PERHITUNGAN BERAT KAPAL KOSONG

Berat bagian kapal yang direncanakan meliputi (berdasarkan LR ' 64) :


A. Berat baja kapal dari lunas sampai geladak menerus teratas
B. Berat - berat setempat (lokal), yang meliputi :
a). Berat poop
b). Berat Forecastle
c). Berat Forepeak tank
d). Berat Afterpeak tank
e). Berat peralatan di ujung-ujung kapal
f). Berat baling-baling dan poros di luar kamar mesin
g). Berat kamar mesin

A. Berat Baja Kapal Kosong dari Geladak Utama hingga Dasar Kapal dari AP ~ FP

Ukuran utama kapal :


Lpp (L) = 89.00 m
B (breadth) = 12.90 m
D (depth) = 6.50 m
d (draught) = 5.61 m
h (height of double bottom) = 1.00 m
NT (num of trans Bulkheads) = 8.00
ND (num of decks) = 1.12 = (L mesin second deck / L main deck) + 1 = (11.4 / 103.82) + 1
CB (block coeff at load draught) = 0.70
V (kecepatan dinas kapal) = 12.00 knot = 6.17 m/s

Rumus :
m = 43,4 x H x ( Lpp / 104 ) (ton/m)
dimana :
H = (c1 x B) + (c2 x D) + (c3 x d) + (c4 x Wo x Nt) + c5 + (2,5 x h)
dari LR ' 64 (fig 1a,1b, dan 2 hal 72 & 73) diperoleh :
c1 = 1.42 c4 = 1.04
c2 = 1.09 c5 = -4.70
c3 = 1.05 Wo = 0.28
maka :
H = 1.415 12.90 1.085 6.50 1.05 5.61
1.035 0.280 8 -4.70 2.5 1.00
H= 31.31
sehingga :
m = 43.4 31.31 89.00 10 4
m= 12.10 (ton/m)
Dari harga m dibuat tabel q = m x a dimana harga m diatas dikalikan dengan harga a ( LR ' 64 fig 3 dan 4, hal 74 & 75).
Kemudian hasilnya dapat di-simpson-kan, maka diperoleh berat baja kapal kosong dari AP ~ FP dan titik berat terhadap
midship kapal.

Jarak Ap ke ujung deck paling belakang = 2.3310 m


Jarak Fp ke ujung deck paling depan = 0.095 m

Station a q=mxa Fs q x Fs Fm q . Fs . Fm hstat = 89.0


0 0.349 4.221 1.00 4.221 -10 -42.214 20
1 0.492 5.951 4 23.804 -9 -214.239 4.45
2 0.622 7.524 2 15.047 -8 -120.376
3 0.726 8.781 4 35.126 -7 -245.881
4 0.812 9.822 2 19.643 -6 -117.860
5 0.880 10.644 4 42.577 -5 -212.884
6 0.934 11.297 2 22.595 -4 -90.379
7 0.973 11.769 4 47.076 -3 -141.229
8 1.000 12.096 2 24.191 -2 -48.383
9 1.000 12.096 4 48.383 -1 -48.383
10 1.000 12.096 2 24.191 0 0.000
11 1.000 12.096 4 48.383 1 48.383
12 1.000 12.096 2 24.191 2 48.383
13 0.993 12.011 4 48.044 3 144.132
14 0.973 11.769 2 23.538 4 94.153
15 0.932 11.273 4 45.093 5 225.464
16 0.868 10.499 2 20.998 6 125.989
17 0.768 9.289 4 37.158 7 260.106
18 0.612 7.403 2 14.805 8 118.441
19 0.398 4.814 4 19.256 9 173.307
20 0.151 1.826 1.00 1.826 10 18.264
S1 = 590.149 S2 = -25.21

W deck kebawah = 1/3 x hstat x S1 =


= 1 3 4.45 590.149
W= 875.39 ton
Titik berat (LCG) = (S2 / S1) x hstat
= -25.21 590.149 4.45
LCG = -0.190 m (di belakang midship) KG = 3.25 m

Kurva q = m x a
14.000

12.000
q =mxa

10.000

8.000

6.000

4.000

2.000

0.000
-2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
No Station

LCG Gabungan = (0,01133 * m * Lpp * (3/8 * Jarak 0,05 Lpp)) + (Berat Ap-Fp * LCG) + (0,00175 * M * Lpp * (1/3 * Jarak 0,025 Lpp))/(0,01133 * m * Lpp) + B

LCG Gabungan = -0.1628 3/8 * Jarak 0,05 Lpp = 1.669 1.66875


1/3 * Jarak 0,05 Lpp = 0.742 0.741667
3.25
p * LCG) + (0,00175 * M * Lpp * (1/3 * Jarak 0,025 Lpp))/(0,01133 * m * Lpp) + Berat Ap-Fp + (0,00175 * m * Lpp)
B. Berat - berat setempat (local weight).
Note :
® Input Value
® Result

1. Berat dan titik berat Poop


a. Berat poop : panjang = 20.75 m
W = 0.1292 x V 2/3 dari panjang lebar = 15.03 m
dimana : tinggi = 2.4 m
V = volume poop deck (m 3) Volume = 748.494 m3
W = 96.705 ton

Lcg ¤
b. Titik berat poop :
distribusi berat berbentuk segi empat, sepanjang poop deck -24.038
LCG = -34.0783 m -10.0403 ucs - massprop
KG = 8.3 m

2. Berat dan titik berat Forecastle


a. Berat forecastle : panjang = 9.66 m
W = 0.0897 x V lebar = 8.07 m
dimana : tinggi = 2.4 m
V = volume forecastle deck (m )
3
volume = 93.547 m3
W= 8.39 ton

¤ Lcg

b. Titik berat forecastle :


Panjang forecastle = 6.35 m , dengan distribusi berat berbentuk segitiga.
Jarak FP ke ujung haluan = 2.38 33.57 m
LCG = 37.49 m 3.92
KG = 8.30 m

3. Berat dan titik berat Forepeak tank


a. Berat forepeak tank : panjang = m
W = 0.0897 x V lebar = m
dimana : tinggi = m
V = volume forecastle deck (m3) volume = 32.904 m3
W= 2.95 ton

¤ Lcg

b. Titik berat forepeak tank :


Panjang forepeak tank = 6.35 m , dengan distribusi berat berbentuk segitiga.
Jarak FP ke ujung haluan = 2.38 m
LCG = 36.15 m
KG = 4.33 m
4. Berat dan titik berat Afterpeak tank
a. Berat Afterpeak tank : panjang = 12.82 m
W = 0.0897 x V lebar = 9.45 m
dimana : tinggi = 8.6 m
V = volume forecastle deck (m3) volume = 209.041 m3
W= 18.75 ton

Lcg
¤
b. Titik berat Afterpeak tank :
Panjang afterpeak tank = 6.35 m , dengan distribusi berat berbentuk segitiga.
Jarak FP ke ujung haluan = 2.38 m
LCG = -49.25 m
KG = 5.66 m

5. Berat dan letak titik berat perlengkapan


Berat yang diperhitungkan antara lain : jangkar (anchor), kabel, hawser, windlass,
capstan, bollard, dan steering gear.
a. Berat di ujung depan (0.2 L dari FP) :
Wfore = (43.75 x L2) / 104
Wfore = 43.75 89 2 10 4
Wfore = 34.65 ton
LCGfore = 0.035 x Lpp = 0.035 89.00
LCGfore = 3.12 m (di belakang FP)
LCGfore = 89.00 2 3.12
LCGfore = 41.39 m (di depan midship)
KG fore= 7.50 m
b. Berat di ujung belakang (0.02 L dari AP) :
Waft = (10.94 x L2) / 104
Waft = 10.94 89 2 10 4
Waft = 8.67 ton
LCGaft = berimpit dengan AP = 89.0 2
LCGaft= -44.50 m (di belakang midship)
KG = 10.97 m 3/4 tinggi windlas 1.0725

6. Berat dan letak titik berat propeller dan poros di luar kamar mesin
Wprop = ls (0.0164 L + S)
ls = panjang poros dari tengah propeller sampai sekat belakang kamar mesin
ls = 2.85 m
L= 89.00 m
ls/L = 2.85 89 0.03
S= 5.35 (dari grafik)
Wprop = 2.85 0.0164 89 5.35
Wprop = 19.41 ton
LCGprop = -Lpp/2 + (1/2 x ls) 89 2 2.85 2
LCGprop = -43.075 m (di belakang midship)
KG = 1.93 m
7. Berat dan letak titik berat kamar mesin
Berdasarkan LR'64, berat kamar mesin dirumuskan :
W = Wm + (0.044 L - 1.17) x le
dimana :
Wm = berat mesin dan perlengkapannya
Wm = Wme + Wae
Wme = berat mesin induk
Wae = berat mesin bantu
L = Lpp = 89.0 m
le = panjang kamar mesin = 12.0 m
Merk : MAN B & W Diesel A/S Type : 8L21/31
Speed : 1000 rev/min Length : 6186
Bmep : 24.1 bar Width [W] : 1650 mm
bhp/cyl : 292 HP Height [H] : 3354 mm
BHP : 2340 HP (Wme) Weight : 16.6 ton

Wae = 0.56(BHP)0.7 0.56 2340 0.7


Wae = 127.83 ton
Wm = Wme + Wae 16.6 127.83
Wm = 144.43 ton

Jadi berat kamar mesin (machinery space) :


W = Wm + (0.044 L - 1.17) x le
W = 144.43 0.044 89.0 1.17 12.0
W= 177.38 ton

LCG = a + 0.5 Le - (Lpp/2)


a= jarak sekat belakang ms thd AP = 4.8 m
LCG = 4.8 0.5 12 89 2
LCG = -33.70 m KG = 2.10 m
mm cm m skala luas bonjean 15
124 37.41 3.741 56.115
125 34.36 3.436 51.54
126 31.31 3.131 46.965
127 28.27 2.827 42.405
128 25.17 2.517 37.755
129 22.05 2.205 33.075
130 18.94 1.894 28.41
131 15.82 1.582 23.73
132 12.74 1.274 19.11
133 9.94 0.994 14.91
134 7.13 0.713 10.695
135 4.33 0.433 6.495
136 1.52 0.152 2.28

forepeak tank
3.25 wl luas mm^2 luas m^2 Fs luas x Fs
Awl 0 289297.6921 0.2892976921 1 0.2892976921
Awl 3.25 5379171.8011 5.3791718011 4 21.5166872044
Awl 6.5 8566859.3941 8.5668593941 1 8.5668593941
30.3728442906
v = 1/3 h jmlh
32.903914648 m^3

FOREPEAK TANK
jarak gading 0.6
y 0.0538
chain 3.2 2.4

0.0538
luas frame luas chain lockef-c faktor simpson lengan momen
56.115 7.68 48.435 2.605803 1 2.605803 0 0 124
51.54 7.68 43.86 2.359668 4 9.438672 1 9.438672 125
46.965 7.68 39.285 2.113533 2 4.227066 2 8.454132 126
42.405 7.68 34.725 1.868205 4 7.47282 3 22.41846 127
37.755 7.68 30.075 1.618035 2 3.23607 4 12.94428 128
33.075 0 33.075 1.779435 4 7.11774 5 35.5887 129
28.41 0 28.41 1.528458 2 3.056916 6 18.341496 130
23.73 0 23.73 1.276674 4 5.106696 7 35.746872 131
19.11 0 19.11 1.028118 2 2.056236 8 16.449888 132
14.91 0 14.91 0.802158 4 3.208632 9 28.877688 133
10.695 0 10.695 0.575391 2 1.150782 10 11.50782 134
6.495 0 6.495 0.349431 4 1.397724 11 15.374964 135
2.28 0 2.28 0.122664 1 0.122664 12 1.471968 136
Sum1 50.197821 Sum 2 216.61494

W=1/3 *jarak gading*sum 1 10.0395642


letak titik berat thdp gading no 124 (LCG) sum2/sum1*jarak gading 2.5891355722 33.56
letK TITIK BERAT TERHADAP MIDSHIP ( D26 + JARAK SEKAT KE MIDSHIP ) ( LCG ) 36.1491355722
untuk volume Forepeak
124 48.435
125 175.44
126 78.57
127 138.9
128 60.15
129 132.3
130 56.82
131 94.92
132 38.22
133 59.64
134 21.39
135 25.98
136 2.28
933.045 6.6666666667
32

AFTER PEAK
mm cm m skala luas bonjean 15
-6 5.37 0.537 8.055
-5 7.9 0.79 11.85
-4 10.05 1.005 15.075
-3 12.2 1.22 18.3
-2 14.34 1.434 21.51
-1 16.49 1.649 24.735
0 18.64 1.864 27.96
1 20.79 2.079 31.185
2 23 2.3 34.5
3 25.34 2.534 38.01
4 27.69 2.769 41.535
5 30.04 3.004 45.06
6 32.49 3.249 48.735
7
8
AFTER PEAK TANK
jarak gading 0.6
y 0.0538
chain 3.2 2.4

0.0538
luas frame luas chain lockef-c faktor simpson lengan momen
1.16 0 1.16 0.062408 1 0.062408 0 0 -6
5.37 0 5.37 0.288906 4 1.155624 1 1.155624 -5
8.055 0 8.055 0.433359 2 0.866718 2 1.733436 -4
11.85 0 11.85 0.63753 4 2.55012 3 7.65036 -3
15.075 0 15.075 0.811035 2 1.62207 4 6.48828 -2
18.3 0 18.3 0.98454 4 3.93816 5 19.6908 -1
21.51 0 21.51 1.157238 2 2.314476 6 13.886856 0
24.735 0 24.735 1.330743 4 5.322972 7 37.260804 1
27.96 0 27.96 1.504248 2 3.008496 8 24.067968 2
31.185 0 31.185 1.677753 4 6.711012 9 60.399108 3
34.5 0 34.5 1.8561 2 3.7122 10 37.122 4
38.01 0 38.01 2.044938 4 8.179752 11 89.977272 5
41.535 0 41.535 2.234583 2 4.469166 12 53.629992 6
45.06 0 45.06 2.424228 4 9.696912 13 126.059856 7
48.735 0 48.735 2.621943 1 2.621943 14 36.707202 8
Sum1 43.913174 Sum 2 353.0625

W=1/3 *jarak gading*sum 1 8.7826348


letak titik berat thdp gading no 124 (LCG) sum2/sum1*jarak gading 4.8240079389 36.04
letK TITIK BERAT TERHADAP MIDSHIP ( D26 + JARAK SEKAT KE MIDSHIP ) ( LCG ) 40.8640079389

untuk volume
1.16
21.48
16.11
47.4
30.15
73.2
43.02
98.94
55.92
124.74
69
152.04
83.07
180.24
48.735
1045.205
10 .

