05%
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp) MINGGU 1 MINGGU 2
PEKERJAAN
PEKERJAAN STRUKTUR bawah
II PEKERJAAN PONDASI
TP1
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 42,843,074.85 ###
3.12%
- Pekerjaan Besi Tulangan 15,853.61 Rp 114,345,606.98 ###
8.32% 1.39%
- Pekerjaan Bekisting 154,410.50 Rp 10,808,735.00 ###
0.79%
- Cyclop 2,519,974.76 Rp 66,149,337.45 4.81% 1.20%
###
TP2
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 7,834,162.26 ###
0.57%
- Pekerjaan Besi Tulangan 15,853.61 Rp 26,573,825.27 ###
1.93% 0.39% 0.39%
- Pekerjaan Bekisting 154,410.50 Rp 2,470,568.00 ###
0.18%
- Cyclop 2,519,974.76 Rp 12,095,878.85 0.88% 0.29%
###
S2 (25/50)
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 7,283,322.73 0.53%
- Pekerjaan Besi Tulangan 15,853.61 Rp 25,381,305.44 1.85%
- Pekerjaan Bekisting 163,035.50 Rp 12,125,765.31 0.88%
- Pekerjaan Bongkar Bekisting 4,075.89 Rp 303,144.13 0.02%
SP (15/20)
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 403,948.99 0.03%
- Pekerjaan Besi Tulangan 15,853.61 Rp 1,229,622.04 0.09%
- Pekerjaan Bekisting 163,035.50 Rp 1,165,703.83 0.08%
- Pekerjaan Bongkar Bekisting 4,075.89 Rp 29,142.60 0.00%
2. Tangga Akses
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp) MINGGU 1 MINGGU 2
PEKERJAAN
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 1,233,880.56 0.09%
- Pekerjaan Besi Tulangan P10 - 150, 2 lapis 15,853.61 Rp 4,128,280.70 0.30%
- Pekerjaan Bekisting Tangga 270,245.98 Rp 421,583.72 0.03%
PEKERJAAN STRUKTUR
I PEKERJAAN STRUKTUR LANTAI 1
1 BALOK
B1 35/70
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 14,275,312.54 1.04%
- Pekerjaan Besi Tulangan 15,853.61 Rp 42,915,754.40 3.12%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 31,200,102.20 2.27%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 780,002.56 0.06%
- Plesteran 112,304.40 Rp 11,693,695.65 0.85%
- Acian 64,078.00 Rp 6,672,121.75 0.49%
B2 25/50
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 10,588,359.93 0.77%
- Pekerjaan Besi Tulangan 15,853.61 Rp 43,623,309.06 3.17%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 32,398,665.55 2.36%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 809,966.64 0.06%
- Plesteran 112,304.40 Rp 12,142,913.25 0.88%
- Acian 64,078.00 Rp 6,928,433.75 0.50%
BKant 20/40
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 470,049.74 0.03%
- Pekerjaan Besi Tulangan 15,853.61 Rp 2,033,910.68 0.15%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 1,797,845.03 0.13%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 44,946.13 0.00%
- Plesteran 112,304.40 Rp 673,826.40 0.05%
- Acian 64,078.00 Rp 384,468.00 0.03%
BK 25/50
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 734,452.71 0.05%
- Pekerjaan Besi Tulangan 15,853.61 Rp 3,025,382.92 0.22%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 2,247,306.28 0.16%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 56,182.66 0.00%
- Plesteran 112,304.40 Rp 842,283.00 0.06%
- Acian 64,078.00 Rp 480,585.00 0.03%
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp) MINGGU 1 MINGGU 2
PEKERJAAN
2 PLAT LANTAI
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 19,389,551.59 1.41%
