PERHITUNGAN STRUKTUR
CL
3500 mm 3500 mm
Aspal
Plat Lantai = 230 mm Marka
Diafragma
a. Data Teknis
Tebal aspal + overlay : 10 cm
Jarak antar balok induk (girder U) : 3,100 m
Lebar lajur lalu lintas : 7,00 m
Tinggi genangan air rencana : 0,08 m
Tebal plat lantai kendaraan : 0,230 m
Ts = (100 + 40.s ) ≥ 200 mm
= ( 100 + 40.3,1)
= 224 mm ≥ 200 mm (oke) (RSNIT – 12 – 2004 : 40)
Diambil tebal plat lantai 230 mm
b. Bahan Struktural
Mutu beton = K-350
0,83 x 350
Kuat tekan beton (fc’) = = 29,05 Mpa (konversi dari kubus ke
10
silinder)
Mutu Baja (fy) = 400 Mpa
c. Berat Isi
Berat beton bertulang = 25 KN/m3
Berat aspal = 25 KN/m3
d. Analisa Beban
Beban mati
- Berat aspal = 25 KN/m3 x 0,10 m x 1 m x 2,0 = 5 KN/m
- Berat pelat lantai = 25 KN/m3 x 0,230 m x 1 m x 1,3 = 7,475 KN/m
- Berat air hujan = 9,8 KN/m3 x 0,08 m x 1 m x 2,0 = 1,578 KN/m
+
qDlult =14,043 KN/m
Pelat lantai kendaraan dianggap satu arah
1/24 1/10 1/10 1/24
1/11 1/16 1/11
= 12,268 KNm
Momen Tumpuan (Mtx) :
1 KN
Mtx = 10 x 14,043 x(3,1m)2
m
= 13,495 KNm
Jadi :
Mlx = 12,268 KNm
Mtx = 13,495 KNm
My = 0 KNm
Beban hidup
Berasal dari kendaraan bergerak (muatan T) :
0,1
45° 45°
0,230
a1 b1
a b
= 0,630 m
0,215
b = b1 + 2 (tg 45°)
0,215
= 0,50 + 2 (tg 45°)
= 0,930 m
Beban truk
Tu = 1,8 × 1,3 × 112,5 KN
= 263,250 KN
Jadi Pembebanan Truk
Tu 263,250
q = axb = = 449,309 KN/m2
0,63 x 0,93
tx = b = 0,93 m
Ly ty = a = 0,63 m
Lx = 3,1 m
Momen :
MxI = fxm . q . tx . ty
= 0,1885 x 449,309 KN/m2 x 0,93 x 0,630
= 49,623 KNm
MyI = fym . q . tx . ty
= 0,1237 x 449,309 KN/m2 x 0,93 x 0,630
= 32,564 KNm
Momen Akhir :
MxI = 49,623 KNm
MyI = 32,564 KNm
tx = 0,93
Ly m ty = 0,630 m
1m
Lx = 3,1 m
ty = 0,630 m ty = 0,630 m
Luasan 2
tx 0,07
= = 0,023 ∼ 0,05 → didapat dari tabel bitner fxm = 0,2768
lx 3,1
ty 0,630
= = 0,203 → didapat dari tabel bitner fym = 0,1968
lx 3,1
Momen :
Mx2 = fxm2 . q . tx2 . ty2
= 0,2768 x 449,309 KN/m2 x 0,07 x 0,630
= 5,485 KNm
My2 = fym2 . q . tx2 . ty2
= 0,1968 x 449,309 KN/m2 x 0,07 x 0,630
= 3,899 KNm
Momen Akhir :
MxII = Mx1 - Mx2 = 72,496 - 5,485 = 67,011 KNm
MyII = My1 – My2 = 49,715 - 3,899 = 45,816 KNm
e. Beban Angin
Faktor beban ultimate (Kew) = 1,2
Koefisien erat (Cw) = 1,2
Kecepatan angin (Vw) = 35 m/s
Tew = 0,0012 x Cw x Vw2 x ab
= 0,0012 x 1,2 x (35 m/s) 2 x (4 m x 1 m)
= 7,056 KN
