PROYEK UNIMED
BIAYA-BIAYA
Januari '08
15 Bi. Kewajiban (Pimpro + PU) 35,000,000.00 111,139,000.00
September
1 Bi. Pulsa 50,000.00 127,894,500.00
Bi. 8 T.Soket@Rp. 3500 28,000.00 127,922,500.00
Bi. 3 Klg lem pipa @Rp. 18.000 54,000.00 127,976,500.00
Bi. 5 bh Seltip @Rp. 12,500.00 127,989,000.00
Bi. 1 kaleng cat nippon 25 kg 195,000.00 128,184,000.00
Bi. 2 psg Engsel pintu 4" @Rp. 8.000 16,000.00 128,200,000.00
Bi. 1 klg cat tembok 25 Kg 195,000.00 128,395,000.00
Bi. 1 klg cat tembok 25 Kg 195,000.00 128,590,000.00
Bi. 2 btl terpentin @Rp. 5.000 10,000.00 128,600,000.00
Bi. 1 ktk secrup 7,000.00 128,607,000.00
Bi. 1 ktk paku 7,000.00 128,614,000.00
Bi. 1/4 kg tepung keramik 15,000.00 128,629,000.00
Bi. 1 bh gunting seng 25,000.00 128,654,000.00
Bi. 1 bh mata gergaji bgs 10,000.00 128,664,000.00
Bi. 2 kg paku 16,000.00 128,680,000.00
Bi. Paku 1,000.00 128,681,000.00
Bi. 23 bh elbow 1/2" @Rp. 1.500 34,500.00 128,715,500.00
Bi. 3 bh seltip @Rp. 1.000 3,000.00 128,718,500.00
Bi. 1 klg lem pipa 17,500.00 128,736,000.00
Bi. 4 btg lat asbes 24,000.00 128,760,000.00
Bi. Pipa 2 1/2" @Rp. 45.000 45,000.00 128,805,000.00
Bi. 2bh elbow 2 1/2" @Rp.3.500 7,000.00 128,812,000.00
Bi. 8 bh kran air 1/2" @Rp. 15.000 120,000.00 128,932,000.00
Bi. 10 btg pipa 1/2" @Rp. 22.000 220,000.00 129,152,000.00
Bi. 1 klg cat tembok 25 Kg 195,000.00 129,347,000.00
Bi. 1 ktk secrup 8,000.00 129,355,000.00
Bi. 2 bh socet 2 1/2" 6,000.00 129,361,000.00
Bi. 1 btg pipa 3" @Rp. 60.000 60,000.00 129,421,000.00
Bi. 1 btg pipa 2" @Rp. 35.000 35,000.00 129,456,000.00
Bi. 6 drat @ Rp. 2500 15,000.00 129,471,000.00
Bi. 4 bh soket 2" 12,000.00 129,483,000.00
Bi. 2 bh elbow 2" 7,000.00 129,490,000.00
Bi. 1 bh elbow 3" + 1 bh soket 3" 11,000.00 129,501,000.00
Bi. 16 set kunci 693 @ Rp. 42.000 672,000.00 130,173,000.00
Bi. 16 set engsel 4" @Rp. 6.000 96,000.00 130,269,000.00
Bi. 16 set grendel @Rp. 4.000 64,000.00 130,333,000.00
Bi. Jaga malam (25/8) 50,000.00 130,383,000.00
Bi. jaga malam (01/9) 50,000.00 130,433,000.00
12 Bi. 4 bh Tangki air Kap 1500 ltr @Rp. 1.250.000 5,000,000.00 144,742,500.00
Bi. 1 unit tangki PU/HU 3000 ltr warna biru 2,400,000.00 147,142,500.00
Oktober
3 Bi. Telepon Watel 830,000.00 1,000.00 162,277,500.00
Bi. 2 botol terpentin 9,000.00 162,286,500.00
Bi. 1 bh kuas 2,500.00 162,289,000.00
Bi. 1 btl terpentin 4,500.00 162,293,500.00
Bi. 2 klg cat 375,000.00 162,668,500.00
Bi. 1 btl terpentin 4,500.00 162,673,000.00
Bi. 2 bh kuas 924,500.00 14,000.00 162,687,000.00
Bi. 1 klg cat minyak 5 kg 150,000.00 162,837,000.00
Bi. 2 kg semen putih 924,500.00 6,000.00 162,843,000.00
Bi. 1 btl terpentin 4,500.00 162,847,500.00
Bi. 1 bh kuas 8,000.00 162,855,500.00
Bi. 5 kg cat nippon 5 kg 50,000.00 162,905,500.00
Bi. 3 btg pipa 3" 168,000.00 163,073,500.00
Bi. 3 btg pipa 3/4" 54,000.00 163,127,500.00
Bi. 1 bh lem pipa karbon 18,000.00 163,145,500.00
Bi. 3 bh elbow 10,500.00 163,156,000.00
Bi. 2 m pipa besi 2 1/2" 45,000.00 163,201,000.00
November
1 Bi. Tranport Ke Unimed 10,000.00 164,631,500.00
2 Bi. Transport Ke Bank Sumut 10,000.00 164,641,500.00
5 Bi. Transport Ke Unimed urus Berita Acara + F. Copy 19,400.00 164,660,900.00
8 Bi. Trandsport ke Unimed 10,000.00 164,670,900.00
16 Bi. Makan Bendaharawan Unimed 200,000 164,870,900.00
Bi. Transport Ke Unimed + Menghubungi P'Antoni 40,000.00 164,910,900.00
29 Bi. Transport Ke Jl. Pancing 10,000.00 164,920,900.00
Desember
3 Bi. Transport Ke Unimed 10,000.00 164,930,900.00
4 Bi. Transport Ke Unimed + Abdullah Lubis (2x PP) 20,000.00 164,950,900.00
Bi. Foto copy 6,700.00 164,957,600.00
12 Bi. Transport urus jam pemeliharaan 30,000.00 164,987,600.00
28 Bi. P'IQbal 1,000,000.00 165,987,600.00
Bi. Bendahara 200,000.00 166,187,600.00
Bi. P'Panjaitan + Transport 310,000.00 166,497,600.00
Januari '08
23 Bi. Transport Ke Unimed urus Pajak 10,000.00 166,507,600.00
TOTAL 277,646,600.00
Upah Tukang
Juni 27 Bi. Upah Tukang (Panjar I) 1,000,000.00
30 Bi. Upah tukang (38 hari @ Rp. 55.000,-) 2,090,000.00
BIAYA-BIAYA
BIAYA BAHAN
Juli 6 COT
- Bi. Upah Tukang keramik (COT) 1,370,000.00 29,685,000.00
- Bi. Beli Batu Bata Jumbo 45,500.00 29,730,500.00
- Bi. Beli Pasir 350,000.00 30,080,500.00
Agustus
7 Bi. 1 klg Nipon pain 25 Kg 195,000.00 36,066,000.00
Bi. 1 kg tepung dempul 2,000.00 36,068,000.00
Bi. 2 bj kuas 4" crocodile 32,000.00 36,100,000.00
Bi. 15 zak semen @ Rp. 28.500 427,500.00 36,527,500.00
Bi. 6 bj ember @ 5000 30,000.00 36,557,500.00
Bi. 6 m bon-bon keramik 30,000.00 36,587,500.00
Bi. 1 m bon-bon keramik 5,000.00 36,592,500.00
Bi. 2000bj B.b jumbo @ Rp 270 540,000.00 37,132,500.00
Bi. 13 zak semen @Rp. 28.500 370,500.00 37,503,000.00
Bi. 2 lbr papan 3/4 @ Rp. 50.000 100,000.00 37,603,000.00
Bi. 5 Bj B. K. Mandi @ Rp. 10.000 50,000.00 37,653,000.00
Bi. 20 Bj baut cacing @Rp. 300 6,000.00 37,659,000.00
