Anda di halaman 1dari 184

ANALISA BAHAN DAN UPAH TCT

NO. URAIAN PEKERJAAN SAT. INDEKS

I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m ² )
Bahan

Tenaga
Pekerja OH 0.100
B. Memasang Bouwplank (m ¹ )
Bahan
Kayu 5/7 M3 0.012
Paku Biasa 2"-5" Kg 0.020
Papan 3/20 M3 0.007
Tenaga
Pekerja OH 0.100
Tukang Kayu OH 0.100

II. PEKERJAAN TANAH


A. Galian Tanah Biasa sedalam 1 m (m ³ )
Tenaga
Pekerja OH 0.400

III. PEKERJAAN BETON


A. 1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt
Bahan
Semen Portland Kg 336.000
Pasir Beton M3 0.540
Koral Beton M3 0.810
Tenaga
Perkerja OH 2.000
Tukang Batu OH 0.350

IV. PEKERJAAN PEMBESIAN


A. Pembesian Dengan Besi Polos (kg)
Bahan
Besi ø 6 mm Kg 1.050
Besi ø 8 mm Kg 1.050
Kawat Beton Kg 0.015
Tenaga
Pekerja OH 0.007
Tukang Besi OH 0.007

V. PEKERJAAN BEKISTING
A. Pasang Bekisting (m²) ( Dua Kali Pakai )
Bahan
Kayu Kelas III M3 0.040
Paku Biasa 2" - 5" Kg 0.400
Minyak Bekisting Ltr 0.200
Plywood 9 mm Lbr 0.350
Dolken Kayu Galam Ø 8 - 10 / 4m Btg 3.000
Tenaga
Pekerja OH 4.000
Tukang Kayu OH 0.330

VI. PEKERJAAN PLESTERAN


A. Plesteran Beton 1pc : 2ps, tebal 15 mm
Bahan
Semen Portland Kg 9.300
NO. URAIAN PEKERJAAN SAT. INDEKS

Pasir Pasang M3 0.018


Tenaga
Perkerja OH 0.260
Tukang Batu OH 0.200

VII. PEKERJAAN PENGECATAN


A. Pengecatan Tembok Baru (m ² )
Bahan
Plamir Kg 0.100
Kertas gosok Lbr 1.000
Cat Dasar Kg 0.100
Cat Penutup 2x Kg 0.260
Tenaga
Pekerja OH 0.020
Tukang Cat OH 0.063
DAN UPAH TCT

KUANTITAS

0.000

0.000
0.000

0.000
0.000
0.000

0.000
0.000

0.027

0.011

0.036

12.096
0.019
0.029

0.072
0.013

3.301

0.773 0.811
2.528 2.654
0.050

0.023
0.023

0.720

0.029
0.288
0.144
0.252
2.160

2.880
0.238

0.600

5.580
KUANTITAS

0.011

0.156
0.120

0.600

0.060
0.600
0.060
0.156

0.012
0.038
VOLUME PEMBESIAN TCT

B T L J. Kolom/Balok/Plat Dia. Tul Panj. 1 Tul Jml Tul Tot. Panj.Tul Berat Tul Dia. Begel
KOLOM/BALOK/PLAT
m m m btg mm m btg m kg mm
1. PONDASI TAPAK 30/30

0.30 0.30 0.10 1.00 8.00 0.30 2.00 0.60 0.237 8.00

2. KOLOM 15/15

0.15 0.15 1.30 1.00 8.00 1.30 4.00 5.20 2.054 6.00
Panj.1 Begel Jml Begel Tot. Panj. Begel Berat Begel
m m m kg

0.30 2.00 0.60 0.237

0.46 7.50 3.48 0.773


PERHITUNGAN VOLUME PEKERJAAN TCT

UKURAN
NO. JENIS PEKERJAAN SATUAN
P L T

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2
2 Pemasangan Bowplank M

II. PEKERJAAN TANAH


1 Galian Tanah Biasa M3 0.3 0.3 0.3

III. PEKERJAAN BETON 1:2:3


1 Pembuatan Beton Pondasi M3 0.3 0.3 0.1
2 Pembuatan Beton Kolom 15/15 M3 0.15 0.15 1.2

IV. PEKERJAAN PEMBESIAN


1 Pembesian Pondasi Tapak
ø 8 mm Kg

2 Pembesian Kolom 15/15


ø 8 mm Kg
ø 6 mm Kg

V. PEKERJAAN BEKISTING
1 Bekisting Kolom 15/15 M2 0.15 0.15 1.2

VII. PLESTERAN
1 Plesteran Kolom 15/15 M2 0.15 0.15 1

VIII PEKERJAAN PENGECATAN M2


1 Pengecatan Kolom 15/15 M2 0.15 0.15 1
E PEKERJAAN TCT

RUMUS QTY

PxLxT 0.027

0.04
PxLxT 0.009
PxLxT 0.027

3.30

0.47

2.05
0.77

0.72
4xLxT 0.72

4xLxT 0.6

0.60
4xLxT 0.6
RENCANA ANGGARAN BIAY

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Seberida
Desa : Paya Rumbai

VOLUME
URAIAN KONSTRIBUSI MASYARAKAT
TOTAL APB-Des APBD
INCASH INKIND
1 2 3 4 5 6
I BAHAN
1 Paku Biasa 2"-5" 3.00 - - - 3
2 Pasir Beton 4.00 - - - 4
3 Koral Beton 3.00 - - - 3
4 Semen Portland 37.00 - - - 37
5 Kayu 5/7 0.20 - - - 0
6 Papan 3/20 0.10 - - - 0
7 Plywood 9 mm 4.00 - - - 4
8 Minyak Bekisting 2.00 - - - 2
9 Bata Merah 1,900.00 - - - 1,900
10 Besi ø 6 mm 13.00 - - - 13
11 Besi ø 8 mm 24.00 - - - 24
12 Kawat Beton 3.00 - - - 3
13 Plamir 3.00 - - - 3
14 Cat Dasar 3.00 - - - 3
15 Cat Penutup 2x 8.00 - - - 8
16 Pintu Besi + Kusen + Perlengkapan 1.00 - - - 1
20 Pipa Galvanis 3 inch 1.00 - - - 1
20 Pipa Galvanis 2 inch 1.00 - - - 1
SUB TOTAL I
II UPAH
1 Pekerja 53.00 - 53 - -
2 Tukang 16.00 - - - 16
SUB TOTAL II
TOTAL

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS
Kabupaten Indragiri Hulu
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO WIDYA ERYUNINGSIH,
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA

No.RAB :
Program : Pamsimas
Jenis : Pembuatan Rumah Mesin
Volume : 1 (satu) unit

HARGA BIAYA (Rp)


SATUAN SATUAN KONSTRIBUSI MASYARAKAT
TOTAL APB-Des
Rp INCASH INKIND
7 8 9=2X8 10 = 3 x 8 11 = 4 x 8 12 = 5 X 8

Kg Rp 20,000 Rp 60,000 Rp - Rp - Rp -
M3 Rp 128,000 Rp 512,000 Rp - Rp - Rp -
M3 Rp 250,000 Rp 750,000 Rp - Rp - Rp -
Zak Rp 67,000 Rp 2,479,000 Rp - Rp - Rp -
M3 Rp 1,700,000 Rp 340,000 Rp - Rp - Rp -
M3 Rp 1,700,000 Rp 170,000 Rp - Rp - Rp -
M3 Rp 125,000 Rp 500,000 Rp - Rp - Rp -
Ltr Rp 11,000 Rp 22,000 Rp - Rp - Rp -
Bh Rp 800 Rp 1,520,000 Rp - Rp - Rp -
Btg Rp 40,000 Rp 520,000 Rp - Rp - Rp -
btg Rp 50,000 Rp 1,200,000 Rp - Rp - Rp -
Kg Rp 20,000 Rp 60,000 Rp - Rp - Rp -
Kg Rp 10,000 Rp 30,000 Rp - Rp - Rp -
kg Rp 15,000 Rp 45,000 Rp - Rp - Rp -
kg Rp 65,000 Rp 520,000 Rp - Rp - Rp -
Ls Rp 2,000,000 Rp 2,000,000 Rp - Rp - Rp -
btg Rp 715,000 Rp 715,000 Rp - Rp - Rp -
btg Rp 370,000 Rp 370,000 Rp - Rp - Rp -
Rp 11,813,000 Rp - Rp - Rp -

Oh Rp 80,000 Rp 4,240,000 Rp - Rp 4,240,000 Rp -


Oh Rp 120,000 Rp 1,920,000 Rp - Rp - Rp -
Rp 6,160,000 Rp - Rp 4,240,000 Rp -
Rp 17,973,000 Rp - Rp 4,240,000 Rp -

Paya Rumbai, Desember 2017


Diperiksa Oleh: Dibuat Oleh:
TFM - WSS Koordinator KKM Pelaksana Pamsimas
WIDYA ERYUNINGSIH, ST MUKSIN YUSPADILA
APBD

13 = 6 X 8

Rp 60,000
Rp 512,000
Rp 750,000
Rp 2,479,000
Rp 340,000
Rp 170,000
Rp 500,000
Rp 22,000
Rp 1,520,000
Rp 520,000
Rp 1,200,000
Rp 60,000
Rp 30,000
Rp 45,000
Rp 520,000
Rp 2,000,000
Rp 715,000
Rp 370,000
Rp 11,813,000

Rp -
Rp 1,920,000
Rp 1,920,000
Rp 13,733,000

na Pamsimas
HARGA SATUAN BAHAN DAN UPAH

KEGIATAN : PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASISI MASARAKAT (PAMSIM
DESA : SUNGAI GOLANG
KECAMATAN : KELAYANG
KABUPATEN : INDRAGIRI HULU
PROPINSI : RIAU

TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN
(Rp) (Rp)

I. UPAH HARIAN

1 Tukang Orang/hari 120,000.00 120,000.00


2 Pekerja Orang/hari 100,000.00 100,000.00

II. BAHAN-BAHAN BANGUNAN

A. BAHAN PASANGAN

1 Pasir urug M3 160,000.00 160,000.00


2 Tanah urug M3 150,000.00 150,000.00
3 Pasir pasang M3 160,000.00 160,000.00
4 Pasir Beton M3 160,000.00 160,000.00
5 Kerikil M3 180,000.00 180,000.00
6 Batu bata Bh 1,200.00 1,200.00
7 Semen Portland Zak 65,000.00 65,000.00
8 Semen Warna Kg 35,000.00 35,000.00
9 Arang Batok M3
10 Goni Rajut M2
11 Kawat Duri (Panjang 50 M' / Glg) Glg

B. BAHAN KAYU

1 Kayu 5/7 M3 1,850,000.00 1,900,000.00


2 Papan M3 1,850,000.00 1,900,000.00
3 Triplek Tebal 9 mm Lbr 145,000.00 145,000.00
4 Triplek Tebal 6 mm Lbr 95,000.00 90,000.00
5 Triplek Tebal 4 mm Lbr 65,000.00 75,000.00
6 Dolken Kayu dia 8-10 cm, Pj 4 meter Btg 15,000.00 15,000.00
7 Bambu Btg 8,000.00 8,000.00
8 Kusen Pintu Lubang 300,000.00 300,000.00
9 Pintu Panel Buah 650,000.00 650,000.00
10 Pintu Fiber Unit 245,000.00 245,000.00
11 Kusen Jendela Unit 300,000.00 300,000.00
12 Jendela Kaca Bh 350,000.00 350,000.00
13 Ventilasi Bh

C. BAHAN BESI / BAJA, PAKU


TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN
(Rp) (Rp)
1 Kawat beton Kg 20,000.00 20,000.00
2 Paku Kg 17,000.00 18,000.00
3 Paku seng Kg 25,000.00 25,000.00
4 Besi Ukuran 8 mm Btg 42,000.00 40,000.00
5 Besi Ukuran 10 mm Btg 90,000.00 85,000.00
6 Besi Ukuran 12 mm Btg 93,000.00 95,000.00
7 Besi Ukuran 14 mm Btg 160,000.00 150,000.00
8 Manhole Unit 500,000.00 500,000.00
9 Tangga Unit 2,000,000.00 2,000,000.00
10 Pagar Besi Unit 2,000,000.00 2,000,000.00
11 Besi Siku 40 x 40 x 4 mm Btg

D. BAHAN CAT/FINISHING

1 Cat air Kg 45,000.00 37,500.00


2 Cat meni Klg 40,000.00 41,000.00
3 Cat Dasar Kg 60,000.00 60,000.00
4 Cat Lapis anti bocor Kg 45,000.00 40,000.00
5 Plamir /dempul Kg 30,000.00 30,000.00
6 Minyak bekesting Ltr 11,000.00 11,000.00
7 Cat Air 20 Kg Kg 970,000.00 1,000,000.00
8 Cat Minyak Kg
TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN
(Rp) (Rp)

E. BAHAN ATAP / LANGIT-LANGIT

1 Seng gelombang BJLS 20 K Lbr 47,000.00 47,500.00


2 Seng gelombang BJLS 20 K Kodi 940,000.00 950,000.00
3 Perabung Seng Lbr

F. BAHAN LANTAI /LAP. DINDING

1 Keramik 30x30 cm Ktk 0.00 0.00


2 Keramik 20x20 cm Ktk 0.00 0.00

G. BAHAN ALAT PENGGANTUNG/KACA

1 Kunci Slot Bh 0.00 0.00


2 Engsel Pintu Kupu-Kupu 3'' Bh 15,000.00 12,500.00
3 Engsel pintu 4" Psg 0.00 12,000.00
4 Engsel jendela 3 " Psg 0.00 12,000.00
5 Grendel pintu Bh 20,000.00 20,000.00
6 Grendel jendela Bh 0.00 8,000.00
7 Tarikan tangan Bh 0.00 5,000.00
8 Hak Angin Bh 0.00 6,000.00
9 Kait Angin Bh 0.00 6,000.00
10 Kaca bening 5 mm M2
11 Kaca hitam 5 mm M2
12 Kaca buram 5 mm M2
13 Kaca nako 5 mm M2
14 Kunci Tanam 2 Slagg Psg 125,000.00 125,000.00
15 Engsel Pintu Bh 23,000.00 23,000.00

H. BAHAN SANITAIR/PLUMBING

1 Kloset jongkok Bh
2 Floordrain Bh 25,000.00 25,000.00
3 Ventilasi/Vent Bh 35,000.00 35,000.00
4 Bak Air Kecil Bh 350,000.00 350,000.00
5 Pintu fiber Bh 450,000.00 450,000.00
6 Wastafel Bh 260,000.00 250,000.00
7 Polytank 1000 ltr Bh
8 Polytank 15000 ltr Bh
9 Seal Tape Bh 10,000.00
10 Lem Pipa Tbg 25,000.00 25,000.00
11 Lem Pipa Bh 12,000.00 12,000.00

RRJ
1 Pipa PVC RRJ 4'' Btg 410,000.00
2 Pipa PVC RRJ 3'' Btg 315,000.00
3 Pipa PVC RRJ 2,5'' Btg
4 Pipa PVC RRJ 2'' Btg 185,000.00 185,000.00
TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN
(Rp) (Rp)
PVC
1 Pipa PVC 4'' Btg 128,000.00 128,000.00
2 Pipa PVC 3'' Btg 80,000.00 80,000.00
4 Pipa PVC 2,5'' Btg 180,000.00 180,000.00
5 Pipa PVC 2'' Btg 55,000.00 50,000.00
6 Pipa PVC 1'' Btg 80,000.00 80,000.00
7 Pipa PVC 1 1/4'' Btg 48,000.00 48,000.00
8 Pipa PVC 3/4'' Btg 0.00
9 Pipa PVC 1/2'' Btg 0.00
10 Elbu/Soket/4'' Buah 35,000.00 35,000.00
11 Elbu/Soket/3'' Buah 15,000.00 15,000.00
12 Elbu/Soket/2,5'' Buah 30,000.00 30,000.00
13 Elbu/Soket/2'' Buah 8,000.00 8,000.00
14 Elbu/Soket/1 1/4'' Buah 7,000.00 7,000.00
15 Elbu/Soket/1'' Buah 10,000.00 10,000.00
16 Elbu/Soket/3/4'' Buah 5,000.00
17 Elbu/Soket/1/2'' Buah 5,000.00
18 Reducer 4x3 Buah
19 Reducer 3x2 Buah
20 Kran Air 1'' Buah 40,000.00 40,000.00
21 Kran Air 3/4'' Buah 30,000.00 10,000.00
22 Kran Air 1/2'' Buah 0.00
23 Stop Kran 3'' Buah 50,000.00 50,000.00
TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN
(Rp) (Rp)
24 Stop Kran 2,5'' Buah
25 Stop Kran 2'' Buah 45,000.00 45,000.00
26 Stop Kran 1'' Buah 45,000.00 -
27 Stop Kran 3/4'' Buah 10,000.00
28 Stop Kran 1/2'' Buah 20,000.00
29 Dop 2" Buah 12,000.00 15,000.00

GIV
1 Pipa 4" Gi Btg 1,200,000.00 1,200,000.00
2 Pipa 3" Gi Btg 960,000.00 950,000.00
3 Pipa 2,5" Gi Btg
4 Pipa 2" Gi Btg 720,000.00 720,000.00
5 Pipa 1" Gi Btg 250,000.00 250,000.00
6 Pipa 3/4" Gi Btg
7 Pipa besi 4" Btg 650,000.00 550,000.00
8 Pipa besi 3" Btg 650,000.00 450,000.00
9 Kran Air 1/2" GIV Bh 50,000.00 50,000.00
10 Meter Air 1/2" Bh 275,000.00 275,000.00
11 Clamp sadle 3" Giv Bh 135,000.00 100,000.00
12 Clamp sadle 2" Giv Bh 88,000.00 80,000.00
13 Elbu/Soket/4'' Bh 15,000.00 150,000.00
14 Elbu/Soket/3'' Bh 8,000.00 8,000.00
15 Elbu/Soket/2.5'' Bh
16 Elbu/Soket/2'' Bh 6,000.00 5,000.00
17 Mesin Diesel Bh 14,000,000.00
18 Instalasi Listrik Ls
19 Kabel Listrik m
20 Sling m
21 Pompa Submersible Bh 14,000,000.00
22 Spoon Lembar 50,000.00
23 Arang Kg 5,000.00
24 Pipa Spiral M 60,000.00
25 Kawat Harmonika M2
TUAN BAHAN DAN UPAH

MINUM DAN SANITASI BERBASISI MASARAKAT (PAMSIMAS)

TB
DIFA HARGA TERENDAH
(Rp) (Rp)

120,000.00 120,000.00
100,000.00 100,000.00

155,000.00 155,000.00
140,000.00 140,000.00
155,000.00 155,000.00
155,000.00 155,000.00
180,000.00 180,000.00
1,500.00 1,200.00
65,000.00 65,000.00
35,000.00
300,000.00
25,000.00
130,000.00

1,900,000.00 1,850,000.00
1,900,000.00 1,850,000.00
150,000.00 145,000.00
95,000.00 90,000.00
65,000.00 65,000.00
150,000.00 10,000.00
8,000.00 8,000.00
300,000.00 300,000.00
650,000.00 650,000.00
250,000.00 245,000.00
300,000.00 300,000.00
350,000.00 350,000.00
TB
DIFA HARGA TERENDAH
(Rp) (Rp)
22,000.00 20,000.00
18,000.00 20,000.00
25,000.00 25,000.00
42,000.00 65,000.00
150,000.00 85,000.00
94,000.00 105,000.00
170,000.00 150,000.00
500,000.00 500,000.00
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00
150,000.00

40,000.00 37,500.00
40,000.00 40,000.00
60,000.00 15,000.00
43,000.00 40,000.00
10,000.00 10,000.00
10,000.00 10,000.00
990,000.00 970,000.00
60,000.00
TB
DIFA HARGA TERENDAH
(Rp) (Rp)

47,500.00 47,000.00
950,000.00 940,000.00
20,000.00 20,000.00

0.00
0.00

0.00 0.00
10,000.00 10,000.00
12,000.00 0.00
11,000.00 0.00
20,000.00 20,000.00
15,000.00 0.00
7,000.00 0.00
10,000.00 0.00
10,000.00 0.00
0.00
0.00
0.00
0.00
125,000.00 125,000.00
25,000.00 23,000.00

0.00
25,000.00 25,000.00
35,000.00 35,000.00
400,000.00 350,000.00
420,000.00 420,000.00
240,000.00 240,000.00
0.00
0.00
10,000.00 10,000.00
25,000.00 25,000.00
12,000.00 12,000.00

410,000.00
315,000.00
0.00
185,000.00 185,000.00
TB
DIFA HARGA TERENDAH
(Rp) (Rp)

130,000.00 128,000.00
81,000.00 80,000.00
180,000.00 180,000.00
55,000.00 50,000.00
80,000.00 80,000.00
50,000.00 48,000.00
0.00
0.00
35,000.00 35,000.00
16,000.00 15,000.00
30,000.00 30,000.00
8,000.00 8,000.00
7,000.00 7,000.00
10,000.00 10,000.00
5,000.00
5,000.00
0.00
0.00
40,000.00 40,000.00
10,000.00 10,000.00
0.00 0.00
50,000.00 50,000.00
TB
DIFA HARGA TERENDAH
(Rp) (Rp)
0.00
45,000.00 45,000.00
45,000.00 45,000.00
10,000.00
20,000.00 20,000.00
15,000.00 12,000.00

