PROJECT: OWNER:
Date : #NAME?
Contractor : Revision :0
MATERIAL
MATERIAL FABRICATION INSTALLATION TOTAL PRICE
TRANSPORT
NO DESCRIPTION QTY UNIT
Local Local Local Local Local
(Rp) (Rp) (Rp) (Rp) (Rp)
DC DIRECT COST
JEMBATAN BETON 10 M, H = 6,4 M (100% BM) - TANAH
1.01 1 lot #NAME? #NAME? #NAME? #NAME? #NAME?
MINERAL
JEMBATAN BETON 15 M, H = 6,7 M - (100% BM) TANAH
1.02 1 lot #NAME? #NAME? #NAME? #NAME? #NAME?
MINERAL
IC INDIRECT COST
IC.04 Construction Services 1 lot -
MATERIAL TRANSPORT
BASE COST MATERIAL WEIGHT
NO DESCRIPTION UNIT (M³ / Ton) TRANSPORTATION
Local BASE
(Rp) Owner Contractor
TRANSPORATION BASE
1 (M³ / Ton)
2 (M³ / Ton)
3 (M³ / Ton)
4 (M³ / Ton)
5 (M³ / Ton)
Keterangan:
1. Volume di atas hanya sebagai panduan, kontraktor harus tetap menghitung ulang
2. Pemisahan harga dasar dengan biaya transportasi hanya untuk material baja dan tiang pancang yang berbobot besar
INSTALLATION FABRICATION
NO DESCRIPTION Base Cost Base Cost
Unit Unit
(Rp) (Rp)
TOTAL TOTAL
MATERIAL MAT. TRANSPORT
TOTAL MATERIAL TRANSPORT
NO DESCRIPTION
Local Local VOLUME Local Local
Unit (Rp) Unit (Rp) (Rp) (Rp)