Bi. 20 bj fisher no. 8 @ Rp. 500 10,000.00 37,669,000.00
Bi. 1 ktk scrup gergaji 6,000.00 37,675,000.00
Bi. Bj mata gergaji 10,000.00 37,685,000.00
Bi. 5000 bj B.b jumbo @ Rp. 250 1,250,000.00 38,935,000.00
Bi. 12 sak semen @ Rp. 28.500 342,000.00 39,277,000.00
Bi. 1 bj gembok 13,000.00 39,290,000.00
Bi. 5 sak semen @ Rp. 28.000 142,500.00 39,432,500.00
Bi. 1 bj. Ban luar 16,000.00 39,448,500.00
Bi. 1 ban dalam 10,000.00 39,458,500.00
Bi. 1 btg kayu 1 x 2 18,000.00 39,476,500.00
Bi. Engsel 4" 30,000.00 39,506,500.00
Bi. Tukang Keramik 310,000.00 39,816,500.00
September
1 Bi. 1 bh psg kaca mati 1,100,000.00 40,916,500.00
Bi. 480 keping lestilo 2 D 5,640,000.00 1,440,000.00 42,356,500.00
Bi. Upah Tukang 1,700,000.00 44,056,500.00
Bi. Upah tukang keramik borongan 1,400,000.00 45,456,500.00
Oktober
1 Bi. Beli Bahan 490,000.00 62,185,200.00
November
5 Bi. Transport Ke A.Malik 5,000.00 62,835,200.00
TOTAL 62,835,200.00
TOTAL 75,456,900.00
UPAH TUKANG
Juni 11 Bi. Upah tukang 500,000.00
14 Bi. Upah Tukang 1 Minggu 700,000.00
22 Bi. Upah Tukang 2,200,000.00
30 Bi. Upah Tukang 1,710,000.00
13 PAGAR
- Bi. Tukang Batu + Kenet 2,025,000.00 16,026,500.00
7 Bi. Bahan
Bi. 7000 bj B.b jumbo @ Rp. 250 1,750,000.00 38,961,500.00
Bi. 3 zak semen @ Rp. 28.500 85,000.00 39,046,500.00
Bi. 1 Bj skop pasir 35,000.00 39,081,500.00
Bi. 1 Bj cangkol 25,000.00 39,106,500.00
Bi. 1 Bj. Gagang cangkol 7,000.00 39,113,500.00
Bi. 2 glg Kawat 16,000.00 39,129,500.00
Tanggal Keterangan Non Fisik Fisik Total
Bi. 5 lbr papan 3/4 250,000.00 39,379,500.00
Bi. 12 zak semen @ Rp. 28.500 342,000.00 39,721,500.00
Bi. 15 zak semen @ Rp. 28.500 427,500.00 40,149,000.00
Bi. 5 sak semen @ Rp. 28.000 142,500.00 40,291,500.00
Bi. 1400 bj B.b jumbo @ Rp. 270 378,000.00 40,669,500.00
Bi. 10 DT sertu darat @ Rp. 350.000 3,500,000.00 44,169,500.00
Bi. 1 DT pasir 350,000.00 44,519,500.00
Bi. 1 DT pasir 350,000.00 44,869,500.00
Bi. 2 DT pasir 700,000.00 45,569,500.00
13 Bi. Bahan:
Bi. Transport/ bensin 50,000.00 45,619,500.00
Bi. 16 zak semen @ Rp 28.500 456,000.00 46,075,500.00
Bi. 1600 B.b Jumbo @ Rp 270 423,000.00 46,498,500.00
Bi. 10 sak semen @Rp. 28.500 285,000.00 46,783,500.00
Bi. 10 zak semen @Rp. 28.500 285,000.00 47,068,500.00
Bi. 5 Zak semen @Rp. 28.500 142,500.00 47,211,000.00
Bi. 10 zak semen @Rp. 28.500 285,000.00 47,496,000.00
Bi. 5 Zak semen @Rp. 28.500 142,500.00 47,638,500.00
Bi. 15 Zak semen @Rp. 28.500 427,500.00 48,066,000.00
Bi. Bahan/ bon lama 2,794,000.00 50,860,000.00
Bi. 7 zak semen @ Rp. 28.500 199,500.00 51,059,500.00
Bi. 7 zak semen @ Rp. 28.500 199,500.00 51,259,000.00
Bi. 15 Zak semen @Rp. 28.500 427,500.00 51,686,500.00
Bi. 5 Zak semen @Rp. 28.500 142,000.00 51,828,500.00
Bi. 15 Zak semen @Rp. 28.500 427,000.00 52,255,500.00
Bi. 1000 bj B.b jumbo @ Rp 270 270,000.00 52,525,500.00
Bi. 5 Zak semen @Rp. 28.500 142,500.00 52,668,000.00
Bi. 10 zak semen @Rp. 28.500 285,000.00 52,953,000.00
Bi. 10 zak semen @Rp. 28.500 285,000.00 53,238,000.00
Bi. 2 bj sokel 1/2 luar@ Rp. 2000 4,000.00 53,242,000.00
Bi. 2 bj sokel 1/2 dalam@ Rp. 2000 4,000.00 53,246,000.00
Bi. 1 bj selotip 1,000.00 53,247,000.00
Bi. 1 kg lem 3,000.00 53,250,000.00
Bi. Transport ke A. Malik 10,000.00 53,260,000.00
18 Bi. Bahan:
Bi. 5 sak semen @Rp. 29.000 145,000.00 53,907,000.00
Bi. 2 btg Besi @Rp. 39,000 78,000.00 53,985,000.00
Bi. 6 zak semen @Rp. 29.000 174,000.00 54,159,000.00
Bi. 3 sak semen @ Rp. 29,000 87,000.00 54,246,000.00
Bi. 2 bj lahar sorong 6,000.00 54,252,000.00
Bi. Bj. Lahar archo @Rp.3000 6,000.00 54,258,000.00
Bi. Upah tukang batu 1,845,000.00 56,103,000.00
Bi. Transport + pulsa 100,000.00 56,203,000.00
Bi, 7000 bj B.b jumbo @ Rp250 1,750,000.00 57,953,000.00
Bi. 3 sak semen @ Rp. 28.500 85,000.00 58,038,000.00
Bi. Bahan 2,794,000.00 60,832,000.00
Bi. 15 sak semen @ rp. 28.000 427,500.00 61,259,500.00
Bi. 3 bj kran 1/2" @Rp.20.000 60,000.00 61,319,500.00
Bi. 2 bj. Selotip @Rp 1000 2,000.00 61,321,500.00
Bi. 1 bj plostex 10,000.00 61,331,500.00
Bi. Sak semen @ Rp. 2900 145,000.00 61,476,500.00
Bi. 5 sak semen @ rp. 29.000 145,000.00 61,621,500.00
Bi. 1 bh thiner 5,000.00 61,626,500.00
Bi. 2 bj yosantex 10,000.00 61,636,500.00
Bi. 1 bj kuas 2" 3,000.00 61,639,500.00
September
7 Bi. Sumbangan pelantikan PPM Kemenangasn Tani 500,000.00 65,630,000.00
Bi. 1 Papan bunga 80,000.00 65,710,000.00
Desember
5 Bi.Transport Ke Adam Malik 5,000.00 68,975,900.00
26 Bi. Leges Notaris Surat Kuasa 75,000.00 69,050,900.00
Bi. Transport ngeleges surat kuasa 5,000.00 69,055,900.00
Bi. Transport antar surat kuasa ke BRI + Ke A.Malik 10,000.00 69,065,900.00
Bi. Materai 1 bh 7,500.00 69,073,400.00
Bi. Transport ke A.Malik Antar Kop Surat 5,000.00 69,078,400.00
28 Bi. Kewajiban 14,790,000.00 83,868,400.00
Bi. Jasa Perusahaan 2,200,000.00 86,068,400.00
2,190,000
1,550,000
??
