Anda di halaman 1dari 158

LEMBAR ISIAN

1 KEGIATAN
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA
TAHUN ANGGARAN : 2019
2 PELAKSANA
DIBUAT : Marthen Joseph
JABATAN : KAUR PERENCANAAN
DISETUJUI : Ricky Manuel,S.STP.MT
JABATAN : PEJABAT KEPALA DESA
NIP : …………………………………………
DAFTAR UPAH DAN HARGA BAHAN

KECAMATAN : BAGUALA
DESA : HALONG
TAHUN ANGGARAN : 2018

HARGA SATUAN
NO. URAIAN SATUAN (Rp.)

A UPAH
1 Mandor OH 196,000.00
2 Kepala Tukang OH 171,000.00
3 Tukang Batu OH 145,000.00
4 Tukang Kayu OH 145,000.00
5 Tukang Besi OH 145,000.00
6 Tukang Cat OH 145,000.00
7 Tukang Listrik OH 145,000.00
7 Tukang Las OH 145,000.00
8 Pekerja OH 75,000.00

B BAHAN
1 Kayu Klas I M3 7,255,000.00
2 Kayu 15 x 15-4M M' 106,600.00
3 Alat Bantu Pancang Set 100,000.00
4 Kayu 15 x 15-750 M M3 106,600.00
5 Kayu 20 x 20-1000 cm M3 290,200.00
6 Kayu Klas II M3 2,917,000.00
7 Papan Kayu Kls I M3 7,180,000.00
8 Papan Kayu Kls III M3 1,851,300.00
9 Batu Kerikil Pecah ( 3 / 2 cm ) M3 313,600.00
10 Pasir Pasang M3 278,000.00
11 Pasir Urug M3 217,100.00
12 Pasir Beton Kg 200.00
13 Batu Krikil (Kg) Kg 300.00
14 Tanah Timbunan M3 196,800.00
15 Batu Karang M3 255,700.00
16 Batu Kali M3 255,700.00
17 Batu Bata Bh 2,300.00
18 Batako Bh 2,300.00
19 Beugel Kuda-kuda Bh 12,000.00
20 Besi Strip Kg 6,500.00
21 Semen PC (Zak) Sak 75,500.00
22 Semen PC (Kg) Kg 1,600.00
23 Sement Warna Kg 2,100.00
24 Air Liter 600.00
25 Besi Dia 16 mm Standart 18.96Kg/Staff kg 11,000.00
26 Besi Dia 12 mm Standart 10.656Kg/Staff kg 11,000.00
27 Besi Dia 10 mm Standart 7.404Kg/Staff kg 11,000.00
28 Besi Dia 8 mm Standart 4.74Kg/Staff kg 11,000.00
29 C - 75, 0.8 M' 21,750.00
30 C - 75, 0.6 M' 18,750.00
31 Baut Bh 5,000.00
32 Dynabolt Bh 7,000.00
33 Talang jurai M' 58,000.00
29 Cat Meni Besi Kg 30,000.00
30 Cat Kayu Kg 57,000.00
31 Plamir Kg 16,000.00
32 Politur Liter 25,000.00
33 Menie Kayu Kg 30,000.00
34 Dumpul Kayu Kg 15,000.00
29 Dolken Kayu Galam Batang 22,300.00
30 Kuas Tangan 4 " Bh 22,000.00
31 Engsel Jendela 3" Pasang 35,000.00
32 Engsel Pintu 4" Pasang 55,000.00
33 Engsel Pintu Gembok Pasang 22,500.00
34 Gerendel Pintu Bh 15,000.00
35 Gerendel Jendela Bh 12,000.00
36 Kaca 3 mm M2 225,000.00
37 Kaca 5 mm M2 95,000.00
38 Lis plafon Profil 6 x 6 cm M' 22,500.00
39 Tripleks 4 mm Lbr 68,000.00
40 Kawat Ikat Kg 22,500.00
41 Kunci Tanam 2 Slaag Bh 180,000.00
42 Kunci Tanam KM/WC Bh 105,000.00
43 Kunci Teralis Penjara (Gembok Besar ) Bh 225,000.00
44 Kertas Amplas Lbr 6,000.00
45 Kait Angin Kls B Bh 17,500.00
46 Tegel Keramik 40/40 Bh 12,500.00
47 Tegel Keramik 20 / 25 Bh 3,409.09
48 Tegel Keramik 20 / 20 Bh 3,000.00
49 Lampu Philips 23 Watt Bh 45,000.00
50 Lampu Philips 18 Watt Bh 35,000.00
30 Besi Strip Kg 5,600.00
31 Minyak Bakesting Liter 5,600.00
32 Paku / Skrup Genteng Kg 25,100.00
33 Paku Campuran Kg 21,200.00
33 Paku Triplek Kg 21,200.00
34 Play Wood 3 mm uk. 120 x 240 cm Lbr 140,500.00
35 Cat meni Staff 50,200.00
36 Plamir Btg 133,800.00
37 Kawat Las Kg 5,600.00
38 Besi Hollow 4 x 4mm x 4 mm M2 669,000.00
39 Besi Hollow 4 x 4mm x 4 mm-M Staff 111,500.00
40 Atap Spandek Lbr 180,300.00
40 Seng Licin Lbr 80,300.00
41 Politur Kg 11,200.00
42 Cat Tembok Kg 27,900.00
43 Cat Dasar Tembok Kg 27,900.00
44 Gloteks Kg 11,200.00
45 MCB 60 AMP Bh 234,200.00
46 Kabel NYM 3 x 2.5 mm M 16,800.00
47 Pipa PVC dia. 3" M' 24,600.00
48 Pipa PVC dia. 1/2" M' 13,400.00
49 Socket PVC dia 1 " Bh 5,000.00
50 Kloset Duduk Bh 1,500,000.00
51 Perlengkapan Kloset Duduk Bh 90,000.00
49 Kran Air 3/4 Bh 39,100.00
50 Kran Air 1/2 Bh 39,100.00
51 Seal Tape Set 9,000.00
52 Floordrain (metal) Set 41,300.00
53 Wastafel lengkap Bh 606,600.00
54 Paving Block Segi Empat Bh 4,500.00
55 Sekring Bh 78,100.00
56 Kabel NYY 3x2,5 M' 16,800.00
57 Benang Roll 5,600.00
58 Titik Lampu Titik 83,700.00
59 Lem Kayu Kg 8,400.00
60 Pipa PVC Conduit M' 4,200.00
61 Lampu TL 20 Watt Bh 87,000.00
62 Lampu pijar philips putih 18 watt Bh 53,000.00
63 Lampu pijar philips putih 23 watt Bh 66,900.00
64 Lampu PL 11 Watt Bh 87,000.00
65 Saklar tunggal Bh 20,100.00
66 Saklar ganda Bh 27,900.00
67 Stop kontak Bh 25,700.00
68 Kabel NYY 3 Phase M' 16,800.00
69 Fiting Tempel Bh 16,800.00
70 T Dooz Bh 7,300.00
71 Isolator Bh 16,800.00
72 Lasdop Bh 5,600.00
73 Mangkok Listrik Bh 55,800.00
74 L.Bow Bh 2,800.00
75 Klem Pipa Bh 1,200.00
C ALAT -
1 Gergaji Bh 100,350.00
2 Martil Bh 94,775.00
3 Mesin Bor Bh 1,115,000.00
4 Kunci Pas Bh 27,875.00
5 Kuas Bh 16,725.00
6 Sewa Tripot Alat Pancang + Hammer Hari 500,000.00
D OPERASIONAL DAN BIAYA LAIN-LAIN -
1 Papan Nama Proyek Bh 150,000.00
2 Prasasti Bh 500,000.00
3 Insentif Pekerja Ls 650,000.00
4 Administrasi + Dokumentasi Ls 1,000,000.00
5 Biaya Penyambungan istrik Ls 1,500,000.00
6 As Buildrawing Ls 2,500,000.00
ALUR BA

No. KEBUTUHAN UPAH/BAHAN SAT


1 2 3
A UPAH
1 Mandor HOK
2 Kepala Tukang HOK
3 Tukang Batu HOK
4 Tukang Kayu HOK
5 Tukang Besi HOK
6 Tukang Cat HOK
7 Tukang Listrik HOK
8 Tukang Las HOK
9 Pekerja HOK

B BAHAN
1 Kayu Klas I M3
2 Kayu 15 x 15-4M M'
3 Alat Bantu Pancang Set
4 Kayu 15 x 15-750 M M3
5 Kayu 20 x 20-1000 cm M3
6 Kayu Klas II M3
7 Papan Kayu Kls I M3
8 Papan Kayu Kls III M3
9 Batu Kerikil Pecah ( 3 / 2 cm ) M3
9 Pasir Pasang M3
10 Pasir Urug M3
11 Pasir Beton Kg
12 Batu Krikil (Kg) Kg
13 Tanah Timbunan M3
14 Batu Karang M3
15 Batu Kali M3
16 Batu Bata Bh
17 Batako Bh
18 Beugel Kuda-kuda Bh
19 Besi Strip Kg
20 Semen PC (Zak) Sak
21 Semen PC (50 Kg/ZAK) Kg
22 Sement Warna Kg
23 Air Liter
24 Besi Dia 16 mm Standart kg
25 Besi Dia 12 mm Standart kg
26 Besi Dia 10 mm Standart kg
27 Besi Dia 8 mm Standart kg
28 C - 75, 0.8 M'
29 C - 75, 0.6 M'
30 Baut Bh
31 Dynabolt Bh
32 Talang jurai M'
33 Cat Meni Besi Kg
34 Cat Kayu Kg
35 Plamir Kg
36 Politur Liter
37 Menie Kayu Kg
38 Dumpul Kayu Kg
39 Dolken Kayu Galam Batang
40 Kuas Tangan 4 " Bh
41 Engsel Jendela 3" Pasang
42 Engsel Pintu 4" Pasang
43 Engsel Pintu Gembok Pasang
44 Gerendel Pintu Bh
45 Gerendel Jendela Bh
46 Kaca 3 mm M2
47 Kaca 5 mm M2
48 Lis plafon Profil 6 x 6 cm M'
49 Tripleks 4 mm Lbr
50 Kawat Ikat Kg
51 Kunci Tanam 2 Slaag Bh
52 Kunci Tanam KM/WC Bh
53 Kunci Teralis Penjara (Gembok Besar ) Bh
54 Kertas Amplas Lbr
55 Kait Angin Kls B Bh
56 Tegel Keramik 40/40 Bh
57 Tegel Keramik 20 / 25 Bh
58 Tegel Keramik 20 / 20 Bh
59 Lampu Philips 23 Watt Bh
60 Lampu Philips 18 Watt Bh
61 Besi Strip Kg
62 Minyak Bakesting Liter
63 Paku / Skrup Genteng Kg
64 Paku Campuran Kg
65 Paku Triplek Kg
65 Play Wood 3 mm uk. 120 x 240 cm Lbr
66 Cat meni Staff
67 Plamir Btg
68 Kawat Las Kg
69 Besi Hollow 4 x 4mm x 4 mm M2
70 Besi Hollow 4 x 4mm x 4 mm-M Staff
71 Atap Spandek Lbr
72 Seng Licin Lbr
72 Politur Kg
73 Cat Tembok Kg
74 Cat Dasar Tembok Kg
75 Gloteks Kg
76 MCB 60 AMP Bh
77 Kabel NYM 3 x 2.5 mm M
78 Pipa PVC dia. 3" M'
79 Pipa PVC dia. 1/2" M'
80 Socket PVC dia 1 " Bh
81 Kloset Duduk Bh
82 Perlengkapan Kloset Duduk Bh
83 Kran Air 3/4 Bh
84 Kran Air 1/2 Bh
85 Seal Tape Set
86 Floordrain (metal) Set
87 Wastafel lengkap Bh
88 Paving Block Segi Empat Bh
89 Sekring Bh
90 Kabel NYY 3x2,5 M'
91 Benang Roll
92 Titik Lampu Titik
93 Lem Kayu Kg
94 Pipa PVC Conduit M'
95 Lampu TL 20 Watt Bh
96 Lampu pijar philips putih 18 watt Bh
97 Lampu pijar philips putih 23 watt Bh
98 Lampu PL 11 Watt Bh
99 Saklar tunggal Bh
100 Saklar ganda Bh
101 Stop kontak Bh
102 Kabel NYY 3 Phase M'
103 Fiting Tempel Bh
104 T Dooz Bh
105 Isolator Bh
105 Lasdop Bh
105 Mangkok Listrik Bh
105 L.Bow Bh
106 Klem Pipa Bh
C ALAT
1 Gergaji Bh
2 Martil Bh
3 Mesin Bor Bh
4 Kunci Pas Bh
5 Kuas Bh
6 Sewa Tripot Alat Pancang + Hammer Hari
D OPERASIONAL DAN BIAYA LAIN-LAIN
1 Papan Nama Proyek Bh
2 Prasasti Bh
3 Insentif Pekerja Ls
4 Administrasi + Dokumentasi Ls
5 Biaya Penyambungan istrik Ls
6 As Buildrawing Ls
ALUR BAHAN DAN UPAH

HARGA PPN PPh 22 PPh 21 ONGKOS ANGKUT


DASAR 10% 1.50% 2.50%
4 5 6 7 8

191,100.00 4,900.00 -
166,725.00 4,275.00 -
141,375.00 3,625.00 -
141,375.00 3,625.00 -
141,375.00 3,625.00 -
141,375.00 3,625.00 -
141,375.00 3,625.00 -
141,375.00 3,625.00 -
73,125.00 1,875.00 -

7,000,000.00 105,000.00 75,000.00


100,800.00 2,362.50 1,687.50
100,000.00
100,800.00 2,362.50 1,687.50
280,000.00 4,200.00 3,000.00
2,800,000.00 42,000.00 75,000.00
7,000,000.00 105,000.00 75,000.00
1,750,000.00 26,250.00 75,000.00
235,000.00 3,525.00 75,000.00
200,000.00 3,000.00 75,000.00
140,000.00 2,100.00 75,000.00
142.86 2.14 53.57
174.07 2.61 55.56
120,000.00 1,800.00 75,000.00
178,000.00 2,670.00 75,000.00
178,000.00 2,670.00 75,000.00
2,000.00 30.00 200.00
2,000.00 30.00 200.00
12,000.00 180.00
6,500.00 97.50
65,000.00 6,500.00 975.00 1,500.00
1,300.00 130.00 19.50 30.00
1,800.00 180.00 27.00
500.00 7.50
8,500.00 850.00 127.50 1,000.00
8,500.00 850.00 127.50 1,000.00
8,500.00 850.00 127.50 1,000.00
8,500.00 850.00 127.50 1,000.00
21,750.00 2,175.00 326.25
18,750.00 1,875.00 281.25
5,000.00 500.00 75.00
7,000.00 700.00 105.00
58,000.00 5,800.00 870.00
30,000.00 3,000.00 450.00
57,000.00 5,700.00 855.00
16,000.00 1,600.00 240.00
25,000.00 2,500.00 375.00
30,000.00 3,000.00 450.00
15,000.00 1,500.00 225.00
20,000.00 2,000.00 300.00
22,000.00 2,200.00 330.00
35,000.00 3,500.00 525.00
55,000.00 5,500.00 825.00
22,500.00 2,250.00 337.50
15,000.00 1,500.00 225.00
12,000.00 1,200.00 180.00
225,000.00 22,500.00 3,375.00
95,000.00 9,500.00 1,425.00
22,500.00 2,250.00 337.50
68,000.00 6,800.00 1,020.00
22,500.00 2,250.00 337.50
180,000.00 18,000.00 2,700.00
105,000.00 10,500.00 1,575.00
225,000.00 22,500.00 3,375.00
6,000.00 600.00 90.00
17,500.00 1,750.00 262.50
12,500.00 1,250.00 187.50
3,409.09 340.91 51.14
3,000.00 300.00 45.00
45,000.00 4,500.00 675.00
35,000.00 3,500.00 525.00
5,000.00 500.00 75.00
5,000.00 500.00 75.00
22,500.00 2,250.00 337.50
19,000.00 1,900.00 285.00
19,000.00 1,900.00 285.00
126,000.00 12,600.00 1,890.00
45,000.00 4,500.00 675.00
120,000.00 12,000.00 1,800.00
5,000.00 500.00 75.00
600,000.00 60,000.00 9,000.00
100,000.00 10,000.00 1,500.00
161,675.00 16,167.50 2,425.13
72,000.00 7,200.00 1,080.00
10,000.00 1,000.00 150.00
25,000.00 2,500.00 375.00
25,000.00 2,500.00 375.00
10,000.00 1,000.00 150.00
210,000.00 21,000.00 3,150.00
15,000.00 1,500.00 225.00
22,000.00 2,200.00 330.00
12,000.00 1,200.00 180.00
5,000.00 500.00 75.00
1,500,000.00 150,000.00 22,500.00
90,000.00 9,000.00 1,350.00
35,000.00 3,500.00 525.00
35,000.00 3,500.00 525.00
8,000.00 800.00 120.00
37,000.00 3,700.00 555.00
544,000.00 54,400.00 8,160.00
4,000.00 400.00 60.00
70,000.00 7,000.00 1,050.00
15,000.00 1,500.00 225.00
5,000.00 500.00 75.00
75,000.00 7,500.00 1,125.00
7,500.00 750.00 112.50
3,750.00 375.00 56.25
78,000.00 7,800.00 1,170.00
47,500.00 4,750.00 712.50
60,000.00 6,000.00 900.00
78,000.00 7,800.00 1,170.00
18,000.00 1,800.00 270.00
25,000.00 2,500.00 375.00
23,000.00 2,300.00 345.00
15,000.00 1,500.00 225.00
15,000.00 1,500.00 225.00
6,500.00 650.00 97.50
15,000.00 1,500.00 225.00
5,000.00 500.00 75.00
50,000.00 5,000.00 750.00
2,500.00 250.00 37.50
1,000.00 100.00 15.00
90,000.00 9,000.00 1,350.00
85,000.00 8,500.00 1,275.00
1,000,000.00 100,000.00 15,000.00
25,000.00 2,500.00 375.00
15,000.00 1,500.00 225.00
500,000.00

