NPM 1410015410027
Rp 101,106.00 + Rp 4,510.89 =
Rp 70,725.00 + Rp 2,174,748,118.40 -
Rp 2,100,000,000.00 -
Rp 70,725.00 + Rp 3,255.93 =
Rp 100,860.00 + Rp 2,174,748,118.40 -
Rp 2,100,000,000.00 -
Rp 100,860.00 + Rp 1,946.07 =
457.60
m2
elektrikal
dangkal
aan Tata Suara
aan Instalasi IT
1.09 x Rp 3,695,000.00 =
x Rp 1,843,006,880.00 =
x Rp 1,843,006,880.00 =
x Rp 1,843,006,880.00 =
x Rp 1,843,006,880.00 =
x Rp 3,789,119,040,000.00 =
Rp 105,616.89
Rp 2,050,000,000.00 x Rp 72,030.00 -
Rp 2,050,000,000.00
Rp 73,980.93
Rp 2,050,000,000.00 x Rp 101,640.00 -
Rp 2,050,000,000.00
Rp 102,806.07
1% x Rp 2,175,030,522.29
Rp 3,695,000.00 /m2
Rp 1,843,006,880.00
Rp 1,843,006,880.00
Rp 55,290,206.40
Rp 129,010,481.60
Rp 92,150,344.00
Rp 55,290,206.40
Rp 113,673,571,200
Rp 331,741,238.40
Rp 2,174,748,118.40
Rp 101,106.00
= Rp 105,616.89
Rp 70,725.00
= Rp 73,980.93
Rp 100,860.00
= Rp 102,806.07
= Rp 282,403.89
= Rp 21,750,305.22
= Rp 2,196,780,827.51
DAFTAR HARGA DASAR SATUAN UPAH
1 Pekerja L01
2 Tukang L02
3 Kepala Tukang L03
4 Mandor L04
5 Juru ukur (STM) L05
6 Pembantu juru ukur L06 Upah
7 Akhli muda L07 dihitung
8 Akhli madya L08 dengan
9 Akhli Utama L09 jumlah hari
10 Sopir / Driver L10 kerja di
asumsikan 25
11 Pembantu Sopir / Driver L11 hari dalam
12 Operator L12 sebulan. Jam
13 Pembantu Operator L13 kerja efektif
14 Mekanik L14 diasumsikan
15 Pembantu Mekanik L15 7 jam sehari.
16 Desain engineer L16
17 Operator komputer/printer/ploter L17
18 Drafter Cad / Estimator (STM) L18
19 Penjaga malam L19
20 Juru Ukur/Drafter Cad/Estimator (D3)
H. PENGGANTUNG/PENGUNCI
- Merk Jangkar 9702 RRC/692 LD/MAXEL/KODAI/dll Set
- Jangkar 746/Kodai/dll Set
- Merk Ciga Brown 5404 Set
- Kunci Antik A/C Itali/Seiss Set
- Kunci Shanghai 9702 LD Set
- Grendel Antik 2 Set
- Tarikan Antik Jendela Set
- Engsel Nylon Set
- Engsel Lokal Set
- Engsel Jendela Bh
- Grendel 2,5" biasa Bh
I. BAHAN CAT
- Platone Cat Tembok/Digatex/dll Kg
- Nagaltex Cat Tembok/Sanalux Kg
- Rimatex Dempul Tembok/Hommer Kg
- Platone Cat Besi Kg
- Multi Seal Cat Seng Kg
No. URAIAN KODE SATUAN
Pipa PVC AW
- Diameter 10 " M'
- Diameter 8 " M'
- Diameter 6 " M'
- Diameter 4 " M'
- Diameter 3 " M'
- Diameter 2 1/2 " M'
- Diameter 2 " M'
- Diameter 1 1/2" M'
- Diameter 1 " M'
- Diameter 3/4 " M'
- Diameter 1/2 " M'
HARGA HARGA
SATUAN PERJAM SATUAN PERHARI
( Rp.) ( Rp.)
Rp 9,650.00 67,550.00
Rp 13,500.00 94,500.00
Rp 15,000.00 105,000.00
Rp 15,000.00 105,000.00
Rp 15,000.00 105,000.00
Rp 13,500.00 94,500.00
Rp 36,000.00 252,000.00
Rp 48,000.00 336,000.00
Rp 66,000.00 462,000.00
Rp 24,000.00 168,000.00
Rp 9,650.00 67,550.00
Rp 24,000.00 168,000.00
Rp 9,650.00 67,550.00
Rp 24,000.00 168,000.00
Rp 9,650.00 67,550.00
Rp 24,000.00 168,000.00
Rp 9,650.00 67,550.00
Rp 15,000.00 105,000.00
Rp 13,500.00 94,500.00
Rp 24,000.00 168,000.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 271,200.00
Rp 126,200.00
Rp 18,000.00
Rp 145,000.00
Rp 110,500.00
Rp 165,500.00
Rp 177,958.33
Rp 82,800.00
Rp 950.00
Rp 900.00
Rp 850.00
Rp 175,000.00
Rp 160,000.00
Rp 8,000.00
Rp 3,900.00
Rp 2,201.50
Rp 25,000.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 2,100.00
Rp 2,000.00
Rp 43,400.00
Rp 55,200.00
Rp 78,800.00
Rp 102,400.00
Rp 149,600.00
Rp 196,700.00
Rp 243,900.00
Rp 603,000.00
Rp 499,000.00
Rp 394,000.00
Rp 289,000.00
Rp 237,000.00
Rp 184,000.00
Rp 99,360.00
Rp 141,840.00
Rp 184,320.00
Rp 269,280.00
Rp 354,060.00
Rp 439,020.00
Rp 78,120.00
Rp 3,070.00
Rp 3,000.00
Rp 3,100.00
Rp 2,400.00
Rp 5,100.00
Rp 10,000.00
Rp 75,000.00
Rp 8,960.00
Rp 19,462.50
Rp 57,500.00
Rp 9,500.00
Rp 7,600.00
Rp 32,500.00
Rp 250,000.00
Rp 8,300.00
Rp 13,600.00
Rp 570,000.00
Rp 13,500.00
Rp 32,900.00
Rp 15,000.00
Rp 73,200.00
Rp 86,500.00
Rp 55,400.00
Rp 30,000.00
Rp 60,000.00
Rp 13,520.00
Rp 4,180,000.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 3,900,000.00
Rp 2,860,000.00
Rp 2,850,000.00
Rp 2,420,000.00
Rp 2,390,000.00
Rp 1,850,000.00
Rp 2,052,700.00
Rp 1,908,600.00
Rp 78,200.00
Rp 19,550.00
Rp 1,737,500.00
Rp 89,500.00
Rp 126,200.00
Rp 175,200.00
Rp 247,800.00
Rp 65,000.00
Rp 122,000.00
Rp 215,000.00
Rp 90,000.00
Rp 51,000.00
Rp 68,000.00
Rp 88,200.00
Rp 102,700.00
Rp 110,000.00
Rp 141,000.00
Rp 17,100.00
Rp 17,200.00
Rp 15,300.00
Rp 8,500.00
Rp 16,700.00
Rp 111,400.00
Rp 62,500.00
Rp 500.00
Rp 300.00
Rp 120,000.00
Rp 75,000.00
Rp 470,000.00
Rp 725,000.00
Rp 1,100,000.00
Rp 12,100.00
Rp 14,500.00
Rp 14,500.00
Rp 19,500.00
Rp 3,500.00
Rp 5,700.00
Rp 4,700.00
Rp 8,200.00
Rp 2,500.00
Rp 11,200.00
Rp 50,900.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 26,900.00
Rp 12,500.00
Rp 11,000.00
Rp 12,100.00
Rp 2,000.00
Rp 30,300.00
Rp 38,050.00
Rp 17,200.00
Rp 16,000.00
Rp 87,500.00
Rp 15,000.00
Rp 16,437.50
Rp 18,750.00
Rp 18,750.00
Rp 18,750.00
Rp 25,200.00
Rp 885,000.00
Rp 950,000.00
Rp 450,000.00
Rp 450,000.00
Rp 110,000.00
Rp 1,500,000.00
Rp 10,500.00
Rp 7,500.00
Rp 36,000.00
Rp 8,000.00
Rp 68,700.00
Rp 47,500.00
Rp 47,500.00
Rp 48,300.00
Rp 60,000.00
Rp 13,100.00
Rp 23,500.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 44,000.00
Rp 58,000.00
Rp 44,400.00
Rp 67,500.00
Rp 60,900.00
Rp 56,000.00
Rp 30,000.00
Rp 89,000.00
Rp 32,500.00
Rp 18,800.00
Rp 54,000.00
Rp 68,300.00
Rp 20,000.00
Rp 34,000.00
Rp 67,500.00
Rp 44,900.00
Rp 60,400.00
Rp 83,100.00
Rp 55,700.00
Rp 77,800.00
Rp 111,400.00
Rp 98,700.00
Rp 69,600.00
Rp 115,000.00
Rp 162,500.00
Rp 60,000.00
Rp 13,500.00
Rp 14,100.00
Rp 17,800.00
Rp 12,700.00
Rp 12,700.00
Rp 10,600.00
Rp 35,800.00
Rp 55,000.00
Rp 33,000.00
Rp 52,500.00
Rp 67,000.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 53,100.00
Rp 51,300.00
Rp 26,500.00
Rp 17,000.00
Rp 30,000.00
Rp 31,200.00
Rp 19,400.00
Rp 21,600.00
Rp 23,100.00
Rp 31,500.00
Rp 10,600.00
Rp 20,800.00
Rp 6,100.00
Rp 25,000.00
Rp 23,100.00
Rp 10,600.00
Rp 64,350.00
Rp 11,600.00
Rp 95,000.00
Rp 93,100.00
Rp 96,500.00
Rp 110,000.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 215,000.00
Rp 107,500.00
Rp 284,000.00
Rp 123,300.00
Rp 2,472,500.00
Rp 800,000.00
Rp 1,590,000.00
Rp 875,000.00
Rp 245,000.00
Rp 287,500.00
Rp 1,730,000.00
Rp 3,950,000.00
Rp 325,000.00
Rp 175,000.00
Rp 325,000.00
Rp 28,300.00
Rp 36,500.00
Rp 55,900.00
Rp 39,050.00
Rp 115,600.00
Rp 190,600.00
Rp 276,200.00
Rp 442,600.00
Rp 654,100.00
Rp 1,277,600.00
Rp 1,510,000.00
Rp 1,750,000.00
Rp 2,000,000.00
Rp 2,600,000.00
Rp 393,600.00
Rp 249,700.00
Rp 149,200.00
Rp 54,800.00
Rp 35,200.00
Rp 26,400.00
Rp 19,800.00
Rp 15,700.00
Rp 9,800.00
Rp 7,100.00
Rp 5,300.00
Rp 900.00
Rp 340.00
Rp 26.00
HARGA
SATUAN KETERANGAN
( Rp.)
Rp 22,000.00
Rp 13,000.00
Rp 26,000.00
Rp 43,000.00
Rp 26,000.00
Rp 54,000.00
Rp 330,000.00
Rp 110,000.00
Rp 2,800,000.00
Rp 3,700,000.00
Rp 13,000,000.00
Rp 2,500,000.00
Rp 22,000.00
Rp 120,000.00
Rp 650,000.00
Rp 3,000,000.00
Rp 4,500,000.00
Rp 60,000.00
Rp 185,000.00
Rp 475,000.00
Rp 875,000.00
Rp 3,500,000.00
Rp 33,500.00
Rp 27,000.00
Rp 22,000,000.00
Rp 1,100,000.00
Rp 3,100,000.00
Rp 31,000,000.00
Rp 31,500,000.00
Rp 3,700,000.00
Rp 6,700,000.00
Rp 2,700,000.00
Rp 15,000,000.00
Rp 270,000.00
Rp 35,500.00
Rp 25,900.00
Rp 110,000.00
Rp 7,500.00
Rp 36,000.00
Rp 1,700,000.00
Rp 2,500,000.00
Rp 2,450,000.00
Rp 470,000.00
Rp 8,000.00
Rp 170,000.00
Rp 870,000.00
Rp 51,000.00
Rp 40,000.00
Rp 1,350,000.00
DINAS PEKERJAAN UMUM KOTA PADANG
DAFTAR
HARGA SATUAN BAHAN
Dompol kg 17,000.00
DVR 8 Chanel Tampil Rekam Unit 14,000,000.00
DVR 8 Chanel Tampil Rekam (Pekerjaan) Unit 15,481,537.50
Sirtu m3 125,000.00
Semen Warna Kg 10,000.00
Semen Portland (PC) (50 Kg) Kg 1,182.10
Sekrup Gypsum 5cm bh 500.00
Sekrup Gypsum 3 cm bh 300.00
Skrup Fixer bh 2,000.00
Skrup bh 150.00
Seng Glmb BJLS 20 k setara angsa lbr 150,000.00
Seng Plat BJLS 20 k lbr 45,000.00
Seng Plat BJLS 30 k lbr 54,000.00
Sealant tube 40,000.00
Seal Tape ( TBA ) rol 3,500.00
Sewa Alat Las jam 18,750.00
Switch 24 Port (Pekerjaan) Unit 763,389.00
Swicth 24 Port Unit 620,000.00
Switch Managed Unit 3,000,000.00
Server Jaringan LAN Ls 30,000,000.00
Saklar Tunggal (Pekerjaan) bh 55,137.50
Saklar Ganda (Pekerjaan) bh 73,837.50
Stop Kontak 10 A (Pekerjaan) bh 55,137.50
Stop Kontak LAN bh 110,000.00
Stop Kontak AC 20 A (Pekerjaan) bh 84,837.50
Sealing Proyektor (Pekerjaan) Set 1,016,537.50
Sealing Proyektor Set 850,000.00
Soda Api kg 30,000.00
Saklar Tunggal Bh 25,000.00
Saklar Ganda Bh 42,000.00
Stop Kontak 10 A Bh 25,000.00
Stop Kontak AC 20 A Bh 52,000.00
Stop Kontak Telephone Bh 57,000.00
Sabun kg 10,000.00
Solar (industri) ltr 13,100.00
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK34 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Upah + Bahan
1.698 m3 Beton K_175 Rp 791,671 Rp. Rp 1,344,283
33.961 m2 Cetakan Cincin Sumuran Rp 122,491 Rp. Rp 4,159,853
Jumlah
pt. natural sumatera consultant sni analisa harga satuan CK35 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
B.12.1 Pasangan 1 titik pondasi Sumuran diameter 100 cm ( diameter luar ) kedalaman Max. 5 m
a. Membuat 1 ttk cicin sumuran diameter 1 m
Upah + Bahan
1.403 m3 Beton K_175 Rp 791,671 Rp. Rp 1,110,494
28.054 m2 Cetakan Cincin Sumuran Rp 122,491 Rp. Rp 3,436,400
Jumlah
pt. natural sumatera consultant sni analisa harga satuan CK36 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
760 kg PB Rp 89 Rp 67,857
1029 kg KR (Maksimum 30 mm) Rp 111 Rp 113,990
215 Liter Air Rp 100 Rp 21,500
Rp 130,990 Rp 588,711
Overhead + Fee ( Max. 10 % )
Jumlah
C.10 MEMBUAT 1 M3 BETON MUTU F'C = 25 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Upah :
1.650 OH Pekerja Rp 60,000 Rp 99,000
0.275 OH Tukang Batu Rp 80,000 Rp 22,000
0.028 OH Kepala Tukang Rp 90,000 Rp 2,520
0.083 OH Mandor Rp 90,000 Rp 7,470
Bahan :
413.000 kg PC Rp 1,182 Rp 488,207
681 Kg PB Rp 89 Rp 60,804
1021 Kg KR batu pecah 2/3 (Maksimum 30 mm) Rp 185 Rp 189,074
215 Liter Air Rp 100 Rp 21,500
Rp 130,990 Rp 759,585
Overhead + Fee ( Max. 10 % )
Jumlah
C.17 PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR
Upah :
0.0070 OH Pekerja Rp 60,000 Rp 420
0.0070 OH Tukang Besi Rp 80,000 Rp 560
0.0007 OH Kepala Tukang Rp 90,000 Rp 63
0.0004 OH Mandor Rp 90,000 Rp 36
Bahan :
1.0500 kg Besi Beton (Polos/Ulir) Rp 10,800 Rp 11,340
0.0150 kg Kawat Beton Rp 17,200 Rp 258
Rp 1,079 Rp 11,598
Overhead + Fee ( Max. 10 % )
Jumlah
C.20 MEMASANG 1 M2 BEKISTING UNTUK PONDASI
Upah :
0.520 OH Pekerja Rp 60,000 Rp 31,200
0.260 OH Tukang Kayu Rp 80,000 Rp 20,800
0.026 OH Kepala Tukang Rp 90,000 Rp 2,340
0.026 OH Mandor Rp 90,000 Rp 2,340
Bahan :
0.040 m3 Kayu Kelas III Rp 2,603,250 Rp 104,130
0.300 kg Paku 5 cm - 10 cm Rp 16,400 Rp 4,920
0.100 Liter Minyak Bekisting Rp 3,000 Rp 300
0.500 Bahan 2 Kali Pakai Rp 56,680 Rp 54,675
Overhead + Fee ( Max. 10 % )
Jumlah
pt. natural sumatera consultant sni analisa harga satuan CK37 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK38 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK39 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK40 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Tenaga :
0.200 Oh Pekerja Rp 60,000 Rp 12,000
0.150 Oh Tukang Batu Rp 80,000 Rp 12,000
0.015 Oh Kepala Tukang Rp 90,000 Rp 1,350
0.010 Oh Mandor Rp 90,000 Rp 900
Bahan :
7.776 Kg Semen Rp 1,182 Rp. Rp 9,192
0.020 m3 Pasir Pasang Rp 125,000 Rp. Rp 2,500
Rp 26,250 Rp 11,692
Over Head + Fee 10%
Dibulatkan
C.46 1 m1 Pasang Beton Kansting K_225 Pabrikasi
Tenaga :
0.150 Pekerja Rp 60,000 Rp. Rp 9,000
0.050 Tukang cat Rp 80,000 Rp. Rp 4,000
0.005 Kepala tukang Rp 90,000 Rp. Rp 450
0.025 Mandor Rp 90,000 Rp. Rp 2,250
Bahan :
0.040 M3 Galian Tanah Rp 51,975 Rp. Rp 2,079
0.040 M3 Pasir Pasang Rp 125,000 Rp. Rp 5,000
5.280 Kg Semen Rp 1,182 Rp. Rp 6,241
1.660 Bh Beton Kanstin K_225 Rp 40,000 Rp. Rp 66,400
Jumlah
Over Head + Fee 10%
Dibulatkan
pt. natural sumatera consultant sni analisa harga satuan CK41 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK42 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Rp 18,620 Rp 3,842
Overhead + Fee ( Max. 10 % )
Jumlah
pt. natural sumatera consultant sni analisa harga satuan CK43 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK44 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK45 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Tenaga :
0.090 Oh Pekerja Rp 60,000 Rp. Rp 5,400
0.090 Oh Tukang batu Rp 80,000 Rp. Rp 7,200
0.009 Oh Kepala tukang Rp 90,000 Rp. Rp 810
0.005 Oh Mandor Rp 90,000 Rp. Rp 450
Bahan :
1.375 bh Nosing Granit Rp 18,300 Rp. Rp 25,163
1.140 Kg Semen Pc (50 kg) Rp 1,182 Rp. Rp 1,348
0.003 M3 Pasir Pasang Rp 125,000 Rp. Rp 375
0.100 Kg Semen Warna Rp 10,000 Rp. Rp 1,000
Jumlah
Over Head + Fee 10%
Dibulatkan
Rp 9,210 Rp 12,075
Overhead + Fee ( Max. 10 % )
Jumlah
H.17 Memasang 1 m2 langit-langit Kisi kisi Alluminium
Tenaga :
0.100 Oh Pekerja Rp 60,000 Rp. Rp 6,000
0.050 Oh Tukang Kayu Rp 80,000 Rp. Rp 4,000
0.005 Oh Kepala tukang Rp 90,000 Rp. Rp 450
0.005 Oh Mandor Rp 90,000 Rp. Rp 450
Bahan :
3.929 Btg Kisi kisi All 3 Inc Rp 50,000 Rp. Rp 196,429
4.400 m Besi Hollow 2/4 Rp 23,000 Rp. Rp 101,200
0.110 Kg Paku Skrup Rp 40,000 Rp. Rp 4,400
Jumlah
Over Head + Fee 10%
Dibulatkan
pt. natural sumatera consultant sni analisa harga satuan CK46 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Dibulatkan
H.20 Memasang 1 m2 langit-langit gypsum board Berpola (Bertingkat) ukuran (120x240x9)mm, tebal 9 mm + Rangka
bahan
4.130 m1 Rangka Plafond Hollow x Rp 23,000 Rp 94,990
0.370 Lbr Gypsum board 9 mm x Rp 62,500 Rp 23,125
13.200 Bh Sekrup gypsum 5 cm x Rp 500 Rp 6,600
13.200 Bh Sekrup gypsum 3 cm x Rp 300 Rp 3,960
0.060 Roll Joint tape x Rp 120,000 Rp 7,200
0.010 Zak Cornise gypsum x Rp 75,000 Rp 750
1.000 Ls Alat bantu x Rp 5,000 Rp 5,000
JUMLAH Rp 141,625
tenaga
0.110 Oh Pekerja x Rp 60,000 Rp 6,600
0.060 Oh Tukang kayu x Rp 80,000 Rp 4,800
0.010 Oh Kepala tukang x Rp 90,000 Rp 900
0.010 Oh Mandor x Rp 90,000 Rp 900
JUMLAH Rp 13,200
JUMLAH
KEUNTUNGAN / OVERHEAD 10%
JUMLAH
I PEKERJAAN BESI DAN ALUMINIUM SNI 7393-2008
I.2 MEMASANG 1 KG RANGKA KUDA-KUDA BAJA IWF
Upah :
0.060 OH Pekerja Rp 60,000 Rp 3,600
0.060 OH Tukang Las Rp 80,000 Rp 4,800
0.006 OH Kepala Tukang Rp 90,000 Rp 540
0.003 OH Mandor Rp 90,000 Rp 270
Bahan & Alat :
1.150 kg Besi Baja IWF Rp 14,000 Rp 16,100
0.040 kg Kawat Las Listrik Rp 46,000 Rp 1,840
0.030 Liter Solar Rp 13,100 Rp 393
0.004 Liter Minyak Pelumas Rp 6,000 Rp 24
Rp 9,210 Rp 18,357
pt. natural sumatera consultant sni analisa harga satuan CK47 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK48 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK49 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK50 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Rp 210,500 Rp 1,782,192
Overhead + Fee ( Max. 10 % )
Jumlah
K.19 Memasang 1 m Pipa Galvanis Diameter 3/4''
Upah :
0.054 OH Pekerja Rp 60,000 Rp 3,240
0.090 OH Tukang Batu Rp 80,000 Rp 7,200
0.009 OH Kepala Tukang Rp 90,000 Rp 810
0.027 OH Mandor Rp 90,000 Rp 2,430
Bahan :
1.200 m pipa galvanis Rp 26,000 Rp 31,200
0.350 ls perlengkapan ( 35% ) Rp 26,000 Rp 9,100
Rp 13,680 Rp 40,300
Overhead + Fee ( Max. 10 % )
Jumlah
pt. natural sumatera consultant sni analisa harga satuan CK51 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Upah :
0.010 OH Pekerja Rp 60,000 Rp 600
0.100 OH Tukang Batu Rp 80,000 Rp 8,000
0.0100 OH Kepala Tukang Rp 90,000 Rp 900
0.0050 OH Mandor Rp 90,000 Rp 450
Bahan :
1.000 bh kran air Rp 20,000 Rp 20,000
0.025 bh seal tape Rp 3,500 Rp 88
Rp 9,950 Rp 20,088
Overhead + Fee ( Max. 10 % )
Jumlah
pt. natural sumatera consultant sni analisa harga satuan CK52 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Bahan :
0.5000 Lbr Seng plat bjls 30 54,000.00 27,000.00
0.0200 Kg Paku Seng 25,000.00 500.00
43,340.00 27,500.00
Overhead + Fee ( Max. 10 % )
Jumlah
pt. natural sumatera consultant sni analisa harga satuan CK53 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Rp 15,272 Rp 137,500
Overhead + Fee ( Max. 10 % )
Jumlah
M.30 Analisa pasang kaca Tempered tebal. 12 mm/lbr
Tenaga
0.015 Pekerja Rp 60,000 Rp. Rp 900
0.15 Tukang Besi / All Rp 80,000 Rp. Rp 12,000
0.015
Kepala tukang Rp 90,000 Rp. Rp 1,350
0.00075 Mandor Rp 90,000 Rp. Rp 68
Bahan
1.000 Lbr Kaca Tempered t.12 mm Rp 1,680,000 Rp. Rp 1,680,000
Jumlah
Over Head + Fee 10%
Dibulatkan
M.32 Pasangan 1 Set Pact Pitting ( Penjepit Kaca Atas Bawah Dan Kunci )
Tenaga
0.010 Pekerja Rp 60,000 Rp. Rp 600
0.6 Tukang Besi / All Rp 80,000 Rp. Rp 48,000
0.01 Kepala tukang Rp 90,000 Rp. Rp 900
0.005 Mandor Rp 90,000 Rp. Rp 450
Bahan
1 Set Pact Pitting Rp 2,400,000 Rp. Rp 2,400,000
Jumlah
Over Head + Fee 10%
Dibulatkan
pt. natural sumatera consultant sni analisa harga satuan CK54 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK55 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK56 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK57 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK58 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK59 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK60 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK61 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
pt. natural sumatera consultant sni analisa harga satuan CK62 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
KODE Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan
Jumlah
N.30 1 m2 pengecatan Kanstin dengan Cat Minyak 3 lapis cat penutup
Tenaga :
0.070 Pekerja Rp 60,000 Rp. Rp 4,200
0.105 Tukang cat Rp 80,000 Rp. Rp 8,400
0.004 Kepala tukang 90,000 Rp. 360.00
0.003 Mandor Rp 90,000 Rp. Rp 225
Bahan :
0.350 Kg cat penutup 51,550 Rp. 18,042.50
Jumlah
Over Head + Fee 10%
Dibulatkan
N.32 1 m2 pengecatan Plafon Gypsum baru (1 lapis cat dasar, 2 lapis cat penutup )
Tenaga :
0.020 Pekerja Rp 60,000 Rp. Rp 1,200
0.063Tukang cat Rp 80,000 Rp. 5,040.00
0.006
Kepala tukang Rp 90,000 Rp. Rp 567
0.003 Mandor Rp 90,000 Rp. Rp 225
Bahan :
0.100 Kg cat dasar Rp 23,900 Rp. Rp 2,390
0.233 Kg cat penutup Rp 96,000 Rp. Rp 22,368
Jumlah
Over Head + Fee 10%
Dibulatkan
pt. natural sumatera consultant sni analisa harga satuan CK63 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
DAFTAR ANALISA
GA SATUAN PEKERJAAN
Jumlah Harga
Rp 47,250
Rp 4,725
Rp 51,975
Rp 69,030
Rp 6,903
Rp 75,933