3,187,000
Bi. Panglong
LAPORAN KEUANGAN
PROYEK PTKI
BIAYA-BIAYA
BIAYA BAHAN
September
1 Bi. 5 sak semen @Rp. 29.000 145,000.00 26,568,300.00
Bi. 10 sak semen @Rp. 29.000 290,000.00 26,858,300.00
Bi. 1 pickup pasir 130,000.00 26,988,300.00
Bi. 10 sak semen @Rp. 29.000 290,000.00 27,278,300.00
Bi. 1 pickup pasir 3,486,000.00 130,000.00 27,408,300.00
Bi. 1 1/2 kg paku @Rp. 10.000 15,000.00 27,423,300.00
Bi. 4 besi 10 mm x 10 m @Rp. 41.500 166,000.00 27,589,300.00
Bi. 5 besi 6 mm @Rp. 14.000 70,000.00 27,659,300.00
Bi. 5 sak semen @Rp. 29.000 145,000.00 27,804,300.00
Bi. 1 kg kawat beton 10,000.00 27,814,300.00
Bi. 5 sak semen @Rp. 29.000 145,000.00 27,959,300.00
Bi. Upah tukang PTKI 1,950,000.00 29,909,300.00
Oktober
5 Bi. Besi 1,000,000.00 43,902,800.00
November
2 Bi. Pelunasan Besi PTKI 4,400,000.00 49,769,800.00
3 Bi. Upah Tukang Cat 550,000.00 50,319,800.00
Januari '08
3 Bi. Urusan pencairan dana PTKI 42,000.00 50,446,800.00
8 Bi. Pemindahan rekening Pry. PTKI 300,000.00 50,746,800.00
Bi. Transport Ke Bank 10,000.00 50,756,800.00
18 Bi. Pengecatan tambahan pagar PTKI 100,000.00 50,856,800.00
TOTAL 80,206,800.00
UPAH TUKANG
BIAYA-BIAYA
Nopember
23 Bi. BA Irigasi 2,350,000.00 53,013,000.00
BIAYA BAHAN
September
1 Bi. Koral 550,000.00 41,550,000.00
3 Bi. Panjar Tukang (V) 10,000,000.00 51,550,000.00
November
3 Bi. Bahan + Upah Tukang (Panjar XII) 2,700,000.00 118,545,000.00
Bi. Bahan + Upah Tukang (Panjar XIII) 3,000,000.00 121,545,000.00
Bi. PU Irigasi 300,000.00 121,845,000.00
Bi. Transport/Minyak Bensin 10,000.00 121,855,000.00
TOTAL 248,237,552.00
246,086,552.00
LAPORAN KEUANGAN
PROYEK IRIGASI
BIAYA-BIAYA
BIAYA BAHAN
September
1 Bi. Koral 550,000.00 42,000,000.00
3 Bi. Panjar Tukang (V) 10,000,000.00 52,000,000.00
8 Bi. Panjar Tukang (VI) 20,000,000.00 72,000,000.00
14 Bi. Bahan + Tukang (Panjar VII) 11,000,000.00 83,000,000.00
22 Bi. Bahan + Tukang (Panjar VIII) 20,000,000.00 103,000,000.00
November
3 Bi. Bahan + Upah Tukang (Panjar XII) 2,700,000.00 118,995,000.00
Bi. Bahan + Upah Tukang (Panjar XIII) 3,000,000.00 121,995,000.00
Bi. Transport/Minyak Bensin 10,000.00 122,005,000.00
14 Bi. Transport untuk pengambilan photo 100% 35,000.00 122,040,000.00
15 Bi. Pulsa fleksi kepala bidang Irigasi 97,000.00 7,179,000.00
20 Bi. Bahan + Upah Tukang (Panjar XIV) 2,000,000.00 9,179,000.00
26 Bi. Bahan + Upah Tukang (Panjar XV) 1,500,000.00 10,679,000.00
Bi. Transport Ke Irigasi 25,000.00 10,704,000.00
246,086,552.00
(13,923,000.00)
PENGELUARAN PROYEK PENGASPALAN BELAWAN
TOTAL 148,925,750.00
REKAPITULASI
I PENGELUARAN PROYEK
1 Bi. Proyek Unimed Rp 277,646,600.00
2 Bi. Proyek A. Malik Cot Rp 75,456,900.00
3 Bi. Proyek A. Malik Pagar Rp 68,078,400.00
4 Bi. Proyek PTKI Rp 80,206,800.00
5 Bi. Proyek Irigasi Rp 248,237,552.00
6 Bi. Proyek Pangururan Rp 489,090,500.00
7 Bi. Proyek Pengaspalan Belawan Rp 148,925,750.00
8 Bi. Proyek Puskesmas Rp 172,965,300.00
9 Bi. Proyek POM Rp 45,148,800.00
10 Bi. Proyek PLN Rp 973,900.00
11 Bi. Proyek Sergai Rp 1,267,000.00
12 Bi. Proyek Keuangan Rp 480,000.00
14 Bi. Proyek Dinas Sosial Rp 585,400.00
15 Bi. Proyek Baristand Rp 657,200.00
16 Bi. Proyek Kehutanan K. Jahe Rp 1,549,500.00
17 Bi. Proyek BKP Rp 290,000.00 11,120,250.00
18 Bi. Proyek Perkim Rp 108,849,000.00
19 Bi. Proyek SD Rp 107,827,000.00
20 Bi. Proyek Poltek Rp 1,171,000.00
21 Bi. Proyek Dikdas Rp 2,987,450.00
22 Bi. Proyek Kantin Unimed Rp 300,000.00
23 Bi. Proyek POM 2008 Rp 475,800.00
24 Bi. Proyek Kehutanan Rp 52,640,000.00
25 Bi. Proyek Rantau Prapat Rp 383,000.00
26 Bi. Proyek PU binamarga Rp 10,000,000.00
Agustus
1 Bi. Foto Copy dokumen 200,000.00 3,629,900.00
Bi. P'Obet Kaban 5,000,000.00 8,629,900.00
3 Bi. Makan lembur (urus jaminan bank) 15,000.00 8,644,900.00
Bi. Transport urus Jaminan bank 35,000.00 8,679,900.00
Bi. Foto copy berkas 1,000.00 8,680,900.00
4 Bi. Transport ke APBI + Bi. Makan (2 orang PP) 50,000.00 8,730,900.00
September
9 Bi. Foto Copy + Materai + dll 142,600.00 16,516,900.00
September
25 Bi. Kejaksaan 50,000,000.00 76,000,000.00
Desember
12 Bi. Astek 1,135,000.00 103,635,000.00
21 Bi. Pelunasan Kewajiban 4,540,000.00 108,175,000.00
Bi. Bendahara 3,000,000.00 111,175,000.00
Bi. Fee Pangururan 15,000,000.00 126,175,000.00
126,175,000.00
KANTOR
14/9 Bi. Panjar Tukang Rp. 10,000,000.00
20/10 Bi. Upah Tukang (Suroso) Rp. 8,000,000.00
9/10 Bi. Upah Tukang (Suroso) Rp. 5,000,000.00
30/11 Bi. Upah Tukang (suroso) Rp. 2,000,000.00
3/12 Bi. Upah Tukang (Suroso) Rp. 10,000,000.00
ANDRE
22/9 Bi. Upah Tukang Rp. 1,000,000.00
28/9 Bi. Upah Tukang Rp. 2,000,000.00
5/10 Bi. Upah Tukang Rp. 1,000,000.00
9/10 Bi. Upah Tukang Rp. 7,800,000.00
31/10 Bi. Upah Tukang Rp. 1,500,000.00
3/11 Bi. Upah Tukang Rp. 2,000,000.00
21/11 Bi. Upah Tukang Rp. 3,000,000.00
Total 53,300,000.00
Total Pengeluaran Untuk Bahan Rp. 69,160,000.00
100,000.00
100,000.00
210,000.00
15,530,000.00
11,500,000.00
1,000,000.00 508,000.00
4,350,000.00
1,000,000.00
28,000.00
20,000.00
15,000.00
3,500.00
20,000,000.00
20,000.00
15,000.00 #REF! #REF!
2,000,000.00
500,000.00
50,000.00
1,050,000.00 1,000,000.00
177,000.00
4,000.00
7,800,000.00 50,000.00
30,000.00
8,000,000.00 23,846,000.00 #REF! #REF!
3,800,000.00
1,650,000.00 4,000.00
30,000.00
34,000.00 3,766,000.00 #REF!
2,000,000.00 176,000.00
20,000.00
2,000,000.00 20,000.00
216,000.00 #REF!
25,000,000.00
23,450,000.00
1,050,000.00
20,000.00
5,000,000.00
#REF!
3,000,000.00
15,000.00
24,000,000.00
#REF! #REF! #REF!
LAPORAN KEUANGAN
PROYEK PANGURURAN
Agustus
1 Bi. Foto Copy dokumen
September
9 Bi. Foto Copy + Materai + dll
14 - Bi. Bahan
- Bi. Panjar Tukang
September
25 Bi. Kejaksaan
Desember
12 Bi. Astek
21 Bi. Pelunasan Kewajiban
Bi. Bendahara
Bi. Fee Pangururan
TOTAL Bi. Fisik + Non Fisik
Bi. UPAH TUKANG
KANTOR
14/9 Bi. Panjar Tukang Rp.
20/10 Bi. Upah Tukang (Suroso) Rp.
2/11 Bi. Upah Tukang (Suroso) Rp.
9/11 Bi. Upah Tukang (Suroso) Rp.
30/11 Bi. Upah Tukang (suroso) Rp.
3/12 Bi. Upah Tukang (Suroso) Rp.
ANDRE
22/9 Bi. Upah Tukang Rp.
28/9 Bi. Upah Tukang Rp.
5/10 Bi. Upah Tukang Rp.
9/10 Bi. Upah Tukang Rp.
31/10 Bi. Upah Tukang Rp.
3/11 Bi. Upah Tukang Rp.
21/11 Bi. Upah Tukang Rp.
Total
Total Pengeluaran Untuk Bahan Rp.
