A. DESA AWEEK
I. PEKERJAAN PERSIAPAN 2,318,938.00 2,318,938.00
II. PEKERJAAN POKOK 101,008,940.39 28,680,558.55
JUMLAH (I) 103,327,878.39 30,999,496.55
DIBULATKAN 103,327,000.00 30,999,000.00
B. DESA DATA CUT
I. PEKERJAAN PERSIAPAN 317,020.00 317,020.00
II. PEKERJAAN POKOK 85,029,998.90 25,283,039.91
JUMLAH (II) 85,347,018.90 25,600,059.91
DIBULATKAN 85,347,000.00 25,600,000.00
III. JUMLAH HARGA 188,674,000.00 56,599,000.00
IV. PPN (10% x III) 18,867,400.00 5,659,900.00
V. JUMLAH HARGA TOTAL 207,541,400.00 62,258,900.00
VI. DIBULATKAN 207,541,000.00 62,258,000.00
TERBILANG : Dua Ratus Tujuh Juta Lima Ratus Empat Puluh Satu Ribu Rupiah
UANG MUKA : Enam Puluh Dua Juta Dua Ratus Lima Puluh Delapan Ribu Rupiah
M. ZAINI
Direktur
REKAPITULASI
SKPA : Dinas Pengairan
Nama Pekerjaan : Saluran Irigasi / Saluran Cacing Desa Aweek, Data Cut ( PIK )
Lokasi : Kecamatan Kota Jantho
Kegiatan : Rehabilitasi / Pemeliharaan Jaringan Irigasi
Tahun Anggaran : 2015
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
I. PEKERJAAN PERSIAPAN
TERBILANG : Dua Ratus Lima Puluh Lima Juta Tujuh Ratus Lima Puluh Ribu Rupiah
Banda Aceh,............................................2015
Konsultan Perencana
CV. ViiA ENGENEERING GROUP
IQBAL MUNAZAR, ST
Direktur
REKAPITULASI
UANG MUKA 30%
SKPA : Dinas Pengairan
Kegiatan : Rehabilitasi / Pemeliharaan Jaringan Irigasi
Nama Pekerjaan : Saluran Irigasi / Saluran Cacing Desa Aweek, Data Cut ( PIK )
Lokasi : Desa Aweek Kota Jantho Kab. Aceh Besar
Tahun Anggaran : 2015 DESA AWEEK
A. DESA AWEEK
M. ZAINI
Direktur
DAFTAR KUANTITAS DAN HARGA
UANG MUKA 30%
SKPA : Dinas Pengairan
Kegiatan : Rehabilitasi / Pemeliharaan Jaringan Irigasi
Nama Pekerjaan : Saluran Irigasi / Saluran Cacing Desa Aweek, Data Cut ( PIK )
Lokasi : Desa Aweek Kota Jantho Kab. Aceh Besar
Tahun Anggaran : 2015 DESA AWEEK
(1) (2) (4) (3) (5) (6) (7) = (4) x (6) (8) (9) (10) (11) (12)
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 319.80 m2 T.01 1,310.00 418,938.00 0.41 319.80 0.41 418,938.00
2. Papan Nama 1.00 Ls Taksir 400,000.00 400,000.00 0.39 1.00 0.39 400,000.00
3. Administrasi dan Dokumentasi 1.00 Ls Taksir 1,500,000.00 1,500,000.00 1.45 1.00 1.45 1,500,000.00
1 1 m3 Galian Tanah Biasa sedalam < 1m 35.64 m3 T.06.a 40,590.00 1,446,627.60 1.40 10.69 0.42 433,988.28
2 1 m3 Timbunan tanah kembali 8.91 m3 T.14.a 27,890.00 248,499.90 0.24 2.67 0.07 74,549.97
3 1 m3 Pasangan Batu 1 : 4 89.54 m3 P.01.c 798,070.00 71,459,187.80 69.16 24.83 19.18 19,815,632.78
4 1 m2 Pekerjaan Plesteran 1 : 3 ( tebal 1,5 cm ) 341.12 m2 P.04.e 61,900.00 21,115,328.00 20.44 102.34 6.13 6,334,598.40
5 1 M3 Beton 1 : 3 : 5 mutu, f'c=7,4 Mpa (K100),