1,200,000.00 1,200,000.00
960,000.00 950,000.00
0.00 0.00
710,000.00 710,000.00
250,000.00 250,000.00
0.00
650,000.00 550,000.00
450,000.00 450,000.00
50,000.00
275,000.00 275,000.00
135,000.00 100,000.00
88,000.00 80,000.00
15,000.00 15,000.00
8,000.00 8,000.00
0.00
50,000.00 5,000.00
14,000,000.00
0.00
0.00
0.00
14,000,000.00
50,000.00
5,000.00
60,000.00
0.00
DAFTAR ANALISA HARGA SATUAN PERPIPAAN

No Kebutuhan Sat Indeks Volume


1 2 3 4 5
I PEKERJAAN PIPANISASI
1 Memasang 1 m' Pipa AW Ø 2" 626
Bahan Pipa AW Ø 2" m' 1 626
Perlengkapan Ls 1 1
Tenaga Pekerja oh 0.054 34
Tukang oh 0.090 56

2 Menggali 1 m3 tanah biasa sedalam 1 m 63


Tenaga Pekerja oh 0.75 47
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Suka Maju
Desa : Batang Peranap

VOLUME HARGA
URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN
TOTAL APB-Des APBD TOTAL
INCASH INKIND Rp
1 2 3 4 5 6 7 8 9=2X8
I BAHAN
1 Pipa SNI S 12.5 diameter 2" 108.00 - - 108.00 - Btg Rp 175,000 Rp 18,900,000
2 Perlengkapan Lain-Lain 1.00 - - 1.00 - Bh Rp 87,000 Rp 87,000
SUB TOTAL I Rp 18,987,000
II U P A H
1 Pekerja 78.00 - - 78.00 - Oh Rp 80,000 Rp 6,240,000
2 Tukang 40.00 - - 40.00 - Oh Rp 120,000 Rp 4,800,000
SUB TOTAL II Rp 11,040,000
TOTAL Rp 30,027,000

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS
Kabupaten Indragiri Hulu

EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO TENGKU SYAFARI, ST


NIP : 19801022 200904 1 003
CANA ANGGARAN BIAYA

No.RAB :
Program : Pamsimas
Jenis : Perpipaan APBDes
Volume : 626 m

BIAYA (Rp)
KONSTRIBUSI MASYARAKAT
APB-Des APBD
INCASH INKIND
10 = 3 x 8 11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp - Rp - Rp 18,900,000 Rp -
Rp - Rp - Rp 87,000 Rp -
Rp - Rp - Rp 18,987,000 Rp -

Rp - Rp - Rp 6,240,000 Rp -
Rp - Rp - Rp 4,800,000 Rp -
Rp - Rp - Rp 11,040,000 Rp -
Rp - Rp - Rp 30,027,000 Rp -

Paya Rumbai, Desember 2017


Dibuat Oleh:
Koordinator KKM Pelaksana Pamsimas

MUKSIN YUSPADILA
DAFTAR ANALISA HARGA SATUAN PERPIPAAN

No Kebutuhan Sat Indeks Volume


1 2 3 4 5
I PEKERJAAN PIPANISASI
1 Memasang 1 m' Pipa AW Ø 3" 238
Bahan Pipa AW Ø 3" m' 1 238
Perlengkapan Ls 1 1
Tenaga Pekerja oh 0.081 19
Tukang oh 0.135 32

2 Menggali 1 m3 tanah biasa sedalam 1 m 24


Tenaga Pekerja oh 0.75 18

1 Memasang 1 m' Pipa AW Ø 2" 493


Bahan Pipa AW Ø 2" m' 1 493
Perlengkapan Ls 1 1
Tenaga Pekerja oh 0.054 27
Tukang oh 0.090 44

2 Menggali 1 m3 tanah biasa sedalam 1 m 49


Tenaga Pekerja oh 0.75 37
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Suka Maju
Desa : Batang Peranap

VOLUME HARGA
URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN
TOTAL APB-Des APBD TOTAL
INCASH INKIND Rp
1 2 3 4 5 6 7 8 9=2X8
I BAHAN
1 Pipa SNI dia 3" 41.00 - - - 41.00 Btg Rp 330,000 Rp 13,530,000
2 Pipa SNI dia 2" 85.00 - - - 85.00 Btg Rp 175,000 Rp 14,875,000
3 Perlengkapan 1.00 - - - 1 Ls Rp 5,681,000 Rp 5,681,000
SUB TOTAL I Rp 34,086,000
II U P A H
1 Pekerja 100.00 - 42 - 58.00 Oh Rp 80,000 Rp 8,000,000
2 Tukang 52.00 - 32 - 20.00 Oh Rp 120,000 Rp 6,240,000
SUB TOTAL II Rp 14,240,000
TOTAL Rp 48,326,000

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS
Kabupaten Indragiri Hulu

EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO TENGKU SYAFARI, ST


NIP : 19801022 200904 1 003
No.RAB :
Program : Pamsimas
Jenis : Perpipaan
Volume : 731 m

BIAYA (Rp)
KONSTRIBUSI MASYARAKAT
APB-Des APBD
INCASH INKIND
10 = 3 x 8 11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp - Rp - Rp - Rp 13,530,000
Rp - Rp - Rp - Rp 14,875,000
Rp - Rp - Rp - Rp 5,681,000
Rp - Rp - Rp - Rp 34,086,000

Rp - Rp 3,360,000 Rp - Rp 4,640,000
Rp - Rp 3,840,000 Rp - Rp 2,400,000
Rp - Rp 7,200,000 Rp - Rp 7,040,000
Rp - Rp 7,200,000 Rp - Rp 41,126,000

Paya Rumbai, Desember 2017


Dibuat Oleh:
Koordinator KKM Pelaksana Pamsimas

MUKSIN YUSPADILA
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Suka Maju
Desa : Batang Peranap

VOLUME HARGA BIAYA (Rp)


URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN KONSTRIBUSI MASYARAKAT
TOTAL APB-Des APBD TOTAL
INCASH INKIND Rp INCASH
1 2 3 4 5 6 7 8 9=2X8 10 = 3 x 8
I BAHAN
1 Pompa Submersible 1 - - - 1 Set Rp 16,000,000 Rp 16,000,000 Rp -
TOTAL Rp 16,000,000 Rp -

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS Koordinator KKM
Kabupaten Indragiri Hulu

EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO TENGKU SYAFARI, ST MUKSIN


NIP : 19801022 200904 1 003
No.RAB :
Program : Pamsimas
Jenis : Pengadaan Pompa
Volume : 1 (satu) paket

BIAYA (Rp)
KONSTRIBUSI MASYARAKAT
APB-Des APBD
INKIND
11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp - Rp - Rp 16,000,000
Rp - Rp - Rp 16,000,000

Paya Rumbai, Desember 2017


Dibuat Oleh:
oordinator KKM Pelaksana Pamsimas

YUSPADILA
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Suka Maju
Desa : Batang Peranap

VOLUME HARGA BIAY


URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN KONSTRIBUSI MASYAR
TOTAL APB-Des APBD TOTAL
INCASH INKIND Rp INCASH
1 2 3 4 5 6 7 8 9=2X8 10 = 3 x 8
I BAHAN
1 KWH Meter 3300 1 - - - 1 Set Rp 6,600,000 Rp 6,600,000 Rp -
2 Kabel 3x1 1/2 2 - - - 2 Rol Rp 1,100,000 Rp 2,200,000 Rp -
TOTAL Rp 8,800,000 Rp -

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS Koordinator KKM
Kabupaten Indragiri Hulu

EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO TENGKU SYAFARI, ST MUKSIN


NIP : 19801022 200904 1 003
No.RAB :
Program : Pamsimas
Jenis : Pengadaan Sumber Energi
Volume : 1 (satu) Paket

BIAYA (Rp)
ONSTRIBUSI MASYARAKAT
APB-Des APBD
INKIND
11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp - Rp - Rp 6,600,000
Rp - Rp - Rp 2,200,000
Rp - Rp - Rp 8,800,000

Paya Rumbai, Desember 2017


Dibuat Oleh:
rdinator KKM Pelaksana Pamsimas

YUSPADILA
REKAPITULASI RAB FISIK

NO SARANA IN CASH IN KIND APB-DES APBD


1 Embung Rp - Rp 8,101,000 Rp - Rp 36,225,000
2 Rumah Mesin Rp - Rp - Rp - Rp -
3 Pengadaan Sumber Energi Rp - Rp - Rp - Rp 8,800,000
4 Pengadaan Pompa Rp - Rp - Rp - Rp 16,000,000
5 Tower Air Rp - Rp 32,562,200 Rp - Rp 97,829,000
6 Perpipaan Rp - Rp 7,200,000 Rp - Rp 41,126,000
7 Perpipaan (APBDes) Rp - Rp - Rp 30,027,000 Rp -
8 PHBS Masyarakat Rp - Rp - Rp - Rp 492,000
9 PHBS Sekolah Rp - Rp - Rp - Rp -
10 Media Promkes di Masyarakat Rp - Rp - Rp - Rp 4,530,000
11 Media Promkes di Sekolah Rp - Rp - Rp - Rp 1,780,000
12 Pel Keuangan Rp - Rp - Rp - Rp 450,000
13 Pel. Teknik Rp - Rp - Rp - Rp 763,000
14 Pel.Tim Pengadaan Rp - Rp - Rp - Rp 252,000
14 Pel. BP SPAMS Rp - Rp - Rp - Rp 300,000
15 OP KKM Rp 12,010,800 Rp - Rp - Rp -
TOTAL Rp 12,010,800 Rp 47,863,200 Rp 30,027,000 Rp 208,547,000
PEDOMAN

TOTAL DANA JUMLAH


Rp 44,326,000 APBD Rp210,189,000.00
Rp - IN CASH Rp12,010,800.00
Rp 8,800,000 IN KIND Rp48,043,200.00
Rp 16,000,000 APB-DES Rp30,027,000.00
Rp 130,391,200 TOTAL Rp300,270,000.00
Rp 48,326,000
Rp 30,027,000
Rp 492,000 beda total Rp1,822,000.00
Rp - beda in CASH Rp0.00
Rp 4,530,000 beda in kind Rp180,000.00
Rp 1,780,000 BEDA APBD Rp1,642,000.00
Rp 450,000
Rp 763,000
Rp 252,000
Rp 300,000
Rp 12,010,800 Rp225.00
Rp 298,448,000
REKAPITULASI TOTAL RKM

Propinsi : Riau Program : PAMSIMAS


Kabupaten : Indragiri Hulu Tahun : 2017
Kecamatan : Suka Maju
Desa : Batang Peranap
0

No Uraian Sat Vol Harga Satuan APBD Masyarakat APB-Des Total Biaya
70% INCASH (4%) INKIND (16%) 10%
RKM
I Kegiatan Pelatihan Masyarakat
1.1. Pelatihan Administrasi dan Keuangan Paket 1 450,000 450,000 - - - 450,000
1.2. Pelatihan Teknik Paket 1 763,000 763,000 - - - 763,000
1.3. Pelatihan Timp Pengadaan Paket 1 252,000 252,000 - - - 252,000
Sub Total I 1,465,000 - - 1,465,000
II Pelatihan BPS
2.1. Pelatihan BP-SPAM Paket 1 300,000 300,000 - - - 300,000
Sub Total II 300,000 - - - 300,000
III PHBS
3.1. Peningkatan PHBS di Masyarakat Paket 1 492,000 492,000 - - - 492,000
3.2. Media Promkes di Masyarakat Paket 1 4,530,000 4,530,000 - - - 4,530,000
3.3. Media Promkes di Sekolah Paket 1 1,780,000 1,780,000 - - - 1,780,000
Sub Total III 6,802,000 - - - 6,802,000
IV Operasional KKM
4.1. Administrasi dan Operasional KKM Paket 1 12,010,800 - 12,010,800 - - 12,010,800
Sub Total IV - 12,010,800 - - 12,010,800
V Pembangunan Sarana Air Minum
5.1. Embung Unit 1 44,326,000 36,225,000 - 8,101,000 - 44,326,000
5.2. Pengadaan Sumber Energi Paket 1 8,800,000 8,800,000 - - - 8,800,000
5.3. Pengadaan Pompa Paket 1 16,000,000 16,000,000 - - - 16,000,000
5.4. Tower Air Unit 1 130,391,200 97,829,000 - 32,562,200 - 130,391,200
5.5. Perpipaan M 731 66,128 41,126,000 - 7,200,000 - 48,326,000
5.6. Perpipaan (APBDes) M 626 47,936 - - - 30,027,000 30,027,000
Sub Total V 199,980,000 - 47,863,200 30,027,000 277,870,200
Total Pembiayaan RKM 208,547,000 12,010,800 47,863,200 30,027,000 298,448,000

240,975,000 13,770,000 55,080,000 34,425,000 344,250,000


Paya Rumbai, Desember 2017
8,567,000
Diperiksa oleh: Dibuat Oleh:
TFM

FM CD FM WSS Pelaksana Pamsimas

BUDI ANWARI, S.Tp JUANDA HANIMAN N., S.Pd TENGKU SYAFARI, ST xxxxxxxxxx

Disetujui Oleh: Mengetahui,

Koordinator Kabupaten Koordinator KKM DPMU PAMSIMAS INDRAGIRI HULU,

BAMBANG SUPRIHARTONO, ST xxxxxxxx BOBBY MAULIANTINO, ST. MT


NIP : 19810120 200604 1 004
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Seberida
Desa : Paya Rumbai

VOLUME HARGA B
URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN KONSTRIBUSI MASY
TOTAL APB-Des APBD TOTAL
INCASH INKIND Rp INCASH
1 2 3 4 5 6 7 8 9=2X8 10 = 3 x 8

I. Bahan
1 Kayu Kaso 5/7 (borneo) 0.50 - - - 0.50 M3 Rp 2,000,000 Rp 1,000,000 Rp -
2 Paku Biasa 2" - 5" 50.00 - - - 50.00 Kg Rp 18,000 Rp 900,000 Rp -
3 Kayu Papan 3/20 borneo 0.50 - - - 0.50 M3 Rp 2,000,000 Rp 1,000,000 Rp -
4 Pasir Urug 2.00 - - - 2.00 M3 Rp 100,000 Rp 200,000 Rp -
5 Semen Portland 195.00 - - - 195.00 Zak Rp 70,000 Rp 13,650,000 Rp -
6 Pasir Beton 12.00 - - - 12.00 M3 Rp 100,000 Rp 1,200,000 Rp -
7 Kerikil 24.00 - - - 24.00 M3 Rp 250,000 Rp 6,000,000 Rp -
8 Kayu Kelas III 3.00 - - - 3.00 M3 Rp 2,000,000 Rp 6,000,000 Rp -
9 Minyak Bekisting 43.00 - - - 43.00 Ltr Rp 10,000 Rp 430,000 Rp -
10 Plywood tebal 9 mm 70.00 - - - 70.00 Lbr Rp 145,000 Rp 10,150,000 Rp -
11 Dolken Kayu galam 329.00 - 329.00 - - Btg Rp 10,000 Rp 3,290,000 Rp -
12 Besi Beton (Polos/Ulir) Ǿ12 123.00 - - - 123.00 Btg Rp 110,000 Rp 13,530,000 Rp -
13 Besi Beton (Polos/Ulir) Ǿ10 32.00 - - - 32.00 Btg Rp 85,000 Rp 2,720,000 Rp -
14 Besi Beton (Polos/Ulir) Ǿ8 246.00 - - - 246.00 Btg Rp 60,000 Rp 14,760,000 Rp -
15 Besi Beton (Polos/Ulir) Ǿ6 1.00 - - - 1.00 Btg Rp 40,000 Rp 40,000 Rp -
16 Kawat Beton 24.00 - - - 24.00 Kg Rp 20,000 Rp 480,000 Rp -
17 Pasir Pasang 6.00 - - - 6.00 M3 Rp 100,000 Rp 600,000 Rp -
18 Plamir 21.00 - - - 21.00 Kg Rp 10,000 Rp 210,000 Rp -
19 Cat Dasar 21.00 - - - 21.00 Kg Rp 15,000 Rp 315,000 Rp -
20 Cat Tembok 55.00 - - - 55.00 Kg Rp 65,000 Rp 3,575,000 Rp -
21 Tangga Besi 1.00 - - - 1.00 Ls Rp 2,500,000 Rp 2,500,000 Rp -
23 Pipa Galvanis diameter 3 inchi 2.00 - - - 2.00 Btg Rp 700,000 Rp 1,400,000 Rp -
24 Pipa Galvanis diameter 2 inchi 2.00 - - - 2.00 Btg Rp 350,000 Rp 700,000 Rp -
25 Pipa Galvanis diameter 1 1/2" inchi 6.00 - - - 6.00 Btg Rp 300,000 Rp 1,800,000 Rp -
25 Pipa Galvanis diameter 1 inchi 4.00 - - - 4.00 Btg Rp 250,000 Rp 1,000,000 Rp -
25 Cat Minyak 1.00 - - - 1.00 Kg Rp 51,000 Rp 51,000 Rp -
Sub Total I Rp 87,501,000 Rp -
II. Upah
1 Pekerja 350.00 - 300.00 - 50.00 Hok Rp 80,000 Rp 28,000,000 Rp -
2 Tukang 168.00 - - - 168.00 Hok Rp 100,000 Rp 16,800,000 Rp -
Sub Total II Rp 44,800,000 Rp -
TOTAL Rp 132,301,000 Rp -

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS Koordinator KKM
Kabupaten Indragiri Hulu

EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO R. PUTRA KURNIAWAN, ST


NIP : 19801022 200904 1 003
ANA ANGGARAN BIAYA

No.RAB :
Program : Pamsimas
Jenis : Tower Air
Volume : 1 (satu) unit Kap. 30 M3

BIAYA (Rp)
KONSTRIBUSI MASYARAKAT
APB-Des APBD
INKIND
11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp - Rp - Rp 1,000,000
Rp - Rp - Rp 900,000
Rp - Rp - Rp 1,000,000
Rp - Rp - Rp 200,000
Rp - Rp - Rp 13,650,000
Rp - Rp - Rp 1,200,000
Rp - Rp - Rp 6,000,000
Rp - Rp - Rp 6,000,000
Rp - Rp - Rp 430,000
Rp - Rp - Rp 10,150,000
Rp 3,290,000 Rp - Rp -
Rp - Rp - Rp 13,530,000
Rp - Rp - Rp 2,720,000
Rp - Rp - Rp 14,760,000
Rp - Rp - Rp 40,000
Rp - Rp - Rp 480,000
Rp - Rp - Rp 600,000
Rp - Rp - Rp 210,000
Rp - Rp - Rp 315,000
Rp - Rp - Rp 3,575,000
Rp - Rp - Rp 2,500,000
Rp - Rp - Rp 1,400,000
Rp - Rp - Rp 700,000
Rp - Rp - Rp 1,800,000
Rp - Rp - Rp 1,000,000
Rp - Rp - Rp 51,000
Rp 3,290,000 Rp - Rp 84,211,000
Rp 24,000,000 Rp - Rp 4,000,000
Rp - Rp - Rp 16,800,000
Rp 24,000,000 Rp - Rp 20,800,000
Rp 27,290,000 Rp - Rp 105,011,000

Paya Rumbai, Desember 2017


Dibuat Oleh:
Pelaksana Pamsimas
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Seberida
Desa : Paya Rumbai 782455.00 0.52

VOLUME HARGA
URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN
TOTAL APBDes APBN TOTAL
INCASH INKIND Rp
1 2 3 4 5 6 7 8=2X7
I BAHAN
1 Paku Biasa 2" - 5" 1.0 - - - 1.0 Kg Rp 20,000 Rp 20,000
2 #REF! 0.2 - - - 0.2 m3 Rp 1,700,000 Rp 340,000
3 #REF! #REF! #REF! #REF! #REF! 1.0 m3 Rp 128,000 #REF!
4 #REF! #REF! #REF! #REF! #REF! 1.0 m3 Rp 250,000 #REF!
5 #REF! 7.0 - - - 7.0 zak Rp 67,000 Rp 469,000
6 #REF! #REF! #REF! #REF! #REF! 2.0 Kg Rp 10,000 #REF!
7 #REF! #REF! #REF! #REF! #REF! 2.0 Kg Rp 15,000 #REF!
8 #REF! #REF! #REF! #REF! #REF! 4.0 Kg Rp 65,000 #REF!
9 Batu Kali 3.0 - - - 3.0 M3 Rp 450,000 Rp 1,350,000
10 Buis Beton 6.0 - - - 6.0 bh Rp 500,000 Rp 3,000,000
11 Pipa Galvanis 1 1/4 " 1.0 - - - 1.0 Btg Rp 280,000 Rp 280,000
12 Pipa SNI 1 1/4" 18.0 - - - 18.0 Btg Rp 120,000 Rp 2,160,000
12 Check Valve 1 1/4" 1.0 - - - 1.0 Btg Rp 350,000 Rp 350,000
13 Perlengkapan Pipa 1.0 - - - 1.0 Ls Rp 500,000 Rp 500,000
14 Box Kontrol 1.0 - - - 1.0 Ls Rp 500,000 Rp 500,000
SUB TOTAL I Rp 9,657,000
II Sewa Alat
1 Mesin Air 5 - - - 5.00 Hari Rp 50,000 Rp 250,000
2 Minyak Mesin 20 - - - 20.00 Ltr Rp 8,000 Rp 160,000
SUB TOTAL II Rp 410,000
III UPAH
1 Pekerja 17 - - - 17.00 Oh Rp 80,000 Rp 1,360,000
2 Tukang 3 - - - 3.00 Oh Rp 100,000 Rp 300,000
3 Galian Intake dan Pemasangan Buis Beton 5 - - - 5.00 m Rp 500,000 Rp 2,500,000
SUB TOTAL III Rp 4,160,000
TOTAL Rp 14,227,000

