENDARAAN OPERASIONAL 5 LITER 30.000 150.000
 KARET REM KENDARAAN OPERASIONAL 2 PCS 5.000 10.000
PT. BATU INTI MORAMO (BIM)
STONE CRUSHER
Desa Lamokula – Kab. Konawe Selatan
Telp. 0812 4485 9910
KENDARI

 MINYAK REM 1 BTL 65.000 65.000


26/09/2019  KONSUMSI MEKANIK 3 ORANG 30.000 90.000
28/09/2019  KONSUMSI MEKANIK 4 ORANG 50.000 200.000
29/09/2019  PHILIPS LED BULB 1 PCS 61.000 61.000
 TEKIRO KUNCI L SHORT 8 PCS FULL SET 1 SET 76.000 76.000
 STEKER ARDE 3 PCS 9.500 28.500
 PHILIPS BVP 172/CW 50 W LP SOROT LED 2 PCS 795.000 1.590.000
 SEAL TIPE 1 PCS 8.700 8.700
 ETERNA KABEL NYYHY 2x0,75 MM 1 ROLL 420.000 420.000
SUB TOTAL 4.789.200
4. SOLAR/BBM
20/09/2019 SOLAR 350 LITER 8.500
22/09/2019 SOLAR 450 LITER 8.500
25/09/2019 SOLAR 1.176LITER 8.500
28/09/2019 SOLAR 750LITER 8.500
29/09/2019 SOLAR 376 LITER 8.500
30/09/2019 SOLAR 350 LITER 8.500
SUB TOTAL 3.452 29.342.000

5. BELANJA BATU ROMPONG/BATU GAJAH/BAHAN BAKU


20/09/2019 BELANJA BATU ROMPONG 25 RET 35.000/TON
21/09/2019 BELANJA BATU ROMPONG 27 RET 35.000/TON
22/09/2019 BELANJA BATU ROMPONG 76 RET 35.000/TON
23/09/2019 BELANJA BATU ROMPONG 30 RET 35.000/TON
24/09/2019 BELANJA BATU ROMPONG 30 RET 35.000/TON
25/09/2019 BELANJA BATU ROMPONG 68 RET 35.000/TON
26/09/2019 BELANJA BATU ROMPONG 43 RET 35.000/TON
27/09/2019 BELANJA BATU ROMPONG 24 RET 35.000/TON
28/09/2019 BELANJA BATU ROMPONG 45 RET 35.000/TON
29/09/2019 BELANJA BATU ROMPONG 95 RET 35.000/TON
30/09/2019 BELANJA BATU ROMPONG 53 RET 35.000/TON
SUB TOTAL 3.483 TON 121.905.000
PT. BATU INTI MORAMO (BIM)
STONE CRUSHER
Desa Lamokula – Kab. Konawe Selatan
Telp. 0812 4485 9910
KENDARI

6. PERAWATAN/PERBAIKAN DUMP TRUCK 10 RODA 2 UNIT


29/09/2019 AKI N50 A 1 PCS 750.000 750.000
SARINGAN UDARA FUSO 1 SET 270.000 270.000
BAUT RODA FUSO 2 PCS 50.000 100.000
SARINGAN SOLAR 1 SET 600.000 600.000
30/09/2019 OLI MEDITRAN SX MIN 15 W-40 CH4 4 LITER 41.250 165.000
SUB TOTAL 1.885.000

7. TIMBANGAN
29/09/2019 TENDA TUKANG 1 PCS 250.000 250.000
30/09/2019 PASIR COR 1 RET 450.000 450.000
BESI 10 FULL 15 BTG 76.000 1.140.000
BESI 8 FULL 15 BTG 50.000 750.000
KAWAT BINDRAT 2 KG 25.000 50.000
PAKU UK. 2 INCH 1 KG 18.000 18.000
PAKU UK. 3 INCH 1 KG 18.000 18.000
SIKA 1 BTL 55.000 55.000
SEMEN TONASA 20 SAK 69.000 1.380.000
SUB TOTAL 4.111.000

TOTAL (1 + 2 + 3 + 4 + 6 + 7)
PT. BATU INTI MORAMO (BIM)
STONE CRUSHER
Desa Lamokula – Kab. Konawe Selatan
Telp. 0812 4485 9910
KENDARI