- Pekerjaan Besi Tulangan P10 - 150, 2 lapis 15,853.61 Rp 47,867,414.66 3.48%
- Pekerjaan Bekisting 411,557.40 Rp 73,257,217.20 5.33%
3 KOLOM
K1 60x60, 14 buah
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 15,300,118.89 1.11%
- Pekerjaan Besi Tulangan 15,853.61 Rp 50,078,797.02 3.64%
- Pekerjaan Pasang Bekisting 279,307.40 Rp 29,092,658.78 2.12%
- Pekerjaan Bongkar Bekisting 6,982.69 Rp 727,316.47 0.05%
- Plesteran beton 112,304.40 Rp 11,697,626.30 0.85%
- Acian Beton 64,078.00 Rp 6,674,364.48 0.49%
K2 40x40, 4 buah
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 1,942,872.24 0.14%
- Pekerjaan Besi Tulangan 15,853.61 Rp 9,148,663.19 0.67%
- Pekerjaan Pasang Bekisting 279,307.40 Rp 5,541,458.82 0.40%
- Pekerjaan Bongkar Bekisting 6,982.69 Rp 138,536.47 0.01%
- Plesteran beton 112,304.40 Rp 2,228,119.30 0.16%
- Acian Beton 64,078.00 Rp 1,271,307.52 0.09%
4 PLAT TANGGA
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 2,338,497.43 0.17%
- Pekerjaan Besi Tulangan 15,853.61 Rp 7,571,685.33 0.55%
- Pekerjaan Bekisting 540,491.95 Rp 10,755,789.81 0.78%
BT 20/30
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 176,268.65 0.01%
- Pekerjaan Besi Tulangan 15,853.61 Rp 855,904.83 0.06%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 719,138.01 0.05%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 17,978.45 0.00%
- Plesteran 112,304.40 Rp 269,530.56 0.02%
- Acian 64,078.00 Rp 153,787.20 0.01%
5 PEKERJAAN RAMP
Ramp
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 2,996,567.06 0.22%
- Pekerjaan Besi Tulangan P10 - 100, 2 lapis 15,853.61 Rp 10,025,824.55 0.73%
- Pekerjaan Pasang Bekisting 540,491.95 Rp 1,491,757.78 0.11%
PEKERJAAN ARSITEKTUR
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp) MINGGU 1 MINGGU 2
PEKERJAAN
5 Pekerjaan Pengecatan
Pekerjaanpengecatan tembok baru interior
B1 35/70 33,416.36 Rp 3,274,802.79 0.24%
B2 25/50 33,416.36 Rp 1,520,444.15 0.11%
Dinding pasangan 33,416.36 Rp 3,147,820.64 0.23%
Pekerjaanpengecatan tembok baru eksterior
BK 25/50 58,923.93 Rp 441,929.48 0.03%
K1 60x60, 14 buah 58,923.93 Rp 6,137,516.55 0.45%
K2 40x40, 4 buah 58,923.93 Rp 1,169,050.77 0.09%
Dinding pasangan 58,923.93 Rp 5,550,634.21 0.40%
Pekerjaan Compound 25,000.00 Rp 4,830,000.00 0.35%
5 Pekerjaan Lavatory
Kloset Jongkok 907,407.50 Rp 3,629,630.00 0.26%
Wastafel 1,441,755.00 Rp 2,883,510.00 0.21%
Pipe Trap Wastafel 416,254.00 Rp 832,508.00 0.06%
Kran Wastafel 339,304.63 Rp 678,609.25 0.05%
Kran Air 285,254.63 Rp 1,141,018.50 0.08%
Floor Drain 226,504.00 Rp 906,016.00 0.07%
Kaca Cermin Wastafel tbl 5 mm lt 1 389,228.10 Rp 778,456.20 0.06%
II Pekerjaan Elektrikal
Pek. Suplai listrik (sambungan dari existing) 250,000.00 Rp 250,000.00 0.02%
Pek. Pas MCB 25A 400,000.00 Rp 400,000.00 0.03%
Pek. Pas MCB 10A 350,000.00 Rp 350,000.00 0.03%
Pek. Pas titik saklar ganda 134,437.50 Rp 403,312.50 0.03%
Pek. Pas titik lampu 100,000.00 Rp 2,400,000.00 0.17%
Pek. Pas Lampu downlight LED 13 watt, setara philips 175,000.00 Rp 4,200,000.00 0.31%
Pek. Pas saklar tunggal 75,000.00 Rp 225,000.00 0.02%
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp) MINGGU 1 MINGGU 2