Kredit Saldo
220,000.00 220,000.00
185,000.00 405,000.00
40,000.00 445,000.00
185,000.00 630,000.00
85,000.00 715,000.00
45,000.00 760,000.00
200,000.00 960,000.00
30,000.00 990,000.00
10,000.00 1,000,000.00
400,000.00 1,400,000.00
50,000.00 1,450,000.00
130,000.00 1,580,000.00
22,000.00 1,602,000.00
80,000.00 1,682,000.00
150,000.00 1,832,000.00
80,000.00 1,912,000.00
60,000.00 1,972,000.00
50,000.00 2,022,000.00
500,000.00 2,522,000.00
220,000.00 2,742,000.00
185,000.00 2,927,000.00
40,000.00 2,967,000.00
185,000.00 3,152,000.00
45,000.00 3,197,000.00
200,000.00 3,397,000.00
30,000.00 3,427,000.00
2,900.00 3,429,900.00
200,000.00 3,629,900.00
50,000.00 8,679,900.00
180,000.00 8,859,900.00
300,000.00 9,159,900.00
390,000.00 9,549,900.00
78,000.00 9,627,900.00
50,000.00 9,677,900.00
50,000.00 9,727,900.00
105,000.00 9,832,900.00
2,000,000.00 11,832,900.00
370,000.00 12,202,900.00
435,400.00 12,638,300.00
635,000.00 13,273,300.00
3,000,000.00 16,273,300.00
142,600.00 16,415,900.00
222,000.00 16,637,900.00
165,000.00 16,802,900.00
150,000.00 16,952,900.00
40,000.00 16,992,900.00
40,000.00 17,032,900.00
55,000.00 17,087,900.00
500,000.00 17,587,900.00
1,860,000.00 31,447,900.00
10,000,000.00 27,587,900.00 10,000,000.00 16,900,000.00
2,000,000.00 29,587,900.00
8,000,000.00 37,587,900.00
3,000,000.00 40,587,900.00
3,900,000.00 44,487,900.00 3,800,000.00
2,000,000.00 46,487,900.00
1,560,000.00 48,047,900.00
250,000.00 31,697,900.00
15,000,000.00 46,697,900.00
800,000.00 38,387,900.00
Kredit Saldo
11,500,000.00
1,000,000.00 39,387,900.00 1,000,000.00
100,000.00 39,487,900.00
10,000,000.00 49,487,900.00
50,000.00 49,537,900.00
639,000.00 50,176,900.00
20,000,000.00 70,176,900.00
500,000.00 70,676,900.00
3,000,000.00 49,487,900.00
100,000.00 49,587,900.00
500,000.00 50,087,900.00
3,800,000.00 53,887,900.00
200,000.00 54,087,900.00
25,000,000.00 79,087,900.00 1,050,000.00
6,000,000.00 102,587,900.00
234,500.00 102,822,400.00
2,000,000.00 104,822,400.00 2,000,000.00
8,200,000.00 56,247,900.00 2,000,000.00
24,000,000.00 80,247,900.00
6,000.00 80,253,900.00
10,000.00 80,263,900.00 25,000,000.00
5,000.00 80,268,900.00
7,840,000.00 88,108,900.00
5,000,000.00 93,108,900.00 5,000,000.00
15,000.00 93,123,900.00
9,290,000.00 102,413,900.00
3,000,000.00 105,413,900.00 3,000,000.00
1,200,000.00 106,613,900.00
3,111,000.00 109,724,900.00
5,000,000.00 114,724,900.00
570,000.00 115,294,900.00
768,000.00 116,062,900.00
1,170,000.00 117,232,900.00
1,750,000.00 118,982,900.00
25,000.00 119,007,900.00
20,000.00 119,027,900.00
550,000.00 119,577,900.00
10,000.00 119,587,900.00
2,700,000.00 122,287,900.00
1,760,000.00 124,047,900.00
650,000.00 124,697,900.00
10,000.00 124,707,900.00
16,900,000.00 141,607,900.00
10,000,000.00 151,607,900.00
2,834,000.00 154,441,900.00
153,000.00 154,594,900.00
2,810,600.00 157,405,500.00
250,000.00 157,655,500.00
25,000.00 157,680,500.00
2,810,000.00 160,490,500.00
500,000.00 160,990,500.00
11,040,000.00 172,030,500.00
5,000,000.00 177,030,500.00
10,000,000.00 187,030,500.00
2,020,000.00 189,050,500.00
9,927,500.00 198,978,000.00
15,000,000.00 213,978,000.00
1,000,000.00 214,978,000.00
400,000.00 215,378,000.00
357,411,500.00
20,460,000.00
Kredit Saldo
26,000,000.00 26,000,000.00
5,000,000.00 8,629,900.00
50,000,000.00 76,000,000.00
24,000,000.00
20,000,000.00 96,000,000.00
6,500,000.00 102,500,000.00
1,135,000.00 103,635,000.00
4,540,000.00 108,175,000.00
3,000,000.00 111,175,000.00
15,000,000.00 126,175,000.00
131,175,000.00
488,586,500.00
10,000,000.00
8,000,000.00
2,000,000.00
5,000,000.00
2,000,000.00
10,000,000.00
1,000,000.00
2,000,000.00
1,000,000.00
7,800,000.00
1,500,000.00
2,000,000.00
3,000,000.00
55,300,000.00 18,300,000.00
68,760,000.00
37,000,000.00
15,900,000.00
50,000.00
15,000,000.00
280,000.00
210,000.00
177,000.00
20,000,000.00
20,000.00
100,000.00
100,000.00
35,677,000.00
508,000.00
4,350,000.00
1,000,000.00
28,000.00
20,000.00
15,000.00
3,500.00
20,000.00
15,000.00 #REF! #REF!
2,000,000.00
500,000.00
50,000.00
1,000,000.00
4,000.00
50,000.00
65,460,500.00 #REF! #REF!
4,000.00
30,000.00
34,000.00 ### #REF!
176,000.00
20,000.00
196,000.00 #REF!
23,450,000.00
1,050,000.00
20,000.00
#REF!
15,000.00
1 Saldo
19-9-2007 Dana Diterima Andre 16,960,000.00
Panjar bahan (BRN) 15,000,000.00
Pembayaran Mat (Hj) 1,180,000.00
Biaya tak terduga: 280,000.00
buka rekening 100,000.00
beli pulasa 50,000.00
biaya transport 20,000.00
20-9-2007 Beli drum 100,000.00
bi. Transport 20,000.00 210,000.00
16,750,000.00 210,000.00
2
21-09-07 Dana Diterima Andre 11,500,000.00
Beli material kontan 508,000.00
Pembayaran material (HJ) 4,350,000.00
22-9-07 Pinjaman tukang 1,000,000.00
Konsultan 100,000.00
beli pipa 28,000.00
Bi. Transport 20,000.00
24-09-07 Panjar bahan (BRN) 5,000,000.00
25-09-07 Beli kertas pasir 15,000.00
Bi. Tranport 10,000.00
26-09-07 beli kertas pasir 15,000.00
pengiriman fax 3,500.00
bi. transport 20,000.00 430,500.00
11,069,500.00 640,500.00
3
28-09-07 Dana yang diterima Andre 24,000,000.00
Panjar bahan 20,000,000.00
pinjaman tukang 2,000,000.00
konsultan 500,000.00
pulsa 50,000.00
31-09-07 uang makan 370,000.00
gaji pengawas lapangan 1,000,000.00
beli material kontan 177,000.00
Bi. Fax 4,000.00
pulsa 50,000.00
transport 30,000.00 (181,000.00)
24,181,000.00 459,500.00
4
3/10/2007 Dana yang Diterima Andre 3,800,000.00
pembayaran material (Hj) 3,800,000.00
biaya fax 4,000.00
Perbaikan Hp 80,000.00
transport 30,000.00
4/10/2007 pembelian material kontan 176,000.00
transport 20,000.00
5/10/2007 transport 20,000.00 (330,000.00)
4,130,000.00 129,500.00
5
8/10/2007 Dana Yang diterima Andre 25,000,000.00
panjar bahan (brn) 23,500,000.00
Pinjaman Tukang 1,000,000.00
transport 20,000.00 480,000.00
24,520,000.00 609,500.00
6
9/10/2007 Dana yang diterima Andre 8,000,000.00
Pinjaman Tukang 7,800,000.00
transport 20,000.00
pulsa 100,000.00 80,000.00
7,920,000.00 689,500.00
7
24-10-2007 Dana yang diterima Andre 22,000,000.00
pembelian material kontan 255,000.00
pinjaman tukang 30,000.00
25-10-2007 panjar bahan (Brn) 15,370,000.00
beli 1 roll film 25,000.00
beli 1 pasang baterai 5,000.00
bi. Beli 1 bh pulpen 5,000.00
pulsa 50,000.00
transport 20,000.00
27-10-07 beli semen 50 sak (kontan) 2,100,000.00
beli elbow 4" 2bh 14,000.00
transport 20,000.00
29-10-07 pembelian material kontan 275,000.00
transport 20,000.00
30-10-07 pembelian material kontan 673,000.00
transport 30,000.00
31-10-07 pembelian material kontan 113,000.00
transport 20,000.00
pinjaman tukang 1,500,000.00
upah bongkar keramik 150,000.00
uang makan 31 hari 1,085,000.00
penginapan 250,000.00
1/11/2007 beli semmen 15 sak kontan 630,000.00
transport 30,000.00 (670,000.00)
22,670,000.00 19,500.00
8
2/11/2007 Dana Yang diterima Andre 8,200,000.00
pembayaran material pajar (rmb) 2,590,000.00
pembelian material kontan 2,260,000.00
tranport 20,000.00
3/11/2007 pinjaman tukang 2,000,000.00
gaji pengawas 1,000,000.00
5/11/2007 pembelian material kontan 42,000.00
pulsa 50,000.00
transport 10,000.00
6/11/2007 beli batu bata kontan 300bj 90,000.00
transport 20,000.00
konsultan 500,000.00 (382,000.00)
8,582,000.00 (362,500.00)
9
7/11/2007 Dana yang diterima Andre 7,840,000.00
pembayaran OKP 200,000.00
transport 20,000.00
10/11/2007 pembayaran Proposal 200,000.00
12/11/2007 pembayaran material (polten) 5,041,000.00
transport 20,000.00
13/11/2007 pembayaran materian (rimba) 1,620,000.00 739,000.00
7,101,000.00 376,500.00
10
20-11-07 Dana yang diterima Andre 12,290,000.00
21-11-07 pembayaran material (polten) 8,287,000.00
pembayaran materia pasir 810,000.00
pinjaman tukang 3,000,000.00
pulsa 100,000.00
transport 20,000.00 73,000.00
12,217,000.00 449,500.00
11
23-11-07 Dana Yang diterima Andre 5,000,000.00
panjar instalateur 1,000,000.00
beli 2 rol film 50,000.00
transport 20,000.00
beli kabel 1 rol 250,000.00
tranport 10,000.00
27-11-2007 Pembayaran PAM 1,568,000.00
transport 20,000.00
27-11-07 pembayaran material yang kurang (rimb) 1,266,000.00
30-11-07 uang makan 30 hari 1,035,000.00 (219,000.00)
5,219,000.00 230,500.00
12
30-11-2007 Dana yang diterima Andre 16,900,000.00
pembayaran listrik 7,500,000.00
beli stop kontak 290,000.00
biaya fax 35,310.00
transport 30,000.00
1/12/2007 panjar material (polten) 7,000,000.00
transport 10,000.00
pinjaman tukang 2,000,000.00
14-12-07 uag tanda tangan 100,000.00
biaya fax 4,000.00
cuci cetak film 36,000.00
transport 10,000.00 (115,310.00)
17,015,310.00 115,190.00
13
18-12-2007 Dana yang diterima Andre 12,330,000.00
pembayaran material (polten) 11,067,000.00
pemelian kusen 2bh 600,000.00
pelunasan instalateur 323,000.00
pembayaran tukang 340,000.00 -
12,330,000.00 115,190.00 sisa uang
Rekapitulasi:
TOTAL Uang Diterima Andre 173,820,000.00
Total Pengeluaran 173,704,810.00
358,148,100.00
31,000,000.00
8,600,000.00
26,000,000.00
70,000,000.00
3,000,000.00
1,135,000.00
6,000,000.00
11,000,000.00
156,735,000.00
514,883,100.00
650,402,000.00
70,952,945.00
475,942,200.00
103,506,855.00
51,753,427.50
16,900,000.00 15,000,000.00
280,000.00
50,000.00
100,000.00
100,000.00
210,000.00
15,530,000.00
11,500,000.00
508,000.00
4,350,000.00
1,000,000.00
28,000.00
20,000.00
15,000.00
3,500.00
20,000,000.00
20,000.00
15,000.00 #REF!