W t
γ=
V m3

Letak titik berat terhadap gading nomor 42


= ∑2/∑1 x jarak gading
=
LCG = m
KG = m

11 . Bridge
Panjang Boat = 10.8 m
Tinggi Boat = 2.4 m
Lebar Boat = 11.74 m
Volume Boat = 304.30 m3
Berat boat
= 0.1185 * V (t).
= 36.06 t
LCG = -31.24 m 2.4
KG = 13.1 m 0.8

12 . Bridge 2
Panjang bridge = 7.8 m
Tinggi bridge = 2.4 m
Lebar bridge = 11.74 m
Volume bridge = 219.77 m3
Volume wind = volume trapesium
= 0.5 x (a+b) x tinggi
= 0.5 x (1.8 + 3) x 0.6
= 1.5855 m3
Vtotal = 221.36
Berat boat
= 0.1292 * V (t).
= 28.60 ton
LCG = -27.9 m
KG = 15.5 m

13 . Navigation
Panjang nav = 6 m
Tinggi nav = 2.4 m
Lebar nav = 8.5 m
Volume nav = 122.40 m3
Volume jendela = volume segitiga
= 0.5 x a x b x tinggi
= 0.5 x (1.2 + 0.3) x 12
= 2.664 m3
Vtotal = 125.06
Berat navigation
= 0.1185 * V (t).
= 14.82 ton
LCG = -26.1 m
KG = 17.9 m

14 . Cargo handling
nb =
=
= 20.2 ton
SWL =
LCG= 4.65 m
KG = 11.43 m

11 . Boat
Panjang Boat = 14.4 m
Tinggi Boat = 2.4 m
Lebar Boat = 11.74 m
Volume Boat = 405.73 m3
Berat boat
= 0.1185 * V (t).
= 48.08 t
LCG = -31.24 m
KG = 10.7 m

9.9 0.8
9.9
Jumlah boom
2

5
Rekapitulasi berat kapal kosong dan titik beratnya

No Bagian Berat (I) LCG (II) I x II (III) KG (IV) I x IV (V)

1 Berat deck kebawah 875.39 -0.19 -166.39 3.25 2845.01

2 Poop 96.71 -34.08 -3295.56 8.30 802.66

3 Forecastle 8.39 37.49 314.59 8.30 69.65

4 Forepeak tank 2.95 36.15 106.69 4.33 12.79

5 Afterpeak tank 18.75 -49.25 -923.49 5.66 106.13

6 Equipment at fore 34.65 41.39 1434.17 7.50 259.91

7 Equipment at after 8.67 -44.50 -385.62 10.97 95.08

8 Propeller dan poros 19.41 -43.08 -835.97 1.93 37.46

9 Machinery space 177.38 -33.70 -5977.84 2.10 372.51

10 Boat 48.08 -31.24 -1502.00 10.70 514.45

11 Bridge 36.06 -31.24 -1126.50 13.10 472.38

12 Bridge 28.60 -27.90 -797.93 15.50 443.29

13 Navigation 14.82 -26.10 -386.80 17.90 265.28

14 Cargo handling 20.20 4.65 93.93 11.43 230.89


S1 = 1390.06 S 2 = -13448.72 S3 = 6527.47

Berat kapal kosong = S1 = 1390.06 ton

LCG = S2/S1 = -13448.72 1390.06

LCG = -9.67 m (di belakang midship)

KG = S3/S1 = 6527.47 1390.06

KG = 4.70 m (diatas baseline)

106.92742

150.96555
PENENTUAN JARI JARI METASENTER 0°

A. SARAT 6,87 meter


ϕ 0° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 6.72 6.72 6.72 6.72 45.1584 45.1584


A2 4 5.82 5.82 23.28 23.28 135.4896 135.4896
A3 2 4.83 4.83 9.66 9.66 46.6578 46.6578
A4 4 3.02 3.02 12.08 12.08 36.4816 36.4816
A5 1 0 0 0 0 0 0
∑= 51.74 51.74 263.79 263.79

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 164.5332


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1513.198

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 2.12 2.12 2.12 2.12 4.4944 4.4944


M2 4 7.51 7.51 30.04 30.04 225.6004 225.6004
M3 2 8.8 8.8 17.6 17.6 154.88 154.88
M4 4 8.8 8.8 35.2 35.2 309.76 309.76
M5 2 8.8 8.8 17.6 17.6 154.88 154.88
M6 4 8.84 8.84 35.36 35.36 312.5824 312.5824
M7 1 6.72 6.72 6.72 6.72 45.1584 45.1584
144.64 144.64 1207.36 1207.36

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1285.686


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 10835.59

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 2.12 2.12 8.48 8.48 17.9776 17.9776
F3 1 7.51 7.51 7.51 7.51 56.4001 56.4001
15.99 15.99 74.3777 74.3777
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 37.37379
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 359.6962

IV. e = ∑II / ∑I = 0
V. Io = ∑III = 12708.49
VI I kor = (∑I) * e² 1487.593
VII Io - I kor = 11220.89
VIII MBφ = VII / Volume displacement = 1.298335

B. SARAT 5,137 meter


ϕ 0° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 1.65 1.65 3.3 3.3 5.445 5.445
A4 4 4.4 4.4 17.6 17.6 77.44 77.44
A5 1 6.04 6.04 6.04 6.04 36.4816 36.4816
∑= 26.94 26.94 119.37 119.37

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 85.6692


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 604.2733

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 6.04 6.04 6.04 6.04 36.4816 36.4816


M2 4 8.25 8.25 33 33 272.25 272.25
M3 2 8.8 8.8 17.6 17.6 154.88 154.88
M4 4 8.8 8.8 35.2 35.2 309.76 309.76
M5 2 8.79 8.79 17.58 17.58 154.5282 154.5282
M6 4 7.42 7.42 29.68 29.68 220.2256 220.2256
M7 1 1.96 1.96 1.96 1.96 3.8416 3.8416
141.06 141.06 1151.97 1151.97

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1253.864


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 10128.46

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.96 1.96 1.96 1.96 3.8416 3.8416


F2 4 0.48 0.48 1.92 1.92 0.9216 0.9216
F3 1 0 0 0 0 0 0
3.88 3.88 4.7632 4.7632

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 9.068811


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 6.21097

IV. e = ∑II / ∑I = 0
V. Io = ∑III = 10738.94
VI I kor = (∑I) * e² 1348.602
VII Io - I kor = 9390.341
VIII MBφ = VII / Volume displacement = 1.505872

C. SARAT 3,4 meter


ϕ 0° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 1.65 1.65 3.3 3.3 5.445 5.445
A4 4 4.4 4.4 17.6 17.6 77.44 77.44
A5 1 6.04 6.04 6.04 6.04 36.4816 36.4816
∑= 26.94 26.94 119.37 119.37

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 85.6692


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 604.2733

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 6.04 6.04 6.04 6.04 36.4816 36.4816


M2 4 8.25 8.25 33 33 272.25 272.25
M3 2 8.8 8.8 17.6 17.6 154.88 154.88
M4 4 8.8 8.8 35.2 35.2 309.76 309.76
M5 2 8.79 8.79 17.58 17.58 154.5282 154.5282
M6 4 7.42 7.42 29.68 29.68 220.2256 220.2256
M7 1 1.96 1.96 1.96 1.96 3.8416 3.8416
141.06 141.06 1151.97 1151.97

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1253.864


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 10128.46

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.96 1.96 1.96 1.96 3.8416 3.8416


F2 4 0.48 0.48 1.92 1.92 0.9216 0.9216
F3 1 0 0 0 0 0 0
3.88 3.88 4.7632 4.7632

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 9.068811


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 6.21097

IV. e = ∑II / ∑I = 0
V. Io = ∑III = 10738.94
VI I kor = (∑I) * e² 1348.602
VII Io - I kor = 9390.341
VIII MBφ = VII / Volume displacement = 2.379764

D. SARAT 1,68 meter


ϕ 0° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0.79 0.79 1.58 1.58 1.2482 1.2482
A4 4 2.03 2.03 8.12 8.12 16.4836 16.4836
A5 1 3.91 3.91 3.91 3.91 15.2881 15.2881
∑= 13.61 13.61 33.02 33.02
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 43.2798
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 99.87771

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.91 3.91 3.91 3.91 15.2881 15.2881


M2 4 7.43 7.43 29.72 29.72 220.8196 220.8196
M3 2 8.45 8.45 16.9 16.9 142.805 142.805
M4 4 8.45 8.45 33.8 33.8 285.61 285.61
M5 2 8.41 8.41 16.82 16.82 141.4562 141.4562
M6 4 6.41 6.41 25.64 25.64 164.3524 164.3524
M7 1 1.34 1.34 1.34 1.34 1.7956 1.7956
128.13 128.13 972.13 972.13

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1138.93


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 8020.092

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.34 1.34 1.34 1.34 1.7956 1.7956


F2 4 0.28 0.28 1.12 1.12 0.3136 0.3136
F3 1 0 0 0 0 0 0
2.46 2.46 2.1092 2.1092

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 5.749813


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 1.943026

IV. e = ∑II / ∑I = 0
V. Io = ∑III = 8121.913
VI I kor = (∑I) * e² 1187.96
VII Io - I kor = 6933.953
VIII MBφ = VII / Volume displacement = 3.621352
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

303.46445 303.464448
788.54947 788.549472
225.35717 225.357174
110.17443 110.174432
0 0
1427.55 1427.55



m⁴

S* Ya³ S* Yb³

9.528128 9.528128
1694.259 1694.259
1362.944 1362.944
2725.888 2725.888
1362.944 1362.944
2763.2284 2763.22842
303.46445 303.464448
10222.26 10222.26



m⁴

S* Ya³ S* Yb³

0 0
38.112512 38.112512
423.56475 423.564751
461.67726 461.677263


m⁴

m e/2 = 0
m⁴
m⁴
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
8.98425 8.98425
340.736 340.736
220.34886 220.348864
570.07 570.07



m⁴

S* Ya³ S* Yb³

220.34886 220.348864
2246.0625 2246.0625
1362.944 1362.944
2725.888 2725.888
1358.3029 1358.30288
1634.074 1634.07395
7.529536 7.529536
9555.15 9555.15



m⁴

S* Ya³ S* Yb³

7.529536 7.529536
0.442368 0.442368
0 0
7.971904 7.971904



m⁴

m e/2 = 0
m⁴
m⁴
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
8.98425 8.98425
340.736 340.736
220.34886 220.348864
570.07 570.07



m⁴

S* Ya³ S* Yb³

220.34886 220.348864
2246.0625 2246.0625
1362.944 1362.944
2725.888 2725.888
1358.3029 1358.30288
1634.074 1634.07395
7.529536 7.529536
9555.15 9555.15



m⁴

S* Ya³ S* Yb³

7.529536 7.529536
0.442368 0.442368
0 0
7.971904 7.971904



m⁴

m e/2 = 0
m⁴
m⁴
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0.986078 0.986078
33.461708 33.461708
59.776471 59.776471
94.22 94.22


m⁴

S* Ya³ S* Yb³

59.776471 59.776471
1640.6896 1640.68963
1206.7023 1206.70225
2413.4045 2413.4045
1189.6466 1189.64664
1053.4989 1053.49888
2.406104 2.406104
7566.12 7566.12



m⁴

S* Ya³ S* Yb³

2.406104 2.406104
0.087808 0.087808
0 0
2.493912 2.493912



m⁴

m e/2 = 0
m⁴
m⁴
m⁴
m
PENENTUAN JARI JARI METASENTER 10°

A. SARAT 6,87 meter


ϕ 10 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 4.66 1.95 18.64 7.8 86.8624 15.21
A3 2 5.85 3.96 11.7 7.92 68.445 31.3632
A4 4 6.65 5.28 26.6 21.12 176.89 111.5136
A5 1 7.4 6.43 7.4 6.43 54.76 41.3449
∑= 64.34 43.27 386.96 199.43

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 171.0999


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 149.0829
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1799.468

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 7.4 6.43 7.4 6.43 54.76 41.3449


M2 4 8.73 8.42 34.92 33.68 304.8516 283.5856
M3 2 8.94 8.94 17.88 17.88 159.8472 159.8472
M4 4 8.94 8.94 35.76 35.76 319.6944 319.6944
M5 2 8.94 8.93 17.88 17.86 159.8472 159.4898
M6 4 7.79 7.55 31.16 30.2 242.7364 228.01
M7 1 2.26 2.09 2.26 2.09 5.1076 4.3681
147.26 143.90 1246.84 1196.34

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1294.041


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 112.2317
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 11013.8

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 2.26 2.09 2.26 2.09 5.1076 4.3681


F2 4 0.75 0.69 3 2.76 2.25 1.9044
F3 1 0 0 0 0 0 0
5.26 4.85 7.3576 6.2725
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 11.81517
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0.634057
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 9.222312

IV. e = ∑II / ∑I = 0.177357


V. Io = ∑III = 12822.49
VI I kor = (∑I) * e² 1476.988
VII Io - I kor = 11345.51
VIII MBφ = VII / Volume displacement = 1.312753

B. SARAT 5,137 meter


ϕ 10 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 2.46 1.41 4.92 2.82 12.1032 3.9762
A4 4 5.37 3.69 21.48 14.76 115.3476 54.4644
A5 1 6.63 5.5 6.63 5.5 43.9569 30.25
∑= 33.03 23.08 171.41 88.69

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 89.2149


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 65.76009
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 696.1973

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 6.63 5.5 6.63 5.5 43.9569 30.25


M2 4 8.58 8.13 34.32 32.52 294.4656 264.3876
M3 2 8.94 8.94 17.88 17.88 159.8472 159.8472
M4 4 8.94 8.94 35.76 35.76 319.6944 319.6944
M5 2 8.94 8.91 17.88 17.82 159.8472 158.7762
M6 4 7.59 7.41 30.36 29.64 230.4324 219.6324
M7 1 2.02 1.96 2.02 1.96 4.0804 3.8416
144.85 141.08 1212.32 1156.43

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1270.797


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 124.2101
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 10570.3

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 2.02 1.96 2.02 1.96 4.0804 3.8416


F2 4 0.49 0.48 1.96 1.92 0.9604 0.9216
F3 1 0 0 0 0 0 0
3.98 3.88 5.0408 4.7632

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 9.185678


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0.16221
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 6.499669

IV. e = ∑II / ∑I = 0.138864


V. Io = ∑III = 11273
VI I kor = (∑I) * e² 1369.217
VII Io - I kor = 9903.779
VIII MBφ = VII / Volume displacement = 1.588209

C. SARAT 3,4 meter


ϕ 10 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0.86 0.85 1.72 1.7 1.4792 1.445
A4 4 3.05 2.37 12.2 9.48 37.21 22.4676
A5 1 5.65 4.43 5.65 4.43 31.9225 19.6249
∑= 19.57 15.61 70.61 43.54

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 55.9362


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 21.52399
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 231.3659

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 5.65 4.43 5.65 4.43 31.9225 19.6249