Rp 15,750
Rp 1,575
Rp 17,325
Rp 102,900
Rp 10,290
Rp 113,190
Rp 167,250
Rp 16,725
Rp 183,975
pt. natural sumatera consultant sni analisa harga satuan CK64 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 613,182
Rp 61,318
Rp 674,501
Rp 710,066
Rp 106,510
Rp 816,576
Rp 5,504,135
Rp 119,350
Rp 5,000
Rp 124,350
pt. natural sumatera consultant sni analisa harga satuan CK65 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 11,989,708
Rp 1,198,971
Rp 13,188,679
Rp 4,546,895
Rp 99,458
Rp 5,000
Rp 104,458
Rp 10,342,141
Rp 1,034,214
Rp 11,376,355
pt. natural sumatera consultant sni analisa harga satuan CK66 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 719,701
Rp 71,970
Rp 791,671
Rp 890,575
Rp 89,057
Rp 979,632
Rp 12,677
Rp 1,268
Rp 13,945
Rp 111,355
Rp 11,136
Rp 122,491
pt. natural sumatera consultant sni analisa harga satuan CK67 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 117,863
Rp 11,786
Rp 129,649
Rp 186,945
Rp 18,695
Rp 205,640
Rp 191,013
Rp 19,101
Rp 210,115
pt. natural sumatera consultant sni analisa harga satuan CK68 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 223,556
Rp 22,356
Rp 245,912
Rp 192,942
Rp 19,294
Rp 212,236
Rp 173,854
Rp 17,385
Rp 191,240
Rp 56,680
Rp 122,366
Rp 61,183
Rp 117,863
Rp 11,786
Rp 129,649
pt. natural sumatera consultant sni analisa harga satuan CK69 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 70,869
Rp 7,087
Rp 77,956
Rp 87,898
Rp 8,790
Rp 96,687
pt. natural sumatera consultant sni analisa harga satuan CK70 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 113,486
Rp 11,349
Rp 124,834
Rp 37,942
Rp 3,794
Rp 41,736
Rp 15,700
Rp 79,720
Rp 95,420
Rp 9,542
Rp 104,963
Rp 111,401
Rp 11,140
Rp 122,541
UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 4 PP
pt. natural sumatera consultant sni analisa harga satuan CK71 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 103,219
Rp 10,322
Rp 113,541
Rp 34,500
Rp 885,180
Rp 919,680
Rp 91,968
Rp 1,011,648
Rp 40,836
Rp 4,084
Rp 44,919
Rp 36,626
Rp 3,663
Rp 40,289
pt. natural sumatera consultant sni analisa harga satuan CK72 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 22,462
Rp 2,246
Rp 24,708
Rp 159,969
Rp 15,997
Rp 175,966
Rp 305,644
Rp 30,564
Rp 336,208
Rp 261,679
Rp 26,168
Rp 287,846
pt. natural sumatera consultant sni analisa harga satuan CK73 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 218,494
Rp 21,849
Rp 240,343
Rp 243,065
Rp 24,306
Rp 267,371
Rp 172,150
Rp 17,215
Rp 189,365
Rp 78,750
Rp 590,744
Rp 669,494
Rp 66,949
Rp 736,443
pt. natural sumatera consultant sni analisa harga satuan CK74 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 71,050
Rp 261,506
Rp 332,556
Rp 33,256
Rp 365,812
Rp 26,805
Rp 221,717
Rp 248,522
Rp 24,852
Rp 273,374
Rp 26,805
Rp 241,161
Rp 267,966
Rp 26,797
Rp 294,763
Rp 13,860
Rp 22,185
Rp 36,045
Rp 3,605
Rp 39,650
pt. natural sumatera consultant sni analisa harga satuan CK75 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 13,860
Rp 27,885
Rp 41,745
Rp 4,175
Rp 45,920
Rp 21,285
Rp 2,129
Rp 23,414
Rp 10,900
Rp 302,029
Rp 312,929
Rp 31,293
Rp 344,221
Rp 1,090
Rp 21,440
Rp 22,530
Rp 2,253
pt. natural sumatera consultant sni analisa harga satuan CK76 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 24,783
Rp 139,438
Rp 13,944
Rp 153,381
Rp 154,825
Rp 15,483
Rp 170,308
Rp 27,567
pt. natural sumatera consultant sni analisa harga satuan CK77 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 2,757
Rp 30,324
Rp 122,144
Rp 12,214
Rp 134,358
Rp 104,170
Rp 10,417
Rp 114,587
Rp 163,058
Rp 16,306
Rp 179,364
pt. natural sumatera consultant sni analisa harga satuan CK78 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 299,981
Rp 29,998
Rp 329,979
Rp 54,680
Rp 5,468
Rp 60,148
Rp 1,234,619
Rp 123,462
Rp 1,358,081
pt. natural sumatera consultant sni analisa harga satuan CK79 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 927,999
Rp 92,800
Rp 1,020,798
Rp 10,500
Rp 1,050
Rp 11,550
Rp 2,517,490
Rp 251,749
Rp 2,769,239
Rp 580,843
Rp 58,084
Rp 638,927
pt. natural sumatera consultant sni analisa harga satuan CK80 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 1,992,692
Rp 199,269
Rp 2,191,961
Rp 53,980
Rp 5,398
Rp 59,378
Rp 64,055
Rp 6,406
Rp 70,461
Rp 67,619
Rp 6,762
Rp 74,381
Rp 106,369
Rp 10,637
Rp 117,006
pt. natural sumatera consultant sni analisa harga satuan CK81 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 30,038
Rp 3,004
Rp 33,041
Rp 54,950
Rp 5,495
Rp 60,445
Rp 115,750
Rp 11,575
Rp 127,325
Rp 140,120
Rp 14,012
Rp 154,132
pt. natural sumatera consultant sni analisa harga satuan CK82 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
70,840
Rp 7,084
Rp 77,924
96,740
Rp 9,674
Rp 106,414
Rp 29,322
Rp 2,932
Rp 32,254
Rp 80,753
Rp 8,075
Rp 88,828
pt. natural sumatera consultant sni analisa harga satuan CK83 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 152,772
Rp 15,277
Rp 168,049
Rp 14,318
Rp 1,680,000
Rp 1,694,318
Rp 169,432
Rp 1,863,749
Rp 49,950
Rp 2,400,000
Rp 2,449,950
Rp 244,995
Rp 2,694,945
Rp 14,318
Rp 2,450,000
Rp 2,464,318
Rp 246,432
Rp 2,710,749
Rp 14,318
Rp 20,000
Rp 34,318
Rp 3,432
Rp 37,749
pt. natural sumatera consultant sni analisa harga satuan CK84 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 40,975
Rp 85,000
Rp 125,975
Rp 12,598
Rp 138,573
Rp 14,318
Rp 10,600
Rp 24,918
Rp 2,492
Rp 27,409
Rp 14,318
Rp 150,000
Rp 164,318
Rp 16,432
Rp 180,749
Rp 14,318
Rp 450,000
Rp 464,318
Rp 46,432
Rp 510,749
Rp 190,950
Rp 19,095
Rp 210,045
pt. natural sumatera consultant sni analisa harga satuan CK85 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 50,125
Rp 5,013
Rp 55,138
Rp 67,125
Rp 6,713
Rp 73,838
Rp 50,125
Rp 5,013
Rp 55,138
Rp 77,125
Rp 7,713
Rp 84,838
pt. natural sumatera consultant sni analisa harga satuan CK86 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 373,990
Rp 37,399
Rp 411,389
Rp 173,990
Rp 17,399
Rp 191,389
Rp 2,773,990
Rp 277,399
Rp 3,051,389
Rp 3,673,990
Rp 367,399
Rp 4,041,389
pt. natural sumatera consultant sni analisa harga satuan CK87 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 12,073,990
Rp 1,207,399
Rp 13,281,389
Rp 592,980
Rp 59,298
Rp 652,278
Rp 693,990
Rp 69,399
Rp 763,389
Rp 2,973,990
Rp 297,399
Rp 3,271,389
pt. natural sumatera consultant sni analisa harga satuan CK88 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 183,990
Rp 18,399
Rp 202,389
Rp 4,142,980
Rp 414,298
Rp 4,557,278
Rp 82,125
Rp 8,213
Rp 90,338
Rp 924,125
Rp 92,413
Rp 1,016,538
pt. natural sumatera consultant sni analisa harga satuan CK89 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 1,074,125
Rp 107,413
Rp 1,181,538
Rp 30,574,125
Rp 3,057,413
Rp 33,631,538
Rp 6,574,125
Rp 657,413
Rp 7,231,538
Rp 2,574,125
Rp 257,413
Rp 2,831,538
Rp 14,074,125
Rp 1,407,413
Rp 15,481,538
pt. natural sumatera consultant sni analisa harga satuan CK90 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 324,125
Rp 32,413
Rp 356,538
Rp 244,125
Rp 24,413
Rp 268,538
Rp 524,125
Rp 52,413
Rp 576,538
Rp 874,125
Rp 87,413
Rp 961,538
pt. natural sumatera consultant sni analisa harga satuan CK91 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 3,274,125
Rp 327,413
Rp 3,601,538
Rp 104,900
Rp 10,490
Rp 115,390
Rp 164,900
Rp 16,490
Rp 181,390
36,082
Rp 3,608
Rp 39,690
24,243
Rp 2,424
pt. natural sumatera consultant sni analisa harga satuan CK92 OF 470
DINAS PEKERJAAN UMUMKOTA PADANG -
Jumlah Harga
Rp 26,667
Rp 13,185
18,043
Rp 31,228
Rp 3,123
34,350
Rp 7,032
Rp 24,758
31,790
Rp 3,179
Rp 34,969
pt. natural sumatera consultant sni analisa harga satuan CK93 OF 470
ANALISA HARGA SATUAN PEKERJAAN BIDANG CIPTA KAR
HARGA SATUAN
NO URAIAN KODE SATUAN INDEKS
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 67,550.00
Tukang Kayu L.02 OH 0.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.012 2,390,000.00
Paku biasa 2" - 5" Kg 0.020 18,750.00
Kayu papan 3/20 m3 0.007 2,420,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 67,550.00
Mandor L.04 OH 0.050 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.750 67,550.00
Mandor L.04 OH 0.025 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : A.2.3.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 72,072.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.900 67,550.00
Mandor L.04 OH 0.045 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.050 67,550.00
Mandor L.04 OH 0.067 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 67,550.00
Mandor L.04 OH 0.050 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 67,550.00
Mandor L.04 OH 0.050 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 67,550.00
Mandor L.04 OH 0.010 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug m3 1.200 129,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Mandor L.04 OH 0.025 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirtu m3 1.200 126,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 67,550.00
Tukang L.02 OH 0.750 94,500.00
Kepala tukang L.03 OH 0.075 105,000.00
Mandor L.04 OH 0.075 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
gal m3 1.200 177,958.33
Semen Portland Kg 163.000 1,258.00
Pasir Pasang m3 0.520 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 3.400 67,550.00
Tukang Batu L.02 OH 0.850 94,500.00
Kepala tukang L.03 OH 0.085 105,000.00
Mandor L.04 OH 0.170 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.480 177,958.33
Semen Portland Kg 194.000 1,258.00
Pasir beton m3 0.312 157,300.00
Kerikil m3 0.468 145,000.00
Besi beton Kg 126.000 11,200.00
Kawat beton Kg 1.800 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
Menurunkan cincin
A
sumuran dengan
penggalian dari dasar
sumuran
keladalam 5m
JENIS PEKERJAAN : A.4.1.1.5 Membuat Lantai kerja beton mutu f3c = 14,5 Mpa (K 1
w/c 0,66
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 168,267.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 67,550.00
Tukang Batu L.02 OH 0.275 94,500.00
Kepala tukang L.03 OH 0.028 105,000.00
Mandor L.04 OH 0.083 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000 -
Pasir beton Kg 760 -
Kerikil (Maks 30 mm) Kg 1029 -
Air Liter 215 18.00
JUMLAH HARGA BAHAN
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.10 Membuat Lantai kerja beton mutu f3c = 26,4 Mpa (K 3
± 2) Cm, w/c 0,52
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 168,267.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 67,550.00
Tukang Batu L.02 OH 0.275 94,500.00
Kepala tukang L.03 OH 0.028 105,000.00
Mandor L.04 OH 0.083 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 413.000 -
Pasir beton Kg 681 -
Kerikil (Maks 30 mm) Kg 1021 -
Air Liter 215 18.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 67,550.00
Tukang L.02 OH 0.260 94,500.00
Kepala tukang L.03 OH 0.026 105,000.00
Mandor L.04 OH 0.026 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,420,000.00
Paku 5 - 10 Cm Kg 0.300 18,750.00
Minyak bekisting Liter 0.100 10,600.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 67,550.00
Tukang L.02 OH 0.260 94,500.00
Kepala tukang L.03 OH 0.026 105,000.00
Mandor L.04 OH 0.026 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.045 2,420,000.00
Paku 5 - 10 Cm Kg 0.300 18,750.00
Minyak bekisting Liter 0.100 10,600.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 67,550.00
Tukang L.02 OH 0.330 94,500.00
Kepala tukang L.03 OH 0.033 105,000.00
Mandor L.04 OH 0.033 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,420,000.00
Paku 5 - 10 Cm Kg 0.400 18,750.00
Minyak bekisting Liter 0.200 10,600.00
Balok kayu kelas II m3 0.015 2,850,000.00
Plywod tebal 9 mm Lbr 0.350 122,000.00
Dolken kayu φ 8-10 Cm Batang 2.000 55,400.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 67,550.00
Tukang L.02 OH 0.330 94,500.00
Kepala tukang L.03 OH 0.033 105,000.00
Mandor L.04 OH 0.033 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,420,000.00
Paku 5 - 10 Cm Kg 0.400 18,750.00
Minyak bekisting Liter 0.200 10,600.00
Balok kayu kelas II m3 0.018 2,850,000.00
Plywod tebal 9 mm Lbr 0.350 122,000.00
Dolken kayu φ 8-10 Cm Batang 2.000 55,400.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 67,550.00
Tukang L.02 OH 0.330 94,500.00
Kepala tukang L.03 OH 0.033 105,000.00
Mandor L.04 OH 0.033 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 2,420,000.00
Paku 5 - 10 Cm Kg 0.400 18,750.00
Minyak bekisting Liter 0.200 10,600.00
Balok kayu kelas II m3 0.015 2,850,000.00
Plywod tebal 9 mm Lbr 0.350 122,000.00
Dolken kayu φ 8-10 Batang 6.000 55,400.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 67,550.00
Tukang L.02 OH 0.330 94,500.00
Kepala tukang L.03 OH 0.033 105,000.00
Mandor L.04 OH 0.033 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030 2,420,000.00
Paku 5 - 10 Cm Kg 0.400 18,750.00
Minyak bekisting Liter 0.200 10,600.00
Balok kayu kelas II m3 0.020 2,850,000.00
Plywod tebal 9 mm Lbr 0.350 122,000.00
Dolken kayu φ 8-10 Cm Batang 3.000 55,400.00
Penjaga jarak bekising/PCacer Bh 4.000 19,550.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 67,550.00
Tukang L.02 OH 0.330 94,500.00
Kepala tukang L.03 OH 0.033 105,000.00
Mandor L.04 OH 0.033 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030 2,420,000.00
Paku 5 - 10 Cm Kg 0.400 18,750.00
Minyak bekisting Liter 0.150 10,600.00
Balok kayu kelas II m3 0.015 2,850,000.00
Plywod tebal 9 mm Lbr 0.350 122,000.00
Dolken kayu φ 8-10 Cm Batang 2.000 55,400.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.180 67,550.00
Tukang L.02 OH 0.260 94,500.00
Kepala tukang L.03 OH 0.026 105,000.00
Mandor L.04 OH 0.026 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III m3 0.045 2,420,000.00
Paku 5 - 10 Cm Kg 0.300 18,750.00
Minyak Bekisting Liter 0.100 10,600.00
Bahan 2 kali Pakai m3 0.500 122,366.25
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 5.300 67,550.00
Tukang Batu L.02 OH 0.275 94,500.00
Tukang kayu L.02 OH 1.300 94,500.00
Tukang besi L.02 OH 1.050 94,500.00
Kepala tukang L.03 OH 0.262 105,000.00
Mandor L.04 OH 0.265 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.240 2,420,000.00
Paku 5 - 12 Cm Kg 3.200 18,750.00
Minyak bekisting Liter 1.600 10,600.00
Besi beton polos Kg 157.500 11,200.00
Kawa beton Kg 2.250 17,200.00
Semen Portland Kg 336.000 1,258.00
Pasir beton m3 0.540 157,300.00
Kerikil m3 0.810 177,958.33
Kayu Kelas II balok m3 0.160 2,850,000.00
Plywood 9 mm Lbr 2.800 122,000.00
Dolken kayu φ (8-10) Cm, panj 4 m Batang 24.000 55,400.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.180 67,550.00
Tukang Batu L.02 OH 0.020 94,500.00
Tukang kayu L.02 OH 0.020 94,500.00
Tukang besi L.02 OH 0.020 94,500.00
Kepala tukang L.03 OH 0.006 105,000.00
Mandor L.04 OH 0.009 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.002 2,420,000.00
Paku 5 - 12 Cm Kg 0.010 18,750.00
Minyak bekisting Liter 1.200 10,600.00
Besi beton polos Kg 3.000 11,200.00
Kawat beton Kg 0.450 17,200.00
Semen Portland Kg 4.000 1,258.00
Pasir beton m3 0.006 157,300.00
Kerikil m3 0.009 177,958.33
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.386 67,550.00
Tukang Batu L.02 OH 0.043 94,500.00
Tukang kayu L.02 OH 0.043 94,500.00
Tukang besi L.02 OH 0.043 94,500.00
Kepala tukang L.03 OH 0.013 105,000.00
Mandor L.04 OH 0.020 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.004 2,420,000.00
Paku 5 - 12 Cm Kg 0.026 18,750.00
Minyak bekisting Liter 0.936 10,600.00
Besi beton polos Kg 4.680 11,200.00
Kawat beton Kg 0.065 17,200.00
Semen Portland Kg 7.150 1,258.00
Pasir beton m3 0.012 157,300.00
Kerikil m3 0.020 177,958.33
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.297 67,550.00
Tukang Batu L.02 OH 0.033 94,500.00
Tukang kayu L.02 OH 0.033 94,500.00
Tukang besi L.02 OH 0.033 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.015 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.003 2,420,000.00
Paku 5 - 12 Cm Kg 0.020 18,750.00
Minyak bekisting Liter 0.720 10,600.00
Besi beton polos Kg 3.600 11,200.00
Kawat beton Kg 0.050 17,200.00
Semen Portland Kg 5.500 1,258.00
Pasir beton m3 0.009 157,300.00
Kerikil m3 0.015 177,958.33
JUMLAH HARGA BAHAN
C PERALATAN
JENIS PEKERJAAN : A.4.2.1.1 Pembesian 1 kg dengan besi ulir atau besi polos
SATUAN : Kg
HARGA SATUAN PEKERJAAN : Rp 14,594.64
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.0070 67,550.00
Tukang Besi L.02 OH 0.0070 94,500.00
Kepala tukang L.03 OH 0.0007 105,000.00
Mandor L.04 OH 0.0004 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Beton/Ulir Kg 1.050 11,200.00
Kawat Beton Kg 0.015 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.060 67,550.00
Tukang Las konstruksi L.02 OH 0.060 94,500.00
Kepala tukang L.03 OH 0.006 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi baja IWF Kg 1.150 14,500.00
A TENAGA
Pekerja L.01 OH 0.9000 67,550.00
Tukang Besi L.02 OH 0.0900 94,500.00
Kepala tukang L.03 OH 0.0090 105,000.00
Mandor L.04 OH 0.0045 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Reng Baja Ringan Zingcalum M 0.800 15,500.00
Baja Ringan Box m 1.500 17,000.00
Sekrup Bh 20.000 500.00
Alat Bantu Ls 1.000 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.085 67,550.00
Tukang L.02 OH 0.085 94,500.00
Kepala tukang L.03 OH 0.009 105,000.00
Mandor L.04 OH 0.004 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Alluminium Strip m 14.600 10,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.420 67,550.00
Tukang besi L.02 OH 0.042 94,500.00
Kepala tukang L.03 OH 0.042 105,000.00
Mandor L.04 OH 0.024 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Pipa Stainlessteel (Lapis Crome) Kg 25.000 35,500.00
Busur Las Kg 0.200 25,900.00
Alat Bantu Ls 1.000 6,500.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.043 67,550.00
Tukang besi L.02 OH 0.043 94,500.00
Kepala tukang L.03 OH 0.004 105,000.00
Mandor L.04 OH 0.002 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Alluminium m 1.100 110,000.00
Skrup Fixer Buah 2.000 7,500.00
Sealant Tube 0.060 36,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 67,550.00
Tukang besi L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca Tempered t.12 mm Lbr 1.000 1,680,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.021 67,550.00
Tukang besi L.02 OH 0.021 94,500.00