PEKERJAAN
5.31% 5.15% 4.87% 4.32% 5.27% 5.89% 5.25% 5.29% 4.86% 6.61% 7.03% 7.17%
MINGGU KE-
MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14
0.80%
0.15%
0.08%
0.68%
0.05%
0.79%
0.02%
0.06% 0.06% 0.06%
0.02% 0.02% 0.02%
0.10% 0.10% 0.10%
0.28% 0.28%
0.10% 0.10%
0.25% 0.25%
1.56% 1.56%
1.39% 1.39% 1.39% 1.39% 1.39%
0.20% 0.20% 0.20% 0.20%
1.20% 1.20% 1.20%
0.28% 0.28%
0.39% 0.39% 0.39%
0.09% 0.09%
0.29% 0.29%
MINGGU KE-
MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14
0.52% 0.52%
0.75% 0.75% 0.75% 0.75%
0.62% 0.62%
0.03%
0.26% 0.26%
0.62% 0.62% 0.62%
0.44% 0.44%
0.02%
0.03%
0.04% 0.04%
0.04% 0.04%
0.00%
0.08% 0.08%
0.16% 0.16% 0.16% 0.16% 0.16%
0.15% 0.15% 0.15%
0.01%
0.64%
0.04%
0.09%
0.30%
0.03%
MINGGU KE-
MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14
0.09%
0.30%
0.03%
0.56%
0.14%
0.08%
1.16%
1.07% 1.07% 1.07%
0.56% 0.56%
0.91% 0.91% 0.91% 0.91%
0.53% 0.53% 0.53% 0.53%
0.05%
0.85%
0.49%
0.07% 0.07%
0.17% 0.17% 0.17% 0.17%
0.10% 0.10% 0.10% 0.10%
0.01%
0.28%
0.39% 0.39%
0.01%
0.03% 0.03%
0.03% 0.03%
0.22%
0.36% 0.36%
0.05% 0.05%
MINGGU KE-
MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14
0.13%
MINGGU KE-
MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14
0.16%
0.27%
0.32%
0.09%
0.09%
0.21%
0.12%
0.04%
0.01%
0.30%
0.09%
0.21%
0.04%
0.10%
0.62%
MINGGU KE-
MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14
5.31% 5.15% 4.87% 4.32% 5.27% 5.89% 5.25% 5.29% 4.86% 6.61% 7.03% 7.17%
13.52% 18.67% 23.54% 27.86% 33.13% 39.02% 44.27% 49.56% 54.42% 61.03% 68.06% 75.23%
6.93% 6.32% 6.63% 2.67% 1.63% 0.60%
0.52% 0.52%
0.62% 0.62%
0.45% 0.45%
0.06%
0.85%
0.49%
0.39% 0.39%
0.63% 0.63%
0.47% 0.47%
0.06%
0.88%
0.50%
0.02% 0.02%
0.03% 0.03%
0.03% 0.03%
0.00%
0.05%
0.03%
0.03% 0.03%
0.04% 0.04%
0.03% 0.03%
0.00%
0.06%
0.03%
MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20
0.71% 0.71%
1.16% 1.16%
1.07% 1.07%
0.16%
0.09%
0.17%
0.28%
0.00%
0.02%
0.01%
MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20
1.17%
1.54%
0.88%
0.01%
0.04%
0.18%
0.13%
0.13%
0.45%
0.24%
0.11%
0.23%
0.03%
0.45%
0.09%
0.40%
0.35%
0.56%
0.26%
MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20
0.26%
0.21%
0.06%
0.05%
0.08%
0.07%
0.06%
0.02%
0.03%
0.03%
0.03%
0.17%
0.31%
0.02%
MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20
0.00%
6.93% 6.32% 6.63% 2.67% 1.63% 0.60%
82.16% 88.48% 95.10% 97.77% 99.40% 100.00%
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp)
PEKERJAAN
PEKERJAAN STRUKTUR bawah
II PEKERJAAN PONDASI
TP1
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 42,843,074.85 3.12% 2.45% ###
78.57%
- Pekerjaan Besi Tulangan 15,853.61 Rp 114,345,606.98 8.32% 8.32% ###
100.00%
- Pekerjaan Bekisting 154,410.50 Rp 10,808,735.00 0.79% 0.62% ###
78.57%
- Cyclop 2,519,974.76 Rp 66,149,337.45 4.81% 3.78% 78.57%
###
TP2
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 7,834,162.26 0.57% 0.57% ###
100.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 26,573,825.27 1.93% 1.93% ###
100.00%
- Pekerjaan Bekisting 154,410.50 Rp 2,470,568.00 0.18% 0.18% ###
100.00%
- Cyclop 2,519,974.76 Rp 12,095,878.85 0.88% 0.88% 100.00%
###
S2 (25/50)