150,000.00
500,000.00
650,000.00
1,000,000.00
1,500,000.00
2,500,000.00
ONGKOS PIKUL
HARGA SATUAN
9 10

- 196,000.00
- 171,000.00
- 145,000.00
- 145,000.00
- 145,000.00
- 145,000.00
- 145,000.00
- 145,000.00
- 75,000.00

75,000.00 7,255,000.00
1,687.50 106,600.00
100,000.00
1,687.50 106,600.00
3,000.00 290,200.00
2,917,000.00
7,180,000.00
1,851,300.00
313,600.00
278,000.00
217,100.00
- 200.00
- 300.00
- 196,800.00
- 255,700.00
- 255,700.00
2,300.00
2,300.00
12,200.00
6,600.00
1,500.00 75,500.00
30.00 1,600.00
2,100.00
600.00
500.00 11,000.00
500.00 11,000.00
500.00 11,000.00
500.00 11,000.00
24,300.00
21,000.00
5,600.00
7,900.00
64,700.00
33,500.00
63,600.00
17,900.00
27,900.00
33,500.00
16,800.00
22,300.00
24,600.00
39,100.00
61,400.00
25,100.00
16,800.00
13,400.00
250,900.00
106,000.00
25,100.00
75,900.00
25,100.00
200,700.00
117,100.00
250,900.00
6,700.00
19,600.00
14,000.00
3,900.00
3,400.00
50,200.00
39,100.00
5,600.00
5,600.00
25,100.00
21,200.00
21,200.00
140,500.00
50,200.00
133,800.00
5,600.00
669,000.00
111,500.00
180,300.00
80,300.00
11,200.00
27,900.00
27,900.00
11,200.00
234,200.00
16,800.00
24,600.00
13,400.00
5,600.00
1,672,500.00
100,400.00
39,100.00
39,100.00
9,000.00
41,300.00
606,600.00
4,500.00
78,100.00
16,800.00
5,600.00
83,700.00
8,400.00
4,200.00
87,000.00
53,000.00
66,900.00
87,000.00
20,100.00
27,900.00
25,700.00
16,800.00
16,800.00
7,300.00
16,800.00
5,600.00
55,800.00
2,800.00
1,200.00
100,350.00
94,775.00
1,115,000.00
27,875.00
16,725.00
500,000.00

150,000.00
500,000.00
650,000.00
1,000,000.00
1,500,000.00
2,500,000.00
J BIDANG PEKERJAAN UMUM
I UPAH KERJA
- Mandor Org/Hari
- Kepala Tukang Org/Hari
- Tukang Batu Org/Hari
- Tukang Kayu Org/Hari
- Tukang Besi Org/Hari
- Tukang Cat Org/Hari
- Pekerja Org/Hari
- Operator Org/Hari
- Supir Org/Hari
- Mekanik Org/Hari
- Pembantu (Mekanik, Operator, Supir) Org/Hari
- Buruh Lapangan Terlatih Org/Hari
- Buruh Lapangan Tidak Terlatih Org/Hari

II BAHAN BANGUNAN
1 BATU
- Batu Kali/Batu Belah M3
- Batu Bulat/Utuh M3
- Batu Pecah 5/7 cm M3
- Batu Pecah 3/5 cm M3
- Batu Pecah 2/3 cm (Stone Crusher) M3
- Batu Pecah 1/2 cm (Stone Crusher) M3
- Batu Karang M3
2 KERIKIL
- Kerikil Sungai/Pantai (Kerikil Cor) M3
- Kerikil Sungai/Pantai (Kerikil Kacang) M3
- Coral Sikat Kg

3 PASIR/TANAH
- Pasir Urug M3
- Pasir Pasangan M3
- Pasir Beton M3
- Sirtu M3
- Tanah Urug M3
- Tanah Hitam (Top Soil) Kg
4 BATU BATA
- Batu Bata Merah tebal 3 Cm Bh
- Batu Bata Merah tebal 5 Cm Bh
- Bata Ringan Bh

5 BATU KAPUR
- Kapur Api Kg

6 SEMEN
- Semen PC 50 Kg Zak
- Semen Putih 40 Kg Zak
- Semen Warna Kg

7 BATAKO CETAK
- Batako Bh
- Batako Cetak Kualitas I (Pres) 27x14x8 Bh
- Batako Cetak Kualitas I (Pres)25x12x6 Bh
- Konblock Bh
- Paving Block Bh
- Segi Enam Besar Warna (30 Bh/M2) Bh
- Segi Enam Besar Polos Bh
- Segi Empat Warna (50 Bh/M2) Bh
- Segi Empat Polos Bh
- Batu Angin Cetak 20 x 20 Bh
- Batu Angin Cetak 30 x 30 Bh
- Batu Angin Keramik 30 x 30 Bh

8 BAHAN ATAP
- Genteng Asbes Bh
- Bubungan Asbes M'
- Genteng Metal (ukuran 80x80) Bh
- Bubungan Genteng Metal M'
- Zink Gelombang BJLS 0.20 Lbr
- Zink Gelombang BJLS 0.25 Lbr
- Zink Gelombang BJLS 0.30 Lbr
- Zink Datar BJLS 0.20 Lbr
- Zink Datar BJLS 0.25 Lbr
- Zink Datar BJLS 0.30 Lbr
- Atap Transparan (Poli Carbonat) Lbr
- Atap Super duck Lbr

9 BAHAN KAYU
- Kayu Kls. I M³
- Kayu Kls. II M³
- Papan Kayu Kls. I M³
- Papan Kayu Kls. II M³
- Dolken Kayu Btg

10 BAHAN BETON
- Kanstein Beton 50 x40 x 15 Bh
- Buis Beton Dia. 0,50 m Bh
- Buis Beton Dia. 1 m Bh
- Pilar Pagar Beton Bh

11 BAHAN LANTAI
- Tegel Keramik
- Tegel Anti Slip 20/20 Dos
- Tegel Anti Slip 30/30 Dos
- Tegel Putih 20/20 Dos
- Tegel Warna 20/20 Dos
- Tegel Putih 30/30 Dos
- Tegel Warna 30/30 Dos
- Tegel Putih 40/40 Dos
- Tegel Warna 40/40 Dos
- Tegel Warna 60/60 Dos
- Tegel Warna 60/60 Setara Granito Tile Dos

12 BAHAN BESI
- Besi Beton Polos Kg
- Besi Beton Ulir Kg
- Baja WF Kg
- Bondeks m2
- Besi Siku 3 x 3 x 0.30 cm Staf
- Besi Siku 4 x 4 x 0.40 cm Staf
- Besi Siku 5 x 5 x 0.50 cm Staf
- Besi Siku 6 x 6 x 0.60 cm Staf
- Besi Plat (3" x 6") tbl. 1.2 mm Staf
- Besi Hollow 2 x 4 cm Staf
- Besi Hollow 4 x 4 cm Staf

13 PLAT ALUMUNIUM
- Ukuran 0.3 mm Lbr
- Ukuran 0.4 mm Lbr
- Ukuran 0.5 mm Lbr
- Ukuran 0.6 mm Lbr

14 KAWAT
- Ikat Beton (Bendrat) Kg
- Kawat Nyamuk Plastik (Kasa) M²
- Kawat Nyamuk M²
- Harmonika Jos M²
- Saringan Pasir (Ayakan) M²
- Kawat Duri Kg
- Kawat Bronjong 4 mm Kg
- Kawat Bronjong 3 mm Kg
- Kawat Angin/Ram M²
- Kawat Las Kg

15 BAHAN LANGIT-LANGIT
- Tripleks 4 mm uk. 120 x 240 cm Lbr
- Tripleks 6 mm uk. 120 x 240 cm Lbr
- Multipleks 9 mm Lbr
- List Plafond Kayu Berprofil 6 x 6 M'
- Play Wood 3 mm uk. 120 x 240 cm Lbr
- Teak Wood 120 x 240 mm Lbr
- Teak Wood 0.90 x 2.10 m Lbr
- Papan Lambersering 10 cm M'
- Plafond Plastik (25X600cm) lembar
- Kalsiboard M²
- Kalsiplank M²
16 BAHAN KACA
- Bening tbl. 3 mm M²
- Bening tbl. 5 mm M²
- Bening tbl. 10 mm M²
- Es/Kembang tbl. 3 mm M²
- Ray Band tbl. 3 mm M²
- Ray Band tbl. 5 mm M²
- Kaca Jendela Nako 4 Mata 5 mm Set
- Kaca Jendela Nako 5 Mata 5 mm Set
- Kaca Jendela Nako 4 Mata 6 mm Set
- Kaca Jendela Nako 4 Mata 7 mm Set
- Rangka Nako 7 Mata Bh
- Rangka Nako 5 Mata Bh

17 BAHAN LISTRIK
- Kabel NYM 2 x 11/2 mm M'
- Kabel NYM 3 x 11/2 mm M'
- Kabel NYM 3 x 2,5 mm M'
- Sekering 1 phase Bh
- Sekering 2 phase Bh
- Stop Kontak Bh
- Lampu Neon (Komplit) TL 10 watt Bh
- Lampu Neon (Komplit) TL 20 watt Bh
- Lampu Pijar 25 watt Bh
- Lampu Pijar 40 watt Bh
- Lampu Pijar 60 watt Bh
- Lampu TL Bulat 7 watt Bh
- Lampu TL Bulat 11 watt Bh
- Lampu TL Bulat 14 watt Bh
- Lampu TL Bulat 18 watt Bh
- Lampu TL Bulat 23 watt Bh
- Saklar Ganda Bh
- Saklar Tunggal Bh
- Vitting tempel Bh
- Vitting Down Light Kecil Bh
- Vitting Down Light Sedang Bh
- Vitting Down Light Besar Bh
- MCB 30 Amp Bh
- MCB 60 Amp Bh
- Pipa Conduit M'

18 BAHAN PENGGANTUNG/PENGUNCI
Kunci
- Kunci Tanam 2 Slaag Bh
- Kunci Tanam 2 Slaag Klas A Bh

Penggantung
- Kait Angin Kls A Psg
- Kait Angin Kls B Psg
- Engsel Pintu Kls A - 4'' Psg
- Engsel Pintu Kls B - 4'' Psg
- Engsel Jendela Kls A - 3" Psg
- Engsel Jendela Kls B - 3" Psg
- Grendel Pintu Kls A -3" Psg
- Grendel Pintu Kls B -3" Psg
- Grendel Jendela Kls A - 2" Psg
- Grendel Jendela Kls B - 2" Psg
- Kunci Gembok Besar Bh
- Kunci Gembok Sedang Bh
- Kunci Gembok Kecil Bh
- Baut 6 cm x 1/2" Kg
- Baut 10 cm x 1/2" Kg
- Baut 15 cm x 1/2" Kg

19 BAHAN SANITAIR
- Kloset Jongkok Unit
- Kloset Duduk Unit
- Wastafel Warna/Keramik Unit
- Tempat Cuci 1 Lubang Bh
- Tempat Cuci 2 Lubang Bh
- Urinoir KW 1 Unit
- Urinoir KW 2 Unit
- Shower Kls. A Unit
- Shower Kls. B Unit
- Shower Kloset Bh
- Floor Drain Besi Bh
- Floor Drain Plastik Bh
- Pompa Air (Biasa) Bh
- Pompa Air 100 -125 Watt Bh
- Pompa Air Bh
- Pompa Air 400 Watt Bh

20 BAHAN PAKU
- Ukuran 1 - 4 cm Kg
- Ukuran 5 - 12 cm Kg
- Paku Zink Kg
- Paku Campur Kg
- Paku Beton Kg
- Paku Tripleks Kg
- Paku Jembatan Kg
- Baut 1/2" Kg
- Paku Genteng Kg

21 BAHAN FINISHING
- Amplas Kayu/Besi Lbr
- Dumpul Kg
- Spitus Btl
- Minyak Cat Kg
- Politur Ltr
- Teak Oil Ltr
- Okir Kg
- Menie Kayu Kg
- Menie Besi Kg
- Cat Besi Kg
- Cat Dasar Tembok Kg
- Cat Dasar Kayu Kg
- Cat Kayu Kg
- Plamir Tembok Kg
- Cat Tembok Kls. A Kg
- Cat Tembok Kls. B Kg
- Adition Kg
- Cat Aquaproof Kg
- Lem Kayu Klg
- ACP M2
- HPL Lembar
- Cairan Damdex Liter
Selang
- Nipon 1/2" M'
- Nipon 1/4" M'
- Biasa 1/2" M'
Palu
- Besar 6 Kg Bh
- Sedang Bh
- Kecil Bh
22 BAHAN GYPSUM
- Jayaboard Standard RE 8 mm Lbr
- Jayaboard Standard RE 9 mm Lbr
- Jayaboard Standard RE 12 mm Lbr
- Jayaboard Standard RE 16 mm Lbr
- Jayaboard Wet Area RE 09 mm Lbr
- Jayaboard Wet Area RE 10 mm Lbr
- Jayaboard Wet Area RE 13 mm Lbr
- Jayaboard Wet Area Fire Stop RE 13 mm Lbr
- Jayaboard Wet Area Fire Stop RE 16 mm Lbr
- Jayaboard Fire Stop RE 13 mm Lbr
- Jayaboard Fire Stop RE 16 mm Lbr
- Jayabell Acoustic RE 12 mm Lbr
- Conice Compound @ 20 Kg Zak
- Joint Compound UB 20 @ 20 Kg Zak
- Joint Profil CA 15 @ 20 Kg Zak
- List Cast @ 20 Kg Zak
- Cotton Tape Roll
- Paper Tape 75 M' Roll
- Drywhell Skrew 1" 1000 pc Pack
- Drywhell Skrew 1,5" 1000 pc Pack
- Furring Chanel 45 mm Btg
- Top Cross Rail 45 mm Btg
- Angle 25 x 25 x 75 Btg
- Suspension Rod/Kawat Penggantung 4mm Btg
- Suspension Clips Rod Btg
- Primary to Secondary Conectors FC to TCR Type 210 Bh
- Paku Penggantung/Boustead Fastener Pack
- C'clamps Pack
- List Profil 7 cm Btg
- List Profil 12 cm Btg
- Hollow 2 cm x 4 cm x 0.30 mm (galvalium) Btg
- Hollow 4 cm x 4 cm x 0.30 mm (galvalium) Btg
- Hollow 2 cm x 4 cm x 0.35 mm (galvalium) Btg
- Hollow 4 cm x 4 cm x 0.35 mm (galvalium) Btg