Kepala tukang L.03 OH 0.002 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil jendela alluminium m 1.100 110,000.00
Profil Kaca m 1.125 8,000.00
Sealant Tube 0.068 36,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 67,550.00
Tukang L.02 OH 0.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.015 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 70.000 900.00
Semen Portland Kg 18.950 1,258.00
Pasir Pasang m3 0.038 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 67,550.00
Tukang L.02 OH 0.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.015 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 70.000 900.00
Semen Portland Kg 11.500 1,258.00
Pasir Pasang m3 0.043 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.010 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 7.776 1,258.00
Pasir Pasang m3 0.020 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.015 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 10.224 1,258.00
Pasir Pasang m3 0.020 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.015 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 6.240 1,258.00
Pasir Pasang m3 0.024 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
G
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 67,550.00
Tukang L.02 OH 0.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.010 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 3.250 1,258.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang L.02 OH 0.120 94,500.00
Kepala tukang L.03 OH 0.012 105,000.00
Mandor L.04 OH 0.013 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Granite 60 x 60 cm Bh 3.00 75,000.00
Semen Portland Kg 9.80 1,258.00
Semen warna Kg 1.30 2,201.50
Pasir Pasang m3 0.045 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang L.02 OH 0.120 94,500.00
Kepala tukang L.03 OH 0.012 105,000.00
Mandor L.04 OH 0.013 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Granite Berpola bh 3.00 75,000.00
Semen Portland Kg 9.80 1,258.00
Semen warna Kg 1.30 2,201.50
Pasir Pasang m3 0.045 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang L.02 OH 0.125 94,500.00
Kepala tukang L.03 OH 0.013 105,000.00
Mandor L.04 OH 0.013 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Granit 40 x 40 cm Bh 6.63 32,900.00
Semen Portland Kg 9.80 1,258.00
Semen warna Kg 1.30 2,201.50
Pasir Pasang m3 0.045 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.700 67,550.00
Tukang L.02 OH 0.350 94,500.00
Kepala tukang L.03 OH 0.035 105,000.00
Mandor L.04 OH 0.035 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
keramik ukuran 20 Cm x 20 Cm Bh 25.00 2,400.00
Semen Portland Kg 10.40 1,258.00
Pasir Pasang m3 0.045 157,300.00
Semen warna Kg 1.620 2,201.50
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.090 67,550.00
Tukang L.02 OH 0.090 94,500.00
Kepala tukang L.03 OH 0.009 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nosing Granit Bh 1.38 18,300.00
Semen Portland Kg 1.14 1,258.00
Pasir Pasang m3 0.003 157,300.00
Semen warna Kg 0.100 2,201.50
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.090 67,550.00
Tukang L.02 OH 0.090 94,500.00
Kepala tukang L.03 OH 0.009 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint granit Bh 1.00 19,462.50
Semen Portland Kg 1.14 1,258.00
Pasir Pasang m3 0.00 157,300.00
Semen warna Kg 0.10 2,201.50
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.900 67,550.00
Tukang L.02 OH 0.450 94,500.00
Kepala tukang L.03 OH 0.045 105,000.00
Mandor L.04 OH 0.045 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 25 Cm x 40 Cm Bh 11.25 8,960.00
Semen Portland Kg 9.30 1,258.00
Pasir Pasang m3 0.02 157,300.00
Semen warna Kg 1.94 2,201.50
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.600 67,550.00
Tukang L.02 OH 0.450 94,500.00
Kepala tukang L.03 OH 0.045 105,000.00
Mandor L.04 OH 0.030 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Les Stilo H. 10 cm M2 1.00 570,000.00
PC Kg 9.30 1,258.00
Pasir Pasang M3 0.02 157,300.00
Semen Warna Kg 2.75 2,201.50
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.700 67,550.00
Tukang L.02 OH 0.350 94,500.00
Kepala tukang L.03 OH 0.035 105,000.00
Mandor L.04 OH 0.035 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu tempel hitam Bh 1.10 175,000.00
Semen Portland Kg 11.75 1,258.00
Pasir Pasang m3 0.035 2,201.50
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 67,550.00
Tukang L.02 OH 0.050 94,500.00
Kepala tukang L.03 OH 0.005 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka Plafond Hollow m1 3.750 23,500.00
Gypsum board 9 mm Lbr 0.335 62,500.00
Sekrup gypsum 5 cm Bh 12.000 500.00
Sekrup gypsum 3 cm Bh 12.000 300.00
Joint tape Roll 0.050 120,000.00
Cornise gypsum Zak 0.010 75,000.00
Alat bantu Ls 1.000 6,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JENIS PEKERJAAN : A.4.5.1.2 Memasang 1 m2 langit-langit gypsum board Berpola (Bertingkat) ukur
(120x240x9)mm, tebal 9 mm + Rangka
SATUAN : M2
HARGA SATUAN : Rp 176,430
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.110 67,550.00
Tukang L.02 OH 0.060 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.010 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka Plafond Hollow m1 4.130 23,500.00
Gypsum board 9 mm Lbr 0.370 62,500.00
Sekrup gypsum 5 cm Bh 13.200 500.00
Sekrup gypsum 3 cm Bh 13.200 300.00
Joint tape Roll 0.060 120,000.00
Cornise gypsum Zak 0.010 75,000.00
Alat bantu Ls 1.000 6,500.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 67,550.00
Tukang L.02 OH 0.050 94,500.00
Kepala tukang L.03 OH 0.005 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kisi kisi All 3 Inc Btg 3.929 51,000.00
Besi Hollow 2/4 m 4.400 23,500.00
Paku Skrup Kg 0.110 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JENIS PEKERJAAN : A.4.5.1.4 MEMASANG 1 M' LIST PLAFON GYPSUM PROFIL 10CM
SATUAN : M2
HARGA SATUAN : Rp 25,017
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.060 67,550.00
Tukang L.02 OH 0.060 94,500.00
Kepala tukang L.03 OH 0.006 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
List gypsum profil M' 1.050 11,000.00
Lem profil gypsum Kg 0.150 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JENIS PEKERJAAN : A.4.5.1.5 Memasang 1 m' List langit-langit Kisi kisi Alluminium
SATUAN : M1
HARGA SATUAN : Rp 25,424
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 67,550.00
Tukang L.02 OH 0.005 94,500.00
Kepala tukang L.03 OH 0.001 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kisi kis All 3 Inc m 1.050 20,400.00
Paku Skrup kg 0.011 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 67,550.00
Tukang L.02 OH 0.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal lbr 1.02 89,000.00
Paku biasa 1/2" - 1" Kg 0.20 18,750.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 67,550.00
Tukang L.02 OH 1.000 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.010 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
nok standar 40cm 16 swg 22 bh 1.200 43,000.00
paku hak panjang Kg 0.040 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.150 67,550.00
Tukang L.02 OH 0.400 94,500.00
Kepala tukang L.03 OH 0.025 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat bjls 30 Lbr 0.500 68,700.00
Paku Seng Kg 0.020 25,200.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.005 67,550.00
Tukang L.02 OH 0.500 94,500.00
Kepala tukang L.03 OH 0.050 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder Bh 1.000 69,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 67,550.00
Tukang L.02 OH 0.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.0005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu Bh 1.000 12,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Grendel Bh 1.000 10,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kait angin Bh 1.000 14,100.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.0008 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.100 60,400.00
Sealant Kg 0.050 36,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.017 67,550.00
Tukang L.02 OH 0.170 94,500.00
Kepala tukang L.03 OH 0.017 105,000.00
Mandor L.04 OH 0.0009 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 9 mm m2 1.100 125,000.00
Sealant Kg 0.070 36,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor Hinges Bts 75 Set 1.000 2,500,000.00
JENIS PEKERJAAN : A.4.6.2.23Pasangan 1 Set Pact Pitting ( Penjepit Kaca Atas Bawa
SATUAN : Set
HARGA SATUAN : Rp 2,759,846
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 67,550.00
Tukang L.02 OH 0.600 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pact Pitting Set 1.000 2,450,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tarikan Pintu Psg 1.000 470,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 67,550.00
Tukang L.02 OH 0.150 94,500.00
Kepala tukang L.03 OH 0.015 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tarikan Pintu Psg 1.000 170,000.00
JENIS PEKERJAAN : A.4.7.1.10 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DA
2 LAPIS CAT PENUTUP) KLAS A
SATUAN : M2
HARGA SATUAN : Rp 41,270
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 67,550.00
Tukang L.02 OH 0.063 94,500.00
Kepala tukang L.03 OH 0.006 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100 17,000.00
Cat dasar Kg 0.100 25,000.00
Cat penutup Kg 0.260 96,500.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 67,550.00
Tukang L.02 OH 0.063 94,500.00
Kepala tukang L.03 OH 0.006 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.100 25,000.00
Cat penutup Kg 0.233 96,500.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.023 67,550.00
Tukang L.02 OH 0.042 94,500.00
Kepala tukang L.03 OH 0.004 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Batu Alam 2x Kg 0.180 110,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 3.300 67,550.00
Tukang L.02 OH 1.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.160 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit 1.000 2,472,500.00
Perlengkapan Ls 1.000 86,537.50
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang L.02 OH 1.500 94,500.00
Kepala tukang L.03 OH 0.150 105,000.00
Mandor L.04 OH 0.160 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Toto Standar Unit 1.000 284,000.00
Semen Portland Kg 6.000 1,258.00
Pasir Pasang m3 0.010 157,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.200 67,550.00
Tukang L.02 OH 1.450 94,500.00
Kepala tukang L.03 OH 0.150 105,000.00
Mandor L.04 OH 0.060 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.200 1,590,000.00
Semen Portland Kg 6.000 1,258.00
Pasir Pasang m3 0.010 157,300.00
Perlengkapan % 12.000 86,537.50
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 67,550.00
Tukang L.02 OH 0.100 94,500.00
Kepala tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
floor drain Unit 1.00 325,000.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 67,550.00
Tukang L.02 OH 0.400 94,500.00
Kepala tukang L.03 OH 0.040 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1/2" m 1.00 39,050.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.054 67,550.00
Tukang L.02 OH 0.090 94,500.00
Kepala tukang L.03 OH 0.009 105,000.00
Mandor L.04 OH 0.027 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4" m 1.20 28,300.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.054 67,550.00
Tukang L.02 OH 0.090 94,500.00
Kepala tukang L.03 OH 0.009 105,000.00
Mandor L.04 OH 0.027 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1" m 1.20 36,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 67,550.00
Tukang L.02 OH 0.135 94,500.00
Kepala tukang L.03 OH 0.0135 105,000.00
Mandor L.04 OH 0.004 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3" m 1.20 35,200.00
Perlengkapan % 35.00 1,232.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : A.5.1.1.32Pemasangan 1 m' pipa PVC tipe AW diameter 4"
SATUAN : M'
HARGA SATUAN : Rp 168,252.21
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 67,550.00
Tukang L.02 OH 0.135 94,500.00
Kepala tukang L.03 OH 0.0135 105,000.00
Mandor L.04 OH 0.004 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" m 1.20 54,800.00
Perlengkapan % 35.00 1,918.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.200 94,500.00
Kepala Tukang L.03 OH 0.020 105,000.00
Mandor L.04 OH 0.005 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYM 3x4 mm2 m1 5.000 22,000.00
Fiting-Fitting Ls 1.000 13,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang ME. L.02 OH 0.050 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar Tunggal Bh 1.000 26,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang ME. L.02 OH 0.050 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Saklar Ganda Bh 1.000 43,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang ME. L.02 OH 0.050 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak 10 A Bh 1.000 26,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang ME. L.02 OH 0.050 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak AC 20 A Bh 1.000 54,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Lampu TL 2x40 W Acrylic Bh 1.000 330,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Lampu Down Light 18 Watt Bh 1.000 110,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Panel MDP unit 1.000 2,800,000.00
Alat Bantu ME Ls 1.000 6,500.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Panel LDP unit 1.000 3,700,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Panel Kapasitor Bank Unit 1.000 13,000,000.00
Alat Bantu ME Ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 2.000 67,550.00
Tukang ME. L.02 OH 0.200 94,500.00
Kepala Tukang L.03 OH 0.020 105,000.00
Mandor L.04 OH 0.002 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel m1 17.000 22,000.00
Stop Kontak LAN bh 1.000 120,000.00
Alat Bantu ME ls 1.000 6,500.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Switch 24 Port unit 1.000 650,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Acces Point unit 1.000 3,000,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.001 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kabel m1 5.500 22,000.00
Alat Bantu ME ls 1.000 6,500.00
A TENAGA
Pekerja L.01 OH 2.000 67,550.00
Tukang ME. L.02 OH 0.200 94,500.00
Kepala Tukang L.03 OH 0.020 105,000.00
Mandor L.04 OH 0.002 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kamera Indoor m1 1.000 4,500,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 0.250 67,550.00
Tukang ME. L.02 OH 0.050 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak Telephone Bh 1.000 60,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
TBT Unit 1.000 185,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
HUB Unit 1.000 475,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
KEY TELEPHONE Unit 1.000 875,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
PABX 4 PSTN 16 Extension Unit 1.000 3,500,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pact Panel Unit 1.000 1,100,000.00
Alat Bantu ME ls 1.000 6,500.00
JUMLAH HARGA BAHAN
C PERALATAN
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
UPS 5 KVA Unit 1.000 31,500,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ups 1000 Watt Unit 1.000 6,700,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Monitor LED TV 29" Unit 1.000 2,700,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
DVR 8 Channel Tampil Rekam Unit 1.000 15,000,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Outlet Data Unit 1.000 270,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 67,550.00
Tukang ME. L.02 OH 0.100 94,500.00
Kepala Tukang L.03 OH 0.010 105,000.00
Mandor L.04 OH 0.003 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sealing Proyektor Set 1.000 870,000.00
Alat Bantu ME ls 1.000 6,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN KOEFISIEN
(Rp)
A TENAGA
Pekerja L.01 OH 1.506 67,550.00
Tukang L.02 OH 0.301 94,500.00
Mandor L.04 OH 0.151 105,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tiang Pancang ø.40 cm M1 1.000 755,000.00
Pile Driving Jam 0.151 310,000.00
Alat Bantu Ls 1.000 6,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA
(Rp)
6,755.00
9,450.00
1,050.00
525.00
17,780.00
28,680.00
375.00
16,940.00
45,995.00
-
63,775.00
6,377.50
70,152.50
JUMLAH HARGA
(Rp)
6,755.00
5,250.00
12,005.00
-
-
-
-
12,005.00
1,200.50
13,205.50
JUMLAH HARGA
(Rp)
50,662.50
2,625.00
53,287.50
-
53,287.50
5,328.75
58,616.25
JUMLAH HARGA
(Rp)
60,795.00
4,725.00
65,520.00
-
65,520.00
6,552.00
72,072.00
JUMLAH HARGA
(Rp)
70,927.50
7,035.00
77,962.50
-
77,962.50
7,796.25
85,758.75
JUMLAH HARGA
(Rp)
33,775.00
5,250.00
39,025.00
-
-
39,025.00
3,902.50
42,927.50
JUMLAH HARGA
(Rp)
33,775.00
5,250.00
39,025.00
-
39,025.00
3,902.50
42,927.50
JUMLAH HARGA
(Rp)
20,265.00
1,050.00
21,315.00
154,800.00
154,800.00
-
176,115.00
17,611.50
193,726.50
JUMLAH HARGA
(Rp)
16,887.50
2,625.00
19,512.50
151,440.00
151,440.00
-
170,952.50
17,095.25
188,047.75
JUMLAH HARGA
(Rp)
101,325.00
70,875.00
7,875.00
7,875.00
187,950.00
213,550.00
205,054.00
81,796.00
500,400.00
-
688,350.00
68,835.00
757,185.00
JUMLAH HARGA
(Rp)
229,670.00
80,325.00
8,925.00
17,850.00
336,770.00
85,420.00
244,052.00
49,077.60
67,860.00
1,411,200.00
30,960.00
1,888,569.60
-
2,225,339.60
222,533.96
2,447,873.56
Pasangan 1 titik pondasi Sumuran diameter 1.20 m ( diameter luar ) kedalaman Max 5.00 m
JUMLAH HARGA
(Rp)
50,662.50
47,250.00
10,500.00
2,625.00
111,037.50
111,037.50
122,141.25
133,245.00
149,900.63
172,108.13
688,432.50
137,686.50
6,500.00
255,224.00
1,417,670.34
4,159,852.91
5,577,523.25
5,577,523.25
1,276,120.00
618,870.15
5,466,786.27
1,409,321.75
2,084,543.86
16,433,165.29
-
16,688,389.29
1,668,838.93
18,357,228.22
Membuat Lantai kerja beton mutu f3c = 14,5 Mpa (K 100), slump (12 ± 2) Cm,
JUMLAH HARGA
(Rp)
111,457.50
25,987.50
2,940.00
8,715.00
149,100.00
-
-
-
3,870.00
3,870.00
-
152,970.00
15,297.00
168,267.00
Membuat Lantai kerja beton mutu f3c = 26,4 Mpa (K 300), slump (12
± 2) Cm, w/c 0,52
JUMLAH HARGA
(Rp)
111,457.50
25,987.50
2,940.00
8,715.00
149,100.00
-
-
-
3,870.00
3,870.00
-
152,970.00
15,297.00
168,267.00
JUMLAH HARGA
(Rp)
35,126.00
24,570.00
2,730.00
2,730.00
65,156.00
96,800.00
5,625.00
1,060.00
103,485.00
-
168,641.00
16,864.10
185,505.10
JUMLAH HARGA
(Rp)
35,126.00
24,570.00
2,730.00
2,730.00
65,156.00
