BLANKO PEMASANGAN AWAL

Bahan Instalasi Kode Pemasangan Harga Bahan unit ( pc) Total Harga Unit
waktu
(pc) pemasangan (jam)
Panel Distribusi 12 7300 1 7300 1 0.66
Kotak sambung ( 95/ 30 2750 2 5500 2 3.2
saklar seri 48 4500 1 4500 1 0.6
kotak kontak 16A FM 48 3082 2 6164 2 0.53
bola lampu 500 2 1000 2 0.3
fiting lampu 10 250 2 500 2 0.7
Kabel NYA (1,5mm2) 60 78 9.7 756.6 9.7 0.03
Kabel NYA (1,5mm2) 70 78 5.7 444.6 5.7 0.06
Kabel NYA (1,5mm2) 71 78 0 0 0 0.12
Kabel NYA (2,5mm2) 60 118 15.4 1817.2 15.4 0.03
Kabel NYA (2,5mm2) 70 118 15.4 1817.2 15.4 0.06
Kabel NYA (2,5mm2) 71 188 15.4 2895.2 15.4 0.12
Pipa PVC 11 10 11 200 18.6 3720 18.6 0.43
\ 32694.8
HARGA TENDER
Total jam kerjaupah/jam total upah TOTAL HA TOTAL UPAH
0.66 350 231 13140
6.4 350 2240 9900 4032
0.6 350 210 8100 378
1.06 350 371 11095.2 667.8
0.6 350 210 1800 378
1.4 350 490 900 882
0.291 350 101.85 1361.88 183.33
0.342 350 119.7 800.28 215.46
0 350 0 0 0
0.462 350 161.7 3270.96 291.06
0.924 350 323.4 3270.96 582.12
1.848 350 646.8 5211.36 1164.24
7.998 350 2799.3
22.585 5105.45 58850.64 8774.01

Total teder