REKAPITULASI BIAYA

PEKERJAAN : Pengawasan Pembangunan Jalan Roidifu - Wouna - Sp. Wokrar

LOKASI : Kabupaten Biak


WAKTU : 1.3 bulan

TOTAL BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL

II BIAYA LANGSUNG NON PERSONIL

JUMLAH
PPN 10 %
JUMLAH
DI BULATKAN

TERBILANG : Empat Ratus Sembilan Belas Juta Empat Ratus Ribu Rupiah

Biak, 2015

DISUSUN OLEH : MENGETAHUI :


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BIAK
SELAKU PENGGUNA ANGGARAN

………………………………………………. ……………………………………………………………
NIP. ………………………………..
NIP. ………………………………….
I. BIAYA LANGSUNG PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA TENAGA AHLI


Site Engineer 1.30 OB 33,510,000
Quality Engineer 1.30 OB 25,579,300
Quantity Engineer 1.30 OB 25,579,300

Sub Total a

b BIAYA ASISTEN TENAGA AHLI


Inspector - 1 1.30 OB 13,837,000
Inspector - 2 1.30 OB 13,837,000
Inspector - 3 1.30 OB 13,837,000
Inspector - 4 1.30 OB 13,837,000
Surveyor - 1 1.30 OB 13,837,000
Surveyor - 2 1.30 OB 13,837,000
Material Technician - 1 1.30 OB 13,837,000
Material Technician - 2 1.30 OB 13,837,000

Sub Total b

c BIAYA STAFF PENDUKUNG


Sekretaris/Adm. Kantor/Op. Komputer 1.30 OB 6,302,000
Pesuruh/ Penjaga Kantor 1.30 OB 3,425,000

Sub Total c

TOTAL I (a+b+c)
II. BIAYA LANGSUNG NON PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA MOBILISASI DAN DEMOBILISASI


Tiket Jakarta/Prov/Kab. Lain - Biak 3.00 Kali 2,500,000
Tiket Biak - Jakarta/Prov/Kab. Lain 3.00 Kali 2,500,000
Ongkos Taxi Jakarta/Prov/Kab. Lain - Biak 6.00 Kali 300,000
Ongkos Taxi Biak - Jakarta/Prov/Kab. Lain 6.00 Kali 300,000
Tiket Makassar/Prov/Kab. Lain - Biak 8.00 Kali 1,500,000
Tiket Biak - Makassar/Prov/Kab. Lain 8.00 Kali 1,500,000
Ongkos Taxi Makassar/Prov/Kab. Lain - Biak 16.00 Kali 250,000
Ongkos Taxi Biak 16.00 Kali 250,000
Sub Total a

b BIAYA PERJALANAN DINAS


OSA 5.00 Hari 350,000
Sub Total b
c BIAYA KANTOR
Sewa Kantor 1.30 Bln 2,500,000
Sewa Furniture Kantor 1.30 Bln 1,200,000
Sewa penunjang Kantor :
- Komputer Desktop 1.30 Bln 2,500,000
- Laptop 1.30 Bln 1,800,000
- Printer (A3) 1.30 Bln 750,000
- Printer (A4) 1.30 Bln 500,000
Komunikasi (Pulsa Telepon + Internet) 1.30 Bln 1,200,000
Bahan-bahan Kantor
- ATK komputer 1.30 Bln 2,000,000
- Foto Copy 1.30 Bln 1,000,000
Sub Total c

d BIAYA PELAPORAN
Laporan Pendahuluan 5.00 Eks 300,000
Laporan Bulanan 5.00 Eks 300,000
Laporan Akhir 5.00 Eks 400,000
CD RW data pengawasan (awal s/d Akhir) 2.00 Pcs 150,000