108,900.00
5,625.00
1,060.00
115,585.00
-
180,741.00
18,074.10
198,815.10
JUMLAH HARGA
(Rp)
44,583.00
31,185.00
3,465.00
3,465.00
82,698.00
96,800.00
7,500.00
2,120.00
42,750.00
42,700.00
110,800.00
302,670.00
-
385,368.00
38,536.80
423,904.80
JUMLAH HARGA
(Rp)
44,583.00
31,185.00
3,465.00
3,465.00
82,698.00
96,800.00
7,500.00
2,120.00
51,300.00
42,700.00
110,800.00
311,220.00
-
393,918.00
39,391.80
433,309.80
JUMLAH HARGA
(Rp)
44,583.00
31,185.00
3,465.00
3,465.00
82,698.00
96,800.00
7,500.00
2,120.00
42,750.00
42,700.00
332,400.00
524,270.00
-
606,968.00
60,696.80
667,664.80
JUMLAH HARGA
(Rp)
44,583.00
31,185.00
3,465.00
3,465.00
82,698.00
72,600.00
7,500.00
2,120.00
57,000.00
42,700.00
166,200.00
78,200.00
426,320.00
-
509,018.00
50,901.80
559,919.80
JUMLAH HARGA
(Rp)
44,583.00
31,185.00
3,465.00
3,465.00
82,698.00
72,600.00
7,500.00
1,590.00
42,750.00
42,700.00
110,800.00
277,940.00
-
360,638.00
36,063.80
396,701.80
JUMLAH HARGA
(Rp)
12,159.00
24,570.00
2,730.00
2,730.00
42,189.00
108,900.00
5,625.00
1,060.00
61,183.13
176,768.13
-
218,957.13
21,895.71
240,852.84
JUMLAH HARGA
(Rp)
358,015.00
25,987.50
122,850.00
99,225.00
27,510.00
27,825.00
661,412.50
580,800.00
60,000.00
16,960.00
1,764,000.00
38,700.00
422,688.00
84,942.00
144,146.25
456,000.00
341,600.00
1,329,600.00
5,239,436.25
-
5,900,848.75
590,084.88
6,490,933.63
JUMLAH HARGA
(Rp)
12,159.00
1,890.00
1,890.00
1,890.00
630.00
945.00
19,404.00
4,840.00
187.50
12,720.00
33,600.00
7,740.00
5,032.00
943.80
1,601.63
66,664.93
-
86,068.93
8,606.89
94,675.82
JUMLAH HARGA
(Rp)
26,081.06
4,054.05
4,054.05
4,054.05
1,365.00
2,047.50
41,655.71
8,712.00
487.50
9,921.60
52,416.00
1,118.00
8,994.70
1,840.41
3,470.19
86,960.40
-
128,616.10
12,861.61
141,477.71
JUMLAH HARGA
(Rp)
20,062.35
3,118.50
3,118.50
3,118.50
1,050.00
1,575.00
32,042.85
7,260.00
375.00
7,632.00
40,320.00
860.00
6,919.00
1,415.70
2,669.38
67,451.08
-
99,493.93
9,949.39
109,443.32
JUMLAH HARGA
(Rp)
472.85
661.50
73.50
42.00
1,249.85
11,760.00
258.00
12,018.00
-
13,267.85
1,326.79
14,594.64
JUMLAH HARGA
(Rp)
4,053.00
5,670.00
630.00
315.00
10,668.00
16,675.00
16,675.00
-
27,343.00
2,734.30
30,077.30
JUMLAH HARGA
(Rp)
60,795.00
8,505.00
945.00
472.50
70,717.50
12,400.00
25,500.00
10,000.00
9,000.00
56,900.00
-
127,617.50
12,761.75
140,379.25
JUMLAH HARGA
(Rp)
5,741.75
8,032.50
892.50
441.00
15,107.75
153,300.00
153,300.00
-
168,407.75
16,840.78
185,248.53
JUMLAH HARGA
(Rp)
28,371.00
3,969.00
4,410.00
2,520.00
39,270.00
887,500.00
5,180.00
6,500.00
899,180.00
-
938,450.00
93,845.00
1,032,295.00
JUMLAH HARGA
(Rp)
2,904.65
4,063.50
451.50
220.50
7,640.15
121,000.00
15,000.00
2,160.00
138,160.00
-
145,800.15
14,580.02
160,380.17
JUMLAH HARGA
(Rp)
1,013.25
14,175.00
1,575.00
78.75
16,842.00
1,680,000.00
1,680,000.00
-
1,696,842.00
169,684.20
1,866,526.20
JUMLAH HARGA
(Rp)
1,435.44
2,008.13
210.00
105.00
3,758.56
121,000.00
121,000.00
-
124,758.56
12,475.86
137,234.42
JUMLAH HARGA
(Rp)
20,265.00
9,450.00
1,050.00
1,575.00
32,340.00
63,000.00
23,839.10
5,977.40
92,816.50
-
125,156.50
12,515.65
137,672.15
JUMLAH HARGA
(Rp)
20,265.00
9,450.00
1,050.00
1,575.00
32,340.00
63,000.00
14,467.00
6,763.90
84,230.90
-
116,570.90
11,657.09
128,227.99
JUMLAH HARGA
(Rp)
13,510.00
14,175.00
1,575.00
1,050.00
30,310.00
9,782.21
3,146.00
12,928.21
-
43,238.21
4,323.82
47,562.03
JUMLAH HARGA
(Rp)
20,265.00
14,175.00
1,575.00
1,575.00
37,590.00
12,861.79
3,146.00
16,007.79
-
53,597.79
5,359.78
58,957.57
JUMLAH HARGA
(Rp)
20,265.00
14,175.00
1,575.00
1,575.00
37,590.00
7,849.92
3,775.20
11,625.12
-
49,215.12
4,921.51
54,136.63
JUMLAH HARGA
(Rp)
13,510.00
9,450.00
1,050.00
1,050.00
25,060.00
4,088.50
4,088.50
-
29,148.50
2,914.85
32,063.35
JUMLAH HARGA
(Rp)
16,887.50
11,340.00
1,260.00
1,312.50
30,800.00
225,000.00
12,328.40
2,861.95
7,078.50
247,268.85
-
278,068.85
27,806.89
305,875.74
JUMLAH HARGA
(Rp)
16,887.50
11,340.00
1,260.00
1,312.50
30,800.00
225,000.00
12,328.40
2,861.95
7,078.50
247,268.85
-
278,068.85
27,806.89
305,875.74
JUMLAH HARGA
(Rp)
16,887.50
11,812.50
1,365.00
1,365.00
31,430.00
218,127.00
12,328.40
2,861.95
7,078.50
240,395.85
-
271,825.85
27,182.59
299,008.44
Pemasangan 1 m2 Lantai keramik ukuran 20 Cm x 20 Cm
JUMLAH HARGA
(Rp)
47,285.00
33,075.00
3,675.00
3,675.00
87,710.00
60,000.00
13,083.20
7,078.50
3,566.43
83,728.13
-
171,438.13
17,143.81
188,581.94
JUMLAH HARGA
(Rp)
6,079.50
8,505.00
945.00
525.00
16,054.50
25,162.50
1,434.12
471.90
220.15
27,288.67
-
43,343.17
4,334.32
47,677.49
JUMLAH HARGA
(Rp)
6,079.50
8,505.00
945.00
525.00
16,054.50
19,462.50
1,434.12
471.90
220.15
21,588.67
-
37,643.17
3,764.32
41,407.49
JUMLAH HARGA
(Rp)
60,795.00
42,525.00
4,725.00
4,725.00
112,770.00
100,800.00
11,699.40
2,831.40
4,270.91
119,601.71
-
232,371.71
23,237.17
255,608.88
40,530.00
42,525.00
4,725.00
3,150.00
90,930.00
570,000.00
11,699.40
2,831.40
6,054.13
590,584.93
-
681,514.93
68,151.49
749,666.42
JUMLAH HARGA
(Rp)
47,285.00
33,075.00
3,675.00
3,675.00
87,710.00
192,500.00
14,781.50
77.05
207,358.55
-
295,068.55
29,506.86
324,575.41
JUMLAH HARGA
(Rp)
JUMLAH HARGA
(Rp)
6,755.00
4,725.00
525.00
525.00
12,530.00
88,125.00
20,937.50
6,000.00
3,600.00
6,000.00
750.00
6,500.00
131,912.50
-
144,442.50
14,444.25
158,886.75
JUMLAH HARGA
(Rp)
7,430.50
5,670.00
1,050.00
1,050.00
15,200.50
97,055.00
23,125.00
6,600.00
3,960.00
7,200.00
750.00
6,500.00
145,190.00
-
160,390.50
16,039.05
176,429.55
JUMLAH HARGA
(Rp)
6,755.00
4,725.00
525.00
525.00
12,530.00
200,357.14
103,400.00
4,400.00
308,157.14
-
320,687.14
32,068.71
352,755.86
JUMLAH HARGA
(Rp)
4,053.00
5,670.00
630.00
315.00
10,668.00
11,550.00
525.00
12,075.00
-
22,743.00
2,274.30
25,017.30
675.50
472.50
52.50
52.50
1,253.00
21,420.00
440.00
21,860.00
-
23,113.00
2,311.30
25,424.30
JUMLAH HARGA
(Rp)
13,510.00
9,450.00
1,050.00
105.00
24,115.00
90,780.00
3,750.00
94,530.00
-
118,645.00
11,864.50
130,509.50
JUMLAH HARGA
(Rp)
6,755.00
94,500.00
1,050.00
1,050.00
103,355.00
51,600.00
720.00
52,320.00
-
155,675.00
15,567.50
171,242.50
JUMLAH HARGA
(Rp)
10,132.50
37,800.00
2,625.00
105.00
50,662.50
34,350.00
504.00
34,854.00
-
85,516.50
8,551.65
94,068.15
JUMLAH HARGA
(Rp)
337.75
47,250.00
5,250.00
315.00
53,152.75
69,600.00
69,600.00
-
122,752.75
12,275.28
135,028.03
JUMLAH HARGA
(Rp)
675.50
9,450.00
1,050.00
52.50
11,228.00
12,700.00
12,700.00
-
23,928.00
2,392.80
26,320.80
JUMLAH HARGA
(Rp)
1,013.25
14,175.00
1,575.00
78.75
16,842.00
10,600.00
10,600.00
-
27,442.00
2,744.20
30,186.20
JUMLAH HARGA
(Rp)
1,013.25
14,175.00
1,575.00
84.00
16,847.25
14,100.00
14,100.00
-
30,947.25
3,094.73
34,041.98
JUMLAH HARGA
(Rp)
1,013.25
14,175.00
1,575.00
84.00
16,847.25
66,440.00
1,800.00
68,240.00
-
85,087.25
8,508.73
93,595.98
JUMLAH HARGA
(Rp)
1,148.35
16,065.00
1,785.00
94.50
19,092.85
137,500.00
2,520.00
140,020.00
-
159,112.85
15,911.29
175,024.14
JUMLAH HARGA
(Rp)
1,013.25
14,175.00
1,575.00
78.75
16,842.00
2,500,000.00
2,500,000.00
-
2,516,842.00
251,684.20
2,768,526.20
Pasangan 1 Set Pact Pitting ( Penjepit Kaca Atas Bawah Dan Kunci )
JUMLAH HARGA
(Rp)
675.50
56,700.00
1,050.00
525.00
58,950.50
2,450,000.00
2,450,000.00
-
2,508,950.50
250,895.05
2,759,845.55
JUMLAH HARGA
(Rp)
1,013.25
14,175.00
1,575.00
78.75
16,842.00
470,000.00
470,000.00
-
486,842.00
48,684.20
535,526.20
JUMLAH HARGA
(Rp)
1,013.25
14,175.00
1,575.00
78.75
16,842.00
170,000.00
170,000.00
-
186,842.00
18,684.20
205,526.20
1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR,
JUMLAH HARGA
(Rp)
1,351.00
5,953.50
661.50
262.50
8,228.50
1,700.00
2,500.00
25,090.00
29,290.00
-
37,518.50
3,751.85
41,270.35
1 m2 pengecatan Plafon Gypsum baru (1 lapis cat dasar, 2 lapis cat penutup )
JUMLAH HARGA
(Rp)
1,351.00
5,953.50
661.50
262.50
8,228.50
2,500.00
22,484.50
24,984.50
-
33,213.00
3,321.30
36,534.30
JUMLAH HARGA
(Rp)
1,553.65
3,969.00
441.00
262.50
6,226.15
19,800.00
19,800.00
-
26,026.15
2,602.62
28,628.77
JUMLAH HARGA
(Rp)
222,915.00
103,950.00
1,050.00
16,800.00
344,715.00
2,472,500.00
86,537.50
2,559,037.50
-
2,903,752.50
290,375.25
3,194,127.75
JUMLAH HARGA
(Rp)
JUMLAH HARGA
(Rp)
67,550.00
141,750.00
15,750.00
16,800.00
241,850.00
284,000.00
7,548.00
1,573.00
293,121.00
-
534,971.00
53,497.10
588,468.10
JUMLAH HARGA
(Rp)
81,060.00
137,025.00
15,750.00
6,300.00
240,135.00
1,908,000.00
7,548.00
1,573.00
1,038,450.00
2,955,571.00
-
3,195,706.00
319,570.60
3,515,276.60
JUMLAH HARGA
(Rp)
675.50
9,450.00
1,050.00
525.00
11,700.50
325,000.00
325,000.00
-
336,700.50
33,670.05
370,370.55
JUMLAH HARGA
(Rp)
675.50
37,800.00
4,200.00
525.00
43,200.50
39,050.00
39,050.00
-
82,250.50
8,225.05
90,475.55
JUMLAH HARGA
(Rp)
3,647.70
8,505.00
945.00
2,835.00
15,932.70
33,960.00
33,960.00
-
49,892.70
4,989.27
54,881.97
JUMLAH HARGA
(Rp)
3,647.70
8,505.00
945.00
2,835.00
15,932.70
43,800.00
43,800.00
-
59,732.70
5,973.27
65,705.97
JUMLAH HARGA
(Rp)
5,471.55
12,757.50
1,417.50
420.00
20,066.55
42,240.00
43,120.00
85,360.00
-
105,426.55
10,542.66
115,969.21
JUMLAH HARGA
(Rp)
5,471.55
12,757.50
1,417.50
420.00
20,066.55
65,760.00
67,130.00
132,890.00
-
152,956.55
15,295.66
168,252.21
JUMLAH HARGA
(Rp)
67,550.00
18,900.00
2,100.00
525.00
89,075.00
110,000.00
13,000.00
123,000.00
-
212,075.00
21,207.50
233,282.50
JUMLAH HARGA
(Rp)
JUMLAH HARGA
(Rp)
16,887.50
4,725.00
1,050.00
262.50
22,925.00
26,000.00
6,500.00
32,500.00
-
55,425.00
5,542.50
60,967.50
JUMLAH HARGA
(Rp)
16,887.50
4,725.00
1,050.00
262.50
22,925.00
43,000.00
6,500.00
49,500.00
-
72,425.00
7,242.50
79,667.50
JUMLAH HARGA
(Rp)
16,887.50
4,725.00
1,050.00
262.50
22,925.00
26,000.00
6,500.00
32,500.00
-
55,425.00
5,542.50
60,967.50
JUMLAH HARGA
(Rp)
16,887.50
4,725.00
1,050.00
262.50
22,925.00
54,000.00
6,500.00
60,500.00
-
83,425.00
8,342.50
91,767.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
330,000.00
6,500.00
336,500.00
-
414,655.00
41,465.50
456,120.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
110,000.00
6,500.00
116,500.00
-
194,655.00
19,465.50
214,120.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
2,800,000.00
6,500.00
2,806,500.00
-
2,884,655.00
288,465.50
3,173,120.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
3,700,000.00
6,500.00
3,706,500.00
-
3,784,655.00
378,465.50
4,163,120.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
13,000,000.00
6,500.00
13,006,500.00
-
13,084,655.00
1,308,465.50
14,393,120.50
JUMLAH HARGA
(Rp)
135,100.00
18,900.00
2,100.00
210.00
156,310.00
374,000.00
120,000.00
494,000.00
-
650,310.00
65,031.00
715,341.00
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
650,000.00
6,500.00
656,500.00
-
734,655.00
73,465.50
808,120.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
3,000,000.00
6,500.00
3,006,500.00
-
3,084,655.00
308,465.50
3,393,120.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
105.00
78,155.00
121,000.00
6,500.00
127,500.00
-
205,655.00
20,565.50
226,220.50
JUMLAH HARGA
(Rp)
135,100.00
18,900.00
2,100.00
210.00
156,310.00
4,500,000.00
6,500.00
4,506,500.00
-
4,662,810.00
466,281.00
5,129,091.00
JUMLAH HARGA
(Rp)
16,887.50
4,725.00
1,050.00
262.50
22,925.00
60,000.00
6,500.00
66,500.00
-
89,425.00
8,942.50
98,367.50
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
185,000.00
6,500.00
191,500.00
-
269,812.50
26,981.25
296,793.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
475,000.00
6,500.00
481,500.00
-
559,812.50
55,981.25
615,793.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
875,000.00
6,500.00
881,500.00
-
959,812.50
95,981.25
1,055,793.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
3,500,000.00
6,500.00
3,506,500.00
-
3,584,812.50
358,481.25
3,943,293.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
1,100,000.00
6,500.00
1,106,500.00
-
1,184,812.50
118,481.25
1,303,293.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
31,500,000.00
6,500.00
31,506,500.00
-
31,584,812.50
3,158,481.25
34,743,293.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
6,700,000.00
6,500.00
6,706,500.00
-
6,784,812.50
678,481.25
7,463,293.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
2,700,000.00
6,500.00
2,706,500.00
-
2,784,812.50
278,481.25
3,063,293.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
15,000,000.00
6,500.00
15,006,500.00
-
15,084,812.50
1,508,481.25
16,593,293.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
270,000.00
6,500.00
276,500.00
-
354,812.50
35,481.25
390,293.75
JUMLAH HARGA
(Rp)
67,550.00
9,450.00
1,050.00
262.50
78,312.50
870,000.00
6,500.00
876,500.00
-
954,812.50
95,481.25
1,050,293.75
JUMLAH HARGA
(Rp)
101,731.93
28,463.86
15,813.25
146,009.04
755,000.00
46,686.75
801,686.75
-
947,695.78
94,769.58
1,042,465.36
DAFTAR HARGA SATUAN P
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank
2 Pembersihan lapangan dan perataan
II PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 Meter
2 Galian Tanah Biasa Sedalam 2 Meter
3 Galian Tanah Biasa Sedalam 3 Meter
4 Urugan Kembali 3 (1/3 dari Pekerjaan Galian)
5 Memadatkan 1 M3 Tanah (Per 20 Cm)
6 Urugan Pasir Urug
7 Pengurugan 1 M3 sirtu padat
IV PEKERJAAN BETON
1 Membuat 1 M3 Beton Mutu K175 (fc = 14,5 MPa), Slump (12 ±
2 Membuat 1 M3 Beton Mutu K300 (fc = 26,4 MPa), Slump (12 ±
3 Memasang Bekesting Untuk Pondasi
4 Memasang Bekesting Untuk Sloof
5 Memasang Bekesting Untuk Kolom
6 Memasang Bekesting Untuk Balok
7 Memasang Bekesting Untuk Lantai
8 Memasang Bekesting Untuk Dinding
9 Memasang Bekesting Untuk Tangga
10 Pemasangan 1 m2 bekisting untuk Poor
11 Membuat Dinding Beton Bertulang (150 Kg Besi + Bekisting)
12 Membuat Kolom Praktis (11 x 11) Cm
13 Membuat 1 m Sloof Praktis (15/20cm) Beton Bertulang
14 Membuat 1 m Balok Late (11/15cm) Beton Bertulang
VI PEKERJAAN DINDING
1 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps
2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps
IX PEKERJAAN PLAFOND
1 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x
2 Memasang 1 m2 langit-langit gypsum board Berpola (Bertingk
3 Memasang 1 m2 langit-langit Kisi kisi Alluminium
4 MEMASANG 1 M' LIST PLAFON GYPSUM PROFIL 10CM
5 Memasang 1 m' List langit-langit Kisi kisi Alluminium
KODE
URAIAN PEKERJAAN SAT
ANALISA
eton Mutu K175 (fc = 14,5 MPa), Slump (12 ± 2) Cm. w/c = 0,66 A.4.1.1.5 M3
eton Mutu K300 (fc = 26,4 MPa), Slump (12 ± 2) Cm. w/c = 0,52 A.4.1.1.10 m'
ting Untuk Pondasi A.4.1.1.20 M2
A.4.1.1.21 M2
A.4.1.1.22 M2
A.4.1.1.23 M2
ting Untuk Lantai A.4.1.1.24 M2
ting Untuk Dinding A.4.1.1.25 M2
ting Untuk Tangga A.4.1.1.26 M2
2 bekisting untuk Poor A.4.1.1.37 M2
g Beton Bertulang (150 Kg Besi + Bekisting) A.4.1.1.33 M3
Praktis (11 x 11) Cm A.4.1.1.35 m
of Praktis (15/20cm) Beton Bertulang A.4.1.1.36 m
ok Late (11/15cm) Beton Bertulang A.4.1.1.37 m
AN ALLUMINIUM
dengan besi ulir atau besi polos A.4.2.1.1 Kg
g rangka kuda-kuda baja IWF A.4.2.1.2 Kg
RANGKA ATAP BAJA RINGAN A.4.2.1.22 M2
panel alluminium strip lebar 8 cm A.4.2.1.11 M1
Tangga /m H.1 M A.4.2.1.22 M1
1 kusen pintu alluminium A.4.2.1.23 M1
KODE
URAIAN PEKERJAAN SAT
ANALISA
aca Tempered tebal. 12 mm/lbr A.4.2.1.24 Lbr
Rangka Daun Pintu / Jendela Kaca A.4.2.1.25 M1
A.4.6.2.4 BH
uah engsel jendela kupu-kupu A.4.6.2.5 BH
A.4.6.2.6 BH
A.4.6.2.7 BH
A.4.6.2.16 M2
A.4.6.2.17 M2
A.4.6.2.22 Set
act Pitting ( Penjepit Kaca Atas Bawah Dan Kunci ) A.4.6.2.23 Set
A.4.6.2.24 Psg
A.4.6.2.25 Psg
KODE
URAIAN PEKERJAAN SAT
ANALISA
AN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) A.4.7.1.10 M2
Plafon Gypsum baru (1 lapis cat dasar, 2 lapis cat penutup ) A.4.7.1.11 M2
AN BATU ALAM 2 LAPIS A.4.7.1.12 M2
IKAL ELEKTRIKAL
Instalasi Mekanikal Elektrikal A.9.9.2.1 Ttk
A.9.9.2.2 Bh
A.9.9.2.3 Bh
A.9.9.2.4 Bh
A.9.9.2.5 Bh
mpu 2 x 40 w Acrylic A.9.9.2.6 Bh
mpu down light 18 watt A.9.9.2.7 Bh
A.9.9.2.8 unit
A.9.9.2.9 unit
nel kapasitor bank 33 KVA A.9.9.2.10 unit
p kontak dan jaringan LAN A.9.9.2.11 unit
A.9.9.2.12 unit
A.9.9.2.13 unit
A.9.9.2.14 titik
A.9.9.2.15 Bh
Kontak Telephone A.9.9.2.16 Bh
A.9.9.2.17 unit
A.9.9.2.18 unit
A.9.9.2.19 unit
BX 4 PSTN 16 Extension A.9.9.2.20 unit
A.9.9.2.21 unit
A.9.9.2.22 unit
A.9.9.2.23 unit
A.9.9.2.24 unit
D R 8 Channel Tampil Rekam A.9.9.2.25 unit
A.9.9.2.26 unit
A.9.9.2.27 Set
AN BIDANG CIPTA KARYA
HARGA SATUAN
KET
PEKERJAAN (Rp)
Rp 70,152.50
Rp 13,205.50
Rp 58,616.25
Rp 72,072.00
Rp 85,758.75
Rp 42,927.50
Rp 42,927.50
Rp 193,726.50
Rp 188,047.75
Rp 757,185.00
Rp 403,713.20
Rp 2,447,873.56
Rp 769,654.44
Rp 1,042,465.36
###
Rp 834,890.82
Rp 944,572.39
Rp 185,505.10
Rp 198,815.10
Rp 423,904.80
Rp 433,309.80
Rp 667,664.80
Rp 559,919.80
Rp 396,701.80
Rp 240,852.84
Rp 6,490,933.63
Rp 94,675.82
Rp 141,477.71
Rp 109,443.32
Rp 14,594.64
Rp 30,077.30
Rp 140,379.25
Rp 185,248.53
Rp 1,032,295.00
Rp 160,380.17
HARGA SATUAN
KET
PEKERJAAN (Rp)
Rp 1,866,526.20
Rp 137,234.42
Rp 137,672.15
Rp 128,227.99
Rp 47,562.03
Rp 58,957.57
Rp 54,136.63
Rp 32,063.35
Rp 305,875.74
Rp 305,875.74
Rp 299,008.44
Rp 188,581.94
Rp 47,677.49
Rp 41,407.49
Rp 275,320.88
Rp 275,320.88
Rp 255,608.88
Rp 749,666.42
Rp 324,575.41
Rp 158,886.75
Rp 176,429.55
Rp 352,755.86
Rp 25,017.30
Rp 25,424.30
Rp 130,509.50
Rp 171,242.50
Rp 94,068.15
Rp 135,028.03
Rp 26,320.80
Rp 30,186.20
Rp 34,041.98
Rp 93,595.98
Rp 175,024.14
Rp 2,768,526.20
Rp 2,759,845.55
Rp 535,526.20
Rp 205,526.20
HARGA SATUAN
KET
PEKERJAAN (Rp)
Rp 41,270.35
Rp 36,534.30
Rp 28,628.77
Rp 3,194,127.75
Rp 588,468.10
Rp 3,515,276.60
Rp 370,370.55
Rp 90,475.55
Rp 54,881.97
Rp 65,705.97
Rp 115,969.21
Rp 168,252.21
Rp 233,282.50
Rp 60,967.50
Rp 79,667.50
Rp 60,967.50
Rp 91,767.50
Rp 456,120.50
Rp 214,120.50
Rp 3,173,120.50
Rp 4,163,120.50
###
Rp 715,341.00
Rp 808,120.50
Rp 3,393,120.50
Rp 226,220.50
Rp 5,129,091.00
Rp 98,367.50
Rp 296,793.75
Rp 615,793.75
Rp 1,055,793.75
Rp 3,943,293.75
Rp 1,303,293.75
###
Rp 7,463,293.75
Rp 3,063,293.75
###
Rp 390,293.75
Rp 1,050,293.75
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
TAHUN
a b
I PEKERJAAN PERSIAPAN
I.1 1 M' PENGUKURAN DAN PEMASANGAN BOUPLA
I.2 1 M2 PEMBERSIHAN LAPANGAN DAN PEMERATA
1.3 PEKERJAAN PEMBONGKARAN DAN PEMINDAHA
1.4 PEKERJAAN PEMBONGKARAN BANGUNAN KAN
II PEKERJAAN STRUKTUR
II.1 PEKERJAAN STRUKTUR BAWAH
II.1.1 PEKERJAAN PONDASI & POUR
II.1.1.1 PEKERJAAN BORED PILE ø40 cm (P1)
a.