M2 4 8.33 7.7 33.32 30.8 277.5556 237.16
M3 2 8.94 8.94 17.88 17.88 159.8472 159.8472
M4 4 8.94 8.94 35.76 35.76 319.6944 319.6944
M5 2 8.94 8.64 17.88 17.28 159.8472 149.2992
M6 4 7.51 6.84 30.04 27.36 225.6004 187.1424
M7 1 1.83 1.73 1.83 1.73 3.3489 2.9929
142.36 135.24 1177.82 1075.76

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1233.775


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 226.7888
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 9902.665

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.83 1.73 1.83 1.73 3.3489 2.9929


F2 4 0.29 0.28 1.16 1.12 0.3364 0.3136
F3 1 0 0 0 0 0 0
2.99 2.85 3.6853 3.3065

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 6.824982


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0.221344
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 4.476583

IV. e = ∑II / ∑I = 0.191691


V. Io = ∑III = 10138.51
VI I kor = (∑I) * e² 1296.573
VII Io - I kor = 8841.934
VIII MBφ = VII / Volume displacement = 2.240783

D. SARAT 1,68 meter


ϕ 10 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0.81 0.8 1.62 1.6 1.3122 1.28
A4 4 2.12 2.01 8.48 8.04 17.9776 16.1604
A5 1 4.33 3.62 4.33 3.62 18.7489 13.1044
∑= 14.43 13.26 38.04 30.54
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 44.0271
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 5.957651
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 106.6903

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.33 3.62 4.33 3.62 18.7489 13.1044


M2 4 7.99 6.73 31.96 26.92 255.3604 181.1716
M3 2 8.94 7.33 17.88 14.66 159.8472 107.4578
M4 4 8.94 7.33 35.76 29.32 319.6944 214.9156
M5 2 8.94 7.28 17.88 14.56 159.8472 105.9968
M6 4 7.17 5.4 28.68 21.6 205.6356 116.64
M7 1 1.45 1.27 1.45 1.27 2.1025 1.6129
137.94 111.95 1121.24 740.90

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1110.619


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 845.1914
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 7604.644

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.45 1.27 1.45 1.27 2.1025 1.6129


F2 4 0.0156 0.0165 0.0624 0.066 0.000973 0.001089
F3 1 0 0 0 0 0 0
1.5124 1.336 2.103473 1.613989

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 3.328815


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0.286021
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 1.985572

IV. e = ∑II / ∑I = 0.735279


V. Io = ∑III = 7713.32
VI I kor = (∑I) * e² 1158.516
VII Io - I kor = 6554.804
VIII MBφ = VII / Volume displacement = 3.423336
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
404.77878 29.6595
400.40325 124.198272
1176.3185 588.791808
405.224 265.847707
2386.72 1008.50



m⁴

S* Ya³ S* Yb³

405.224 265.847707
2661.3545 2387.79075
1429.034 1429.03397
2858.0679 2858.06794
1429.034 1424.24391
1890.9166 1721.4755
11.543176 9.129329
10685.17 10095.59



m⁴

S* Ya³ S* Yb³

11.543176 9.129329
1.6875 1.314036
0 0
13.230676 10.443365


m⁴

m e/2 = 0.08867856
m⁴
m⁴ 0.17735712
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
29.773872 5.606442
619.41661 200.973636
291.43425 166.375
940.62 372.96



m⁴

S* Ya³ S* Yb³

291.43425 166.375
2526.5148 2149.47119
1429.034 1429.03397
2858.0679 2858.06794
1429.034 1414.69594
1748.9819 1627.47608
8.242408 7.529536
10291.31 9652.65



m⁴

S* Ya³ S* Yb³

8.242408 7.529536
0.470596 0.442368
0 0
8.713004 7.971904



m⁴

m e/2 = 0.06943208
m⁴
m⁴ 0.13886415
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
1.272112 1.22825
113.4905 53.248212
180.36213 86.938307
295.12 141.41



m⁴

S* Ya³ S* Yb³

180.36213 86.938307
2312.0381 1826.132
1429.034 1429.03397
2858.0679 2858.06794
1429.034 1289.94509
1694.259 1280.05402
6.128487 5.177717
9908.92 8775.35



m⁴

S* Ya³ S* Yb³

6.128487 5.177717
0.097556 0.087808
0 0
6.226043 5.265525



m⁴

m e/2 = 0.09584544
m⁴
m⁴ 0.19169088
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
1.062882 1.024
38.112512 32.482404
81.182737 47.437928
120.36 80.94


m⁴

S* Ya³ S* Yb³

81.182737 47.437928
2040.3296 1219.28487
1429.034 787.665674
2858.0679 1575.33135
1429.034 771.656704
1474.4073 629.856
3.048625 2.048383
9315.10 5033.28



m⁴

S* Ya³ S* Yb³

3.048625 2.048383
1.519E-05 1.7969E-05
0 0
3.0486402 2.04840097



m⁴

m e/2 = 0.36763956
m⁴
m⁴ 0.73527913
m⁴
m
PENENTUAN JARI JARI METASENTER 20°

A. SARAT 6,87 meter


ϕ 20 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 5.01 1.43 20.04 5.72 100.4004 8.1796
A3 2 5.01 3.3 10.02 6.6 50.2002 21.78
A4 4 5.01 4.94 20.04 19.76 100.4004 97.6144
A5 1 5.01 6.35 5.01 6.35 25.1001 40.3225
∑= 55.11 38.43 276.10 167.90

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 148.7286


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 86.02266
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1168.703

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 5.01 6.35 5.01 6.35 25.1001 40.3225


M2 4 5.01 8.74 20.04 34.96 100.4004 305.5504
M3 2 5.01 9.55 10.02 19.1 50.2002 182.405
M4 4 5.01 9.55 20.04 38.2 100.4004 364.81
M5 2 5.01 9.52 10.02 19.04 50.2002 181.2608
M6 4 5.01 7.995 20.04 31.98 100.4004 255.6801
M7 1 2.36 2.34 2.36 2.34 5.5696 5.4756
87.53 151.97 432.27 1335.50

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1064.442


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -2007.18
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 7465.559

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 2.36 2.34 2.36 2.34 5.5696 5.4756


F2 4 0.64 0.87 2.56 3.48 1.6384 3.0276
F3 1 0 0 0 0 0 0
4.92 5.82 7.208 8.5032

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 12.55142


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -0.75683
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 11.54628

IV. e = ∑II / ∑I = -1.56799


V. Io = ∑III = 8645.808
VI I kor = (∑I) * e² 1228.18
VII Io - I kor = 7417.628
VIII MBφ = VII / Volume displacement = 0.858271

B. SARAT 5,137 meter


ϕ 20 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 4.96 1.44 9.92 2.88 49.2032 4.1472
A4 4 6.33 3.4 25.32 13.6 160.2756 46.24
A5 1 7.36 5.25 7.36 5.25 54.1696 27.5625
∑= 42.60 21.73 263.65 77.95

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 102.2847


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 147.6305
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1041.541

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 7.36 5.25 7.36 5.25 54.1696 27.5625


M2 4 8.77 8.52 35.08 34.08 307.6516 290.3616
M3 2 9.22 9.28 18.44 18.56 170.0168 172.2368
M4 4 9.22 9.28 36.88 37.12 340.0336 344.4736
M5 2 9.22 9.24 18.44 18.48 170.0168 170.7552
M6 4 7.97 7.51 31.88 30.04 254.0836 225.6004
M7 1 1.99 2.16 1.99 2.16 3.9601 4.6656
150.07 145.69 1299.93 1235.66

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1314.486


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 142.8361
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 11710.73

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.99 2.16 1.99 2.16 3.9601 4.6656


F2 4 0.38 0.64 1.52 2.56 0.5776 1.6384
F3 1 0 0 0 0 0 0
3.51 4.72 4.5377 6.304

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 9.618082


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -1.0321
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 7.4897

IV. e = ∑II / ∑I = 0.202914


V. Io = ∑III = 12759.76
VI I kor = (∑I) * e² 1426.43
VII Io - I kor = 11333.33
VIII MBφ = VII / Volume displacement = 1.817457

C. SARAT 3,4 meter


ϕ 20 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0.72 1.09 1.44 2.18 1.0368 2.3762
A4 4 4.07 2.53 16.28 10.12 66.2596 25.6036
A5 1 6.48 4.47 6.48 4.47 41.9904 19.9809
∑= 24.20 16.77 109.29 47.96

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 65.1423


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 48.75425
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 370.5774

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 6.48 4.47 6.48 4.47 41.9904 19.9809


M2 4 8.77 7.59 35.08 30.36 307.6516 230.4324
M3 2 9.16 8.23 18.32 16.46 167.8112 135.4658
M4 4 9.16 8.23 36.64 32.92 335.6224 270.9316
M5 2 9.16 8.19 18.32 16.38 167.8112 134.1522
M6 4 7.73 6.53 30.92 26.12 239.0116 170.5636
M7 1 1.76 1.95 1.76 1.95 3.0976 3.8025
147.52 128.66 1263.00 965.33

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1227.464


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 661.4806
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 9738.572

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.76 1.95 1.76 1.95 3.0976 3.8025


F2 4 0.1 0.48 0.4 1.92 0.04 0.9216
F3 1 0 0 0 0 0 0
2.16 3.87 3.1376 4.7241

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 7.047027


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -0.92704
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 5.186137

IV. e = ∑II / ∑I = 0.545767


V. Io = ∑III = 10114.34
VI I kor = (∑I) * e² 1299.951
VII Io - I kor = 8814.385
VIII MBφ = VII / Volume displacement = 2.233802

D. SARAT 1,68 meter


ϕ 20 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0.08 1.57 0.16 3.14 0.0128 4.9298
A4 4 1.48 2.75 5.92 11 8.7616 30.25
A5 1 4.19 3.98 4.19 3.98 17.5561 15.8404
∑= 10.27 18.12 26.33 51.02

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 45.1401


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ -19.6283
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 127.4652

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.19 3.98 4.19 3.98 17.5561 15.8404


M2 4 7.89 5.07 31.56 20.28 249.0084 102.8196
M3 2 8.59 5.07 17.18 10.14 147.5762 51.4098
M4 4 8.59 5.07 34.36 20.28 295.1524 102.8196
M5 2 8.58 5.07 17.16 10.14 147.2328 51.4098
M6 4 7.04 4.74 28.16 18.96 198.2464 89.8704
M7 1 0.77 1.92 0.77 1.92 0.5929 3.6864
133.38 85.70 1055.37 417.86

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 973.6865


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 1416.684
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 5597.138

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0.77 1.92 0.77 1.92 0.5929 3.6864


F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0.77 1.92 0.5929 3.6864

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 3.143699


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -1.80763
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 2.935062

IV. e = ∑II / ∑I = 1.365253


V. Io = ∑III = 5727.538
VI I kor = (∑I) * e² 1023.834
VII Io - I kor = 4703.704
VIII MBφ = VII / Volume displacement = 2.456574
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
503.006 11.696828
251.503 71.874
503.006 482.215136
125.7515 256.047875
1383.27 821.83



m⁴

S* Ya³ S* Yb³

125.7515 256.047875
503.006 2670.5105
251.503 1741.96775
503.006 3483.9355
251.503 1725.60282
503.006 2044.1624
13.144256 12.812904
2150.92 11935.04



m⁴

S* Ya³ S* Yb³

13.144256 12.812904
1.048576 2.634012
0 0
14.192832 15.446916



m⁴

m e/2 = -0.7839927
m⁴
m⁴ -1.5679853
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
244.04787 5.971968
1014.5445 157.216
398.68826 144.703125
1657.28 307.89



m⁴

S* Ya³ S* Yb³

398.68826 144.703125
2698.1045 2473.88083
1567.5549 1598.3575
3135.1098 3196.71501
1567.5549 1577.77805
2025.0463 1694.259
7.880599 10.077696
11399.94 10695.77



m⁴

S* Ya³ S* Yb³

7.880599 10.077696
0.219488 1.048576
0 0
8.100087 11.126272



m⁴

m e/2 = 0.1014571
m⁴
m⁴ 0.20291419
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0.746496 2.590058
269.67657 64.777108
272.09779 89.314623
542.52 156.68



m⁴

S* Ya³ S* Yb³

272.09779 89.314623
2698.1045 1748.98192
1537.1506 1114.88353
3074.3012 2229.76707
1537.1506 1098.70652
1847.5597 1113.78031
5.451776 7.414875
10971.82 7402.85



m⁴

S* Ya³ S* Yb³

5.451776 7.414875
0.004 0.442368
0 0
5.455776 7.857243



m⁴

m e/2 = 0.27288354
m⁴
m⁴ 0.54576708
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0.001024 7.739786
12.967168 83.1875
73.560059 63.044792
86.53 153.97



m⁴

S* Ya³ S* Yb³

73.560059 63.044792
1964.6763 521.295372
1267.6796 260.647686
2535.3591 521.295372
1263.2574 260.647686
1395.6547 425.985696
0.456533 7.077888
8500.64 2059.99



m⁴

S* Ya³ S* Yb³

0.456533 7.077888
0 0
0 0
0.456533 7.077888



m⁴

m e/2 = 0.68262634
m⁴
m⁴ 1.36525268
m⁴
m
PENENTUAN JARI JARI METASENTER 30°

A. SARAT 6,87 meter


ϕ 30 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.93 0.34 15.72 1.36 61.7796 0.4624
A3 2 3.93 1.8 7.86 3.6 30.8898 6.48
A4 4 3.93 3.34 15.72 13.36 61.7796 44.6224
A5 1 3.93 4.8 3.93 4.8 15.4449 23.04
∑= 43.23 23.12 169.89 74.60

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 105.4965


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 75.75483
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 497.7416

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.93 4.8 3.93 4.8 15.4449 23.04


M2 4 3.93 7.53 15.72 30.12 61.7796 226.8036
M3 2 3.93 8.56 7.86 17.12 30.8898 146.5472
M4 4 3.93 8.56 15.72 34.24 61.7796 293.0944
M5 2 3.93 8.5 7.86 17 30.8898 144.5
M6 4 3.93 6.77 15.72 27.08 61.7796 183.3316
M7 1 3.93 0.84 3.93 0.84 15.4449 0.7056
70.74 131.20 278.01 1018.02

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 897.5089


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -1644.47
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 4846.492

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 3.93 0.84 3.93 0.84 15.4449 0.7056


F2 4 2.84 -0.66 11.36 -2.64 32.2624 1.7424
F3 1 0 0 0 0 0 0
15.29 -1.8 47.7073 2.448
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 15.76524
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 26.4464
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 59.12117

IV. e = ∑II / ∑I = -1.51385


V. Io = ∑III = 5403.355
VI I kor = (∑I) * e² 1021.062
VII Io - I kor = 4382.293
VIII MBφ = VII / Volume displacement = 0.507062

B. SARAT 5,137 meter


ϕ 30 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 6.48 1.6 12.96 3.2 83.9808 5.12
A4 4 6.48 3.4 25.92 13.6 167.9616 46.24
A5 1 6.48 5.34 6.48 5.34 41.9904 28.5156
∑= 45.36 22.14 293.93 79.88