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS
Kabupaten Indragiri Hulu

HERY FERDIAN, ST BAMBANG SUPRIHARTONO, ST R. PUTRA KURNIAWAN, ST


NIP : 19840213 200904 1 005
No.RAB :
Program : Pamsimas
Jenis : Pembuatan Intake
Volume : 1 (satu) unit

BIAYA (Rp)
KONSTRIBUSI MASYARAKAT
APBDes APBN
INCASH INKIND
9=3x7 10 = 4 x 7 11 = 5 X 7

Rp - Rp - Rp - Rp 20,000
Rp - Rp - Rp - Rp 340,000
#REF! #REF! #REF! Rp 128,000
#REF! #REF! #REF! Rp 250,000
Rp - Rp - Rp - Rp 469,000
#REF! #REF! #REF! Rp 20,000
#REF! #REF! #REF! Rp 30,000
#REF! #REF! #REF! Rp 260,000
Rp - Rp - Rp - Rp 1,350,000
Rp - Rp - Rp - Rp 3,000,000
Rp - Rp - Rp - Rp 280,000
Rp - Rp - Rp - Rp 2,160,000
Rp - Rp - Rp - Rp 350,000
Rp - Rp - Rp - Rp 500,000
Rp - Rp - Rp - Rp 500,000
Rp - Rp - Rp - Rp 9,657,000

Rp - Rp - Rp - Rp 250,000
Rp - Rp - Rp - Rp 160,000
Rp - Rp - Rp - Rp 410,000

Rp - Rp - Rp - Rp 1,360,000
Rp - Rp - Rp - Rp 300,000
Rp - Rp - Rp - Rp 2,500,000
Rp - Rp - Rp - Rp 4,160,000
Rp - Rp - Rp - Rp 14,227,000

Paya Rumbai, Desember 2017


Dibuat Oleh:
Koordinator KKM Pelaksana Pamsimas
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Seberida
Desa : Paya Rumbai

VOLUME HARGA BIAYA (Rp)


URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN KONSTRIBUSI MASYARAKAT
TOTAL APB-Des APBN TOTAL
INCASH INKIND Rp INCASH
1 2 3 4 5 6 7 8 9=2X8 10 = 3 x 8
I BAHAN
1 Paku Biasa 2"-5" 20.0 - - - 20.0 Kg Rp 18,000 Rp 360,000 Rp -
2 Pasir Beton 3.0 - - - 3.0 M3 Rp 100,000 Rp 300,000 Rp -
3 Pasir Pasang 2.0 - - - 2.0 M3 Rp 100,000 Rp 200,000 Rp -
4 Koral Beton 4.0 - - - 4.0 M3 Rp 250,000 Rp 1,000,000 Rp -
5 Semen Portland 49.0 - - - 49.0 Zak Rp 70,000 Rp 3,430,000 Rp -
6 Kayu Kelas III 1.0 - - - 1.0 M3 Rp 2,000,000 Rp 2,000,000 Rp -
7 Kayu 5/7 0.5 - - - 0.5 M3 Rp 2,000,000 Rp 1,000,000 Rp -
8 Papan 3/20 0.2 - - - 0.2 M3 Rp 2,000,000 Rp 348,000 Rp -
9 Plywood 9 mm 40.0 - - - 40.0 Lbr Rp 145,000 Rp 5,800,000 Rp -
10 Dolken Kayu Galam Ø 8 - 10 / 4m 196.0 - - - 196.0 Btg Rp 10,000 Rp 1,960,000 Rp -
11 Minyak Bekisting 20.0 - - - 20.0 Ltr Rp 10,000 Rp 200,000 Rp -
12 Besi ø 8 mm 37.0 - - - 37.0 Btg Rp 60,000 Rp 2,220,000 Rp -
13 Besi ø 10 mm 119.0 - - - 119.0 Btg Rp 85,000 Rp 10,115,000 Rp -
14 Kawat Beton 10.0 - - - 10.0 Kg Rp 20,000 Rp 200,000 Rp -
15 Kertas gosok 35.0 - - - 35.0 Lbr Rp 5,000 Rp 175,000 Rp -
16 Plamir 4.0 - - - 4.0 Kg Rp 10,000 Rp 40,000 Rp -
17 Cat Dasar 4.0 - - - 4.0 kg Rp 15,000 Rp 60,000 Rp -
18 Cat Penutup 2x 10.0 - - - 10.0 kg Rp 65,000 Rp 650,000 Rp -
19 Ijuk 25.0 - - - 25.0 kg Rp 20,000 Rp 500,000 Rp -
20 Arang Aktif 1.0 - - - 1.0 Ls Rp 500,000 Rp 500,000 Rp -
SUB TOTAL I Rp 31,058,000 Rp -
II U P A H
1 Pekerja 154.0 - 154.0 - - OH Rp 80,000 Rp 12,320,000 Rp -
2 Tukang 98.0 - - - 98.0 OH Rp 100,000 Rp 9,800,000 Rp -
SUB TOTAL II Rp 22,120,000 Rp -
TOTAL Rp 53,178,000 Rp -

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS Koordinator KKM
Kabupaten Indragiri Hulu

EFRI MARYONI, ST BAMBANG SUPRIHARTONO, ST R. PUTRA KURNIAWAN, ST PUJIANTO


NIP : 19801022 200904 1 003
No.RAB :
Program : Pamsimas
Jenis : Pembuatan Intake
Volume : 1 (satu) unit

BIAYA (Rp)
NSTRIBUSI MASYARAKAT
APB-Des APBN
INKIND
11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp - Rp - Rp 360,000
Rp - Rp - Rp 300,000
Rp - Rp - Rp 200,000
Rp - Rp - Rp 1,000,000
Rp - Rp - Rp 3,430,000
Rp - Rp - Rp 2,000,000
Rp - Rp - Rp 1,000,000
Rp - Rp - Rp 348,000
Rp - Rp - Rp 5,800,000
Rp - Rp - Rp 1,960,000
Rp - Rp - Rp 200,000
Rp - Rp - Rp 2,220,000
Rp - Rp - Rp 10,115,000
Rp - Rp - Rp 200,000
Rp - Rp - Rp 175,000
Rp - Rp - Rp 40,000
Rp - Rp - Rp 60,000
Rp - Rp - Rp 650,000
Rp - Rp - Rp 500,000
Rp - Rp - Rp 500,000
Rp - Rp - Rp 31,058,000

Rp 12,320,000 Rp - Rp -
Rp - Rp - Rp 9,800,000
Rp 12,320,000 Rp - Rp 9,800,000
Rp 12,320,000 Rp - Rp 40,858,000

Paya Rumbai, Desember 2017


Dibuat Oleh:
Pelaksana Pamsimas

SUHUD
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Batang Cenaku
Desa : Pematang Manggis

VOLUME HARGA BIAY


URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN KONSTRIBUSI MASYARA
TOTAL APB-Des APBN TOTAL
INCASH INKIND Rp INCASH
1 2 3 4 5 6 7 8 9=2X8 10 = 3 x 8
I BAHAN
1 Paku Biasa 2"-5" 1.00 - - - 1.00 Kg Rp 18,000 Rp 18,000 Rp -
2 Pasir Beton 0.50 - - - 0.50 M3 Rp 100,000 Rp 50,000 Rp -
3 Koral Beton 0.50 - - - 0.50 M3 Rp 250,000 Rp 125,000 Rp -
4 Semen Portland 1.00 - - - 1.00 Zak Rp 70,000 Rp 70,000 Rp -
5 Papan 3/20 6.00 - - - 6.00 Lbr #REF! #REF! #REF!
6 Besi ø 6 mm 2.00 - - - 2.00 Btg Rp 40,000 Rp 80,000 Rp -
7 Besi ø 8 mm 4.00 - - - 4.00 btg Rp 60,000 Rp 240,000 Rp -
8 Kawat Beton 1.00 - - - 1.00 Kg Rp 20,000 Rp 20,000 Rp -
9 Cat Tembok 2.00 - - - 2.00 kg Rp 65,000 Rp 130,000 Rp -
10 Pipa PVC AW 3/4 inch 8.00 - - - 8.00 btg Rp 22,000 Rp 176,000 Rp -
11 Elbow 3/4 Inch 12.00 - - - 12.00 Bh Rp 5,000 Rp 60,000 Rp -
12 Kran Air Giv 3/4 Inch 6.00 - - - 6.00 Bh Rp 35,000 Rp 210,000 Rp -
13 Socket Drat 3/4 Inch 6.00 - - - 6.00 Bh Rp 15,000 Rp 90,000 Rp -
14 Tee 3/4 Inch 6.00 - - - 6.00 Bh Rp 5,000 Rp 30,000 Rp -
15 Socket 3/4 Inch 8.00 - - - 8.00 Bh Rp 5,000 Rp 40,000 Rp -
16 Seal Tape 6.00 - - - 6.00 Bh Rp 5,000 Rp 30,000 Rp -
17 Lem Pipa 2.00 - - - 2.00 Bh Rp 15,000 Rp 30,000 Rp -
SUB TOTAL I #REF! #REF!
II UPAH
1 Pekerja 19.0 - 19.0 - - Oh Rp 80,000 Rp 1,520,000 Rp -
2 Tukang 3.0 - - - 3.0 Oh Rp 100,000 Rp 300,000 Rp -
SUB TOTAL II Rp 1,820,000 Rp -
TOTAL UNTUK 1 SEKOLAH (6 UNIT) #REF! #REF!
Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:
PPK PAMSIMAS Koordinator Kabupaten TFM - WSS Koordinator KKM
Kabupaten Indragiri Hulu

EFRI MARYONI, ST BAMBANG SUPRIHARTONO, ST R. PUTRA KURNIAWAN, ST


NIP : 19801022 200904 1 003
No.RAB :
Program : Pamsimas
Jenis : Pembuatan Tempat Cuci Tangan
Volume : 6 (enam) unit

BIAYA (Rp)
KONSTRIBUSI MASYARAKAT
APB-Des APBN
INKIND
11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp - Rp - Rp 18,000
Rp - Rp - Rp 50,000
Rp - Rp - Rp 125,000
Rp - Rp - Rp 70,000
#REF! #REF! #REF!
Rp - Rp - Rp 80,000
Rp - Rp - Rp 240,000
Rp - Rp - Rp 20,000
Rp - Rp - Rp 130,000
Rp - Rp - Rp 176,000
Rp - Rp - Rp 60,000
Rp - Rp - Rp 210,000
Rp - Rp - Rp 90,000
Rp - Rp - Rp 30,000
Rp - Rp - Rp 40,000
Rp - Rp - Rp 30,000
Rp - Rp - Rp 30,000
#REF! #REF! #REF!
###
Rp 1,520,000 Rp - Rp -
Rp - Rp - Rp 300,000
Rp 1,520,000 Rp - Rp 300,000
#REF! #REF! #REF!

Kuala Kilan, Desember 2017


Dibuat Oleh:
ordinator KKM Pelaksana Pamsimas
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Suka Maju
Desa : Batang Peranap

VOLUME
URAIAN KONSTRIBUSI MASYARAKAT SATUAN
TOTAL APB-Des APBD
INCASH INKIND
1 2 3 4 5 6 7
I BAHAN
1 Paku Biasa 2"-5" 17.0 - - - 17.00 Kg
2 Pasir Beton 4.0 - - - 4.00 M3
3 Pasir Pasang 1.0 - - - 1.00 M3
4 Koral Beton 6.0 - 1.00 - 5.00 M3
5 Semen Portland 52.0 - - - 52.00 Zak
6 Kayu Kelas III 3.0 - 1.00 - 2.00 M3
7 Kayu 5/7 0.5 - - - 0.500 M3
8 Papan 3/20 0.3 - - - 0.30 M3
9 Plywood 9 mm 30.0 - - - 30.00 Lbr
10 Dolken Kayu Galam Ø 8 - 10 / 4m 174.0 - 134.00 - 40.00 Btg
11 Minyak Bekisting 17.0 - 1.00 - 16.00 Ltr
12 Besi ø 10 mm 43.0 - - - 43.00 Btg
13 Kawat Beton 5.0 - - - 5.00 Kg
14 Plamir 3.0 - - - 3.00 Kg
15 Cat Dasar 3.0 - - - 3.00 kg
16 Cat Penutup 2x 9.0 - - - 9.00 kg
17 Kawat Pagar Duri 6.00 - - - 6.00 Rol
18 Besi Siku 5 cm x 5 cm tebal 4 mm 4.00 - - - 4.00 Btg
19 Pintu Pagar Besi 1.0 - - - 1.00 Ls
20 Sewa Alat Berat Excavator 13.0 - - - 13.00 Jam
21 Mobilisasi Alat Berat Excavator 1.0 - - - 1.00 PP
22 Arang Batok 1.0 - - - 1.00 M3
23 Ijuk 25.0 - - 25.00 Kg
SUB TOTAL I
II U P A H
1 Pekerja 70.0 - 60.00 - 10.00 OH
2 Tukang 49.0 - - - 49.00 OH
SUB TOTAL II
TOTAL

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS
Kabupaten Indragiri Hulu

EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO TENGKU SYAFARI, ST


NIP : 19801022 200904 1 003
NA ANGGARAN BIAYA

No.RAB :
Program : Pamsimas
Jenis : Pembuatan Embung
Volume : 1 (satu) unit

HARGA BIAYA (Rp)


SATUAN KONSTRIBUSI MASYARAKAT
TOTAL APB-Des APBD
Rp INCASH INKIND
8 9=2X8 10 = 3 x 8 11 = 4 x 8 12 = 5 X 8 13 = 6 X 8
Volume
Rp 20,000 Rp 340,000 Rp - Rp - Rp - Rp 340,000
Rp 128,000 Rp 512,000 Rp - Rp - Rp - Rp 512,000
Rp 128,000 Rp 128,000 Rp - Rp - Rp - Rp 128,000
Rp 250,000 Rp 1,500,000 Rp - Rp 250,000 Rp - Rp 1,250,000
Rp 67,000 Rp 3,484,000 Rp - Rp - Rp - Rp 3,484,000
Rp 1,700,000 Rp 5,100,000 Rp - Rp 1,700,000 Rp - Rp 3,400,000
Rp 1,700,000 Rp 850,000 Rp - Rp - Rp - Rp 850,000
Rp 1,700,000 Rp 510,000 Rp - Rp - Rp - Rp 510,000
Rp 125,000 Rp 3,750,000 Rp - Rp - Rp - Rp 3,750,000
Rp 10,000 Rp 1,740,000 Rp - Rp 1,340,000 Rp - Rp 400,000
Rp 11,000 Rp 187,000 Rp - Rp 11,000 Rp - Rp 176,000
Rp 70,000 Rp 3,010,000 Rp - Rp - Rp - Rp 3,010,000
Rp 20,000 Rp 100,000 Rp - Rp - Rp - Rp 100,000
Rp 10,000 Rp 30,000 Rp - Rp - Rp - Rp 30,000
Rp 15,000 Rp 45,000 Rp - Rp - Rp - Rp 45,000
Rp 65,000 Rp 585,000 Rp - Rp - Rp - Rp 585,000
Rp 125,000 Rp 750,000 Rp - Rp - Rp - Rp 750,000
Rp 150,000 Rp 600,000 Rp - Rp - Rp - Rp 600,000
Rp 500,000 Rp 500,000 Rp - Rp - Rp - Rp 500,000
Rp 400,000 Rp 5,200,000 Rp - Rp - Rp - Rp 5,200,000
Rp 3,000,000 Rp 3,000,000 Rp - Rp - Rp - Rp 3,000,000
Rp 300,000 Rp 300,000 Rp - Rp - Rp - Rp 300,000
Rp 25,000 Rp 625,000 Rp - Rp - Rp - Rp 625,000
Rp 32,846,000 Rp - Rp 3,301,000 Rp - Rp 29,545,000
###
Rp 80,000 Rp 5,600,000 Rp - Rp 4,800,000 Rp - Rp 800,000
Rp 120,000 Rp 5,880,000 Rp - Rp - Rp - Rp 5,880,000
Rp 11,480,000 Rp - Rp 4,800,000 Rp - Rp 6,680,000
Rp 44,326,000 Rp - Rp 8,101,000 Rp - Rp 36,225,000

Paya Rumbai, Desember 2017


Diperiksa Oleh: Dibuat Oleh:
TFM - WSS Koordinator KKM Pelaksana Pamsimas

GKU SYAFARI, ST MUKSIN YUSPADILA


JENIS PEKERJAAN : Galian Struktur Kedalaman 2-5 M

URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : Desa Kerubung Jaya
3 Kondisi waduk : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fh 1.20 -

II. METHODE PELAKSANAAN


1 Penggalian dilakukan dengan menggunakan alat
Excavator
L 193 m3

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 EXCAVATOR (E10)
Kapasitas Bucket V 0.60 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Faktor kedalaman Fd 0.65 -
Berat isi material Bim 0.85 -

Waktu siklus
- Menggali / memuat Te1 0.55 menit
- Lain-lain Te2 0.25 menit
Te 0.80 menit

Kap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 15.48 M3/Jam


Te x Fh

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0646 Jam

Lama Pekerjaan L/Q1 12.48 Jam

File : 433483940.xlsx
AIAN ANALISA HARGA SATUAN

KETERANGAN

File : 433483940.xlsx
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80-140 HP E10
2 Tenaga Pw 80.0 HP
3 Kapasitas Cp 0.8 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,468,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Alat yang dipakai
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Alat yang dipakai
c. Harga Alat (*) B' 1,247,800,000 Rupiah Alat yang dipakai

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 124,780,000 Rupiah

2 Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 Rupiah


(1 + i)^A' - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 333,203.74 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 1,559.75 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 334,763.49 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 96,000.00 Rupiah

2 Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 43,200.00 Rupiah

3 Perawatan dan (12,5 % - 17,5 %) x B' K 116,981.25 Rupiah


perbaikan = W'

4 Operator = ( 1 Orang / Jam ) x U1 L 50,000.00 Rupiah


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 15,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 321,181.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 655,000 Rupiah


E. Mobilisasi 2,000,000 Rupiah
File : 433483940.xlsx
VOL VOL BAHAN VOL UPAH

Alat yang dipakai


Alat yang dipakai
Alat yang dipakai

12.48 5.92

12.48 4,157,095.40

12.48 19,459.65

12.48 4,176,555.06

12.48 1,197,709.14
-
12.48 538,969.11
-
12.48 1,459,474.08
-
-
12.48 623,806.84
12.48 187,142.05
-
12.48 4,007,101.22

Sewa Alat 8,183,000


Total Sewa Alat 10,183,000
File : 433483940.xlsx
F. LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 50,000.00 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 15,000.00 Rp./Jam
4 Bahan Bakar Bensin Mb 8,000.00 Liter
5 Bahan Bakar Solar Ms 8,000.00 Liter
6 Minyak Pelumas Mp 27,000.00 Liter

File : 433483940.xlsx
File : 433483940.xlsx
FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR PER M 3

I. MENGHITUNG BIAYA PENGELOLAAN


A. Biaya Penyusutan
- Asumsi faktor penyusutan per tahun = 5% - 8% dari nilai investasi sarana air minum

Investasi sarana air minum Belimbing = Rp

Biaya penyusutan per tahun = 5% x Rp Err:509 = Rp


Biaya penyusutan per bulan = Rp

B. Biaya Operasional
- Honor penjaga air 2 orang @ Rp 300,000 = Rp
- Honor pemungut iuran 1 orang @ Rp 50,000 = Rp
- ATK per bulan Rp 50,000 = Rp
- Kegiatan kesehatan/PHBS Rp 100,000 = Rp
- Mesin:
Solar 5 liter/hari @ Rp 10,000 = Rp
Oli 5 liter/bulan Rp 30,000 = Rp
Biaya Operasional per tahun = Rp
Biaya Operasional per bulan = Rp

C. Biaya pemeliharaan
Asumsikan 1% per tahun dari nilai investasi Sarana Air Minum

Biaya pemeliharaan per tahun = 1% x Rp Err:509 = Rp


Biaya pemeliharaan per bulan = Rp

Total biaya pengelolaan per bulan


a. Biaya penyusutan = Rp
b. Biaya operasional = Rp
c. Biaya pemeliharaan = Rp
= Rp