b.
a b
II.2.1.1 PEKERJAAN KOLOM Type 1 (K1) 30 x40 CM
a.
b.
c.
a b
a.
b.
c.
a b
III.1.2 PEKERJAAN MEKANIKAL ELEKTRIKAL
a. Pengalihan Sambungan Daya PLN ( 33KVA )+ K
b. Instalasi Penerangan
c. Instalasi Stop Kontak 10 A
d. Instalasi Stop Kontak AC
e. Pas. Saklar Tunggal
f. Pas. Saklar Ganda
g. Pas. Stop Kontak 10 A
h. Pas. Stop Kontak AC 20 A
i. Pas. Lampu TL 2 x 40 W Acrylic
j. Pas. Lampu Down Light & SL 18 W
k. Pas. Panel MDP
l. Pas. Panel LDP
m. Pas. Panel Capasitor Bank
n. Test Commisioning Lt 1 dan2
r. Pekerjaan Telepon
-
-
-
-
-
-
j. Pekerjaan Reservoar
- Galian Tanah Biasa
NO. ITEM PEKERJ
a b
- Urugan Pasir
- Lantai Kerja Beton Fc 14.5 Mpa
- Be
- Bekisting Dinding
- Pembesian
- Pasang Keramik Dinding 20x25 cm (Setara Ro
- Pasang Keramik Dinding 20x20 cm (Setara Ro
- Urugan Tanah Kembali
o. Pekerjaan CCTV
-
-
-
-
-
a b
r. Pasang Outlet Data
-
-
IV PEKERJAAN ARSITEKTUR
IV.1 PEKERJAAN ARSITEKTUR GEDUNG LANTAI 1 (SAT
A. PEKERJAAN BETON BERTULANG & DINDING
- PEKERJAAN PONDASI BT KALI
a. 1 m3 URUGAN PASIR UNTUK PASANG BATU
b. 1 M3 PASANG PONDASI BATU KALI 1PC : 4PS
- PEKERJAAN PLESTERAN
a. MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, T
b. MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, T
c. MEMASANG 1 M2 ACIAN
- PEKERJAAN FINISHING
a. MEMASANG 1 M2 DINDING KERAMIK UKURA
b. MEMASANG 1 M2 LES STELO DINDING KERA
c. MEMASANG PLIN GRANIT 15 X 60 CM (Setara
d. MEMBENTUK 1 M1 TALI AIR
NO. ITEM PEKERJ
a b
e. PASANG 1 M1 RAILLING TANGGA FINISH CRO
f. 1 M3 BETON FC 26,4 Mpa UNTUK KOLOM SIR
g. 1 M2 BEKISTING DINDING UNTUK KOLOM SI
- TYPE P1 2 UNIT
a.
b.
c.
d.
e.
f.
- TYPE P2 4 UNIT
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
NO. ITEM PEKERJ
a b
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BURAM T.5MM
d. PASANG 1 M2 ALLUMINIUM STRIP
e. PASANG 1 SET TARIKAN PINTU BIASA
f. 1 BUAH PASANG ENGSEL
g. 1 BUAH PASANG GRENDEL
h. 1 BUAH PASANG KUNCI
- TYPE P3 3 UNIT
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BURAM T.5MM
d. PASANG 1 M2 ALLUMINIUM STRIP
e. PASANG 1 M2 KACA BENING T.5MM
f. PASANG 1 SET TARIKAN PINTU BIASA
g. 1 BUAH PASANG ENGSEL
h. 1 BUAH PASANG GRENDEL
i. 1 BUAH PASANG KUNCI
- TYPE J1 3 UNIT
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BENING T.5MM
d. 1 BUAH PASANG ENGSEL
e. 1 BUAH PASANG GRENDEL
f. 1 BUAH PASANG HAK ANGIN
- TYPE J2 11 UNIT
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BENING T.5MM
d. 1 BUAH PASANG ENGSEL
e. 1 BUAH PASANG GRENDEL
f. 1 BUAH PASANG HAK ANGIN
NO. ITEM PEKERJ
a b
- TYPE V1 4 UNIT
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BENING T.5MM
d. 1 BUAH PASANG ENGSEL
e. 1 BUAH PASANG GRENDEL
f. 1 BUAH PASANG HAK ANGIN
C. PEKERJAAN PLAFON
a. PASANG RANGKA DAN LANGIT PLAFON GYP
b. PASANG RANGKA DAN LANGIT PLAFON GYP
c. PASANG 1 M1 LIST PROFIL GYPSUM
D. PEKERJAAN LANTAI
a. 1 M3 URUGAN PILIHAN PENINGGIAN MUKA L
b. 1 M3 URUGAN PASIR
c. 1 M3 CORAN LANTAI KERJA FC 14,5 Mpa
d. PASANG 1 M2 GRANIT UK. 60X60 CM (Setara
e. PASANG 1 M2 GRANIT UK. 60X60 CM BERPO
f. PASANG 1 M2 KERAMIK UK. 20X20 CM (Seta
g. PASANG 1 M1 NOSHING
F. PEKERJAAN FINISHING
a. 1 M2 AFWERKING BETON
b. 1 M2 PENGECATAN BIDANG TEMBOK BARU
c. 1 M2 PENGECATAN PLAFON GYPSUM (Setar
d. 1 M2 PASANG BATU CANDI ALUR
e. 1 M2 PENGECATAN BATU CANDI ALUR 2 LAP
f. PASANG 1 M1 PROFIL BETON
- PEKERJAAN PLESTERAN
NO. ITEM PEKERJ
a b
a. MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, T
b. MEMASANG 1 M2 ACIAN
- PEKERJAAN FINISHING
a. MEMASANG 1 M2 DINDING KERAMIK UKURA
b. MEMASANG 1 M2 LES STELO DINDING KERA
c. MEMASANG PLIN GRANIT 15 X 60 CM (Setara
d. MEMBENTUK 1 M1 TALI AIR
- TYPE P2 4 Unit
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BURAM T.5MM
d. PASANG 1 M2 ALLUMINIUM STRIP
e. PASANG 1 SET TARIKAN PINTU BIASA
f. 1 BUAH PASANG ENGSEL
g. 1 BUAH PASANG GRENDEL
h. 1 BUAH PASANG KUNCI
a b
f. 1 BUAH PASANG ENGSEL
g. 1 BUAH PASANG GRENDEL
h. 1 BUAH PASANG KUNCI
- TYPE P4 2 Unit
a. KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 LEMBAR PINTU KACA TEMPERED
c. PASANG 1M2 JENDELA KACA TEBAL 5 MM B
d. PASANG 1 SET FLOOR HINGES BTS 75
e. PASANT 1 SET PACT PITTING (Penjepit Kaca A
f. PASANG 1 PSG TARIKAN PINTU UTAMA (STA
- TYPE P5 2 Unit
a. KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 LEMBAR PINTU KACA TEMPERED
c. PASANG 1 SET FLOOR HINGES BTS 75
d. PASANT 1 SET PACT PITTING (Penjepit Kaca A
e. PASANG 1 PSG TARIKAN PINTU UTAMA (STA
- TYPE P6 1 Unit
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BURAM T.5MM
d. PASANG 1 M2 KACA BENING T.5MM
e. PASANG 1 SET TARIKAN PINTU BIASA
f. 1 BUAH PASANG ENGSEL
g. 1 BUAH PASANG GRENDEL
h. 1 BUAH PASANG KUNCI
- TYPE J3 3 Unit
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BENING T.5MM
d. 1 BUAH PASANG ENGSEL
NO. ITEM PEKERJ
a b
e. 1 BUAH PASANG GRENDEL
f. 1 BUAH PASANG HAK ANGIN
- TYPE J4 7 Unit
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BENING T.5MM
d. 1 BUAH PASANG ENGSEL
e. 1 BUAH PASANG GRENDEL
f. 1 BUAH PASANG HAK ANGIN
- TYPE J5 2 Unit
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BENING T.5MM
d. 1 BUAH PASANG ENGSEL
e. 1 BUAH PASANG GRENDEL
f. 1 BUAH PASANG HAK ANGIN
- TYPE J6 2 Unit
a. 1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
b. PASANG 1 M1 RANGKA DAUN PINTU/JENDEL
c. PASANG 1 M2 KACA BENING T.5MM
d. 1 BUAH PASANG ENGSEL
e. 1 BUAH PASANG GRENDEL
f. 1 BUAH PASANG HAK ANGIN
C. PEKERJAAN PLAFON
a. PASANG 1 M2 RANGKA DAN LANGIT PLAFON
b. PASANG 1 M2 RANGKA DAN LANGIT PLAFON
c. PASANG 1 M1 LIST PROFIL GYPSUM
d. PASANG 1 M2 RANGKA DAN LANGIT-LANGIT
e. PASANG 1 M1 LIST KISI-KISI LANGIT-LANGIT
D. PEKERJAAN LANTAI
a. PASANG 1 M2 GRANIT UK. 60X60 CM (Setara
b. PASANG 1 M2 GRANIT UK. 60X60 CM BERPO
NO. ITEM PEKERJ
a b
c. PASANG 1 M2 KERAMIK UK. 20X20 CM (Setar
d. PASANG 1 M1 NOSHING
E. PEKERJAAN FINISHING
a. 1 M2 AFWERKING BETON
b. 1 M2 PENGECATAN BIDANG TEMBOK BARU
c. 1 M2 PENGECATAN PLAFON GYPSUM (Setar
d. PASANG 1 M1 PROFIL BETON
e. PASANG 1 M2 UKIRAN GRC
f. 1 M2 PASANG BATU CANDI ALUR
g. 1 M2 PENGECATAN BATU CANDI ALUR 2 LAP
ITEM PEKERJAAN
PEKERJAAN PERSIAPAN
1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK
1 M2 PEMBERSIHAN LAPANGAN DAN PEMERATAAN
PEKERJAAN PEMBONGKARAN DAN PEMINDAHAN TOWER
PEKERJAAN PEMBONGKARAN BANGUNAN KANTOR CAMAT LAMA
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR BAWAH
PEKERJAAN PONDASI & POUR
PEKERJAAN BORED PILE ø40 cm (P1)
PEKERJAAN PONDASI BORED FILE Ø40cm (P1)
POUR PONDASI BORED PILE (100x100x40)
b
PEKERJAAN KOLOM Type 1 (K1) 30 x40 CM
PEMBESIAN / KG
MEMASANG 1 M2 BEKISTING UNTUK KOLOM
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
PEKERJAAN BALOK
PEKERJAAN BALOK INDUK (Type BI) 30x50 CM
MEMASANG 1 M2 BEKISTING UNTUK BALOK
PEMBESIAN / KG
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
b
PEMBESIAN / KG
MEMASANG 1 M2 BEKISTING UNTUK KOLOM
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
PEKERJAAN BALOK
PEKERJAAN BALOK INDUK (Type BI.1) 30x40 CM
MEMASANG 1 M2 BEKISTING UNTUK BALOK
PEMBESIAN / KG
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
b
PEKERJAAN MEKANIKAL ELEKTRIKAL
Pengalihan Sambungan Daya PLN ( 33KVA )+ Konsuil & UJL
Instalasi Penerangan
Instalasi Stop Kontak 10 A
Instalasi Stop Kontak AC
Pas. Saklar Tunggal
Pas. Saklar Ganda
Pas. Stop Kontak 10 A
Pas. Stop Kontak AC 20 A
Pas. Lampu TL 2 x 40 W Acrylic
Pas. Lampu Down Light & SL 18 W
Pas. Panel MDP
Pas. Panel LDP
Pas. Panel Capasitor Bank
Test Commisioning Lt 1 dan2
Pekerjaan Telepon
Pas instalasi jaringan Telepon
Pas Stop Kontak Telpon
Pasang TBT
Pasang HUB
Pasang Key Telpon
Pasang PABX 4 PSTN 16 Extension
PEKERJAAN PLUMBING
Pasang Pipa Induk Air Bersih Gip D. 1"
Pasang Pipa Pembagi Air Bersih Gip D. 3/4"
Pasang Pipa Air Buangan & Air Hujan PVC D. 4"
Pasang Pipa Air Buangan PVC D. 3"
Pasang Pipa Air Buangan Padat PVC D. 4"
Pasang Kloset Jongkok Setara Toto
Pasang Kran Air D. 3/4"
Pasang Floor Drain Setara Toto
1 Unit Septictank Beton Kapasitas 50 Orang + Resapan
Pekerjaan Reservoar
- Galian Tanah Biasa
ITEM PEKERJAAN
b
- Urugan Pasir
- Lantai Kerja Beton Fc 14.5 Mpa
Beton FC 26,4 Mpa
- Bekisting Dinding
- Pembesian
- Pasang Keramik Dinding 20x25 cm (Setara Roman)
- Pasang Keramik Dinding 20x20 cm (Setara Roman)
- Urugan Tanah Kembali
Pekerjaan CCTV
Pasangan Instalasi Jaringan CCTV (Setara Cable Telview CAB 20 VP)
Pas. Ups 1000 Watt
Monitor LED TV 29 Inch (Setara LG Premium IPS Monitor)
DVR 8 Chanel Tampil Rekam
Pasangan Kamera CCTV Indoor (Setara Complit DIY-120)
b
Pasang Outlet Data
TBT
HUB
PEKERJAAN PLUMBING
Pasang Pipa Induk Air Bersih Gip D. 1"
Pasang Pipa Pembagi Air Bersih Gip D. 3/4"
Pasang Pipa Air Buangan & Air Hujan PVC D. 4"
Pasang Pipa Air Buangan PVC D. 3"
Pasang Pipa Air Buangan Padat PVC D. 4"
Pasang Kloset Jongkok Setara Toto
Pasang Kran Air D. 3/4"
Pasang Floor Drain Setara Toto
Pasang Kloset Duduk Setara Toto
Pasang 1 Set Wastafel (toto)+ Cermin
PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEKTUR GEDUNG LANTAI 1 (SATU)
PEKERJAAN BETON BERTULANG & DINDING
PEKERJAAN PONDASI BT KALI
1 m3 URUGAN PASIR UNTUK PASANG BATU KALI
1 M3 PASANG PONDASI BATU KALI 1PC : 4PS
PEKERJAAN PLESTERAN
MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 15 MM
MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MM
MEMASANG 1 M2 ACIAN
PEKERJAAN FINISHING
MEMASANG 1 M2 DINDING KERAMIK UKURAN (25 X 40) (Setara Roman)
MEMASANG 1 M2 LES STELO DINDING KERAMIK
MEMASANG PLIN GRANIT 15 X 60 CM (Setara Granito)
MEMBENTUK 1 M1 TALI AIR
ITEM PEKERJAAN
b
PASANG 1 M1 RAILLING TANGGA FINISH CROME
1 M3 BETON FC 26,4 Mpa UNTUK KOLOM SIRIP
1 M2 BEKISTING DINDING UNTUK KOLOM SIRIP
TYPE P1 2 UNIT
KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PINTU KACA TEMPERED TEBAL 12MM BENING
JENDELA KACA TEBAL 5 MM BENING
FLOOR HINGES BTS 75
PACT PITTING (Penjepit Kaca Atas Bawah dan Kunci) PT.10, PT20 us20
TARIKAN PINTU UTAMA (STAINLEES STEEL L 300)
TYPE P2 4 UNIT
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
ITEM PEKERJAAN
b
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BURAM T.5MM
PASANG 1 M2 ALLUMINIUM STRIP
PASANG 1 SET TARIKAN PINTU BIASA
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG KUNCI
TYPE P3 3 UNIT
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BURAM T.5MM
PASANG 1 M2 ALLUMINIUM STRIP
PASANG 1 M2 KACA BENING T.5MM
PASANG 1 SET TARIKAN PINTU BIASA
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG KUNCI
TYPE J1 3 UNIT
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BENING T.5MM
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG HAK ANGIN
TYPE J2 11 UNIT
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BENING T.5MM
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG HAK ANGIN
ITEM PEKERJAAN
b
TYPE V1 4 UNIT
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BENING T.5MM
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG HAK ANGIN
PEKERJAAN PLAFON
PASANG RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BIASA
PASANG RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BERTINGKAT
PASANG 1 M1 LIST PROFIL GYPSUM
PEKERJAAN LANTAI
1 M3 URUGAN PILIHAN PENINGGIAN MUKA LANTAI
1 M3 URUGAN PASIR
1 M3 CORAN LANTAI KERJA FC 14,5 Mpa
PASANG 1 M2 GRANIT UK. 60X60 CM (Setara Granito)
PASANG 1 M2 GRANIT UK. 60X60 CM BERPOLA (Setara Granito)
PASANG 1 M2 KERAMIK UK. 20X20 CM (Setara Roman)
PASANG 1 M1 NOSHING
PEKERJAAN FINISHING
1 M2 AFWERKING BETON
1 M2 PENGECATAN BIDANG TEMBOK BARU KELAS A (Setara Dulux Wheathershield)
1 M2 PENGECATAN PLAFON GYPSUM (Setara Catylac)
1 M2 PASANG BATU CANDI ALUR
1 M2 PENGECATAN BATU CANDI ALUR 2 LAPIS
PASANG 1 M1 PROFIL BETON
PEKERJAAN PLESTERAN
ITEM PEKERJAAN
b
MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MM
MEMASANG 1 M2 ACIAN
PEKERJAAN FINISHING
MEMASANG 1 M2 DINDING KERAMIK UKURAN (25 X 40) (Setara Roman)
MEMASANG 1 M2 LES STELO DINDING KERAMIK
MEMASANG PLIN GRANIT 15 X 60 CM (Setara Granito)
MEMBENTUK 1 M1 TALI AIR
TYPE P2 4 Unit
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BURAM T.5MM
PASANG 1 M2 ALLUMINIUM STRIP
PASANG 1 SET TARIKAN PINTU BIASA
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG KUNCI
b
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG KUNCI
TYPE P4 2 Unit
KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 LEMBAR PINTU KACA TEMPERED TEBAL 12MM BENING
PASANG 1M2 JENDELA KACA TEBAL 5 MM BENING
PASANG 1 SET FLOOR HINGES BTS 75
PASANT 1 SET PACT PITTING (Penjepit Kaca Atas Bawah dan Kunci) PT.10, PT20 us20
PASANG 1 PSG TARIKAN PINTU UTAMA (STAINLEES STEEL L 300)
TYPE P5 2 Unit
KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 LEMBAR PINTU KACA TEMPERED TEBAL 12MM BENING
PASANG 1 SET FLOOR HINGES BTS 75
PASANT 1 SET PACT PITTING (Penjepit Kaca Atas Bawah dan Kunci) PT.10, PT20 us20
PASANG 1 PSG TARIKAN PINTU UTAMA (STAINLEES STEEL L 300)
TYPE P6 1 Unit
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BURAM T.5MM
PASANG 1 M2 KACA BENING T.5MM
PASANG 1 SET TARIKAN PINTU BIASA
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG KUNCI
TYPE J3 3 Unit
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BENING T.5MM
1 BUAH PASANG ENGSEL
ITEM PEKERJAAN
b
1 BUAH PASANG GRENDEL
1 BUAH PASANG HAK ANGIN
TYPE J4 7 Unit
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BENING T.5MM
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG HAK ANGIN