2,000,000.00
500,000.00
50,000.00
1,000,000.00
177,000.00
4,000.00
50,000.00
30,000.00
23,846,000.00 #REF!
3,800,000.00
4,000.00
30,000.00
34,000.00 3,766,000.00
176,000.00
20,000.00
20,000.00
216,000.00
25,000,000.00
23,450,000.00
1,050,000.00
20,000.00
15,000.00
24,000,000.00
#REF! #REF!
LAPORAN KEUANGAN
PROYEK PANGURURAN
Agustus
1 Bi. Foto Copy dokumen 200,000.00 3,629,900.00
Bi. Jaminan Penawaran Bank 25 % @Rp. 26.200.000,- 6,550,000.00 10,179,900.00
Bi. Perusahaan + di Lapangan 5,000,000.00 15,179,900.00
3 Bi. Makan lembur (urus jaminan bank) 15,000.00 15,194,900.00
Bi. Transport urus Jaminan bank 35,000.00 15,229,900.00
Bi. Foto copy berkas 1,000.00 15,230,900.00
4 Bi. Transport ke APBI + Bi. Makan (2 orang PP) 50,000.00 15,280,900.00
September
9 Bi. Foto Copy + Materai + dll 142,600.00 23,066,900.00
September
25 Bi. Kejaksaan 50,000,000.00 76,000,000.00
Desember
12 Bi. Astek 1,135,000.00 103,635,000.00
21 Bi. Pelunasan Kewajiban 4,540,000.00 108,175,000.00
Bi. Bendahara 3,000,000.00 111,175,000.00
Bi. Fee Pangururan 15,000,000.00 126,175,000.00
126,175,000.00
172,490,000.00
18,300,000.00
Bi. UPAH TUKANG
KANTOR
14/9 Bi. Panjar Tukang Rp. 10,000,000.00
20/10Bi. Upah Tukang (Suroso) Rp. 8,000,000.00
2/11 Bi. Upah Tukang (Suroso) Rp. 2,000,000.00
9/11 Bi. Upah Tukang (Suroso) Rp. 5,000,000.00
30/11Bi. Upah Tukang (suroso) Rp. 2,000,000.00
3/12 Bi. Upah Tukang (Suroso) Rp. 10,000,000.00
ANDRE
22/9 Bi. Upah Tukang Rp. 1,000,000.00
28/9 Bi. Upah Tukang Rp. 2,000,000.00
5/10 Bi. Upah Tukang Rp. 1,000,000.00
9/10 Bi. Upah Tukang Rp. 7,800,000.00
31/10Bi. Upah Tukang Rp. 1,500,000.00
3/11 Bi. Upah Tukang Rp. 2,000,000.00
21/11Bi. Upah Tukang Rp. 3,000,000.00
20,000,000.00
20,000.00
15,000.00 #REF! #REF!
2,000,000.00
500,000.00
50,000.00
1,050,000.00 1,000,000.00
177,000.00
4,000.00
7,800,000.00 50,000.00
30,000.00
8,000,000.00 23,846,000.00 #REF! #REF!
3,800,000.00
1,650,000.00 4,000.00
30,000.00
34,000.00 ### #REF!
2,000,000.00 176,000.00
20,000.00
2,000,000.00 20,000.00
216,000.00 #REF!
25,000,000.00
23,450,000.00
1,050,000.00
20,000.00
5,000,000.00
#REF!
3,000,000.00
15,000.00
24,000,000.00
#REF! #REF! #REF!
PENGELUARAN PROYEK PUSKESMAS
November
1 Bi. Foto Copy Dokumen + dll 597,650.00 43,802,650.00
5 Bi. Pulsa 50,000.00 43,852,650.00
9 Bi. Foto Copy gambar A3 13,500.00 43,866,150.00
10 Bi. Foto Copy gambar A3 15,500.00 43,881,650.00
14 Bi. Upah Tukang 1,000,000.00 44,881,650.00
17 Bi. Upah Tukang 2,415,000.00 47,296,650.00
21 Bi. Pinjaman Sementara P'Marulam 5,000,000.00 52,296,650.00
Bi. Panjar Kosen Puskesmas Bromo 2,000,000.00 54,296,650.00
22 Bi. Transport Ke Bank Sumut 10,000.00 54,306,650.00
Desember
1 Bi. Transport Ke Panglong PTKI 310,000.00 107,998,650.00
4 Bi. Conblok 1,200,000.00 109,198,650.00
6 Bi. Koramil 500,000.00 109,698,650.00
7 Bi. Lapangan Puskesmas (didit) 180,000.00 109,878,650.00
Bi. Upah Tukang Medan Denai 2,420,000.00 112,298,650.00
Bi. Upah Tukang Sunggal 2,850,000.00 115,148,650.00
Bi. Upah Tukang Tegal Sari 1,830,000.00 116,978,650.00
12 Bi. Bahan (cat, paku dan 3 dus keramik dll) 386,000.00 117,364,650.00
Bi. Minum bersama Bendahara Puskesmas 200,000.00 117,564,650.00
Bi. Gaji Nopember Lapangan 1,500,000.00 119,064,650.00
Bi. Conblok 450,000.00 119,514,650.00
Bi. Konsultan Proyek 1,000,000.00 120,514,650.00
Nopember
19 Bi. Proyek Puskesmas /P'Lusder 5,000,000.00 5,000,000.00
23 Bi. Proyek Puskesmas /P'Lusder 5,000,000.00 10,000,000.00
28 Bi. Proyek Puskesmas /P'Lusder 3,200,000.00 13,200,000.00
30 Bi. Proyek Puskesmas /P'Lusder 3,220,000.00 16,420,000.00
TOTAL 232,465,300.00
172,965,300.00
6,099,863.00
45,950,000.00
27,000,000.00
1,000,000.00
1,000,000.00
500,000.00
10,000,000.00
40,000,000.00
2,000,000.00
1,000,000.00
307,515,163.00
459,500,000.00
52,842,500.00
307,515,163.00
99,142,337.00
49,571,168.50 49,571,168.50
45,950,000.00
15,000,000.00
40,000,000.00
150,521,168.50
132,521,168.50
10,000,000.00
22,640,000.00
330,000.00
2,875,000.00
8,705,000.00 2,305,000.00
3,195,000.00 7,736,500.00
60,500.00
640,000.00
1,648,000.00
1,947,000.00
3,790,000.00
70,000.00
2,636,000.00
3,080,500.00
1,832,000.00
1,059,000.00
595,000.00
600,000.00
409,500.00
1,141,000.00
1,041,500.00
971,900.00
480,000.00
4,905,000.00
580,000.00
530,000.00
992,000.00
2,162,000.00
1,252,500.00
280,000.00
460,000.00
378,000.00
490,000.00
560,000.00
620,000.00
1,417,000.00
140,000.00
187,000.00
425,000.00
250,000.00
567,500.00
1,226,500.00
490,000.00
594,000.00
320,000.00
85,000.00
1,455,000.00
105,000.00
371,000.00
51,549,400.00
7,736,500.00
2,048,000.00
15,805,400.00
14,661,500.00
40,251,400.00
PENGELUARAN PROYEK PUSKESMAS
November
1 Bi. Foto Copy Dokumen + dll
9 Bi. Foto Copy gambar A3
10 Bi. Foto Copy gamabr A3
14 Bi. Upah Tukang
17 Bi. Upah Tukang
21 Bi. Panjar Kosen Puskesmas Bromo
Desember
4 Bi. Conblok
6 Bi. Koramil 500,000.00
7 Bi. Lapangan Puskesmas (didit)
Bi. Upah Tukang Medan Denai
Bi. Upah Tukang Sunggal
Bi. Upah Tukang Tegal Sari
Nopember
23 Bi. Proyek Puskesmas /P'Lusder
28 Bi. Proyek Puskesmas /P'Lusder
30 Bi. Proyek Puskesmas /P'Lusder
Sub Total
TOTAL
8,705,000.00
SKESMAS
3,220,000.00 3,220,000.00
13,220,000.00
28,220,000.00
360,000.00 2,360,000.00
470,000.00 2,830,000.00 #REF!