C. LAPORAN PENJUALAN

No. TANGGAL JENIS CARGO/JENIS BATU VOLUME (TON) HARGA SATUAN (Rp./TON) JUMLAH (Rp.)
1. 20/09/2019 LPB 57,407 TON 20.000 1.148.140

2. 21/09/2019 LPB 131,65 TON 20.000 2.633.000


3. 23/09/2019 LPB 141,573 TON 20.000 2.831.460
4. 24/09/2019 LPB 246,97 TON 20.000 4.939.400
5. 25/09/2019 SPLIT 1x2 67,336 TON 110.000 7.406.960
SPLIT 2x3 59,492 TON 110.000 6.544.120
6. 29/09/2019 ABU BATU 138,645 TON 85.000 11.784.825

7. 30/09/2019 ABU BATU 89,214 TON 85.000 7.583.190

SUB TOTAL 44.871.095


PT. BATU INTI MORAMO (BIM)
STONE CRUSHER
Desa Lamokula – Kab. Konawe Selatan
Telp. 0812 4485 9910
KENDARI

D. ANALISIS TEKHNIS SEBELUMNYA

KEMAMPUAN HOPER KEMAMPUAN KEMAMPUAN JAW


(VOLUME INPUT) CONVEYOR PRIMER & JAW TERSIER
(ASUMSI 5 KUBIK PER (ASUMSI 5 KUBIK PER (ASUMSI 5 KUBIK PER KENDALA SARAN PERBAIKAN KETERANGAN
RETASE) RETASE) RETASE)
N x 5 x 1,35 TON N x 5 x 1,35 TON N x 5 x 1,35 TON
196 TON PER JAM 92 TON PER JAM 92 TON PER JAM KARET CONVEYOR BALIK GANTI KARET CONVEYOR BARANGNYA
SUDAH RUSAK, JADINYA BALIK & GIGI JAW SUDAH DIORDER
SERING MACET (PRIMER, TERSIER) & SUDAH DALAM
PENGIRIMAN
CATATAN : UNTUK MEMAKSIMALKAN 196 TON PER JAM, SEBAIKNYA KARET CONVEYOR BALIK & JAW (PRIMER, TERSIER) DIGANTI. KONDISI TERKINI JAW PRIMER &
TERSIER SUDAH RATA/GIGI JAWNYA HABIS. JADINYA TIDAK MAKSIMAL. HASILNYA JAW TERSIER SERING TERLAMBAT MENGGILING BATU.

E. ANALISIS TEKHNIS SEMENTARA (PROGRESS SAAT INI)

KEMAMPUAN HOPER KEMAMPUAN KEMAMPUAN JAW


(VOLUME INPUT) CONVEYOR PRIMER & JAW TERSIER
(ASUMSI 5 KUBIK PER (ASUMSI 5 KUBIK PER (ASUMSI 5 KUBIK PER KENDALA SARAN PERBAIKAN KETERANGAN
RETASE) RETASE) RETASE)
N x 5 x 1,35 TON N x 5 x 1,35 TON N x 5 x 1,35 TON
196 TON PER JAM 103,5 TON PER JAM 92 TON PER JAM JAW PRIMER & TERSIER GIGI JAW (PRIMER, ADA
MASIH LAMBAT KARENA TERSIER) PENINGKATAN
GIGI JAWNYA HABIS KAPASITAS
(SUDAH RATA) PRODUKSI
VOLUME INPUT
MENJADI 103,5
TON PER JAM
CATATAN : 1) KAPASITAS PRODUKSI VOLUME INPUT MASIH BISA MENINGKAT SAMPAI 150 TON PER JAM JIKA GIGI JAW PRIMER & TERSIER DIGANTI YANG BARU.
2) RENCANA KERJA PER TANGGAL 01 OKTOBER UNTUK MEMAKSIMALKAN PRODUKSI AKAN DILAKUKAN DENGAN MENAMBAH KARYAWAN &
MEMBAGINYA MENJADI 2 SHIFT (2 GILIRAN JAM KERJA). SHIFT PERTAMA MASUK MULAI JAM 07.00 WITA Sd. 14.00 WITA. SHIFT KEDUA AKAN
MASUK MULAI 14.00 WITA Sd. 21.00 WITA