TYPE J5 2 Unit
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BENING T.5MM
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG HAK ANGIN
TYPE J6 2 Unit
1 M1 KUZEN ALLUMINIUM SILVER 1.3/4'X3'
PASANG 1 M1 RANGKA DAUN PINTU/JENDELA KACA
PASANG 1 M2 KACA BENING T.5MM
1 BUAH PASANG ENGSEL
1 BUAH PASANG GRENDEL
1 BUAH PASANG HAK ANGIN
PEKERJAAN PLAFON
PASANG 1 M2 RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BIASA
PASANG 1 M2 RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BERTINGKAT
PASANG 1 M1 LIST PROFIL GYPSUM
PASANG 1 M2 RANGKA DAN LANGIT-LANGIT KISI-KISI ALLUMINIUM
PASANG 1 M1 LIST KISI-KISI LANGIT-LANGIT ALLUMINIUM
PEKERJAAN LANTAI
PASANG 1 M2 GRANIT UK. 60X60 CM (Setara Granito)
PASANG 1 M2 GRANIT UK. 60X60 CM BERPOLA (Setara Granito)
ITEM PEKERJAAN
b
PASANG 1 M2 KERAMIK UK. 20X20 CM (Setara Roman)
PASANG 1 M1 NOSHING
PEKERJAAN FINISHING
1 M2 AFWERKING BETON
1 M2 PENGECATAN BIDANG TEMBOK BARU KELAS A (Setara Dulux weathershield)
1 M2 PENGECATAN PLAFON GYPSUM (Setara Catylac)
PASANG 1 M1 PROFIL BETON
PASANG 1 M2 UKIRAN GRC
1 M2 PASANG BATU CANDI ALUR
1 M2 PENGECATAN BATU CANDI ALUR 2 LAPIS
VOLUME
HARGA VOLUME ITEM JUMLAH
SATUAN PEKERJAAN HARGA
c d e=cxd
TOTAL
SUB
TOTAL
f = jumlah sub. (e)
Rp 27,383,630.00
Rp 470,212,076.12
Rp 16,787,374.16
Rp 36,714,456.43
Rp 4,873,370.97
Rp 153,999,006.45
SUB
TOTAL
f = jumlah sub. (e)
Rp 214,502,426.84
Rp 17,130,026.32
Rp 218,354,726.52
Rp 29,142,414.78
Rp 338,117,070.13
Rp 27,035,537.68
Rp 32,891,645.66
Rp 164,768,360.39
Rp 8,152,628.86
SUB
TOTAL
f = jumlah sub. (e)
Rp 5,709,107.92
Rp 193,828,278.77
Rp 70,716,415.82
Rp 1,114,083.91
Rp 151,924,404.16
Rp 440,641,941.46
Rp 225,822,298.61
SUB
TOTAL
f = jumlah sub. (e)
SUB
TOTAL
f = jumlah sub. (e)
Rp 242,429,170.46
SUB
TOTAL
f = jumlah sub. (e)
Rp 480,538,187.53
SUB
TOTAL
f = jumlah sub. (e)
Rp 237,214,535.93
SUB
TOTAL
f = jumlah sub. (e)
SUB
TOTAL
f = jumlah sub. (e)
Rp 66,252,324.67
Rp 202,458,242.83
Rp 81,015,579.29
Rp 129,571,026.05
Rp 291,886,282.04
SUB
TOTAL
f = jumlah sub. (e)
Rp 218,339,812.84
SUB
TOTAL
f = jumlah sub. (e)
SUB
TOTAL
f = jumlah sub. (e)
Rp 97,114,434.01
Rp 124,985,190.24
SUB
TOTAL
f = jumlah sub. (e)
Rp 175,116,518.16
Rp 11,136,395.60
Rp 5,207,878,981.62
A
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
TAHUN
Uraian Pekerjaan
(J)
I PEKERJAAN PERSIAPAN
I.1 1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK
II PEKERJAAN STRUKTUR
II.1 PEKERJAAN STRUKTUR BAWAH
II.1.1 PEKERJAAN PONDASI & POUR
II.1.1.1 PEKERJAAN BORED PILE ø40 cm (P1)
a. PEKERJAAN PONDASI BORED FILE Ø40cm (P1)
c. PEMBESIAN / KG
Uraian Pekerjaan
Uraian Pekerjaan
Tulangan Stek
c. PEMBESIAN / KG
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
Uraian Pekerjaan
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
Uraian Pekerjaan
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
b. PEMBESIAN / KG
Uraian Pekerjaan
b. PEMBESIAN / KG
Uraian Pekerjaan
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
Uraian Pekerjaan
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
b. PEMBESIAN / KG
c. MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (1
Uraian Pekerjaan
IV PEKERJAAN ARSITEKTUR
IV.1 PEKERJAAN ARSITEKTUR GEDUNG LANTAI 1 (SATU)
A. PEKERJAAN BETON BERTULANG & DINDING
- PEKERJAAN PONDASI BT KALI
a. 1 m3 URUGAN PASIR UNTUK PASANG BATU KALI
- PEKERJAAN PLESTERAN
a. MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 15 MM
c. MEMASANG 1 M2 ACIAN
- PEKERJAAN FINISHING
a. MEMASANG 1 M2 DINDING KERAMIK UKURAN (25 X 40) (Setara Ro
C. PEKERJAAN PLAFON
a. PASANG RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BIA
Uraian Pekerjaan
b. PASANG RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BE
c. PASANG 1 M1 LIST PROFIL GYPSUM
D. PEKERJAAN LANTAI
a. 1 M3 URUGAN PILIHAN PENINGGIAN MUKA LANTAI
b. 1 M3 URUGAN PASIR
b. 1 M3 URUGAN PASIR
Uraian Pekerjaan
F. PEKERJAAN FINISHING
a. 1 M2 AFWERKING BETON
b. 1 M2 PENGECATAN BIDANG TEMBOK BARU KELAS A (Setara Dulux W
c. 1 M2 PENGECATAN PLAFON GYPSUM (Setara Catylac)
d. 1 M2 PASANG BATU CANDI ALUR
- PEKERJAAN PLESTERAN
a. MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MM
b. MEMASANG 1 M2 ACIAN
- PEKERJAAN FINISHING
a. MEMASANG 1 M2 DINDING KERAMIK UKURAN (25 X 40) (Setara Ro
b. MEMASANG 1 M2 LES STELO DINDING KERAMIK
c. MEMASANG PLIN GRANIT 15 X 60 CM (Setara Granito)
d. MEMBENTUK 1 M1 TALI AIR
- PEKERJAAN BETON, BALOK DAN KOLOM
a. 1 M3 BETON FC 26,4 Mpa UNTUK PLAT CANTILEVER
C. PEKERJAAN PLAFON
a. PASANG 1 M2 RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9M
D. PEKERJAAN LANTAI
a. PASANG 1 M2 GRANIT UK. 60X60 CM (Setara Granito)
E. PEKERJAAN FINISHING
a. 1 M2 AFWERKING BETON
b. 1 M2 PENGECATAN BIDANG TEMBOK BARU KELAS A (Setara Dulux w
Uraian Pekerjaan
c. 1 M2 PENGECATAN PLAFON GYPSUM (Setara Catylac)
d. PASANG 1 M1 PROFIL BETON
e. PASANG 1 M2 UKIRAN GRC
f. 1 M2 PASANG BATU CANDI ALUR
d. BAJA TULANGAN
- Urugan Pasir
- Beton Fc 25 Mpa
- Bekisting Dinding
Uraian Pekerjaan
- Pembesian
Uraian Pekerjaan
(J)
AN PERSIAPAN
PENGUKURAN DAN PEMASANGAN BOUPLANK
PANJANG
LEBAR
AN STRUKTUR
RJAAN STRUKTUR BAWAH
RJAAN PONDASI & POUR
PEKERJAAN BORED PILE ø40 cm (P1)
PEKERJAAN PONDASI BORED FILE Ø40cm (P1)
Panjang
Jumlah
POUR PONDASI BORED PILE (100x100x40)
Panjang
Uraian Pekerjaan
Lebar
Tinngi
Jumlah
PEKERJAAN PONDASI TANGGA Type 1 (P2)
MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METER
Luas Penampang Galian
Panjang
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Luas Penampang Galian
lebar
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Luas Tampak Atas
Tebal
RJAAN BALOK
PEKERJAAN BALOK INDUK (Type BI) 30x50 CM
MEMASANG 1 M2 BEKISTING UNTUK BALOK
Keliling Sisi
Panjang
PEMBESIAN / KG
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Uraian Pekerjaan
Luas Dimensi
Panjang Bentang
PEMBESIAN / KG
Untuk Plat Tangga
Tulangan D16-125
diameter
lebar bentang
jarak
jumlah tul.
panjang 1 tul.
berat I tul.
Tulangan D12-200
diameter
panjang 1 tul.
jarak
jumlah tul.
Panjang bentang
berat I tul.
Tulangan D10-150
diameter
panjang 1 tul.
jarak
jumlah tul.
Panjang bentang
berat I tul.
Uraian Pekerjaan
Untuk Anak Tangga
Tulangan D8-150
diameter
panjang 1 tul.
jarak
jumlah tul.
Panjang bentang
berat I tul.
Tulangan 1 D8
diameter
panjang 1 tul.
jumlah tul.
berat I tul.
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Untuk plat tangga
tebal
panjang
lebar
Anak tangga
luas penampang
Lebar
Jumlah
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Untuk plat tangga
tebal
panjang
lebar
Anak tangga
luas penampang
Lebar
Jumlah
RJAAN BALOK
PEKERJAAN BALOK INDUK (Type BI.1) 30x40 CM
MEMASANG 1 M2 BEKISTING UNTUK BALOK
Keliling Sisi
Panjang
PEMBESIAN / KG
MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Luas Dimensi
Panjang Bentang
Uraian Pekerjaan
AN ARSITEKTUR
AN ARSITEKTUR GEDUNG LANTAI 1 (SATU)
RJAAN BETON BERTULANG & DINDING
RJAAN PONDASI BT KALI
1 m3 URUGAN PASIR UNTUK PASANG BATU KALI
luas penampang 1
panjang 1
luas penampang 2
panjang 2
1 M3 PASANG PONDASI BATU KALI 1PC : 4PS
luas penampang 1
panjang 1
luas penampang 2
panjang 2
Uraian Pekerjaan
MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURA
panjang 1
tinggi pasangan1
panjang 2
tinggi pasangan 2
luas pintu, jendela, ventilasi
pasangan 1:2 tampa mengurangi luas pintu
Uraian Pekerjaan
RJAAN PLESTERAN
MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 15 MM
luas pasangan bata
jumlah sisi
luas batu candi posisi pasangan 1:2
MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MM
luas pasangan bata
luas Pasangan Batu Candi candi
luas pasangan batu candi posisi pasangan bata 1 : 4
jumlah sisi
MEMASANG 1 M2 ACIAN
RJAAN FINISHING
MEMASANG 1 M2 DINDING KERAMIK UKURAN (25 X 40) (Setara Roman)
panjang
tinggi
MEMASANG 1 M2 LES STELO DINDING KERAMIK
panjang
lebar
MEMASANG PLIN GRANIT 15 X 60 CM (Setara Granito)
MEMBENTUK 1 M1 TALI AIR
panjang posisi plint
panjang stelo
PASANG 1 M1 RAILLING TANGGA FINISH CROME
tangga utama
tangga samping
Entrance
1 M3 BETON FC 26,4 Mpa UNTUK KOLOM SIRIP
tebal
Uraian Pekerjaan
luas
1 M2 BEKISTING DINDING UNTUK KOLOM SIRIP
RJAAN PLAFON
PASANG RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BIASA
luas total
Uraian Pekerjaan
PASANG RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BERTINGKAT
PASANG 1 M1 LIST PROFIL GYPSUM
RJAAN LANTAI
1 M3 URUGAN PILIHAN PENINGGIAN MUKA LANTAI
Luas Tampak Atas
Ketinggian
1 M3 URUGAN PASIR
Luas Tampak Atas
Ketinggian
1 M3 CORAN LANTAI KERJA FC 14,5 Mpa
Luas Tampak Atas
Ketinggian
RJAAN FINISHING
1 M2 AFWERKING BETON
1 M2 PENGECATAN BIDANG TEMBOK BARU KELAS A (Setara Dulux Wheathershield)
1 M2 PENGECATAN PLAFON GYPSUM (Setara Catylac)
1 M2 PASANG BATU CANDI ALUR
L1
L2
L3
L4
L5
L6
PASANG 1 M1 PROFIL BETON
Uraian Pekerjaan
RJAAN ARSITEKTUR GEDUNG LANTAI 2 (DUA)
RJAAN BETON BERTULANG & DINDING
RJAAN DINDING BATA MERAH
MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURA
Panjang
Tinggi
Luasan pintu, jendela, ventilasi
Luas Pasangan pembesaran kolom
panjang
tinggi
RJAAN PLESTERAN
MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MM
MEMASANG 1 M2 ACIAN
RJAAN FINISHING
MEMASANG 1 M2 DINDING KERAMIK UKURAN (25 X 40) (Setara Roman)
MEMASANG 1 M2 LES STELO DINDING KERAMIK
MEMASANG PLIN GRANIT 15 X 60 CM (Setara Granito)
MEMBENTUK 1 M1 TALI AIR
RJAAN BETON, BALOK DAN KOLOM
1 M3 BETON FC 26,4 Mpa UNTUK PLAT CANTILEVER
Luas
tebal
1 M2 BEKISTING PLAT CANTILEVER
KG PEMBESIAN PLAT CANTILEVER
PEKERJAAN 1 M1 BALOK LATE (11X15CM) BETON BERTULANG
PEKERJAAN 1 M1 KOLOM PRAKTIS (11X11CM) BETON BERTULANG
Tinggi 1
jumlah 1
Tinggi 2
jumlah 2
Uraian Pekerjaan
RJAAN PLAFON
PASANG 1 M2 RANGKA DAN LANGIT PLAFON GYPSUM BOARD T.9MM BIASA
Luas Total
RJAAN LANTAI
PASANG 1 M2 GRANIT UK. 60X60 CM (Setara Granito)
Luas Total
RJAAN FINISHING
1 M2 AFWERKING BETON
1 M2 PENGECATAN BIDANG TEMBOK BARU KELAS A (Setara Dulux weathershield)
Uraian Pekerjaan
1 M2 PENGECATAN PLAFON GYPSUM (Setara Catylac)
PASANG 1 M1 PROFIL BETON
PASANG 1 M2 UKIRAN GRC
1 M2 PASANG BATU CANDI ALUR
L1
L2
L3
L4
p1
n1
p2
n2
p3
n3
p4
n4
p5
n5
D. 12
Panjang
Berat / M'
D.16 Tangga Monyet
Baja Siku
12 =2*(J13+J14) 101.00 M1
40.5 m 13 20 meter keluar dr as kolom struktur
10 m 14
15 =N12 101.00 M1
16 =J13*J14 405.00 M2
17
18
1.00 Ls 19 1.00 Ls
20
1.00 Ls 21 1.00 Ls
26
27
28
29
30
31 =j32*j33 380.00 M1
10 M1 32
38 ttk 33
34 =j35*j36*j37*j38 15.20 M3
1 35
Kode Keterangan Nilai Sat.
1 36
0.4 37
38 ttk 38
114
115 =+J116*J117 9.25 M3
4.0209 m2 116 =4.0209
2.3 m 117 =2.3
118
119
120
121 =J122+J126 23.69 M2
8.43742 m2 122 =(J123*J124)+J125
3.3054 m 123 =3.3054
2.3 m 124 =J117
0.835 m2 125 =0.4175*2
15.2512 m2 126 =((J127*J128)*J129)+J130
3.05 m 127 =3.05
2.3 m 128 =J124
2 sisi 129 =2
1.2212 m2 130 =0.6106*2
131 =J132+J161 659.24 Kg
214.4514 Kg 132 =J133+J140+J147+J154
68.08448 kg 133 =J136*J139
1.9 cm 134 =1.9
1.912 m 135 =+(1.5-0.08)+(0.25-(2*0.04))+(0.25-(2*0.04))+(2*(4*(J134/100)
4.25528 kg 136 =0.6165*J134*J134*J135
2.3 m 137 =J128
0.15 m 138 =0.15
16 bh 139 =ROUND((J137/J138)+1,0)
39.21106 kg 140 =J143*J146
Kode Keterangan Nilai Sat.
1.6 cm 141 =1.6
1.5528 m 142 =1.4248+(2*4*(J141/100))
2.450691 kg 143 =0.6165*J141*J141*J142
2.3 m 144 =J137
0.15 m 145 =0.15
16 bh 146 =ROUND((J144/J145)+1,0)
66.39306 kg 147 =J150*J153
1.9 cm 148 =1.9
2.712 m 149 =+(2.3-0.08)+(0.25-0.08)+(0.25-0.08)+(2*(4*(J148/100)))
6.035732 kg 150 =0.6165*J148*J148*J149
1.5 m 151 =1.5
0.15 m 152 =0.15
11 bh 153 =ROUND((J151/J152)+1,0)
40.76278 kg 154 =J157*J160
1.6 cm 155 =1.6
2.348 m 156 =(2.3-0.08)+(2*4*(J155/100))
3.705708 kg 157 =0.6165*J155*J155*J156
1.5 m 158 =J151
0.15 m 159 =0.15
11 bh 160 =ROUND((J158/J159)+1,0)
444.7851 Kg 161 =J162+J169
155.6397 kg 162 =(J165*J168)*2
1.6 cm 163 =1.6
2.348 m 164 =+(2.3-0.08)+(2*(4*(J163/100)))
3.705708 kg 165 =0.6165*J163*J163*J164
3.05 m 166 =3.05
0.15 m 167 =0.15
21 bh 168 =ROUND((J166/J167)+1,0)
289.1454 kg 169 =(J172*J175)*2
1.9 cm 170 =1.9
Kode Keterangan Nilai Sat.
4.06 m 171 =+(3.3)+(40*(J170/100))
9.035794 kg 172 =0.6165*J170*J170*J171
2.3 m 173 =J144
0.15 m 174 =0.15
16 bh 175 =ROUND((J173/J174)+1,0)
176
177
178 =J179*J180 2.36 M3
1.0281 m2 179 =1.0281
2.3 m 180 =J128
181
182
183
184
185
186 =2 2.00 M1
187
1.402721 m3 188 =(J190*J192*J191)
0.95 m 189 =+(1-J191/2)
2.984513 m 190 =+PI()*J189
0.1 m 191 =0.1
4.7 m 192 =J67
28.05442 m2 193 =(J194*J195)*J196
2.984513 m 194 =J190
4.7 m 195 =J192
2 sisi 196 =2
212
0.496215 m3 213 =J215*J216
0.9 m 214 =0.9
0.636173 m 215 =0.25*PI()*J214^2
Kode Keterangan Nilai Sat.
0.78 m 216 =ROUND(((1/6)*J217),2)
4.7 m 217 =J206
1.495005 m3 218 =J220*J221
0.9 m 219 =J214
0.636173 m 220 =0.25*PI()*J219^2
2.35 m 221 =ROUND(((3/6)*J222),2)
4.7 m 222 =J217
0.998791 m3 223 =J225*J226
0.9 m 224 =J219
0.636173 m 225 =0.25*PI()*J224^2
1.57 m 226 =ROUND(((2/6)*J227),2)
4.7 m 227 =J222
116.4731 Kg 228 =+J229+J236
99.42934 Kg 229 =J232*J234
2.513274 m 230 =+PI()*(1-0.2)
0.15 m 231 =0.15
18 Bh 232 =ROUND((J230/J231)+1,0)
1.9 cm 233 =1.9
5.523852 kg 234 =0.6165*J233*J233*J235
2.482 m 235 =+J226+(40*(J233/100))+(2*(4*(J233/100)))
17.04377 Kg 236 =J240*J242
1.57 m 237 =J226
2.513274 m 238 =J230
0.15 m 239 =0.15
11 Bh 240 =ROUND(((J237/J239)+1),0)
1 cm 241 =1
1.549433 kg 242 =0.6165*J241*J241*J238
243
2.00 Ttk 244 =N186
245 =+J246*J247*J244 0.62 M3
Kode Keterangan Nilai Sat.