23 BAHAN JALAN
- Aspal Minyak (Aspal Penetrasi 60/70) Kg
- Aspal Emulsi Kg
- Aspal Cair Kg
- Filler Kg
- Gravel M³
- Minyak Tanah Ltr
- Bensin Ltr
- Solar Ltr
- Tinner Ltr
- Minyak Pelumas (Olie) Ltr
- Cat Marka (Non Thermoplas) Kg
- Cat Marka (Thermoplastic) Kg
- Plastik Filler M²
- Pipa Galvanis dia. 3" Batang
- Pipa Porus M'
- Geotextile M²
- Bahan Agregat Base Kelas A M³
- Bahan Agregat Base Kelas B M³
- Bahan Agregat Base Kelas C M³
- Gebalan Rumput M²
- Chipping M³
- Glass Bead Kg
- Pelat Rambu (Eng. Grade) Bh
- Pelat Rambu (High I. Grade) Bh
- Rel Pengaman M'
- Pemantul Cahaya (Reflector) Bh
- Arbocell Kg
- Minyak Fluks Ltr
- Bunker Oil Ltr
- PCI Girder L = 17 m Bh
- PCI Girder L = 21 m Bh
- PCI Girder L = 26 m Bh
- PCI Girder L = 32 m Bh
- PCI Girder L = 36 m Bh
- PCI Girder L = 41 m Bh

24 BAHAN PIPA
- Pipa GIP Medium A dia. 6" Staf
- Pipa GIP Medium A dia. 4" Staf
- Pipa GIP Medium A dia. 3" Staf
- Pipa GIP Medium A dia. 2" Staf
- Pipa GIP Medium A dia. 2,5" Staf
- Pipa GIP Medium A dia. 1,5" Staf
- Pipa GIP Medium A dia. 1" Staf
- Pipa GIP Medium A dia. 1 1/4" Staf
- Pipa GIP Medium A dia. 1/2" Staf
- Pipa GIP Medium A dia. 3/4" Staf
- Pipa PVC dia. 6" Staf
- Pipa PVC dia. 4" Staf
- Pipa PVC dia. 3" Staf
- Pipa PVC dia. 2,5" Staf
- Pipa PVC dia. 2" Staf
- Pipa PVC dia. 1,5" Staf
- Pipa PVC dia. 1" Staf
- Pipa PVC dia. 1 1/4" Staf
- Pipa PVC dia. 1/2" Staf
- Pipa PVC dia. 3/4" Staf
- Knee GIP dia. 6" Bh
- Knee GIP dia. 4" Bh
- Knee GIP dia. 3" Bh
- Knee GIP dia. 2,5" Bh
- Knee GIP dia. 2" Bh
- Knee GIP dia. 1,5" Bh
- Knee GIP dia. 1" Bh
- Knee GIP dia. 3/4" Bh
- Knee GIP dia. 1/2" Bh
- Elbow/Bend GIP dia. 4" Bh
- Elbow/Bend GIP dia. 3" Bh
- Elbow/Bend GIP dia. 2,5" Bh
- Elbow/Bend GIP dia. 2" Bh
- Elbow/Bend GIP dia. 1,5" Bh
- Elbow/Bend GIP dia. 1" Bh
- Elbow/Bend GIP dia. 3/4" Bh
- Elbow/Bend GIP dia. 1/2" Bh
- Reducer GIP dia. 4" x 3" Bh
- Reducer GIP dia. 3" x 2" Bh
- Reducer GIP dia. 2 1/2" x2" Bh
- Reducer GIP dia. 2" x 1/2" Bh
- Reducer GIP dia. 2" x 1 1/4" Bh
- Reducer GIP dia. 2" x 1" Bh
- Reducer GIP dia. 1" x 3/4" Bh
- Reducer GIP dia. 3/4" x1/2" Bh
- Tee GIP dia. 4" x 4" Bh
- Tee GIP dia. 3" x 3" Bh
- Tee GIP dia. 2" x 2" Bh
- Tee GIP dia. 2" x 1 1/2" Bh
- Tee GIP dia. 2" x 1 1/4" Bh
- Tee GIP dia. 2" x 1" Bh
- Tee GIP dia. 2" x 3/4" Bh
- Tee GIP dia. 2" x 1/2" Bh
- Tee GIP dia. 1 1/2" x 1 1/2" Bh
- Tee GIP dia. 1 1/2" x 1 1/4" Bh
- Tee GIP dia. 1 1/2" x 1" Bh
- Tee GIP dia. 1 1/2" x 3/4" Bh
- Tee GIP dia. 1 1/2" x 1/2" Bh
- Tee GIP dia. 1 1/4" x 1 1/4" Bh
- Tee GIP dia. 1 1/4" x 1 1/2" Bh
- Tee GIP dia. 1 1/4" Bh
- Tee GIP dia. 1" x 1" Bh
- Tee GIP dia. 1" x 3/4" Bh
- Tee GIP dia. 1" x 1/2" Bh
- Tee GIP dia. 3/4" x 3/4" Bh
- Tee GIP dia. 3/4" x 1/2" Bh
- Tee GIP dia. 1/2" x 1/2" Bh
- Tee GIP dia. 1/2" Bh
- Socket GIP dia. 6" Bh
- Socket GIP dia. 4" Bh
- Socket GIP dia. 3" Bh
- Socket GIP dia. 2 1/2" Bh
- Socket GIP dia. 2" Bh
- Socket GIP dia. 1 1/2" Bh
- Socket GIP dia. 1 1/4" Bh
- Socket GIP dia. 1" Bh
- Socket GIP dia. 3/4" Bh
- Socket GIP dia. 1/2" Bh
- Stop Kran (Draft) dia. 4" (Kite) Bh
- Stop Kran (Draft) dia. 3" Bh
- Stop Kran (Draft) dia. 2 1/2" Bh
- Stop Kran (Draft) dia. 2" Bh
- Stop Kran (Draft) dia. 1 1/2" Bh
- Stop Kran (Draft) dia. 1 1/4" Bh
- Stop Kran (Draft) dia. 1" Bh
- Stop Kran (Draft) dia. 3/4" Bh
- Stop Kran (Draft) dia. 1/2" Bh
- Kran Biasa dia. 3/4" Bh
- Kran Biasa dia. 1/2" Bh
- Kran Handle dia. 3/4" Bh
- Kran Handle dia. 1/2" Bh
- Water Mur dia. 4" Bh
- Water Mur dia. 3" Bh
- Water Mur dia. 2 1/2" Bh
- Water Mur dia. 2" Bh
- Water Mur dia. 1 1/2" Bh
- Water Mur dia. 1 1/4" Bh
- Water Mur dia. 1" Bh
- Water Mur dia. 3/4" Bh
- Water Mur dia. 1/2" Bh
- Clamp Sadle GIP dia. 6" x 1/2" Bh
- Clamp Sadle GIP dia. 4" x 1/2" Bh
- Clamp Sadle GIP dia. 3" x 1/2" Bh
- Clamp Sadle GIP dia. 2" x 1/2" Bh
- Clamp Sadle GIP dia. 6" x 3/4" Bh
- Clamp Sadle GIP dia. 4" x 3/4" Bh
- Clamp Sadle GIP dia. 3" x 3/4" Bh
- Clamp Sadle GIP dia. 2" x 3/4" Bh
- Clamp Sadle GIP dia. 6" x 1" Bh
- Clamp Sadle GIP dia. 4" x 1" Bh
- Clamp Sadle GIP dia. 3" x 1" Bh
- Clamp Sadle GIP dia. 2" x 1" Bh
- Boch GIP dia. 100 mm x 90 derjt Bh
- Boch GIP dia. 75 mm x 90 derjt Bh
- Boch GIP dia. 75 mm x 45 derjt Bh
- Boch GIP dia. 12.5 mm Bh
- Nepel dia. 100 mm Bh
- Nepel dia. 75 mm Bh
- Nepel dia. 50 mm Bh
- Nepel dia. 40 mm Bh
- Nepel dia. 25 mm Bh
- Nepel dia. 20 mm Bh
- Nepel dia. 12,5 mm Bh
- Doop dia. 150 mm Bh
- Doop dia. 100 mm Bh
- Doop dia. 75 mm Bh
- Doop dia. 50 mm Bh
- Doop dia. 40 mm Bh
- Doop dia. 25 mm Bh
- Doop dia. 20 mm Bh
- Doop dia. 12,5 mm Bh
- Gilbaut Joint GIP dia. 150 mm Bh
- Gilbaut Joint GIP dia. 100 mm Bh
- Gilbaut Joint GIP dia. 75 mm Bh
- Gilbaut Joint GIP dia. 50 mm Bh
- Gilbaut Joint GIP dia. 40 mm Bh
- Gilbaut Joint GIP dia. 25 mm Bh
- Gilbaut Joint GIP dia. 20 mm Bh
- Gilbaut Joint GIP dia. 12,5 mm Bh
- Gate Valve Flange dia. 150 mm Bh
- Gate Valve Flange dia. 100 mm Bh
- Gate Valve Flange dia. 75 mm Bh
- Gate Valve Flange dia. 50 mm Bh
- Gate Valve Flange dia. 40 mm Bh
- Gate Valve Flange dia. 25 mm Bh
- Gate Valve Flange dia. 20 mm Bh
- Gate Valve Flange dia. 12,5 mm Bh
- Over Sock GIP dia. 4" x 3" Bh
- Over Sock GIP dia. 3" x 2" Bh
- Over Sock GIP dia. 2" x 1,5" Bh
- Over Sock GIP dia. 1,5" x 3/4" Bh
- Over Sock GIP dia. 1" x 3/4" Bh
- Flange dia. 6" Bh
- Flange dia. 4" Bh
- Flange dia. 3" Bh
- Flange dia. 2,5" Bh
- Flange dia. 2" Bh
- Flange dia. 1,5" Bh
- Flange dia. 1" Bh
- Stop Kran Kitz dia. 6" (Putar) Bh
- Stop Kran Kitz dia. 4" (Putar) Bh
- Stop Kran Kitz dia. 3" (Putar) Bh
- Stop Kran Kitz dia. 2,5" (Putar) Bh
- Stop Kran Kitz dia. 2" (Putar) Bh
- Stop Kran Kitz dia. 1,5" (Putar) Bh
- Stop Kran Kitz dia. 1,25" (Putar) Bh
- Stop Kran Kitz dia. 1" (Putar) Bh
- Stop Kran Kitz dia. 3/4" (Putar) Bh
- Stop Kran Kitz dia. 1/2" (Putar) Bh
- Stop Kran Kitz dia. 6" (Handle) Bh
- Stop Kran Kitz dia. 4" (Handle) Bh
- Stop Kran Kitz dia. 3" (Handle) Bh
- Stop Kran Kitz dia. 2,5" (Handle) Bh
- Stop Kran Kitz dia. 2" (Handle) Bh
- Stop Kran Kitz dia. 1,5" (Handle) Bh
- Stop Kran Kitz dia. 1,25" (Handle) Bh
- Stop Kran Kitz dia. 1" (Handle) Bh
- Stop Kran Kitz dia. 3/4" (Handle) Bh
- Stop Kran Kitz dia. 1/2" (Handle) Bh
- Atao Kran dia. 3/4" (Onda) Bh
- Atao Kran dia. 1/2" (Onda) Bh
- Pipa Hawa GIP dia. 2 Bh

25 BAHAN LAMPU JALAN DAN ARMATURE


- Kap Lampu Jalan Oziwa Buah
- Kap Lampu Jalan Zetalux Buah
- Stang Lampu Æ 1,5" (1.5 m) Buah
- Balon Mercury Son 250 Watt Buah
- Balon Mercury Son T 250 Watt Buah
- Balon Mercury Son 220 Watt (Non Ignitor) Buah
- Balon Mercury HPL-N 250 Watt Buah
- Balon Mercury ML 250 Watt Buah
- Balon Visicom 75 Watt Buah
- Lampu Solar Cell 80 Watt Buah
- Solar Panel 240 Wp Buah
- Controler Tenaga Surya 24V 10 A Buah
- Baterai Solar Cell 12V 120 Ah Buah
- Kabel MCA Konektor Buah
- LED CL RL-2 100 Watt (Bridgelux Chip) Buah
- Travo BSN 250 Watt Buah
- Travo BHL 250 Watt Buah
- Travo BHL 400 Watt Buah
- Lampu Selang Meter
- Lampu Meteor Buah
- Ignitor Buah
- Capasitor Buah

a. MATERIAL/BAHAN PANEL
- Box Panel uk. 40 x 60 (Indoor) Buah
- Box Panel uk. 30 x 40 (Indoor) Buah
- Magnetic Contactor 80 A Buah
- Magnetic Contactor 50 A Buah
- Magnetic Contactor 35 A Buah
- Timer Switch Panasonic Buah
- Timer Switch Theben Buah
- MCB 2 Ampere Buah
- MCB 4 Ampere Buah
- MCB 35 Ampere (3 Phase) Buah
- MCB 35 Ampere Buah
- MCB 50 Ampere (3 Phase) Buah
- MCB 50 Ampere Buah
- MCB 63 Ampere (3 Phase) Buah
- MCB 63 Ampere Buah
- MCB 80 Ampere (3 Phase) Buah
- MCB 80 Ampere Buah

b. KABEL JARINGAN
- NYM 2 x 2.5 mm (Eterna) Meter
- NYM 2 x 4 mm (Eterna) Meter
- NYM 2 x 6 mm (Eterna) Meter
- NYM 2 x 10 mm (Eterna) Meter
- NYM 3 x 2.5 mm (Eterna) Meter
- NYM 3 x 4 mm (Eterna) Meter
- NYM 3 x 6 mm (Eterna) Meter
- NYM 3 x 10 mm (Eterna) Meter
- NYM 4 x 2.5 mm (Eterna) Meter
- NYM 4 x 4 mm (Eterna) Meter
- NYM 4 x 6 mm (Eterna) Meter
- NYM 4 x 10 mm (Eterna) Meter
- NYM 2 x 2.5 mm Meter
- NYM 2 x 4 mm Meter
- NYM 2 x 6 mm Meter
- NYM 2 x 10 mm Meter
- NYM 3 x 2.5 mm Meter
- NYM 3 x 4 mm Meter
- NYM 3 x 6 mm Meter
- NYM 3 x 10 mm Meter
- NYM 4 x 2.5 mm Meter
- NYM 4 x 4 mm Meter
- NYM 4 x 6 mm Meter
- NYM 4 x 10 mm Meter
- NGA 1.5 mm Meter
- NGA 2.5 mm Meter
- NGA 4 mm Meter
- NGA 6 mm Meter
- NGA 10 mm Meter
- NYY 2 x 4 mm Meter
- NYY 3 x 4 mm Meter
- NYY 4 x 4 mm Meter
- NYY 2 x 6 mm Meter
- NYY 3 x 6 mm Meter
- NYY 4 x 6 mm Meter
- NYY 2 x 10 mm Meter
- NYY 3 x 10 mm Meter
- NYY 4 x 10 mm Meter
- Tuistek 2 x 10 mm Meter
- Tuistek 2 x 16 mm Meter
- Tuistek 4 x 16 mm Meter

c. TIANG LAMPU
- Tiang PJU Type ISP Lengan Tunggal Oct. 9 M Buah
- Tiang PJU Type ISP Lengan Ganda Oct. 9 M Buah
- Tiang Galvanis 12 M Buah
- Tiang PJU Solar Cell Type ISA 9 M Oct Buah
- Tiang Listrik Besi 9 M Buah
- Tiang Listrik Besi 11 M Buah
- Tiang Listrik Besi 13 M Buah

d. KLEM BEUGEL
- Klem Beugel 3 x 1.5 " Pasang
- Klem Beugel 4 x 1.5 " Pasang
- Klem Beugel 4 x 1.5 " Pasang
- Klem Beugel 4 x 1.5 " Pasang
- Beugel 3 " Pasang
- Beugel 4 " Pasang
- Beugel 5 " Pasang
- Beugel 6 " Pasang

e. PIPA JARINGAN
- Pipa GIP Medium A Ø1 " Staf
- Pipa GIP Medium A Ø1.5 " Staf
- Pipa PVC Ø1 " Staf
- Pipa PVC Ø1.5 " Staf
- Pipa Listrik PVC 5/8" x 4 m M'

f. LAIN-LAIN
- Fotocell Buah
- Isolasi Listrik Roll
- Klem Kabel No. 9 Dos
- Klem Kabel No. 10 Dos
- Klem Kabel No. 12 Dos
- Klem Kabel No. 14 Dos
- Afta Klem 10 mm Buah
- Afta Klem 16 mm Buah
- SCW Strick Kabel 10 mm Buah
- SCW Strick Kabel 16 mm Buah
- Socket Automat Lampu Selang Buah
- T Dos Buah
- Dora Dos 3/4 Buah
- Dora Dos 5/8 Buah
- Automatic Timer Solenoid 1 " Buah
- Automatic Timer Solenoid 1 1/2" Buah
- Automatic Timer Solenoid 2 " Buah
- Automatic Timer Hunter 9 Sim Buah
- Penangkal Petir (Terpasang) Set
26 RANGKA BAJA RINGAN
- Kap 0,65 mm Btg
- Kap 0,75 mm Btg
- Reng 32 (Kecil) Btg
- Reng 34 (Besar) Btg
- Skrup Reng Bh
- Skrup Baja Bh
- Pemasangan Rangka Atap Lengkap M²