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 107.325


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 170.1755
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1177.854

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 6.48 5.34 6.48 5.34 41.9904 28.5156


M2 4 6.48 8.49 25.92 33.96 167.9616 288.3204
M3 2 6.48 9.11 12.96 18.22 83.9808 165.9842
M4 4 6.48 9.11 25.92 36.44 167.9616 331.9684
M5 2 6.48 9.08 12.96 18.16 83.9808 164.8928
M6 4 6.48 7.53 25.92 30.12 167.9616 226.8036
M7 1 1.96 2.48 1.96 2.48 3.8416 6.1504
112.12 144.72 717.68 1212.64

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1141.508


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -1099.9
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 7944.681

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.96 2.48 1.96 2.48 3.8416 6.1504


F2 4 0.19 0.89 0.76 3.56 0.1444 3.1684
F3 1 0 0 0 0 0 0
2.72 6.04 3.986 9.3188

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 10.23747


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -3.11612
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 9.9842

IV. e = ∑II / ∑I = -0.7409


V. Io = ∑III = 9132.519
VI I kor = (∑I) * e² 1259.62
VII Io - I kor = 7872.9
VIII MBφ = VII / Volume displacement = 1.262529

C. SARAT 3,4 meter


ϕ 30 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0.18 1.77 0.36 3.54 0.0648 6.2658
A4 4 5.43 3.2 21.72 12.8 117.9396 40.96
A5 1 7.01 4.93 7.01 4.93 49.1401 24.3049
∑= 29.09 21.27 167.14 71.53

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 80.0724


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 76.01297
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 660.8472

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 7.01 4.93 7.01 4.93 49.1401 24.3049


M2 4 9.09 6.97 36.36 27.88 330.5124 194.3236
M3 2 9.35 7.01 18.7 14.02 174.845 98.2802
M4 4 9.35 7.01 37.4 28.04 349.69 196.5604
M5 2 9.35 7.01 18.7 14.02 174.845 98.2802
M6 4 7.93 6.22 31.72 24.88 251.5396 154.7536
M7 1 1.34 2.56 1.34 2.56 1.7956 6.5536
151.23 116.33 1332.37 773.06

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1189.153


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 1242.911
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 9060.1

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 1.34 2.56 1.34 2.56 1.7956 6.5536


F2 4 -0.51 1.06 -2.04 4.24 1.0404 4.4944
F3 1 0 0 0 0 0 0
-0.7 6.8 2.836 11.048

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 7.128834


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -4.79852
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 9.122095

IV. e = ∑II / ∑I = 1.029593


V. Io = ∑III = 9730.069
VI I kor = (∑I) * e² 1277.414
VII Io - I kor = 8452.655
VIII MBφ = VII / Volume displacement = 2.14213

D. SARAT 1,68 meter


ϕ 30 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 -1.45 2.92 -2.9 5.84 4.205 17.0528
A4 4 0.08 3.8 0.32 15.2 0.0256 57.76
A5 1 3.52 3.9 3.52 3.9 12.3904 15.21
∑= 0.94 24.94 16.62 90.02
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 41.1492
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ -58.3544
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 194.0437

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.52 3.9 3.52 3.9 12.3904 15.21


M2 4 7.29 3.9 29.16 15.6 212.5764 60.84
M3 2 7.84 3.9 15.68 7.8 122.9312 30.42
M4 4 7.84 3.9 31.36 15.6 245.8624 60.84
M5 2 7.84 3.9 15.68 7.8 122.9312 30.42
M6 4 6.24 3.9 24.96 15.6 155.7504 60.84
M7 1 -0.83 3.08 -0.83 3.08 0.6889 9.4864
119.53 69.38 873.13 268.06

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 839.5979


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 1344.607
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 3952.406

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 -0.83 3.08 -0.83 3.08 0.6889 9.4864


F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
-0.83 3.08 0.6889 9.4864

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 2.629488


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -5.14065
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 11.15928

IV. e = ∑II / ∑I = 1.450244


V. Io = ∑III = 4157.609
VI I kor = (∑I) * e² 885.4798
VII Io - I kor = 3272.13
VIII MBφ = VII / Volume displacement = 1.708915
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
242.79383 0.157216
121.39691 11.664
242.79383 149.038816
60.698457 110.592
667.68 271.45



m⁴

S* Ya³ S* Yb³

60.698457 110.592
242.79383 1707.83111
121.39691 1254.44403
242.79383 2508.88806
121.39691 1228.25
242.79383 1241.15493
60.698457 0.592704
1092.57 8051.75



m⁴

S* Ya³ S* Yb³

60.698457 0.592704
91.625216 -1.149984
0 0
152.32367 -0.55728


m⁴

m e/2 = -0.7569273
m⁴
m⁴ -1.5138547
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
544.19558 8.192
1088.3912 157.216
272.09779 152.273304
1904.68 317.68



m⁴

S* Ya³ S* Yb³

272.09779 152.273304
1088.3912 2447.8402
544.19558 1512.11606
1088.3912 3024.23212
544.19558 1497.22662
1088.3912 1707.83111
7.529536 15.252992
4633.19 10356.77



m⁴

S* Ya³ S* Yb³

7.529536 15.252992
0.027436 2.819876
0 0
7.556972 18.072868



m⁴

m e/2 = -0.3704487
m⁴
m⁴ -0.7408975
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0.011664 11.090466
640.41203 131.072
344.4721 119.823157
984.90 261.99



m⁴

S* Ya³ S* Yb³

344.4721 119.823157
3004.3577 1354.43549
1634.8008 688.944202
3269.6015 1377.8884
1634.8008 688.944202
1994.709 962.567392
2.406104 16.777216
11885.15 5209.38



m⁴

S* Ya³ S* Yb³

2.406104 16.777216
-0.530604 4.764064
0 0
1.8755 21.54128



m⁴

m e/2 = 0.51479656
m⁴
m⁴ 1.02959313
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
-6.09725 49.794176
0.002048 219.488
43.614208 59.319
37.52 328.60


m⁴

S* Ya³ S* Yb³

43.614208 59.319
1549.682 237.276
963.78061 118.638
1927.5612 237.276
963.78061 118.638
971.8825 237.276
-0.571787 29.218112
6419.73 1037.64



m⁴

S* Ya³ S* Yb³

-0.571787 29.218112
0 0
0 0
-0.571787 29.218112



m⁴

m e/2 = 0.72512198
m⁴
m⁴ 1.45024396
m⁴
m
PENENTUAN JARI JARI METASENTER 40°

A. SARAT 6,87 meter


ϕ 40 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.57 0.48 14.28 1.92 50.9796 0.9216
A3 2 3.57 0.71 7.14 1.42 25.4898 1.0082
A4 4 3.57 2.07 14.28 8.28 50.9796 17.1396
A5 1 3.57 3.51 3.57 3.51 12.7449 12.3201
∑= 39.27 15.13 140.19 31.39

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 86.496


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 86.4995
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 307.5977

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.57 3.51 3.57 3.51 12.7449 12.3201


M2 4 3.57 6.5 14.28 26 50.9796 169
M3 2 3.57 7.48 7.14 14.96 25.4898 111.9008
M4 4 3.57 7.48 14.28 29.92 50.9796 223.8016
M5 2 3.57 7.44 7.14 14.88 25.4898 110.7072
M6 4 3.57 5.66 14.28 22.64 50.9796 128.1424
M7 1 3.57 -0.69 3.57 -0.69 12.7449 0.4761
64.26 111.22 229.41 756.35

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 779.9092


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -1170.97
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 3190.814

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 3.57 -0.69 3.57 -0.69 12.7449 0.4761


F2 4 3.57 -2.14 14.28 -8.56 50.9796 18.3184
F3 1 0 0 0 0 0 0
17.85 -9.25 63.7245 18.7945
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 10.05049
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 26.25398
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 73.22309

IV. e = ∑II / ∑I = -1.20739


V. Io = ∑III = 3571.635
VI I kor = (∑I) * e² 877.9134
VII Io - I kor = 2693.721
VIII MBφ = VII / Volume displacement = 0.311682

B. SARAT 5,137 meter


ϕ 40 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 5.57 -2.18 22.28 -8.72 124.0996 19.0096
A3 2 6.05 0.85 12.1 1.7 73.205 1.445
A4 4 6.05 2.64 24.2 10.56 146.41 27.8784
A5 1 6.05 4.69 6.05 4.69 36.6025 21.9961
∑= 64.63 8.23 380.32 70.33

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 115.8474


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 246.4405
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1260.286

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 6.05 4.69 6.05 4.69 36.6025 21.9961


M2 4 6.05 7.17 24.2 28.68 146.41 205.6356
M3 2 6.05 7.31 12.1 14.62 73.205 106.8722
M4 4 6.05 8.11 24.2 32.44 146.41 263.0884
M5 2 6.05 7.28 12.1 14.56 73.205 105.9968
M6 4 6.05 6.33 24.2 25.32 146.41 160.2756
M7 1 3.15 1.88 3.15 1.88 9.9225 3.5344
106.00 122.19 632.17 867.40

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1014.175


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -522.741
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 5342.994

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 3.15 1.88 3.15 1.88 9.9225 3.5344


F2 4 1.07 0.14 4.28 0.56 4.5796 0.0784
F3 1 0 0 0 0 0 0
7.43 2.44 14.5021 3.6128

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 11.53469


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 6.362952
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 16.67746

IV. e = ∑II / ∑I = -0.23646


V. Io = ∑III = 6619.958
VI I kor = (∑I) * e² 1141.613
VII Io - I kor = 5478.344
VIII MBφ = VII / Volume displacement = 0.878529

C. SARAT 3,4 meter


ϕ 40 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 -0.67 2.82 -1.34 5.64 0.8978 15.9048
A4 4 6.9 4.26 27.6 17.04 190.44 72.5904
A5 1 7.58 5.44 7.58 5.44 57.4564 29.5936
∑= 33.84 28.12 248.79 118.09

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 98.5164


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 103.9108
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1199.936

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 7.58 5.44 7.58 5.44 57.4564 29.5936


M2 4 7.58 5.8 30.32 23.2 229.8256 134.56
M3 2 7.58 5.8 15.16 11.6 114.9128 67.28
M4 4 7.58 5.8 30.32 23.2 229.8256 134.56
M5 2 7.58 5.8 15.16 11.6 114.9128 67.28
M6 4 7.58 5.77 30.32 23.08 229.8256 133.1716
M7 1 0.67 3.44 0.67 3.44 0.4489 11.8336
129.53 101.56 977.21 578.28

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 1027.064


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 886.5065
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 5679.254

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0.67 3.44 0.67 3.44 0.4489 11.8336


F2 4 -1.52 0.43 -6.08 1.72 9.2416 0.7396
F3 1 0 0 0 0 0 0
-5.41 5.16 9.6905 12.5732

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ -0.29217


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -1.68445
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 10.62669

IV. e = ∑II / ∑I = 0.878648


V. Io = ∑III = 6889.816
VI I kor = (∑I) * e² 1126.06
VII Io - I kor = 5763.756
VIII MBφ = VII / Volume displacement = 1.46069

D. SARAT 1,68 meter


ϕ 40 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0 0 0 0 0 0
A4 4 -1.73 3.53 -6.92 14.12 11.9716 49.8436
A5 1 2.46 3.53 2.46 3.53 6.0516 12.4609
∑= -4.46 17.65 18.02 62.30
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 20.9721
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ -35.2036
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 113.4788

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 2.46 3.53 2.46 3.53 6.0516 12.4609


M2 4 6.75 3.53 27 14.12 182.25 49.8436
M3 2 7.21 3.53 14.42 7.06 103.9682 24.9218
M4 4 7.21 3.53 28.84 14.12 207.9364 49.8436
M5 2 7.21 3.53 14.42 7.06 103.9682 24.9218
M6 4 5.44 3.53 21.76 14.12 118.3744 49.8436
M7 1 0 0 0 0 0 0
108.90 60.01 722.55 211.84

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 750.7092


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 1134.916
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 2986.684

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 1.425086


V. Io = ∑III = 3100.163
VI I kor = (∑I) * e² 773.7122
VII Io - I kor = 2326.451
VIII MBφ = VII / Volume displacement = 1.215021
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
181.99717 0.442368
90.998586 0.715822
181.99717 35.478972
45.499293 43.243551
500.49 79.88



m⁴

S* Ya³ S* Yb³

45.499293 43.243551
181.99717 1098.5
90.998586 837.017984
181.99717 1674.03597
90.998586 823.661568
181.99717 725.285984
45.499293 -0.328509
818.99 5201.42



m⁴

S* Ya³ S* Yb³

45.499293 -0.328509
181.99717 -39.201376
0 0
227.49647 -39.529885


m⁴

m e/2 = -0.6036936
m⁴
m⁴ -1.2073873
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
691.23477 -41.440928
442.89025 1.22825
885.7805 73.598976
221.44513 103.161709
2241.35 136.55



m⁴

S* Ya³ S* Yb³

221.44513 103.161709
885.7805 1474.40725
442.89025 781.235782
885.7805 2133.64692
442.89025 771.656704
885.7805 1014.54455
31.255875 6.644672
3795.82 6285.30



m⁴

S* Ya³ S* Yb³

31.255875 6.644672
4.900172 0.010976
0 0
36.156047 6.655648



m⁴

m e/2 = -0.1182322
m⁴
m⁴ -0.2364645
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
-0.601526 44.851536
1314.036 309.235104
435.51951 160.989184
1748.95 515.08



m⁴

S* Ya³ S* Yb³

435.51951 160.989184
1742.078 780.448
871.03902 390.224
1742.078 780.448
871.03902 390.224
1742.078 768.400132
0.300763 40.707584
7404.13 3311.44



m⁴

S* Ya³ S* Yb³

0.300763 40.707584
-14.047232 0.318028
0 0
-13.746469 41.025612



m⁴

m e/2 = 0.4393242
m⁴
m⁴ 0.8786484
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0 0
-20.710868 175.947908
14.886936 43.986977
-5.82 219.93


m⁴

S* Ya³ S* Yb³

14.886936 43.986977
1230.1875 175.947908
749.61072 87.973954
1499.2214 175.947908
749.61072 87.973954
643.95674 175.947908
0 0
4887.47 747.78



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.7125431
m⁴
m⁴ 1.4250862
m⁴
m
PENENTUAN JARI JARI METASENTER 50°

A. SARAT 6,87 meter


ϕ 50 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.38 -1.07 13.52 -4.28 45.6976 4.5796
A3 2 3.38 -0.01 6.76 -0.02 22.8488 0.0002
A4 4 3.38 1.19 13.52 4.76 45.6976 5.6644
A5 1 3.38 2.63 3.38 2.63 11.4244 6.9169
∑= 37.18 3.09 125.67 17.16

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 64.0293


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 86.2633
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 235.7393

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.38 2.63 3.38 2.63 11.4244 6.9169


