LAMPIRAN
DESAIN STRUKTUR BANGUNAN GEDUNG
PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN SHEARWALL
SERTA METODE PELAKSANAAN
PELAKSANAAN PEKERJAAN PONDASI
Mahasiswa
HISYAM ASHFAHANI
NRP. 3113041032
Dosen Pembimbing
Prof. Ir. M. SIGIT DARMAWAN, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
LAMPIRAN
DESAIN STRUKTUR BANGUNAN GEDUNG
PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN SHEARWALL
SERTA METODE PELAKSANAAN
PELAKSANAAN PEKERJAAN PONDASI
Mahasiswa
HISYAM ASHFAHANI
NRP. 3113041032
Dosen Pembimbing
Prof. Ir. M. SIGIT DARMAWAN, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
OLEH :
Hisyam Ashfahani
NRP. 3113041032
DOSEN PEMBIMBING:
175
Ø10 - 200
3.60
STRUKTUR TANGGA ; PLAT Ø10 - 200 FAKULTAS VOKASI
BETON BERTULANG t.15Omm
D13 - 200
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
D13 - 200
175
3.60 D13 - 200
D13 - 200
JUDUL TUGAS AKHIR TERAPAN
150
00 DESAIN STRUKTUR BANGUNAN
=6
ℓd GEDUNG PERKULIAHAN DI SURABAYA
300
ℓd = 600 MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
LANTAI KERAMIK 200 X 300
0
= 60 SPESI
ℓd DOSEN PEMBIMBING
175
175
D13 - 200
D13 - 200
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
175
NAMA MAHASISWA
175
A
30
30
D13 - 200
D13 - 200 300 300 Hisyam Ashfahani
135
135
D13 - 200
D13 - 200
D13 - 200
D13 - 200
NRP. 3113041032
300
KETERANGAN
360
30
30
30
30
30
500
30
30
17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5
MUTU BAJA = 400 Mpa
30 30
30 30
11 X 30
D13 - 150
12 X 30
330
360
D13 - 150
12 X 17.5
NAMA GAMBAR
30 30
30 30
D13 - 150
210.0
D13 - 150
D13 - 150
D13 - 150
30 30
30 30
DETAIL TANGGA 1
30
30
6
30
30 150 150 30
360
A STR -
19 69
B
D10 - 200
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
D10 - 200
1/4 Lx
FAKULTAS VOKASI
D10 - 200
D10 - 200 DIV DEPARTEMEN INFRASTRUKTUR SIPIL
D10 - 200
D10 - 200
DESAIN STRUKTUR BANGUNAN GEDUNG
PERKULIAHAN DI SURABAYA
D10 - 200
MENGGUNAKAN SRPMK DAN
Potongan B-B
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
Lx (Short Section)
DOSEN PEMBIMBING
D10 - 200
D10 - 200 D10 - 200
A D10 - 200 A
D10 - 200
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
D10 - 200
NAMA MAHASISWA
D10 - 200
D10 - 200
D10 - 200
1/4 Lx
D10 - 200 Hisyam Ashfahani
NRP. 3113041032
KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
D10 - 200 D10 - 200 D10 - 200 D10 - 200 NAMA GAMBAR
DETAIL PLAT S1
D10 - 200 D10 - 200 D10 - 200 D10 - 200
KODE GAMBAR SKALA
Potongan A-A
1/4 Ly 1/4 Ly STR 1 : 50
Ly (Long Section)
NO. LEMBAR JUMLAH LEMBAR
24 69
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
Ø8 - 200
PELAKSANAAN PEKERJAAN PONDASI
D10 - 200
Ø8 - 200
Lx (Short Section)
A Ø8 - 200 Ø8 - 200 A
D10 - 200
D10 - 200
D10 - 200
D10 - 200
D10 - 200
Ø8 - 200
Ø8 - 200
Ø8 - 200
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
D10 - 200
Ø8 - 200 NAMA MAHASISWA
D10 - 200
D10 - 200
1/4 Ly
Ø8 - 200
Hisyam Ashfahani
NRP. 3113041032
D10 - 200 Ø8 - 200 B Ø8 - 200 D10 - 200 KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
Ø8 - 200 D10 - 200 Ø8 - 200 Ø8 - 200 KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
Potongan A-A
NAMA GAMBAR
1/4 Ly 1/4 Ly
Ly (Long Section) DETAIL PLAT S3
STR 1 : 50
26 69
KODE
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
120 120 120 120 DIV DEPARTEMEN INFRASTRUKTUR SIPIL
GAMBAR
POTONGAN
JUDUL TUGAS AKHIR TERAPAN
700 700 700 700
DESAIN STRUKTUR BANGUNAN GEDUNG
PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
400 400 400 400 PELAKSANAAN PEKERJAAN PONDASI
DIMENSI ( mm ) 400 x 700 400 x 700 400 x 700 400 x 700 DOSEN PEMBIMBING
T. PLAT ( mm ) 120 120 120 120
TUL. ATAS 4 D 25 2 D 25 4 D 25 2 D 25
TUL. SAMPING 4 D 19 4 D 19 4 D 19 4 D 19
TUL. BAWAH 3 D 25 3 D 25 2 D 25 2 D 25
SENGKANG 2D13 - 80 2D13 - 125 2D13 - 100 2D13 - 150 Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
NAMA MAHASISWA
KODE
POSISI TUMPUAN LAPANGAN
Hisyam Ashfahani