MATERIAL
1 Architectural #NAME? #NAME?
1.1 Pasir Pasang m³ #NAME? mt #NAME? - #NAME? #NAME?
2 Civil #NAME? #N/A
2.1 Alat Bantu Pengecoran (Kereta Dorong, Rel Papan, Dll) m³ #NAME? mt #N/A - #NAME? #N/A
2.2 Batu Kali m³ #NAME? mt #N/A - #NAME? #N/A
2.3 Benang Nylon rl #NAME? mt #N/A - #NAME? #N/A
2.4 Besi Beton > Ø 12 mm kg #NAME? mt #N/A - #NAME? #N/A
2.5 Besi Beton ≤ Ø 12 mm kg #NAME? mt #N/A - #NAME? #N/A
2.6 Cerucuk Kayu dia. 15 cm @ 4 m point #NAME? mt #N/A - #NAME? #N/A
2.7 Cofferdam lot #NAME? mt #N/A - #NAME? #N/A
2.8 Elastomeric 450 x 350 x 30 mm pc #NAME? mt #N/A - #NAME? #N/A
2.9 Elastomeric 500 x 450 x 30 mm pc #NAME? mt #N/A - #NAME? #N/A
2.10 Ijuk kg #NAME? mt #N/A - #NAME? #N/A
2.11 Kawat Beton/Bendrat kg #NAME? mt #N/A - #NAME? #N/A
2.12 Kayu Balok 4/6 - 4 m Kelas II pc #NAME? mt #N/A - #NAME? #N/A
2.13 Kayu Galam Ø 3 cm - 4 m bar #NAME? mt #N/A - #NAME? #N/A
2.14 Kayu Galam Ø 7 cm - 6 m bar #NAME? mt #N/A - #NAME? #N/A
2.15 Kayu Papan 2/20 - 4 m Kelas II pc #NAME? mt #N/A - #NAME? #N/A
2.16 Kerikil/koral m³ #NAME? mt #N/A - #NAME? #N/A
2.17 Paku 2" kg #NAME? mt #N/A - #NAME? #N/A
2.18 Paku 2,5" kg #NAME? mt #N/A - #NAME? #N/A
2.19 Paku 3" kg #NAME? mt #N/A - #NAME? #N/A
2.20 Paku 4" kg #NAME? mt #N/A - #NAME? #N/A
2.21 Pasir Beton/Cor m³ #NAME? mt #N/A - #NAME? #N/A
2.22 Pasir Urug m³ #NAME? mt #N/A - #NAME? #N/A
2.23 Semen PC Type 1 @ 50 Kg bag #NAME? mt #N/A - #NAME? #N/A
2.24 Split m³ #NAME? mt #N/A - #NAME? #N/A
2.25 Triplek 9 mm pc #NAME? mt #N/A - #NAME? #N/A
3 Painting #NAME? #NAME?
3.1 Cat Genteng Matex produk Nippon Paint kg #NAME? mt #NAME? - #NAME? #NAME?
4 Piping #NAME? #NAME?
4.1 Pipa PVC 2" D - 4 m pc #NAME? mt #NAME? - #NAME? #NAME?
5 Steel Structural #NAME? #NAME?
5.1 Baut Angker Ø 16 mm - 250 mm pc #NAME? mt #NAME? - #NAME? #NAME?
5.2 Besi Beton ≤ Ø 12 mm (tanpa kawat beton) kg #NAME? mt #NAME? - #NAME? #NAME?
5.3 Pembesian > dia. 12 mm (tanpa kawat beton) kg #NAME? mt #NAME? - #NAME? #NAME?
5.4 Plat > 8 mm kg #NAME? mt #NAME? - #NAME? #NAME?
TOTAL TOTAL
INSTALLATION FABRICATION
TOTAL INSTALLATION FABRICATION
NO DESCRIPTION
Base Cost Base Cost VOLUME
Unit (Rp) Unit (Rp) (Rp) (Rp)
I WOODEN PILE #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.1 Pancang Cerucuk Kayu dia. 15 cm @ 4 m point 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Cerucuk Kayu dia. 15 cm @ 4 m Material point 1.00 1.00 #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pancang Cerucuk Kayu dia. 15 cm @ 4 m Installation point 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
II EARTH WORK #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
2.1 Galian Tanah Installation m³ 1.00 1.00 #N/A - - - #N/A - - - - #N/A
2.2 Urug Pasir m³ 1.00 1.00 #NAME? - - - #N/A - - - - #NAME?
Urug Pasir Installation m³ 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
Pasir Urug Material m³ 1.20 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
2.3 Urugan Tanah & Pemadatan Installation m³ 1.00 1.00 #N/A - - - #N/A - - - - #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
III CONCRETE WORK #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
3.1 Bekisting Dinding Multiplek 9 mm m² 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Triplek 9 mm Material pc 0.17 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kayu Balok 4/6 - 4 m Kelas II Material pc 2.50 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Paku 2" Material kg 0.08 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Bekisting Dinding Multiplek 9 mm Installation m² 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
3.2 Bekisting Plat Lantai Multiplek 9 mm m² 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Triplek 9 mm Material pc 0.35 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kayu Balok 4/6 - 4 m Kelas II Material pc 2.50 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Paku 2" Material kg 0.08 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Bekisting Plat Lantai Multiplek 9 mm Installation m² 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
3.3 Bekisting Setempat Multiplek 9 mm m² 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Triplek 9 mm Material pc 0.35 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kayu Balok 4/6 - 4 m Kelas II Material pc 2.67 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Paku 2" Material kg 0.08 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Bekisting Setempat Multiplek 9 mm Installation m² 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
3.4 Lantai Kerja m² 1.00 1.00 #NAME? - - - #N/A - - - - #NAME?
Lantai Kerja Installation m² 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
Semen PC Type 1 @ 50 Kg Material bag 0.23 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pasir Beton/Cor Material m³ 0.03 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kerikil/koral Material m³ 0.05 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
3.5 Pembesian > dia. 12 mm (IFP) kg 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Besi Beton > Ø 12 mm Material kg 1.05 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kawat Beton/Bendrat Material kg 0.02 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pembesian > dia. 12 mm (IFP) Installation kg 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
3.6 Pembesian ≤ dia. 12 mm (IFP) kg 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Besi Beton ≤ Ø 12 mm Material kg 1.05 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kawat Beton/Bendrat Material kg 0.02 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pembesian £ dia. 12 mm (IFP) Installation kg 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
3.7 Pengecoran (K 175) Bentang > 6 M m³ 1.00 1.00 #N/A - - - #N/A - - 149.17 2,700,000 #N/A
Semen PC Type 1 @ 50 Kg Material bag 6.60 101,000.00 #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pasir Beton/Cor Material m³ 0.50 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Split Material m³ 0.80 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Alat Bantu Pengecoran (Kereta Dorong, Rel Papan, Dll) Material m³ 1.00 1.00 #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pengecoran (K 175) Bentang > 6 M Installation m³ 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 149.17 2,700,000 #N/A
3.8 Pengecoran Abutment m³ 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Semen PC Type 1 @ 50 Kg Material bag 2.01 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pasir Beton/Cor Material m³ 0.23 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Split Material m³ 0.32 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Batu Kali Material m³ 0.72 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pengecoran Abutment Installation m³ 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
3.9 Steiger Bentang > 6 M m² 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Kayu Galam Ø 7 cm - 6 m Material bar 10.00 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Paku 4" Material kg 0.32 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kayu Galam Ø 3 cm - 4 m Material bar 8.00 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Paku 3" Material kg 0.52 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Steiger Bentang > 6 M Installation m² 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
IV MISCELLANEOUS CIVIL #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.1 Cofferdam Material & Install lot 1.00 1.00 #NAME? - - - #N/A - - - - #NAME?