M2 4 3.38 5.87 13.52 23.48 45.6976 137.8276
M3 2 3.38 6.68 6.76 13.36 22.8488 89.2448
M4 4 3.38 6.68 13.52 26.72 45.6976 178.4896
M5 2 3.38 6.65 6.76 13.3 22.8488 88.445
M6 4 3.38 4.93 13.52 19.72 45.6976 97.2196
M7 1 3.38 -1.97 3.38 -1.97 11.4244 3.8809
60.84 97.24 205.64 602.02

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 702.576


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -880.854
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 2316.403

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 3.38 -1.97 3.38 -1.97 11.4244 3.8809


F2 4 3.38 -3.36 13.52 -13.44 45.6976 45.1584
F3 1 0 0 0 0 0 0
16.9 -15.41 57.122 49.0393
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 1.741305
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 4.722969
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 13.12592

IV. e = ∑II / ∑I = -1.02801


V. Io = ∑III = 2565.268
VI I kor = (∑I) * e² 769.4034
VII Io - I kor = 1795.865
VIII MBφ = VII / Volume displacement = 0.207794

B. SARAT 5,137 meter


ϕ 50 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 4.75 -1.79 19 -7.16 90.25 12.8164
A3 2 4.75 0.82 9.5 1.64 45.125 1.3448
A4 4 4.75 2.75 19 11 90.25 30.25
A5 1 4.75 4.91 4.75 4.91 22.5625 24.1081
∑= 52.25 10.39 248.19 68.52

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 99.5976


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 142.8362
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 720.0634

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.75 4.91 4.75 4.91 22.5625 24.1081


M2 4 4.75 6.48 19 25.92 90.25 167.9616
M3 2 4.75 6.48 9.5 12.96 45.125 83.9808
M4 4 4.75 6.48 19 25.92 90.25 167.9616
M5 2 4.75 6.48 9.5 12.96 45.125 83.9808
M6 4 4.75 6.09 19 24.36 90.25 148.3524
M7 1 4.75 1.95 4.75 1.95 22.5625 3.8025
85.50 108.98 406.13 680.15

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 864.3534


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -608.938
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 3298.465

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 4.75 1.95 4.75 1.95 22.5625 3.8025


F2 4 1.71 -0.07 6.84 -0.28 11.6964 0.0196
F3 1 0 0 0 0 0 0
11.59 1.67 34.2589 3.8221

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 15.49645


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 17.78515
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 52.42857

IV. e = ∑II / ∑I = -0.45772


V. Io = ∑III = 4070.957
VI I kor = (∑I) * e² 979.657
VII Io - I kor = 3091.3
VIII MBφ = VII / Volume displacement = 0.495733

C. SARAT 3,4 meter


ϕ 50 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 -1.9 4.18 -3.8 8.36 7.22 34.9448
A4 4 6.07 5.1 24.28 20.4 147.3796 104.04
A5 1 6.07 5.15 6.07 5.15 36.8449 26.5225
∑= 26.55 33.91 191.44 165.51

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 96.1314


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 20.62007
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 1016.428

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 6.07 5.15 6.07 5.15 36.8449 26.5225


M2 4 6.07 5.15 24.28 20.6 147.3796 106.09
M3 2 6.07 5.15 12.14 10.3 73.6898 53.045
M4 4 6.07 5.15 24.28 20.6 147.3796 106.09
M5 2 6.07 5.15 12.14 10.3 73.6898 53.045
M6 4 6.07 5.15 24.28 20.6 147.3796 106.09
M7 1 -0.4 4.4 -0.4 4.4 0.16 19.36
102.79 91.95 626.52 470.24

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 865.5089


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 347.2898
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 3290.871

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 -0.4 4.4 -0.4 4.4 0.16 19.36


F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
-0.4 4.4 0.16 19.36

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 4.674645


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -11.2191
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 33.15882

IV. e = ∑II / ∑I = 0.369125


V. Io = ∑III = 4340.458
VI I kor = (∑I) * e² 966.4512
VII Io - I kor = 3374.006
VIII MBφ = VII / Volume displacement = 0.855064

D. SARAT 1,68 meter


ϕ 50 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0 0 0 0 0 0
A4 4 0 0 0 0 0 0
A5 1 -0.2 6.43 -0.2 6.43 0.04 41.3449
∑= -0.20 6.43 0.04 41.34
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 9.9057
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ -32.8374
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 140.895

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 -0.2 6.43 -0.2 6.43 0.04 41.3449


M2 4 6.42 3.42 25.68 13.68 164.8656 46.7856
M3 2 6.83 3.42 13.66 6.84 93.2978 23.3928
M4 4 6.83 3.42 27.32 13.68 186.5956 46.7856
M5 2 6.83 3.42 13.66 6.84 93.2978 23.3928
M6 4 4.75 3.42 19 13.68 90.25 46.7856
M7 1 0 0 0 0 0 0
99.12 61.15 628.35 228.49

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 712.3093


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 888.5744
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 2619.2

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 1.184878


V. Io = ∑III = 2760.095
VI I kor = (∑I) * e² 723.619
VII Io - I kor = 2036.476
VIII MBφ = VII / Volume displacement = 1.063578
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
154.45789 -4.900172
77.228944 -0.000002
154.45789 6.740636
38.614472 18.191447
424.76 20.03



m⁴

S* Ya³ S* Yb³

38.614472 18.191447
154.45789 809.048012
77.228944 596.155264
154.45789 1192.31053
77.228944 588.15925
154.45789 479.292628
38.614472 -7.645373
695.06 3675.51



m⁴

S* Ya³ S* Yb³

38.614472 -7.645373
154.45789 -151.73222
0 0
193.07236 -159.3776


m⁴

m e/2 = -0.5140047
m⁴
m⁴ -1.0280094
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
428.6875 -22.941356
214.34375 1.102736
428.6875 83.1875
107.17188 118.370771
1178.89 179.72



m⁴

S* Ya³ S* Yb³

107.17188 118.370771
428.6875 1088.39117
214.34375 544.195584
428.6875 1088.39117
214.34375 544.195584
428.6875 903.466116
107.17188 7.414875
1929.09 4294.43



m⁴

S* Ya³ S* Yb³

107.17188 7.414875
20.000844 -0.001372
0 0
127.17272 7.413503



m⁴

m e/2 = -0.228862
m⁴
m⁴ -0.4577241
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
-13.718 146.069264
894.59417 530.604
223.64854 136.590875
1104.52 813.26



m⁴

S* Ya³ S* Yb³

223.64854 136.590875
894.59417 546.3635
447.29709 273.18175
894.59417 546.3635
447.29709 273.18175
894.59417 546.3635
-0.064 85.184
3801.96 2407.23



m⁴

S* Ya³ S* Yb³

-0.064 85.184
0 0
0 0
-0.064 85.184



m⁴

m e/2 = 0.18456235
m⁴
m⁴ 0.36912469
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0
-0.008 265.847707
-0.01 265.85


m⁴

S* Ya³ S* Yb³

-0.008 265.847707
1058.4372 160.006752
637.22397 80.003376
1274.4479 160.006752
637.22397 80.003376
428.6875 160.006752
0 0
4036.01 905.87



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.59243924
m⁴
m⁴ 1.18487848
m⁴
m
PENENTUAN JARI JARI METASENTER 60°

A. SARAT 6,87 meter


ϕ 60 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.29 -1.54 13.16 -6.16 43.2964 9.4864
A3 2 3.29 -0.57 6.58 -1.14 21.6482 0.6498
A4 4 3.29 0.53 13.16 2.12 43.2964 1.1236
A5 1 3.29 1.99 3.29 1.99 10.8241 3.9601
∑= 36.19 -3.19 119.07 15.22

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 52.47


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 82.55693
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 204.167

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.29 1.99 3.29 1.99 10.8241 3.9601


M2 4 3.29 5.51 13.16 22.04 43.2964 121.4404
M3 2 3.29 6.09 6.58 12.18 21.6482 74.1762
M4 4 3.29 6.09 13.16 24.36 43.2964 148.3524
M5 2 3.29 6.06 6.58 12.12 21.6482 73.4472
M6 4 3.29 4.47 13.16 17.88 43.2964 79.9236
M7 1 3.29 -3.11 3.29 -3.11 10.8241 9.6721
59.22 87.46 194.83 510.97

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 651.9095


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -702.528
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1826.109

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 3.29 -3.11 3.29 -3.11 10.8241 9.6721


F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
3.29 -3.11 10.8241 9.6721
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0.210359
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0.673149
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 2.154644

IV. e = ∑II / ∑I = -0.87895


V. Io = ∑III = 2032.43
VI I kor = (∑I) * e² 705.3624
VII Io - I kor = 1327.068
VIII MBφ = VII / Volume displacement = 0.153551

B. SARAT 5,137 meter


ϕ 60 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 4.33 -1.65 17.32 -6.6 74.9956 10.89
A3 2 4.33 0.49 8.66 0.98 37.4978 0.4802
A4 4 4.33 2.69 17.32 10.76 74.9956 28.9444
A5 1 4.33 4.87 4.33 4.87 18.7489 23.7169
∑= 47.63 10.01 206.24 64.03

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 91.6476


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 113.0541
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 566.3785

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.33 4.87 4.33 4.87 18.7489 23.7169


M2 4 4.33 5.6 17.32 22.4 74.9956 125.44
M3 2 4.33 5.6 8.66 11.2 37.4978 62.72
M4 4 4.33 5.6 17.32 22.4 74.9956 125.44
M5 2 4.33 5.6 8.66 11.2 37.4978 62.72
M6 4 4.33 5.5 17.32 22 74.9956 121
M7 1 4.33 1.81 4.33 1.81 18.7489 3.2761
77.94 95.88 337.48 524.31

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 772.5314


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -415.183
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 2308.475

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 4.33 1.81 4.33 1.81 18.7489 3.2761


F2 4 4.33 -0.66 17.32 -2.64 74.9956 1.7424
F3 1 0 0 0 0 0 0
21.65 -0.83 93.7445 5.0185

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 24.33153


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 51.84532
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 159.9872

IV. e = ∑II / ∑I = -0.28169


V. Io = ∑III = 3034.84
VI I kor = (∑I) * e² 888.5899
VII Io - I kor = 2146.25
VIII MBφ = VII / Volume displacement = 0.344181

C. SARAT 3,4 meter


ϕ 60 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 5.27 -3.99 21.08 -15.96 111.0916 63.6804
A3 2 2.2 2.29 4.4 4.58 9.68 10.4882
A4 4 5.27 4.66 21.08 18.64 111.0916 86.8624
A5 1 5.27 4.66 5.27 4.66 27.7729 21.7156
∑= 51.83 11.92 259.64 182.75

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 101.3625


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 61.12715
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 855.6698

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 5.27 4.66 5.27 4.66 27.7729 21.7156


M2 4 5.27 4.66 21.08 18.64 111.0916 86.8624
M3 2 5.27 4.66 10.54 9.32 55.5458 43.4312
M4 4 5.27 4.66 21.08 18.64 111.0916 86.8624
M5 2 5.27 4.66 10.54 9.32 55.5458 43.4312
M6 4 5.27 4.66 21.08 18.64 111.0916 86.8624
M7 1 -1.26 4.66 -1.26 4.66 1.5876 21.7156
88.33 83.88 473.73 390.88

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 765.3759


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 184.102
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 2283.069

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 -1.26 4.66 -1.26 4.66 1.5876 21.7156


F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
-1.26 4.66 1.5876 21.7156

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 3.973448


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ -11.7614
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 38.64152

IV. e = ∑II / ∑I = 0.268134


V. Io = ∑III = 3177.381
VI I kor = (∑I) * e² 870.7837
VII Io - I kor = 2306.597
VIII MBφ = VII / Volume displacement = 0.584554

D. SARAT 1,68 meter


ϕ 60 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0 0 0 0 0 0
A4 4 0 0 0 0 0 0
A5 1 0 0 0 0 0 0
∑= 0.00 0.00 0.00 0.00
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 0
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 0

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 0 0 0 0 0 0
M2 4 6.57 3.36 26.28 13.44 172.6596 45.1584
M3 2 6.57 3.36 13.14 6.72 86.3298 22.5792
M4 4 6.57 3.36 26.28 13.44 172.6596 45.1584
M5 2 6.57 3.36 13.14 6.72 86.3298 22.5792
M6 4 4.51 3.3 18.04 13.2 81.3604 43.56
M7 1 0 0 0 0 0 0
96.88 53.52 599.34 179.04

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 668.4428


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 934.0066
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 2315.57

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 1.397287


V. Io = ∑III = 2315.57
VI I kor = (∑I) * e² 670.3952
VII Io - I kor = 1645.175
VIII MBφ = VII / Volume displacement = 0.859215
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
142.44516 -14.609056
71.222578 -0.370386
142.44516 0.595508
35.611289 7.880599
391.72 -6.50



m⁴

S* Ya³ S* Yb³

35.611289 7.880599
142.44516 669.136604
71.222578 451.733058
142.44516 903.466116
71.222578 445.090032
142.44516 357.258492
35.611289 -30.080231
641.00 2804.48



m⁴

S* Ya³ S* Yb³

35.611289 -30.080231
0 0
0 0
35.611289 -30.080231


m⁴

m e/2 = -0.4394738
m⁴
m⁴ -0.8789475
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
324.73095 -17.9685
162.36547 0.235298
324.73095 77.860436
81.182737 115.501303
893.01 175.63



m⁴

S* Ya³ S* Yb³

81.182737 115.501303
324.73095 702.464
162.36547 351.232
324.73095 702.464
162.36547 351.232
324.73095 665.5
81.182737 5.929741
1461.29 2894.32



m⁴

S* Ya³ S* Yb³

81.182737 5.929741
324.73095 -1.149984
0 0
405.91369 4.779757



m⁴

m e/2 = -0.1408445
m⁴
m⁴ -0.2816889
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
585.45273 -254.0848
21.296 24.017978
585.45273 404.778784
146.36318 101.194696
1338.56 275.91



m⁴

S* Ya³ S* Yb³

146.36318 101.194696
585.45273 404.778784
292.72637 202.389392
585.45273 404.778784
292.72637 202.389392
585.45273 404.778784
-2.000376 101.194696
2486.17 1821.50



m⁴

S* Ya³ S* Yb³

-2.000376 101.194696
0 0
0 0
-2.000376 101.194696



m⁴

m e/2 = 0.13406717
m⁴
m⁴ 0.26813433
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0
0 0
0.00 0.00


m⁴

S* Ya³ S* Yb³

0 0
1134.3736 151.732224
567.18679 75.866112
1134.3736 151.732224
567.18679 75.866112
366.9354 143.748
0 0
3770.06 598.94



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.69864362
m⁴
m⁴ 1.39728723
m⁴
m
PENENTUAN JARI JARI METASENTER 70°