225,000.00 3,055,000.00
140,000.00 3,195,000.00 #REF!
310,000.00 3,505,000.00
940,000.00 4,445,000.00
90,000.00 4,535,000.00
530,000.00 5,065,000.00
180,000.00 5,245,000.00
28,500.00 5,273,500.00
24,000.00 5,297,500.00
225,000.00 5,522,500.00
140,000.00 5,662,500.00
1,525,000.00 7,187,500.00
310,000.00 7,497,500.00
38,000.00 7,535,500.00
37,000.00 7,572,500.00
250,000.00 7,822,500.00
30,000.00 7,852,500.00
280,000.00 8,132,500.00
310,000.00 8,442,500.00
120,000.00 8,562,500.00
310,000.00 8,872,500.00
20,000.00 8,892,500.00
280,000.00 9,172,500.00
60,000.00 9,232,500.00
470,000.00 9,702,500.00
140,000.00 9,842,500.00
140,000.00 9,982,500.00
310,000.00 10,292,500.00
210,000.00 10,502,500.00
225,000.00 10,727,500.00
310,000.00 11,037,500.00
940,000.00 11,977,500.00
90,000.00 12,067,500.00
530,000.00 12,597,500.00
180,000.00 12,777,500.00
28,500.00 12,806,000.00
24,000.00 12,830,000.00
225,000.00 13,055,000.00
140,000.00 13,195,000.00
1,525,000.00 14,720,000.00
310,000.00 15,030,000.00
38,000.00 15,068,000.00
37,000.00 15,105,000.00
250,000.00 15,355,000.00
30,000.00 15,385,000.00
310,000.00 15,695,000.00
1,645,000.00 17,340,000.00
120,000.00 17,460,000.00
225,000.00 17,685,000.00
72,000.00 17,757,000.00
180,000.00 17,937,000.00
310,000.00 18,247,000.00
1,220,000.00 19,467,000.00
310,000.00 19,777,000.00
250,000.00 20,027,000.00
38,000.00 20,065,000.00
37,000.00 20,102,000.00
47,500.00 20,149,500.00
180,000.00 20,329,500.00
212,000.00 20,541,500.00
1,280,000.00 21,821,500.00
200,000.00 22,021,500.00
155,000.00 22,176,500.00
48,000.00 22,224,500.00
20,000.00 22,244,500.00
37,000.00 22,281,500.00
39,000.00 22,320,500.00
762,500.00 23,083,000.00
98,000.00 23,181,000.00
18,000.00 23,199,000.00
12,000.00 23,211,000.00
510,000.00 23,721,000.00
510,000.00 24,231,000.00
135,000.00 24,366,000.00
48,000.00 24,414,000.00
30,000.00 24,444,000.00
384,000.00 24,828,000.00
480,000.00 25,308,000.00
160,000.00 25,468,000.00
45,000.00 25,513,000.00
70,000.00 25,583,000.00
170,000.00 25,753,000.00
3,350,000.00 29,103,000.00
930,000.00 30,033,000.00
2,025,000.00 32,058,000.00
930,000.00 32,988,000.00
1,495,000.00 34,483,000.00
15,000.00 34,498,000.00
5,000,000.00 39,498,000.00
5,000.00 39,503,000.00
10,000.00 39,513,000.00
1,020,000.00 40,533,000.00
1,920,000.00 42,453,000.00
1,045,000.00 43,498,000.00
840,000.00 44,338,000.00
1,920,000.00 46,258,000.00
180,000.00 46,438,000.00
310,000.00 46,748,000.00
180,000.00 46,928,000.00
280,000.00 47,208,000.00
648,000.00 47,856,000.00
432,000.00 48,288,000.00
310,000.00 48,598,000.00
50,000.00 48,648,000.00
60,000.00 48,708,000.00
330,000.00 49,038,000.00
95,000.00 49,133,000.00
280,000.00 49,413,000.00
310,000.00 49,723,000.00
1,564,000.00 51,287,000.00
90,000.00 51,377,000.00
280,000.00 51,657,000.00
310,000.00 51,967,000.00
564,000.00 52,531,000.00
360,000.00 52,891,000.00
275,000.00 53,166,000.00
550,000.00 53,716,000.00
280,000.00 53,996,000.00
310,000.00 54,306,000.00
376,000.00 54,682,000.00
60,000.00 54,742,000.00
310,000.00 55,052,000.00
20,000.00 55,072,000.00
310,000.00 55,382,000.00
1,200,000.00 56,582,000.00
57,082,000.00
180,000.00 57,262,000.00
2,420,000.00 59,682,000.00
2,850,000.00 62,532,000.00
1,830,000.00 64,362,000.00
386,000.00 64,748,000.00
200,000.00 64,948,000.00
1,500,000.00 66,448,000.00
450,000.00 66,898,000.00
67,898,000.00
2,500,000.00 70,398,000.00
40,311,900.00 110,709,900.00
8,705,000.00 119,414,900.00
125,000.00 119,539,900.00
20,000.00 119,559,900.00
3,846,000.00 123,405,900.00
165,750.00 123,571,650.00
235,000.00 123,806,650.00
37,000.00 123,843,650.00
180,000.00 124,023,650.00
139,023,650.00
180,000.00 139,203,650.00
1,000,000.00 140,203,650.00
3,080,000.00 143,283,650.00
575,000.00 143,858,650.00
560,000.00 144,418,650.00
3,817,000.00 148,235,650.00
31,243,000.00 179,478,650.00
172,179,300.00 226,679,300.00
2,500.00
Fisik TOTAL
5,000,000.00 5,000,000.00
3,200,000.00 8,200,000.00
3,220,000.00 11,420,000.00
6,000,000.00 17,420,000.00
3,000,000.00 20,420,000.00
5,310,000.00 25,730,000.00
5,823,000.00 31,553,000.00
31,553,000.00
172,179,300.00
54,500,000.00
226,679,300.00
172,965,300.00
6,099,863.00
45,950,000.00
27,000,000.00
1,000,000.00
1,000,000.00
500,000.00
10,000,000.00
40,000,000.00
2,000,000.00
1,000,000.00
307,515,163.00
459,500,000.00
52,842,500.00
307,515,163.00
99,142,337.00
49,571,168.50 49,571,168.50
45,950,000.00
15,000,000.00
40,000,000.00
150,521,168.50
132,521,168.50
10,000,000.00
22,640,000.00
330,000.00
2,875,000.00
2,305,000.00
3,195,000.00 7,736,500.00
60,500.00
640,000.00
1,648,000.00
1,947,000.00
3,790,000.00
70,000.00
2,636,000.00
3,080,500.00
1,832,000.00
1,059,000.00
595,000.00
600,000.00
409,500.00
1,141,000.00
1,041,500.00
971,900.00
480,000.00
4,905,000.00
580,000.00
530,000.00
992,000.00
2,162,000.00
1,252,500.00
280,000.00
460,000.00
378,000.00
490,000.00
560,000.00
620,000.00
1,417,000.00
140,000.00
187,000.00
425,000.00
250,000.00
567,500.00
1,226,500.00
490,000.00
594,000.00
320,000.00
85,000.00
1,455,000.00
105,000.00
371,000.00
51,549,400.00
7,736,500.00
2,048,000.00
15,805,400.00
14,661,500.00
40,251,400.00
PENGELUARAN PROYEK PUSKESMAS
Total
Total
Total
Nopember
19 Bi. Proyek Puskesmas /P'Lusder
23 Bi. Proyek Puskesmas /P'Lusder
28 Bi. Proyek Puskesmas /P'Lusder
30 Bi. Proyek Puskesmas /P'Lusder
Sub Total
November
1 Bi. Foto Copy Dokumen + dll
9 Bi. Foto Copy gambar A3
10 Bi. Foto Copy gamabr A3
23 Bi. Lapangan Dinkes (2 Minggu)
1,525,000.00 1,525,000.00
310,000.00 1,835,000.00
38,000.00 1,873,000.00
37,000.00 1,910,000.00
250,000.00 2,160,000.00
30,000.00 2,190,000.00
280,000.00 2,470,000.00
310,000.00 2,780,000.00
120,000.00 2,900,000.00
310,000.00 3,210,000.00
20,000.00 3,230,000.00
280,000.00 3,510,000.00
60,000.00 3,570,000.00
470,000.00 4,040,000.00