4.2 Elastomeric 450 x 350 x 30 mm Material & Install pc 1.00 1.00 #NAME? - - - #N/A - - - - #NAME?
4.3 Elastomeric 500 x 450 x 30 mm Material & Install pc 1.00 1.00 #NAME? - - - #N/A - - - - #NAME?
4.4 Ijuk Material & Install kg 1.00 1.00 #NAME? - - - #N/A - - - - #NAME?
4.5 Pasang Bowplank m 1.00 1.00 #NAME? - - - #N/A - - 2.76 50,000 #NAME?
Pasang Bowplank Installation m 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2.76 50,000 #N/A
Kayu Papan 2/20 - 4 m Kelas II Material pc 0.26 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Kayu Balok 4/6 - 4 m Kelas II Material pc 0.18 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Paku 2,5" Material kg 0.01 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Benang Nylon Material rl 0.02 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
V STEEL PROFILE #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
5.1 Pembesian > dia. 12 mm (tanpa kawat beton) kg 1.00 1.00 #NAME? - - - #NAME? - - - - #NAME?
Pembesian > dia. 12 mm (tanpa kawat beton) Fabrication kg 1.00 1.00 #N/A - - #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Pembesian > dia. 12 mm (tanpa kawat beton) Installation kg 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
Pembesian > dia. 12 mm (tanpa kawat beton) Material kg 1.01 - #NAME? #N/A #N/A - #NAME? #N/A #N/A #N/A #N/A #NAME?
5.2 Pembesian ≤ dia. 12 mm (tanpa kawat beton) kg 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Besi Beton ≤ Ø 12 mm (tanpa kawat beton) Material kg 1.01 - #NAME? #N/A #N/A - #NAME? #N/A #N/A #N/A #N/A #NAME?
Besi Beton ≤ Ø 12 mm (tanpa kawat beton) Installation kg 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
Besi Beton ≤ Ø 12 mm (tanpa kawat beton) Fabrication kg 1.00 1.00 #N/A - - #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VI PLATE #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
6.1 Pekerjaan Baja Plat > 8 mm (Fabrikasi & Erection) (IFP) kg 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Plat > 8 mm Material kg 1.05 - #NAME? #N/A #N/A - #NAME? #N/A #N/A #N/A #N/A #NAME?
Pekerjaan Baja Plat > 8 mm (IFP) Fabrication kg 1.00 1.00 #N/A - - #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Pekerjaan Baja Plat > 8 mm (IFP) Installation kg 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VII ACCESSORIES STEEL STRUCTURE #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
7.1 Baut Angker Ø 16 mm - 250 mm pc 1.00 1.00 #NAME? - - - #NAME? - - - - #NAME?
Baut Angker Ø 16 mm - 250 mm Material pc 1.00 1.00 #NAME? #N/A #N/A - #NAME? #N/A #N/A #N/A #N/A #NAME?
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VIII WALLS/ PARTITION #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8.1 Plesteran 1:2 + Acian m² 1.00 1.00 #NAME? - - - #NAME? - - - - #NAME?
Plesteran 1:2 + Acian Installation m² 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
Semen PC Type 1 @ 50 Kg Material bag 0.17 - #NAME? #N/A #N/A - #N/A #N/A #N/A #N/A #N/A #NAME?
Pasir Pasang Material m³ 0.02 - #NAME? #N/A #N/A - #NAME? #N/A #N/A #N/A #N/A #NAME?