Sub Total d
e BIAYA AKOMODASI
Tunjangan Perumahan SE 1.30 Bln 900,000
Tunjangan Perumahan Quality/Quantity 2.60 Bln 700,000
Sewa Mobil 1.30 Bln 12,500,000
Sewa Sepeda Motor-1 1.30 Bln 2,600,000
Sewa Sepeda Motor-2 1.30 Bln 2,600,000
Sewa Sepeda Motor-3 1.30 Bln 2,600,000
Sewa Sepeda Motor-4 1.30 Bln 2,600,000
Sewa Sepeda Motor-5 1.30 Bln 2,600,000
Sewa Sepeda Motor-6 1.30 Bln 2,600,000
Sub Total e
TOTAL II (a+b+c+d+e)
APITULASI BIAYA

TOTAL BIAYA
(Rp)

266,619,080

114,655,000

381,274,080
38,127,408
419,401,488
419,400,000

…………………………………………………………….
BIAYA LANGSUNG PERSONIL
Jumlah Harga
( Rp)

43,563,000
33,253,090
33,253,090

110,069,180

17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100

143,904,800

8,192,600
4,452,500

12,645,100

266,619,080
AYA LANGSUNG NON PERSONIL
Jumlah Harga
( Rp)

7,500,000
7,500,000
1,800,000
1,800,000
12,000,000
12,000,000
4,000,000
4,000,000
50,600,000

1,750,000
1,750,000

3,250,000
1,560,000

3,250,000
2,340,000
975,000
650,000
1,560,000

2,600,000
1,300,000
17,485,000

1,500,000
1,500,000
2,000,000
300,000

5,300,000

1,170,000
1,820,000
16,250,000
3,380,000
3,380,000
3,380,000
3,380,000
3,380,000
3,380,000
39,520,000
114,655,000
REKAPITULASI BIAYA

PEKERJAAN : Pengawasan Pembangunan Jalan Syabes-Nermnu

LOKASI : Kabupaten Biak


WAKTU : 1.3 bulan

TOTAL BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL

II BIAYA LANGSUNG NON PERSONIL

JUMLAH
PPN 10 %
JUMLAH
DI BULATKAN

TERBILANG : Empat Ratus Sembilan Belas Juta Empat Ratus Ribu Rupiah

Biak, 2015

DISUSUN OLEH : MENGETAHUI :


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BIAK
SELAKU PENGGUNA ANGGARAN

………………………………………………. ……………………………………………………………
NIP. ………………………………..
NIP. ………………………………….
I. BIAYA LANGSUNG PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA TENAGA AHLI


Site Engineer 1.30 OB 33,510,000
Quality Engineer 1.30 OB 25,579,300
Quantity Engineer 1.30 OB 25,579,300

Sub Total a

b BIAYA ASISTEN TENAGA AHLI


Inspector - 1 1.30 OB 13,837,000
Inspector - 2 1.30 OB 13,837,000
Inspector - 3 1.30 OB 13,837,000
Inspector - 4 1.30 OB 13,837,000
Surveyor - 1 1.30 OB 13,837,000
Surveyor - 2 1.30 OB 13,837,000
Material Technician - 1 1.30 OB 13,837,000
Material Technician - 2 1.30 OB 13,837,000

Sub Total b

c BIAYA STAFF PENDUKUNG


Sekretaris/Adm. Kantor/Op. Komputer 1.30 OB 6,302,000
Pesuruh/ Penjaga Kantor 1.30 OB 3,425,000

Sub Total c

TOTAL I (a+b+c)
II. BIAYA LANGSUNG NON PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA MOBILISASI DAN DEMOBILISASI


Tiket Jakarta/Prov/Kab. Lain - Biak 3.00 Kali 2,500,000
Tiket Biak - Jakarta/Prov/Kab. Lain 3.00 Kali 2,500,000
Ongkos Taxi Jakarta/Prov/Kab. Lain - Biak 6.00 Kali 300,000
Ongkos Taxi Biak - Jakarta/Prov/Kab. Lain 6.00 Kali 300,000
Tiket Makassar/Prov/Kab. Lain - Biak 8.00 Kali 1,500,000
Tiket Biak - Makassar/Prov/Kab. Lain 8.00 Kali 1,500,000
Ongkos Taxi Makassar/Prov/Kab. Lain - Biak 16.00 Kali 250,000
Ongkos Taxi Biak 16.00 Kali 250,000
Sub Total a

