Anda di halaman 1dari 2

RENCANA ANGGARAN BIAYA (RAB)

PENGADAAN ALAT UKUR PEKERJAAN JARINGAN DISTRIBUSI


PLN AREA BANDA ACEH

Harga Satuan (
No Material Satuan Volume Jumlah ( Rp )
Rp )
1 Telescopic Hot Stick 10.5 m Triangular Shape Design 24 kV Bh 5 8,512,000 42,560,000
2 Earth Tester Soft Case CS-69S Bh 5 4,864,944 24,324,720
3 Analog High Voltage Insulation Tester 10000 kV Bh 5 9,296,000 46,480,000
4 GPS titik 1 4,180,000 4,180,000
Jumlah 117,544,720
PPn 10 % 11,754,472
Total 129,299,192
Terbilang : Seratus dua puluh sembilan juta dua ratus sembilan puluh sembilan ribu seratus sembilan puluh dua rupiah

PLH Asman Jaringan

Ramadhan
RENCANA ANGGARAN BIAYA (RAB)
PENGADAAN ALAT UKUR PEKERJAAN JARINGAN DISTRIBUSI
PLN AREA BANDA ACEH

Harga Satuan (
No Material Satuan Volume Jumlah ( Rp )
Rp )
1 Telescopic Hot Stick 10.5 m Triangular Shape Design 24 kV Merk Ritz Bh 5 -
2 Earth Tester Soft Case CS-69S Kyoritsu 4105A Bh 5 -
3 Analog High Voltage Insulation Tester 10000 kV Kyoritsu 3123A Bh 5 -
4 GPS titik 1 -
Jumlah -
PPn 10 % -
Total -
Terbilang :

PLH Asman Jaringan

Ramadhan