Rab Perumahan Guru SMPN 6
Rab Perumahan Guru SMPN 6
TOTAL Rp.
Terbilang : Dua Ratus Sembilan Puluh Sembilan Juta Tujuh Ratus Empat Puluh Enam Ribu Rupiah
JULIANSYAH. MT YUNITA,SP
NIP. 19760714 201001 1 012 Direktur
Mengetahui/Menyetujui :
PENGGUNA ANGGARAN
DINAS PENDIDIKAN KAB. TANAH BUMBU
IR.SARTONO,M.Si
NIP. 19600915 198703 1 018
ARAN BIAYA ( EE )
6 MANTEWE
TOTAL JUMLAH
2,071,656.40
34,113,363.84
44,886,320.22
63,921,984.50
58,995,683.12
22,480,915.89
17,328,918.60
5,014,545.00
2,117,750.00
2,317,842.00
15,364,799.20
3,882,832.00
272,496,610.76 ###
27,249,661.08
299,746,271.84
299,746,000.00
YUNITA,SP
Direktur
BUMBU
RENCANA ANGGARAN BIAYA ( EE )
KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUMAH DINAS GURU SMPN 6 MANTEWE
LOKASI : KEC. MANTEWE
TAHUN ANGGARAN : 2014
I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi I.1 72.00 M2 5,800.00 417,600.00
2 Papan nama proyek - 1.00 Bh 350,000.00 350,000.00
3 Pengukuran / Pasang Bouwplank I.2 34.00 M' 38,354.60 1,304,056.40
Sub Total I 2,071,656.40
II. PEKERJAAN PONDASI
1 Galian Tanah pondasi II.1 17.76 M3 24,720.00 439,027.20
2 Urugan Tanah kembali II.2 5.92 M3 11,852.00 70,163.84
3 Urugan pasir bawah pondasi II.3 2.96 M3 197,180.00 583,652.80
4 Pasangan pondasi batu kali/gunung camp. 1 : 4 III.1 28.80 M3 902,200.00 25,983,360.00
5 Pasangan pondasi Teras Dan Trap Tangga Depan Belakang III.1 7.80 M3 902,200.00 7,037,160.00
Sub Total II 34,113,363.84
III. PEKERJAAN STRUKTUR/BETON BERTULANG
1 Pek. Beton sloof bangunan 15/20 VII.4 2.40 M3 4,947,049.00 11,872,917.60
2 Pek. Beton kolom K.2 15/20 VII.6 0.48 M3 6,032,480.00 2,895,590.40
3 Pek. Beton kolom praktis K.1 15/15 VII.5 2.43 M3 5,041,049.00 12,249,749.07
4 Pek. Ringbalk 15/20 VII.8 1.98 M3 5,387,049.00 10,666,357.02
5 Pek.balok guevel beton bertulang 15/15 VII.8 0.80 M3 5,387,049.00 4,309,639.20
6 Pek. Kolom beton praktis pada kuda-kuda 15/15 VII.5 0.22 M3 5,041,049.00 1,088,866.58
7 Pek.Dak Beton Teras T ebal 10 Cm VII.9 0.45 M3 4,007,111.88 1,803,200.34
Sub Total III 44,886,320.22
IV. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding 1/2 bata Camp. 1 : 4 IV.2 265.50 M2 119,860.00 31,822,830.00
2 Plesteran Dinding,kolom dan sloof Camp. 1 : 4 V.2 545.00 M2 36,095.00 19,671,775.00
3 Pas Dinding Keramik 20/25 Untuk Km/Wc X.3 20.00 M2 139,047.76 2,780,955.25
4 Pas Dinding Batu tempel depan rumah 13.55 M2 300,000.00 4,065,000.00
5 Plesteran pondasi &samping trap tangga cam.1:2 V.1 10.50 M2 40,899.00 429,439.50
4 Pek.acian V.1 555.50 M2 9,274.50 5,151,984.75
Sub Total IV 63,921,984.50
V. PEKERJAAN PLAPON DAN PENUTUP ATAP
1 Pek. Konstruksi Kuda-kuda baja ringan 160.00 M2 220,000.00 35,200,000.00
2 Pas. Atap Genteng Metal 0,25 mm VIII.1 160.00 M2 66,518.00 10,642,880.00
3 Pas. Pamuung Genteng Metal 0,25 mm VIII.2 16.00 M' 56,309.00 900,944.00
4 Pas. Listplank Nusaplang VI.5 72.00 M' 62,500.00 4,500,000.00
5 Pas.Plafon kalsibord VI.6 83.40 M2 71,006.80 5,921,967.12