120 120
GAMBAR NRP. 3113041032
POTONGAN KETERANGAN
700 700 FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
34 69
KODE
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
120 120 120 120 DIV DEPARTEMEN INFRASTRUKTUR SIPIL
GAMBAR
POTONGAN
JUDUL TUGAS AKHIR TERAPAN
600 600 600 600
DIMENSI ( mm ) 350 x 600 350 x 600 350 x 600 350 x 600 DOSEN PEMBIMBING
T. PLAT ( mm ) 120 120 120 120
TUL. ATAS 4 D 25 2 D 25 3 D 25 3 D 25
TUL. SAMPING 2 D 19 2 D 19 2 D 19 2 D 19
TUL. BAWAH 2 D 25 2 D 25 3 D 25 3 D 25
SENGKANG 2D13 - 80 2D13 - 125 2D13 - 100 2D13 - 150 Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
NAMA MAHASISWA
KODE
POSISI TUMPUAN LAPANGAN
Hisyam Ashfahani
120 120
GAMBAR NRP. 3113041032
POTONGAN KETERANGAN
600 600
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
350 350
NAMA GAMBAR
35 69
KODE
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
GAMBAR
120 120 120 120
POTONGAN
350 350 JUDUL TUGAS AKHIR TERAPAN
500 500
DESAIN STRUKTUR BANGUNAN GEDUNG
250 250 PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
300 300 SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
DIMENSI ( mm ) 300 x 500 300 x 500 250 x 350 250 x 350 DOSEN PEMBIMBING
T. PLAT ( mm ) 120 120 120 120
TUL. ATAS 3 D 19 2 D 19 2 D 25 2 D 25
TUL. SAMPING 2 D 19 2 D 19 2 D 19 2 D 19
TUL. BAWAH 2 D 19 2 D 19 2 D 25 2 D 25
SENGKANG 2Ø10 - 150 2Ø10 - 150 2Ø10 - 125 2Ø10 - 125 Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
NAMA MAHASISWA
KODE
POSISI TUMPUAN LAPANGAN
Hisyam Ashfahani
GAMBAR NRP. 3113041032
120 120
POTONGAN KETERANGAN
350 350
NAMA GAMBAR
36 69
B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35)
B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35)
B8 (25/35)
B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50)
B9 (25/35)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B8 (25/35)
B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B9 (25/35)
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
B5 (35/60) B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70) FAKULTAS VOKASI
B8 (25/35)
B8 (25/35)
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
B9 (25/35)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B1 (40/70)
B1 (40/70)
B9 (25/35) B9 (25/35) B9 (25/35) B7 (30/50)
B8 (25/35)
DESAIN STRUKTUR BANGUNAN GEDUNG
B3 (40/70) PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
DOSEN PEMBIMBING
4-D25 3-D25
2-D19 2-D19
2-D19 2-D19
3-D25 3-D25
800 13 x 2D13-80 13 x 2D13-125 600
NAMA MAHASISWA
700
Hisyam Ashfahani
NRP. 3113041032
1025 2050 1025
120 4800 KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
4D25 2D25 MUTU BAJA = 400 Mpa
400 400 37 69
B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35)
B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35)
B8 (25/35)
B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50)
B9 (25/35)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B8 (25/35)
B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B9 (25/35)
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
B5 (35/60) B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70) FAKULTAS VOKASI
B8 (25/35)
B8 (25/35)
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
B9 (25/35)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B1 (40/70)
B1 (40/70)
B9 (25/35) B9 (25/35) B9 (25/35) B7 (30/50)
B8 (25/35)
DESAIN STRUKTUR BANGUNAN GEDUNG
B3 (40/70) PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
DOSEN PEMBIMBING
4-D25 2-D25 4-D25
2-D19 2-D19 2-D19
2-D19 2-D19 2-D19
2-D25 2-D25 2-D25
800 16 x 2D13-100 21 x 2D13-150 16 x 2D13-100 800
NAMA MAHASISWA
700
Hisyam Ashfahani
NRP. 3113041032
1600 3200 1600
7200 KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
4D25 2D25 MUTU BAJA = 400 Mpa
400 400 38 69
B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35)
B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35)