A. SARAT 6,87 meter


ϕ 70 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.23 -1.98 12.92 -7.92 41.7316 15.6816
A3 2 3.23 -1.07 6.46 -2.14 20.8658 2.2898
A4 4 3.23 -0.01 12.92 -0.04 41.7316 0.0004
A5 1 3.23 1.53 3.23 1.53 10.4329 2.3409
∑= 35.53 -8.57 114.76 20.31

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 42.8664


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 75.08711
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 180.6043

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.23 1.53 3.23 1.53 10.4329 2.3409


M2 4 3.23 5.34 12.92 21.36 41.7316 114.0624
M3 2 3.23 5.7 6.46 11.4 20.8658 64.98
M4 4 3.23 5.7 12.92 22.8 41.7316 129.96
M5 2 3.23 5.67 6.46 11.34 20.8658 64.2978
M6 4 3.23 4.27 12.92 17.08 41.7316 72.9316
M7 1 0 0 0 0 0 0
54.91 85.51 177.36 448.57

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 624.0873


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -602.695
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1575.526

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = -0.79107


V. Io = ∑III = 1756.13
VI I kor = (∑I) * e² 667.5795
VII Io - I kor = 1088.55
VIII MBφ = VII / Volume displacement = 0.125953

B. SARAT 5,137 meter


ϕ 70 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 4.06 -1.63 16.24 -6.52 65.9344 10.6276
A3 2 4.06 0.31 8.12 0.62 32.9672 0.1922
A4 4 4.06 3.08 16.24 12.32 65.9344 37.9456
A5 1 4.06 4.92 4.06 4.92 16.4836 24.2064
∑= 44.66 11.34 181.32 72.97

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 89.04


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 86.1365
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 506.0769

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.06 4.92 4.06 4.92 16.4836 24.2064


M2 4 4.06 5.1 16.24 20.4 65.9344 104.04
M3 2 4.06 5.1 8.12 10.2 32.9672 52.02
M4 4 4.06 5.1 16.24 20.4 65.9344 104.04
M5 2 4.06 5.1 8.12 10.2 32.9672 52.02
M6 4 4.06 5.1 16.24 20.4 65.9344 104.04
M7 1 4.06 1.95 4.06 1.95 16.4836 3.8025
73.08 88.47 296.70 444.17

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 717.9982


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -327.697
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1830.38

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 4.06 1.95 4.06 1.95 16.4836 3.8025


F2 4 4.06 -1.32 16.24 -5.28 65.9344 6.9696
F3 1 0 0 0 0 0 0
20.3 -3.33 82.418 10.7721

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 19.83218


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 41.86489
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 129.656

IV. e = ∑II / ∑I = -0.24151


V. Io = ∑III = 2466.113
VI I kor = (∑I) * e² 826.9287
VII Io - I kor = 1639.185
VIII MBφ = VII / Volume displacement = 0.262866

C. SARAT 3,4 meter


ϕ 70 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 4.79 -3.2 19.16 -12.8 91.7764 40.96
A3 2 4.79 -1.84 9.58 -3.68 45.8882 6.7712
A4 4 4.79 4.36 19.16 17.44 91.7764 76.0384
A5 1 4.79 4.36 4.79 4.36 22.9441 19.0096
∑= 52.69 5.32 252.39 142.78

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 92.2359


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 87.13669
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 784.2955

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.79 4.36 4.79 4.36 22.9441 19.0096


M2 4 4.79 4.36 19.16 17.44 91.7764 76.0384
M3 2 4.79 4.36 9.58 8.72 45.8882 38.0192
M4 4 4.79 4.36 19.16 17.44 91.7764 76.0384
M5 2 4.79 4.36 9.58 8.72 45.8882 38.0192
M6 4 4.79 4.36 19.16 17.44 91.7764 76.0384
M7 1 0 0 0 0 0 0
81.43 74.12 390.05 323.16

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 691.3316


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 148.6363
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1736.985

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 0.300897


V. Io = ∑III = 2521.28
VI I kor = (∑I) * e² 783.658
VII Io - I kor = 1737.622
VIII MBφ = VII / Volume displacement = 0.44036

D. SARAT 1,68 meter


ϕ 70 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0 0 0 0 0 0
A4 4 0 0 0 0 0 0
A5 1 0 0 0 0 0 0
∑= 0.00 0.00 0.00 0.00
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 0
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 0

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 0 0 0 0 0 0
M2 4 5.73 3.42 22.92 13.68 131.3316 46.7856
M3 2 5.73 3.42 11.46 6.84 65.6658 23.3928
M4 4 5.73 3.42 22.92 13.68 131.3316 46.7856
M5 2 5.73 3.42 11.46 6.84 65.6658 23.3928
M6 4 5.73 3.42 22.92 13.68 131.3316 46.7856
M7 1 0 0 0 0 0 0
91.68 54.72 525.33 187.14

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 650.665


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 751.5181
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1934.578

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 1.155


V. Io = ∑III = 1934.578
VI I kor = (∑I) * e² 651.9991
VII Io - I kor = 1282.579
VIII MBφ = VII / Volume displacement = 0.669844
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
134.79307 -31.049568
67.396534 -2.450086
134.79307 -0.000004
33.698267 3.581577
370.68 -29.92



m⁴

S* Ya³ S* Yb³

33.698267 3.581577
134.79307 609.093216
67.396534 370.386
134.79307 740.772
67.396534 364.568526
134.79307 311.417932
0 0
572.87 2399.82



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0


m⁴

m e/2 = -0.3955356
m⁴
m⁴ -0.7910711
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
267.69366 -17.322988
133.84683 0.059582
267.69366 116.872448
66.923416 119.095488
736.16 218.70



m⁴

S* Ya³ S* Yb³

66.923416 119.095488
267.69366 530.604
133.84683 265.302
267.69366 530.604
133.84683 265.302
267.69366 530.604
66.923416 7.414875
1204.62 2248.93



m⁴

S* Ya³ S* Yb³

66.923416 7.414875
267.69366 -9.199872
0 0
334.61708 -1.784997



m⁴

m e/2 = -0.120754
m⁴
m⁴ -0.241508
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
439.60896 -131.072
219.80448 -12.459008
439.60896 331.527424
109.90224 82.881856
1208.92 270.88



m⁴

S* Ya³ S* Yb³

109.90224 82.881856
439.60896 331.527424
219.80448 165.763712
439.60896 331.527424
219.80448 165.763712
439.60896 331.527424
0 0
1868.34 1408.99



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.15044842
m⁴
m⁴ 0.30089684
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0
0 0
0.00 0.00


m⁴

S* Ya³ S* Yb³

0 0
752.53007 160.006752
376.26503 80.003376
752.53007 160.006752
376.26503 80.003376
752.53007 160.006752
0 0
3010.12 640.03



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.5775
m⁴
m⁴ 1.155
m⁴
m
PENENTUAN JARI JARI METASENTER 80°

A. SARAT 6,87 meter


ϕ 80 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.21 -2.49 12.84 -9.96 41.2164 24.8004
A3 2 3.21 -1.64 6.42 -3.28 20.6082 5.3792
A4 4 3.21 -0.54 12.84 -2.16 41.2164 1.1664
A5 1 3.21 1.16 3.21 1.16 10.3041 1.3456
∑= 35.31 -14.24 113.35 32.69

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 33.5013


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 64.11953
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 155.9228

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.21 1.16 3.21 1.16 10.3041 1.3456


M2 4 3.21 5.27 12.84 21.08 41.2164 111.0916
M3 2 3.21 5.47 6.42 10.94 20.6082 59.8418
M4 4 3.21 5.47 12.84 21.88 41.2164 119.6836
M5 2 3.21 5.44 6.42 10.88 20.6082 59.1872
M6 4 3.21 4.24 12.84 16.96 41.2164 71.9104
M7 1 0 0 0 0 0 0
54.57 82.90 175.17 423.06

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 610.9763


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -550.866
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1461.841

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = -0.75526


V. Io = ∑III = 1617.764
VI I kor = (∑I) * e² 645.048
VII Io - I kor = 972.7159
VIII MBφ = VII / Volume displacement = 0.11255

B. SARAT 5,137 meter


ϕ 80 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.91 -1.63 15.64 -6.52 61.1524 10.6276
A3 2 3.91 0.16 7.82 0.32 30.5762 0.0512
A4 4 3.91 4.06 15.64 16.24 61.1524 65.9344
A5 1 3.91 4.81 3.91 4.81 15.2881 23.1361
∑= 43.01 14.85 168.17 99.75

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 91.9974


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 54.39374
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 540.1785

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.91 4.81 3.91 4.81 15.2881 23.1361


M2 4 3.91 4.82 15.64 19.28 61.1524 92.9296
M3 2 3.91 4.82 7.82 9.64 30.5762 46.4648
M4 4 3.91 4.82 15.64 19.28 61.1524 92.9296
M5 2 3.91 4.82 7.82 9.64 30.5762 46.4648
M6 4 3.91 4.82 15.64 19.28 61.1524 92.9296
M7 1 3.91 2.39 3.91 2.39 15.2881 5.7121
70.38 84.32 275.19 400.57

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 687.5538


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -278.623
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1586.076

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 3.91 2.39 3.91 2.39 15.2881 5.7121


F2 4 3.91 -2.3 15.64 -9.2 61.1524 21.16
F3 1 0 0 0 0 0 0
19.55 -6.81 76.4405 26.8721

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 14.88874


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 28.96433
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 102.7901

IV. e = ∑II / ∑I = -0.24579


V. Io = ∑III = 2229.044
VI I kor = (∑I) * e² 794.5004
VII Io - I kor = 1434.544
VIII MBφ = VII / Volume displacement = 0.230049

C. SARAT 3,4 meter


ϕ 80 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 4.52 -2.81 18.08 -11.24 81.7216 31.5844
A3 2 4.52 1.64 9.04 3.28 40.8608 5.3792
A4 4 4.52 0.86 18.08 3.44 81.7216 2.9584
A5 1 4.52 4.21 4.52 4.21 20.4304 17.7241
∑= 49.72 -0.31 224.73 57.65

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 78.5619


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 132.8352
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 536.9069

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.52 4.21 4.52 4.21 20.4304 17.7241


M2 4 4.52 4.21 18.08 16.84 81.7216 70.8964
M3 2 4.52 4.21 9.04 8.42 40.8608 35.4482
M4 4 4.52 4.21 18.08 16.84 81.7216 70.8964
M5 2 4.52 4.21 9.04 8.42 40.8608 35.4482
M6 4 4.52 4.21 18.08 16.84 81.7216 70.8964
M7 1 0 0 0 0 0 0
76.84 71.57 347.32 301.31

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 659.5984


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 102.2377
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1504.344

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 0.318458


V. Io = ∑III = 2041.251
VI I kor = (∑I) * e² 738.2617
VII Io - I kor = 1302.99
VIII MBφ = VII / Volume displacement = 0.330213

D. SARAT 1,68 meter


ϕ 80 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0 0 0 0 0 0
A4 4 0 0 0 0 0 0
A5 1 0 0 0 0 0 0
∑= 0.00 0.00 0.00 0.00
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 0
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 0

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 0 0 0 0 0 0
M2 4 5.28 3.21 21.12 12.84 111.5136 41.2164
M3 2 5.28 3.41 10.56 6.82 55.7568 23.2562
M4 4 5.28 3.41 21.12 13.64 111.5136 46.5124
M5 2 5.28 3.41 10.56 6.82 55.7568 23.2562
M6 4 5.28 1.64 21.12 6.56 111.5136 10.7584
M7 1 0 0 0 0 0 0
84.48 46.68 446.05 145.00

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 582.9319


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 669.009
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1495.835

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 1.147662


V. Io = ∑III = 1495.835
VI I kor = (∑I) * e² 584.249
VII Io - I kor = 911.586
VIII MBφ = VII / Volume displacement = 0.476088
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
132.30464 -61.752996
66.152322 -8.821888
132.30464 -0.629856
33.076161 1.560896
363.84 -69.64



m⁴

S* Ya³ S* Yb³

33.076161 1.560896
132.30464 585.452732
66.152322 327.334646
132.30464 654.669292
66.152322 321.978368
132.30464 304.900096
0 0
562.29 2195.90



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0


m⁴

m e/2 = -0.377629
m⁴
m⁴ -0.7552581
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
239.10588 -17.322988
119.55294 0.008192
239.10588 267.693664
59.776471 111.284641
657.54 361.66



m⁴

S* Ya³ S* Yb³

59.776471 111.284641
239.10588 447.920672
119.55294 223.960336
239.10588 447.920672
119.55294 223.960336
239.10588 447.920672
59.776471 13.651919
1075.98 1916.62



m⁴

S* Ya³ S* Yb³

59.776471 13.651919
239.10588 -48.668
0 0
298.88236 -35.016081



m⁴

m e/2 = -0.1228949
m⁴
m⁴ -0.2457898
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
369.38163 -88.752164
184.69082 8.821888
369.38163 2.544224
92.345408 74.618461
1015.80 -2.77



m⁴

S* Ya³ S* Yb³

92.345408 74.618461
369.38163 298.473844
184.69082 149.236922
369.38163 298.473844
184.69082 149.236922
369.38163 298.473844
0 0
1569.87 1268.51



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.15922894
m⁴
m⁴ 0.31845787
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0
0 0
0.00 0.00


m⁴

S* Ya³ S* Yb³

0 0
588.79181 132.304644
294.3959 79.303642
588.79181 158.607284
294.3959 79.303642
588.79181 17.643776
0 0
2355.17 467.16



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.5738312
m⁴
m⁴ 1.1476624
m⁴
m
PENENTUAN JARI JARI METASENTER 90°

A. SARAT 6,87 meter


ϕ 90 ° T= 6.87 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.23 -3.22 12.92 -12.88 41.7316 41.4736
A3 2 3.23 -2.42 6.46 -4.84 20.8658 11.7128
A4 4 3.23 1.29 12.92 5.16 41.7316 6.6564
A5 1 3.23 0.81 3.23 0.81 10.4329 0.6561
∑= 35.53 -11.75 114.76 60.50

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 37.8102


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 43.13909
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 115.4919

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.23 0.81 3.23 0.81 10.4329 0.6561


M2 4 3.23 5.3 12.92 21.2 41.7316 112.36
M3 2 3.23 5.37 6.46 10.74 20.8658 57.6738
M4 4 3.23 5.37 12.92 21.48 41.7316 115.3476
M5 2 3.23 5.365 6.46 10.73 20.8658 57.56645
M6 4 3.23 4.39 12.92 17.56 41.7316 77.0884
M7 1 0 0 0 0 0 0
54.91 82.52 177.36 420.69

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 610.7985


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -540.739
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1455.007

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = -0.76718


V. Io = ∑III = 1570.499
VI I kor = (∑I) * e² 649.1972
VII Io - I kor = 921.302
VIII MBφ = VII / Volume displacement = 0.106601

B. SARAT 5,137 meter


ϕ 90 ° T= 5.137 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 3.87 -1.68 15.48 -6.72 59.9076 11.2896
A3 2 3.87 -0.02 7.74 -0.04 29.9538 0.0008
A4 4 3.87 4.68 15.48 18.72 59.9076 87.6096
A5 1 3.87 4.73 3.87 4.73 14.9769 22.3729
∑= 42.57 16.69 164.75 121.27

