ANALISIS KOMPONEN BANGUNAN UNTUK PENETAPAN NILAI SISA BANGUNAN GEDUNG

NILAI JUAL BAHAN BANGUNAN BEKAS


NAMA BANGUNAN : -

TAHUN DIBANGUN : -
JUMLAH TINGKAT : - Lt LEMBAGA : -
LUAS TOTAL LANTAI BANGUNAN : - m2
ANALISIS LANTAI KE- : - PEMAKAI : -
ALAMAT : -
KELAS BANGUNAN : -

NILAI JUAL BAHAN BANGUNAN


NILAI SISA BANGUNAN VOLUME (Rp.)
KOMPONEN SUB KOMP. MACAM BAHAN BANGUNAN
No. HARGA SAT.
BANGUNAN BANGUNAN BOBOT NILAI LAYAK JUAL HRG JUAL
VOL. KONS. KOEF. BAHAN VOL. BAHAN BAHAN
(%) (%) BAHAN
BEKAS
1. PONDASI PONDASI - -
2. STRUKTUR KOLOM, BALOK& SLOOF - -
3. ATAP KUDA-KUDA/GORDING/KASO - -
PENUTUP ATAP - -
4. PLAFOND RANGKA LANGIT-LANGIT - -
PENUTUP LANGIT-LANGIT - -
5. DINDING BATU BATA - -
PLESTERAN - -
K A C A - -
DAUN PINTU / JENDELA - -
KOSEN - -
6. LANTAI PENUTUP LANTAI - -
7. UTILITAS INSTALASI LISTRIK - -
INSTALASI AIR - -
DRAINASE LIMBAH - -
8 FINISHING FINISHING DINDING - -
( CAT TEMBOK )
FINISHING LANGIT - LANGIT - -
( CAT )
FINISHING KUSEN / - -
DAUN PINTU ( CAT KAYU )
JUMLAH - -
NILAI TAKSIRAN -
PERHITUNGAN NILAI SISA BANGUNAN
NILAI TAKSIR HARGA JUAL MATERIAL = Rp -
BIAYA PEMBONGKARAN = 10% x H.J.M. -
BIAYA TRANSPORT = 5% x H.J.M. - (+) = Rp - (-)
Dibulatkan menjadi
AJUAN BIAYA PEKERJAAN = Rp - = Rp -
Terbilang : (................................................................................................................)

Dibuat Oleh,

Unsur Teknis

Moh. Fadil , A.Md Mughni, A.Md


Nip. 19740609 200112 1 002 Nip. 19781201 200212 1 004