0.7771 m2 246 =+(1.25*1.25)-0.7854
0.4 m 247 =0.3+0.1
248 =+J249*J250*J244 0.86 M2
1.44 m 249 =1.2*1.2
0.3 m 250 =J247-0.1
251 =(J252+J262)*J244 260.42 Kg
67.23584 Kg 252 =(J258*J257)+J259
1.9 cm 253 =1.9
1.2 m 254 =1.2
0.15 m 255 =0.15
3.144 m 256 =+(2*(J254+J250))-(4*0.04)+(4*(4*(J253/100)))
9 bh 257 =+ROUND((J254/J255)+1,0)
6.997176 kg 258 =0.6165*J253*J253*J256
4.261248 Kg 259 =0.6165*J260*J260*J261
1.2 cm 260 =1.2
4.8 m 261 =1.2*4
62.97459 kg 262 =+J252-J259
263
264 =+(J265*J266)*J244 0.86 M3
1.44 265 =+J254*J254
0.3 266 =+J250
267
300
301
302
303 =+J304*J305 196.49 M2
1m 304 =0.5+0.5
196.49 m 305 =196.49
306 =Tabel Perhitungan Balok (Lampiran) 5,967.76 Kg
307 =+J308*J309 29.47 M3
Kode Keterangan Nilai Sat.
0.15 m 308 =0.3*0.5
196.49 m 309 =J305
310
311
312
313
314 =Tabel perhitungan Kolom (Lampiran 7,187.27 Kg
34 bh 315 =+J316*J317*J315 214.20 M2
1.4 m 316 =0.3+0.3+0.4+0.4
4.5 m 317 =5-0.5
318 =+J320*J319*J315 19.91 M3
0.12 m2 319 =0.3*0.4
4.88 m 320 =5-0.12
321
322
323 =Tabel perhitungan Kolom (Lampiran 399.57 Kg
4 bh 324 =+J325*J326*J324 23.40 M2
1.3 m 325 =0.15+0.15+0.5+0.5
4.5 m 326 =+J317
327 =+J329*J328*J324 1.46 M3
0.075 m2 328 =0.15*0.5
4.88 m 329 =+J320
330
331
332
333 =+J334*J335 242.95 M2
1.06 m 334 =0.3+0.38+0.38
229.2 m 335 =229.2
336 =Tabel Perhitungan Balok (Lampiran) 6,057.05 Kg
337 =+J338*J339 26.13 M3
Kode Keterangan Nilai Sat.
0.114 m 338 =0.3*0.38
229.2 m 339 =J335
340
341
342 =+J343*J344 37.41 M2
0.56 m 343 =0.2+0.18+0.18
66.8 m 344 =66.8
345 =Tabel Perhitungan Balok (Lampiran) 730.77 Kg
346 =+J347*J348 2.40 M3
0.036 m 347 =0.2*0.18
66.8 m 348 =J344
349
350
351
352
353 =+J354+J355 283.21 M2
267.803 m2 354 =265.353+(4.9*0.5)
15.408 m2 355 =(128.4*0.12)
356 =J358*Tabel Perhitungan Balok (Lamp 7,078.01 Kg
357 =J358*J359 48.41 M3
403.45 m2 358 =401+(4.9*0.5)
0.12 m 359 =0.12
360
361
362 =J363+J366+J370 34.46 M2
22.4434 m2 363 =J364*J365
9.758 m 364 =J415
2.3 m 365 =J416
7.36 m2 366 =(J367*J368)*J369
2.3 m 367 =J419
Kode Keterangan Nilai Sat.
0.2 m 368 =0.2
16 bh 369 =J420
4.654 m2 370 =SUM(J371:J373)
1.33 m2 371 =1.33
1.0672 m2 372 =1.0672
2.2568 m2 373 =0.7627+0.9741+(0.2*2.6)
374
375 =J376+J398 626.46 Kg
536.7389 Kg 376 =J377+J384+J391
311.8003 kg 377 =+J381*J383
1.6 cm 378 =1.6
2.3 m 379 =J367
0.125 m 380 =0.125
19 bh 381 =ROUND((J379/J380)+1,0)
10.398 m 382 =J364+(40*(J378/100))
16.41054 kg 383 =0.6165*J378*J378*J382
212.7073 kg 384 =(+J388*J390)*2
1.2 cm 385 =1.2
2.396 m 386 =J379+(2*(4*(J385/100)))
0.2 m 387 =0.2
50 bh 388 =ROUND((J389/J387)+1,0)
9.758 m 389 =J415
2.127073 kg 390 =0.6165*J385*J385*J386
12.23136 kg 391 =+J395*J397
1 cm 392 =1
0.62 m 393 =0.11+0.11+0.16+0.16+(2*(4*(J392/100)))
0.15 m 394 =0.15
32 bh 395 =ROUND((J396/J394)+1,0)
4.7 m 396 =4.7
0.38223 kg 397 =0.6165*J392*J392*J393
Kode Keterangan Nilai Sat.
89.71781 kg 398 =J399+J406
74.59196 kg 399 =+J403*J405
0.8 cm 400 =0.8
0.7685 m 401 =0.7685
0.15 m 402 =0.15
246 bh 403 =ROUND((J404/J402)+1,0)
36.8 m 404 =+(2.3*J369)
0.303219 kg 405 =0.6165*J400*J400*J401
15.12585 kg 406 =+J409*J410
0.8 cm 407 =0.8
2.396 m 408 =+J386
16 bh 409 =J369
0.945366 kg 410 =0.6165*J407*J407*J408
411
412 =J413+J417 4.47 M3
3.36651 m3 413 =+(J415*J416)*J414
0.15 m 414 =0.15
9.758 m 415 =4.3175+5.4405
2.3 m 416 =2.3
1.104 m3 417 =(J418*J419)*J420
0.03 m2 418 =0.03
2.3 m 419 =J416
16 bh 420 =16
421
2 bh 422
423 =(J424+J427+J431)*J422 42.28 M2
11.50884 m2 424 =J425*J426
9.5907 m 425 =4.526+5.0647
1.2 m 426
4.8 m2 427 =(J428*J429)*J430
Kode Keterangan Nilai Sat.
1.2 m 428 =J426
0.2 m 429
20 bh 430
4.8326 m2 431 =SUM(J432:J434)
1.4086 m2 432
1.1877 m2 433
2.2363 m2 434 =1.2286+1.0077
435 =(J436+J451)*J422 787.97 Kg
290.3641 Kg 436 =J437+J444
177.6115 kg 437 =+J441*J443
1.6 cm 438
1.2 m 439 =J428
0.125 m 440
11 bh 441 =ROUND((J439/J440)+1,0)
10.2307 m 442 =J425+(40*(J438/100))
16.1465 kg 443 =0.6165*J438*J438*J442
112.7526 kg 444 =(+J448*J450)*2
1.2 cm 445
1.296 m 446 =J439+(2*(4*(J445/100)))
0.2 m 447
49 bh 448 =ROUND((J449/J447)+1,0)
9.5907 m 449 =J425
1.150537 kg 450 =0.6165*J445*J445*J446
103.6186 kg 451 =J452+J459
93.39156 kg 452 =+J456*J458
0.8 cm 453
0.7685 m 454
0.15 m 455
308 bh 456 =ROUND((J457/J455)+1,0)
46 m 457 =+(2.3*J473)
Kode Keterangan Nilai Sat.
0.303219 kg 458 =0.6165*J453*J453*J454
10.227 kg 459 =+J462*J463
0.8 cm 460
1.296 m 461 =+J446
20 bh 462 =J473
0.51135 kg 463 =0.6165*J460*J460*J461
464
2 bh 465 =(J466+J470)*J465 4.89 M3
1.726326 m3 466 =+(J468*J469)*J467
0.15 m 467
9.5907 m 468 =J425
1.2 m 469 =J426
0.72 m3 470 =(J471*J472)*J473
0.03 m2 471
1.2 m 472 =J426
20 bh 473 =J430
474
475
476
477
478
479 =Tabel perhitungan Kolom (Lampiran 5,256.22 Kg
34 bh 480 =+J481*J482*J480 171.36 M2
1.4 m 481 =0.3+0.3+0.4+0.4
3.6 m 482 =4-0.4
483 =+J485*J484*J480 16.32 M3
0.12 m2 484 =0.3*0.4
4m 485
486
487
Kode Keterangan Nilai Sat.
488
489
490
491 =Tabel perhitungan Kolom (Lampiran 192.89 Kg
4 bh 492 =+J493*J494*J492 10.92 M2
1.3 m 493 =0.15+0.15+0.5+0.5
2.1 m 494 =2.5-0.4
495 =+J497*J496*J492 0.75 M3
0.075 m2 496 =0.15*0.5
2.5 m 497
498
499
500 =Tabel perhitungan Kolom (Lampiran 186.34 Kg
24 bh 501 =+J502*J503*J501 5.76 M2
0.8 m 502 =0.2+0.2+0.2+0.2
0.3 m 503 =0.6-0.3
504 =+J506*J505*J501 0.58 M3
0.04 m2 505 =0.2*0.2
0.6 m 506
507
508
509
510
511 =+J512*J513 237.25 M2
1.1 m 512 =0.3+0.4+0.4
215.68 m 513 =+(((3.95*6)+4.7)*4)+(((4.7*2)+1.7)*8)+((2.47*4)+(1.7*2))
514 =Tabel perhitungan Balok (Lampiran) 4,561.95 Kg
515 =+J516*J517 25.88 M3
0.12 m 516 =0.3*0.4
215.68 m 517 =J513
Kode Keterangan Nilai Sat.
518
519
520 =+J521*J522 82.73 M2
0.5 m 521 =0.2+0.3
165.45 m 522 =+(3*12)+(0.75*4)+(4.75*3)+(3.75*4)+(0.75*4)+(1.7*2)+5+(4*2
523 =Tabel perhitungan Balok (Lampiran) 1,746.47 Kg
524 =+J525*J526 9.93 M3
0.06 m 525 =0.2*0.3
165.45 m 526 =J522
527
528
529 =+J530*J531 1.44 M2
0.45 m 530
3.2 m 531 =1.6*2
532 =Tabel perhitungan Balok (Lampiran) 27.11 Kg
533 =+J534*J535 0.10 M3
0.03 m 534 =0.2*0.15
3.2 m 535 =J531
536
537
538
539 =+J540+J541 172.29 M2
161.7891 m2 540 =+(490.7739-396.7998)+(3.525)+(0.5625*4)+(2.8125*4)+(1.275
10.5 m2 541 =105*0.1
542 =J544*Perhitungan Balok (lampiran) 1,480.63 Kg
543 =J544*J545 16.18 M3
161.7891 m2 544 =J540
0.1 m 545
546
547
Kode Keterangan Nilai Sat.
548
549
550 =J551+J557+J563+J575+J567+J571 7,522.51 kg
4258.394 kg 551 =(+J552*J553)+J554+J555+J556
128.8 m 552 =16.1*8
30.6 kg 553
27.5535 kg 554 =((4*(0.009*0.05*0.13))*7850)*15
169.56 kg 555 =+((4*(0.2*0.2*0.009))*7850)*15
120 kg 556 =4*15*2
415.6018 kg 557 =(+J558*J559)+J560+J561+J562
12.2 m 558 =6.1*2
30.6 kg 559
3.6738 kg 560 =((4*(0.009*0.05*0.13))*7850)*2
22.608 kg 561 =+((4*(0.2*0.2*0.009))*7850)*2
16 kg 562 =4*2*2
464.64 kg 563 =((J564*J565)*J566)
16 m 564 panjang Rata2
12 bh 565 Jumlah Rata2
2.42 kg 566 buku tabel profil konstruksi baja
43.155 Kg 567 =(J568*J569)*J570
3.5 m 568
20 bh 569
0.6165 kg/m 570 =0.6165*1*1*1
1808.64 kg 571 =J572*(J573*J574)
9.42 kg/m' 572
12 bh 573 =J565
16 m 574 =J564
532.0786 kg 575 =J578*J580
4.089595 m 576 =3.35/COS(RADIANS(35))
11.84094 kg 577 =+((0.0838*2)*0.009)*7850
Kode Keterangan Nilai Sat.
16.62746 kg 578 =(0.6165*1.2*1.2*J576)+J577+J579
1.155938 kg 579 =0.6165*2.5*2.5*0.3
32 bh 580
581
582 =N583 533.66 m2
583 =(J584/(COS(RADIANS(J585))))*J586 533.66 M2
397.41 m2 584
35 o 585
1.1 586
587 5.00 unit
588 5.00 unit
589 =ROUND((6.7*2)+(20.8*4)+(11.55*2) 157.00 m1
590 =ROUND((11.15*2)+(10.5*2)+(11.5), 54.80 m1
591 =10/(COS(RADIANS(J585))) 12.21 m1
592 =ROUNDUP((11.12*2)+(4.75),0) 27.00 m2
602
603
604
605
1011
1012
1013 =J1014*J1015*J1016 21.25 m3
3.3 m 1014
2.3 m 1015
2.8 m 1016
1017 =J1018*J1019 0.76 m3
7.59 m2 1018 =J1014*J1015
0.1 m' 1019
1020 =J1021*J1022 0.53 m3
7.59 m2 1021 =J1018
0.07 m' 1022
1023 =(J1024*J1025)+(J1026*J1027) 6.81 m3
1.6 m2 1024
1.9 m 1025
1.3 m2 1026
2.9 m 1027
1028 =(J1029*J1030)+(J1031*J1032) 57.30 m2
12.88 m 1029 =2.5+5.15+5.23
1.9 m 1030
11.32 m 1031 =+(5+3.16+3.16)
2.9 m 1032
Kode Keterangan Nilai Sat.
1033 =J1034+J1048+J1051+J1053+J1055 701.62 Kg
511.9293 Kg 1034 =+J1035*J1036
830.38 m' 1035 =(J1038*J1039)+(J1040*J1041)+(J1042*J1043)+(J1044*J1045)+
0.6165 Kg 1036 =0.6165*1*1*1
1037
7.71 m 1038
14 bh 1039
6.76 m 1040
20 bh 1041
11.2 m 1042
14 bh 1043
3m 1044
76 bh 1045
0.84 m 1046
241 bh 1047
140.2661 Kg 1048 =+J1049*J1050
158 m' 1049 =(5*22)+(6*8)
0.88776 Kg 1050 =0.6165*1.2*1.2*1
9.232704 Kg 1051 =0.6165*1.6*1.6*(0.65*9)
1052
30.144 Kg 1053 =7850*(1.28*0.003)
1054
10.048 Kg 1055 =+(0.1*0.002*6.4)*7850
1056
1057
1058 =J1059*J1060 19.52 m2
2m 1059
9.76 m 1060
1061 =J1060 9.76 m2
1062 =J1063*J1064 0.69 M3
Kode Keterangan Nilai Sat.
0.3 m2 1063
2.3 m 1064
REKAPITULASI RENCANA ANGGARAN BIAYA
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR CAMAT
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR CAMAT
LOKASI : PADANG UTARA
TAHUN : 2015
No Uraian Pekerjaan
I PEKERJAAN PERSIAPAN
II PEKERJAAN STRUKTUR
II.1 PEKERJAAN STRUKTUR BAWAH
II.2 PEKERJAAN STRUKTUR LANTAI 1 (SATU)
II.3 PEKERJAAN STRUKTUR LANTAI 2 (DUA)
II.4 PEKERJAAN STRUKTUR ATAP & FINISHING ATAP
IV PEKERJAAN ARSITEKTUR
IV.1 PEKERJAAN ARSITEKTUR GEDUNG LANTAI 1 (SATU)
IV.2 PEKERJAAN ARSITEKTUR GEDUNG LANTAI 2 (DUA)
IV.3 PEKERJAAN ARSITEKTUR LANSCAPE
Terbilang : Lima Milyar Tujuh Ratus Dua Puluh Delapan Juta Enam Ratus Ribu Rupiah
REKAPITULASI RENCANA ANGGARAN BIAYA
SUB TOTAL
27,383,630.00
682,586,284.13
877,173,847.92
596,213,279.84
440,641,941.46
225,822,298.61
242,429,170.46
1,197,049,896.30
907,442,237.30
11,136,395.60
Rp 5,207,878,981.62
Rp 520,787,898.16
Rp 5,728,666,879.78
Rp 5,728,600,000.00
DAFTAR
HARGA SATUAN PEKERJAAN
O PEKERJAAN SEPTITANK
O.2 Membuat Septictank Bata Kap. 25 orang ( uk. 1.25 x 3 x 1 ) + Resapan
Padang, No
Konsultan
PT. Natural Sum
PT. NATURAL SUMATERA CONSULTANT Daftar Harga Satuan Pekerjaan361 OFIr. 470
CHAND
Dir
Padang, No
Konsultan
PT. Natural Sum
DINAS PEKERJAAN UMUMKOTA PADANG
KODE URAIAN PEKERJAAN
Ir. CHAND
Dir
DAFTAR
TUAN PEKERJAAN
HARGA SAT
SAT KET
(Rupiah)
M3 Rp 51,975.00
M3 Rp 75,933.00
M3 Rp 17,325.00
M3 Rp 113,190.00
M3 Rp 183,975.00
M3 Rp 674,500.53
TTK Rp 13,188,679.00
M3 Rp 791,671.46
M3 Rp 979,632.44
KG Rp 13,944.70
M2 Rp 122,490.50
M2 Rp 129,649.44
M2 Rp 205,639.93
M2 Rp 210,114.73
M2 Rp 245,911.58
M2 Rp 212,235.97
M2 Rp 191,239.56
M2 Rp 129,649.00
M2 Rp 112,077.29
M3 Rp 3,792,140.34
M3 Rp 4,724,761.59
M3 Rp 7,919,305.03
M3 Rp 6,055,870.29
M3 Rp 5,537,610.48
M3 Rp 5,266,468.88
M3 Rp 5,608,170.63
M1 Rp 77,955.73
M1 Rp 96,687.29
M2 Rp 41,736.00
M1 Rp 104,963.00
M2 Rp 122,540.87
M2 Rp 113,541.07
M1 Rp 1,011,648.00
M2 Rp 44,919.37
M2 Rp 40,288.93
M2 Rp 175,965.72
M2 Rp 336,207.88
M2 Rp 287,846.38
M2 Rp 240,342.88
M2 Rp 267,371.14
M2 Rp 189,365.00
M2 Rp 736,443.00
M2 Rp 365,812.00
M2 Rp 273,374.00
M2 Rp 294,763.00
M Rp 39,650.00
M Rp 45,920.00
M' Rp 23,413.50
M2 Rp 344,221.00
M1 Rp 24,783.00
M2 Rp 153,381.25
M2 Rp 170,307.50
KG Rp 30,323.70
M1 Rp 134,357.85
M1 Rp 114,587.00
M2 Rp 179,363.80
M1 Rp 329,979.30
M1 Rp 60,148.28
M2 Rp 1,358,080.64
M2 Rp 1,020,798.35
M2 Rp 11,550.00
Buah Rp 2,769,239.00
Buah Rp 638,926.86
Buah Rp 2,191,961.04
M1 Rp 59,378.00
M1 Rp 70,460.50
M1 Rp 74,380.90
M1 Rp 117,005.90
Buah Rp 33,041.25
Buah Rp 60,445.00
M2 Rp 127,325.00
M1 Rp 154,132.00
M' Rp 77,924.00
M2 Rp 106,414.00
M2 Rp 39,690.20
M2 Rp 26,667.30
M2 Rp 34,350.00
M2 Rp 34,969.00
Unit Rp 17,517,005.07
DAFTAR
HARGA SATUAN UPAH
HARGA SATUAN
No. JENIS UPAH SATUAN KETERANGAN
Rp.
1 Pelaksana hari
2 Mandor hari 90,000.00
3 Kepala Tukang Kayu hari 90,000.00
4 Kepala Tukang Batu hari 90,000.00
5 Kepala Tukang Besi hari 90,000.00
6 Kepala Tukang Cat hari 90,000.00
7 Tukang Kayu hari 80,000.00
8 Tukang Besi hari 80,000.00
9 Tukang Batu hari 80,000.00
10 Tukang Cat hari 80,000.00
11 Tukang Listrik hari 80,000.00
12 Pekerja hari 60,000.00
13 Penjaga Malam hari 55,000.00
ul melintang Ø 8 = 57.60 m
tul memanjang Ø 8 = 48.00 m
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-350 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-300 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-250 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-175 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K125 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (a) Bentang 16 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 16 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (b) Bentang 25 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 25 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (c) Bentang 35 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 35 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (d) Bentang ....... meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 0 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U (a) Bentang 16 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 16 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U (c) Bentang 35 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 35 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 #NAME?
2 Crane 2 (E31) 0.9036 #NAME?
3 Alat Bantu LS 1.0000 500.00
JUMLAH
HARGA
(Rp.)
6,884.68
18,072.29
1,075.73
26,032.70
535,435.20
56,595.00
164,591.25
0.00
0.00
756,621.45
62,391.65
300,986.33
8,785.02
500.00
372,663.00
1,155,317.15
115,531.72
1,270,848.87
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
6,884.68
11,044.18
1,075.73
19,004.59
535,435.20
56,061.92
164,591.25
0.00
0.00
756,088.37
62,391.65
300,986.33
#REF!
500.00
#REF!
#REF!
#REF!
#REF!
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
6,884.68
11,044.18
0.00
17,928.86
481,422.00
59,526.92
164,591.25
0.00
0.00
705,540.17
62,391.65
300,986.33
8,785.02
500.00
372,663.00
1,096,132.03
109,613.20
1,205,745.24
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
11,703.96
13,654.62
7,314.97
32,673.55
373,395.60
55,262.31
200,263.75
0.00
0.00
628,921.65
107,949.07
8,785.02
500.00
117,234.09
778,829.30
77,882.93
856,712.23
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
11,703.96
13,654.62
7,314.97
32,673.55
354,608.40
56,239.62
200,263.75
0.00
0.00
611,111.76
107,949.07
8,785.02
500.00
117,234.09
761,019.41
76,101.94
837,121.35
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
154,285.71
50,000.00
10,714.29
215,000.00
5,481,538.58
17,035,200.00
6,226,110.00
3,852,000.00
5,304,000.00
37,898,848.58
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
154,285.71
50,000.00
10,714.29
215,000.00
8,564,904.04
26,617,500.00
9,728,296.88
5,778,000.00
12,431,250.00
63,119,950.91
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
154,285.71
50,000.00
10,714.29
215,000.00
11,990,865.65
37,264,500.00
13,619,615.63
7,704,000.00
23,205,000.00
93,783,981.28
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
JUMLAH
HARGA
(Rp.)