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 7,283,322.73 0.53% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 25,381,305.44 1.85% 0.00% 0.00%
- Pekerjaan Bekisting 163,035.50 Rp 12,125,765.31 0.88% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 4,075.89 Rp 303,144.13 0.02% 0.00% 0.00%
SP (15/20)
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 403,948.99 0.03% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 1,229,622.04 0.09% 0.00% 0.00%
- Pekerjaan Bekisting 163,035.50 Rp 1,165,703.83 0.08% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 4,075.89 Rp 29,142.60 0.00% 0.00% 0.00%
2. Tangga Akses
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp)
PEKERJAAN
- Pekerjaan Beton fc' = 25 MPa, slump 12 979,270.28 Rp 1,233,880.56 0.09% 0.00% 0.00%
- Pekerjaan Besi Tulangan P10 - 150, 2 lapis 15,853.61 Rp 4,128,280.70 0.30% 0.00% 0.00%
- Pekerjaan Bekisting Tangga 270,245.98 Rp 421,583.72 0.03% 0.00% 0.00%
PEKERJAAN STRUKTUR
I PEKERJAAN STRUKTUR LANTAI 1
1 BALOK
B1 35/70
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 14,275,312.54 1.04% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 42,915,754.40 3.12% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 31,200,102.20 2.27% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 780,002.56 0.06% 0.00% 0.00%
- Plesteran 112,304.40 Rp 11,693,695.65 0.85% 0.00% 0.00%
- Acian 64,078.00 Rp 6,672,121.75 0.49% 0.00% 0.00%
B2 25/50
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 10,588,359.93 0.77% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 43,623,309.06 3.17% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 32,398,665.55 2.36% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 809,966.64 0.06% 0.00% 0.00%
- Plesteran 112,304.40 Rp 12,142,913.25 0.88% 0.00% 0.00%
- Acian 64,078.00 Rp 6,928,433.75 0.50% 0.00% 0.00%
BKant 20/40
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 470,049.74 0.03% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 2,033,910.68 0.15% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 1,797,845.03 0.13% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 44,946.13 0.00% 0.00% 0.00%
- Plesteran 112,304.40 Rp 673,826.40 0.05% 0.00% 0.00%
- Acian 64,078.00 Rp 384,468.00 0.03% 0.00% 0.00%
BK 25/50
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 734,452.71 0.05% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 3,025,382.92 0.22% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 2,247,306.28 0.16% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 56,182.66 0.00% 0.00% 0.00%
- Plesteran 112,304.40 Rp 842,283.00 0.06% 0.00% 0.00%
- Acian 64,078.00 Rp 480,585.00 0.03% 0.00% 0.00%
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp)
PEKERJAAN
2 PLAT LANTAI
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 19,389,551.59 1.41% 0.00% 0.00%
- Pekerjaan Besi Tulangan P10 - 150, 2 lapis 15,853.61 Rp 47,867,414.66 3.48% 0.00% 0.00%
- Pekerjaan Bekisting 411,557.40 Rp 73,257,217.20 5.33% 0.00% 0.00%
3 KOLOM
K1 60x60, 14 buah