6 Pas.List Flafon kayu lanan VI.7 109.00 M1 16,788.00 1,829,892.00
Sub Total V 58,995,683.12
VI. PEKERJAAN LANTAI
1 Pek. Urugan tanah bawah lantai II.4 19.35 M3 195,450.00 3,781,957.50
2 Pek. Urugan pasir urug bawah lantai t = 5 cm II.3 4.90 M3 197,180.00 966,182.00
3 Pek. Cor lantai beton t = 7 cm camp. 1 : 3 : 5 VII.1 4.80 M3 916,115.00 4,392,771.43
4 Pek.pasangan kramik Km/Wc 20 X 20 X.2 6.00 M2 129,609.76 777,658.58
5 Pek.pasangan kramik R.dalam Dan Teras 40 X 40 X.1 91.00 M2 138,047.76 12,562,346.39
Sub Total VI 22,480,915.89
1 2 3 4 5 6=4x5
III.1 Pasang pondasi batu kali, 1Pc : 4 SNI BAB III-6 1M3
1.1000 M3 Batu belah 15/20 cm 320,000.00 - 352,000.00 352,000.00
### Kg Semen 1,700.00 - 277,100.00 277,100.00
0.5200 M3 Pasir pasang 280,000.00 - 145,600.00 145,600.00
1.5000 Oh Pekerja 55,000.00 82,500.00 - 82,500.00
0.6000 Oh Tukang batu 60,000.00 36,000.00 - 36,000.00
0.0600 Oh Kepala Tukang 65,000.00 3,900.00 - 3,900.00
0.0750 Oh Mandor 68,000.00 5,100.00 - 5,100.00
127,500.00 774,700.00 902,200.00
III.2 Pasang pondasi batu kosong SNI BAB III-10 1M3
1.2000 M3 Batu belah 15/20 cm 320,000.00 - 384,000.00 384,000.00
0.3000 M3 Pasir urug 150,000.00 - 45,000.00 45,000.00
0.7800 Oh Pekerja 55,000.00 42,900.00 - 42,900.00
0.3900 Oh Tukang batu 60,000.00 23,400.00 - 23,400.00
0.0390 Oh Kepala Tukang 65,000.00 2,535.00 - 2,535.00
0.0390 Oh Mandor 68,000.00 2,652.00 - 2,652.00
71,487.00 429,000.00 500,487.00
IV. DAFTAR ANALIS HARGA SATUAN PEKERJAAN DINDING
Satuan Upah Bahan Jumlah
No Uraian Pekerjaan Analis / Satuan
( Rp ) ( Rp ) ( Rp ) ( Rp )
IV.1 Pasangan bata merah tebal 1/2 bSNI BAB IV-8 1M2
1 Pc : 2 Ps 70.0000 Bh Bata merah 5x11x22 cm 900.00 - 63,000.00 63,000.00
18.9500 Kg Semen 1,700.00 - 32,215.00 32,215.00
0.0380 M3 Pasir Pasang 280,000.00 - 10,640.00 10,640.00
0.3200 Oh Pekerja 55,000.00 17,600.00 - 17,600.00
0.1000 Oh Tukang batu 60,000.00 6,000.00 - 6,000.00
0.0100 Oh Kepala Tukang 65,000.00 650.00 - 650.00
0.0150 Oh Mandor 68,000.00 1,020.00 - 1,020.00
25,270.00 105,855.00 131,125.00
IV.2 Pasangan bata merah tebal 1/2 bSNI BAB IV-9 1M2
1 Pc : 4 Ps 70.0000 Bh Bata merah 5x11x22 cm 900.00 - 63,000.00 63,000.00
11.5000 Kg Semen 1,700.00 - 19,550.00 19,550.00
0.0430 M3 Pasir Pasang 280,000.00 - 12,040.00 12,040.00
0.3200 Oh Pekerja 55,000.00 17,600.00 - 17,600.00
0.1000 Oh Tukang batu 60,000.00 6,000.00 - 6,000.00
0.0100 Oh Kepala Tukang 65,000.00 650.00 - 650.00
0.0150 Oh Mandor 68,000.00 1,020.00 - 1,020.00
25,270.00 94,590.00 119,860.00
XII.2 PAS. 1 BUAH KLOSET 1.0000 bh Kloset Jongkok Porselen 150,000.00 150,000.00 150,000.00
JONGKOK PORSELEN 6.0000 kg Semen Portland 1,700.00 10,200.00 10,200.00
0.0100 m3 Pasir pasang 280,000.00 2,800.00 2,800.00
0.1800 org Pekerja 55,000.00 9,900.00 9,900.00
0.2700 org Tukang batu 60,000.00 16,200.00 16,200.00
0.0540 org Kepala Tukang batu 65,000.00 3,510.00 3,510.00
0.0110 org Mandor 68,000.00 748.00 748.00
Jumlah 30,358.00 163,000.00 193,358.00