27 PINTU DAN PAGAR


- Rangka Pintu Almunium +Asesoris M2
- Rangka Jendela Almunium + Asesoris M2
- Pagar BRC Dia. 8 mm T=1.75 M', P=2.4 M' Bh
196,000
171,000
145,000
145,000
145,000
145,000
75,000
150,000
150,000
150,000
85,000
75,000
65,000

178,000
178,000
235,000
275,000
660,000
660,000
178,000

235,000
250,000
9,000

140,000
200,000
200,000
150,000
120,000
1,200
1,200
1,800
13,000

9,000

67,000
135,000
16,000

2,500
2,500
2,000
3,000

3,200
3,100
4,000
3,000
10,000
20,000
65,000

42,500
37,000
55,000
77,500
47,500
60,000
70,000
50,000
65,000
72,500
1,850,000
50,000

7,000,000
2,800,000
7,000,000
2,800,000
20,000

85,000
150,000
300,000
75,000

75,000
85,000
70,000
75,000
70,000
82,500
75,000
110,000
290,000
385,000

13,000
14,000
17,500
132,250
125,000
175,000
275,000
375,000
375,000
125,000
150,000

100,000
125,000
145,000
165,000

25,000
38,000
30,000
38,000
38,000
85,000
30,000
30,000
30,000
45,000

80,000
105,000
165,000
35,000
105,000
125,000
95,000
30,000
240,000
72,000
75,000
160,000
210,000
650,000
230,000
190,000
200,000
120,000
150,000
100,000
105,000
100,000
80,000

9,000
15,000
15,000
45,000
70,000
23,000
55,000
92,500
10,500
11,000
11,750
38,500
29,000
45,000
47,500
60,000
25,000
18,000
15,000
47,500
55,000
95,000
57,500
155,000
3,750

250,000
450,000

100,000
30,000
180,000
45,000
125,000
30,000
75,000
43,000
27,500
10,000
160,000
75,000
60,000
30,000
30,000
30,000

275,000
1,475,000
1,125,000
400,000
950,000
1,850,000
1,750,000
375,000
295,000
215,000
150,000
25,000
650,000
1,350,000
1,950,000
3,200,000

25,000
20,000
35,000
22,000
60,000
27,500
25,000
30,000
30,000

6,000
38,000
37,000
33,000
60,000
47,500
45,000
30,000
60,000
95,000
150,000
39,000
79,000
46,500
265,000
155,000
50,000
65,000
160,000
350,000
250,000
53,000

6,500
8,000
5,000

375,000
150,000
50,000

78,000
87,000
125,000
144,000
148,200
155,400
208,200
314,400
364,200
202,800
214,800
349,200
110,000
100,000
100,000
63,000
20,000
31,500
53,000
85,000
61,950
43,575
7,875
17,850
2,100
2,100
163,800
306,600
40,000
55,000
67,500
85,000
104,000
145,000

12,500
13,500
13,500
2,000
280,000
8,934
8,313
10,420
23,000
36,000
100,000
175,000
75,000
925,000
24,000
25,000
350,000
325,000
300,000
30,000
325,500
245,500
345,500
385,500
475,500
56,500
33,000
133,000
48,000
87,500
97,500
125,500
158,000
169,500
193,500

2,305,000
1,360,000
925,000
575,000
825,000
465,000
375,000
375,000
170,000
225,000
901,000
475,000
250,000
142,000
130,000
79,000
44,000
61,000
44,000
58,000
490,000
140,000
95,000
75,000
37,500
27,500
17,000
11,000
10,500
352,500
180,000
115,000
80,000
37,500
25,000
20,000
15,000
225,000
107,500
78,000
39,500
45,000
29,250
18,500
16,500
225,500
112,500
45,000
61,500
60,000
52,500
48,000
46,000
30,500
46,500
39,000
38,000
36,000
23,500
46,500
22,500
16,500
25,500
23,500
16,000
18,000
12,000
9,000
265,000
112,500
70,000
50,000
35,000
22,500
18,500
15,000
12,000
10,000
2,450,000
1,350,000
1,125,000
450,000
285,000
235,000
150,000
95,000
65,500
40,000
22,500
35,000
25,000
300,000
150,000
120,500
65,000
55,000
35,000
28,000
25,000
27,250
75,500
65,500
55,500
45,000
85,500
65,000
55,000
45,000
76,000
60,000
50,000
36,000
345,000
170,000
95,000
86,000
89,000
65,000
46,000
36,000
14,000
13,000
11,000
250,000
85,000
53,000
28,000
17,500
13,500
8,000
8,000
325,000
180,000
135,000
95,000
85,000
70,000
70,000
50,000
2,200,000
1,800,000
1,050,000
855,000
1,500,000
495,000
405,000
315,000
15,000
99,000
46,500
23,500
18,000
140,000
80,000
65,000
60,000
45,000
42,500
42,500
1,500,000
1,850,000
1,500,000
1,000,000
340,000
260,000
200,000
169,000
112,500
100,000
-
2,900,000
1,600,000
1,200,000
480,000
300,000
220,000
135,000
90,000
80,000
35,000
25,000
47,500

600,000
950,000
125,000
375,000
275,000
365,000
300,000
95,000
375,000
4,387,500
6,187,500
1,350,000
4,275,000
1,000,000
5,760,000
285,000
265,000
320,000
20,000
85,000
95,000
95,000
660,000
570,000
825,000
800,000
750,000
550,000
450,000
65,000
65,000
375,000
325,000
580,000
200,000
675,000
210,000
795,000
197,500

13,000
17,500
35,000
37,000
15,000
25,000
38,500
45,000
17,500
37,500
46,500
80,000
11,000
25,000
30,000
35,500
25,000
28,000
40,000
46,500
17,500
28,000
46,500
80,000
3,000
5,000
6,500
13,000
18,500
35,500
32,000
35,500
34,500
40,000
46,500
53,000
61,000
80,000
53,000
15,000
25,000

4,880,000
5,100,000
6,400,000
5,400,000
4,200,000
4,250,000
4,450,000

60,000
75,000
85,000
95,000
50,000
60,000
70,000
80,000

300,000
425,000
420,000
75,000
10,000

150,000
15,000
17,500
20,000
25,000
30,000
25,000
25,000
25,000
12,500
55,000
6,500
57,500
55,000
540,000
1,200,000
2,150,000
3,750,000
85,000

109,825
125,500
55,000
5,500
2,000
2,500
345,000

862,500
190,900
1,485,000
REKAPITULASI

PEKERJAAN : PEMBANGUNAN HALTE 3 X 5


LOKASI : DESA GALALA
DESA : DESA GALALA
TAHUN ANGGARAN : 2019

Jumlah Harga
No. Jenis Pekerjaan
(Rp.)

A PEKERJAAN PERSIAPAN/UMUM 3,400,0

B PEMBANGUNAN HALTE 3 X 5 59,383,1

C ALAT 1,395,0

D HONOR 1,150,0

E PEKERJAAN AKHIR 2,250,0

NILAI KONSTRUKSI 67,578,1


JUMLAH NILAI KONSTRUKSI 67,578,1
DIBULATKAN 67,578,0

TERBILANG : Enam Puluh Tujuh Juta Lima Ratus Tujuh Puluh Delapan Ribu Rupiah

DISETUJUI OLEH DIBUAT OLEH


PEJABAT KEPALA DESA KAUR PERENCANAAN

Marthen Joseph Ricky Manuel,S.STP.MT


NIP .…………………………………………
REKAPITULASI

Jumlah Harga
(Rp.)

3,400,000.00

59,383,189.32

1,395,000.00

1,150,000.00

2,250,000.00

67,578,189.32
67,578,189.32
67,578,000.00

Juta Lima Ratus Tujuh Puluh Delapan Ribu Rupiah

DIBUAT OLEH
KAUR PERENCANAAN

Ricky Manuel,S.STP.MT
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN HALTE 3 X 5


LOKASI : DESA GALALA
DESA : DESA GALALA
TAHUN ANGGARAN : 2019

NO. JENIS PEKERJAAN TEM SATUAN

A PEKERJAAN PERSIAPAN/UMUM
1 Papan Nama Proyek BR-9 Ls
2 Pembersihan Awal dan Pembongkaran BR-20 Hok
3 Biaya Perencanaan BR-13 Ls

B PEMBANGUNAN HALTE 3 X 5
I Pekerjaan Tanah
1 Galian Tanah Pondasi Plat A.2.3.1.1. M3

II Pekerjaan Pasangan
1 Dinding Batako Uk. 8 x 15 x 25 cm, ad. 1 pc : 4 psr (tbl. 1/2 bata) A.4.4.1.9. M2
2 Plesteran Dinding ad. 1 pc : 4 psr A.4.4.2.4. M2
3 Rabat Beton Lantai A.A.4.1.4 M2
4 Acian Dinding & Beton A.4.4.2.27 M2
III Pekerjaan Pasangan
1 Pondasi Telapak 70 x 70 A.4.1.1.5 M3
Bekesting A.4.1.1.22 M2
Besi Tulangan 12 Mod. 2007 6.17.1 Kg
Besi Begel 10 Mod. 2007 6.17.2 Kg
Besi Begel 8 Mod. 2007 6.17.3 Kg
2 Kolom 25 x 25 A.4.1.1.5 M3
Bekesting A.4.1.1.22 M2
Besi Tulangan 12 Mod. 2007 6.17.1 Kg
Besi Begel 8 Mod. 2007 6.17.3 Kg
2 Kolom 20 x 20 A.4.1.1.5 M3
Bekesting A.4.1.1.22 M2
Besi Tulangan 12 Mod. 2007 6.17.1 Kg
Besi Begel 8 Mod. 2007 6.17.3 Kg
3 Balok 20 x 25 A.4.1.1.5 M3
Bekesting A.4.1.1.23 M2
Besi Tulangan 12 Mod. 2007 6.17.1 Kg
Besi Begel 8 Mod. 2007 6.17.3 Kg
4 Ring Balk 15 x 20 A.4.1.1.5 M3
Bekesting A.4.1.1.23 M2
Besi Tulangan 12 Mod. 2007 6.17.1 Kg
Besi Begel 8 Mod. 2007 6.17.3 Kg
5 Plat Lantai A.4.1.1.5 M3
Bekesting A.4.1.1.20 M2
Besi Tulangan 10 Mod. 2007 6.17.1 Kg

IV PEKERJAAN KAYU, ATAP & PLAFOND


1 Kuda-Kuda Kap A.4.6.1.14. M3
2 Gording A.4.6.1.14.1 M3
3 Atap Zeng Gelombang Modif SNI A.4.5.2.31. M2
4 Nok/Bubungan Zeng Gelombang A.4.5.2.39 M'
5 Pemasangan Lisplank Papan 3/20 A.4.6.1.22 M'
6 Rangka Langit - Langit (60 x 60) cm, Kayu Kls II A.4.6.1.20 M2
7 Plafond Tripleks ukuran (60x120) tbl 4 mm A.4.5.1.5. M2
8 List Langit - Langit Kayu Profil 5 cm A.4.5.1.9. M'

VII PEKERJAAN LANTAI KERAMIK & PENGECATAN


1 Lantai Tegel Keramik Warna 40/40 cm A.4.4.3.4. M2
2 Cat Dinding & Beton dengan (2x + Cat Dasar 1x) A.4.7.1.10 M2
3 Cat Plafond dengan (2x + Cat Dasar 1x) A.4.7.1.4. M2

C ALAT
1 Pakuel BR-1 Bh
2 Skop BR-2 Bh
3 Benang Tukang BR-3 Tukal
4 Gerobak Dorong BR-4 Bh
5 Martil BR-5 Bh
6 Selang BR-6 M'
7 Ember Cor BR-7 Bh
8 Gergaji BR-8 M'

D HONOR
1 Insentif TPK BR-11 Ls

E PEKERJAAN AKHIR
1 Prasasti BR-10 Ls
2 Pembersihan Akhir BR-21 Hok
3 Administrasi + Dokumentasi selama proyek berjalan BR-12 Ls
NGGARAN BIAYA (RAB)

HARGA JUMLAH HARGA


VOLUME SATUAN
(Rp.) (Rp.)

1.00 150,000.00 150,000.00


10.00 75,000.00 750,000.00
1.00 2,500,000.00 2,500,000.00
Jumlah 3,400,000.00

9.36 61,150.00 572,364.00


Jumlah 572,364.00

27.96 127,204.00 3,556,623.84


55.92 66,411.00 3,713,703.12
1.30 1,108,880.00 1,441,544.00
55.92 38,370.00 2,145,650.40
Jumlah 10,857,521.36
1.01 1,360,981.00 1,372,889.58
5.00 329,542.00 1,647,710.00
6.57 136,256.00 895,453.42
2.84 136,256.00 387,394.34
2.25 136,256.00 306,878.24
0.75 1,360,981.00 1,020,735.75
5.00 329,542.00 1,647,710.00
17.99 136,256.00 2,451,355.83
8.41 136,256.00 1,146,190.23
0.75 1,360,981.00 1,020,735.75
3.00 329,542.00 988,626.00
5.93 136,256.00 807,808.81
5.29 136,256.00 721,242.15
0.57 1,360,981.00 775,759.17
5.00 338,293.00 1,691,465.00
11.08 136,256.00 1,509,493.71
4.80 136,256.00 654,464.82
0.95 1,360,981.00 1,292,931.95
5.00 338,293.00 1,691,465.00
7.39 136,256.00 1,006,329.14
3.49 136,256.00 475,974.41
1.80 1,360,981.00 2,449,765.80
5.00 167,214.00 836,070.00
27.35 136,256.00 3,727,203.11
Jumlah 30,525,652.22

0.24 6,309,320.00 1,494,823.33


0.18 ### 1,985,736.70
35.84 131,714.00 4,720,629.76
6.40 223,958.00 1,433,331.20
18.80 120,940.00 2,273,672.00
15.00 118,437.10 1,776,556.50
15.00 48,576.00 728,640.00
16.00 36,068.00 577,088.00
Jumlah 14,990,477.49

5.74 155,441.00 892,231.34


55.92 17,866.20 999,077.90
15.00 36,391.00 545,865.00
Jumlah 2,437,174.24
TOTAL 59,383,189.32

1.00 90,000.00 90,000.00


3.00 85,000.00 255,000.00
5.00 10,000.00 50,000.00
1.00 500,000.00 500,000.00
2.00 50,000.00 100,000.00
10.00 15,000.00 150,000.00
10.00 15,000.00 150,000.00
2.00 50,000.00 100,000.00
Total Jumlah I 1,395,000.00

1.00 1,150,000.00 1,150,000.00


Jumlah 1,150,000.00

1.00 500,000.00 500,000.00


10.00 75,000.00 750,000.00
1.00 1,000,000.00 1,000,000.00
Jumlah 2,250,000.00
RINCIAN ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN HALTE 3 X 5


LOKASI : DESA GALALA
DESA : DESA GALALA
TAHUN ANGGARAN : 2019

HARGA
NO. URAIAN SATUAN
(Rp.)