b BIAYA PERJALANAN DINAS


OSA 5.00 Hari 350,000
Sub Total b
c BIAYA KANTOR
Sewa Kantor 1.30 Bln 2,500,000
Sewa Furniture Kantor 1.30 Bln 1,200,000
Sewa penunjang Kantor :
- Komputer Desktop 1.30 Bln 2,500,000
- Laptop 1.30 Bln 1,800,000
- Printer (A3) 1.30 Bln 750,000
- Printer (A4) 1.30 Bln 500,000
Komunikasi (Pulsa Telepon + Internet) 1.30 Bln 1,200,000
Bahan-bahan Kantor
- ATK komputer 1.30 Bln 2,000,000
- Foto Copy 1.30 Bln 1,000,000
Sub Total c

d BIAYA PELAPORAN
Laporan Pendahuluan 5.00 Eks 300,000
Laporan Bulanan 5.00 Eks 300,000
Laporan Akhir 5.00 Eks 400,000
CD RW data pengawasan (awal s/d Akhir) 2.00 Pcs 150,000

Sub Total d
e BIAYA AKOMODASI
Tunjangan Perumahan SE 1.30 Bln 900,000
Tunjangan Perumahan Quality/Quantity 2.60 Bln 700,000
Sewa Mobil 1.30 Bln 12,500,000
Sewa Sepeda Motor-1 1.30 Bln 2,600,000
Sewa Sepeda Motor-2 1.30 Bln 2,600,000
Sewa Sepeda Motor-3 1.30 Bln 2,600,000
Sewa Sepeda Motor-4 1.30 Bln 2,600,000
Sewa Sepeda Motor-5 1.30 Bln 2,600,000
Sewa Sepeda Motor-6 1.30 Bln 2,600,000
Sub Total e
TOTAL II (a+b+c+d+e)
APITULASI BIAYA

TOTAL BIAYA
(Rp)

266,619,080

114,655,000

381,274,080
38,127,408
419,401,488
419,400,000

…………………………………………………………….
BIAYA LANGSUNG PERSONIL
Jumlah Harga
( Rp)

43,563,000
33,253,090
33,253,090

110,069,180

17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100

143,904,800

8,192,600
4,452,500

12,645,100

266,619,080
AYA LANGSUNG NON PERSONIL
Jumlah Harga
( Rp)

7,500,000
7,500,000
1,800,000
1,800,000
12,000,000
12,000,000
4,000,000
4,000,000
50,600,000

1,750,000
1,750,000

3,250,000
1,560,000

3,250,000
2,340,000
975,000
650,000
1,560,000

2,600,000
1,300,000
17,485,000

1,500,000
1,500,000
2,000,000
300,000

5,300,000

1,170,000
1,820,000
16,250,000
3,380,000
3,380,000
3,380,000
3,380,000
3,380,000
3,380,000
39,520,000
114,655,000
REKAPITULASI BIAYA

PEKERJAAN : Pengawasan Pembangunan Jalan Lingkar Numfor

LOKASI : Kabupaten Biak


WAKTU : 1.3 bulan

TOTAL BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL

II BIAYA LANGSUNG NON PERSONIL

JUMLAH
PPN 10 %
JUMLAH
DI BULATKAN

TERBILANG : Empat Ratus Sembilan Belas Juta Empat Ratus Ribu Rupiah

Biak, 2015

DISUSUN OLEH : MENGETAHUI :


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BIAK
SELAKU PENGGUNA ANGGARAN

………………………………………………. ……………………………………………………………
NIP. ………………………………..
NIP. ………………………………….
I. BIAYA LANGSUNG PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA TENAGA AHLI


Site Engineer 1.30 OB 33,510,000
Quality Engineer 1.30 OB 25,579,300
Quantity Engineer 1.30 OB 25,579,300