140,000.00 4,180,000.00
140,000.00 4,320,000.00
310,000.00 4,630,000.00
210,000.00 4,840,000.00
225,000.00 5,065,000.00
310,000.00 5,375,000.00
940,000.00 6,315,000.00
90,000.00 6,405,000.00
530,000.00 6,935,000.00
180,000.00 7,115,000.00
28,500.00 7,143,500.00
24,000.00 7,167,500.00
225,000.00 7,392,500.00
140,000.00 7,532,500.00
564,000.00 8,096,500.00
360,000.00 8,456,500.00
275,000.00 8,731,500.00
550,000.00 9,281,500.00
280,000.00 9,561,500.00
310,000.00 9,871,500.00
376,000.00 10,247,500.00
60,000.00 10,307,500.00
310,000.00 10,617,500.00
20,000.00 10,637,500.00
310,000.00 10,947,500.00
1,200,000.00 12,147,500.00
450,000.00 12,597,500.00
7,736,500.00 20,334,000.00
20,334,000.00
470,000.00 470,000.00
310,000.00 780,000.00
1,645,000.00 2,425,000.00
120,000.00 2,545,000.00
225,000.00 2,770,000.00
72,000.00 2,842,000.00
180,000.00 3,022,000.00
310,000.00 3,332,000.00
1,220,000.00 4,552,000.00
310,000.00 4,862,000.00
250,000.00 5,112,000.00
38,000.00 5,150,000.00
37,000.00 5,187,000.00
47,500.00 5,234,500.00
180,000.00 5,414,500.00
212,000.00 5,626,500.00
3,350,000.00 8,976,500.00
310,000.00 9,286,500.00
180,000.00 9,466,500.00
648,000.00 10,114,500.00
432,000.00 10,546,500.00
310,000.00 10,856,500.00
50,000.00 10,906,500.00
60,000.00 10,966,500.00
330,000.00 11,296,500.00
95,000.00 11,391,500.00
280,000.00 11,671,500.00
2,000,000.00 13,671,500.00
560,000.00 14,231,500.00
1,000,000.00 15,231,500.00
15,805,400.00 31,036,900.00
3,817,000.00 34,853,900.00
34,853,900.00
1,280,000.00 1,280,000.00
200,000.00 1,480,000.00
155,000.00 1,635,000.00
48,000.00 1,683,000.00
20,000.00 1,703,000.00
37,000.00 1,740,000.00
39,000.00 1,779,000.00
762,500.00 2,541,500.00
98,000.00 2,639,500.00
18,000.00 2,657,500.00
12,000.00 2,669,500.00
510,000.00 3,179,500.00
510,000.00 3,689,500.00
135,000.00 3,824,500.00
48,000.00 3,872,500.00
30,000.00 3,902,500.00
384,000.00 4,286,500.00
480,000.00 4,766,500.00
160,000.00 4,926,500.00
45,000.00 4,971,500.00
70,000.00 5,041,500.00
170,000.00 5,211,500.00
386,000.00 5,597,500.00
125,000.00 5,722,500.00
14,722,000.00 20,444,500.00
20,444,500.00
225,000.00 225,000.00
140,000.00 365,000.00
310,000.00 675,000.00
940,000.00 1,615,000.00
90,000.00 1,705,000.00
530,000.00 2,235,000.00
180,000.00 2,415,000.00
28,500.00 2,443,500.00
24,000.00 2,467,500.00
225,000.00 2,692,500.00
140,000.00 2,832,500.00
1,525,000.00 4,357,500.00
310,000.00 4,667,500.00
38,000.00 4,705,500.00
37,000.00 4,742,500.00
250,000.00 4,992,500.00
30,000.00 5,022,500.00
280,000.00 5,302,500.00
310,000.00 5,612,500.00
1,564,000.00 7,176,500.00
90,000.00 7,266,500.00
280,000.00 7,546,500.00
310,000.00 7,856,500.00
2,048,000.00 9,904,500.00
9,904,500.00
Fisik TOTAL
5,000,000.00 5,000,000.00
5,000,000.00 10,000,000.00
3,200,000.00 13,200,000.00
3,220,000.00 16,420,000.00
6,000,000.00 22,420,000.00
3,000,000.00 25,420,000.00
5,823,000.00 31,243,000.00
31,243,000.00
Fisik TOTAL
3,220,000.00 3,220,000.00
13,220,000.00
28,220,000.00
255,000.00 44,400,650.00
44,900,650.00
180,000.00 45,080,650.00
200,000.00 45,280,650.00
1,500,000.00 46,780,650.00
47,780,650.00
2,500,000.00 50,280,650.00
20,000.00 50,300,650.00
3,846,000.00 54,146,650.00
165,750.00 54,312,400.00
235,000.00 54,547,400.00
37,000.00 54,584,400.00
180,000.00 54,764,400.00
69,764,400.00
180,000.00 69,944,400.00
15,444,400.00 69,944,400.00
13,988,880.00
2,500.00
159,407,755.00
0.02
2,391,116.33
157,016,638.68
1,263,763.68
23,658,982.00
30,427,218.00
23,777,472.00
77,863,672.00
1,167,955.08
27,083,577.00
26,648,700.00
23,727,136.00
77,459,413.00
81,018,484.41
81,518,484.41
237,271,427.00 23,727,142.70
233,712,355.60
PENGELUARAN PROYEK SD
November
1 Bi. Foto Copy + dll 499,300.00 18,399,300.00
2 Bi. Panjar Keramik 4,000,000.00 22,399,300.00
23 Bi. Proyek SD
Bi. Mingguan Atin 102,000.00 57,326,800.00
Bi. Kosen SD 3,000,000.00 60,326,800.00
Bi. 1 bh Pahat batu 10,000.00 60,336,800.00
Bi. 1 bh martil 28,000.00 60,364,800.00
Bi. 30 lbr asbes Atrisco @ 9.000 270,000.00 60,634,800.00
Bi. 1 cat asbes 60,000.00 60,694,800.00
Bi. 2 kg paku 2 1/2" @ 9.000 18,000.00 60,712,800.00
Bi. 15 sak semen @ 30.500 457,500.00 61,170,300.00
Bi. 2 Pu Pasir @ 70.000 140,000.00 61,310,300.00
Bi. 90 lbr asbes @ 9.000 810,000.00 62,120,300.00
Bi. 20 btg/ 1 ikat cat asbes 60,000.00 62,180,300.00
Bi. 1 Pu Pasir 70,000.00 62,250,300.00
Bi. 2 ikat cat asbes @ 60.000 120,000.00 62,370,300.00
Bi. 1 Pu Pasir 70,000.00 62,440,300.00
Bi. 15 sak semen @ 31.000 465,000.00 62,905,300.00
Bi. 5 kg paku 5" @ 10.000 50,000.00 62,955,300.00
Bi. 4 Pu pasir 280,000.00 63,235,300.00
Bi. 25 sak semen @ 31.000 787,500.00 64,022,800.00
Bi. 5 kotak paku beton @8000 40,000.00 64,062,800.00
Bi. 4 klg Cat Kimex putih 25 kg @ 190.000 760,000.00 64,822,800.00
Bi. 10 lbr kertas pasir @ 2000 20,000.00 64,842,800.00
Bi. 10 kg tepung dempul @ 2000 20,000.00 64,862,800.00
Bi. 2 klg cat Menie @ 45.000 90,000.00 64,952,800.00
Bi. 3 bh kuas 4 " 54,000.00 65,006,800.00
Bi. 3 Bh kuas 2 1/2" @ 11.500 34,500.00 65,041,300.00
Bi. 10 Botol terpentin @ 8000 180,000.00 65,221,300.00
Bi. 2 Pu Pasir @ 70.000 140,000.00 65,361,300.00
Bi. 16 btg kayu 2 " x 3 ' x 1 " @ 48.000 768,000.00 66,129,300.00
Bi. 1 Pu Pasir 70,000.00 66,199,300.00
Bi. 2 ikat cat asbes @ 60.000 120,000.00 66,319,300.00
Bi. 1 DT Pasir timbun 230,000.00 66,549,300.00
Bi. 1 DT Pasir timbun 230,000.00 66,779,300.00
Bi. Upah Tukang 2,715,000.00 69,494,300.00
30 Bi. Proyek SD :
Bi. Jaga Malam 200,000.00 69,694,300.00
Bi. Mingguan Atin 102,000.00 69,796,300.00
Bi. Transport Ke SD 5,000.00 69,801,300.00
Bi. Kosen SD 2,000,000.00 71,801,300.00
Bi. Upah Tukang 3,820,000.00 75,621,300.00
Desember
1 Bi. Kontrak (26/11) 800,000.00 76,421,300.00
Bi. Pengawas di dinas pendidikan 250,000.00 76,671,300.00