A UPAH
1 Mandor OH 196,000.00
2 Kepala Tukang OH 171,000.00
3 Tukang Batu OH 145,000.00
4 Tukang Kayu OH 145,000.00
5 Pekerja OH 75,000.00

B BAHAN
1 Batu Bata Bh 2,300.00
2 Batako Bh 2,300.00
3 Batu Kerikil Pecah ( 3 / 2 cm ) M3 313,600.00
4 Batu Krikil (Kg) Kg 300.00
5 Pasir Pasang M3 278,000.00
6 Pasir Beton Kg 200.00
7 Besi Strip Kg 6,500.00
8 Semen PC (Zak) Sak 75,500.00
9 Semen PC (Kg) Kg 1,600.00
10 Sement Warna Kg 2,100.00
11 Air Liter 600.00
12 Besi Dia 12 mm Standart Staff 11,000.00
13 Besi Dia 10 mm Standart Staff 11,000.00
14 Besi Dia 8 mm Standart Staff 11,000.00
15 Cat Dasar Tembok Kg 27,900.00
16 Cat Tembok Kg 27,900.00
17 Cat Meni Besi Kg 30,000.00
18 Cat Kayu Kg 57,000.00
19 Plamir Kg 16,000.00
20 Politur Liter 25,000.00
21 Menie Kayu Kg 30,000.00
22 Dumpul Kayu Kg 15,000.00
23 Dolken Kayu Galam Batang 22,300.00
24 Kayu Klas I M3 7,255,000.00
25 Kayu Klas II M3 2,917,000.00
26 Papan Kayu Kls I M3 7,180,000.00
27 Papan Kayu Kls III M3 1,851,300.00
28 Lis plafon Profil 6 x 6 cm M' 22,500.00
29 Tripleks 4 mm Lbr 68,000.00
30 Kawat Ikat Kg 22,500.00
31 Tegel Keramik 40/40 Bh 12,500.00
32 Minyak Bakesting Liter 5,600.00
33 Paku / Skrup Genteng Kg 25,100.00
34 Paku Campuran Kg 21,200.00
35 Paku Triplek Kg 21,200.00
36 Atap Spandek Lbr 180,300.00
37 Seng Licin M 80,300.00
38 Play Wood 3 mm uk. 120 x 240 cm Lbr 140,500.00

C ALAT
1 Pakuel Bh 90,000.00
2 Skop Bh 85,000.00
3 Benang Tukang Tukal 10,000.00
4 Gerobak Dorong Bh 500,000.00
5 Martil Bh 50,000.00
6 Selang M' 15,000.00
7 Ember Cor Bh 15,000.00
8 Gergaji Bh 50,000.00

D OPERASIONAL DAN BIAYA LAIN-LAIN


1 Papan Nama Proyek Bh 150,000.00
2 Prasasti Bh 500,000.00
3 Honor TPK Ls 1,150,000.00
4 Administrasi + Dokumentasi Ls 1,000,000.00
5 ShopDrwaing Ls 2,500,000.00
N ANGGARAN BIAYA

JUMLAH
VOLUME
(Rp.)

5.30 1,038,800.00
5.90 1,008,900.00
47.30 6,858,500.00
20.80 3,016,000.00
130.20 9,765,000.00
TOTAL II 21,687,200.00
- -
- -
671.00 1,543,300.00
- -
7,437.80 2,231,340.00
2.80 778,400.00
5,229.40 1,045,880.00
6.20 40,300.00
- -
3,369.90 5,391,840.00
7.50 15,750.00
1,513.20 907,920.00
801.30 8,814,300.00
29.90 328,900.00
254.70 2,801,700.00
10.10 281,790.00
6.70 186,930.00
- -
3.90 222,300.00
2.30 36,800.00
- -
5.60 168,000.00
- -
46.00 1,025,800.00
0.20 1,451,000.00
0.90 2,625,300.00
0.20 1,436,000.00
1.10 2,036,430.00
16.80 378,000.00
5.60 380,800.00
15.50 348,750.00
38.10 476,250.00
5.10 28,560.00
- -
18.70 396,440.00
0.50 10,600.00
14.00 2,524,200.00
1.90 152,570.00
8.10 1,138,050.00
TOTAL II 39,204,200.00
- -
1.00 90,000.00
3.00 255,000.00
5.00 50,000.00
1.00 500,000.00
2.00 100,000.00
10.00 150,000.00
10.00 150,000.00
2.00 100,000.00
TOTAL III 1,395,000.00
- -
1.00 150,000.00
1.00 500,000.00
1.00 1,150,000.00
1.00 1,000,000.00
1.00 2,500,000.00
TOTAL IV 5,300,000.00
GRAND TOTAL 67,586,400.00
ANALISA

HARGA SATUAN
No. Uraian Kegiatan
(Rp.)