Sub Total a

b BIAYA ASISTEN TENAGA AHLI


Inspector - 1 1.30 OB 13,837,000
Inspector - 2 1.30 OB 13,837,000
Inspector - 3 1.30 OB 13,837,000
Inspector - 4 1.30 OB 13,837,000
Surveyor - 1 1.30 OB 13,837,000
Surveyor - 2 1.30 OB 13,837,000
Material Technician - 1 1.30 OB 13,837,000
Material Technician - 2 1.30 OB 13,837,000

Sub Total b

c BIAYA STAFF PENDUKUNG


Sekretaris/Adm. Kantor/Op. Komputer 1.30 OB 6,302,000
Pesuruh/ Penjaga Kantor 1.30 OB 3,425,000

Sub Total c

TOTAL I (a+b+c)
II. BIAYA LANGSUNG NON PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA MOBILISASI DAN DEMOBILISASI


Tiket Jakarta/Prov/Kab. Lain - Biak 3.00 Kali 2,500,000
Tiket Biak - Jakarta/Prov/Kab. Lain 3.00 Kali 2,500,000
Ongkos Taxi Jakarta/Prov/Kab. Lain - Biak 6.00 Kali 300,000
Ongkos Taxi Biak - Jakarta/Prov/Kab. Lain 6.00 Kali 300,000
Tiket Makassar/Prov/Kab. Lain - Biak 8.00 Kali 1,500,000
Tiket Biak - Makassar/Prov/Kab. Lain 8.00 Kali 1,500,000
Ongkos Taxi Makassar/Prov/Kab. Lain - Biak 16.00 Kali 250,000
Ongkos Taxi Biak 16.00 Kali 250,000
Sub Total a

b BIAYA PERJALANAN DINAS


OSA 5.00 Hari 350,000
Sub Total b
c BIAYA KANTOR
Sewa Kantor 1.30 Bln 2,500,000
Sewa Furniture Kantor 1.30 Bln 1,200,000
Sewa penunjang Kantor :
- Komputer Desktop 1.30 Bln 2,500,000
- Laptop 1.30 Bln 1,800,000
- Printer (A3) 1.30 Bln 750,000
- Printer (A4) 1.30 Bln 500,000
Komunikasi (Pulsa Telepon + Internet) 1.30 Bln 1,200,000
Bahan-bahan Kantor
- ATK komputer 1.30 Bln 2,000,000
- Foto Copy 1.30 Bln 1,000,000
Sub Total c

d BIAYA PELAPORAN
Laporan Pendahuluan 5.00 Eks 300,000
Laporan Bulanan 5.00 Eks 300,000
Laporan Akhir 5.00 Eks 400,000
CD RW data pengawasan (awal s/d Akhir) 2.00 Pcs 150,000

Sub Total d
e BIAYA AKOMODASI
Tunjangan Perumahan SE 1.30 Bln 900,000
Tunjangan Perumahan Quality/Quantity 2.60 Bln 700,000
Sewa Mobil 1.30 Bln 12,500,000
Sewa Sepeda Motor-1 1.30 Bln 2,600,000
Sewa Sepeda Motor-2 1.30 Bln 2,600,000
Sewa Sepeda Motor-3 1.30 Bln 2,600,000
Sewa Sepeda Motor-4 1.30 Bln 2,600,000
Sewa Sepeda Motor-5 1.30 Bln 2,600,000
Sewa Sepeda Motor-6 1.30 Bln 2,600,000
Sub Total e
TOTAL II (a+b+c+d+e)
APITULASI BIAYA

TOTAL BIAYA
(Rp)

266,619,080

114,655,000

381,274,080
38,127,408
419,401,488
419,400,000

…………………………………………………………….
BIAYA LANGSUNG PERSONIL
Jumlah Harga
( Rp)

43,563,000
33,253,090
33,253,090

110,069,180

17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100
17,988,100

143,904,800

8,192,600
4,452,500

12,645,100

266,619,080
AYA LANGSUNG NON PERSONIL
Jumlah Harga
( Rp)