XII.3 PAS. 1 BH KRAN AIR LOKAL 1.0000 bh Kran Air 10,000.00 10,000.00 10,000.00
DIA 1/2" ATAU 3/4" 0.0250 bh Seal Tape 5,000.00 125.00 125.00
0.0100 org Pekerja 55,000.00 550.00 550.00
0.1000 org Tukang pipa 60,000.00 6,000.00 6,000.00
0.0100 org Kepala Tukang pipa 65,000.00 650.00 650.00
0.0050 org Mandor 68,000.00 340.00 340.00
Jumlah 7,540.00 10,125.00 17,665.00
XII.4 PAS. 1 BUAH BAK MANDI FIBER 1.0000 bh Bak Fiberglass 500,000.00 500,000.00 500,000.00
60X60 bak sudut 1.0000 Ls Perlengkapan ( 18% x Harga B 20,000.00 20,000.00 20,000.00
0.1800 org Pekerja 55,000.00 9,900.00 9,900.00
0.2700 org Tukang batu 60,000.00 16,200.00 16,200.00
0.0540 org Kepala Tukang batu 65,000.00 3,510.00 3,510.00
0.0110 org Mandor 68,000.00 748.00 748.00
Jumlah 30,358.00 520,000.00 550,358.00
XII.5 PAS. 1 BH FLOOR DRAIN 1.0000 bh Floor drain 15,000.00 15,000.00 15,000.00
0.0100 org Pekerja 55,000.00 550.00 550.00
0.1000 org Tukang pipa 60,000.00 6,000.00 6,000.00
0.0100 org Kepala Tukang pipa 65,000.00 650.00 650.00
0.0050 org Mandor 68,000.00 340.00 340.00
7,540.00 15,000.00 22,540.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUMAH DINAS GURU SMPN 6 MANTEWE
LOKASI : KEC. MANTEWE
TAHUN ANGGARAN : 2014
DAFTAR UPAH
DAFTAR BAHAN
BAHAN GALIAN
1 Tanah Urug Rp. 150,000.00 per m3
2 Tanah urug pilihan (Laterit) Rp. 150,000.00 per m3
3 Pasir urug Rp. 150,000.00 per m3
4 Pasir pasang Rp. 280,000.00 per m3
5 Kerikil/split Rp. 330,000.00 per m3
6 Semen PC Rp. 1,700.00 per kg
7 Semen PC 50 Kg Rp. 85,000.00 per zak
8 Semen warna Rp. 2,250.00 Per Kg
9 Batu gunung / kali Rp. 320,000.00 per m3
10 Batu bata Rp. 900.00 per bj
11 Roster 20 x 20 beton Rp. 22,000.00 per bj
BAHAN KAYU
1 Kayu balok Meranti Rp. 2,000,000.00 per m3
2 Kayu papan Meranti Rp. 2,000,000.00 per m3
3 Kayu balok karuing Rp. 2,500,000.00 per m3
4 Kayu papan karuing Rp. 3,000,000.00 per m3
5 Kayu balok ulin Rp. 4,050,000.00 per m3
6 Kayu papan ulin Rp. 5,062,500.00 per m3
7 Kayu papan bikisting Rp. 1,800,000.00 per m3
8 Kayu balok bikisting Rp. 1,800,000.00 per m3
9 Kusen Lanan 5/10 cm (pabrikasi) Rp. 50,000.00 per m'
10 Kusen Ulin 5/10 cm (pabrikasi) Rp. 60,000.00 per m'
11 Pintu Lanan uk. 80 x 200 cm (pabrikasi) Rp. 650,000.00 per Bh
12 Pintu ulin uk. 80 x 200 cm (pabrikasi) Rp. 900,000.00 per Bh
13 Jendela rangka lanan J1 (pabrikasi) Rp. 250,000.00 per Bh
14 Jendela rangka ulin J1 (pabrikasi) Rp. 350,000.00 per Bh
15 List kayu plafond (meranti) Rp. 25,000.00 per m`
16 Kayu galam panjang 4 m Rp. 10,800.00 per btg
BAHAN BESI
1 Besi beton Rp. 22,000.00 per Kg
2 Kawat beton (bendrat) Rp. 35,000.00 per Kg
BAHAN FLYWOOD
1 Kalsiboard tebal 3 mm Rp. 67,000.00 per lbr
2 Plywood tebal 4 mm Rp. 110,000.00 per lbr
3 Playwood tebal 9 cm Rp. 190,000.00 per lbr
BAHAN PAKU
1 Rupa-rupa paku Rp. 30,000.00 per kg
2 Besi strip / begel Rp. 35,000.00 per kg
3 Paku atap Rp. 40,000.00 per kg
4 Paku ulin Rp. 40,000.00 per kg
BAHAN ATAP
1 Atap genteng mental Rp. 40,000.00 per Lbr