A.2.2.1.9 Pembersihan 1 m² lapangan & perataan


0.100 OH Pekerja 75,000.00
0.050 OH Mandor 196,000.00
A.2.2.1.4 Pengukuran 1 m' & pemasangan 1 m’ bouwplank
0.100 OH Pekerja 75,000.00
0.100 OH Tukang Kayu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
0.012 M3 Kayu Klas II 2,917,000.00
0.020 Kg Paku Campuran 21,200.00
0.007 M3 Kayu Klas II 2,917,000.00
A.2.2.1.7 Pembuatan 1 m² gudang semen & peralatan
0.100 OH Pekerja 75,000.00
0.100 OH Tukang Kayu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
1.700 Batang Dolken Kayu Galam 22,300.00
0.210 M3 Kayu Klas II 2,917,000.00
0.300 Kg Paku Campuran 21,200.00
10.500 Kg Semen PC (Kg) 1,600.00
0.030 M3 Pasir Pasang 278,000.00
0.050 M3 Batu Kerikil Pecah ( 3 / 2 cm ) 313,600.00
1.500 Lbr Atap Spandek 180,300.00
0.250 Lbr Seng Licin 80,300.00
A.2.3.1.1. Penggalian 1M³ Tanah biasa sedalam 1 m
0.750 OH Pekerja 75,000.00
0.025 OH Mandor 196,000.00
A.2.3.1.9. Pengurungan kembali 1 M³ galian tanah
0.500 OH Pekerja 75,000.00
0.050 OH Mandor 196,000.00
A.2.3.1.14 Pengurugan 1 m3 Tanah Timbunan
0.250 OH Pekerja 75,000.00
0.025 OH Mandor 196,000.00
1.200 M3 Tanah Timbunan 196,800.00
A.2.3.1.11. Pengurungan 1M³ dengan pasir urug
0.300 OH Pekerja 75,000.00
0.010 OH Mandor 196,000.00
1.200 M3 Pasir Urug 217,100.00
A.3.2.1.9. Pemasangan 1M³ batu kosong ( anstamping )
0.780 OH Pekerja 75,000.00
0.390 OH Tukang Kayu 145,000.00
0.039 OH Kepala Tukang 171,000.00
0.039 OH Mandor 196,000.00
1.200 M3 Batu Kali 255,700.00
0.432 M3 Pasir Urug 217,100.00
A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 4 PP
1.500 OH Pekerja 75,000.00
0.750 OH Tukang Kayu 145,000.00
0.075 OH Kepala Tukang 171,000.00
0.075 OH Mandor 196,000.00
1.200 M3 Batu Kali 255,700.00
163.000 Kg Semen PC (Kg) 1,600.00
0.520 M3 Pasir Pasang 278,000.00
A.A.4.1.4 Pembuatan 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), sl
1.200 OH Pekerja 75,000.00
0.200 OH Tukang Kayu 145,000.00
0.020 OH Kepala Tukang 171,000.00
0.060 OH Mandor 196,000.00
230.000 Kg Semen PC (Kg) 1,600.00
893.000 Kg Pasir Beton 200.00
1,027.00 Kg Batu Krikil (Kg) 300.00
200.000 Liter Air 600.00
Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c
1.650 OH Pekerja 75,000.00
0.275 OH Tukang Kayu 145,000.00
0.028 OH Kepala Tukang 171,000.00
0.083 OH Mandor 196,000.00
371.000 Kg Semen PC (Kg) 1,600.00
698.000 Kg Pasir Beton 200.00
1,047.00 Kg Batu Krikil (Kg) 300.00
215.000 Liter Air 600.00
A.4.1.1.20 Pemasangan 1 M² Bekisting Untuk Pondasi
0.520 OH Pekerja 75,000.00
0.260 OH Tukang Kayu 145,000.00
0.026 OH Kepala Tukang 171,000.00
0.026 OH Mandor 196,000.00
0.040 M3 Papan Kayu Kls III 1,851,300.00
0.300 Kg Paku Campuran 21,200.00
0.100 Liter Minyak Bakesting 5,600.00
A.4.1.1.21 Pemasangan 1 M² Bekisting Untuk Sloof
0.520 OH Pekerja 75,000.00
0.260 OH Tukang Kayu 145,000.00
0.026 OH Kepala Tukang 171,000.00
0.026 OH Mandor 196,000.00
0.045 M3 Papan Kayu Kls III 1,851,300.00
0.300 Kg Paku Campuran 21,200.00
0.100 Liter Minyak Bakesting 5,600.00
A.4.1.1.22 Pemasangan 1 M² Bekisting Untuk Kolom
0.660 OH Pekerja 75,000.00
0.330 OH Tukang Kayu 145,000.00
0.030 OH Kepala Tukang 171,000.00
0.030 OH Mandor 196,000.00
0.040 M3 Papan Kayu Kls III 1,851,300.00
0.400 Kg Paku Campuran 21,200.00
0.200 Liter Minyak Bakesting 5,600.00
0.015 M3 Kayu Klas II 2,917,000.00
0.350 Lbr Play Wood 3 mm uk. 120 x 240 cm 140,500.00
2.000 Btg Dolken Kayu Galam 22,300.00
A.4.1.1.23 Pemasangan 1 M² Bekisting Untuk Balok
0.660 OH Pekerja 75,000.00
0.330 OH Tukang Kayu 145,000.00
0.030 OH Kepala Tukang 171,000.00
0.030 OH Mandor 196,000.00
0.040 M3 Papan Kayu Kls III 1,851,300.00
0.400 Kg Paku Campuran 21,200.00
0.200 Liter Minyak Bakesting 5,600.00
0.018 M3 Kayu Klas II 2,917,000.00
0.350 Lbr Play Wood 3 mm uk. 120 x 240 cm 140,500.00
2.000 Btg Dolken Kayu Galam 22,300.00
A.4.1.1.23 Pemasangan 1 M² Bekisting Untuk Lantai
0.660 OH Pekerja 75,000.00
0.330 OH Tukang Kayu 145,000.00
0.030 OH Kepala Tukang 171,000.00
0.030 OH Mandor 196,000.00
0.040 M3 Papan Kayu Kls III 1,851,300.00
0.400 Kg Paku Campuran 21,200.00
0.200 Liter Minyak Bakesting 5,600.00
0.015 M3 Kayu Klas II 2,917,000.00
0.350 Lbr Play Wood 3 mm uk. 120 x 240 cm 140,500.00
6.000 Btg Dolken Kayu Galam 22,300.00
A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding
0.660 OH Pekerja 75,000.00
0.330 OH Tukang Kayu 145,000.00
0.033 OH Kepala Tukang 171,000.00
0.033 OH Mandor 196,000.00
0.030 M3 Papan Kayu Kls III 1,851,300.00
0.400 Kg Paku Campuran 21,200.00
0.200 Liter Minyak Bakesting 5,600.00
0.020 M3 Kayu Klas II 2,917,000.00
0.350 Lbr Play Wood 3 mm uk. 120 x 240 cm 140,500.00
7.000 Btg Dolken Kayu Galam 22,300.00
Pembesian 10 Kg dengan besi 16
0.070 OH Pekerja 75,000.00
0.070 OH Tukang Kayu 145,000.00
0.0070 OH Kepala Tukang 171,000.00
0.0040 OH Mandor 196,000.00
10.500 Kg Besi Dia 16 mm Standart 11,000.00
0.150 Kg Kawat Ikat 22,500.00
Pembesian 10 Kg dengan besi 12
0.070 OH Pekerja 75,000.00
0.070 OH Tukang Kayu 145,000.00
0.0070 OH Kepala Tukang 171,000.00
0.0040 OH Mandor 196,000.00
10.500 Kg Besi Dia 12 mm Standart 11,000.00
0.150 Kg Kawat Ikat 22,500.00
Pembesian 10 Kg dengan besi 10
0.070 OH Pekerja 75,000.00
0.070 OH Tukang Kayu 145,000.00
0.0070 OH Kepala Tukang 171,000.00
0.0040 OH Mandor 196,000.00
10.500 Kg Besi Dia 10 mm Standart 11,000.00
0.150 Kg Kawat Ikat 22,500.00
Pembesian 10 Kg dengan besi 8
0.070 OH Pekerja 75,000.00
0.070 OH Tukang Kayu 145,000.00
0.0070 OH Kepala Tukang 171,000.00
0.0040 OH Mandor 196,000.00
10.500 Kg Besi Dia 8 mm Standart 11,000.00
0.150 Kg Kawat Ikat 22,500.00
An. 2007 6.27. Mengerjakan 1 m2 Siram & Bongkar
0.100 OH Pekerja 75,000.00
0.050 OH Mandor 196,000.00
A.4.4.1.9. Pemasangan 1 m2 dinding bata merah ukuran (25 x 15 x 8) cm teba
0.300 OH Pekerja 75,000.00
0.100 OH Tukang Kayu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.015 OH Mandor 196,000.00
24.000 Bh Batako 2,300.00
11.500 Kg Semen PC (Kg) 1,600.00
0.043 M3 Pasir Pasang 278,000.00
A.4.4.2.4. Pemasangan 1 m2 plesteran 1 SP : 4 PP, tebal 15 mm
0.300 OH Pekerja 75,000.00
0.150 OH Tukang Batu 145,000.00
0.015 OH Kepala Tukang 171,000.00
0.015 OH Mandor 196,000.00
6.240 Kg Semen PC (Kg) 1,600.00
0.024 M3 Pasir Pasang 278,000.00
A.4.4.2.3. Pemasangan 1 m2 plesteran 1 SP : 3 PP, tebal 15 mm
0.300 OH Pekerja 75,000.00
0.150 OH Tukang Batu 145,000.00
0.015 OH Kepala Tukang 171,000.00
0.015 OH Mandor 196,000.00
7.776 Kg Semen PC (Kg) 1,600.00
0.023 M3 Pasir Pasang 278,000.00
A.4.4.2.27. Pemasangan 1 m2 acian
0.200 OH Pekerja 75,000.00
0.100 OH Tukang Batu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.010 OH Mandor 196,000.00
3.250 Kg Semen PC (Kg) 1,600.00
A.4.4.3.4. Pemasangan 1 m2 lantai ubin warna ukuran (40 x 40) cm
0.250 OH Pekerja 75,000.00
0.125 OH Tukang Batu 145,000.00
0.013 OH Kepala Tukang 171,000.00
0.013 OH Mandor 196,000.00
6.630 Bh Tegel Keramik 40/40 12,500.00
9.800 Kg Semen PC (Kg) 1,600.00
0.045 M3 Pasir Pasang 278,000.00
1.300 Kg Sement Warna 2,100.00
Pemasangan 1 m2 dinding keramik warna uk. (20 x 25) cm
0.900 OH Pekerja 75,000.00
0.450 OH Tukang Batu 145,000.00
0.045 OH Kepala Tukang 171,000.00
0.045 OH Mandor 196,000.00
21.200 Bh Tegel Keramik 20 / 25 3,409.09
9.300 Kg Semen PC (Kg) 1,600.00
0.018 M3 Pasir Pasang 278,000.00
1.940 Kg Sement Warna 2,100.00
Pemasangan 1 m2 lantai ubin warna (Anti Slip) ukuran (20 x 20) cm
0.270 OH Pekerja 75,000.00
0.135 OH Tukang Batu 145,000.00
0.014 OH Kepala Tukang 171,000.00
0.014 OH Mandor 196,000.00
26.500 Bh Tegel Keramik 20 / 20 3,000.00
10.400 Kg Semen PC (Kg) 1,600.00
0.045 M3 Pasir Pasang 278,000.00
1.620 Kg Sement Warna 2,100.00
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela,
7.000 OH Pekerja 75,000.00
21.000 OH Tukang Batu 145,000.00
2.100 OH Kepala Tukang 171,000.00
0.350 OH Mandor 196,000.00
1.100 M3 Kayu Klas I 7,255,000.00
1.250 Kg Paku Campuran 21,200.00
1.000 Kg Lem Kayu 8,400.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I
1.000 OH Pekerja 75,000.00
3.000 OH Tukang Batu 145,000.00
0.300 OH Kepala Tukang 171,000.00
0.050 OH Mandor 196,000.00
0.040 M3 Papan Kayu Kls I 7,180,000.00
0.500 M3 Lem Kayu 8,400.00
A.4.6.1.6. Pembuatan dan pemasangan 1M² Pintu dan Jendela Kaca, Kayu Kla
0.800 OH Pekerja 75,000.00
2.400 OH Tukang Batu 145,000.00
0.240 OH Kepala Tukang 171,000.00
0.040 OH Mandor 196,000.00
0.024 M3 Papan Kayu Kls I 7,180,000.00
0.300 M3 Lem Kayu 8,400.00
A.4.6.1.14. Kuda-Kuda Kayu Kelas I
12.000 OH Pekerja 75,000.00
12.000 OH Tukang Batu 145,000.00
1.200 OH Kepala Tukang 171,000.00
0.200 OH Mandor 196,000.00
1.100 M' Kayu Klas II 2,917,000.00
15.000 M' Besi Strip 6,500.00
5.600 Bh Paku Campuran 21,200.00
A.4.6.1.14.1 Gording Kayu Kelas II
12.000 OH Pekerja 75,000.00
12.000 OH Tukang Batu 145,000.00
1.200 OH Kepala Tukang 171,000.00
0.200 OH Mandor 196,000.00
1.100 M' Kayu Klas I 7,255,000.00
15.000 M' Besi Strip 6,500.00
5.600 Bh Paku Campuran 21,200.00
Pemasangan 1M2 Kuda - Kuda Baja Ringan + Reng
0.200 OH Pekerja 75,000.00
0.450 OH Tukang Batu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.050 OH Mandor 196,000.00
1.488 M' C - 75, 0.8 21,750.00
2.232 M' C - 75, 0.6 18,750.00
28.000 Bh Baut 5,000.00
1.600 Bh Dynabolt 7,000.00
5.400 M' Talang jurai 58,000.00
I A.4.5.2.31. Modif A.4.5.2.31. . Pemasangan 1 m² Atap Spandek 4 m
I A.4.5.2.31. 0.200 OH Pekerja 75,000.00
I A.4.5.2.31. 0.300 OH Tukang Batu 145,000.00
I A.4.5.2.31. 0.003 OH Kepala Tukang 171,000.00
I A.4.5.2.31. 0.010 OH Mandor 196,000.00
I A.4.5.2.31. 0.390 Lbr Atap Spandek 180,300.00
I A.4.5.2.31. 0.020 Kg Paku Campuran 21,200.00
A.4.5.2.36. Pemasangan 1m' Nok Seng Licin Bjls
1.200 OH Pekerja 75,000.00
0.600 OH Tukang Batu 145,000.00
0.060 OH Kepala Tukang 171,000.00
0.060 OH Mandor 196,000.00
0.300 Lbr Seng Licin 80,300.00
0.040 Kg Paku Campuran 21,200.00
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
0.100 OH Pekerja 75,000.00
0.200 OH Tukang Batu 145,000.00
0.020 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
0.011 Lbr Papan Kayu Kls I 7,180,000.00
0.050 Kg Paku Campuran 21,200.00
A.4.6.1.20.Pemasangan 1M² Rangka langit langit Kayu Klas II
0.200 OH Pekerja 75,000.00
0.300 OH Tukang Batu 145,000.00
0.030 OH Kepala Tukang 171,000.00
0.010 OH Mandor 196,000.00
0.016 M3 Kayu Klas II 2,917,000.00
0.250 Kg Paku Campuran 21,200.00
A.4.5.1.5.Pemasangan 1M² Langit - Langit Triplex 4 mm Kayu Klas II
0.070 OH Pekerja 75,000.00
0.100 OH Tukang Batu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
0.375 Lbr Tripleks 4 mm 68,000.00
0.030 Kg Paku Triplek 21,200.00
A.4.5.1.9. Pemasangan 1M' List Langit-Langit Kayu Profil
0.050 OH Pekerja 75,000.00
0.050 OH Tukang Batu 145,000.00
0.005 OH Kepala Tukang 171,000.00
0.003 OH Mandor 196,000.00
1.050 M' Lis plafon Profil 6 x 6 cm 22,500.00
A.5.5.1.1. Memasang 1 buah Kloset Duduk / Monoblok
3.300 OH Pekerja 75,000.00
1.100 OH Tukang Batu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.160 OH Mandor 196,000.00
1.000 Bh Kloset Duduk 1,500,000.00
6.000 % Perlengkapan Kloset Duduk 90,000.00
A.5.1.1.19. Pemasangan 1 buah kran dia. 1/2" atau 3/4"
0.010 OH Pekerja 75,000.00
0.100 OH Tukang Batu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
1.000 Bh Kran Air 3/4 39,100.00
0.025 Bh Seal Tape 9,000.00
A.5.1.1.14. Pemasangan 1 buah Floor drain
0.010 OH Pekerja 75,000.00
0.100 OH Tukang Batu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
1.000 Bh Floordrain (metal) 41,300.00
A.5.1.1.27. Pemasangan 1 M' pipa PVC tipe AW dia. 1/2"
0.081 OH Pekerja 75,000.00
0.135 OH Tukang Batu 145,000.00
0.014 OH Kepala Tukang 171,000.00
0.004 OH Mandor 196,000.00
1.200 M' Pipa PVC dia. 1/2" 13,400.00
A.4.6.2.2. Pemasangan 1 Buah Tanam Biasa
0.010 OH Pekerja 75,000.00
0.500 OH Tukang Batu 145,000.00
0.050 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
1.000 Bh Kunci Tanam 2 Slaag 180,000.00
A.4.6.2.3. Pemasangan 1 Buah kunci Tanam Kamar Mandi
0.010 OH Pekerja 75,000.00
0.500 OH Tukang Batu 145,000.00
0.050 OH Kepala Tukang 171,000.00
0.005 OH Mandor 196,000.00
1.000 Bh Kunci Tanam KM/WC 105,000.00
A.4.6.2.5 PASANG 1 BH ENGSEL PINTU
0.015 OH Pekerja 75,000.00
0.150 OH Tukang Batu 145,000.00
0.015 OH Kepala Tukang 171,000.00
0.001 OH Mandor 196,000.00
1.000 Bh Engsel Pintu 4" 55,000.00
A.4.6.2.6 PASANG 1 BH ENGSEL JENDELA
0.010 OH Pekerja 75,000.00
0.100 OH Tukang Batu 145,000.00
0.010 OH Kepala Tukang 171,000.00
0.001 OH Mandor 196,000.00
1.000 Bh Engsel Jendela 3" 35,000.00
A.4.6.2.7 PASANG GRENDEL PINTU
0.100 OH Pekerja 75,000.00
0.200 OH Tukang Batu 145,000.00
0.020 OH Kepala Tukang 171,000.00
0.001 OH Mandor 196,000.00
1.000 Bh Gerendel Pintu 15,000.00
A.4.6.2.7 PASANG GRENDEL JENDELA
0.100 OH Pekerja 75,000.00
0.200 OH Tukang Batu 145,000.00
0.020 OH Kepala Tukang 171,000.00
0.001 OH Mandor 196,000.00
1.000 Bh Gerendel Jendela 12,000.00
A.4.6.2.9 PASANG 1 BH KAIT ANGIN
0.015 OH Pekerja 75,000.00
0.150 OH Tukang Batu 145,000.00
0.015 OH Kepala Tukang 171,000.00
0.008 OH Mandor 196,000.00
1.000 Bh Kait Angin Kls B 17,500.00
1 TITIK INSTALASI PENERANGAN DAN STOP KONTAK
1.000 Ls Tukang Listrik 145,000.00
1.000 Ljr Pipa PVC 1/2" 4,200.00
6.000 Bh Lasdop 5,600.00
0.200 Roll Benang 5,600.00
1.000 Bh T Dooz 7,300.00
2.000 Bh Isolator 16,800.00
0.300 Kg Paku Campuran 21,200.00
PASANG LAMPU PIJAR PHILIPS 23 WATT
1.000 Ls Tukang Listrik 145,000.00
1.000 Bh Fiting Tempel 16,800.00
1.000 Bh Lampu pijar philips putih 23 watt 66,900.00
PASANG LAMPU PIJAR PHILIPS 18 WATT
1.000 Ls Tukang Listrik 145,000.00
1.000 Bh Lampu pijar philips putih 18 watt 53,000.00
PASANG STOP KONTAK
1.000 Ls Tukang Listrik 145,000.00
1.000 Bh Stop kontak 25,700.00
PASANG SAKLAR TUNGGAL
1.000 Ls Tukang Listrik 145,000.00
1.000 Bh Saklar tunggal 20,100.00
PASANG SAKLAR GANDA
1.000 Ls Tukang Listrik 145,000.00
1.000 Bh Saklar ganda 27,900.00
PASANG VITTING
1.000 Ls Tukang Listrik 145,000.00
1.000 Bh Fiting Tempel 16,800.00
PASANG KABEL NYY
1.000 Ls Tukang Listrik 145,000.00
1.000 M Kabel NYY 3x2,5 16,800.00
Pemasangan 1 UNIT MCB & Sekring Khast
1.0000 Ls Tukang Listrik 145,000.00
1.0000 Unit MCB 60 AMP 234,200.00
1.0000 Unit Sekring 78,100.00
A.4.7.1.10. Pengecatan 1 m² Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 La
0.028 OH Pekerja 75,000.00
0.042 OH Tukang Batu 145,000.00
0.004 OH Kepala Tukang 171,000.00
0.003 OH Mandor 196,000.00
0.120 Kg Cat Tembok 27,900.00
0.180 Kg Cat Dasar Tembok 27,900.00
A.4.7.1.4. 1M2 Pengecetan bidang kayu baru (1 lapisan plamuur, 1 lapisan ca
0.070 OH Pekerja 75,000.00
0.009 OH Tukang Batu 145,000.00
0.006 OH Kepala Tukang 171,000.00
0.003 OH Mandor 196,000.00
0.200 Kg Menie Kayu 30,000.00
0.150 Kg Plamir 16,000.00
0.170 Kg Menie Kayu 30,000.00
0.260 Kg Cat Kayu 57,000.00
PAVING BLOCK PERSEGI 4 K 300
0.320 OH Pekerja 75,000.00
0.200 OH Tukang Batu 145,000.00
0.060 OH Mandor 196,000.00
50.000 M2 Paving Block 4,500.00
1.000 Bh Pakuel 90,000.00
1.000 Bh Skop 85,000.00
1.000 Tukal Benang Tukang 10,000.00
1.000 Bh Gerobak Dorong 500,000.00
1.000 Bh Martil 50,000.00
1.000 M' Selang 15,000.00
1.000 Bh Ember Cor 15,000.00
1.000 M' Gergaji 50,000.00

1.000 Hok Pembersihan Awal 75,000.00


1.000 Hok Pembersihan Akhir 75,000.00
1.000 Bh Papan Nama Proyek 150,000.00
1.000 Bh Prasasti 500,000.00
1.000 Ls Insentif Pekerja 1,150,000.00
1.000 Ls Administrasi + Dokumentasi 1,000,000.00
1.000 Ls Biaya Pemasangan Listrik 1,500,000.00
1.000 Ls As Buildrawing 2,500,000.00
ANALISA

JUMLAH
(Rp.)

17,300.00
7,500.00
9,800.00
80,537.00
7,500.00
14,500.00
1,710.00
980.00
35,004.00
424.00
20,419.00
1,012,875.00
7,500.00
14,500.00
1,710.00
980.00
37,910.00
612,570.00
6,360.00
16,800.00
8,340.00
15,680.00
270,450.00
20,075.00
61,150.00
56,250.00
4,900.00
47,300.00
37,500.00
9,800.00
259,810.00
18,750.00
4,900.00
236,160.00
284,980.00
22,500.00
1,960.00
260,520.00
529,990.20
58,500.00
56,550.00
6,669.00
7,644.00
306,840.00
93,787.20
960,975.00
112,500.00
108,750.00
12,825.00
14,700.00
306,840.00
260,800.00
144,560.00
1,108,880.00
90,000.00
29,000.00
3,420.00
11,760.00
368,000.00
178,600.00
308,100.00
120,000.00
1,360,981.00
123,750.00
39,875.00
4,788.00
16,268.00
593,600.00
139,600.00
314,100.00
129,000.00
167,214.00
39,000.00
37,700.00
4,446.00
5,096.00
74,052.00
6,360.00
560.00
176,470.50
39,000.00
37,700.00
4,446.00
5,096.00
83,308.50
6,360.00
560.00
329,542.00
49,500.00
47,850.00
5,130.00
5,880.00
74,052.00
8,480.00
1,120.00
43,755.00
49,175.00
44,600.00
338,293.00
49,500.00
47,850.00
5,130.00
5,880.00
74,052.00
8,480.00
1,120.00
52,506.00
49,175.00
44,600.00
418,742.00
49,500.00
47,850.00
5,130.00
5,880.00
74,052.00
8,480.00
1,120.00
43,755.00
49,175.00
133,800.00
438,215.00
49,500.00
47,850.00
5,643.00
6,468.00
55,539.00
8,480.00
1,120.00
58,340.00
49,175.00
156,100.00
136,256.00
5,250.00
10,150.00
1,197.00
784.00
115,500.00
3,375.00
136,256.00
5,250.00
10,150.00
1,197.00
784.00
115,500.00
3,375.00
136,256.00
5,250.00
10,150.00
1,197.00
784.00
115,500.00
3,375.00
136,256.00
5,250.00
10,150.00
1,197.00
784.00
115,500.00
3,375.00
17,300.00
7,500.00
9,800.00
127,204.00
22,500.00
14,500.00
1,710.00
2,940.00
55,200.00
18,400.00
11,954.00
66,411.00
22,500.00
21,750.00
2,565.00
2,940.00
9,984.00
6,672.00
68,590.60
22,500.00
21,750.00
2,565.00
2,940.00
12,441.60
6,394.00
38,370.00
15,000.00
14,500.00
1,710.00
1,960.00
5,200.00
155,441.00
18,750.00
18,125.00
2,223.00
2,548.00
82,875.00
15,680.00
12,510.00
2,730.00
245,495.73
67,500.00
65,250.00
7,695.00
8,820.00
72,272.73
14,880.00
5,004.00
4,074.00
157,015.00
20,250.00
19,575.00
2,394.00
2,744.00
79,500.00
16,640.00
12,510.00
3,402.00
12,013,100.00
525,000.00
3,045,000.00
359,100.00
68,600.00
7,980,500.00
26,500.00
8,400.00
862,500.00
75,000.00
435,000.00
51,300.00
9,800.00
287,200.00
4,200.00
631,720.00
60,000.00
348,000.00
41,040.00
7,840.00
172,320.00
2,520.00
6,309,320.00
900,000.00
1,740,000.00
205,200.00
39,200.00
3,208,700.00
97,500.00
118,720.00
11,081,120.00
900,000.00
1,740,000.00
205,200.00
39,200.00
7,980,500.00
97,500.00
118,720.00
630,374.00
15,000.00
65,250.00
1,710.00
9,800.00
32,364.00
41,850.00
140,000.00
11,200.00
313,200.00
131,714.00
15,000.00
43,500.00
513.00
1,960.00
70,317.00
424.00
223,958.00
90,000.00
87,000.00
10,260.00
11,760.00
24,090.00
848.00
120,940.00
7,500.00
29,000.00
3,420.00
980.00
78,980.00
1,060.00
118,437.10
15,000.00
43,500.00
5,130.00
1,960.00
47,547.10
5,300.00
48,576.00
5,250.00
14,500.00
1,710.00
980.00
25,500.00
636.00
36,068.00
3,750.00
7,250.00
855.00
588.00
23,625.00
2,480,070.00
247,500.00
159,500.00
1,710.00
31,360.00
1,500,000.00
540,000.00
57,265.00
750.00
14,500.00
1,710.00
980.00
39,100.00
225.00
59,240.00
750.00
14,500.00
1,710.00
980.00
41,300.00
44,908.00
6,075.00
19,575.00
2,394.00
784.00
16,080.00
262,780.00
750.00
72,500.00
8,550.00
980.00
180,000.00
187,780.00
750.00
72,500.00
8,550.00
980.00
105,000.00
80,596.80
1,125.00
21,750.00
2,565.00
156.80
55,000.00
52,058.00
750.00
14,500.00
1,710.00
98.00
35,000.00
55,018.00
7,500.00
29,000.00
3,420.00
98.00
15,000.00
52,018.00
7,500.00
29,000.00
3,420.00
98.00
12,000.00
44,508.00
1,125.00
21,750.00
2,565.00
1,568.00
17,500.00
231,180.00
145,000.00
4,200.00
33,600.00
1,120.00
7,300.00
33,600.00
6,360.00
228,700.00
145,000.00
16,800.00
66,900.00
198,000.00
145,000.00
53,000.00
170,700.00
145,000.00
25,700.00
165,100.00
145,000.00
20,100.00
172,900.00
145,000.00
27,900.00
161,800.00
145,000.00
16,800.00
161,800.00
145,000.00
16,800.00
457,300.00
145,000.00
234,200.00
78,100.00
17,866.20
2,100.00
6,090.00
718.20
588.00
3,348.00
5,022.00
36,391.00
5,250.00
1,305.00
1,026.00
490.00
6,000.00
2,400.00
5,100.00
14,820.00
289,760.00
24,000.00
29,000.00
11,760.00
225,000.00
90,000.00
85,000.00
10,000.00
500,000.00
50,000.00
15,000.00
15,000.00
50,000.00