7,500,000
7,500,000
1,800,000
1,800,000
12,000,000
12,000,000
4,000,000
4,000,000
50,600,000

1,750,000
1,750,000

3,250,000
1,560,000

3,250,000
2,340,000
975,000
650,000
1,560,000

2,600,000
1,300,000
17,485,000

1,500,000
1,500,000
2,000,000
300,000

5,300,000

1,170,000
1,820,000
16,250,000
3,380,000
3,380,000
3,380,000
3,380,000
3,380,000
3,380,000
39,520,000
114,655,000
REKAPITULASI BIAYA

PEKERJAAN : Pengawasan Pembangunan Jalan Lingkar Numfor

LOKASI : Kabupaten Biak


WAKTU : 1.3 bulan

TOTAL BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL

II BIAYA LANGSUNG NON PERSONIL

JUMLAH
PPN 10 %
JUMLAH
DI BULATKAN

TERBILANG : Tiga Ratus Empat Puluh Tiga Juta Seratus Ribu Rupiah

Biak, 2015

DISUSUN OLEH : MENGETAHUI :


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BIAK
SELAKU PENGGUNA ANGGARAN

………………………………………………. ……………………………………………………………
NIP. ………………………………..
NIP. ………………………………….
I. BIAYA LANGSUNG PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA TENAGA AHLI


Site Engineer 1.30 OB 33,510,000
Quality Engineer 1.30 OB 25,579,300
Quantity Engineer 1.30 OB 25,579,300

Sub Total a

b BIAYA ASISTEN TENAGA AHLI


Inspector - 1 1.30 OB 13,837,000
Inspector - 2 1.30 OB 13,837,000
Inspector - 3 1.30 OB 13,837,000
Inspector - 4 0.00 OB 0
Surveyor - 1 1.30 OB 13,837,000
Surveyor - 2 0.00 OB 0
Material Technician - 1 1.30 OB 13,837,000
Material Technician - 2 0.00 OB 0

Sub Total b

c BIAYA STAFF PENDUKUNG


Sekretaris/Adm. Kantor/Op. Komputer 1.30 OB 6,302,000
Pesuruh/ Penjaga Kantor 1.30 OB 3,425,000

Sub Total c

TOTAL I (a+b+c)
II. BIAYA LANGSUNG NON PERSONIL
Harga Satuan
No Uraian Volume Satuan
(Rp)

a BIAYA MOBILISASI DAN DEMOBILISASI


Tiket Jakarta/Prov/Kab. Lain - Biak 3.00 Kali 2,500,000
Tiket Biak - Jakarta/Prov/Kab. Lain 3.00 Kali 2,500,000
Ongkos Taxi Jakarta/Prov/Kab. Lain - Biak 6.00 Kali 300,000
Ongkos Taxi Biak - Jakarta/Prov/Kab. Lain 6.00 Kali 300,000
Tiket Makassar/Prov/Kab. Lain - Biak 5.00 Kali 1,500,000
Tiket Biak - Makassar/Prov/Kab. Lain 5.00 Kali 1,500,000
Ongkos Taxi Makassar/Prov/Kab. Lain - Biak 10.00 Kali 250,000
Ongkos Taxi Biak 10.00 Kali 250,000
Sub Total a

b BIAYA PERJALANAN DINAS


OSA 5.00 Hari 350,000
Sub Total b
c BIAYA KANTOR
Sewa Kantor 1.30 Bln 2,500,000
Sewa Furniture Kantor 1.30 Bln 1,200,000
Sewa penunjang Kantor :
- Komputer Desktop 1.30 Bln 2,500,000
- Laptop 1.30 Bln 1,800,000
- Printer (A3) 1.30 Bln 750,000
- Printer (A4) 1.30 Bln 500,000
Komunikasi (Pulsa Telepon + Internet) 1.30 Bln 1,200,000
Bahan-bahan Kantor
- ATK komputer 1.30 Bln 2,000,000
- Foto Copy 1.30 Bln 1,000,000
Sub Total c

d BIAYA PELAPORAN
Laporan Pendahuluan 5.00 Eks 300,000
Laporan Bulanan 5.00 Eks 300,000
Laporan Akhir 5.00 Eks 400,000
CD RW data pengawasan (awal s/d Akhir) 2.00 Pcs 150,000