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
IX PIPE & FITIING #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9.1 Pipa PVC 2" D - 4 m pc 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Pipa PVC 2" D - 4 m Material pc 1.01 - #NAME? #N/A #N/A - #NAME? #N/A #N/A #N/A #N/A #NAME?
Pipa PVC 2" D - 4 m Installation pc 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
X WALLS PAINTING #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
10.1 Pengecatan Kanstin m² 1.00 1.00 #N/A - - - #N/A - - - - #N/A
Cat Genteng Matex produk Nippon Paint Material kg 0.50 - #NAME? #N/A #N/A - #NAME? #N/A #N/A #N/A #N/A #NAME?
Pengecatan Kanstin Installation m² 1.00 1.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A - - #N/A
TOTAL P : #NAME?
CONTRA :
I JEMBATAN BETON 10 M, H = 6,4 M (100% BM) - TANAH MINE 18-55-47-139 lot 1.00 1.00 #NAME? #NAME?
1.1 PEKERJAAN TANAH & PONDASI lot 1.00 1.00 #NAME? #NAME?
1.1.1 Cofferdam ( bendung sementara ) lot 1.00 1.00 #NAME? #NAME?
Cofferdam lot 1.00 #NAME? #NAME?
1.1.2 Bowplank lot 1.00 1.00 #NAME? #NAME?
Pasang Bowplank m 8.60 #NAME? #NAME?
1.1.3 Abutment lot 1.00 1.00 #NAME? #NAME?
Pancang Cerucuk Kayu dia. 15 cm @ 4 m point 198.00 #N/A #N/A
Galian Tanah m³ 49.54 #N/A #N/A
Urugan Tanah & Pemadatan m³ 12.38 #N/A #N/A
Urug Pasir m³ 4.13 #NAME? #NAME?
Lantai Kerja m² 41.28 #NAME? #NAME?
Bekisting Dinding Multiplek 9 mm m² 109.70 #N/A #N/A
Pengecoran Abutment m³ 106.50 #N/A #N/A
Pembesian > dia. 12 mm (tanpa kawat beton) Besi Beton D 25 mm kg 110.46 #NAME? #NAME?
Pembesian > dia. 12 mm (tanpa kawat beton) Besi Beton D 16 mm kg 398.91 #NAME? #NAME?
Pembesian ≤ dia. 12 mm (tanpa kawat beton) Besi Beton Ø 12 mm kg 52.74 #N/A #N/A
Ijuk kg 14.40 #NAME? #NAME?
Pipa PVC 2" D - 4 m pc 28.80 #N/A #N/A
Plesteran 1:2 + Acian m² 44.72 #NAME? #NAME?
1.1.4 Sayap Jembatan lot 1.00 1.00 #NAME? #NAME?
Pancang Cerucuk Kayu dia. 15 cm @ 4 m point 84.00 #N/A #N/A
Galian Tanah m³ 40.62 #N/A #N/A
Urugan Tanah & Pemadatan m³ 10.16 #N/A #N/A
Urug Pasir m³ 1.11 #NAME? #NAME?
Lantai Kerja m² 11.06 #NAME? #NAME?
Bekisting Dinding Multiplek 9 mm m² 152.94 #N/A #N/A
Pengecoran Abutment m³ 67.63 #N/A #N/A
Pembesian > dia. 12 mm (tanpa kawat beton) Besi Beton D 16 mm kg 93.12 #NAME? #NAME?
Pembesian ≤ dia. 12 mm (tanpa kawat beton) Besi Beton Ø 12 mm kg 22.37 #N/A #N/A
Ijuk kg 5.74 #NAME? #NAME?
Pipa PVC 2" D - 4 m pc 11.48 #N/A #N/A
Plesteran 1:2 + Acian m² 61.36 #NAME? #NAME?
Remarks : Estimation quantity only as guidance, all bidders shall review & calculate regarding to specifications, drawings and documentations.
TOTAL P : #NAME?
CONTRA :
I JEMBATAN BETON 15 M, H = 6,7 M - (100% BM) TANAH MINE 18-55-47-139 lot 1.00 1.00 #NAME? #NAME?
1.1 PEKERJAAN TANAH & PONDASI lot 1.00 1.00 #NAME? #NAME?
1.1.1 Cofferdam ( bendung sementara ) lot 1.00 1.00 #NAME? #NAME?
Cofferdam lot 1.00 #NAME? #NAME?
