PT MULTIBANGUN ADHITAMA KONSTRUKSI

PROYEK HARCO GLODOK JAKARTA


1

PJG TUMPUAN DIMENSI BALOK Sengkang


TBL PLAT Pjg
NO DESKRIPSI TIPE JML Spasi Posisi
Dia Berat
Kiri Kanan Lo L T Tump. Lap. Tump. Tump. Lap. Tump. Tump. Lap. Tump.
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (kg/m) (m) (m) (m) (bh) (bh) (bh)

A BALOK PINGGIR ( Luar )


TENDER

1 As. 7'-8/A'-C Lantai 1 - 5


BALOK Ki End Ka End G5 5 - - 11.23 0.40 0.80 0.18 TOP 2.81 5.61 2.81 0.010 0.62 0.100 0.150 0.100 29 39 29
TOP 8 4 6 400 x 800 BOT 1.68 7.86 1.68 TIES X
BOT 4 4 3 TIES Y
TIES Y
TIES Y
SUBTOT

2 As. 8'-10/D' Lantai 1 - 5


BALOK Ki End Ka End G1 5 - - 11.46 0.40 0.90 0.18 TOP 2.87 5.73 2.87 0.010 0.62 0.100 0.100 0.100 29 59 29
TOP 8 4 10 400 x 900 BOT 1.72 8.02 1.72 TIES X
BOT 4 8 5 TIES Y
TIES Y
TIES Y
SUBTOT

3 As. 7'-8/A'-C Lantai 6


BALOK Ki End Ka End G6 1 - - 11.23 0.40 0.80 0.18 TOP 2.81 5.61 2.81 0.010 0.62 0.100 0.150 0.100 29 39 29
TOP 8 4 8 400 x 800 BOT 1.68 7.86 1.68 TIES X
BOT 4 8 4 TIES Y
TIES Y
TIES Y
SUBTOT

4 As. 8'-10/D' Lantai 6


BALOK Ki End Ka End G1 1 - - 11.46 0.40 0.90 0.18 TOP 2.87 5.73 2.87 0.010 0.62 0.100 0.100 0.100 29 59 29
TOP 8 4 10 400 x 900 BOT 1.72 8.02 1.72 TIES X
BOT 4 8 5 TIES Y
TIES Y
TIES Y
SUBTOT

FORCON

1 As. 7'-8/A'-C Lantai 3, 5, 6, 7


BALOK Ki End Ka End G30 4 - - 11.45 0.70 0.60 0.15 TOP 2.86 5.73 2.86 0.010 0.62 0.100 0.100 0.100 29 59 29
TOP 11 9 16 700 x 600 BOT 1.72 8.02 1.72 TIES X
BOT 9 15 14 TIES Y
TIES Y
TIES Y
SUBTOT

2 As. 8'-10/D' Lantai 3, 5, 6, 7


BALOK Ki End Ka End G30 4 - - 11.45 0.70 0.60 0.15 TOP 2.86 5.73 2.86 0.010 0.62 0.100 0.100 0.100 29 59 29
TOP 11 9 16 700 x 600 BOT 1.72 8.02 1.72 TIES X
BOT 9 15 14 TIES Y
TIES Y
TIES Y
SUBTOT
PEMBESIAN
Tulangan Pokok
BESI BEKISTING BETON WATERPROFING

Jml Pjg Volume Dia Berat Pjg Jml Volume Dia Berat Pjg Jml Volume
Utama Pgg
(bh) (m) (kg) (m) (kg/m) (m) (bh) (kg) (m) (kg/m) (m) (bh) (kg) (kg) (m2) (m3) (m3)

97.00 2.39 714.62 0.022 2.98 MENERUS 12.62 7 1,318.15 0.010 0.62 MENERUS 12.62 4 155.63 2,707.55 92.05 13.92 13.92
0.47 - KI ATAS 3.93 4 234.75
0.87 - KI BAWAH 2.81 1 41.94
2.07 - MID ATAS 6.14 - -
2.16 - MID BAWAH 8.39 1 125.11
714.62 KA ATAS 3.93 2 117.37
KA BAWAH 2.81 - -
SUBTOTAL 1,837.31

117.00 2.59 934.09 0.022 2.98 MENERUS 12.86 8 1,534.98 0.010 0.62 MENERUS 12.86 4 158.57 3,991.73 105.47 16.51 16.51
29.00 0.47 42.01 KI ATAS 3.99 4 238.31
58.00 0.97 173.42 KI BAWAH 2.85 - -
2.27 - MID ATAS 6.26 - -
2.36 - MID BAWAH 8.55 4 510.41
1,149.53 KA ATAS 3.99 6 357.47
KA BAWAH 2.85 1 42.47
SUBTOTAL 2,683.64

97.00 2.39 142.92 0.022 2.98 MENERUS 12.62 8 301.29 0.010 0.62 MENERUS 12.62 4 31.13 669.32 18.41 2.78 2.78
0.47 - KI ATAS 3.93 4 46.95
0.87 - KI BAWAH 2.81 - -
2.07 - MID ATAS 6.14 - -
2.16 - MID BAWAH 8.39 4 100.08
142.92 KA ATAS 3.93 4 46.95
KA BAWAH 2.81 - -
SUBTOTAL 495.27

117.00 2.59 186.82 0.022 2.98 MENERUS 12.86 8 307.00 0.010 0.62 MENERUS 12.86 4 31.71 798.35 21.09 3.30 3.30
29.00 0.47 8.40 KI ATAS 3.99 4 47.66
58.00 0.97 34.68 KI BAWAH 2.85 - -
2.27 - MID ATAS 6.26 - -
2.36 - MID BAWAH 8.55 4 102.08
229.91 KA ATAS 3.99 6 71.49
KA BAWAH 2.85 1 8.49
SUBTOTAL 536.73

8,166.95 237.02 36.51 36.51

117.00 2.59 850.97 0.022 2.98 MENERUS 12.85 18 2,760.17 0.010 0.62 MENERUS 12.85 4 126.73 5,707.64 81.75 18.16 18.16
59.00 0.77 112.03 KI ATAS 3.99 2 95.25
29.00 1.89 135.16 KI BAWAH 2.84 - -
59.00 1.83 265.72 MID ATAS 6.25 - -
29.00 3.45 246.63 MID BAWAH 8.54 6 611.84
1,610.52 KA ATAS 3.99 7 333.36
KA BAWAH 2.84 5 169.78
SUBTOTAL 3,970.39

117.00 2.59 850.97 0.022 2.98 MENERUS 12.85 18 2,760.17 0.010 0.62 MENERUS 12.85 4 126.73 5,707.64 81.75 18.16 18.16
59.00 0.77 112.03 KI ATAS 3.99 2 95.25
29.00 1.89 135.16 KI BAWAH 2.84 - -
59.00 1.83 265.72 MID ATAS 6.25 - -
29.00 3.45 246.63 MID BAWAH 8.54 6 611.84
1,610.52 KA ATAS 3.99 7 333.36
KA BAWAH 2.84 5 169.78
SUBTOTAL 3,970.39

11,415.28 163.50 36.33 36.33