II. CARA MENENTUKAN BIAYA TARIF AIR DENGAN HARGA per KK


Jumlah penduduk yang terlayani = 205 KK

Harga (Rp) per m 3 = Total biaya pengelolaan = Rp


Kebutuhan air penduduk KK

Rp

Maka Tarif Harga Air Berdasarkan Perhitungan adalah Rp

III. CARA MENENTUKAN BIAYA TARIF AIR DENGAN HARGA per M3


Jumlah penduduk yang terlayani = 820 Jiwa
Kebutuhan per jiwa = 90 ltr/jiwa/hari

Kebutuhan air seluruh penduduk = 90 ltr/jiwa/hari x 820 Jiwa


= 73,800 ltr/hari
= 73.8 m3/hari
Tingkat kebocoran air 20% dari kebutuhan air = 73.8 m3/hari x 0,2
FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR PER M 3

= 14.76 m3/hari x 0,2


Kebutuhan air seluruh penduduk per bulan = 88.56 m3/hari x 30
= 2656.8 m3/bln

Harga (Rp) per m3 = Total Biaya Pengelolaan =


Kebutuhan air penduduk

Maka Tarif Harga Air Berdasarkan Perhitungan adalah Rp


FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR PER M 3

III. Tarif Progresif


1. Pemakaian air 1-10 m3 = 1x Rp ### per m3 = Rp
2. Pemakaian air 10-20 m3 = 1.5 x Rp ### per m3 = Rp
3. Pemakaian air ³ 20 m3 = 2x Rp ### per m3 = Rp

IV. Tarif air per sambungan rumah


Jumlah rumah yang terlayani = 200 rumah

Harga (Rp) per m 3 = Total Biaya Pengelolaan = Rp


Jumlah rumah

= Rp
ULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR PER M 3

Err:509

Err:509
Err:509

7,200,000.-
600,000.-
600,000.-
1,200,000.-

18,000,000.-
1,800,000.-
29,400,000.-
2,450,000.-

Err:509
Err:509

Err:509
2,450,000.-
Err:509
Err:509

Err:509 / bln
205 KK

Err:509 per KK
per bln

Err:509 per KK/bln

ltr/jiwa/hari

ltr/jiwa/hari x 820 Jiwa

m3/hari
m3/hari x 0,2
ULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR PER M 3

m3/hari x 0,2
m3/hari x 30

Rp Err:509 / bln
2656.8 m3/bln

Rp Err:509 per m3

Err:509 per m 3
ULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR PER M 3

Err:509 per m3
Err:509 per m3
Err:509 per m3

Err:509 / bln
200 Rmh

Err:509 /rmh/bln
No Kebutuhan Jumlah Satuan Pembulatan Satuan
1 2 3 4 5 6
1 Pekerja 349.862 Hok 349.86 Hok
2 Tukang 167.610 Hok 167.61 Hok
3 Kayu Kaso 5/7 (borneo) 0.220 M3 0.22 M3
4 Paku Biasa 2" - 5" 88.356 Kg 88.36 Kg
5 Kayu Papan 3/20 borneo 0.154 M3 0.15 M3
6 Pasir Urug 1.200 M3 1.20 M3
7 Semen Portland 9713.753 Kg 194.28 Zak
8 Pasir Beton 11.358 M3 11.36 M3
9 Kerikil 23.478 M3 23.48 M3
10 Kayu Kelas III 8.43 M3 8.43 M3
11 Minyak Bekisting 42.52 Ltr 42.52 Ltr
12 Balok Kayu 3.37 M3 3.37 M3
13 Plywood tebal 9 mm 69.37 Lbr 69.37 Lbr
14 Dolken Kayu galam 428.80 Btg 428.80 Btg
15 Besi Beton (Polos/Ulir) Ǿ12 1320.07 Kg 1320.07 Btg
16 Kawat Beton 23.64 Kg 23.64 Kg
17 Besi Beton (Polos/Ulir) Ǿ8 1160.12 Kg 245.02 Btg
18 Besi Beton (Polos/Ulir) Ǿ10 235.49 Kg 31.83 Btg
19 Besi Beton (Polos/Ulir) Ǿ6 2.40 Kg 0.90 Btg
20 Pasir Pasang 5.65 M3 5.65 M3
21 Plamir 20.93 Kg 20.93 Kg
22 Cat Dasar 20.93 Kg 20.93 Kg
23 Cat Tembok 54.41 Kg 54.41 Kg
Pembulatan
5
350.00
168.00
0.50
89.00
0.50
2.00
195.00
12.00
24.00
8.50
43.00
3.50
70.00
429.00
123.91
24.00
246.00
32.00
1.00
6.00
21.00
21.00
55.00
DAFTAR ANALISA HARGA SATUAN

NO Kebutuhan Satuan

1 2 3

1) 1 M2 Membersihkan Lapangan dan Peralatan


Tenaga Pekerja Oh
Tukang Oh

2) 1 M' Pengukuran & Pemasangan Bowplank


Bahan Kayu Kaso 5/7 (borneo) M3
Paku Biasa 2" - 5" Kg
Kayu Papan 3/20 borneo M3
Tenaga Pekerja Oh
Tukang Oh

3) 1 M3 Menggali Tanah Biasa


Tenaga Pekerja Oh

4) 1 M3 Mengurug Pasir Urug


Bahan Pasir Urug M3
Tenaga Pekerja Oh

5) 1 M3 Mengurug Tanah Bekas Galian


Tenaga Pekerja Oh

6) 1 M3 Membuat Lantai Kerja Beton Cor 1:3:5


Bahan Semen Portland Kg
Pasir Beton m3
Koral Beton m3
Tenaga Pekerja Oh
Tukang Oh

7) 1 M3 Membuat Beton Bertulang 1 : 2 : 3 Plat Pondasi


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh
8) 1 M2 Pasang Bekisting Untuk Plat Pondasi
Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh

9) 1 Kg Pembesian untuk Plat Pondasi


Bahan Besi Beton (Polos/Ulir) Ǿ12 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

10) 1 M3 Membuat Beton Bertulang 1 : 2 : 3 Kolom Pondasi (35 x 35)


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh

11) 1 M2 Pasang Bekisting Untuk Kolom Pondasi (35 x 35)


Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh

12) 1 Kg Pembesian untuk Kolom Pondasi (35 x 35)


Bahan Besi Beton (Polos/Ulir) Ǿ12 Kg
Tenaga Pekerja Oh
Tukang Besi Oh
13) 1 Kg Pembesian Begel Kolom Pondasi (35 x 35)
Bahan Besi Beton (Polos/Ulir) Ǿ8 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh
14) 1 M3 Membuat Sloof Beton Bertulang 1 : 2 : 3 (20/30)
Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh

15) 1 M2 Pasang Bekisting Untuk Sloof (20/30)


Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh

16) 1 Kg Pembesian Sloof (20/30)


Bahan Besi Beton (Polos/Ulir) Ǿ12 Kg
Tenaga Pekerja Oh
Tukang Besi Oh

17) 1 Kg Pembesian Sloof Begel (20/30)


Bahan Besi Beton (Polos/Ulir) Ǿ8 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

18) 1 M3 Membuat Beton Bertulang 1 : 2 : 3 Kolom (30 x 30)


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh

19) 1 M2 Pasang Bekisting Untuk Kolom (30 x 30)


Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh
20) 1 Kg Pembesian Kolom (30 x 30)
Bahan Besi Beton (Polos/Ulir) Ǿ12 Kg
Tenaga Pekerja Oh
Tukang Besi Oh

21) 1 Kg Pembesian Begel Kolom (30 x 30)


Bahan Besi Beton (Polos/Ulir) Ǿ8 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

22) 1 M3 Membuat Beton Bertulang 1 : 2 : 3 Balok (20/25)


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh

23) 1 M2 Pasang Bekisting Untuk Balok (20/25)


Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh

24) 1 Kg Pembesian Balok (20/25)


Bahan Besi Beton (Polos/Ulir) Ǿ12 Kg
Tenaga Pekerja Oh
Tukang Besi Oh

25) 1 Kg Pembesian Begel Balok (20/25)


Bahan Besi Beton (Polos/Ulir) Ǿ8 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

26) 1 M3 Membuat Beton Bertulang 1 : 2 : 3 Balok (20/20)


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh
27) 1 M2 Pasang Bekisting Untuk Balok (20/20)
Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh

28) 1 Kg Pembesian Balok (20/20)


Bahan Besi Beton (Polos/Ulir) Ǿ12 Kg
Tenaga Pekerja Oh
Tukang Besi Oh

31) 1 Kg Pembesian Begel (20/20)


Bahan Besi Beton (Polos/Ulir) Ǿ8 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

32) 1 m3 Membuat Beton Bertulang 1 : 2 : 3 Kolom (10 x 10)


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh

33) 1 M2 Pasang Bekisting Untuk Kolom (10 x 10)


Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh

34) 1 Kg Pembesian Balok (10/10)


Bahan Besi Beton (Polos/Ulir) Ǿ10 Kg
Tenaga Pekerja Oh
Tukang Besi Oh
35) 1 Kg Pembesian Begel Kolom (10 x 10)
Bahan Besi Beton (Polos/Ulir) Ǿ6 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

35) 1 M3 Membuat Plat Lantai Beton Bertulang 1 : 2 : 3 (Tb=20 cm)


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh

36) 1 m2 Pasang Bekisting Untuk Plat Lantai (Tb=20 cm)


Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh

37) 1 Kg Pembesian Plat Lantai (Tb=20 cm)


Bahan Besi Beton (Polos/Ulir) Ǿ8 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

38) 1 M3 Membuat Dinding Plat Beton Bertulang 1 : 2 : 3 (Tb = 15 cm)


Bahan Semen Portland Kg
Pasir Beton M3
Koral Beton M3
Tenaga Pekerja Oh
Tukang Batu Oh

39) 1 m2 Pasang Bekisting Untuk Dinding Plat (Tb = 15 cm)


Bahan Kayu Kelas III M3
Paku Biasa 2" - 5" Kg
Minyak Bekisting Ltr
Balok Kayu M3
Plywood tebal 9 mm Lbr
Dolken Kayu galam Btg
Tenaga Pekerja Oh
Tukang Kayu Oh
40) 1 Kg Pembesian Dinding Plat (Tb = 15 cm)
Bahan Besi Beton (Polos/Ulir) Ǿ8 Kg
Kawat Beton Kg
Tenaga Pekerja Oh
Tukang Besi Oh

41) 1 M2 Pekerjaan Plesteran (1:2)


Bahan Portland Cement kg
Pasir Pasang m3
Tenaga Pekerja Oh
Tukang Batu Oh

42) 1 M3 Membuat Lantai Beton (1:3:5)


Bahan Portland Cement kg
Pasir beton m3
Koral Beton m3
Tenaga Pekerja Oh
Tukang batu Oh

43) 1 M2 Pengecatan Tembok baru (1 Plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Bahan Plamir kg
Cat Dasar kg
Cat Tembok kg
Tenaga Pekerja Oh
Tukang cat Oh

44) 1 M3 Menggali Tanah untuk (Box Penutup Pipa)


Tenaga Pekerja Oh

45) 1 M' Memasang Tangga Besi


Bahan Pipa Besi Ø 2" m2
Perlengkapan m2
Kawat Las kg
Tenaga Pekerja OH
Tukang besi OH
DAFTAR ANALISA HARGA SATUAN

Indeks Volume

4 5

20.000
0.100 2.000
0.050 1.000

22.000
0.010 0.220
0.020 0.440
0.007 0.154
0.100 2.200
0.100 2.200

40.000
0.750 30.000

1.000
1.200 1.200
0.300 0.300

13.333
0.250 3.333

1.000
218.000 218.000
0.520 0.520
0.870 0.870
1.650 1.650
0.250 0.250

7.912
232.000 1,835.535
0.520 4.114
0.780 6.171
1.650 13.054
0.250 1.978
19.200
0.040 0.768
0.300 5.760
0.100 1.920
0.000 -
0.000 -
0.000 -
0.520 9.984
0.260 4.992

469.030
1.050 492.482
0.015 7.035
0.007 3.283
0.007 3.283

0.703
232.000 163.150
0.520 0.366
0.780 0.549
1.650 1.160
0.250 0.176

4.550
0.040 0.182
0.400 1.820
0.200 0.910
0.015 0.068
0.350 1.593
0.000 -
0.660 3.003
0.330 1.502

53.400
1.050 56.070
0.007 0.374
0.007 0.374
26.520
1.050 27.846
0.015 0.398
0.007 0.186
0.007 0.186
0.988
232.000 229.214
0.520 0.514
0.780 0.771
1.650 1.630
0.250 0.247

9.600
0.045 0.432
0.300 2.880
0.100 0.960
0.000 -
0.000 -
0.000 -
0.520 4.992
0.260 2.496

64.080
1.050 67.284
0.007 0.449
0.007 0.449

22.113
1.050 23.219
0.015 0.332
0.007 0.155
0.007 0.155

3.560
232.000 825.856
0.520 1.851
0.780 2.777
1.650 5.874
0.250 0.890

58.240
0.040 2.330
0.400 23.296
0.200 11.648
0.015 0.874
0.350 20.384
0.000 -
0.660 38.438
0.330 19.219
222.144
1.050 233.251
0.007 1.555
0.007 1.555

112.464
1.050 118.087
0.015 1.687
0.007 0.787
0.007 0.787

2.462
232.000 571.104
0.520 1.280
0.780 1.920
1.650 4.062
0.250 0.615

9.800
0.040 0.392
0.400 3.920
0.200 1.960
0.018 0.176
0.350 3.430
2.000 19.600
0.660 6.468
0.330 3.234

224.280
1.050 235.494
0.007 1.570
0.007 1.570

225.720
1.050 237.006
0.015 3.386
0.007 1.580
0.007 1.580

1.166
232.000 270.576
0.520 0.606
0.780 0.910
1.650 1.924
0.250 0.292
7.200
0.040 0.288
0.400 2.880
0.200 1.440
0.018 0.130
0.350 2.520
2.000 14.400
0.660 4.752
0.330 2.376

224.280
1.050 235.494
0.007 1.570
0.007 1.570

225.720
1.050 237.006
0.015 3.386
0.007 1.580
0.007 1.580

0.080
232.000 18.560
0.520 0.042
0.780 0.062
1.650 0.132
0.250 0.020

17.600
0.040 0.704
0.400 7.040
0.200 3.520
0.015 0.264
0.350 6.160
0.000 -
0.660 11.616
0.330 5.808

19.728
1.050 235.494
0.007 1.570
0.007 1.570
2.288
1.050 2.402
0.015 0.034
0.007 0.016
0.007 0.016

5.083
232.000 1,179.254
0.520 2.643
0.780 3.965
1.650 8.387
0.250 1.271

30.800
0.040 1.232
0.400 12.320
0.200 6.160
0.015 0.462
0.350 10.780
6.000 184.800
0.660 20.328
0.330 10.164

217.620
1.050 228.501
0.015 3.264
0.007 1.523
0.007 1.523

4.800
232.000 1,113.600
0.520 2.496
0.780 3.744
1.650 7.920
0.250 1.200

70.000
0.030 2.100
0.400 28.000
0.200 14.000
0.020 1.400
0.350 24.500
3.000 210.000
0.660 46.200
0.330 23.100
274.716
1.050 288.452
0.015 4.121
0.007 1.923
0.007 1.923

209.280
13.632 2,852.905
0.027 5.651
0.400 83.712
0.200 41.856

2.000
218.000 436.000
0.520 1.040
0.870 1.740
1.650 3.300
0.250 0.500

209.280
0.100 20.928
0.100 20.928
0.260 54.413
0.020 4.186
0.063 13.185

0.288
0.750 0.216

10.400
4.500 46.800
4.500 46.800
0.050 0.520
1.050 10.920
1.050 10.920
BACK UP PERHITUNGAN BETON TOWER

Beton
No Uraian Gambar
P L T Jumlah (n)

1 Pekerjaan Pondasi
5.000 4.000 0.400 1.000

2 Pekerjaan Kolom Pondasi 35 x 35


a. Tulangan Pokok 0.350 0.350 1.450 4.000
b. Tulangan Begel
Ø8-15

6Ø14 35

35

3 Pekerjaan Sloof 20/30


a. Tulangan Pokok 16.800 0.200 0.300
b. Tulangan Begel

Ø8-15

6Ø14 30

20

4 Pekerjaan Kolom 30 x 30
a. Tulangan Pokok 10.000 0.300 0.300 4.000
b. Tulangan Begel
Ø8-15

6Ø14 30

30

5 Pekerjaan Balok 20/25


a. Tulangan Pokok 50.400 0.200 0.250
b. Tulangan Begel
Ø8-15

25
6Ø14

20

6 Pekerjaan Balok 20/20


a. Tulangan Pokok 30.000 0.200 0.200
b. Tulangan Begel

Ø8-15

20
6Ø14

20

7 Pekerjaan Plat Tb 20 cm
5,60
5.600 4.600 0.200
4,95

Tangga

BALOK 20/20
BALOK 20/20

Ø8-15
Ø8-15
BALOK 20/20 4,60

Ø8-15 Ø8-15 3,35


Ø8-15 T= 20 Ø8-15

BALOK 20/20
Ø8-15
Ø8-15
ERHITUNGAN BETON TOWER

Beton Besi
Total Beton
Volume Luas (A) Volume (m3)
Ø Besi P Jumlah (n)
(m3) (m2) (m3)

8.000 Ø12 0.00015 8.600 33.333 0.088 7.912

0.711 Ø12 0.00015 1.810 24.000 0.007 0.703


Ø8 0.00005 1.200 9.667 0.001

1.008 Ø12 0.00015 16.800 6.000 0.016 0.988


Ø8 0.00005 0.800 112.000 0.005

3.600 Ø12 0.00015 10.000 24.000 0.037 3.560


Ø8 0.00005 1.000 66.667 0.003

2.520 Ø12 0.00015 50.400 6.000 0.047 2.462


Ø8 0.00005 0.700 336.000 0.012

1.200 Ø12 0.00015 30.000 6.000 0.028 1.166


Ø8 0.00005 0.600 200.000 0.006

5.152 Ø8 0.00005 20.200 68.000 0.069 5.083


DAFTAR IN KIND

Desa : Pematang Manggis


Kecamatan : Batang Cenaku
Kabupaten : Indragiri Hulu

HOK PEKERJA HOK TUKANG MATERIAL


NO PEKERJAAN
VOL HARGA SAT JUMLAH VOL HARGA SAT JUMLAH VOL HARGA SAT JUMLAH
1 Rumah Mesin #REF! Rp 80,000 #REF! Rp - #REF! Bata Merah #REF! #REF!
2 Pengadaan Sumber Energi
3 Pengadaan Pompa
4 Bak Filter 154 Rp 80,000 Rp 12,320,000
5 Tower Air 300 Rp 80,000 Rp 24,000,000
6 Perpipaan 0 Rp 80,000 Rp - 0 Rp 100,000 Rp -
7 Tempat Cuci Tangan (TCT) 19 Rp 80,000 Rp 1,520,000 0 Kran Air Giv Rp 35,000 Rp -
TOTAL #REF! #REF! 0 Rp - #REF! #REF!
TOTAL IN KIND #REF!
DAFTAR PERBANDINGAN HARGA BAHAN/ALAT

KKM : Sumber Mulyo


Desa/Kelurahan : Pematang Manggis
Kecamatan : Batang Cenaku
Kabupaten : Indragiri Hulu
Provinsi : Riau
Tanggal Penetapan :

Harga Satuan Toko/Suplier


No. Nama Barang/ Alat/Jasa Satuan SINAR TANI BANGUNAN
(Rp).

A. Bahan Bangunan
1 Pasir Beton Lokal M3 160,000
2 Pasir Urug M3 125,000
3 Pasir Pasang M3 160,000
4 Kerikil M3 250,000
5 Batu Bata, ukuran standar buah 700
6 Semen PC, berat 50 kg Zak 70,000
7 Tulangan Polos dia 12 batang 96,000
8 Tulangan Polos dia 10 batang 75,000
9 Tulangan Polos dia 8 batang 62,000
10 Tulangan Polos dia 6 batang 37,000
11 Kawat Beton Kg 19,000
12 Paku Biasa 2"-5" Kg 20,000
13 Plamir Kg 15,000
14 Cat Minyak Kg 60,000
15 Cat Dasar Kg 18,000
16 Cat Tembok Kg 25,000
17 Amplas Lbr 5,000
18 Kayu Klas III M3 1,500,000
19 Kayu 5/7 M3 1,800,000
19 Kayu 5/7 Btg 26,000
20 Papan 3/20 M3 1,500,000
21 Papan 3/20 Lbr 36,000
22 plywood 9 mm lbr 145,000
23 Kayu Cerocok/Perancah Btg 12,000
24 Minyak Bekisting Ltr 10,000
25 Jet Pump Kapasitas hisap 30 m Unit 3,200,000
26 Pompa Ebara Unit 13,000,000
27 Mesin Diesel + Perlengkapan Unit 15,000,000

B. Perpipaan
1 PVC SNI dia. 3" RRJ batang 330,000
2 PVC SNI dia. 2" RRJ batang 170,000
Harga Satuan Toko/Suplier
No. Nama Barang/ Alat/Jasa Satuan SINAR TANI BANGUNAN
(Rp).
PIPA PVC
1 PVC AW dia. 1 1/4" batang 52,000
2 PVC AW dia. 1" batang 40,000
3 PVC AW dia. 3/4" batang 33,000

PIPA Galvanis
1 SNI dia. 3" , Pj 6 meter batang 670,000
2 SNI dia. 2" , Pj 6 meter batang 380,000
3 SNI dia. 1" , Pj 6 meter batang 250,000

Aksesoris Pipa:
1 Elbow Ukuran dia. 3/4" buah 6,000
2 Socket Ukuran dia. 3/4" buah 6,000
3 Socket Drat Ukuran dia. 3/4" buah 16,000
4 Tee Ukuran dia. 3/4" buah 6,000

Perlengkapan :
1 Kran Air antik Ø 3/4" buah 35,000
2 Lem PVC bh 17,000
3 Seal Tape M' 5,000

No. Nama Jabatan


1.