1.1.2 Bowplank lot 1.00 1.00 #NAME? #NAME?
Pasang Bowplank m 8.60 #NAME? #NAME?
1.1.3 Abutment lot 1.00 1.00 #NAME? #NAME?
Pancang Cerucuk Kayu dia. 15 cm @ 4 m point 216.00 #N/A #N/A
Galian Tanah m³ 54.18 #N/A #N/A
Urugan Tanah & Pemadatan m³ 13.55 #N/A #N/A
Urug Pasir m³ 4.52 #NAME? #NAME?
Lantai Kerja m² 45.15 #NAME? #NAME?
Bekisting Dinding Multiplek 9 mm m² 118.74 #N/A #N/A
Pengecoran Abutment m³ 123.45 #N/A #N/A
Pembesian > dia. 12 mm (tanpa kawat beton) Besi Beton D 25 mm kg 110.46 #NAME? #NAME?
Pembesian > dia. 12 mm (tanpa kawat beton) Besi Beton D 16 mm kg 476.00 #NAME? #NAME?
Pembesian ≤ dia. 12 mm (tanpa kawat beton) Besi Beton Ø 12 mm kg 57.53 #N/A #N/A
Ijuk kg 16.33 #NAME? #NAME?
Pipa PVC 2" D - 4 m pc 32.66 #N/A #N/A
Plesteran 1:2 + Acian m² 47.30 #NAME? #NAME?
1.1.4 Sayap Jembatan lot 1.00 1.00 #NAME? #NAME?
Pancang Cerucuk Kayu dia. 15 cm @ 4 m point 108.00 #N/A #N/A
Galian Tanah m³ 48.20 #N/A #N/A
Urugan Tanah & Pemadatan m³ 12.05 #N/A #N/A
Urug Pasir m³ 1.47 #NAME? #NAME?
Lantai Kerja m² 14.69 #NAME? #NAME?
Bekisting Dinding Multiplek 9 mm m² 189.73 #N/A #N/A
Pengecoran Abutment m³ 96.00 #N/A #N/A
Pembesian > dia. 12 mm (tanpa kawat beton) Besi Beton D 16 mm kg 110.48 #NAME? #NAME?
Pembesian ≤ dia. 12 mm (tanpa kawat beton) Besi Beton Ø 12 mm kg 28.77 #N/A #N/A
Ijuk kg 5.84 #NAME? #NAME?
Pipa PVC 2" D - 4 m pc 11.69 #N/A #N/A
Plesteran 1:2 + Acian m² 77.00 #NAME? #NAME?
Remarks : Estimation quantity only as guidance, all bidders shall review & calculate regarding to specifications, drawings and documentations.
Project Duration
No Description Quantity Unit
1 Project duration estimated by QSCE 4 Month(s)
2 Project duration estimated by Kontraktor Month(s)
Indirect Cost
UNIT PRICE TOTAL COST
QUANTITY
NO DESCRIPTION UNIT (Rp) (Rp) REMARKS
QSCE Kontraktor Kontraktor Kontraktor
4 Construction Services -
4.1 OHSE -
A. Alat Pelindung Diri -
* Safety Vest Set 12 -
* Pelindung tangan Set 12 -
* Pelindung kaki Worker Set 12 -
* Pelindung kepala Set 12 -
B. Pelindung bahaya jatuh -
* Safety Line 3"X 500 M . Yellow & Black Set 1 -
C. Fire Fighting -
* Alat Pemadam Api Ringan Pcs 1 -
D. Clean Environment -
* Kotak K3 Unit 1 -
E. Others -
* Rapid Test Antigen Set 12 -
4.2 Temporary Godown -
Barak Pekerja m2 25.92 -
Index:
Must be filled by kontraktor (if it's necessary)
No calculation cost
REFERENCE LIST
Pekerjaan Sipil
1 Spesifikasi Teknis Jembatan Beton 01 Januari 2018 18-76-01-139 Rev 0
Layout & Detail Jembatan Beton Bentang 10 M - 100% BM
2 18 Januari 2019 18-55-47-139 Rev 0
(Tanah Mineral)
Layout & Detail Jembatan Beton Bentang 15 M - 100% BM
3 21 Januari 2019 18-55-47-139 Rev 0
(Tanah Mineral)