B8 (25/35)
B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50)
B9 (25/35)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B8 (25/35)
B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B9 (25/35)
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
B5 (35/60) B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70) FAKULTAS VOKASI
B8 (25/35)
B8 (25/35)
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
B9 (25/35)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B1 (40/70)
B1 (40/70)
B9 (25/35) B9 (25/35) B9 (25/35) B7 (30/50)
B8 (25/35)
DESAIN STRUKTUR BANGUNAN GEDUNG
B3 (40/70) PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
3-D25 2-D25
DOSEN PEMBIMBING
2-D19 2-D19
2-D19 2-D19
2-D25 2-D25
800 10 x 2D13-100 14 x 2D13-150 800
KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
3D25 2D25 MUTU BAJA = 400 Mpa
400 400 39 69
B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35)
B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35)
B8 (25/35)
B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50)
B9 (25/35)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B8 (25/35)
B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B9 (25/35)
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
B5 (35/60) B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70) FAKULTAS VOKASI
B8 (25/35)
B8 (25/35)
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
B9 (25/35)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B1 (40/70)
B1 (40/70)
B9 (25/35) B9 (25/35) B9 (25/35) B7 (30/50)
B8 (25/35)
DESAIN STRUKTUR BANGUNAN GEDUNG
B3 (40/70) PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
600 600
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
700 600 600 700
NAMA MAHASISWA
KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
4D25 2D25
NAMA GAMBAR
120 120
DETAIL PENULANGAN BALOK B4
2D19 2D19
KODE GAMBAR SKALA
2Ø13-80 2Ø13-125
600 600
STR -
2D25 2D25
NO. LEMBAR JUMLAH LEMBAR
350 350
40 69
B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35)
B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35)
B8 (25/35)
B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50)
B9 (25/35)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B8 (25/35)
B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B9 (25/35)
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
B5 (35/60) B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70) FAKULTAS VOKASI
B8 (25/35)
B8 (25/35)
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
B9 (25/35)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B1 (40/70)
B1 (40/70)
B9 (25/35) B9 (25/35) B9 (25/35) B7 (30/50)
B8 (25/35)
DESAIN STRUKTUR BANGUNAN GEDUNG
B3 (40/70) PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
600 600
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
350 1000 NIP. 19630726 198903 1 003
600 600 700
300
NAMA MAHASISWA
250
500
KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
3D25 2D25
NAMA GAMBAR
120 120
DETAIL PENULANGAN BALOK B5
2D19 2D19
KODE GAMBAR SKALA
2Ø13-100 2Ø13-150
600 600
STR -
3D25 3D25
NO. LEMBAR JUMLAH LEMBAR
350 350
41 69
B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35)
B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35)
B8 (25/35)
B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50)
B9 (25/35)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B8 (25/35)
B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B9 (25/35)
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
B5 (35/60) B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70) FAKULTAS VOKASI
B8 (25/35)
B8 (25/35)
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
B9 (25/35)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B1 (40/70)
B1 (40/70)
B9 (25/35) B9 (25/35) B9 (25/35) B7 (30/50)
B8 (25/35)
DESAIN STRUKTUR BANGUNAN GEDUNG