2.

3.

4.

5
TAR PERBANDINGAN HARGA BAHAN/ALAT

Harga Satuan Toko/Suplier Harga Satuan


BINTANG TIMUR KERAMIK FAJAR BARU Ditetapkan
(Rp). (Rp). (Rp).

160,000 160,000 100,000


125,000 125,000 100,000
160,000 160,000 100,000
250,000 250,000 250,000
800 850 #REF!
73,000 70,000 70,000
98,000 95,000 110,000
78,000 75,000 85,000
65,000 60,000 60,000
35,000 40,000 40,000
22,000 20,000 20,000
24,000 20,000 18,000
13,000 10,000 10,000
55,000 58,000 51,000
20,000 15,000 15,000
30,000 25,000 65,000
7,000 10,000 5,000
1,650,000 1,700,000 2,000,000
1,900,000 1,900,000 2,000,000
27,000 27,000 #REF!
1,600,000 1,700,000 2,000,000
39,000 36,000 2,000,000
147,000 148,000 145,000
13,000 15,000 10,000
10,000 12,000 10,000
3,500,000 3,000,000 Err:509
13,000,000 12,000,000 12,000,000
18,000,000 17,000,000 Err:509

320,000 325,000 Err:509


170,000 173,000 175,000
Harga Satuan Toko/Suplier Harga Satuan
BINTANG TIMUR KERAMIK FAJAR BARU Ditetapkan
(Rp). (Rp). (Rp).

50,000 60,000 #REF!


30,000 45,000 #REF!
22,000 33,000 22,000

680,000 650,000 700,000


370,000 350,000 350,000
280,000 280,000 250,000

7,000 5,000 5,000


7,000 5,000 5,000
17,000 15,000 15,000
7,000 5,000 5,000

45,000 40,000 35,000


20,000 15,000 15,000
5,000 5,000 5,000

yang menetapkan ;

Jabatan tandatangan
VERIFIKASI RENCANA PENGADAAN BARA

KKM : Sumber Mulyo


Desa : Pematang Manggis
Kecamatan : Batang Cenaku

Pengadaan Pengadaan
No. Uraian Satuan Bak Filter Rumah Mesin Tower Air Perpipaan TCT
Sumber Energi Pompa

I Barang/Material
A. Paket 1
1 Semen PC, berat 50 kg Zak 49.0 #REF! 195.0 1.0
2 Tulangan Polos dia 12 Btg 123.0
3 Tulangan Polos dia 10 Btg 119.0 32.0
4 Tulangan Polos dia 8 Btg 37.0 #REF! 246.0 4.0
5 Tulangan Polos dia 6 Btg #REF! 1.0 2.0
6 plywood 9 mm Lbr 40.0 #REF! 70.0
7 Plamir Kg 4.0 #REF! 21.0
8 Cat Dasar Kg 4.0 #REF! 21.0
9 Cat Penutup / Cat Tembok Kg 10.0 #REF! 55.0 2.0
10 Kawat Beton Kg 10.0 #REF! 24.0 1.0
11 Paku Biasa 2"-5" Kg 20.0 #REF! 50.0 1.0
12 Minyak Bekisting Ltr 20.0 #REF! 43.0
13 Amplas Lbr 35.0
JUML

B. Paket 2
1 Pasir Beton Lokal M3 3.0 #REF! 12.0 0.5
2 Pasir Urug M3 2.0
3 Pasir Pasang M3 2.0 6.0
Pengadaan Pengadaan
No. Uraian Satuan Bak Filter Rumah Mesin Tower Air Perpipaan TCT
Sumber Energi Pompa

4 Kerikil Ayak/Koral M3 4.0 #REF! 24.0 0.5


5 Kayu Klas III M3 1.0 3.0
6 Kayu 5/7 Btg 0.5 #REF! 35.0
7 Papan 3/20 Lbr 0.2 #REF! 21.0
8 Batu Bata, ukuran standar Bh #REF!
JUML

C. Paket 3
1 Pipa SNI dia. 3" Btg Err:509
2 Pipa SNI dia. 2" Btg #REF! -
3 Perlengkapan Pipa Ls
4 PVC AW dia. 3/4" Btg 8.0
5 PVC AW dia. 1" Btg #REF!
6 PVC AW dia. 1 1/4" Btg #REF!
7 Elbow 3/4 Inch Bh 12.0
8 Kran Air Giv 3/4 Inch Bh 6.0
9 Socket Drat 3/4 Inch Bh 6.0
10 Tee 3/4 Inch Bh 6.0
11 Socket 3/4 Inch Bh 8.0
12 Pipa Galvanis SNI dia. 3" , Pj 6 meter Btg #REF! 2.0
13 Pipa Galvanis SNI dia. 2" , Pj 6 meter Btg 2.0
14 Pipa Galvanis SNI dia. 1" , Pj 6 meter Btg 4.0
JUML
Pengadaan Pengadaan
No. Uraian Satuan Bak Filter Rumah Mesin Tower Air Perpipaan TCT
Sumber Energi Pompa

D. Paket 4
1 Mesin Diesel Err:509 Err:509
1 Pompa Sentrifugal Set 1.0
2 Pompa Jet Pump Set Err:509
3 Pengadaan KWH Listrik Ls Err:509
JUML
TOTAL JUMLAH BARANG

E. Upah
1 Pekerja OH 154.0 #REF! 350.0 - 19.0
2 Tukang OH 98.0 #REF! 168.0 - 3.0
TOTAL JU

Dibuat Oleh, Diperiksa Oleh,


Tim Pengadaan Barang dan Jasa Koordinator. KKM Fasilitator Tek
Ketua

( ) PUJIANTO R. PUTRA KURNIA


Pengadaan Pengadaan
No. Uraian Satuan Bak Filter Rumah Mesin Tower Air Perpipaan TCT
Sumber Energi Pompa

VERIFIKASI RENCANA PENGADAAN BARA

KKM : Sumber Mulyo


Desa : Pematang Manggis
Kecamatan : Batang Cenaku

Pengadaan Pengadaan
No. Uraian Satuan Bak Filter Rumah Mesin Tower Air Perpipaan TCT
Sumber Energi Pompa

SUMBER DANA APBDes


A. Bahan
1 Pipa SNI dia. 2" Btg 108.0
2 Perlengkapan Pipa Ls Err:509
JUM
B. Upah
1 Pekerja OH - #REF! - 78.0 -
2 Tukang OH - #REF! - 40.0 -
TOTAL JU

Dibuat Oleh, Diperiksa Oleh,


Tim Pengadaan Barang dan Jasa Koordinator. KKM Fasilitator Tek
Ketua
Pengadaan Pengadaan
No. Uraian Satuan Bak Filter Rumah Mesin Tower Air Perpipaan TCT
Sumber Energi Pompa

( ) PUJIANTO R. PUTRA KURNIA


A PENGADAAN BARANG DAN JASA

Kabupaten : Indragiri Hulu


Propinsi : Riau
Jenis Kegiatan : Pengadaan Barang dan Jasa

TOTAL HARGA TOTAL METODE PENGADAAN


BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA PENUNJUKAN WAKTU PELAKSANAAN
ALAT BINTANG TIMUR LANGSUNG PENGADAAN
( Rp ) ( Rp ) SINAR TANI BANGUNAN FAJAR BARU
JASA KERAMIK REKANAN PLN

#REF! 70,000.00 #REF! #REF!


123.0 95,000.00 11,685,000.00 11,685,000.00
151.0 75,000.00 11,325,000.00 11,325,000.00
#REF! 60,000.00 #REF! #REF!
#REF! 35,000.00 #REF! #REF!
#REF! 145,000.00 #REF! #REF!
#REF! 10,000.00 #REF! #REF!
#REF! 55,000.00 #REF! #REF!
#REF! 15,000.00 #REF! #REF!
#REF! 19,000.00 #REF! #REF!
#REF! 20,000.00 #REF! #REF! B
#REF! 10,000.00 #REF! #REF! U
35.0 5,000.00 175,000.00 175,000.00 L
A
JUMLAH PAKET 1 #REF! #REF! #REF! #REF! - N

K
E
#REF! 160,000.00 #REF! #REF!
-
2.0 125,000.00 250,000.00 250,000.00 1
8.0 160,000.00 1,280,000.00 1,280,000.00
S
.
U
L
A
N

TOTAL HARGA TOTAL METODE PENGADAAN K


E
BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA PENUNJUKAN WAKTU PELAKSANAAN
-
ALAT BINTANG TIMUR LANGSUNG PENGADAAN
1
( Rp ) ( Rp ) SINAR TANI BANGUNAN FAJAR BARU
JASA KERAMIK REKANAN PLN
#REF! 250,000.00 #REF! #REF! S
.
4.0 1,500,000.00 6,000,000.00 6,000,000.00 D
#REF! 26,000.00 #REF! #REF!
#REF! 36,000.00 #REF! #REF! B
U
#REF! 700.00 #REF! #REF! L
JUMLAH PAKET 2 #REF! #REF! #REF! #REF! - A
- N
- K
Err:509 320,000.00 Err:509 Err:509 E
#REF! 170,000.00 #REF! #REF! -
3
- -
8.0 22,000.00 176,000.00 176,000.00
#REF! 30,000.00 #REF! #REF!
#REF! 50,000.00 #REF! #REF!
12.0 5,000.00 60,000.00 60,000.00
6.0 35,000.00 210,000.00 210,000.00
6.0 5,000.00 30,000.00 30,000.00
6.0 15,000.00 90,000.00 90,000.00
8.0 5,000.00 40,000.00 40,000.00
#REF! 650,000.00 #REF! #REF!
2.0 350,000.00 700,000.00 700,000.00
4.0 250,000.00 1,000,000.00 1,000,000.00
JUMLAH PAKET 3 Err:509 1,210,000.00 #REF! #REF! -
TOTAL HARGA TOTAL METODE PENGADAAN
BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA PENUNJUKAN WAKTU PELAKSANAAN
ALAT BINTANG TIMUR LANGSUNG PENGADAAN
( Rp ) ( Rp ) SINAR TANI BANGUNAN FAJAR BARU
JASA KERAMIK REKANAN PLN

-
Err:509 Err:509 Err:509 Err:509
1.0 16,000,000.00 16,000,000.00 12,000,000.00

-3
KE
Err:509 Err:509 Err:509 Err:509

N
LA
Err:509 6,600,000.00 Err:509 Err:509

BU
JUMLAH PAKET 4 Err:509 Err:509 - Err:509 Err:509

D
S.
-1
OTAL JUMLAH BARANG/MATERIAL #REF! #REF! #REF! #REF! Err:509

KE
-

N
LA
BU
#REF! 80,000.00 #REF!
#REF! 120,000.00 #REF!
TOTAL JUMLAH JASA #REF! - - - -

#REF! Pematang Manggis, Oktober 2016

Menyetujui,
Fasilitator Teknik Fasilitator Senior Koordinator Kabupaten, ( DC )

R. PUTRA KURNIAWAN, ST IIF MARESTA, ST BAMBANG SUPRIHARTONO, ST


TOTAL HARGA TOTAL METODE PENGADAAN
BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA PENUNJUKAN WAKTU PELAKSANAAN
ALAT BINTANG TIMUR LANGSUNG PENGADAAN
( Rp ) ( Rp ) SINAR TANI BANGUNAN FAJAR BARU
JASA KERAMIK REKANAN PLN
A PENGADAAN BARANG DAN JASA

Kabupaten : Indragiri Hulu


Propinsi : Riau
Jenis Kegiatan : Pengadaan Barang dan Jasa

TOTAL HARGA TOTAL METODE PENGADAAN


BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA PENUNJUKAN WAKTU PELAKSANAAN
ALAT BINTANG TIMUR LANGSUNG PENGADAAN
( Rp ) ( Rp ) SINAR TANI BANGUNAN FAJAR BARU
JASA KERAMIK REKANAN PLN

-3
108.0 175,000.00 18,900,000.00 18,360,000.00

KE
N
Err:509 Err:509 Err:509 Err:509

LA
BU
JUMLAH PAKET Err:509 - Err:509 - -

D
S.
-1
KE
N
#REF! 80,000.00 #REF!

LA
BU
#REF! 120,000.00 #REF!
TOTAL JUMLAH UPAH #REF! - - - -

Pematang Manggis, Oktober 2016

Menyetujui,
Fasilitator Teknik Fasilitator Senior Koordinator Kabupaten, ( DC )
TOTAL HARGA TOTAL METODE PENGADAAN
BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA PENUNJUKAN WAKTU PELAKSANAAN
ALAT BINTANG TIMUR LANGSUNG PENGADAAN
( Rp ) ( Rp ) SINAR TANI BANGUNAN FAJAR BARU
JASA KERAMIK REKANAN PLN
R. PUTRA KURNIAWAN, ST IIF MARESTA, ST BAMBANG SUPRIHARTONO, ST
RENCANA PENGGUNAAN DANA TAHAP 1
Desa/Kecamatan/Kabupaten : Pematang Manggis/Batang Cenaku/Indragiri Hulu
cash 12,010,800
apbn 208,913,600

VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11

I PELATHAN
- PEL. ADM & KEUANGAN 1.0 - 1.0 1.0 - - 1.0 - Paket
- PEL. TEKNIK 1.0 - 1.0 1.0 - - 1.0 - Paket
- PENINGKATAN PHBS DI MASYARAKAT 1.0 - - - 1.0 - - - Paket
- PENINGKATAN PHBS DI SEKOLAH 1.0 - - - 1.0 - - - Paket
- PEL. BP-SPAM ( PENGELOLA ) 1.0 - - - 1.0 - - - Paket

TOTAL

II OPERASIONAL KKM
II.1 Administrasi KKM (ATK)
- Pulpen 1.0 - 1.0 1.0 - - 1.0 - Lusin
- Penggaris (Mistar) 1.0 - 1.0 1.0 - - 1.0 - Buah
- Spidol 3.0 - 3.0 3.0 - - 3.0 - Buah
- Pensil 1.0 - 1.0 1.0 - - 1.0 - kotak
- Peruncing Pensil 1.0 - 1.0 1.0 - - 1.0 - Buah
- Penghapus Pensil 1.0 - 1.0 1.0 - - 1.0 - Buah
- Buku Folio 5.0 - 5.0 5.0 - - 5.0 - Buah
- Kalkulator 1.0 - 1.0 1.0 - - 1.0 - Buah
- Kertas HVS 70 gr 1.0 - 1.0 1.0 - - 1.0 - Rim
- Kertas A4 70 gr 3.0 - 3.0 3.0 - - 3.0 - Rim
- Map Kertas/stopmap folio 11.0 - 11.0 11.0 - - 11.0 Buah
- Map Plastik/clear bag 4.0 - 4.0 4.0 - - 4.0 Buah
- Map Binder/file 2.0 - 2.0 2.0 - - 2.0 Buah
- Map tulang 8.0 - 8.0 8.0 - - 8.0 - Buah
- Strepler Besar 1.0 - 1.0 1.0 - - 1.0 - Buah
- Strepler Kecil 1.0 - 1.0 1.0 - - 1.0 - Buah
- Isi Strepler Besar 4.0 - 4.0 4.0 - - 4.0 - Kotak
- Isi Strepler Kecil 4.0 - 4.0 4.0 - - 4.0 - Kotak
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11
- Pembolong Kertas 1.0 - 1.0 1.0 - - 1.0 - Buah
- Materai 6000 25.0 - 25.0 25.0 - - 25.0 - Lembar
- Kwitansi 5.0 - 5.0 5.0 - - 5.0 - Buku
- Lakban Hitam Besar 1.0 - 1.0 1.0 - - 1.0 - Buah
- Lakban Kertas Besar 3.0 - 3.0 3.0 - - 3.0 - Buah
- Lem kertas Povinol 4.0 - 4.0 4.0 - - 4.0 - Buah
- Stempel KKM 1.0 - 1.0 1.0 - - 1.0 - Buah
- Tinta Print (hitam dan warna) 4.0 - 4.0 4.0 - - 4.0 - Botol
- Buku Tulis 3.0 - 3.0 3.0 - - 3.0 - Buah
- Lemari arsip kecil 1.0 - 1.0 1.0 - - 1.0 - Buah
- Akta Notaris 1.0 - 1.0 1.0 - - 1.0 - Paket
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11

II.2 TRANSPORTASI KKM


- Konsultasi KKM/SATLAK ke Kabupaten (2 org) 5.0 - 2.0 2.0 3.0 - 2.0 - PP
- Pencairan dana ke Bank BRI Batang Cenaku (3 Org) 4.0 - 1.0 1.0 3.0 - 1.0 - PP
- Transport KKM/SATLAK Belanja Material 10.0 - 3.0 3.0 7.0 - 3.0 - PP
-
II.3 DOKUMENTASI KKM -
- Cuci Cetak Foto 50.0 - - - 50.0 - - - Lembar
- Album Foto 2.0 - - - 2.0 - - - Buah
- Pembuatan Dokumen Akhir 5.0 - - - 5.0 - - - Eks
- Pembuatan papan informasi PAMSIMAS 1.0 - 1.0 1.0 - - 1.0 - Unit
- Pembuatan papan proyek 2.0 - 2.0 2.0 - - 2.0 - Unit
- Pembuatan papan sekretariat KKM 1.0 - 1.0 1.0 - - 1.0 - Buah
- Pembuatan papan struktur KKM 1.0 - 1.0 1.0 - - 1.0 - Buah
- Pembuatan papan struktur BP SPAM 1.0 - 1.0 1.0 - - 1.0 - Buah
- Penggandaan dokumen -
a.RKM 5.0 - 5.0 5.0 - - 5.0 - Eks
b. Foto copy arsip KKM 1,162.0 - 200.0 200.0 962.0 - 200.0 - Lembar
c. Laporan pengunaan dana Termin 15.0 - 5.0 5.0 10.0 - 5.0 - Eks
- Pengadaan Kotak Saran 1.0 - 1.0 1.0 - - 1.0 - Buah

TOTAL

III RUMAH MESIN


III. 1 BAHAN
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - 306.0 306.0 #REF! 306.0 - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - - - #REF! - - - #REF!
- #REF! #REF! - - - #REF! - - - #REF!
- #REF! #REF! - - - #REF! - - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - #REF! #REF! #REF! #REF! - - #REF!
- #REF! #REF! - - - #REF! - - - #REF!
- #REF! #REF! - - - #REF! - - - #REF!

III.2 UPAH
- #REF! #REF! - 40.0 40.0 #REF! - - 40.0 #REF!
- #REF! #REF! - 10.0 10.0 #REF! 10.0 - - #REF!