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 94.2234


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 34.56104
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 601.2515

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 3.87 4.73 3.87 4.73 14.9769 22.3729


M2 4 3.87 4.73 15.48 18.92 59.9076 89.4916
M3 2 3.87 4.73 7.74 9.46 29.9538 44.7458
M4 4 3.87 4.73 15.48 18.92 59.9076 89.4916
M5 2 3.87 4.73 7.74 9.46 29.9538 44.7458
M6 4 3.87 4.73 15.48 18.92 59.9076 89.4916
M7 1 3.87 3.24 3.87 3.24 14.9769 10.4976
69.66 83.65 269.58 390.84

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 681.3761


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ -269.45
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1524.443

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 3.87 3.24 3.87 3.24 14.9769 10.4976


F2 4 3.87 -3.56 15.48 -14.24 59.9076 50.6944
F3 1 0 0 0 0 0 0
19.35 -11 74.8845 61.192

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 9.758322


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 8.000947
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 55.83987

IV. e = ∑II / ∑I = -0.2889


V. Io = ∑III = 2181.535
VI I kor = (∑I) * e² 785.4413
VII Io - I kor = 1396.093
VIII MBφ = VII / Volume displacement = 0.223883

C. SARAT 3,4 meter


ϕ 90 ° T= 3.4 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 4.43 -2.62 17.72 -10.48 78.4996 27.4576
A3 2 4.43 -1.54 8.86 -3.08 39.2498 4.7432
A4 4 4.43 0.45 17.72 1.8 78.4996 0.81
A5 1 4.43 3.95 4.43 3.95 19.6249 15.6025
∑= 48.73 -7.81 215.87 48.61

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 65.0628


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 132.9722
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 497.7083

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 4.43 3.95 4.43 3.95 19.6249 15.6025


M2 4 4.43 4.17 17.72 16.68 78.4996 69.5556
M3 2 4.43 4.17 8.86 8.34 39.2498 34.7778
M4 4 4.43 4.17 17.72 16.68 78.4996 69.5556
M5 2 4.43 4.17 8.86 8.34 39.2498 34.7778
M6 4 4.43 4.17 17.72 16.68 78.4996 69.5556
M7 1 4.43 -4.38 4.43 -4.38 19.6249 19.1844
79.74 66.29 353.25 313.01

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 649.0206


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 89.41955
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1432.42

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 4.43 -4.38 4.43 -4.38 19.6249 19.1844


F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
4.43 -4.38 19.6249 19.1844

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0.058433


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0.257398
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 1.133849

IV. e = ∑II / ∑I = 0.311772


V. Io = ∑III = 1931.262
VI I kor = (∑I) * e² 714.239
VII Io - I kor = 1217.023
VIII MBφ = VII / Volume displacement = 0.308426

D. SARAT 1,68 meter


ϕ 90 ° T= 1.68 m V=
Δ=
1 . Bagian Belakang Kapal I₁ = 4.77 ρ=

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

A1 1 0 0 0 0 0 0
A2 4 0 0 0 0 0 0
A3 2 0 0 0 0 0 0
A4 4 0 0 0 0 0 0
A5 1 0 0 0 0 0 0
∑= 0.00 0.00 0.00 0.00
I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₁ 0
II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₁ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₁ 0

2 . Bagian Tengah Kapal I₂ = 13.3333

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

M1 1 0 0 0 0 0 0
M2 4 4.97 2.12 19.88 8.48 98.8036 17.9776
M3 2 4.97 3.15 9.94 6.3 49.4018 19.845
M4 4 4.97 3.15 19.88 12.6 98.8036 39.69
M5 2 4.97 3.11 9.94 6.22 49.4018 19.3442
M6 4 4.97 -0.66 19.88 -2.64 98.8036 1.7424
M7 1 0 0 0 0 0 0
79.52 30.96 395.21 98.60

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₂ 491.021


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₂ 659.1432
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₂ 1191.903

3 . Bagian Depan Kapal I₃ = 3.51

No. S Ya Yb S* Ya S* Yb S* Ya² S* Yb²

F1 1 0 0 0 0 0 0
F2 4 0 0 0 0 0 0
F3 1 0 0 0 0 0 0
0 0 0 0

I. Area A = ⅓ * {∑(S * Ya) + ∑(S * Yb)} * I₃ 0


II. Momen Statis A = ⅙ * {∑(S * Ya²) - ∑(S * Yb²)} * I₃ 0
III. Momen Inersia A = ⅟₉ * {∑(S * Ya³) + ∑(s * Yb³)} * I₃ 0

IV. e = ∑II / ∑I = 1.342393


V. Io = ∑III = 1191.903
VI I kor = (∑I) * e² 492.823
VII Io - I kor = 699.0801
VIII MBφ = VII / Volume displacement = 0.365104
8642.5268 m³
8858.59 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
134.79307 -133.54499
67.396534 -28.344976
134.79307 8.586756
33.698267 0.531441
370.68 -152.77



m⁴

S* Ya³ S* Yb³

33.698267 0.531441
134.79307 595.508
67.396534 309.708306
134.79307 619.416612
67.396534 308.844004
134.79307 338.418076
0 0
572.87 2172.43



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0


m⁴

m e/2 = -0.3835901
m⁴
m⁴
m⁴
m

6235.8146 m³
6391.71 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
231.84241 -18.966528
115.92121 -0.000016
231.84241 410.012928
57.960603 105.823817
637.57 496.87



m⁴

S* Ya³ S* Yb³

57.960603 105.823817
231.84241 423.295268
115.92121 211.647634
231.84241 423.295268
115.92121 211.647634
231.84241 423.295268
57.960603 34.012224
1043.29 1833.02



m⁴

S* Ya³ S* Yb³

57.960603 34.012224
231.84241 -180.47206
0 0
289.80302 -146.45984



m⁴

m e/2 = -0.1444487
m⁴
m⁴
m⁴
m

3945.9122 m³
4044.56 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
347.75323 -71.938912
173.87661 -7.304528
347.75323 0.3645
86.938307 61.629875
956.32 -17.25



m⁴

S* Ya³ S* Yb³

86.938307 61.629875
347.75323 290.046852
173.87661 145.023426
347.75323 290.046852
173.87661 145.023426
347.75323 290.046852
86.938307 -84.027672
1564.89 1137.79



m⁴

S* Ya³ S* Yb³

86.938307 -84.027672
0 0
0 0
86.938307 -84.027672



m⁴

m e/2 = 0.15588579
m⁴
m⁴
m⁴
m

1914.7415 m³
1962.61 ton dari kurva hidrostatik
1.025 ton/m³

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0
0 0
0.00 0.00


m⁴

S* Ya³ S* Yb³

0 0
491.05389 38.112512
245.52695 62.51175
491.05389 125.0235
245.52695 60.160462
491.05389 -1.149984
0 0
1964.22 284.66



m⁴

S* Ya³ S* Yb³

0 0
0 0
0 0
0 0



m⁴

m e/2 = 0.6711966
m⁴
m⁴
m⁴
m
PENENTUAN KOORDINAT TITIK B, KOORDINAT TITIK M DAN LENGAN STABILITAS

A. SARAT 6,87 meter


T = 6.87 m V = 8642.52682927 m³ dφ / 2 =

φ MB φ MB φ * cos φ ʃ MB φ * cos φ MB φ * sin φ


φ cos φ sin φ
(°) (m) (m) (m) (m)
I II III IV V
0 1.2983 0 1 1.298 0.000 0.000 0.000
10 1.3128 0.1744 0.9848 1.293 2.591 0.174 0.228
20 0.8583 0.3489 0.9398 0.807 4.691 0.342 0.293
30 0.5071 0.5233 0.8662 0.439 5.936 0.500 0.253
40 0.3117 0.6978 0.7663 0.239 6.614 0.643 0.200
50 0.2078 0.8722 0.6431 0.134 6.987 0.766 0.159
60 0.1536 1.0467 0.5005 0.077 7.197 0.866 0.133
70 0.126 1.2211 0.3426 0.043 7.317 0.939 0.118
80 0.1125 1.3956 0.1743 0.020 7.380 0.985 0.111
90 0.1066 1.57 0.0008 0.000 7.400 1.000 0.107

B. SARAT 5,137 meter


T = 5.137 m V = 6235.81463415 m³

φ MB φ MB φ * cos φ ʃ MB φ * cos φ MB φ * sin φ


φ cos φ sin φ
(°) (m) (m) (m) (m)
I II III IV V
0 1.5059 0 1 1.506 0.000 0.000 0.000
10 1.5882 0.1744 0.9848 1.564 3.070 0.174 0.276
20 1.8175 0.3489 0.9398 1.708 6.342 0.342 0.621
30 1.2625 0.5233 0.8662 1.094 9.144 0.500 0.631
40 0.8785 0.6978 0.7663 0.673 10.910 0.643 0.564
50 0.4957 0.8722 0.6431 0.319 11.902 0.766 0.380
60 0.3442 1.0467 0.5005 0.172 12.393 0.866 0.298
70 0.2629 1.2211 0.3426 0.090 12.656 0.939 0.247
80 0.23 1.3956 0.1743 0.040 12.786 0.985 0.227
90 0.2239 1.57 0.0008 0.000 12.826 1.000 0.224

C. SARAT 3,4 meter


T= 3.4 m V = 3945.91219512 m³

φ MB φ MB φ * cos φ ʃ MB φ * cos φ MB φ * sin φ


φ cos φ sin φ
(°) (m) (m) (m) (m)
I II III IV V
0 2.3798 0 1 2.380 0.000 0.000 0.000
10 2.2408 0.1744 0.9848 2.207 4.587 0.174 0.389
20 2.2338 0.3489 0.9398 2.099 8.893 0.342 0.764
30 2.1421 0.5233 0.8662 1.855 12.847 0.500 1.071
40 1.4607 0.6978 0.7663 1.119 15.822 0.643 0.939
50 0.8551 0.8722 0.6431 0.550 17.491 0.766 0.655
60 0.5846 1.0467 0.5005 0.293 18.334 0.866 0.506
70 0.4404 1.2211 0.3426 0.151 18.777 0.939 0.414
80 0.3302 1.3956 0.1743 0.058 18.985 0.985 0.325
90 0.3084 1.57 0.0008 0.000 19.043 1.000 0.308

D. SARAT 1,68 meter


T = 1.68 m V = 1914.74146341 m³

φ MB φ MB φ * cos φ ʃ MB φ * cos φ MB φ * sin φ


φ cos φ sin φ
(°) (m) (m) (m) (m)
, II III IV V
0 3.6214 0 1 3.621 0.000 0.000 0.000
10 3.4233 0.1744 0.9848 3.371 6.993 0.174 0.594
20 2.4566 0.3489 0.9398 2.309 12.673 0.342 0.840
30 1.7089 0.5233 0.8662 1.480 16.461 0.500 0.854
40 1.215 0.6978 0.7663 0.931 18.873 0.643 0.781
50 1.0636 0.8722 0.6431 0.684 20.488 0.766 0.814
60 0.8592 1.0467 0.5005 0.430 21.602 0.866 0.744
70 0.6698 1.2211 0.3426 0.229 22.261 0.939 0.629
80 0.4761 1.3956 0.1743 0.083 22.574 0.985 0.469
90 0.3651 1.57 0.0008 0.000 22.657 1.000 0.365
N LENGAN STABILITAS

(10° / (2*180°)) * π = 0.087

ʃ MB φ * sin φ dφ Koordinat titik B (m) Yφ * cos φ Zφ * sin φ GZ = IX + X


(m) 2 Yφ = dφ/2 * IV Zφ = dφ/2 * VI (m) (m) (m)
VI VII VIII IX X XI
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.228 0.087 0.226 0.020 0.223 0.003 0.226
0.749 0.174 0.818 0.131 0.769 0.045 0.814
1.296 0.262 1.553 0.339 1.345 0.169 1.515
1.750 0.349 2.308 0.610 1.768 0.392 2.161
2.109 0.436 3.047 0.920 1.960 0.704 2.664
2.401 0.523 3.767 1.257 1.885 1.088 2.973
2.652 0.611 4.468 1.619 1.531 1.521 3.052
2.881 0.698 5.150 2.011 0.898 1.980 2.878
3.099 0.785 5.809 2.433 0.005 2.433 2.437

ʃ MB φ * sin φ dφ Koordinat titik B (m) Yφ * cos φ Zφ * sin φ GZ = IX + X


(m) 2 Yφ = dφ/2 * IV Zφ = dφ/2 * VI (m) (m) (m)
VI VII VIII IX X XI
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.276 0.087 0.268 0.024 0.264 0.004 0.268
1.173 0.174 1.106 0.205 1.040 0.070 1.110
2.425 0.262 2.393 0.635 2.072 0.317 2.389
3.620 0.349 3.806 1.263 2.917 0.812 3.728
4.564 0.436 5.191 1.991 3.338 1.524 4.863
5.242 0.523 6.486 2.743 3.246 2.375 5.621
5.787 0.611 7.727 3.533 2.647 3.319 5.967
6.260 0.698 8.922 4.368 1.555 4.301 5.857
6.711 0.785 10.069 5.268 0.008 5.268 5.276

ʃ MB φ * sin φ dφ Koordinat titik B (m) Yφ * cos φ Zφ * sin φ GZ = IX + X


(m) 2 Yφ = dφ/2 * IV Zφ = dφ/2 * VI (m) (m) (m)
VI VII VIII IX X XI
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.389 0.087 0.400 0.034 0.394 0.006 0.400
1.541 0.174 1.551 0.269 1.458 0.092 1.550
3.376 0.262 3.362 0.883 2.912 0.441 3.353
5.385 0.349 5.520 1.879 4.230 1.207 5.437
6.978 0.436 7.628 3.043 4.906 2.330 7.236
8.139 0.523 9.595 4.259 4.802 3.688 8.489
9.059 0.611 11.464 5.531 3.928 5.196 9.124
9.798 0.698 13.248 6.837 2.310 6.732 9.041
10.431 0.785 14.949 8.188 0.012 8.188 8.200