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 15,300,118.89 1.11% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 50,078,797.02 3.64% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 279,307.40 Rp 29,092,658.78 2.12% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 6,982.69 Rp 727,316.47 0.05% 0.00% 0.00%
- Plesteran beton 112,304.40 Rp 11,697,626.30 0.85% 0.00% 0.00%
- Acian Beton 64,078.00 Rp 6,674,364.48 0.49% 0.00% 0.00%
K2 40x40, 4 buah
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 1,942,872.24 0.14% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 9,148,663.19 0.67% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 279,307.40 Rp 5,541,458.82 0.40% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 6,982.69 Rp 138,536.47 0.01% 0.00% 0.00%
- Plesteran beton 112,304.40 Rp 2,228,119.30 0.16% 0.00% 0.00%
- Acian Beton 64,078.00 Rp 1,271,307.52 0.09% 0.00% 0.00%
4 PLAT TANGGA
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 2,338,497.43 0.17% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 7,571,685.33 0.55% 0.00% 0.00%
- Pekerjaan Bekisting 540,491.95 Rp 10,755,789.81 0.78% 0.00% 0.00%
BT 20/30
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 176,268.65 0.01% 0.00% 0.00%
- Pekerjaan Besi Tulangan 15,853.61 Rp 855,904.83 0.06% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 299,640.84 Rp 719,138.01 0.05% 0.00% 0.00%
- Pekerjaan Bongkar Bekisting 7,491.02 Rp 17,978.45 0.00% 0.00% 0.00%
- Plesteran 112,304.40 Rp 269,530.56 0.02% 0.00% 0.00%
- Acian 64,078.00 Rp 153,787.20 0.01% 0.00% 0.00%
5 PEKERJAAN RAMP
Ramp
- Pekerjaan Beton k-300, slump 12 979,270.28 Rp 2,996,567.06 0.22% 0.00% 0.00%
- Pekerjaan Besi Tulangan P10 - 100, 2 lapis 15,853.61 Rp 10,025,824.55 0.73% 0.00% 0.00%
- Pekerjaan Pasang Bekisting 540,491.95 Rp 1,491,757.78 0.11% 0.00% 0.00%
PEKERJAAN ARSITEKTUR
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp)
PEKERJAAN
5 Pekerjaan Pengecatan
Pekerjaanpengecatan tembok baru interior
B1 35/70 33,416.36 Rp 3,274,802.79 0.24% 0.00% 0.00%
B2 25/50 33,416.36 Rp 1,520,444.15 0.11% 0.00% 0.00%
Dinding pasangan 33,416.36 Rp 3,147,820.64 0.23% 0.00% 0.00%
Pekerjaanpengecatan tembok baru eksterior
BK 25/50 58,923.93 Rp 441,929.48 0.03% 0.00% 0.00%
K1 60x60, 14 buah 58,923.93 Rp 6,137,516.55 0.45% 0.00% 0.00%
K2 40x40, 4 buah 58,923.93 Rp 1,169,050.77 0.09% 0.00% 0.00%
Dinding pasangan 58,923.93 Rp 5,550,634.21 0.40% 0.00% 0.00%
Pekerjaan Compound 25,000.00 Rp 4,830,000.00 0.35% 0.00% 0.00%
5 Pekerjaan Lavatory
Kloset Jongkok 907,407.50 Rp 3,629,630.00 0.26% 0.00% 0.00%
Wastafel 1,441,755.00 Rp 2,883,510.00 0.21% 0.00% 0.00%
Pipe Trap Wastafel 416,254.00 Rp 832,508.00 0.06% 0.00% 0.00%
Kran Wastafel 339,304.63 Rp 678,609.25 0.05% 0.00% 0.00%
Kran Air 285,254.63 Rp 1,141,018.50 0.08% 0.00% 0.00%
Floor Drain 226,504.00 Rp 906,016.00 0.07% 0.00% 0.00%
Kaca Cermin Wastafel tbl 5 mm lt 1 389,228.10 Rp 778,456.20 0.06% 0.00% 0.00%
II Pekerjaan Elektrikal
Pek. Suplai listrik (sambungan dari existing) 250,000.00 Rp 250,000.00 0.02% 0.00% 0.00%
Pek. Pas MCB 25A 400,000.00 Rp 400,000.00 0.03% 0.00% 0.00%
Pek. Pas MCB 10A 350,000.00 Rp 350,000.00 0.03% 0.00% 0.00%
Pek. Pas titik saklar ganda 134,437.50 Rp 403,312.50 0.03% 0.00% 0.00%
Pek. Pas titik lampu 100,000.00 Rp 2,400,000.00 0.17% 0.00% 0.00%