TOTAL
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11

IV PENGADAAN SUMBER ENERGI DAN POMPA


IV. 1 BAHAN
- Err:509 Err:509 - - - Err:509 - - - Err:509
- Err:509 Err:509 - - - Err:509 - - - Err:509
- KWH Meter 3300 1.0 - - - 1.0 - - - Set
- Err:509 Err:509 - - - Err:509 - - - Err:509

TOTAL

V PENGADAAN SUMBER ENERGI DAN POMPA


V. 1 BAHAN
- Pompa Submersible 1.0 - - - 1.0 - - - Set
- Err:509 Err:509 - - - Err:509 - - - Err:509
- Err:509 Err:509 - - - Err:509 - - - Err:509

TOTAL

VI. BAK FILTER


VI.1 BAHAN
- Paku Biasa 2"-5" 20.0 - 20.0 20.0 - 20.0 - - Kg
- Pasir Beton 3.0 - 3.0 3.0 - 3.0 - - M3
- Pasir Pasang 2.0 - 2.0 2.0 - 2.0 - - M3
- Koral Beton 4.0 - 4.0 4.0 - 4.0 - - M3
- Semen Portland 49.0 - 49.0 49.0 - 49.0 - - Zak
- Kayu Kelas III 1.0 - 1.0 1.0 - 1.0 - - M3
- Kayu 5/7 0.5 - 0.5 0.5 - 0.5 - - M3
- Papan 3/20 0.2 - 0.2 0.2 - 0.2 - - M3
- Plywood 9 mm 40.0 - 40.0 40.0 - 40.0 - - Lbr
- Dolken Kayu Galam Ø 8 - 10 / 4m 196.0 - 100.0 100.0 96.0 100.0 - - Btg
- Minyak Bekisting 20.0 - 20.0 20.0 - 20.0 - - Ltr
- Besi ø 8 mm 37.0 - 37.0 37.0 - 37.0 - - Btg
- Besi ø 10 mm 119.0 - 59.0 59.0 60.0 59.0 - - Btg
- Kawat Beton 10.0 - 5.0 5.0 5.0 5.0 - - Kg
- Kertas gosok 35.0 - - - 35.0 - - - Lbr
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11
- Plamir 4.0 - - - 4.0 - - - Kg
- Cat Dasar 4.0 - - - 4.0 - - - kg
- Cat Penutup 2x 10.0 - - - 10.0 - - - kg
- Ijuk 25.0 - - - 25.0 - - - kg
- Arang Aktif 1.0 - - - 1.0 - - - Ls

VI.2 UPAH
- Pekerja 154.0 - 54.0 54.0 100.0 - - 54.0 OH
- Tukang 98.0 - 35.0 35.0 63.0 35.0 - - OH

TOTAL
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11

VII TOWER AIR


VII.1 BAHAN
- Kayu Kaso 5/7 (borneo) 0.5 - 0.5 0.5 - 0.5 - - M3
- Paku Biasa 2" - 5" 50.0 - 50.0 50.0 - 50.0 - - Kg
- Kayu Papan 3/20 borneo 0.5 - 0.5 0.5 - 0.5 - - M3
- Pasir Urug 2.0 - 2.0 2.0 - 2.0 - - M3
- Semen Portland 195.0 - 100.0 100.0 95.0 100.0 - - Zak
- Pasir Beton 12.0 - 12.0 12.0 - 12.0 - - M3
- Kerikil 24.0 - 24.0 24.0 - 24.0 - - M3
- Kayu Kelas III 3.0 - 3.0 3.0 - 3.0 - - M3
- Minyak Bekisting 43.0 - 43.0 43.0 - 43.0 - - Ltr
- Plywood tebal 9 mm 70.0 - 70.0 70.0 - 70.0 - - Lbr
- Dolken Kayu galam 329.0 - 250.0 250.0 79.0 250.0 - - Btg
- Besi Beton (Polos/Ulir) Ǿ12 123.0 - 123.0 123.0 - 123.0 - - Btg
- Besi Beton (Polos/Ulir) Ǿ10 32.0 - 32.0 32.0 - 32.0 - - Btg
- Besi Beton (Polos/Ulir) Ǿ8 246.0 - 164.0 164.0 82.0 164.0 - - Btg
- Besi Beton (Polos/Ulir) Ǿ6 1.0 - 1.0 1.0 - 1.0 - - Btg
- Kawat Beton 24.0 - 10.0 10.0 14.0 10.0 - - Kg
- Pasir Pasang 6.0 - - - 6.0 - - - M3
- Plamir 21.0 - 9.0 9.0 12.0 9.0 - - Kg
- Cat Dasar 21.0 - - - 21.0 - - - Kg
- Cat Tembok 55.0 - - - 55.0 - - - Kg
- Tangga Besi 1.0 - - - 1.0 - - - Ls
- Err:509 Err:509 - - - Err:509 - - - Err:509
- Pipa Galvanis diameter 3 inchi 2.0 - - - 2.0 - - - Btg
- Pipa Galvanis diameter 2 inchi 2.0 - - - 2.0 - - - Btg
- Pipa Galvanis diameter 1 inchi 4.0 - - - 4.0 - - - Btg
- Cat Minyak 1.0 - - - 1.0 - - - Kg

VII. 2 UPAH
- Pekerja 350.0 - 150.0 150.0 200.0 - - 150.0 Hok
- Tukang 168.0 - 74.0 74.0 94.0 74.0 - - Hok

TOTAL
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11

VIII PERPIPAAN
VIII.1 BAHAN
- Err:509 Err:509 - - - Err:509 - - - Err:509
- Pipa SNI S 12.5 diameter 2" 108.0 - - - 108.0 - - - Btg
- Err:509 Err:509 - - - Err:509 - - - Err:509
- - - - - - - - -
VIII.2 UPAH -
- Pekerja 78.0 - - - 78.0 - - - Oh
- Tukang 40.0 - - - 40.0 - - - Oh

TOTAL
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11

IX TEMPAT CUCI TANGAN (TCT)


IX.1 BAHAN
- Paku Biasa 2"-5" 1.0 - 1.0 1.0 - 1.0 - - Kg
- Pasir Beton 0.5 - 0.5 0.5 - 0.5 - - M3
- Koral Beton 0.5 - 0.5 0.5 - 0.5 - - M3
- Semen Portland 1.0 - 1.0 1.0 - 1.0 - - Zak
- Papan 3/20 6.0 - 6.0 6.0 - 6.0 - - Lbr
- Besi ø 6 mm 2.0 - 2.0 2.0 - 2.0 - - Btg
- Besi ø 8 mm 4.0 - 4.0 4.0 - 4.0 - - btg
- Kawat Beton 1.0 - 1.0 1.0 - 1.0 - - Kg
- Cat Tembok 2.0 - 2.0 2.0 - 2.0 - - kg
- Pipa PVC AW 3/4 inch 8.0 - 8.0 8.0 - 8.0 - - btg
- Elbow 3/4 Inch 12.0 - 12.0 12.0 - 12.0 - - Bh
- Kran Air Giv 3/4 Inch 6.0 - 6.0 6.0 - 4.0 - 2.0 Bh
- Socket Drat 3/4 Inch 6.0 - 6.0 6.0 - 6.0 - - Bh
- Tee 3/4 Inch 6.0 - 6.0 6.0 - 6.0 - - Bh
- Socket 3/4 Inch 8.0 - 8.0 8.0 - 8.0 - - Bh
- Seal Tape 6.0 - 6.0 6.0 - 6.0 - - Bh
- Lem Pipa 2.0 - 2.0 2.0 - 2.0 - - Bh

IX.2 UPAH
- Pekerja 19.0 - 19.0 19.0 - - - 19.0 Oh
- Tukang 3.0 - 3.0 3.0 - 3.0 - - Oh

TOTAL
JUMLAH Rp.
JUMLAH PENGAJUAN Rp.
PEMBULATAN Rp.
TERBILANG SERATUS TIGA JUTA SEMBILAN RATUS EMPAT PULUH DELAPAN RI

Disetujui Oleh:
Koordinator KKM
VOLUME
UNIT/
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH
SISA APBN INCASH INKIND SATUAN
TAHAP LALU SEKARANG KOMULATIF

1 2 3 4 5 6=4+5 7=3-6 8 9 10 11

PUJIANTO

Diperiksa Oleh:

Koordinator Kabupaten Fasilitator Senior Fasilitator Masyarakat

BAMBANG SUPRIHARTONO, ST IIF MARESTA, ST R. PUTRA KURNIAWAN, ST

Diketahui Oleh:
PPK Program Pamsimas

EFRI MARYONI, ST
NIP. 19801022 200904 1 003
agiri Hulu
Err:509 Err:509 4,200.00
Err:509 83,565,440 Err:509 Err:509 30100

HARGA JUMLAH (Rp)


TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16

450,000.00 - 450,000.00 - 450,000.00


252,000.00 - 252,000.00 - 252,000.00
492,000.00 - - - -
Err:509 Err:509 Err:509 Err:509 Err:509
300,000.00 - - - -

TOTAL Err:509 Err:509 Err:509 Err:509

18,000.00 - 18,000.00 - 18,000.00


6,000.00 - 6,000.00 - 6,000.00
8,000.00 - 24,000.00 - 24,000.00
15,000.00 - 15,000.00 - 15,000.00
3,000.00 - 3,000.00 - 3,000.00
3,000.00 - 3,000.00 - 3,000.00
16,000.00 - 80,000.00 - 80,000.00
60,000.00 - 60,000.00 - 60,000.00
50,000.00 - 50,000.00 - 50,000.00
40,000.00 - 120,000.00 - 120,000.00
2,000.00 - 22,000.00 - 22,000.00
7,000.00 - 28,000.00 - 28,000.00
40,000.00 - 80,000.00 - 80,000.00
8,500.00 - 68,000.00 - 68,000.00
18,000.00 - 18,000.00 - 18,000.00
13,000.00 - 13,000.00 - 13,000.00
4,000.00 - 16,000.00 - 16,000.00
3,000.00 - 12,000.00 - 12,000.00
HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16
35,000.00 - 35,000.00 - 35,000.00
7,000.00 - 175,000.00 - 175,000.00
5,000.00 - 25,000.00 - 25,000.00
15,000.00 - 15,000.00 - 15,000.00
15,000.00 - 45,000.00 - 45,000.00
4,000.00 - 16,000.00 - 16,000.00
100,000.00 - 100,000.00 - 100,000.00
60,000.00 - 240,000.00 - 240,000.00
20,000.00 - 60,000.00 - 60,000.00
300,000.00 - 300,000.00 - 300,000.00
500,000.00 - 500,000.00 - 500,000.00
HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16

300,000.00 - 600,000.00 - 600,000.00


225,000.00 - 225,000.00 - 225,000.00
100,000.00 - 300,000.00 - 300,000.00

5,000.00 - - - -
30,000.00 - - - -
200,000.00 - - - -
250,000.00 - 250,000.00 - 250,000.00
150,000.00 - 300,000.00 - 300,000.00
150,000.00 - 150,000.00 - 150,000.00
250,000.00 - 250,000.00 - 250,000.00
250,000.00 - 250,000.00 - 250,000.00

250,000.00 - 1,250,000.00 - 1,250,000.00


300.00 - 60,000.00 - 60,000.00
85,000.00 - 425,000.00 - 425,000.00
120,000.00 - 120,000.00 - 120,000.00

TOTAL - 6,327,000.00 - 6,327,000.00

#REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF!

TOTAL #REF! #REF! #REF! #REF!


HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16

Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509
6,600,000.00 - - - -
Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL Err:509 Err:509 Err:509 Err:509

16,000,000.00 - - - -
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL Err:509 Err:509 Err:509 Err:509

18,000.00 360,000.00 - - 360,000.00


100,000.00 300,000.00 - - 300,000.00
100,000.00 200,000.00 - - 200,000.00
250,000.00 1,000,000.00 - - 1,000,000.00
70,000.00 3,430,000.00 - - 3,430,000.00
2,000,000.00 2,000,000.00 - - 2,000,000.00
2,000,000.00 1,000,000.00 - - 1,000,000.00
2,000,000.00 348,000.00 - - 348,000.00
145,000.00 5,800,000.00 - - 5,800,000.00
10,000.00 1,000,000.00 - - 1,000,000.00
10,000.00 200,000.00 - - 200,000.00
60,000.00 2,220,000.00 - - 2,220,000.00
85,000.00 5,015,000.00 - - 5,015,000.00
20,000.00 100,000.00 - - 100,000.00
5,000.00 - - - -
HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16
10,000.00 - - - -
15,000.00 - - - -
65,000.00 - - - -
20,000.00 - - - -
500,000.00 - - - -

80,000.00 - - 4,320,000.00 4,320,000.00


100,000.00 3,500,000.00 - - 3,500,000.00

TOTAL 26,473,000.00 - 4,320,000.00 30,793,000.00


HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16

2,000,000.00 1,000,000.00 - - 1,000,000.00


18,000.00 900,000.00 - - 900,000.00
2,000,000.00 1,000,000.00 - - 1,000,000.00
100,000.00 200,000.00 - - 200,000.00
70,000.00 7,000,000.00 - - 7,000,000.00
100,000.00 1,200,000.00 - - 1,200,000.00
250,000.00 6,000,000.00 - - 6,000,000.00
2,000,000.00 6,000,000.00 - - 6,000,000.00
10,000.00 430,000.00 - - 430,000.00
145,000.00 10,150,000.00 - - 10,150,000.00
10,000.00 2,500,000.00 - - 2,500,000.00
110,000.00 13,530,000.00 - - 13,530,000.00
85,000.00 2,720,000.00 - - 2,720,000.00
60,000.00 9,840,000.00 - - 9,840,000.00
40,000.00 40,000.00 - - 40,000.00
20,000.00 200,000.00 - - 200,000.00
100,000.00 - - - -
10,000.00 90,000.00 - - 90,000.00
15,000.00 - - - -
65,000.00 - - - -
2,500,000.00 - - - -
Err:509 Err:509 Err:509 Err:509 Err:509
700,000.00 - - - -
350,000.00 - - - -
250,000.00 - - - -
51,000.00 - - - -

80,000.00 - - 12,000,000.00 12,000,000.00


100,000.00 7,400,000.00 - - 7,400,000.00

TOTAL Err:509 - - -
HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16

Err:509 Err:509 Err:509 Err:509 Err:509


175,000.00 - - - -
Err:509 Err:509 Err:509 Err:509 Err:509
- - - - -
-
80,000.00 - - - -
120,000.00 - - - -

TOTAL Err:509 Err:509 Err:509 Err:509


HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16

18,000.00 18,000.00 - - 18,000.00


100,000.00 50,000.00 - - 50,000.00
250,000.00 125,000.00 - - 125,000.00
70,000.00 70,000.00 - - 70,000.00
#REF! #REF! #REF! #REF! #REF!
40,000.00 80,000.00 - - 80,000.00
60,000.00 240,000.00 - - 240,000.00
20,000.00 20,000.00 - - 20,000.00
65,000.00 130,000.00 - - 130,000.00
22,000.00 176,000.00 - - 176,000.00
5,000.00 60,000.00 - - 60,000.00
35,000.00 140,000.00 - 70,000.00 210,000.00
15,000.00 90,000.00 - - 90,000.00
5,000.00 30,000.00 - - 30,000.00
5,000.00 40,000.00 - - 40,000.00
5,000.00 30,000.00 - - 30,000.00
15,000.00 30,000.00 - - 30,000.00

80,000.00 - - 1,520,000.00 1,520,000.00


100,000.00 300,000.00 - - 300,000.00

#REF! #REF! #REF! #REF!


Err:509 Err:509 Err:509 Err:509
Err:509
Err:509
MPAT PULUH DELAPAN RIBU DUA RATUS RUPIAH

84,075,600.00 Err:509 Pematang Manggis, Juli 2017


Dibuat Oleh:
Satlak PAMSIMAS
HARGA JUMLAH (Rp)
TOTAL APBN TOTAL INCASH TOTAL INKIND
SATUAN (Rp)

12 13 14 15 16

SUHUD
FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR

I. MENGHITUNG BIAYA PENGELOLAAN


A. Biaya Penyusutan
- Asumsi faktor penyusutan per tahun = 5% - 8% dari nilai investasi sarana air minum

Investasi sarana air minum Pematang Manggis = Rp

Biaya penyusutan per tahun = 5% x Rp 277,870,200 = Rp


Biaya penyusutan per bulan = Rp

B. Biaya Operasional
- Honor penjaga air 2 orang @ Rp 500,000 = Rp
- Honor pemungut iuran 1 orang @ Rp 100,000 = Rp
- ATK per bulan Rp 50,000 = Rp
- Kegiatan kesehatan/PHBS Rp 255,000 = Rp
- Biaya Listrik Rp 400,000 = Rp
- Mesin:
Solar 5 liter/hari @ Rp 10,000 = Rp
Oli 5 liter/bulan Rp 30,000 = Rp
Biaya Operasional per tahun = Rp
Biaya Operasional per bulan = Rp

C. Biaya pemeliharaan
Asumsikan 1% per tahun dari nilai investasi Sarana Air Minum

Biaya pemeliharaan per tahun = 1% x Rp 277,870,200 = Rp


Biaya pemeliharaan per bulan = Rp

Total biaya pengelolaan per bulan


a. Biaya penyusutan = Rp
b. Biaya operasional = Rp
c. Biaya pemeliharaan = Rp
= Rp

II. CARA MENENTUKAN BIAYA TARIF AIR DENGAN HARGA per KK


Jumlah penduduk yang terlayani = 102 KK

Harga (Rp) per KK/bln = Total biaya pengelolaan = Rp


Jumlah KK KK

= Rp

@ Rp

Maka Tarif Harga Air Berdasarkan Perhitungan adalah Rp

III. CARA MENENTUKAN BIAYA TARIF AIR DENGAN HARGA per M3


Jumlah penduduk yang terlayani = 372 Jiwa
Kebutuhan per jiwa = 90 ltr/jiwa/hari

Kebutuhan air seluruh penduduk = 90 ltr/jiwa/hari x 355 Jiwa


= 33,480 ltr/hari
= 33.48 m3/hari
Tingkat kebocoran air 20% dari kebutuhan air = 33.48 m3/hari x 0,2
= 6.696 m3/hari x 0,2
Kebutuhan air seluruh penduduk per bulan = 40.176 m3/hari x 30
= 1205.28 m3/bln
FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR

Harga (Rp) per m3 = Total Biaya Pengelolaan =


Kebutuhan air penduduk

Maka Tarif Harga Air Berdasarkan Perhitungan adalah Rp

III. Tarif Progresif


1. Pemakaian air 1-10 m3 = 1x Rp 4,500 per m3 = Rp
2. Pemakaian air 10-20 m3 = 1.5 x Rp 4,500 per m3 = Rp
3. Pemakaian air ³ 20 m3 = 2x Rp 4,500 per m3 = Rp

IV. Tarif air per sambungan rumah


Jumlah rumah yang terlayani = 93 rumah

Harga (Rp) per sambungan rumah = Total Biaya Pengelolaan = Rp


Jumlah rumah

= Rp

= Rp
RMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR

277,870,200.-

13,893,510.-
1,157,792.5

12,000,000.-
1,200,000.-
600,000.-
3,060,000.-
4,800,000.-

18,000,000.-
1,800,000.-
41,460,000.-
3,455,000.-

2,778,702
231,559

1,157,792.5
3,455,000.-
231,558.5
4,844,351.-

4,844,351.- / bln
102 KK

47,494 per KK/bln

51,000 per KK/bln

51,000 per KK/bln

ltr/jiwa/hari

ltr/jiwa/hari x 355 Jiwa

m3/hari
m3/hari x 0,2
m3/hari x 0,2
m3/hari x 30
RMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR

Rp 4,844,351.- / bln
1205.28 m3/bln

Rp 4019 per m3

Rp 4500 per m3

4,500.- per m 3

4,500.00.- per m3
6,750.00.- per m3
9,000.00.- per m3

4,844,351.- / bln
93 Rmh

52,089.80.- /rmh/bln

56,000.00.- /rmh/bln
JADWAL PELAKSANAAN KEGIATAN RKM

Provinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Batang Cenaku

No URAIAN Volume Satuan Harga Satuan Rp Bobot (%) 1 2

I Operasional KKM
1 Administrasi dan Operasional KKM 1 Paket 12,010,800 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II Kegiatan Pelatihan di Masyarakat
1 Pelatihan Administrasi Keuangan 1 Paket 450,000 Err:509 Err:509
2 Pelatihan Teknik 1 Paket 252,000 Err:509 Err:509
III Pembangunan SAM
1 Rumah Mesin 1 Unit Err:509 Err:509
2 Peng. Sumber Energi 1 Paket 8,800,000 Err:509 Err:509
3 Peng. Pompa 1 Paket 16,000,000 Err:509 Err:509
4 Bak Filter 1 Unit 44,326,000 Err:509 Err:509 Err:509 Err:509 Err:509
5 Tower Air 1 Unit 130,391,200 Err:509 Err:509 Err:509 Err:509 Err:509
6 Perpipaan 731 M 48,326,000 Err:509
IV Pembangunan SAN
1 Tempat Cuci Tangan (TCT) 6 Unit #REF! #REF! #REF! #REF!
V Pelatihan Badan Pengelola Sarana
1 Pelatihan Badan Pengelola Sarana 1 Paket 300,000 Err:509 Err:509
VI PHBS
1 Peningkatan PHBS di Masyarakat 1 Paket 492,000 Err:509
2 Peningkatan PHBS di Sekolah 1 Paket Err:509 Err:509
Total Pembiayaan Err:509 Err:509
Rencana Err:509 Err:509 #REF! #REF! Err:509
Jumlah Komulatif Rencana Err:509 Err:509 Err:509 Err:509 Err:509
Realisasi
Deviasi
Diperiksa Oleh : Disetujui Oleh :
Koordinator Kabupaten TFM Teknik Koordinator KKM "Maju Bersa

Bambang Suprihartono, ST R. Putra Kurniawan, ST Pujianto

Mengetahui :
PPK PAMSIMAS
Kabupaten Indragiri Hulu

EFRI MARYONI, ST
NIP : 19801022 200904 1 003
EGIATAN RKM

Desa : Pematang Manggis


Kegiatan : Pamsimas
Tahun : 2016

2 3

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509

Err:509
Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Pematang Manggis, Oktober 2016

Disetujui Oleh : Dibuat Oleh :


Koordinator KKM "Maju Bersama" Satlak KKM "Sumber Mulyo"

Pujianto Suhud
ANALISA BAHAN DAN UPAH BAK FILTER

NO. URAIAN PEKERJAAN SAT. INDEKS


I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²)
Bahan

Tenaga
Pekerja OH 0.100
B. Memasang Bouwplank (m¹)
Bahan
Kayu 5/7 M3 0.012
Paku Biasa 2"-5" Kg 0.020
Papan 3/20 M3 0.007
Tenaga
Pekerja OH 0.100
Tukang Kayu OH 0.100