ʃ MB φ * sin φ dφ Koordinat titik B (m) Yφ * cos φ Zφ * sin φ GZ = IX + X


(m) 2 Yφ = dφ/2 * IV Zφ = dφ/2 * VI (m) (m) (m)
VI VII VIII IX X XI
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.594 0.087 0.610 0.052 0.601 0.009 0.610
2.028 0.174 2.211 0.354 2.077 0.121 2.198
3.722 0.262 4.307 0.974 3.731 0.487 4.218
5.357 0.349 6.584 1.869 5.045 1.201 6.246
6.952 0.436 8.935 3.032 5.746 2.322 8.068
8.510 0.523 11.305 4.454 5.658 3.856 9.513
9.883 0.611 13.592 6.034 4.657 5.669 10.326
10.981 0.698 15.751 7.663 2.746 7.545 10.291
11.815 0.785 17.786 9.275 0.014 9.275 9.289
Koordinat titik M (m) SEBENARNYA X 1914.741 3945.912 6235.815
YM = VII -V ZM = VIII -III SKALA X 1.914741 3.945912 6.235815
XII XIII GZ 0 Y 0.000 0.000 0.000
0.000 -1.298 GZ 10 Y 0.610 0.400 0.268
-0.002 -1.273 GZ 20 Y 2.198 1.550 1.110
0.525 -0.676 GZ 30 Y 4.218 3.353 2.389
1.300 -0.100 GZ 40 Y 6.246 5.437 3.728
2.107 0.372 GZ 50 Y 8.068 7.236 4.863
2.888 0.786 GZ 60 Y 9.513 8.489 5.621
3.634 1.180 GZ 70 Y 10.326 9.124 5.967
4.349 1.576 GZ 80 Y 10.291 9.041 5.857
5.039 1.991 GZ 90 Y 9.289 8.200 5.276
5.702 2.433
GRAFIK DI EXCEL
X 19.14741 39.45912 62.35815
GZ 0 Y 0 0 0
GZ 10 Y 0.60966 0.399864 0.267879
GZ 20 Y 2.198438 1.54972 1.109609
Koordinat titik M (m) GZ 30 Y 4.217633 3.353192 2.389449
YM = VII -V ZM = VIII -III GZ 40 Y 6.246285 5.436967 3.728358
XII XIII GZ 50 Y 8.067889 7.23617 4.86261
0.000 -1.506 GZ 60 Y 9.513431 8.489272 5.620967
-0.008 -1.540 GZ 70 Y 10.32567 9.123835 5.966704
0.485 -1.503 GZ 80 Y 10.29142 9.04147 5.856933
1.762 -0.459 GZ 90 Y 9.289181 8.200348 5.276019
3.242 0.590
4.811 1.672
6.188 2.571
7.480 3.443 MASIH RAGU, SKALA Y nya MERAGUKAN
8.695 4.328
9.845 5.268 70
GZ
60 90
GZ
50 80
GZ
70
40 GZ
Koordinat titik M (m) 60
30 GZ
YM = VII -V ZM = VIII -III 50
XII XIII GZ
20 40
0.000 -2.380 GZ
10 30
GZ
0 20
19.1474146341 39.4591219512 62.3581463415 86.4252682927
30 GZ
50
GZ
20 40
GZ
0.011 -2.173 10 30
GZ
0.788 -1.830 20
0
2.291 -0.972
19.1474146341 39.4591219512 62.3581463415 86.4252682927
4.582 0.759
6.973 2.493
9.088 3.967
11.051 5.380
12.922 6.779
14.641 8.188 SEBENARNYA X 1914.741 3945.912 6235.815
SKALA X 1.914741 3.945912 6.235815
GZ 0 Y 0.000 0.000 0.000
GZ 10 Y 0.610 0.400 0.268
GZ 20 Y 2.198 1.550 1.110
GZ 30 Y 4.218 3.353 2.389
Koordinat titik M (m) GZ 40 Y 6.246 5.437 3.728
YM = VII -V ZM = VIII -III GZ 50 Y 8.068 7.236 4.863
XII XIII GZ 60 Y 9.513 8.489 5.621
0.000 -3.621 GZ 70 Y 10.326 9.124 5.967
0.016 -3.320 GZ 80 Y 10.291 9.041 5.857
1.371 -1.955 GZ 90 Y 9.289 8.200 5.276
3.453 -0.506
5.804 0.938
8.120 2.348
10.561 4.024
12.962 5.805
15.283 7.580
17.421 9.275
8642.527
8.642527 X 1.914741 3.945912 6.235815 8.642527 CON
0.000 GZ 0 Y 0 0 0 0 1.91474143.9459121
0.226 GZ 10 Y 0.60966 0.399864 0.267879 0.226026 1.91474143.9459121
0.814 GZ 20 Y 2.198438 1.54972 1.109609 0.813617 1.91474143.9459121
1.515 GZ 30 Y 4.217633 3.353192 2.389449 1.514904 1.91474143.9459121
2.161 GZ 40 Y 6.246285 5.436967 3.728358 2.160502 1.91474143.9459121
2.664 GZ 50 Y 8.067889 7.23617 4.86261 2.663926 1.91474143.9459121
2.973 GZ 60 Y 9.513431 8.489272 5.620967 2.972882 1.91474143.9459121
3.052 GZ 70 Y 10.32567 9.123835 5.966704 3.051981 1.91474143.9459121
2.878 GZ 80 Y 10.29142 9.04147 5.856933 2.877632 1.91474143.9459121
2.437 GZ 90 Y 9.289181 8.200348 5.276019 2.43724 1.91474143.9459121

86.42527 SAMA SEPERTI HASIL AUTOCAD


0
0.226026
0.813617
Diagram Lengan Stabilitas Bentuk
1.514904 12
2.160502 GZ 0
GZ
2.663926 10 10
GZ (m)

2.972882 GZ
3.051981 20
8 GZ
2.877632 30
2.43724 GZ
40
6
GZ
50
GZ
4 60
GZ
70
2
GZ
90
GZ 0
80 Volume Displacement (m³)
0 10 20 30 40 50 60 70 80 90 100
GZ
70
GZ
60
GZ
50
GZ
40
GZ
30
GZ
20
4252682927
GZ
50
GZ
40
GZ
30
GZ
20
4252682927

8642.527 SEBENA X 38.29483 78.91824 124.7163 172.8505


8.642527 SKALA X 1.914741 3.945912 6.235815 8.642527
0.000 GZ 0 Y 0.000 0.000 0.000 0.000
0.226 GZ 10 Y 0.610 0.400 0.268 0.226
0.814 GZ 20 Y 2.198 1.550 1.110 0.814
1.515 GZ 30 Y 4.218 3.353 2.389 1.515
2.161 GZ 40 Y 6.246 5.437 3.728 2.161
2.664 GZ 50 Y 8.068 7.236 4.863 2.664
2.973 GZ 60 Y 9.513 8.489 5.621 2.973
3.052 GZ 70 Y 10.326 9.124 5.967 3.052
2.878 GZ 80 Y 10.291 9.041 5.857 2.878
2.437 GZ 90 Y 9.289 8.200 5.276 2.437
CONCATENATE
6.23581468.64252682926829,0
6.23581468.64252682926829,0.226026229131084
6.23581468.64252682926829,0.813616686295908
6.23581468.64252682926829,1.51490415082055
6.23581468.64252682926829,2.16050161308707
6.23581468.64252682926829,2.66392567065616
6.23581468.64252682926829,2.97288160945767
6.23581468.64252682926829,3.05198135480327
6.23581468.64252682926829,2.87763236107761
6.23581468.64252682926829,2.43724025662913

uk
GZ 0
GZ
10
GZ
20
GZ
30
GZ
40
GZ
50
GZ
60
GZ
70
A. TANGKI BAHAN BAKAR
1 . Tangki HFO LOT 0.92
Fr. S N 0 mwl 0.5 mwl 1
(Fs) (Fn) S'= 1 S'= 4 S'=
YS' YS Y YS' YS YS'
30 1 0 5.25 5.25 8.3 33.2 8.3 9.26
31 4 1 5.53 22.12 8.71 34.84 34.84 9.7
32 2 2 5.8 11.6 9.1 36.4 18.2 10.13
33 4 3 6.09 24.36 9.49 37.96 37.96 10.54
34 2 4 6.38 12.76 9.87 39.48 19.74 10.93
35 4 5 6.69 26.76 10.24 40.96 40.96 11.28
36 2 6 6.99 13.98 10.6 42.4 21.2 11.59
37 4 7 7.3 29.2 10.97 43.88 43.88 11.88
38 2 8 3.6 7.2 11.33 45.32 22.66 12.13
39 4 9 7.91 31.64 11.67 46.68 46.68 12.36
40 1 10 8.21 8.21 11.95 47.8 11.95 12.6
Function of WL
S YS 193.08 306.37
S' 1 4
S(YS) S' 193.08 1225.5
N' 0 1
S(YS) S' N' 0.00 1225.48
Jarak ordinat, a = 0.6 Jarak garis air, b = 0.5 g = 0.944
Volume, V = ⅓ * ⅓ * a * b * S (Y * S’ * S) 58.434 m³
Berat, G = g * V 55.1617 ton
∑Y * S * S' * N'
KG = *b 0.54032 m (dari baseline)
∑Y * S * S'
∑Y * S' * S * N'
LCG = * α - (0.5 LPP) -41.328 m (dari midship)
∑Y * S' * S

2 . Tangki HFO
Fr. S N 0 mwl 0.5 mwl 1
(Fs) (Fn) S'= 1 S'= 4 S'=
YS' YS Y YS' YS YS'
41 1 0 8.52 8.52 12.9 51.6 12.9 12.83
41.5 4 1 8.67 34.68 12.3 49.2 49.2 12.95
42 1 2 8.79 8.79 12.41 49.64 12.41 13.07
Function of WL
S YS 51.99 74.51
S' 1 4
S(YS) S' 51.99 298.0
N' 0 1
S(YS) S' N' 0.00 298.04
Jarak ordinat, a = 0.6 Jarak garis air, b = 0.5 g= 0.92
Volume, V = ⅓ * ⅓ * a * b * S (Y * S’ * S) 14.2577 m³
Berat, G = g * V 13.1171 ton
∑Y * S * S' * N'
KG = *b 0.53005 m (dari baseline)
∑Y * S * S'
∑Y * S' * S * N'
LCG = + (1/2 LPP) 50.598 m (dari midship)
∑Y * S' * S
mwl
1 ∑Y * S’ ∑Y * S’ * S ∑Y * S’ * S * N
YS
9.26 47.71 47.71 0
38.8 50.07 200.28 200.28
20.26 52.33 104.66 209.32
42.16 54.59 218.36 655.08
21.86 56.79 113.58 454.32
45.12 58.93 235.72 1178.6
23.18 60.98 121.96 731.76
47.52 63.06 252.24 1765.68
24.26 61.05 122.1 976.8
49.44 66.95 267.8 2410.2
12.6 68.61 68.61 686.1
1753.02
334.46 9268.14
1
334.46 1753.02
2
668.92 1894.40

mwl
1 ∑Y * S’ ∑Y * S’ * S ∑Y * S’ * S * N
YS
12.83 72.95 72.95 0
51.8 70.82 283.28 283.28
13.07 71.5 71.5 143
427.73
77.70 426.28
1
77.70 427.73
2
155.40 453.44
A. TANGKI BAHAN BAKAR B. TANGKI BALLAST TRIM
1 . Tangki HFO 1 . Tangki Afterpeak
Frame Luas (m²) FS Luas x FS Frame Luas (m²) FS Luas x FS
30 8.0076 1 8.0076 AP 1 16.3768 16.3768
31 8.4042 4 33.6168 1 4 17.7321 70.9284
32 8.7939 2 17.5878 2 2 19.9745 39.949
33 9.1768 4 36.7072 3 4 21.7088 86.8352
34 9.5489 2 19.0978 4 2 23.6358 47.2716
35 9.9161 4 39.6644 5 4 25.6699 102.6796
36 10.2826 2 20.5652 6 2 28.8942 57.7884
37 10.6502 4 42.6008 7 4 32.0512 128.2048
38 11.0226 2 22.0452 8 2 35.5234 71.0468
39 11.3831 4 45.5324 9 4 38.4028 153.6112
40 11.6674 1 11.6674 10 1 42.6817 42.6817
∑ 297.0926 ∑ 817.3735
Volume = (1/3)*0.6*∑ (m³) 59.41852 Volume = (1/3)*0.6*∑ (m³) 163.4747
Berat = ρ*V (ton) 56.447594 Berat = ρ*V (ton) 167.56157
LCG
KG

2 . Tangki LOT 2 . Tangki Forerpeak


Frame Luas (m²) FS Luas x FS Frame Luas (m²) FS Luas x FS
41 11.9103 0.5 5.95515 170 1 43.9836 43.9836
41.5 12.0169 2 24.0338 171 4 39.7839 159.1356
42 12.1218 0.5 6.0609 172 2 35.6518 71.3036
∑ 36.04985 173 4 31.5201 126.0804
Volume = (1/3)*0.6*∑ (m³) 7.20997 174 2 27.4544 54.9088
Berat = ρ*V (ton) 6.8494715 175 4 23.5365 94.146
176 2 19.6573 39.3146
177 4 15.715 62.86
178 2 12.0258 24.0516
179 4 8.2266 32.9064
180 2 4.7766 9.5532
181 4 2.0723 8.2892
182 1 0.8801 0.8801
∑ 727.4131
Volume = (1/3)*0.6*∑ (m³) 145.48262
Berat = ρ*V (ton) 149.11969
C. TANGKI BALLAST BIASA D. CARGO HOLD
1 . Tangki Ballast 1
Frame FS Luas (m²) Luas x FS
134 1 13.3119 13.3119
146.5 4 11.1479 44.5916
154 2 8.7716 17.5432
161.5 4 5.3419 21.3676
179 1 2.5717 2.5717
∑ 99.386
Volume = (1/3)*0.6*∑ (m³) 149.079
Berat = ρ*V (ton) 152.805975

2 . Tangki Ballast 2
Frame FS Luas (m²) Luas x FS
102 1 14.644 14.644
110 4 14.644 58.576
118 2 14.644 29.288
126 4 14.3438 57.3752
134 1 13.3119 13.3119
∑ 173.1951
Volume = (1/3)*0.6*∑ (m³) 277.11216
Berat = ρ*V (ton) 284.039964

3 . Tangki Ballast 3
Frame FS Luas (m²) Luas x FS
60 1 14.4695 14.4695
68 4 14.644 58.576
76 2 14.644 29.288
94 4 14.644 58.576
102 1 14.644 14.644
∑ 175.5535
Volume = (1/3)*0.6*∑ (m³) 280.8856
Berat = ρ*V (ton) 287.90774

4 . Tangki Ballast 4
Frame FS Luas (m²) Luas x FS
44 1 11.7201 11.7201
48 4 13.222 52.888
53 2 13.7207 27.4414
56 4 14.1884 56.7536
60 1 14.4695 14.4695
∑ 163.2726
Volume = (1/3)*0.6*∑ (m³) 130.61808
Berat = ρ*V (ton) 133.883532
1 . Tangki HFO
- Letak tangki
- Panjang tangki m
- Garis air 0m
- Jarak ordinat, a = 0.6 m
Fr. Y S Y*S Y² * S Y³ * S
30 9.26 1 9.26
31 9.7 4 38.8
32 10.13 2 20.26
33 10.54 4 42.16
34 10.93 2 21.86
35 11.28 4 45.12
36 11.59 2 23.18
37 11.88 4 47.52
38 12.13 2 24.26
39 12.36 4 49.44
40 12.6 1 12.6
S