2,75 m
Tew
4,00 m
1,75 m
Pew Pew
= 8,064 KNm
f. Kombinasi Beban
Mlx = Beban mati + Beban hidup + Beban angin
= 12,268 KNm + 67,011 KNm + 8,064 KNm
= 87,343 KNm
Mtx = Beban mati + Beban hidup + Beban angin
= 13,495 KNm + 67,011 KNm + 8,064 KNm
= 88,570 KNm
My = Beban mati + Beban hidup + Beban angin
= 0 KNm + 45,816 KNm + 8,064 KNm
= 53,880 KNm
Rasio Tulangan :
1,4
ρ min = fy
1,4
= 400
= 0,0035
0,85 β1 fc′ 600
ρ max = 0,75 x (600+ fy)
fy
0,85 x 0,85 x 29,05 600
ρ max = 0,75 x (600+400) = 0,024
400
Mu ρ fy
= ρ fy (1 − 1,7 fc′)
∅bd2
19754 ρ −160000ρ2
3,962 = 49,385
= 0,0035
0,85 β1 fc′ 600
ρ max = 0,75 x (600+fy)
fy
19754 ρ −160000ρ2
4,018 = 49,385
3. Penulangan arah y
My = 53,880 KNm
Diameter tulangan arah x, D = 16 mm
Diameter tulangan arah y, D = 16 mm
Fc’ = 29,05 Mpa
Fy = 400 Mpa
P = 40 mm
Tebal Pelat = 230 mm
d’ = h –p – diameter tulangan y – ½ diameter tulangan x
= 230 mm – 40 mm – 16 mm – (½ x 16 mm)
= 166 mm
Rasio Tulangan :
1,4
ρ min = fy
1,4
= 400
= 0,0035
0,85 β1 fc′ 600
ρ max = 0,75 x (600+fy)
fy
0,85 x 0,85 x 29,05 600
ρ max = 0,75 x (600+400) = 0,024
400
Mu ρ fy
= ρ fy (1 − 1,7 fc′)
∅bd2
19754 ρ −160000ρ2
2,44 = 49,385
D16 - 100
3.2.2 Paraphet
1. Data Teknis
P = 100 kg/m
0,9 m
2. Pembebanan
20 10 20
Luas A1 = 75 cm x 20 cm = 1500 cm2
Beban Mati
Berat sendiri = 0,3875 m2 x 25 KN/m3 x 1,3 = 12,594 KN/m
Pipa = 182,415 x 10-4 m2 x 236,8 kg/m x 2 = 8,639 KN
+
21,233 KN
Beban Hidup
Beban orang bekerja = 100kg/m = 1 KN/m
QU = qDL + qLL
= 21,233 KN + 1 KN
= 22,233 KN
Momen Ultimate :
Beban sandaran bekerjaa setinggi 90 cm dari lantai jembatan sehingga
momen terjadi
Mu = 0,9 x Pu
= 0,9 x 22,233 KN
= 20,010 KNm
3. Penulangan
Mutu beton (fc’) = 30 Mpa
Mutu baja = 400 Mpa
Diameter tulangan pokok = 13 mm
Diameter tulangan sengkang = 13 mm
Selimut beton (p) = 40 mm
𝛽1 = 0,85
d’ = Lebar paraphet – p – (½ x diameter)
= 500 mm – 40 mm – 13 - (½ x 13 mm)
= 440,500 mm
1,4
𝜌 𝑚𝑖𝑛 = 𝑓𝑦
1,4
= 400
= 0,0035
0,85 𝛽1 𝑓𝑐′ 600
𝜌 𝑚𝑎𝑥 = 0,75 𝑥 (600+𝑓𝑦)
fy
0,85 𝑥 0,85 𝑥 30 600
𝜌 𝑚𝑎𝑥 = 0,75 𝑥 (600+400) = 0,024
400
𝑀𝑢 ρ fy
= ρ fy (1 − 1,7 fc′)
∅bd2
20400 ρ −160000ρ2
0,129 =
51
D13 - 150
D 13 - 100
D13 - 150
15 120 15 30
15 15
90
60 60
95
10 150 95
10
(a) Gambar Memanjang (b) Gambar Melintang
a. Bahan Struktural
Kuat tekan beton (fc’) = 30 Mpa
Mutu baja (fy) = 400 Mpa