II. PEKERJAAN TANAH


A. Galian Tanah sedalam 2 m
Tenaga
Pekerja OH 0.9

III. PEKERJAAN BETON


A. 1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt
Bahan
Semen Portland Kg 336.000
Pasir Beton M3 0.540
Koral Beton M3 0.810
Tenaga
Perkerja OH 2.000
Tukang Batu OH 0.350

IV. PEKERJAAN PEMBESIAN


A. Pembesian Dengan Besi Polos (kg)
Bahan
Besi ø 8 mm Kg 1.050
Besi ø 10 mm Kg 1.050
Kawat Beton Kg 0.015
Tenaga
Pekerja OH 0.007
Tukang Besi OH 0.007

V. PEKERJAAN BEKISTING
A. Pasang Bekisting (m²) ( Dua Kali Pakai )
Bahan
Kayu Kelas III M3 0.040
Paku Biasa 2" - 5" Kg 0.400
Minyak Bekisting Ltr 0.200
Plywood 9 mm Lbr 0.350
Dolken Kayu Galam Ø 8 - 10 / 4m Btg 2.000
Tenaga
Pekerja OH 0.300
Tukang Kayu OH 0.330

VI. PEKERJAAN PLESTERAN


A. Plesteran Beton 1pc : 2ps, tebal 15 mm
NO. URAIAN PEKERJAAN SAT. INDEKS
Bahan
Semen Portland Kg 9.300
Pasir Pasang M3 0.018
Tenaga
Perkerja OH 0.260
Tukang Batu OH 0.200

VII. PEKERJAAN PENGECATAN


A. Pengecatan Tembok Baru (m²)
Bahan
Plamir Kg 0.100
Kertas gosok Lbr 1.000
Cat Dasar Kg 0.100
Cat Penutup 2x Kg 0.260
Tenaga
Pekerja OH 0.020
Tukang Cat OH 0.063
N UPAH BAK FILTER

KUANTITAS

49.000

4.900
24.800

0.298
0.496
0.174

2.480
2.480

49.57

44.615

4.413

1482.768
2.383
3.575

8.826
1.545

1015.825

167.868 176.261
844.982 887.231
15.237

7.111
7.111

196.400

7.856
78.560
39.280
68.740
392.800

58.920
64.812

103.200
KUANTITAS

959.760
1.858

26.832
20.640

35.960

3.596
35.960
3.596
9.350

0.719
2.265
PERHITUNGAN VOLUME PEKERJAAN BAK FILTER

UKURAN
NO. JENIS PEKERJAAN SATUAN
P L T

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 7 7 -
2 Pemasangan Bowplank M 5.2 5.2

B. PEKERJAAN TANAH
1 Galian Tanah Biasa ( U0 ) M3 5 5 1.7

C. PEKERJAAN BETON 1:2:3


1 Pembuatan Beton Sloof Pondasi Bak (15/20) M3 0.15 5.2 0.2
2 Pembuatan Beton Kolom Bak (20/20) M3 0.2 0.2 2.9
3 Pembuatan Beton Balok Sloof Atas Bak (20/20) M3 0.2 5.2 0.2
4 Pembuatan Beton Praktis (15/20) M3 0.15 2.675 0.2
5 Pembuatan Beton Praktis (15/20) M3 0.15 1.1 0.2
6 Pembuatan Beton Plat Bak Filter M3 1.4 1.4 0.1
7 Pembuatan Beton Kolom Bak Filter (15/15) M3 0.15 0.15 1
10 Pembuatan Beton Lantai Teras Bak M3 6.2 6.2 0.1

D. PEKERJAAN PEMBESIAN
1 Pembesian Sloof Pondasi (15/20)
ø 10 mm Kg
ø 8 mm Kg
2 Pembesian Balok Pinggang(15/20)
ø 10 mm Kg
ø 8 mm Kg
3 Pembesian Sloof Atas (15/20)
ø 10 mm Kg
ø 8 mm Kg
4 Pembesian Kolom Bak (20/20)
ø 10 mm Kg
ø 8 mm Kg
5 Pembesian Kolom (15/15)
ø 10 mm Kg
ø 8 mm Kg
6 Pembesian Plat Bak Filter
ø 10 mm Kg
7 Pembesian Plat Dinding
ø 10 mm Kg

E. PEKERJAAN BEKISTING M2
1 Pembuatan Bekisting Balok Pondasi M2 0.15 0.2 5.2
2 Pembuatan Bekisting Kolom Bak (20/20) M2 0.2 0.2 2.5
3 Pembuatan Bekisting Balok Sloof Atas (15/20) M2 0.15 0.2 5.2
4 Pembuatan Bekisting Balok Praktis (15/20) M2 0.15 1.1 0.2
5 Pembuatan Bekisting Plat Dinding M2 0.15 4.6 2.3

F. PEKERJAAN PLESTERAN M2
1 Plesteran Dinding Bak Sisi Dalam M2 - 4.8 2.7
2 Plesteran Dinding Bak Sisi Luar M2 - 5.2 1.2
4 Plesteran Dinding Bak Filter M2 - 1.2 1

G. PEKERJAAN PENGECATAN M2
1 Pengecatan Kolom dan Dinding Bak M2 5.2 1.2
UKURAN
NO. JENIS PEKERJAAN SATUAN
P L T
2 Pengecatan Kolom dan Dinding Bak Filter M2 1.1 1
E PEKERJAAN BAK FILTER

RUMUS QTY

PxL 49
2 x (( P + 1 ) + ( L + 1 )) 24.8

49.572
( P + 0,4 ) x ( L + 0,4 ) x ( T ) 49.572

4.41
4xPxLxT 0.62
8 x P x L x ( T-0,4) 0.80
4xPxLxT 0.83
2xPxLxT 0.16
2xPxLxT 0.07
3xPxLxT 0.59
10 x P x L x ( T-0.1) 0.20
(P x L x T ) - ( 5,2 x 5,2 x T ) 1.14

1015.83

51.33
32.23

51.33
32.23

51.33
32.23

51.33
32.23

57.26
38.93

79.08

503.31

196.40
7x3xLxT
8x3xLxT 12.00
4x2xLxT 12.48
4x3xLxT 2.64
4x2xLxT 169.28

103.20
4xLxT 51.84
4xLxT 24.96
11 x 2 x L x T 26.40

35.96
4xLxT 24.96
RUMUS QTY
10 x L x T 11.00
VOLUME PEMBESIAN BAK FILTER
J.
Kolom/Balok/P Dia. Panj. 1 Jml Tot.
Berat Tul Dia. Begel
KOLOM/BALOK/PLAT B T L lat Tul Tul Tul Panj.Tul
m m m btg mm m btg m kg mm
1. BALOK SLOOF PONDASI (15/20)
Ø8-15 15
0.15 0.20 5.20 4.00 10.00 5.20 4.00 83.20 51.334 8.00
4Ø10
20

2. BALOK PINGGANG (15/20)


Ø8-15 15
0.15 0.20 5.20 4.00 10.00 5.20 4.00 83.20 51.334 8.00
4Ø10
20

3. BALOK SLOOF ATAS (15/20)


Ø8-15 15
0.15 0.20 5.20 4.00 10.00 5.20 4.00 83.20 51.334 8.00
4Ø10
20

4. KOLOM (20/20)

Ø8-15 20
0.20 0.20 2.90 8.00 10.00 2.90 4.00 92.80 57.258 8.00
4Ø10 20

5. KOLOM (15/15)

Ø6-15 15 0.15 0.15 2.90 4.00 10.00 2.90 4.00 46.40 28.629 8.00

4Ø8 15

6. PLAT BAK FILTER


1.40

1.10 0.10 2.60 1.00 10.00 2.60 18.33 47.67 29.410 10.00

2.65 1.10 0.10 1.10 1.00 10.00 1.10 8.33 9.17 5.656 10.00
Ø10 -15
Ø10 -15

7. PLAT DINDING

5.20 2.90 0.15 4.00 10.00 5.20 30.67 637.87 393.564

5.20 2.90 0.15 4.00 10.00 2.90 15.33 177.87 109.744


Panj.1 Jml Tot. Panj. Berat
Begel Begel Begel Begel
m m m kg

0.57 35.67 81.61 32.234

0.57 35.67 81.61 32.234

0.57 35.67 81.61 32.234

0.67 146.67 98.56 38.931

0.47 20.33 38.39 15.164

4.28 8.33 35.67 22.006

4.28 8.33 35.67 22.006


PERHITUNGAN VOLUME PEKERJAAN

UKURAN
NO. JENIS PEKERJAAN SATUAN
P L T

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 3.5 3.5 -
2 Pemasangan Bowplank M 3.5 3.5

II PEKERJAAN TANAH
1. Galian Tanah Biasa ( U0 ):
M' 5 0.7 1.5
M' 5 0.7 1
Urugan Tanah Kembali M' 5 0.7 1.5

III PEK. PEMASANGAN CINCIN DAN LANTAI TAPAK


1 Pek. Pemasangan Cincin Sumur M' 5
2 Pek. Cor lantai tapak M3 3.5 3.5 0.1
3 Pek. Cor Penutup Intake M3 1.2 0.1

IV PEK. PENGECATAN
1 Pengecatan Dinding Intake M2 1.2 1
2 Pengecatan Penutup Intake M2 1.2 0.1
E PEKERJAAN

RUMUS QTY

PxL 12.25
2 x (( P + 1 ) + ( L + 1 )) 18

4.25
PxLxT 1.5
( 0,7 + 0,4 )/2 ) x T x P 2.75
PxLxT 1.5

6
( P x L x T ) - ( 0,25 x 3,14 x 1,5 x T )
2
1.05
( 0,25 x 3,14 x L2 x T ) 0.11

4.90
3,14 x L x T 3.77
( 0,25 x 3,14 x L2 ) 1.13
DAFTAR ANALISA HARGA SATUAN

No Kebutuhan Sat Indeks Volume

1 2 3 4 5
I. PEKERJAAN PERSIAPAN
A. Pembersihan Lapangan 12.250
Tenaga
Pekerja Oh 0.100 1.225

B. Pek. Pengukuran & Pemasangan Bowplank (M') 18.000


Bahan
Kayu Kaso 5/7 (borneo) m3 0.012 0.216
Paku Biasa 2" - 5" Kg 0.020 0.360
Kayu klas III m3 0.007 0.126
Tenaga
Pekerja Oh 0.100 1.800
Tukang Oh 0.100 1.800

II. PEKERJAAN TANAH


Galian Tanah Biasa sedalam 1 m (m³) 5
Tenaga
Pekerja M' 1.000 5

III. PEK. PEMASANGAN CINCIN 5.000


Bahan
Sumur Cincin/ Gorong-gorong M' 1.000 5.000
Tenaga
Tukang m' 1.000 5.000

IV. PEK. BETON


1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt 1.161
Bahan
Semen Portland Kg 336.000 390.235
Pasir Beton M3 0.540 0.627
Koral Beton M3 0.810 0.941
Tenaga
Perkerja OH 2.000 2.323
Tukang Batu OH 0.350 0.406

V. PEKERJAAN PENGECATAN
1 m2 Pengecatan Tembok baru (1 Plamir, 1 lapis cat dasar, 2 lapis cat penutup) 4.898
Bahan
Plamir kg 0.100 0.490
Cat Dasar kg 0.100 0.490
Cat Tembok kg 0.260 1.274
Tenaga
Pekerja Oh 0.020 0.098
Tukang cat Oh 0.063 0.309
VOLUME PEMBESIAN EMBUNG

J. Dia. Panj. 1 Jml Tot.


KOLOM/BALOK/PLAT Kolom/Balok/P Tul Tul Tul Panj.Tul
B T L lat
m m m btg mm m btg m
1. Pembesian Bak Filter
Tulangan Vertikal:

2.00 0.15 5.30 1.00 10.00 5.30 10.00 53.00

Tulangan Horizontal:

2.00 0.15 5.30 1.00 10.00 2.00 26.50 53.00

2. Pembesian Bak Penampung


Tulangan Vertikal:

2.00 0.15 9.70 2.00 10.00 9.70 10.00 194.00

Tulangan Horizontal:

2.00 0.15 9.70 2.00 10.00 2.00 48.50 194.00


MBUNG

Panj.1 Jml Tot. Panj. Berat


Berat Tul Dia. Begel
Begel Begel Begel Begel

kg mm m m m kg

32.701

32.701

119.698

119.698
PERHITUNGAN VOLUME PEKERJAAN EMBUNG

UKURAN
NO. JENIS PEKERJAAN SATUAN
P L T

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 12 10 -
2 Pemasangan Bowplank M 12 10

B. PEKERJAAN TANAH
M3
1 Galian Tanah M3 8 6 3
M3 2 1.3 2.15
M3 2 2 4

B. PEKERJAAN BETON 1:2:3


1 Pek. Beton Tapak Pagar M3 0.2 0.2 0.5
2 Pek. Beton Dinding Bak Filter M3 2 0.15 2
3 Pek. Beton Lantai Bak Filter M3 2 1.3 0.15
4 Pek. Beton Dinding Bak Penampung M3 7.4 0.15 3.85
5 Pek. Beton Lantai Bak Penampung M3 2 2 0.15

C. PEKERJAAN BEKISTING M2
1 Pek. Bekisting Tapak Pagar M2 0.3 0.3 0.5
2 Pek. Bekisting Dinding Bak Filter M2 2 0.15 2
3 Pek. Bekisting Dinding Bak Penampung M2 2 0.15 3.85

D. PEKERJAAN PEMBESIAN
1 Pembesian Bak Filter
ø 10 mm Kg
2 Pembesian Bak Penampung
ø 10 mm Kg

E. PEKERJAAN PLESTERAN M2
1 Pek. Plesteran Dinding Bak Filter M2 2 0.15 2
2 Pek. Plesteran Lantai Bak Filter M2 2 1.3 0.15
3 Pek. Plesteran Dinding Bak Penampung M2 1.7 0.15 3.85
4 Pek. Plesteran Lantai Bak Penampung M2 1.7 1.7 0.15

F. PEKERJAAN PENGECATAN M2
1 Pek. Pengecatan Tiang Pagar M2 0.05 0.05 1
2 Pek. Beton Dinding Bak Filter M2 2 0.15 2
3 Pek. Beton Dinding Bak Penampung M2 1.7 0.15 3.85
KERJAAN EMBUNG

RUMUS QTY

PxL 120.00
2 x (( P + 1 ) + ( L + 1 )) 48.00

193.09
( P + 0,4 ) x ( L + 0,4 ) x ( T ) 161.28
( P + 0,4 ) x ( L + 0,4 ) x ( T ) 8.77
( P + 0,4 ) x ( L + 0,4 ) x ( T ) 23.04

6.78
16 x P x L x T 0.32
2xPxLxT 1.20
PxLxT 0.39
PxLxT 4.27
PxLxT 0.60

87.20
16x 4 x P x T 9.60
2x2xPxT 16.00
4x2xPxT 61.60

304.80
65.40
65.40
239.40
239.40

39.67
2xPxT 8.00
PxL 2.60
4xPxT 26.18
PxL 2.89

37.58
17 x 4 x P x T 3.40
2xPxT 8.00
4xPxT 26.18
ANALISA BAHAN DAN UPAH EMBUNG

NO. URAIAN PEKERJAAN SAT. INDEKS KUANTITAS

I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²) 120.000
Bahan

Tenaga
Pekerja OH 0.100 12.000
B. Memasang Bouwplank (m¹) 48.000
Bahan
Kayu 5/7 M3 0.012 0.576
Paku Biasa 2"-5" Kg 0.020 0.960
Papan 3/20 M3 0.007 0.336
Tenaga
Pekerja OH 0.100 4.800
Tukang Kayu OH 0.100 4.800

II. PEKERJAAN TANAH


A. Galian Tanah sedalam 3 m 12.476
Tenaga
Sewa Alat Excavator Jam 1 12.476

III. PEKERJAAN BETON


A. 1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt 6.784
Bahan
Semen Portland Kg 336.000 2279.256
Pasir Beton M3 0.540 3.663
Koral Beton M3 0.810 5.495
Tenaga
Perkerja OH 2.000 13.567
Tukang Batu OH 0.350 2.374

IV. PEKERJAAN PEMBESIAN


A. Pembesian Dengan Besi Polos (kg) 304.798
Bahan
Besi ø 10 mm Kg 1.050 320.038
Kawat Beton Kg 0.015 4.572
Tenaga
Pekerja OH 0.007 2.134
Tukang Besi OH 0.007 2.134

V. PEKERJAAN BEKISTING
A. Pasang Bekisting (m²) ( Dua Kali Pakai ) 87.200
Bahan
Kayu Kelas III M3 0.040 3.488
Paku Biasa 2" - 5" Kg 0.400 34.880
Minyak Bekisting Ltr 0.200 17.440
Plywood 9 mm Lbr 0.350 30.520
Dolken Kayu Galam Ø 8 - 10 / 4m Btg 2.000 174.400
Tenaga
Pekerja OH 0.300 26.160
Tukang Kayu OH 0.330 28.776

VI. PEKERJAAN PLESTERAN


A. Plesteran Beton 1pc : 2ps, tebal 15 mm 39.670
Bahan
Semen Portland Kg 9.300 368.931
Pasir Pasang M3 0.018 0.714
Tenaga
Perkerja OH 0.260 10.314
Tukang Batu OH 0.200 7.934

VII. PEKERJAAN PENGECATAN


A. Pengecatan Tembok Baru (m²) 37.580
Bahan
Plamir Kg 0.100 3.758
Kertas gosok Lbr 1.000 37.580
Cat Dasar Kg 0.100 3.758
Cat Penutup 2x Kg 0.260 9.771
Tenaga
Pekerja OH 0.020 0.752
Tukang Cat OH 0.063 2.368

VII. PEKERJAAN DINDING


A Pemasangan Dinding Bata 0.000
Bahan
Bata Merah Bh 70.000 0.000
Semen Kg 14.370 0.000
Pasir Pasang M3 0.040 0.000
Tenaga
Pekerja OH 0.320 0.000
Tukang OH 0.100 0.000

Total
RENCANA ANGGARAN BIAYA

Propinsi : Riau
Kabupaten : Indragiri Hulu
Kecamatan : Suka Maju
Desa : Batang Peranap 0.00

VOLUME HARGA
URAIAN KONSTRIBUSI MASYARAKAT SATUAN SATUAN
TOTAL APB-Des APBN
INCASH INKIND Rp
1 2 3 4 5 6 7 8
I BAHAN
1 Paku Biasa 2"-5" 85.0 - - - 85.0 Kg Rp 20,000
2 Pasir Beton 21.0 - - - 21.0 M3 Rp 128,000
3 Pasir Urug 3.0 - - - 3.0 M3 Rp 128,000
4 Koral Beton 24.0 - - - 24.0 M3 Rp 250,000
5 Semen Portland 245.0 - - - 245.0 Zak Rp 67,000
6 Kayu Kelas III 7.0 - 4.00 - 3.0 M3 Rp 1,700,000
7 Kayu 5/7 0.4 - - - 0.4 M3 Rp 1,700,000
8 Papan 3/20 0.1 - - - 0.1 M3 Rp 1,700,000
9 Plywood 9 mm 45.0 - - - 45.0 Lbr Rp 125,000
10 Dolken Kayu Galam Ø 8 - 10 / 4m 400.0 - 180.00 - 220.0 Btg Rp 10,000
11 Minyak Bekisting 42.0 - 30.00 - 12.0 Ltr Rp 11,000
12 Bata merah kelas I 59.0 - 9.00 - 50.0 Bh Rp 800
13 Besi ø 8 mm 57.0 - - - 57.0 btg Rp 50,000
14 Besi ø 10 mm 179.0 - - - 179.0 btg Rp 70,000
15 Besi ø 12 mm 118.0 - - - 118.0 btg Rp 90,000
16 Kawat Beton 41.0 - - - 41.0 Kg Rp 20,000
17 Plamir 15.0 - - - 15.0 Kg Rp 10,000
18 Cat Dasar 15.0 - - - 15.0 kg Rp 15,000
19 Cat Penutup 2x 37.0 - 17.00 - 20.0 kg Rp 65,000
20 Pipa Galvanized ø 3" 2.0 - - - 2.0 btg Rp 715,000
21 Pipa Galvanized ø 2" 2.0 - - - 2.0 btg Rp 370,000
22 Pipa Galvanized ø 1 1/4'' 2.0 - - - 2.0 btg Rp 270,000
23 Pipa Pvc Tipe AW ø 1 1/4" 8.0 - - - 8.0 btg Rp 250,000
24 Pipa Hawa ø 1 1/2" 1.0 - - - 1.0 Bh Rp 100,000
25 Tangga Besi (Tinggi 11 m') 1.0 - - - 1.0 Ls Rp 2,250,000
26 Pagar Besi Selasar 1.0 - - - 1.0 Ls Rp 1,500,000
27 Elbow GI Dia.3'' 2.0 - - - 2.0 Bh Rp 90,000
28 Elbow GI Dia.2'' 2.0 - - - 2.0 Bh Rp 75,000
29 Elbow GI Dia.1 1/4'' 2.0 - - - 2.0 Bh Rp 50,000
30 Gate Valve SNI 3'' 1.0 - - - 1.0 Bh Rp 550,000
31 Gate Valve SNI 2'' 1.0 - - - 1.0 Bh Rp 350,000
32 Tutup Manhole 2.0 - - - 2.0 Bh Rp 500,000
33 Cat Minyak 2.0 - - - 2.0 Kg Rp 55,000
SUB TOTAL I
II U P A H
1 Pekerja 243.0 - 193.00 - 50.0 Oh Rp 80,000
2 Tukang 169.0 - 59.00 - 110.0 Oh Rp 120,000
SUB TOTAL II
TOTAL