B3 (40/70) PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
600 600
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
250 250 600700
300 300
NAMA MAHASISWA
500 500
KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
3D25 2D25
NAMA GAMBAR
120 120
DETAIL PENULANGAN BALOK B6
2D19 2D19
KODE GAMBAR SKALA
2Ø13-100 2Ø13-150
600 600
STR -
2D25 2D25
NO. LEMBAR JUMLAH LEMBAR
350 350
42 69
B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35) B9 (25/35)
B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35) B9 (25/35) B8 (25/35) B8 (25/35)
B8 (25/35)
B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50)
B9 (25/35)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B8 (25/35)
B3 (40/70)
B7 (30/50)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B4 (35/60)
B9 (25/35)
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
B5 (35/60) B1 (40/70) B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70) FAKULTAS VOKASI
B8 (25/35)
B8 (25/35)
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
B9 (25/35)
B7 (30/50)
B7 (30/50)
B9 (25/35)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B3 (40/70)
B7 (30/50) B7 (30/50) B7 (30/50) B7 (30/50)
B8 (25/35)
B2 (40/70) B6 (35/60) B2 (40/70) B3 (40/70)
B1 (40/70)
B1 (40/70)
B9 (25/35) B9 (25/35) B9 (25/35) B7 (30/50)
B8 (25/35)
DESAIN STRUKTUR BANGUNAN GEDUNG
B3 (40/70) PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN
SHEARWALL SERTA METODE
PELAKSANAAN PEKERJAAN PONDASI
3-D19 2-D19
DOSEN PEMBIMBING
2-D19 2-D19
2-D19 2-D19
11 x 2Ø10-150 22 x 2Ø10-150
500 500
Hisyam Ashfahani
NRP. 3113041032
KETERANGAN
3D19 2D19
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
2D19 2D19
KODE GAMBAR SKALA
220 220
300 300
STR -
43 69
5D25
800
2D25
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
5D13 - 100 FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
2D25
JUDUL TUGAS AKHIR TERAPAN
800
2D25 DESAIN STRUKTUR BANGUNAN GEDUNG
PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN SHEARWALL
800 SERTA METODE PELAKSANAAN
5D25 PEKERJAAN PONDASI
DOSEN PEMBIMBING
800
5D25
Hisyam Ashfahani
2D25 NRP. 3113041032
5D13 - 150 KETERANGAN
2D25 FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
800 MUTU BETON = 35 Mpa
800 MUTU BAJA = 400 Mpa
2D25
NAMA GAMBAR
DETAIL PENULANGAN
5D25 KOLOM K1
800 STR -
47 69
4D25 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
2D25
JUDUL TUGAS AKHIR TERAPAN
4D13 - 100
2D25 DESAIN STRUKTUR BANGUNAN GEDUNG
600 PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN SHEARWALL
600 SERTA METODE PELAKSANAAN
4D25 PEKERJAAN PONDASI
DOSEN PEMBIMBING
600
Hisyam Ashfahani
4D25 NRP. 3113041032
KETERANGAN
2D25 FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
600 4D13 - 150 MUTU BAJA = 400 Mpa
600 STR -
48 69
Kolom 80/80
800
5D25
800
NAMA MAHASISWA
400
800
4D25 KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
2D25 KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
3D13 - 150
NAMA GAMBAR
600 2D25
600 350 DETAIL HUBUNGAN
BALOK-KOLOM
4D25
KODE GAMBAR SKALA
600
STR -
600
NO. LEMBAR JUMLAH LEMBAR
49 69
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
600 FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
DOSEN PEMBIMBING
1300
NAMA MAHASISWA
700
Hisyam Ashfahani
NRP. 3113041032
KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
NAMA GAMBAR
800
DETAIL HUBUNGAN
BALOK-KOLOM K1-K2
STR -
50 69
TIANG PANCANG Ø40 CM
80
60 100 100 60
SLOOF 30/50 ELV. +0,00
ELV. -0,20 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
60 FAKULTAS VOKASI
D25 - 150
D25 - 150
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
TANAH URUG
100
D25 - 150 ELV. -1,20 JUDUL TUGAS AKHIR TERAPAN
D25 - 150
ELV. -1,45
320 50
12D25 DESAIN STRUKTUR BANGUNAN GEDUNG
POER TEBAL 75 CM 75 PERKULIAHAN DI SURABAYA
100 100
MENGGUNAKAN SRPMK DAN SHEARWALL
D25 - 150 LANTAI KERJA 5 CM ELV. -2,20
100 ELV. -2,25 SERTA METODE PELAKSANAAN
