PEKERJAAN STRUKTUR
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN LANTAI I
A PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Foot Plat 123.48 M3 25,000.00 3,087,000.00
2 Pek. Galian Tanah Sloof 7.46 M3 25,000.00 186,600.00
3 Pek. Urugan Pasir Bawah Foot Plat T.5cm 1.27 M3 150,000.00 190,500.00
4 Pek. Lantai Kerja Foot Plat T.5cm Adk. 1:3:5 1.27 M3 800,000.00 1,016,000.00
JUMLAH 4,480,100.00
B PEKERJAAN PONDASI
1 Pek. Beton Pondasi Foot Plat K-250 7.62 M3 3,500,000.00 26,670,000.00
2 Pek. Pedestal Kolom 40x40 K-250 3.66 M3 3,500,000.00 12,796,875.00
JUMLAH 39,466,875.00
JUMLAH 72,450,087.50
JUMLAH 52,447,455.50
TOTAL PEKERJAAN LANTAI I 168,844,518.00
II PEKERJAAN LANTAI II
A PEKERJAAN BETON BERTULANG
1 Pek. Kolom Struktur K-250 5.63 M3 3,500,000.00 19,707,187.50
2 Pek. Kolom Praktis K-175 1.16 M3 2,500,000.00 2,911,562.50
3 Pek. Balok K-250 10.29 M3 3,500,000.00 36,003,450.00
4 Pek. Plat Beton Lantai K-250 14.67 M3 3,000,000.00 44,010,000.00
5 Pek. Dak Beton t.10cm K-175 1.84 M3 2,500,000.00 4,606,100.00
JUMLAH 107,238,300.00
PEKERJAAN STRUKTUR
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp) (Rp)
1 2 3 4 5 6
B SUNSCREEN
1 Pek. Finishing Plat 4.40 M1 150,000.00 660,000.00
2 Pek. Balok 20/30 K-250 0.25 M3 3,500,000.00 873,600.00
3 Pek. Balok 11/15 K-175 0.04 M3 2,500,000.00 90,750.00
4 Pek. Plat Beton t.10cm K-175 0.22 M3 2,500,000.00 550,000.00
JUMLAH 2,174,350.00
TOTAL PEKERJAAN LANTAI II 109,412,650.00
JUMLAH 92,328,980.50
B SUNSCREEN
1 Pek. Finishing Plat 10.13 M1 150,000.00 1,519,500.00
2 Pek. Balok 20/30 K-250 0.61 M3 3,500,000.00 2,127,300.00
3 Pek. Balok 11/15 K-175 0.08 M3 2,500,000.00 210,375.00
4 Pek. Plat Beton t.10cm K-175 0.79 M3 2,500,000.00 1,970,000.00
JUMLAH 5,827,175.00
TOTAL PEKERJAAN LANTAI III 98,156,155.50
V PEKERJAAN TANGGA
1 Pek. Galian Tanah Pondasi Tangga 4.78 M3 25,000.00 119,531.25
2 Pek. Urugan Tanah Kembali 1.59 M3 50,000.00 79,687.50
3 Pek. Urugan Pasir Bawah Pondasi Tangga 0.09 M3 150,000.00 12,937.50
4 Pek. Beton Foot Plat Tangga K-250 0.47 M3 3,500,000.00 1,651,125.00
5 Pek. Pedestal Tangga K-250 2.40 M3 3,500,000.00 8,402,187.50
6 Pek. Balok 15/30 K-250 1.50 M3 3,500,000.00 5,240,340.00
7 Pek. Beton Tangga K-250 3.09 M3 3,500,000.00 10,824,953.13
VI PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan dan Penutup Atap 73.43 M2 160,000.00 11,748,640.00
2 Pas. Bubungan Metal Pasir 7.70 M1 30,000.00 231,000.00
3 Pas. Lisplank Wood Plank 7.70 M1 45,000.00 346,500.00
JUMLAH 12,326,140.00
TOTAL PEKERJAAN ATAP 148,069,551.88
TOTAL PEKERJAAN STRUKTUR 585,352,512.25