Diketahui Oleh: Disetujui Oleh: Diperiksa Oleh:


PPK PAMSIMAS Koordinator Kabupaten TFM - WSS
Kabupaten Indragiri Hulu

EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO TENGKU SYAFARI, ST


NIP : 19801022 200904 1 003
No.RAB :
Program : Pamsimas
Jenis : Pembuatan Tower Air
Volume : 1 (satu) unit

BIAYA (Rp)
KONSTRIBUSI MASYARAKAT
TOTAL APB-Des APBD
INCASH INKIND
9=2X8 10 = 3 x 8 11 = 4 x 8 12 = 5 X 8 13 = 6 X 8

Rp 1,700,000 Rp - Rp - Rp - Rp 1,700,000
Rp 2,688,000 Rp - Rp - Rp - Rp 2,688,000
Rp 384,000 Rp - Rp - Rp - Rp 384,000
Rp 6,000,000 Rp - Rp - Rp - Rp 6,000,000
Rp 16,415,000 Rp - Rp - Rp - Rp 16,415,000
Rp 11,900,000 Rp - Rp 6,800,000 Rp - Rp 5,100,000
Rp 680,000 Rp - Rp - Rp - Rp 680,000
Rp 170,000 Rp - Rp - Rp - Rp 170,000
Rp 5,625,000 Rp - Rp - Rp - Rp 5,625,000
Rp 4,000,000 Rp - Rp 1,800,000 Rp - Rp 2,200,000
Rp 462,000 Rp - Rp 330,000 Rp - Rp 132,000
Rp 47,200 Rp - Rp 7,200 Rp - Rp 40,000
Rp 2,850,000 Rp - Rp - Rp - Rp 2,850,000
Rp 12,530,000 Rp - Rp - Rp - Rp 12,530,000
Rp 10,620,000 Rp - Rp - Rp - Rp 10,620,000
Rp 820,000 Rp - Rp - Rp - Rp 820,000
Rp 150,000 Rp - Rp - Rp - Rp 150,000
Rp 225,000 Rp - Rp - Rp - Rp 225,000
Rp 2,405,000 Rp - Rp 1,105,000 Rp - Rp 1,300,000
Rp 1,430,000 Rp - Rp - Rp - Rp 1,430,000
Rp 740,000 Rp - Rp - Rp - Rp 740,000
Rp 540,000 Rp - Rp - Rp - Rp 540,000
Rp 2,000,000 Rp - Rp - Rp - Rp 2,000,000
Rp 100,000 Rp - Rp - Rp - Rp 100,000
Rp 2,250,000 Rp - Rp - Rp - Rp 2,250,000
Rp 1,500,000 Rp - Rp - Rp - Rp 1,500,000
Rp 180,000 Rp - Rp - Rp - Rp 180,000
Rp 150,000 Rp - Rp - Rp - Rp 150,000
Rp 100,000 Rp - Rp - Rp - Rp 100,000
Rp 550,000 Rp - Rp - Rp - Rp 550,000
Rp 350,000 Rp - Rp - Rp - Rp 350,000
Rp 1,000,000 Rp - Rp - Rp - Rp 1,000,000
Rp 110,000 Rp - Rp - Rp - Rp 110,000
Rp 90,671,200 Rp - Rp 10,042,200 Rp - Rp 80,629,000

Rp 19,440,000 Rp - Rp 15,440,000 Rp - Rp 4,000,000


Rp 20,280,000 Rp - Rp 7,080,000 Rp - Rp 13,200,000
Rp 39,720,000 Rp - Rp 22,520,000 Rp - Rp 17,200,000
Rp 130,391,200 Rp - Rp 32,562,200 Rp - Rp 97,829,000

Paya Rumbai, Desember 2017


Dibuat Oleh:
Koordinator KKM Pelaksana Pamsimas

MUKSIN YUSPADILA
VOLUME PEMBESIAN MENARA

P L T J. Kolom/Balok/Plat Dia. Tul Panj. 1 Tul Jml Tul


KOLOM/BALOK/PLAT
m m m btg mm m btg
KOLOM PONDASI 30/30

0.30 0.30 1.75 4.00 12.00 1.75 8.00

KOLOM UTAMA 30/30

0.30 0.30 8.00 4.00 12.00 8.00 8.00

BALOK SLOOF 20/30

0.20 0.30 13.20 1.00 12.00 13.20 6.00

BALOK 20/25

0.20 0.25 13.20 3.00 12.00 13.20 6.00

BALOK ANAK 20/20

0.20 0.20 6.60 1.00 12.00 6.60 6.00

KOLOM 15/15

0.15 0.15 2.60 4.00 12.00 2.60 4.00

PLAT PONDASI

Ø12-15 0,30 5.00 0.40 4.00 1.00 12.00 8.44 33.67

0,35 0,35
1,00
PLAT LANTAI + DINDING
Plat Dinding:
14.00 0.15 2.50 1.00 10.00 5.14 94.00

Plat Lantai
5.90 0.20 4.90 1.00 10.00 10.04 40.00

Plat Atap
4.00 0.10 3.00 1.00 10.00 3.04 27.33
PEMBESIAN MENARA

Tot. Panj.Tul Berat Tul Dia. Begel Panj.1 Begel Jml Begel Tot. Panj. Begel Berat Begel
m kg mm m m m kg

58.80 52.214 8.00 1.04 12.33 53.87 21.279

268.80 238.694 8.00 1.04 54.07 236.16 93.284

83.16 73.846 8.00 0.84 88.67 78.20 30.891

249.48 221.538 8.00 0.74 88.67 206.68 81.639

41.58 36.923 8.00 0.64 44.67 30.02 11.856

43.68 38.788 8.00 0.44 18.00 33.26 13.139

298.35 264.938 12.00 10.44 27.00 295.97 262.825


507.32 313.015 10.00 28.14 17.33 512.15 315.995

421.68 260.177 10.00 12.04 33.33 421.40 260.004

87.25 53.832 10.00 4.04 20.67 87.67 54.091


ANALISA BAHAN DAN UPAH MENARA

NO. URAIAN PEKERJAAN SAT. INDEKS KUANTITAS

I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²) 28.910
Bahan

Tenaga
Pekerja OH 0.100
B. Memasang Bouwplank (m¹) 25.600
Bahan
Kayu 5/7 M3 0.012
Paku Biasa 2"-5" Kg 0.020
Papan 3/20 M3 0.007
Tenaga
Pekerja OH 0.100
Tukang Kayu OH 0.100

II. PEKERJAAN TANAH


A. Galian Tanah Biasa sedalam 1 m (m³) 43.68
Tenaga
Pekerja OH 0.400
B. Urugan Kembali (m³) 32.25
Tenaga
Pekerja OH 0.192
C. Urugan Pasir Bawah Pondasi (m³) 2.184
Bahan
Pasir Urug M3 1.200
Tenaga
Pekerja OH 0.300
D. Pembuatan Cor Lantai Kerja 1:3:6 (m3) 1.092
Bahan
Semen Portland Kg 336.000
Pasir Beton M3 0.540
Koral Beton M3 0.810
Tenaga
Pekerja OH 0.300
Tukang Batu OH 0.350

III. PEKERJAAN BETON


A. 1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt 28.400
Bahan
Semen Portland Kg 336.000
Pasir Beton M3 0.540
Koral Beton M3 0.810
Tenaga
Perkerja OH 2.000
Tukang Batu OH 0.350

IV. PEKERJAAN PEMBESIAN


A. Pembesian Dengan Besi Polos (kg) 2698.971
Bahan
Besi ø 8 mm Kg 1.050 252.089
Besi ø 10 mm Kg 1.050 1,257.114
Besi ø 12 mm Kg 1.050 1,189.767
Kawat Beton Kg 0.015
Tenaga
Pekerja OH 0.007
Tukang Besi OH 0.007

V. PEKERJAAN BEKISTING
A. Pasang Bekisting (m²) ( Dua Kali Pakai ) 209.670
Bahan
Kayu Kelas III M3 0.040
Paku Biasa 2" - 5" Kg 0.400
Minyak Bekisting Ltr 0.200
Plywood 9 mm Lbr 0.350
Dolken Kayu Galam Ø 8 - 10 / 4m Btg 2.000
Tenaga
Pekerja OH 0.300
Tukang Kayu OH 0.330

VI. PEKERJAAN PLESTERAN


A. Plesteran Beton 1pc : 2ps, tebal 15 mm 245.220
Bahan
Semen Portland Kg 9.300
Pasir Pasang M3 0.018
Tenaga
Perkerja OH 0.260
Tukang Batu OH 0.200

VII. PEKERJAAN BAK


A. Membuat Bak Kontrol Ukuran ( 40 x 40 x 50 ) cm 1.000
Bahan
Bata merah kelas I Bh 56.000
Semen Portland Kg 43.644
Pasir Pasang M3 0.110
Koral Beton M3 0.032
Besi Beton Kg 4.850
Pasir Beton M3 0.019
Tenaga
Perkerja OH 1.752
Tukang Batu OH 0.500
B. Memasang pipa PVC tipe AW Ø 1 1/4'' (m¹) 45.000
Bahan
Pipa PVC M 1.200
Perlengkapan 35 % harga pipa 0.350
Tenaga
Pekerja OH 0.036
Tukang Pipa OH 0.060

C. Memasang 1 M Pipa Galvanis Ø 1 1/4'' (m¹) 12.000


Bahan
Pipa PVC M 1.200
Perlengkapan 35 % harga pipa 0.350
Tenaga
Pekerja OH 0.108
Tukang Pipa OH 0.180

E. Memasang 1 M Pipa Galvanis ø 2'' 12.000


Bahan
Pipa Galvanis Bh 1.200
Perlengkapan Bh 0.350
Tenaga
Perkerja OH 0.108
Tukang Pipa OH 0.180
F. Memasang 1 M Pipa Galvanis ø 3'' M 12.000
Bahan
Pipa Galvanis M 1.200
Perlengkapan M 0.350
Tenaga
Perkerja OH 0.108
Tukang Pipa OH 0.180

VIII. PEKERJAAN PENGECATAN


A. Pengecatan Tembok Baru (m²) 140.870
Bahan
Plamir Kg 0.100
Kertas gosok Lbr 1.000
Cat Dasar Kg 0.100
Cat Penutup 2x Kg 0.260
Tenaga
Pekerja OH 0.020
Tukang Cat OH 0.063
KUANTITAS

2.891

0.307
0.512
0.179

2.560
2.560

17.472

6.191

2.621

0.655

366.912
0.590
0.885

0.328
0.382

9542.400
15.336
23.004

56.800
9.940
264.694
1319.970
1249.256
40.485

18.893
18.893

8.387
83.868
41.934
73.385
419.340

62.901
69.191

2,280.546
4.414

63.757
49.044

56.000
43.644
0.110
0.032
4.850
0.019

1.752
0.500
14.400
4.200

1.296
2.160

14.400
4.200

1.296
2.160

14.087
140.870
14.087
36.626

2.817
8.875
PERHITUNGAN VOLUME PEKERJAAN MENARA

UKURAN
NO. JENIS PEKERJAAN SATUAN
P L T

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 5.9 4.9 -
2 Pemasangan Bowplank M 5.9 4.9 -

B. PEKERJAAN TANAH
1 Galian Tanah Biasa ( U0 ) M3 5.2 4.2 2
2 Urugan Tanah Kembali
- U1 = Volume Tapak Pondasi M3 5 4 0.4
- U2 = Volume Kolom Pondasi M3 0.3 0.3 1.75
- U3 = Volume Isian Tanah Sisi Tapak Pondasi M3 18.4 0.1 0.4
- U4 = Volume Urugan Pasir Bawah Pondasi M3 5.2 4.2 0.1
- U5 = Volume Lantai Kerja M3 5.2 4.2 0.05

3 Urugan Pasir Bawah Pondasi M3 5.2 4.2 0.1


4 Pembuatan Cor Lantai Kerja 1:3:6 (m3) M3 5.2 4.2 0.05

C. PEKERJAAN BETON 1:2:3


1 Pembuatan Beton Pondasi Tapak M3 5 4 0.4
2 Pembuatan Beton Kolom Pondasi 30/30 M3 0.3 0.3 1.75
3 Pembuatan Beton Balok Sloof 20/30 M3 12.8 0.2 0.3
4 Pembuatan Beton Kolom 30/30 M3 0.3 0.3 8
5 Pembuatan Beton Kolom 15/15 M3 0.15 0.15 2.6
6 Pembuatan Beton Balok 20/25 M3 12.8 0.2 0.25
7 Pembuatan Beton Balok Anak 20x20 M3 6.6 0.2 0.2
8 Pembuatan Beton Reservoir M3
- Dinding Reservoir M3 14 0.15 2.5
- Plat Lantai Reservoir M3 5.9 4.9 0.2
- Plat Penutup Reservoir M3 4 3 0.1
9 Pembuatan Beton Lantai Selasar Tower M3 18.4 0.8 0.1

D. PEKERJAAN PEMBESIAN
1 Pembesian Pondasi Tapak
ø 12 mm Kg
2 Pembesian Kolom Pondasi 30/30
ø 12 mm Kg
ø 8 mm Kg
3 Pembesian Kolom Utama 30/30
ø 12 mm Kg
ø 8 mm Kg
4 Pembesian Balok Sloof 20/30
ø 12 mm Kg
ø 8 mm Kg
5 Pembesian Balok 20/25
ø 12 mm Kg
ø 8 mm Kg
6 Pembesian Balok 20/20
ø 12 mm Kg
ø 8 mm Kg
7 Pembesian Kolom 15/15
ø 12 mm Kg
ø 8 mm Kg
8 Pembuatan Beton Dinding Reservoir
ø 10 mm Kg
9 Pembuatan Beton Lantai + Atap
ø 10 mm Kg

E. PEKERJAAN BEKISTING
1 Pek. Bekisting Pondasi Tapak M2 5 4 0.4
2 Pek. Bekisting Kolom Pondasi 30/30 M2 0.3 0.3 1.75
3 Pek. Bekisting Balok Sloof 20/30 M2 12.8 0.2 0.3
4 Pek. Bekisting Kolom 30/30 M2 0.3 0.3 8
5 Pek. Bekisting Balok 20/25 M2 12.8 0.2 0.25
6 Pek. Bekisting Balok 20/20 M2 6.6 0.2 0.2
7 Pek. Bekisting Kolom 15x15 M2 0.15 0.15 2.6
8 Pek. Bekisting Reservoir M2
- Dinding Reservoir M2 14 0.15 2.5
- Plat Lantai Reservoir M2 5.9 4.9 0.2
- Plat Penutup Reservoir M2 4 3 0.1
F. PEKERJAAN PLESTERAN M2
1 Pek. Plesteran Kolom 30/30 M2 0.3 0.3 8
2 Pek. Plesteran Balok Sloof 20/30 M3 12.8 0.2 0.3
3 Pek. Plesteran Balok 20/25 M2 12.8 0.2 0.25
4 Pek. Plesteran Balok 20/20 M2 6.6 0.2 0.2
5 Pek. Plesteran Kolom 15/15 M2 0.15 0.15 2.6
6 Pek. Plesteran Reservoir M2
- Dinding Reservoir M2 14 0.15 2.5
- Plat Lantai Reservoir M2 5.9 4.9 0.2
- Plat Penutup Reservoir M2 4 3 0.1

G. PEKERJAAN PENGECATAN M2
1 Pek. Pengecatan Kolom 30/30 M2 0.3 0.3 8
2 Pek. Pengecatan Balok Sloof 20/30 M3 12.8 0.2 0.3
3 Pek. Pengecatan Balok 20/25 M2 12.8 0.2 0.25
4 Pek. Pengecatan Balok 20/20 M2 6.6 0.2 0.2
5 Pek. Pengecatan Reservoir M2
- Dinding Reservoir M2 15.2 0.15 2.6
- Plat Penutup Reservoir M2 4.3 3.3 0.1

H. PEKERJAAN BAK
1 Membuat Bak Kontrol (0,90x0,75x0,75) bh
2 Memasang Pipa PVC tipe AW Ø 1 1/4" (m¹) M
3 Memasang Pipa Galvaniz Ø 1 1/4" (m¹) M
4 Memasang Pipa Galvaniz Ø 2" (m¹) M
5 Memasang Pipa Galvaniz Ø 3" (m¹) M
4 Memasang pipa PVC tipe AW Ø 1" (m¹) M
5 Memasang Kran Air Ø ½" atau ¾" (Bh) bh
6 Memasang Gate Valve Bh
8 Memasang Pipa Hawa Bh

I. PEKERJAAN BESI
1 Memasang Tangga 11 m Ls
2 Memasang Pagar Selasar Ls
KERJAAN MENARA

RUMUS QTY

PxL 28.91
2 x (( P + 0,5 ) + ( L + 0,5)) 25.60

PxLxT 43.68

PxLxT 8.00
PxLxT 0.16
PxLxT 0.74
PxLxT 2.18
PxLxT 1.09
U0 - U1 - U2 - U3 - U4 32.25
PxLxT 2.18
PxLxT 1.09

28.40
PxLxT 8.00
4xPxLxT 0.63
PxLxT 0.77
4xPxLxT 2.88
4xPxLxT 0.23
3xPxLxT 1.92
PxLxT 0.26
13.70
PxLxT 5.25
PxLxT 5.78
PxLxT 1.20
PxLxT 1.47

2698.97
527.76
527.76
73.49
52.21
21.28
331.98
238.69
93.28
104.74
73.85
30.89
303.18
221.54
81.64
48.78
36.92
11.86
51.93
38.79
13.14
629.01
629.01
628.10
628.10

209.67
2 x (P + L) x T 7.20
4x4xLxT 8.40
2 x (P x T) 7.68
4x4xLxT 38.40
3 x ((2 x P x T)+(P x L)) 26.88
((2 x P x T)+(P x L)) 3.96
4x4xLxT 6.24
110.91
2xPxT 70.00
PxL 28.91
PxL 12.00
245.22
4x4xLxT 38.40
(2 x P x T)+(P x L) 10.24
3 x ((2 x P x T)+( P x L)) 34.56
(2 x P x T)+(P x L) 3.96
4x4xLxT 6.24
151.82
2xPxT 70.00
2xPxL 57.82
2xPxL 24.00

140.87
4x4xLxT 38.40
(2 x P x T)+( P x L) 10.24
3 ((2 x P x T)+(2 x P x L)) 34.56
(2 x P x T)+(P x L) 3.96
53.71
PxT 39.52
PxL 14.19

1
45
12
12
12
6
3
2
1

-
1
1
BAHAN SATUAN HARGA SATUAN
1 Paku Biasa 2"-5" Kg 20,000
2 Pasir Pasang M3 128,000
3 Pasir Beton M3 128,000
4 Pasir Urug M3 128,000
5 Koral Beton M3 250,000
6 Semen Portland ZAK 67,000
7 Kayu Kelas III M3 1,700,000
8 Kayu 5/7 M3 1,700,000
9 Papan 3/20 M3 1,700,000
10 Plywood 9 mm Lbr 125,000
11 Dolken Kayu Galam Ø 8 - 10 / 4m Btg 10,000
12 Minyak Bekisting Ltr 11,000
13 Bata merah kelas I Bh 800
14 Besi ø 8 mm Btg 50,000
15 Besi ø 10 mm Btg 70,000
16 Besi ø 12 mm Btg 90,000
17 Kawat Beton Kg 20,000
18 Plamir Ltr 10,000
19 Cat Dasar Kg 15,000
20 Cat Penutup 2x Kg 65,000
21 Pipa Galvanized ø 3" Btg 715,000
22 Pipa Galvanized ø 2" Btg 370,000
23 Pipa Galvanized ø 1 1/4'' Btg 270,000
24 Pipa Pvc Tipe AW ø 1 1/4" Btg 250,000
25 Pipa Hawa ø 1 1/2" Bh 100,000
26 Tangga Besi (Tinggi 11 m') Ls 2,250,000
27 Pagar Besi Selasar Ls 1,500,000
28 Elbow GI Dia.3'' Bh 90,000
29 Elbow GI Dia.2'' Bh 75,000
30 Elbow GI Dia.1 1/4'' Bh 50,000
31 Cat Minyak Kg 55,000
32 Gate Valve 3'' Bh 550,000
33 Gate Valve 2'' Bh 350,000
34 Penutup Manhole Bh 500,000
35 Kawat Pagar Duri Rol 125,000
36 Besi Siku 50x50x4 mm Btg 150,000
37 Arang Batok M3 300,000
38 Ijuk Kg 25,000

U PAH
1 Pekerja 80,000
2 Tukang 120,000

Anda mungkin juga menyukai