75,000.00
75,000.00
150,000.00
500,000.00
1,150,000.00
1,000,000.00
1,500,000.00
2,500,000.00
DAFTAR UPAH DAN HARGA BAHAN

PEKERJAAN : PEMBANGUNAN HALTE 3 X 5


LOKASI : DESA GALALA
DESA : DESA GALALA
TAHUN ANGGARAN : 2019

HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A UPAH
1 Mandor OH 196,000.00
2 Kepala Tukang OH 171,000.00
3 Tukang Batu OH 145,000.00
4 Tukang Kayu OH 145,000.00
5 Tukang Besi OH 145,000.00
6 Tukang Cat OH 145,000.00
7 Tukang Listrik OH 145,000.00
8 Pekerja OH 75,000.00

B BAHAN
1 Kayu Klas I M3 7,255,000.00
2 Kayu Klas II M3 2,917,000.00
3 Papan Kayu Kls I M3 7,180,000.00
4 Papan Kayu Kls III M3 1,851,300.00
5 Batu Kerikil Pecah ( 3 / 2 cm ) M3 313,600.00
6 Pasir Pasang M3 278,000.00
7 Pasir Urug M3 217,100.00
8 Tanah Timbunan M3 196,800.00
9 Batu Karang M3 255,700.00
10 Batu Kali M3 255,700.00
11 Pasir Beton Kg 200.00
12 Batu Krikil (Kg) Kg 300.00
13 Batu Bata Bh 2,300.00
14 Batako Bh 2,300.00
15 Beugel Kuda-kuda Bh 12,000.00
16 Besi Strip Kg 6,500.00
17 Semen PC (Zak) Sak 75,500.00
18 Semen PC (Kg) Kg 1,600.00
19 Sement Warna Kg 2,100.00
20 Air Liter 600.00
21 Besi Dia 16 mm Standart Staff 11,000.00
22 Besi Dia 12 mm Standart Staff 11,000.00
23 Besi Dia 10 mm Standart Staff 11,000.00
24 Besi Dia 8 mm Standart Staff 11,000.00
25 C - 75, 0.8 M' 21,750.00
26 C - 75, 0.6 M' 18,750.00
27 Baut Bh 5,000.00
28 Dynabolt Bh 7,000.00
29 Talang jurai M' 58,000.00
30 Cat Dasar Tembok Kg 27,900.00
31 Cat Tembok Kg 27,900.00
32 Cat Meni Besi Kg 30,000.00
33 Cat Kayu Kg 57,000.00
34 Plamir Kg 16,000.00
35 Politur Liter 25,000.00
36 Menie Kayu Kg 30,000.00
37 Dumpul Kayu Kg 15,000.00
38 Dolken Kayu Galam Batang 22,300.00
39 Kuas Tangan 4 " Bh 22,000.00
40 Engsel Jendela 3" Pasang 35,000.00
41 Engsel Pintu 4" Pasang 55,000.00
42 Engsel Pintu Gembok Pasang 22,500.00
43 Gerendel Pintu Bh 15,000.00
44 Gerendel Jendela Bh 12,000.00
45 Kaca 3 mm M2 225,000.00
46 Kaca 5 mm M2 95,000.00
47 Lis plafon Profil 6 x 6 cm M' 22,500.00
48 Tripleks 4 mm Lbr 68,000.00
49 Kawat Ikat Kg 22,500.00
50 Kunci Tanam 2 Slaag Bh 180,000.00
51 Kunci Tanam KM/WC Bh 105,000.00
52 Kunci Teralis Penjara (Gembok Besar ) Bh 225,000.00
53 Kertas Amplas Lbr 6,000.00
54 Kait Angin Kls B Bh 17,500.00
55 Tegel Keramik 40/40 Bh 12,500.00
56 Tegel Keramik 20 / 25 Bh 3,409.09
57 Tegel Keramik 20 / 20 Bh 3,000.00
58 Lampu Philips 23 Watt Bh 45,000.00
59 Lampu Philips 18 Watt Bh 35,000.00
60 Minyak Bakesting Liter 5,600.00
61 Paku / Skrup Genteng Kg 25,100.00
62 Paku Campuran Kg 21,200.00
63 Paku Triplek Kg 21,200.00
64 MCB 60 AMP Bh 234,200.00
65 Kabel NYM 3 x 2.5 mm M 16,800.00
66 Atap Spandek Lbr 180,300.00
67 Seng Licin M 80,300.00
68 Play Wood 3 mm uk. 120 x 240 cm Lbr 140,500.00
69 Pipa PVC dia. 3" M' 24,600.00
70 Pipa PVC dia. 1/2" M' 13,400.00
71 Socket PVC dia 1 " Bh 5,000.00
72 Kloset Duduk Bh 1,500,000.00
73 Perlengkapan Kloset Duduk Bh 90,000.00
74 Kran Air 3/4 Bh 39,100.00
75 Kran Air 1/2 Bh 39,100.00
76 Seal Tape Set 9,000.00
77 Floordrain (metal) Set 41,300.00
78 Wastafel lengkap Bh 606,600.00
79 Paving Block Bh 4,500.00
80 Sekring Bh 78,100.00
81 Kabel NYY 3x2,5 M' 16,800.00
82 Benang Roll 5,600.00
83 Titik Lampu Titik 83,700.00
84 Lem Kayu Kg 8,400.00
85 Pipa PVC 1/2" M' 4,200.00
86 Lampu TL 20 Watt Bh 87,000.00
87 Lampu pijar philips putih 18 watt Bh 53,000.00
88 Lampu pijar philips putih 23 watt Bh 66,900.00
89 Lampu PL 11 Watt Bh 87,000.00
90 Saklar tunggal Bh 20,100.00
91 Saklar ganda Bh 27,900.00
92 Stop kontak Bh 25,700.00
93 Kabel NYY 3 Phase M' 16,800.00
94 Fiting Tempel Bh 16,800.00
95 T Dooz Bh 7,300.00
96 Isolator Bh 16,800.00
97 Lasdop Bh 5,600.00
C ALAT
1 Pakuel Bh 90,000.00
2 Skop Bh 85,000.00
3 Benang Tukang Tukal 10,000.00
4 Gerobak Dorong Bh 500,000.00
5 Martil Bh 50,000.00
6 Selang M' 15,000.00
Ember Cor Bh 15,000.00
Gergaji Bh 50,000.00
D OPERASIONAL DAN BIAYA LAIN-LAIN
1 Papan Nama Proyek Bh 150,000.00
2 Prasasti Bh 500,000.00
3 Honor TPK Ls 1,150,000.00
4 Administrasi + Dokumentasi Ls 1,000,000.00
5 Biaya Pemasangan Listrik Ls 1,500,000.00
6 ShopDrwaing Ls 2,500,000.00
PERHITUNGAN VOLUME PEKERJAAN
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA

No. Lokasi / Lebar Perhitun


Sketsa / Gambar Tinggi Panjang
Urut STA Atas Bawah

01. GALIAN TANAH

Galian Tanah Untuk Pondasi Saluran

0.4
0.30 0.40 358.00 0.30 x

0.30

02. URUGAN TANAH


02. INSTALASI PIPA

1 PIPA Ø 2 " 131.00 21.83


2 PIPA Ø 1 1/2 " 42.00 7.00
3 PIPA Ø 1 " 185.00 30.83
4 PIPA Ø 1/2 " 157.00 26.17

03. PEMASANGAN METERAN

1 Jumlah KK pengguna Air 25 25


VOLUME PEKERJAAN

Perhitungan Dimensi Luas Volume


(M) ( M2 ) ( M3 )

0.4 0.12 42.96

Total Galian Tanah 42.96

Total Urugan Tanah 1/4 Galian 10.7400

Staff
Staff
Staff
Staff

Buah
PERHITUNGAN VOLUME PEKERJAAN
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA

No. Lokasi / Lebar Perhitun


Sketsa / Gambar Tinggi Panjang
Urut STA Atas Bawah (

SALURAN Panjang Sumbu Tegak


= 3.5 + 3.5 + 3.5 + 1 + 3.5 + 3.5 +
3.5 + + + + + +
= 22 M

Panjang Sumbu Datar


= 16 + 3.5 + 3 + 3.5 + 3 + 0 +
0 + + + + + +
= 29 M

Total Panjang sumbu ( Tegak + Datar )

= 22 + 29
= 51 M

01. GALIAN TANAH

Galian Tanah Untuk Pondasi Saluran

0.32
0.50 0.32 51.00 0.50 x

0.50

02. URUGAN TANAH 1/4

03. URUGAN PASIR

Urugan Pasir Bawa Lantai 0.20 0.05 51.00

0.05
0.20

06. PASANGAN BATU

Pasangan Batu Kali Utk Saluran

0.15 0.32 51.00


0.32

0.15
08. PASANGAN BATU BATA

Sumbu Tegak
Pasangan Batu Bata

51.0 0.32 51.0 x

0.32

51
0.1

09. RABAT BETON TUMBUK

Rabat Beton Tumbuk Utk Saluran

0.07 0.20 0.07 51.00


0.20

10. PLESTERAN

Plesteran Saluran

0.15 0.15 0.9 51.00 0.9 x

0.2 0.2

0.2
JAAN

Perhitungan Dimensi Luas Volume


(M) ( M2 ) ( M3 )

0.3 0.16 8.16

Total Galian Tanah 8.16

Total Urugan Tanah 1/4 2.04

0.20 x 0.05 0.01 0.51

0.15 x 0.32 0.048 2.45

Total Pasangan 2 4.896


Ukuran Batu Gomblo
0.14 x 0.40 = 0.056
0.3 16.32
32.64
583

Total Pasangan 2 32.64 3.264

0.20 x 0.07 0.014 0.71

Total Beton Tumbuk 0.714

51.0 45.90

Total 45.90
TAKE OF SHEET
Pekerjaan :
: Pembesian Pagar
PERHITUNGAN VOLUME PEKERJA
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA

No. Lebar
Lokasi / STA Sketsa / Gambar Tinggi Panjang
Urut Atas Bawah

PAGAR Panjang Sumbu Tegak


= 5 + 1.5 + 7 + 2 + 5 + 7 +
1.5 + 2 + 0 + 0 + 0 + +
= 31 M

Panjang Sumbu Datar


= 2 + 12 + 2 + 2 + 3.8 + 4.2 +
4 + 2 + 0 + 0 + + +
= 32 M

Total Panjang sumbu ( Tegak + Datar )

= 31 + 32
= 63 M / 3 = 21

01. GALIAN TANAH

Galian Tanah Untuk Pondasi

0.6 0.55 63.00

0.55

0.60

02. URUGAN TANAH 1/4

03. URUGAN PASIR

Urugan Pasir Bawa Pondasi 0.60 0.05 63.00

0.05
0.60

04. TRIMBIRISAN BATU KALI

0.60 0.10 63.00


0.10

0.60
05. PASANGAN BATU

Pasangan Batu Kali Utk Pondasi Pagar

0.25 0.25 0.40 0.55 63.00

0.55

0.4

06. BETON BERTULANG

Beton Bertulang Utk Kolom

4O 12
0.15 0.15 0.15 1.70
` 8 - 15

Kolom 15/15
0.15
Beton Bertulang Utk Sloof

4O 12
0.15 0.20 61.00
0.20 O 8 - 20

0.15 Sloof 15/20

Beton Bertulang Utk Balok

4O 12
0.20 0.15 0.20 61.00
O 8 - 20

Balok 15/20
0.15 `

07. PASANGAN BATU BATA

Pasangan Batu Bata

61.0 1.7

1.7

61
0.1

8. PLESTERAN
Plesteran Sumbu Tegak/Datar

1.7 61.00
1.70

61
VOLUME PEKERJAAN

Perhitungan Dimensi Luas Volume


(M) ( M2 ) ( M3 )

0.55 x 0.6 0.33 20.79

Total Urugan Tanah 1/4 5.1975

0.60 x 0.05 0.03 1.89

Total Urugan Pasir 1.890

0.60 x 0.10 0.06 3.78


( 0.25 + 0.40 ) 0.55 0.17875 11.26
x
2

Total Pasangan 11.261

0.15 x 0.15 0.02 0.04

Jumlah Tiang 21 0.4725 0.80

0.15 x 0.20 0.03 1.83


Pintu 2.00

Total Beton Sloof 1.830

0.15 x 0.20 0.03 1.83

Total Beton Balok 1.830

61.0 x 1.7 103.70

Kolom Beton
0.15 x 0.15 x 21 0.47

Total Pasangan 103.23 10.32275


1.7 x 61.0 103.70

Total 103.70
Total Muka Belakang 2 207.40
TAKE OF SHEET
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA

Pembesiaan
No. Lokasi /
Sketsa / Gambar Bengkokan Panjang
Urut STA
Atas Bawah Besi

01. Pembesian Kolom

0.03 0.03 0.03 0.03 1.70


1.70

4 O 12 0.03 0.03 0.48


0.12 O 8 - 10

0.12

02. Pembesian Sloof

0.03 0.03 0.03 0.03 61.00


61.00

4 O 12 0.03 0.03 0.58


0.17
O 8 - 15

0.12

03. Pembesian Balok

0.03 0.03 0.03 0.03 61.00


61.00

4 O 12 0.03 0.03 0.58


0.17
O 8 - 15

0.12

04. Pintu Pagar 1 Set


E OF SHEET
Pekerjaan :: Pembesian Pagar

Pembesiaan Panjang Jumlah Total


Jarak Panjang Bangunan Total
Total Total Stap Jumlah Volume
Panjang Besi Lebar Panjang Batang (M) ( Staf )

1.76 4.00 7.04 0.6 21.00 13

0.54 0.10 1.70 17 9.180 0.8 21.00 18

61.06 4.00 244.24 22 1.00 22

0.64 0.15 61.00 407 260.267 24 1.00 24

61.06 4.00 244.24 22 1.00 22

0.64 0.15 61.00 407 260.267 24 1.00 24

Besi dia. 10 58
Besi dia. 8 65
PERHITUNGAN VOLUME PEKERJAAN
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA

No. Lokasi / Lebar Perhitun


Sketsa / Gambar Tinggi Panjang
Urut STA Atas Bawah (

01. GALIAN TANAH

Galian Tanah Untuk Pondasi

0.15
0.15 0.15 5.00 0.15 x

0.15

02. URUGAN TANAH 1/4

03. URUGAN PASIR

Urugan Pasir Bawa Lantai 1.70 0.05 5.00

0.05
1.70

06. PASANGAN BATU

Pasangan Batu Kali Pondasi

0.15 0.3 5.00


0.3

0.15

09. RABAT BETON TUMBUK

Rabat Beton Tumbuk Lantai

0.07 1.70 0.07 5.00


1.70

10. PLESTERAN

Plesteran Pondasi
0.15 0.15 0.15 5.00 0.15 +
0.15
VOLUME PEKERJAAN

Perhitungan Dimensi Luas Volume


(M) ( M2 ) ( M3 )

0.2 0.02 0.11

Total Galian Tanah 2 0.23

Total Urugan Tanah 1/4 0.056

1.70 x 0.05 0.085 0.43

0.15 x 0.30 0.045 0.23

Total Pasangan 2 0.450

1.70 x 0.07 0.119 0.60

Total Beton Tumbuk 0.595


0.15 = 0.30 1.5

Total 1.50
PERHITUNGAN VOLUME PEKERJAAN
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA

No. Lokasi / Lebar Perhitun


Sketsa / Gambar Tinggi Panjang
Urut STA Atas Bawah (

RUMAH Panjang Sumbu Tegak


= 5 + 5 + 5 + +
+ + + + +
= 15 M

Panjang Sumbu Datar


= 10 + 10 + 2 +
+ + +
= 22 M

Total Panjang sumbu ( Tegak + Datar )

= 15 + 22
= 37 M

PEKERJAAN TANAH

01. Galian Tanah

Galian Tanah Untuk Pondasi

0.8 0.25 - 0.25 x

0.25

0.80
Galian Tanah Untuk Pondasi

0.8 1.5 0.60 1.50 x

1.50

0.80

02. Urugan Tanah 1/4

03. Urugan Pasir Bawa Pondasi 0.80 0.05 -

0.05
0.80
04. Urugan Pasir Bawa Lantai 5.00 0.05 -

0.05
5
Urugan Pasir Lantai Selasar 0.80 0.05 -

0.05

0.8

05. Urugan Tanah dibawah Lantai

Urugan Tanah di bawa Lantai

0.15 0.00 0.15 -

Urugan Tanah di bawa Selasar

0.08 0.00 0.08 -

PEKERJAAN PASANGAN & BETON

01. Timbrisan Batu Kali


0.00 0.15 -
0.15

0.00

02. Pas. Pondasi Batu Kali ad. 1:5


0.30
0.30 0.60 0.50 - (

0.50

0.60

03. Pasangan Batu Bata ad. 1:5


LANTAI I
Sumbu Datar
Pasangan Batu Dinding Belakang

5.0 3 5.0 x

Kosen Ventilasi
3 0.30 x
Kosen Pintu
0.00 x
Kosen Jendelah
5 0 x

0.1

Pasangan Batu Dinding Samping Kiri


3.0 1.2 3.0 x

Kosen Ventilasi
1.2 0.30 x
Kosen Pintu
0.00 x
Kosen Jendelah
3 0 x

0.1

Pasangan Batu Dinding Samping Kanan

3.0 1.2 3.0 x

Kosen Ventilasi
1.2 0.30 x
Kosen Pintu
1.32 x
Kosen Jendelah
3.0 0.58 x

0.1

Pasangan Batu Tempat Duduk

9.6 0.6 9.6 x

Kosen Ventilasi
0.6 0.30 x
Kosen Pintu
0.92 x
Kosen Jendelah
9.6 0.58 x

0.1

04. Beton Bertulang

Pondasi Telapak

8O 12
0.25 0.25 0.25 1.00 0.25 x
` 10 - 15 0.65 0.65 0.25 0.65 x

0.25

Beton Bertulang Utk Kolom 25/25

8O 12
0.25 0.25 0.25 2.00 0.25 x
` 10 - 15

0.25
Beton Bertulang Utk Kolom 20/20

8O 12
0.20 0.20 0.20 3.00 0.20 x
` 10 - 15

0.20

Balok 20/25

4O 12
0.25 0.20 19.00 0.25 x
0.20 O 8 - 20

0.25

Sloof 15/20

4O 12
0.15 0.20 19.00 0.15 x
0.20 O 8 - 20

0.15

Plat Lantai
3.00 0.12 5.00 3.00 x
0.12

3
05. RABAT BETON TUMBUK

Rabat Beton Untuk Tempat Duduk

0.07 0.70 0.07 9.60

0.70

Rabat Beton Tumbuk Utk Lantai

0.07 3.60 0.07 2.30

3.60

Rabat Beton Tumbuk Selasar

0.05 1.00 0.05 5.00


1

PEKERJAAN KAYU DAN ATAP

Kuda-Kuda Kayu Kls I & Gording

Kuda-Kuda Kecil Kayu Klas I Kayu 6 / 12


C
E F

A G H B Balok Tarik
1.5 D 1.5 Kaki Kuda-kuda

3.00
Tiang Kuda-kuda
Dari Kuda-kuda ABC diketahui Skor DE + DF
<A = <B = 30 °
CD = 1/2 AC = 1/2 BC Skor EG + FH
AD = BD = 1.5
AC² = CD² + AD² Balok Pengunci
AC² = ( 1/2 AC² ) + ( 1.5 )² Balok Pengapit
AC² = 1/4 AC² + 2.25
4 AC² = AC² + 4 X 2.25
3 AC² = 9.00 `
AC² = 9.00 = 3
3 3
02. AC = Ѵ 3 = 1.7 Skor Angin
CD = 1/2 AC = 0.9
AD = EF = 1.5 Nok Gording
ED = DF = CD = 0.9 ( <C1 = <D2 = <E= 60° )
EG = FH = 1/2 CD = 0.4

Uraian Volume
47 x

Kayu 5 / 10

Gording
Uraian Volume
51 x

04. PAPAN LISPLANK KAYU KLS 1

0.200 0.03 0.200 18.8 0.200 x

18.80

Rangka Plafon Dalam


Rangka Plafon Luar Ruang 1
5 x
3 x
5 x
3 x
5
3 4.4

6.4

Rangka Plafon Luar Ruang 1


19.2 x
0.8 x

4.4

6.4

0.11 Kehilangan Kayu


05.

Volume
Volume

Uraian Volume
91 x
Uraian Volume
71 x
PLAFON TRIPLEKS

Plafond Dalam Ruang 1

5
3

06.

Plafond Luar
Samping Kiri
Belakang
Samping Kanan
4.4 Depan

6.4

PEKERJAAN ATAP

Pasangan Seng Gelombang Bjls 0.25

2.8 x
2.8 x

0.025

Pasangan Seng Datar Bjls 0.25 = 5 +


+

= 6.40
VOLUME PEKERJAAN

Perhitungan Dimensi Luas Volume


(M) ( M2 ) ( M3 )

0.8 0.20 0.00

0.8 x 13 bh 15.60 9.36

Total Galian Tanah 9.360

Total Urugan Tanah 1/4 2.34

0.80 x 0.05 0.04 -


5.00 x 0.05 0.25 -
0.80 x 0.05 0.04 -

Total Urugan Pasir 0.000

0.00 x 0.15 0 -

0.00 x 0.08 0 -

Total Urugan Tanah/Sirtu 0.000

0.00 x 0.15 0 -

0.30 + 0.60 ) 0.50 0.225 -


x
2

3.0 15.00

Kosen Ventilasi
0.4 x 0.00
Kosen Pintu
0 x 0.00
Kosen Jendelah
0 x 0.00

Total Pasangan 15.00 1.5


1.2 3.60

Kosen Ventilasi
0.4 x 0 0.00
Kosen Pintu
0 x 0 0.00
Kosen Jendelah
0 x 0 0.00

Total Pasangan 3.60 0.36

1.2 3.60

Kosen Ventilasi
0.3 x 0 0.00
Kosen Pintu
2.16 x 0 0.00
Kosen Jendelah
1.52 x 0 0.00

Total Pasangan 3.60 0.36

0.6 5.76

Kosen Ventilasi
0.3 x 0.00
Kosen Pintu
2.16 x 0.00
Kosen Jendelah
1.52 x 0.00

Total Pasangan 5.76 0.576

Total Pasangan bata 27.96

0.25 0.06 0.06


0.65 0.42 0.11
Jumlah Tiang 6 2.91 1.01

0.25 0.06 0.13

Jumlah Tiang 6 0.375 0.75


0.20 0.04 0.12

Jumlah Tiang 5 0.2 0.60

0.20 0.05 0.95

0.20 0.03 0.57

0.12 0.36 1.80


0.70 x 0.07 0.049 0.47

3.60 x 0.07 0.252 0.58

1.00 x 0.05 0.05 0.25

Total Beton Tumbuk 1.300

Balok Tarik = 3.0


Kaki Kuda-kuda
2 x 1.7 = 3.5

Tiang Kuda-kuda 0.9


Skor DE + DF
2 x 0.9 = 1.7
Skor EG + FH
2 x 0.4 = 0.9
Balok Pengunci = 0
Balok Pengapit
2 x 1.5 = 3.0

Total = 12.9

Buah Kuda-kuda = 38.8


Skor Angin
2 x 2.8 = 5.6 M
Nok Gording = 3

Total = 47 M

Uraian Volume
0.05 x 0.1 0.237

4 x 6.4 = 25.6
4 x 6.4 = 25.6
Total = 51 M

Uraian Volume
0.05 x 0.07 0.1792

18.80 3.76 0.113

Kayu 5/10 Kayu 5/7

5 = 25
9 = 27
5 = 25
9 = 27

2 = 38.4
24 = 19.2

5/10 = 90.4 + 0.11


5/7 = 0.11 + 71.31

Uraian Volume
0.05 x 0.1 0.45255
Uraian Volume
0.05 x 0.07 0.24997
3.0 x 5.0 1 15

Samping Kiri 0.7 x 4.4 3.08


1.0 x 6.4 6.4
Samping Kanan 0.7 x 4.4 3.08
1.0 x 6.4 6.4

Total Tripleks 33.96

6.4
6.4 17.92
6.4 17.92
0

Total Seng Gelombang 35.84

0.70 + 0.70 + +
0 + 0

6.40
PERHITUNGAN VOLUME PE
PEKERJAAN : PEMBANGUNAN HALTE 3 X 5
LOKASI : DESA GALALA
DESA : DESA GALALA

Pembesiaan
No. Lokasi /
Sketsa / Gambar Bengkokan Panjang
Urut STA
Atas Bawah Besi

01 Pembesian Kolom 30/30

0.03 0.03 0.03 0.03 2.00


2.00

4 O 12 0.03 0.03 0.92


0.23 O 8 - 10

0.23

Pembesian Kolom 20/20

0.03 0.03 0.03 0.03 3.00


3.00

4 O 12 0.03 0.03 0.68


0.17 O 8 - 10

0.17

Pembesian Balok 25/30


0.03 0.03 0.03 0.03 19.00
19.00

5 O 16 0.03 0.03 0.82


0.23
O 8 - 15

0.18

Pembesian Ring Balok 15/20

0.03 0.03 0.03 0.03 19.00


19.00
01

4 O 12 0.03 0.03 0.58


0.17
O 8 - 15
0.12

Pembesiaan
No. Lokasi /
Sketsa / Gambar
Urut STA
No. Lokasi /
Sketsa / Gambar Bengkokan Panjang
Urut STA
Atas Bawah Besi

Plat Lantai

0.03 0.03 0.03 0.03 5.00


5.00

0.03 0.03 0.03 0.03 3.00


3.00

Pembesian Pondasi Telapak 70 x 70

0.03 0.03 0.03 0.03 1.00


1

4 O 16 0.03 0.03 0.92


0.23 O 10 - 15

0.23

Plat Pondasi Tapak

0.03 0.03 0.03 0.03 0.60


0.60

0.03 0.03 0.03 0.03 0.60


0.60
N VOLUME PEKERJAAN

Pembesiaan Panjang Jumlah Total


Jarak Panjang Bangunan Total
Total Total Stap Jumlah Volume
Panjang Besi Lebar Panjang Batang (M) ( Staf )

2.06 8.00 16.48 1.5 6.00 9

0.98 0.10 3.32 33 32.536 3.0 6.00 18

3.06 4.00 12.24 1.1 5.00 6

0.74 0.10 3.32 33 24.568 2.2 5.00 11

19.06 6.00 114.36 10.4 1.00 10

0.88 0.15 19.00 127 111.467 10.1 1.00 10

19.06 4.00 76.24 6.9 1.00 7

0.64 0.15 19.00 127 81.067 7.4 1.00 7


Pembesiaan Panjang Jumlah Total
Jarak Panjang Bangunan Total
Jumlah
Jarak Panjang Bangunan Total
Total Total Stap Jumlah Volume
Panjang Besi Lebar Panjang Batang (M) ( Staf )

5.06 0.15 3.00 20 101.20 9 2.00 18

3.06 0.15 5.00 33 102.00 9 2.00 19

1.06 8.00 8.48 0.8 8.00 6

0.98 0.15 1.00 7 6.533 0.6 8.00 5

0.66 0.15 0.60 4 2.64 0 8.00 2

0.66 0.15 0.60 4 2.64 0 8.00 2


PERHITUNGAN VOLUME

PEKERJAAN : PEMBANGUNAN HALTE 3 X 5


LOKASI : DESA GALALA
DESA : DESA GALALA

No. URAIAN PEKERJAAN SATUAN

I. PEKERJAAN PENGGANTUNG, PENGUNCI & KACA

01. Kunci tanam 2x mengunci BH


02. Kunci BH
03. Engsel pintu nilon kuningan 4" PSG
04. Engsel jendela, ventilasi nilon kuningan 3" PSG
05. Grendel jendela, ventilasi kuningan kodok BH
06. Kait angin PSG
07. Baut, mur, beugel, angker dll. BH

II. PEKERJAAN INSTALASI LISTRIK

01. Titik cahaya lampu dan stop kontak TTK


02. Lampu hias ruang tamu BH
03. Lampu hias ruang keluarga BH
04. Lampu Philips SL 13 Watt BH
05. Lampu Philips TL 18 Watt BH
06. AC 1/2 PK merk mitsubishi komplit Unit
07. Stop kontak merk Broco BH
08. Saklar tunggal merk Broco BH
09. Saklar ganda merk Broco BH
10. Panel MCB 2 group Unit

III. PEKERJAAN INSTALASI AIR

01. Titik air bersih/ Instalasi air TTK


02. Kloset duduk poselin tipe concord BH
02. Kloset jongkok poselin tipe concord BH
03. Kran air vernekel BH
04. Kran air leher angsa BH
05. Wastafel porselin BH
06. Tempat cuci alluminium 2 bak BH
07. Floor dryn stanless steel BH
08. Saluran pembuangan kotoran, pipa PVC dia. 4" Staf
09. Saluran air kotor pipa PVC dia. 2" Staf

IV. PEKERJAAN PENGECATAN

01. Cat kayu dengan cat glotex M2


02. Menie teakoil M2
03. Cat plafon tripleks dengan Metrolite M2
04. Cat dinding luar dan dalam dengan Metrolite M2
05. Acian & Plamir dinding M2
VOLUME

2.00
3.00
7.00
15.00
15.00
30.00
25.00

14.00
0.00
0.00
6.00
8.00
0.00
2.00
2.00
4.00
1.00

3.00
0.00
2.00
3.00
0.00
1.00
0.00
0.00
3.00
3.00

#REF!
#REF!
#REF!
#REF!
#REF!
TABEL BERAT BESI

NO DIA BERAT

1 25 3.85

2 22 2.98

3 19 2.23

4 16 1.58

5 12 0.888

6 10 0.617

7 8 0.395

8 6 0.222

Anda mungkin juga menyukai