PASIR URUG 10 CM ELV. -2,30 PEKERJAAN PONDASI
D25 - 150
TIANG PANCANG Ø40 CM
60 DOSEN PEMBIMBING
NAMA MAHASISWA
60
Hisyam Ashfahani
SLOOF 30/50 ELV. +0,00 NRP. 3113041032
TIANG PANCANG Ø40 CM ELV. -0,20
KETERANGAN
60 100 60 FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
TANAH URUG KONDISI TANAH = TANAH LUNAK
ELV. -1,20 MUTU BETON = 35 Mpa
60 D25 - 150 MUTU BAJA = 400 Mpa
D25 - 150
D25 - 150
220
60 100 100 60
ELV. -22,00 STR -
54 69
TIANG PANCANG Ø40 CM
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
60 100 100 60 DIV DEPARTEMEN INFRASTRUKTUR SIPIL
D25 - 150
DESAIN STRUKTUR BANGUNAN GEDUNG
PERKULIAHAN DI SURABAYA
MENGGUNAKAN SRPMK DAN SHEARWALL
120 SERTA METODE PELAKSANAAN
PEKERJAAN PONDASI
80
SLOOF 30/50 ELV. +0,00 DOSEN PEMBIMBING
D25 - 150 ELV. -0,20
120 TANAH URUG
D25 - 150
D25 - 150
D25 - 150
ELV. -1,20
50 12D25 Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
120 100 NIP. 19630726 198903 1 003
100 100
POER TEBAL 100 CM
720 NAMA MAHASISWA
ELV. -2,20
LANTAI KERJA 5 CM ELV. -2,25
PASIR URUG 10 CM ELV. -2,30
Hisyam Ashfahani
NRP. 3113041032
ELV. -22,00
60 100 100 60
KETERANGAN
120
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
60
NAMA GAMBAR
320
DETAIL PONDASI P3
STR -
55 69
TIANG PANCANG Ø40 CM
D25 - 150
D25 - 150
JUDUL TUGAS AKHIR TERAPAN
100
DESAIN STRUKTUR BANGUNAN GEDUNG
PERKULIAHAN DI SURABAYA
320 MENGGUNAKAN SRPMK DAN SHEARWALL
D25 - 150 SERTA METODE PELAKSANAAN
100 PEKERJAAN PONDASI
D25 - 150
DOSEN PEMBIMBING
60
720
NAMA MAHASISWA
80 80
SLOOF 30/50 ELV. +0,00 Hisyam Ashfahani
ELV. -0,20
NRP. 3113041032
TANAH URUG
KETERANGAN
D25 - 150
D25 - 150 FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
ELV. -1,20 KONDISI TANAH = TANAH LUNAK
50 12D25 50 12D25 MUTU BETON = 35 Mpa
100 MUTU BAJA = 400 Mpa
100 100 100 100
POER TEBAL 100 CM
ELV. -2,20
NAMA GAMBAR
LANTAI KERJA 5 CM ELV. -2,25
PASIR URUG 10 CM ELV. -2,30
DETAIL PONDASI P4
TIANG PANCANG Ø40 CM
ELV. -22,00
60 120 120 120 120 120 60
STR -
56 69
60 120 120 120 120 120 60
D25 - 150
D25 - 150
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
120
FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
D25 - 150
D25 - 150
120 JUDUL TUGAS AKHIR TERAPAN
120
60
720 Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
NIP. 19630726 198903 1 003
NAMA MAHASISWA
80 80
SLOOF 30/50 ELV. +0,00 Hisyam Ashfahani
ELV. -0,20
NRP. 3113041032
D25 - 150 KETERANGAN
D25 - 150
ELV. -0,90
TANAH URUG FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
50 12D25 50 12D25
KONDISI TANAH = TANAH LUNAK
POER TEBAL 130 CM 100 100 100 100 MUTU BETON = 35 Mpa
130 MUTU BAJA = 400 Mpa
ELV. -2,20
NAMA GAMBAR
LANTAI KERJA 5 CM ELV. -2,25
PASIR URUG 10 CM ELV. -2,30
DETAIL PONDASI P5
TIANG PANCANG Ø40 CM
ELV. -22,00
57 69
TIANG PANCANG Ø40 CM
DOSEN PEMBIMBING
D25 - 150
D25 - 150
70 ELV. -1,20
135
POER TEBAL 135 CM
160
ELV. -2,20
LANTAI KERJA 5 CM ELV. -2,25
PASIR URUG 10 CM ELV. -2,30
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
TIANG PANCANG Ø40 CM NIP. 19630726 198903 1 003
D25 - 150
NAMA MAHASISWA
D25 - 150 160
920 ELV. -22,00
160 KETERANGAN
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
NAMA GAMBAR
160
DETAIL PONDASI P6
380
STR -
58 69
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
700 700
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
500
NIP. 19630726 198903 1 003
NAMA MAHASISWA
KETERANGAN
3D19 2D19
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
2D19 2D19
KODE GAMBAR SKALA
220 220
300 300
STR -
59 69
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
DIV DEPARTEMEN INFRASTRUKTUR SIPIL
700 700
Prof. Ir. M. Sigit Darmawan, M.EngSc., Ph.D
500
NIP. 19630726 198903 1 003
NAMA MAHASISWA
KETERANGAN
3D19 2D19
FUNGSI BANGUNAN = BANGUNAN PENDIDIKAN
KONDISI TANAH = TANAH LUNAK
MUTU BETON = 35 Mpa
MUTU BAJA = 400 Mpa
2D19 2D19
KODE GAMBAR SKALA
220 220
300 300
STR -
60 69