154,285.71
50,000.00
10,714.29
215,000.00
5,481,538.58
17,035,200.00
6,226,110.00
3,852,000.00
5,304,000.00
37,898,848.58
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
HARGA
(Rp.)
154,285.71
50,000.00
10,714.29
215,000.00
8,564,904.04
26,617,500.00
9,728,296.88
5,778,000.00
12,431,250.00
63,119,950.91
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
rga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
alasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
ah termasuk bahan bakar, bahan habis dipakai dan operator.
geluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Analisa EI-721
JUMLAH
HARGA
(Rp.)
154,285.71
50,000.00
10,714.29
215,000.00
11,990,865.65
37,264,500.00
13,619,615.63
7,704,000.00
23,205,000.00
93,783,981.28
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
HARGA
(Rp.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#NAME?
#NAME?
500.00
#NAME?
#NAME?
#NAME?
#NAME?
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NO URAIAN PEKERJAAN
1 2
A PEKERJAAN PENDAHULUAN
B BANGUNAN LANTAI I
1 PEKERJAAN PONDASI
2 PEKERJAAN BETON
3 PEKERJAAN DINDING
4 PEKERJAAN KOZEN, PINTU DAN JENDELA
5 PAS. ALAT PENGGANTUNG DAN PENGUNCI
6 PEKERJAAN PLAFOND
7 PEKERJAAN LANTAI
8 PEKERJAAN LISTRIK
9 PEKERJAAN INSTALASI AIR & SANITASI
10 PEKERJAAN PENGECATAN
C BANGUNAN LANTAI II
1 PEKERJAAN BETON
2 PEKERJAAN DINDING
3 PEKERJAAN KOZEN, PINTU DAN JENDELA
4 PAS. ALAT PENGGANTUNG DAN PENGUNCI
5 PEKERJAAN PLAFOND
6 PEKERJAAN ATAP
7 PEKERJAAN LANTAI
8 PEKERJAAN LISTRIK
10 PEKERJAAN PENGECATAN
11 PEKERJAAN TANGGA
Jumlah
Ppn 10%
Total Jumlah
Dibulatkan
Terbilang : Satu miliar enam ratus delapan puluh enam juta sembilan ratus empat puluh tujuh ribu rupiah.
JUMLAH
HARGA
(Rp)
3
13,035,352.00
24,672,875.65
370,955,280.05
85,193,393.43
93,635,585.77
6,479,938.30
129,998,926.37
61,131,967.18
8,071,915.00
19,949,702.85
40,957,812.14
241,228,891.87
75,046,577.92
52,925,240.77
6,143,635.58
129,786,279.32
106,255,869.25
45,602,843.60
8,071,915.00
37,420,424.59
128,807,527.87
7,062,831.78
1,692,434,786.27
169,243,478.63
1,861,678,264.90
1,861,678,000.00
h ribu rupiah.
DAFTAR KUANTITAS DAN HARGA
HARGA
NO URAIAN PEKERJAAN SAT VOL SATUAN
(Rp)
1 2 3 4 5
A PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan M2 594.00 13,205.50
2 Pengukuran & Pemasangan Bouwplank M' 74.00 70,152.50
B BANGUNAN LANTAI I
I PEKERJAAN PONDASI
Pondasi Plat Beton
1 Galian Tanah Pondasi M3 27.50 58,616.25
2 Urugan Tanah Kembali M3 6.88 42,927.50
3 Pasangan Pondasi Plat M3 7.57 2,447,873.56
4 Lantai Kerja Beton 1 : 3 : 5 M3 1.14 168,267.00
Pondasi Batu Kali
1 Galian Tanah Pondasi M3 4.20 58,616.25
2 Pasir Urug/Lantai Kerja M3 0.42 193,726.50
3 Aanstampang M3 0.84 403,713.20
4 Pasangan Batu kali M3 4.40 757,185.00
5 Timbunan M3 1.05 42,927.50
II PEKERJAAN BETON
1 Pek. Sloof Beton Bertulang K-225 (30/50) M3 15.75 5,700,382.22
Pek. Sloof Beton Bertulang K-175 (15/20) M3 41.25 4,902,109.75
4 Pek. Kolom Beton Bertulang K-225 (30/50) M3 10.5 5,252,576.47
5 Pek. Kolom Beton Bertulang K-175 (25/25) M3 1.19 7,227,951.50
6 Pek. Kolom Beton Bertulang K-175 (15/15) M3 2.03 7,492,077.64
VI PEKERJAAN PLAFOND
1 Rangka+penutup Plafond M2 805.70 158,886.75
2 List profil M' 79.30 25,017.30
B BANGUNAN LANTAI II
I PEKERJAAN BETON
3 Pek. Kolom Beton Bertulang K-225 (30/50) M3 7.04 11,061,218.99
4 Pek. Kolom Beton Bertulang K-175 (25/25) M3 0.84 8,776,928.46
5 Pek. Kolom Beton Bertulang K-175 (15/15) M3 0.53 7,492,077.64
6 Pek. Plat Beton M3 24.84 6,119,745.94
II PEKERJAAN DINDING
1 Pas. Bata 1:4 M2 317.32 128,227.99
2 Plasteran 1:4 M2 634.64 54,136.63
V PEKERJAAN PLAFOND
1 Rangka+penutup Plafond M2 805.70 158,886.75
3 List profil M' 70.80 25,017.30
VI PEKERJAAN ATAP
1 Pasang Kuda - Kuda Baja Ringan M2 366.30 140,379.25
2 Pasang Listplank M 74.81 63,351.00
3 Pasang Atap Genteng Metal M2 366.30 130,509.50
4 Pasang Perabung Atap M1 38.00 60,264.00
IX PEKERJAAN PENGECATAN
1 Cat dinding M2 634.64 41,270.35
2 Cat Plafond M2 262.60 36,534.30
3 Cat Minyak M2 57.10 28,628.77
X PEKERJAAN TANGGA
Pek. Plat Beton Bertulang K-225 Tangga + Borde M3 17.52 6,119,745.94
Pas. Railing Tangga Besi Hollow M' 14.20 1,032,295.00
Pas. Keramik Tangga 30 x30 cm (Berteksture) M2 36.00 192,527.50
Jumlah
Ppn 10%
Total Jumlah
Dibulatkan
Terbilang : Satu miliar enam ratus delapan puluh enam juta sembilan ratus empat puluh tujuh ribu rupiah.
HARGA
7,844,067.00
5,191,285.00
13,035,352.00
1,611,946.88
295,341.20
18,530,402.85
191,824.38
246,188.25
81,365.13
339,119.09
3,331,614.00
45,073.88
24,672,875.65
89,781,019.89
202,212,027.32
55,152,052.96
8,601,262.28
15,208,917.61
370,955,280.05
5,465,584.36
40,689,305.79
4,681,231.15
34,357,272.13
85,193,393.43
3,274,278.00
67,098,249.63
9,686,961.97
13,576,096.17
93,635,585.77
1,872,894.10
1,044,337.80
422,606.80
842,265.60
965,958.40
864,450.40
467,425.20
6,479,938.30
128,015,054.48
1,983,871.89
129,998,926.37
5,407,842.28
2,868,813.09
2,209,345.71
46,685,745.30
3,960,220.80
61,131,967.18
4,898,932.50
365,805.00
304,837.50
637,340.00
1,375,000.00
130,000.00
360,000.00
8,071,915.00
823,229.55
985,589.55
452,377.75
2,353,872.40
182,184.20
1,159,692.05
1,739,538.08
2,523,783.08
1,481,482.20
8,247,954.00
19,949,702.85
29,468,680.71
9,593,907.18
1,895,224.24
40,957,812.14
77,870,981.67
7,372,619.90
3,970,801.15
152,014,489.15
241,228,891.87
40,689,305.79
34,357,272.13
75,046,577.92
2,806,524.00
26,855,658.63
9,686,961.97
13,576,096.17
52,925,240.77
1,872,894.10
1,044,337.80
422,606.80
842,265.60
899,650.40
594,455.68
467,425.20
6,143,635.58
128,015,054.48
1,771,224.84
129,786,279.32
51,420,919.28
4,739,288.31
47,805,629.85
2,290,031.81 106,255,869.25
5,332,523.57
40,270,320.03
45,602,843.60
4,898,932.50
365,805.00
304,837.50
637,340.00
1,375,000.00
130,000.00
360,000.00
8,071,915.00
26,191,814.92
9,593,907.18
1,634,702.48
37,420,424.59
107,217,948.87
14,658,589.00
6,930,990.00
128,807,527.87
7,062,831.78 7,062,831.78
1,692,434,786.27
169,243,478.63
1,861,678,264.90
1,861,678,000.00
A. pendahuluan
1 Pembersihan Lapangan M2 594.00
2 Pengukuran & Pemasangan Bouwplank M1 74.00
Bangunan lantai 1
B. pekerjaan pondasi
BANGUNAN LANTAI II
14 PEKERJAAN BETON
Pek. Kolom Beton Bertulang K-225 (30/50) M3 7.04
Pek. Kolom Beton Bertulang K-175 (25/25) M3 0.84
Pek. Kolom Beton Bertulang K-175 (15/15) M3 0.53
Pek. Plat Beton M3 24.84
15 PEKERJAAN DINDING
Pas. Bata 1:4 M2 317.32
Plasteran 1:4 M2 634.64
16 PEKERJAAN KOZEN, PINTU DAN JENDELA
Pas. Kozen M3 0.42
Pas. Daun Pintu M2 167.45
Pas. Daun Jendela M2 60.40
Pas. Kaca M2 145.05
17 PAS. ALAT PENGGANTUNG DAN PENGUNCI
Pas. Kunci Tanam Dua Slag BH 7
Pas. Engsel Pintu BH 24
Pas. Grendel Pintu BH 14
Pas. Engsel Jendela BH 32
Pas. Grendel Jendela BH 32
Pas. Hak Angin Jendela BH 32
Pas. Tangan-Tangan Jendela BH 16
18 PEKERJAAN PLAFOND
Rangka+penutup Plafond M2 805.70
List profil M1 70.80
19 PEKERJAAN ATAP
Pasang Kuda - Kuda Baja Ringan M2 366.30
Pasang Listplank 74.81
Pasang Atap Genteng Metal M2 366.30
Pasang Perabung Atap M1 38.00
20 PEKERJAAN LANTAI
Cor beton M3 10.42
Keramik 30/30 cm M2 208.40
21 PEKERJAAN LISTRIK
Pas. Instalasi Penerangan TTK 21
Pas. Instalasi Stop Kontak TTK 6
Pas. Saklar Tunggal BH 5
Pas. Saklar Double BH 8
Pas. Lampu TLD 1x36W Lamp BH 11
Pas. Lampu Jari 12V-50W,24 BH 2
Pas. Lampu Pijar 10 W BH 8
22 PEKERJAAN PENGECATAN
Cat dinding M2 634.64
Cat Plafond M2 262.60
Cat Minyak M2 57.10
23 PEKERJAAN TANGGA
Pek. Plat Beton Bertulang K-225 Tangga + Bordes, T = 12 cm M3 17.52
Pas. Railing Tangga Besi Hollow M1 14.20
Pas. Keramik Tangga 30 x30 cm (Berteksture) M2 36.00
24 PEKERJAAN SEPTIK TANK
Septictank Kap. 50 Org + Resapan UNIT 1.00
25 TOTAL
mandorkepala tukangtukang kayutukang batu
tukang besi
tukang cat
tukang listrikpekerja
29.70 0.10
0.37 0.74 7.40 0.1
0.69 20.63
0.34 3.44
1.29 0.64 6.43 25.74
0.09 0.03 0.31 1.88
0.11 3.15
0.00 0.13
0.03 0.03 0.33 0.66
0.33 0.33 3.30 6.60
0.05 0.53
1 PEKERJAAN PENDAHULUAN
Pembersihan Lapangan 7,844,067.00
Pengukuran & Pemasangan Bouwplank 5,191,285.00
BANGUNAN LANTAI I
2 PEKERJAAN PONDASI
Pondasi Plat Beton
Galian Tanah Pondasi 1,611,946.88
Urugan Tanah Kembali 295,341.20
Pasangan Pondasi Plat 18,530,402.85
Lantai Kerja Beton 1 : 3 : 5 191,824.38
3 Pondasi Batu Kali
Galian Tanah Pondasi 246,188.25
Pasir Urug/Lantai Kerja 81,365.13
Aanstampang 339,119.09
Pasangan Batu kali 3,331,614.00
Timbunan 45,073.88
4 PEKERJAAN BETON
Pek. Sloof Beton Bertulang K-225 (30/50) 89,781,019.89
Pek. Sloof Beton Bertulang K-175 (15/20) 202,212,027.32
Pek. Kolom Beton Bertulang K-225 (30/50) 55,152,052.96
Pek. Kolom Beton Bertulang K-175 (25/25) 8,601,262.28
Pek. Kolom Beton Bertulang K-175 (15/15) 15,208,917.61
5 PEKERJAAN DINDING
Pas. Bata 1:2 5,465,584.36
Pas. Bata 1:4 40,689,305.79
Plasteran 1:2 4,681,231.15
Plasteran 1:4 34,357,272.13
6 PEKERJAAN KOZEN, PINTU DAN JENDELA
Pas. Kozen 3,274,278.00
Pas. Daun Pintu 67,098,249.63
Pas. Daun Jendela 9,686,961.97
Pas. Kaca 13,576,096.17
7 PAS. ALAT PENGGANTUNG DAN PENGUNCI
Pas. Kunci Tanam Dua Slag 1,872,894.10
Pas. Engsel Pintu 1,044,337.80
Pas. Grendel Pintu 422,606.80
Pas. Engsel Jendela 842,265.60
Pas. Grendel Jendela 965,958.40
Pas. Hak Angin Jendela 864,450.40
Pas. Tangan-Tangan Jendela 467,425.20
8 PEKERJAAN PLAFOND
Rangka+penutup Plafond 128,015,054.48
List profil 1,983,871.89
9 PEKERJAAN LANTAI
Tanah Urug bawah Lantai 5,407,842.28
Pasir Urug 2,868,813.09
Cor beton 2,209,345.71
Keramik 30/30 cm 46,685,745.30
Keramik 20/20 cm 3,960,220.80
10 PEKERJAAN LISTRIK
Pas. Instalasi Penerangan 4,898,932.50
Pas. Instalasi Stop Kontak 365,805.00
Pas. Saklar Tunggal 304,837.50
Pas. Saklar Double 637,340.00
Pas. Lampu TLD 1x36W Lamp 1,375,000.00
Pas. Lampu Jari 12V-50W,24 130,000.00
Pas. Lampu Pijar 10 W 360,000.00
11 PEKERJAAN INSTALASI AIR & SANITASI
Pas. Instalasi Air bersih dia. 3/4 " + Acc 823,229.55
Pas. Instalasi Air bersih dia. 1 " + Acc 985,589.55
Pas. Instalasi Air Bersih dia. 1/2 " + Acc 452,377.75
Pas. Closet Jongkok 2,353,872.40
Pas. Kran air 1/2 " 182,184.20
Pas. Instalasi Air kotor dia. 3 " + Acc ( Air Hujan) 1,159,692.05
Pas. Instalasi Air kotor dia. 3 " + Acc 1,739,538.08
Pas. Instalasi Air kotor dia. 4 " + Acc 2,523,783.08
Pas. Floor drain 1,481,482.20
Pas. Bak Fibre 8,247,954.00
12 PEKERJAAN PENGECATAN
Cat dinding 29,468,680.71
Cat Plafond 9,593,907.18
Cat Minyak 1,895,224.24
BANGUNAN LANTAI II
13 PEKERJAAN BETON
Pek. Kolom Beton Bertulang K-225 (30/50) 77,870,981.67
Pek. Kolom Beton Bertulang K-175 (25/25) 7,372,619.90
Pek. Kolom Beton Bertulang K-175 (15/15) 3,970,801.15
Pek. Plat Beton 152,014,489.15
14 PEKERJAAN DINDING
Pas. Bata 1:4 40,689,305.79
Plasteran 1:4 34,357,272.13
15 PEKERJAAN KOZEN, PINTU DAN JENDELA
Pas. Kozen 2,806,524.00
Pas. Daun Pintu 26,855,658.63
Pas. Daun Jendela 9,686,961.97
Pas. Kaca 13,576,096.17
16 PAS. ALAT PENGGANTUNG DAN PENGUNCI
Pas. Kunci Tanam Dua Slag 1,872,894.10
Pas. Engsel Pintu 1,044,337.80
Pas. Grendel Pintu 422,606.80
Pas. Engsel Jendela 842,265.60
Pas. Grendel Jendela 899,650.40
Pas. Hak Angin Jendela 594,455.68
Pas. Tangan-Tangan Jendela 467,425.20
17 PEKERJAAN PLAFOND
Rangka+penutup Plafond 128,015,054.48
List profil 1,771,224.84
18 PEKERJAAN ATAP
Pasang Kuda - Kuda Baja Ringan 51,420,919.28
Pasang Listplank 4,739,288.31
Pasang Atap Genteng Metal 47,805,629.85
Pasang Perabung Atap 2,290,031.81
19 PEKERJAAN LANTAI
Cor beton 5,332,523.57
Keramik 30/30 cm 40,270,320.03
20 PEKERJAAN LISTRIK
Pas. Instalasi Penerangan 4,898,932.50
Pas. Instalasi Stop Kontak 365,805.00
Pas. Saklar Tunggal 304,837.50
Pas. Saklar Double 637,340.00
Pas. Lampu TLD 1x36W Lamp 1,375,000.00
pas. Lampu jari 12v-50w,24 130,000.00
Pas. Lampu Pijar 10 W 360,000.00
21 PEKERJAAN PENGECATAN
Cat dinding 26,191,814.92
Cat Plafond 9,593,907.18
Cat Minyak 1,634,702.48
22 PEKERJAAN TANGGA
Pek. Plat Beton Bertulang K-225 Tangga + Bordes, T = 12 cm 107,217,948.87
Pas. Railing Tangga Besi Hollow 14,658,589.00
Pas. Keramik Tangga 30 x30 cm (Berteksture) 6,930,990.00
23 PEKERJAAN SEPTIK TANK
Septictank Kap. 50 Org + Resapan 7,062,831.78
0.4634782423
0.3067347139
0.0952442533
0.0174506694
1.0948961224
0.0113342258
0.0145463951
0.0048075784
0.0200373504
0.1968533161
0.0026632562
5.3048436852
11.9479952173
3.2587402131
0.5082182399
0.8986412787
0.322942095
2.4041875124
0.2765974318
2.0300499855
0.1934655342
3.9645988239
0.5723684035
0.8021636215
0.1106627041
0.0617062358
0.0249703447
0.0497665025
0.0570750736
0.051077324
0.0276185058
7.5639578856
0.1172199902
0.3195303192
0.1695080433
0.1305424426
2.7584959655
0.2339954742
0.2894606362
0.0216141268
0.0180117723
0.0376581718
0.0812438985
0.0076812413
0.0212711298
0.0486417295
0.058235009
0.0267294051
0.1390820148
0.0107646216
0.0685221114
0.1027831671
0.1491214371
0.087535556
0.4873425001
1.7412003672
0.5668701245
0.1119821135
4.6011215501
0.4356220969
0.2346206294
8.9819998019
2.4041875124
2.0300499855
0.1658276007
1.5868061119
0.5723684035
0.8021636215
0.1106627041
0.0617062358
0.0249703447
0.0497665025
0.0531571678
0.0351242887
0.0276185058
7.5639578856
0.1046554263
3.0382806884
0.2800278243
2.8246659923
0.1353098996
0.3150800027
2.3794311225
0.2894606362
0.0216141268
0.0180117723
0.0376581718
0.0812438985
0.0076812413
0.0212711298
1.5475819297
0.5668701245
0.0965888018
6.335130295
0.8661243032
0.4095277441
0.4173178099
100
JADWAL PELAKSANA
MINGGU KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0.4635
0.3067
0.0476 0.048
0.009 0.009
0.365 0.365 0.365
0.006 0.006
0.161 0.161
1.202 1.202
0.138 0.138
1.015 1.015
0.097 0.097
3.965
0.572
0.802
0.11
0.06
0.02
0.05
0.06
0.05
0.03
3.782 3.782
0.12
0.32
0.17
0.065 0.07
1.38 1.379
0.12 0.117
0.145 0.145
0.022
0.018
0.038
0.081
0.008
0.021
0.024 0.024
0.029 0.029
0.013 0.013
0.07 0.07
0.01
0.034 0.034
0.034 0.034 0.03
0.05 0.05 0.05
0.044 0.04
0.49
1.202 1.202
1.015 1.015
0.083 0.083
1.587
0.572
0.802
0.111
0.062
0.025
0.05
0.053
0.035
M(
1.013 1.013
0.158
120
0.145 0.145
100 0.011 0.011
0.018
80 0.038
0.081
0.008
60
0.021
40
20
80
60
40
20
3.168 3.168
0 0.866
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0.41
1.1959 0.434 4.805 4.419 4.31 5.73 3.069 4.302 15.38 10.8 4.44 4.495 2.334 4.421 8.822 1.506
1.1959 1.63 6.436 10.85 15.2 20.9 24 28.27 43.65 54.45 58.9 63.38 65.72 70.14 79 80.47
17 18 19 20
0.871 0.8706
0.2834 0.2834
0.112
3.782 3.782
0.105
1.013
0.14 0.14
1.412 1.412
0.135
0.158
1.19 1.19
Row 131
Row 131
13 14 15 16 17 18 19 20
0.417