Pek. Pas Lampu downlight LED 13 watt, setara philips 175,000.00 Rp 4,200,000.00 0.31% 0.00% 0.00%
Pek. Pas saklar tunggal 75,000.00 Rp 225,000.00 0.02% 0.00% 0.00%
BOBOT
NO URAIAN PEKERJAAN HARGA (Rp) JUMLAH (Rp)
PEKERJAAN
MINGGU KE-
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
1.20% 0.48%
0.22% 0.22%
2.04%
0.40%
0.05%
0.06% 0.06% 0.02%
0.28% 0.28%
1.11% 1.34%
2.77% 2.77% 2.77%
0.28% 0.34%
1.72% 2.06%
0.28% 0.28%
0.97% 0.97%
0.09% 0.09%
0.44% 0.44%
MINGGU KE-
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
0.45%
1.32% 1.59%
0.85% 1.02%
0.08%
0.39% 0.39%
0.23% 0.23%
MINGGU KE-
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
MINGGU KE-
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
MINGGU KE-
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
MINGGU KE-
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
MINGGU KE-
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
MINGGU KE-
MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17
MINGGU KE-
MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17
MINGGU KE-
MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17
MINGGU KE-
MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17
MINGGU KE-
MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17
MINGGU KE-
MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17
MINGGU KE-
MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30.58% 30.58% 30.58% 30.58% 30.58% 30.58% 30.58% 30.58% 30.58% 30.58% 30.58% 30.58%
4.32% 5.27% 5.89% 5.25% 5.29% 4.86% 6.61% 7.03% 7.17% 6.93% 6.32% 6.63%
27.86% 33.13% 39.02% 44.27% 49.56% 54.42% 61.03% 68.06% 75.23% 82.16% 88.48% 95.10%
2.72% -2.55% -8.44% -13.69% -18.98% -23.84% -30.45% -37.48% -44.65% -51.58% -57.89% -64.52%
0.00% 0.00% 0.00%
A. Waktu Pelaksanaan
Jangka waktu pelaksanaan : 150 Hari kalender
Waktu yang telah digunakan : 35 Hari kalender
Sisa Waktu : 115 Hari kalender
Prosentase
Waktu yang telah digunakan : 23.33 %
B. Prestasi Kerja
Prestasi kerja yang telah dicapai Kontraktor sampai dengan tanggal 26 April 2019
adalah sebagai berikut :
Prestasi kerja : 30.6%
Time Schedule : 23.5%
Mendahului/Terlambat : 7.0%
###
C. Tenaga Kerja
s/d Minggu ke - 5 JUMLAH / TANGGAL
Keahlian
Site Manager 1
Pelaksana 1
Mandor 1
Logistik & peralatan 1
Kep. Tukang 1
Tukang Gali 2
Tukang Besi 3
Tukang Kayu 2
Tukang Batu 3
Tenaga 4
Jumlah Total 19
Pekerjaan mulai jam 08.00 WIB. Berakhir jam 16.00 WIB.
E. Pekerjaan yang telah dilaksanakan :
BANGUNAN UTAMA
I Pekerjaan Tanah
1 Menggali Tanah Pondasi dan Lantai
2 Membuang tanah urugan
3 Mengurug tanah
4
II Pekerjaan Struktur
A Pekerjaan Pondasi Tapak
1 Membuat Pondasi Batu kali
2 Merangkai Pembesian Pondasi Tapak
3 Memasang Bekisting
4 Mengecor pondasi tapak
B Pekerjaan Pedestal
1 Merangkai Pembesian Pedestal
2 Memasang Bekisting
3 Pengecoran Kolom Pedestal dengan Ready Mix, k-300
II Teknis
1 Progres terkendala oleh hujan.
2 Alat berat kurang leluasa dengan kondisi site.
Kontraktor Pelaksana
CV. ASTA KARYA LAKSANA
Agung Panji S.
Direktur
Agung Panji S.
Direktur
4 lembar
Agung Panji S.
Direktur
Agung Panji S.
Direktur
Tanggapan
Time Schedule
Laporan Mingguan
Cyclop
Quality
Kerapian