2 Nok/Pamu'ung atap genteng metal Rp. 27,000.00 per m`
3 Baja Ringan (Rangka atap) Rp. 220,000.00 per m2
BAHAN LANTAI
1 Keramik 40 x 40 cm Rp. 90,000.00 per m2
2 Keramik 20 x 20 cm (Anti slip) Rp. 105,000.00 per m2
3 Keramik 20/25 Rp. 105,000.00 per m2
BAHAN KACA
1 Kaca bening 5 mm Rp. 118,800.00 per m2
2 Kaca rayban 5 mm Rp. 108,000.00 per m2
3 List kaca Rp. 6,750.00 per m'
BAHAN PENYELESAIAN
1 Cat air/tembok Rp. 34,000.00 per Kg
2 Cat minyak/kilap Rp. 45,000.00 per Kg
3 Cat Manie Rp. 25,312.50 per Kg
4 Cat air/tembuk dasar Rp. 25,312.50 per Kg
5 Cat minyak/kilap dasar Rp. 25,312.50 per Kg
6 Plamir tembuk Rp. 23,760.00 per Kg
7 Dempul kayu Rp. 22,275.00 per Kg
8 Lem kayu Rp. 20,250.00 per Kg
9 Ampalas Rp. 5,062.50 per Lb
10 Minyak cat Rp. 25,312.50 per Ltr
11 Minyak bikisting Rp. 5,040.00 per Ltr
12 Kuas 4" Rp. 20,250.00 per Bh
13 Kuas gulung Rp. 20,250.00 per Bh
BAHAN LISTRIK
1 Instalasi titik lampu Rp. 120,000.00 per Bh
2 Saklar ganda Rp. 18,000.00 per Bh
3 Saklar tunggal Rp. 15,000.00 per Bh
4 Stop kontak Rp. 16,875.00 per Bh
5 Fitting lampu Rp. 6,000.00 per Bh
6 Lampu TL 20 watt komplit Rp. 50,625.00 per Bh
7 Lampu SL 8 watt Rp. 25,875.00 per Bh
8 MCB Rp. 55,000.00 per Bh
BAHAN SANITAIR
1 Kloset Jongkok Rp. 150,000.00 per Bh
2 Bak Fiber Rp. 500,000.00 per Bh
3 Floor Dran(FD) Rp. 15,000.00 per Bh
4 Kran Rp. 10,000.00 per Bh
5 Solatip Rp. 5,000.00 per Bh
68,000.00
65,000.00
60,000.00
60,000.00
60,000.00
60,000.00
55,000.00
55,000.00
55,000.00
130,000.00
150,000.00
186,250.00
189,062.50
250,937.50
1,340.00
67,000.00
2,500.00
239,687.50
570.00
6,750.00
1,687,500.00
1,912,000.00
1,687,500.00
2,250,000.00
4,500,000.00
5,625,000.00
1,000,000.00
1,000,000.00
48,000.00
57,000.00
337,500.00
450,000.00
86,000.00
202,500.00
15,000.00
12,000.00
20,000.00
23,400.00
59,625.00
70,200.00
162,000.00
24,700.00
25,350.00
30,000.00
28,125.00
45,000.00
30,000.00
337,000.00
60,000.00
50,625.00
132,000.00
120,000.00
7,500.00
33,750.00
19,200.00
11,250.00
12,000.00
12,000.00
192,000.00
16,200.00
42,750.00
28,125.00
28,125.00
28,125.00
26,400.00
24,750.00
22,500.00
5,625.00
28,125.00
5,600.00
22,500.00
22,500.00
120,000.00
18,000.00
15,000.00
16,875.00
6,000.00
50,625.00
25,875.00
55,000.00
RENCANA ANGGARAN BIAYA ( EE )
KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUMAH DINAS GURU SMPN 6 MANTEWE
LOKASI : KEC. MANTEWE
TAHUN ANGGARAN : 2014
KODE L . BWH
URAIAN PEKERJAAN ANALISA VOLUME
NO (M)
1 2 3 4 3
I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi I.1 72.00 M2
2 Papan nama proyek - 1.00 Bh
3 Pengukuran / Pasang Bouwplank I.2 34.00 M'
1 2 3 4
X PEKERJAAN SANITASI
1 Floor Drain XII.5 2.00 Bh
2 Kloset Jongkok XII.2 2.00 Bh
3 Bak Fiber XII.4 2.00 Bh
4 Kran Air XII.3 2.00 Bh
5 Instalasi Air Kotor - 1.00 Ls
6 Instalasi Air Bersih - 1.00 Ls
XI PEKERJAAN PENGECATAN
1 Pek cat Tembok dan flapon (danabrith) XI.2 638.90 M2
2 Pek.Cat Kilap Untuk Kusen,pintu,jendela,lisplang&li XI.1 89 M2
0.3 45.5