Berat beton bertulang = 25 KN/m3
b. Pembebanan
Berat sendiri total
= 0,3 m x 0,9 m x 25 KN/m3 x 1,3
= 8,775 KN/m
Segitiga atas
= (1/2 x 2 x 0,15 m x 0,15 x 0,3 m x 25KN/m3 x 1,3)/1,30
= - 0,169 KN/m
Segitiga bawah
= (1/2 x 2 x 0,1 m x 0,60 x 0,3 x 25 KN/m3 x 1,3)/1,7
= 0,344 KN/m
Wu = 8,775 KN/m – 0,169 KN/m + 0,344 KN/m
= 8,950 KN/m
Momen Lapangan :
1
MuL = 8 𝑥 𝑊𝑢 𝑥 𝑙 2
1
= 8 𝑥 8,950 𝐾𝑁/𝑚 𝑥 1,72
= 3,233 KNm
Momen Tumpuan :
1
MuT = 8 𝑥 𝑊𝑢 𝑥 𝑙 2
1
= 24 𝑥 8,950 𝐾𝑁/𝑚 𝑥 1,72
= 1,078 KNm
c. Penulangan
Penulangan Lapangan :
Momen lapangan = 3,233 KN/m
Mutu beton (fc’) = 30 Mpa
Mutu baja (fy) = 400 Mpa
Diameter tulangan pokok = 19 mm
Diameter tulangan pembagi = 13 mm
Tebal selimut beton (p) = 40 mm
= 0,0035
0,85 𝛽1 𝑓𝑐′ 600
𝜌 𝑚𝑎𝑥 = 0,75 𝑥 ( )
fy 600+𝑓𝑦
0,85 𝑥 0,85 𝑥 30 600
𝜌 𝑚𝑎𝑥 = 0,75 𝑥 400
(600+400) = 0,024
𝑀𝑢 ρ fy
= ρ fy (1 − 1,7 fc′)
∅bd2
20400 ρ −160000ρ2
0,0192 = 51
Luas Tulangan :
As = ρ x b x d’
= 0,0035 x 300 x 837,500 mm
= 879,375 mm2
Tulangan yang dipakai 6 D19-100 (1701,172 mm2)
Tulangan Pembagi :
0,18
As perlu = xbxh
100
0,18
= x 300 x 900 mm
100
= 486 mm2
1⁄
4 𝑥 𝜋 𝑥 132
As pakai = 𝑥 1700
150
= 1504,3 mm2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖
n = 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢
1504,13
= = 11,3 ~ 11 𝑏𝑎𝑡𝑎𝑛𝑔
486
Penulangan Tumpuan :
Momen tumpuan = 1,078 KN/m
Mutu beton (fc’) = 30 Mpa
Mutu baja (fy) = 400 Mpa
Diameter tulangan pokok = 19 mm
Diameter tulangan pembagi = 13 mm
Tebal selimut beton (p) = 40 mm
Jarak tulangan dengan serat terluar (d’)
d’ = tinggi diafragma – selimut beton - diameter tulangan
pembagi – ½ tulangan pokok
= 900 mm – 40 mm – 13 mm – ½ x 19 mm
= 837,500 mm
1,4
𝜌 𝑚𝑖𝑛 = 𝑓𝑦
1,4
= 400
= 0,0035
0,85 𝛽1 𝑓𝑐′ 600
𝜌 𝑚𝑎𝑥 = 0,75 𝑥 (600+𝑓𝑦)
fy
0,85 𝑥 0,85 𝑥 30 600
𝜌 𝑚𝑎𝑥 = 0,75 𝑥 (600+400) = 0,024
400
𝑀𝑢 ρ fy
= ρ fy (1 − 1,7 fc′)
∅bd2
20400 ρ −160000ρ2
0,0064 = 51
Luas Tulangan :
As = ρ x b x d’
= 0,0035 x 300 x 837,500 mm
= 879,375 mm2
Tulangan yang dipakai 6 D19-100 (1701,172 mm2)
Tulangan Pembagi :
0,18
As perlu = xbxh
100
0,18
= x 300 x 900 mm
100
= 486 mm2
1⁄
4 𝑥 𝜋 𝑥 132
As pakai = 𝑥 1700
150
= 1504,3 mm2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖
n = 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢
1504,13
= = 11,3 ~ 11 𝑏𝑎𝑡𝑎𝑛𝑔
486
15 120 15 30
D13-150
6 D19
90
170