Sub Total d
e BIAYA AKOMODASI
Tunjangan Perumahan SE 1.30 Bln 900,000
Tunjangan Perumahan Quality/Quantity 2.60 Bln 700,000
Sewa Mobil 1.30 Bln 12,500,000
Sewa Sepeda Motor-1 1.30 Bln 2,600,000
Sewa Sepeda Motor-2 1.30 Bln 2,600,000
Sewa Sepeda Motor-3 1.30 Bln 2,600,000
Sewa Sepeda Motor-4 1.30 Bln 2,600,000
Sewa Sepeda Motor-5 1.30 Bln 2,600,000
Sewa Sepeda Motor-6 0.00 Bln 0
Sub Total e
TOTAL II (a+b+c+d+e)
APITULASI BIAYA

TOTAL BIAYA
(Rp)

212,654,780

99,275,000

311,929,780
31,192,978
343,122,758
343,100,000

…………………………………………………………….
BIAYA LANGSUNG PERSONIL
Jumlah Harga
( Rp)

43,563,000
33,253,090
33,253,090

110,069,180

17,988,100
17,988,100
17,988,100
0
17,988,100
0
17,988,100
0

89,940,500

8,192,600
4,452,500

12,645,100

212,654,780
AYA LANGSUNG NON PERSONIL
Jumlah Harga
( Rp)

7,500,000
7,500,000
1,800,000
1,800,000
7,500,000
7,500,000
2,500,000
2,500,000
38,600,000

1,750,000
1,750,000

3,250,000
1,560,000

3,250,000
2,340,000
975,000
650,000
1,560,000

2,600,000
1,300,000
17,485,000

1,500,000
1,500,000
2,000,000
300,000

5,300,000

1,170,000
1,820,000
16,250,000
3,380,000
3,380,000
3,380,000
3,380,000
3,380,000
0
36,140,000
99,275,000
DAFTAR BIAYA LANGSUNG PERSONIL (TENAGA AHLI)
GAJI / UPAH SESUAI SURAT EDARAN MENTERI PEKERJAAN UMUM TAHUN 2013

JABATAN HARGA SATUAN KOEFISIEN JUMLAH


A. TENAGA AHLI
1 Site Engineer Rp 30,000,000.00 1.117 Rp 33,510,000.00
2 Quality Engineer Rp 22,900,000.00 1.117 Rp 25,579,300.00
3 Quantity Engineer Rp 22,900,000.00 1.117 Rp 25,579,300.00

DAFTAR BIAYA LANGSUNG PERSONIL (ASISTEN TENAGA AHLI DLL)


GAJI / UPAH SESUAI KEPUTUSAN INKINDO TAHUN 2014

B. ASISTEN TENAGA AHLI


1 Inspector Rp 10,100,000.00 1.370 Rp 13,837,000.00
2 Surveyor Rp 10,100,000.00 1.370 Rp 13,837,000.00
3 Material Technician Rp 10,100,000.00 1.370 Rp 13,837,000.00

C. TENAGA PENDUKUNG
1 Operator Komputer Rp 4,600,000.00 1.370 Rp 6,302,000.00
2 Pesuruh/Penjaga Kantor Rp 2,500,000.00 1.370 Rp 3,425,000.00
Minimal S1 Ahli Madya 2 Tahun Pengalaman
Minimal S1 Ahli Muda 2 Tahun Pengalaman
Minimal S1 Ahli Muda 2 Tahun Pengalaman

Minimal D3, atau Sarjana S1


Minimal D3, atau Sarjana S1
Minimal D3, atau Sarjana S1

Minimal SMA atau sederajat