6 Bi. Proyek SD/ Panjar Jerajak Besi 4,000,000.00 80,671,300.00
7 Bi. Upah Tukang 2,235,000.00 82,906,300.00
Bi. Tempel ban beko 5,000.00 82,911,300.00
12 Bi. Pintu SD 3,000,000.00 85,911,300.00
Bi. Panitia 3,750,000.00 89,661,300.00
15 Bi. Mingguan Atin (2 minggu) 204,000.00 89,865,300.00
Bi. Upah Tukang 1,255,000.00 91,120,300.00
17 Bi. Foto Copy + Jilid + Transportasi 19,000.00 91,139,300.00
18 Bi. Kosen SD 3,000,000.00 94,139,300.00
Bi. Jaga Malam 100,000.00 94,239,300.00
Bi. Listrik + Air Nopember 200,000.00 94,439,300.00
Bi. Upah Tukang 1,255,000.00 95,694,300.00
Bi. Bahan di panglong 17,881,000.00 113,575,300.00
19 Bi. Transport urus Astek 10,000.00 113,585,300.00
Bi. Kosen SD 1,000,000.00 114,585,300.00
Bi. Transport Ke APBI 15,000.00 114,600,300.00
Bi. Astek 468,000.00 115,068,300.00
28 Bi. Pry. SD
Bi. Mingguan Atin 102,000.00 115,170,300.00
Bi. Komunikasi/wartel 7,000.00 115,177,300.00
Bi. Transport urus berita acara 20,000.00 115,197,300.00
Bi. Transport jumpa kepala sekolah 10,000.00 115,207,300.00
Bi. Transport jumpa kepala sekolah 15,000.00 115,222,300.00
Bi. Transport jumpa kepala sekolah (22/12) 10,000.00 115,232,300.00
Bi. Pelunasan Kosen SD 4,000,000.00 119,232,300.00
Bi. Pelunasan upah tukang 1,682,500.00 120,914,800.00
Bi. Upah tukang 1,212,500.00 122,127,300.00
Bi. Pelunasan besi SD 2,000,000.00 124,127,300.00
Bi. Bahan di panglong Multi Mitra 636,000.00 124,763,300.00
29 Bi. Keramik 4,400,000.00 129,163,300.00
30 Bi. Foto Copy di Randal Photo 213,700.00 129,377,000.00
16,000,000.00
976,000.00
17,105,000.00
1,255,000.00
1,046,000.00
882,500.00
190,000.00
57,500.00
49,000.00
6,000.00 1,570,000.00
876,000.00 472,500.00
2,636,000.00 570,000.00
882,500.00
170,000.00 2,042,500.00
1,992,500.00
1,046,000.00
140,000.00
525,500.00
520,000.00
950,000.00
1,289,000.00
1,239,000.00
24,000.00
1,204,500.00
250,000.00
24,000.00
217,000.00
180,000.00
1,280,000.00
3,000,000.00
300,000.00
16,397,000.00
(6,039,000.00)
PENGELUARAN PROYEK SD
November
2 Bi. Keramik 8,400,000.00 26,260,000.00
16,000,000.00
17,105,000.00
1,255,000.00
1,046,000.00
882,500.00
190,000.00
57,500.00
49,000.00
6,000.00 1,570,000.00
876,000.00 472,500.00
2,636,000.00 570,000.00
882,500.00
170,000.00 2,042,500.00
1,992,500.00
1,046,000.00
140,000.00
525,500.00
520,000.00
950,000.00
1,289,000.00
1,239,000.00
24,000.00
1,204,500.00
250,000.00
24,000.00
217,000.00
180,000.00
1,280,000.00
3,000,000.00
300,000.00
16,397,000.00
(6,039,000.00)
PENGELUARAN PROYEK PERKIM
Oktober
3 Bi.Pengamanan Perkim I 5,000,000.00 5,000,000.00
Nopember
26 Bi. Panjar I Pek. Jalan Setapak 15,000,000.00 20,000,000.00
Desember
3 Bi. Upah tukang proyek perkim 5,000,000.00 25,000,000.00
Bi. Berita acara, laporan & LSM perkim 1,450,000.00 26,450,000.00
4 Bi. Pak'Bangkit Sitepu/ 6 paket 10,000,000.00 36,450,000.00
Desember
3 Bi. Transport Ke Kehutanan + Ke Kamboja ambil berkas 20,000.00 975,000.00
4 Bi. Transport Ke Kamboja untuk minta tanda tangan 5,000.00 980,000.00
Bi. Transport Ke Kehutanan antar berkas 10,000.00 990,000.00
5 Bi. Transport ke kehutanan 10,000.00 1,000,000.00
6 Bi. Jaminan Penawaran kehutanan 60,000.00 1,060,000.00
Bi. Transport Ke Kamboja antar surat kuasa agar dileges 8,000.00 1,068,000.00
10 Bi. Transport Ambil surat kuasa 5,000.00 1,073,000.00
Bi. Leges Surat Kuasa 150,000.00 1,223,000.00
12 Bi. Transport ke dinas kehutanan + APBI + Kamboja 22,000.00 1,245,000.00
13 Bi. Transport pengurusan Pry. Kehutanan 50,000.00 1,295,000.00
14 Bi. Transport ke dinas Kehutanan 10,000.00 1,305,000.00
21 Bi. Jaminan Pelaksanaan Kehutanan 95,000.00 1,400,000.00
28 Bi. Panjar Plotter 20,000,000.00 21,400,000.00
Bi. Transport survey plotter 200,000.00 21,600,000.00
Bi. Pelunasan Jasa perusahan 1,000,000.00 22,600,000.00
Bi. Fee Kewajiban 4,030,000.00 26,630,000.00
29 Bi. Panitia 1,000,000.00 27,630,000.00
Bi. Beli Komputer 2 Unit 25,000,000.00 52,630,000.00
Bi. Transport pengambilan berita acara ke dinas kehutanan 10,000.00 52,640,000.00
TOTAL 52,640,000.00
Pengeluaran Pry. Kehutanan/ Pengadaan Plotter
Desember
Bi. Leges Surat Kuasa 75,000.00 775,000.00
14 Bi. Transport pengurusan proyek 150,000.00 925,000.00
21 Bi. Jaminan Penawaran + Pelaksanaan Kehutanan 155,000.00 1,080,000.00
28 Bi. Plotter + ongkos pasang + wayar 39,400,000.00 40,480,000.00
Bi. Fee Kewajiban 2,950,000.00 43,430,000.00
Jasa Perusahaan 1,000,000.00 44,430,000.00
29 Bi. Panitia 500,000.00 44,930,000.00
Bi. Pane 4,200,000.00 49,130,000.00
Bi. Panitia Penerimaan 1,000,000.00 50,130,000.00
TOTAL 50,130,000.00
PENGELUARAN SERGAI
Mei 19 Bi. Minyak Ke APBI antar Dokumen Perusahaan yang Daftar 25,000.00 25,000.00
Bi. Beli Materai 10 Bh 60,000.00 85,000.00
Bi. Foto Copy + Tinta + Kertas DLL 375,000.00 460,000.00
TOTAL 1,267,000.00
PENGELUARAN KEUANGAN
TOTAL 480,000.00
TOTAL 113,000.00
PENGELUARAN PLN
Agustus
1 Bi. Fotocopy + Materai dll 383,900.00 973,900.00
TOTAL 973,900.00
TOTAL 585,400.00
PENGELUARAN PROYEK BARISTAND
TOTAL 657,200.00
September
6 Bi. Transport ambil dokumen 10,000.00 510,000.00
Bi. Makan 2 org + Transport ke E'karya (lembur) 40,000.00 550,000.00
Bi. Foto copy 5,300.00 555,300.00
TOTAL 1,549,500.00
TOTAL 290,000.00
TOTAL 1,171,000.00
PENGELUARAN PROYEK DIKDAS
TOTAL 2,987,450.00
TOTAL 300,000.00
November
5 Bi. Transport Ke Rumah Pak Fajar 20,000.00 170,000.00
Bi. Makan 2 orang (DUP) Balai POM 50,000.00 220,000.00
Desember
1 Bi. Foto Copy + Jilid 51,900.00 301,900.00
30 Bi. Foto Copy di E Karya + randall 173,900.00 475,800.00
TOTAL 475,800.00
TOTAL 383,000.00
TOTAL 10,000,000.00
225,000.00
32,142.86
LAPORAN KEUANGAN
PROYEK BALAI POM
Agustus 1 Bi. Transport ke POM antar berkas untuk P'Fajar 15,000.00 45,048,800.00
Bi. Gambar POM 100,000.00 45,148,800.00
TOTAL 561,460,000.00
111,200,000.00
NILAI KONTRAK
Kekurangan 47,140,700.00
280,000,000.00
Rp 650,402,000.00