8.53 m3 B.02.a 790,070.00 6,739,297.10 6.52 2.56 1.96 2,021,789.13
slump (12+2) cm, w/c=0,87
M. ZAINI
Direktur
DAFTAR KUANTITAS DAN HARGA
UANG MUKA 30%
(1) (2) (4) (3) (5) (6) (7) = (4) x (6) (8) (9) (10) (11) (12)
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 242.00 m2 T.01 1,310.00 317,020.00 0.37 242.00 0.37 317,020.00
1 1 m3 Galian Tanah Biasa sedalam < 1m 20.94 m3 T.06.a 40,590.00 849,954.60 1.00 6.28 0.30 254,986.38
2 1 m3 Timbunan tanah kembali 5.23 m3 T.14.a 27,890.00 145,864.70 0.17 1.57 0.05 43,759.41
3 1 m3 Pasangan Batu 1 : 4 71.36 m3 P.01.c 798,070.00 56,950,275.20 66.73 21.41 20.02 17,085,082.56
4 1 m2 Pekerjaan Plesteran 1 : 3 ( tebal 1,5 cm ) 280.80 m2 P.04.e 61,900.00 17,381,520.00 20.37 80.59 5.84 4,988,496.24
5 1 M3 Beton 1 : 3 : 5 mutu, f'c=7,4 Mpa (K100),
9.20 m3 B.02.a 790,070.00 7,268,644.00 8.52 2.76 2.55 2,180,593.20
slump (12+2) cm, w/c=0,87
8 1 m3 Bongkaran Pasangan Batu 17.29 m3 P.01.f 140,760.00 2,433,740.40 2.85 5.19 0.86 730,122.12
HARGA SATUAN
NO. URAIAN SAT. KETERANGAN
(Rp.)
1 Mandor OH 80,000.00
2 Kepala Tukang OH 110,000.00
3 Tukang OH 86,000.00
4 Pekerja OH 76,000.00
B DAFTAR BAHAN
IQBAL MUNAZAR, ST
Direktur
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Timbunan Tanah Hasil Galian, Diratakan dan Dipadatkan (MP)
Satuan/Unit : m3
Analisa : T.14.a
Jenis Pekerjaan : Pasangan Bronjong Dia. 3 mm, Uk. 2,0 x 1,0 x 0,50 m (Pabrikasi)
Satuan/Unit : m3
Analisa : G.5.a
Dibulatkan 690,390.00
ANALISA HARGA SATUAN ALAT BERAT
I DATA PERALATAN
1. Jenis Peralatan = DUMP TRUCK 4.00 M3
2. Tenaga = 100.00 HP
3. Harga = Rp 305,000,000.00
4. Umur Kerja = 5.00 Tahun
5. 1 tahun = 300.00 Hari
6. 1 hari kerja = 7.00 Jam
7. Umur Ekonomis (Tahun) UE = 5.00 Thn 10,000.00 Jam
8. Jam kerja per tahun (Tahun) h = 2,000.00
9. Harga Pokok HP = 305,000,000.00
9. Harga Bahan Pokok/ Ban Hbp = 10,800,000.00
11. Harga Sisa (HS) = 10% (HP Hbp) = 29,420,000.00
12. Harga Penyusutan (HP - Hbp - HS) = 264,780,000.00
II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam 42,033.00
- Penyusutan D = (HP-Hbp-HS)/ (UE x h) Rp/ jam 26,478.00
- Bunga Modal BM = (i= 15% ) i ((UE + 1)/ (2 UE) x (HP/ h)) Rp/ jam 13,725.00
- Asuransi (P = 2%) Ba = (p= 2% ) p ((UE + 1)/ (2 UE) x (HP/ h)) Rp/ jam 1,830.00
III BIAYA OPERASIONAL (OPERATIONAL COST) 405,662.40
- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm 18.27 /jam 228,352.210
S = (Solar) = 0.150
E = = 0.657
N = = 100.00
Hbbm = (Harga BBM) = 12,500.00
- Biaya Bahan Oli Pelumas
a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop 0.13 /jam 5,509.05
C = = 0.13
T = (Jam) = 250.00
S = = 0.0005
E = = 0.657
N = = 100.00
Hbop = (Harga bahan oli) = 43,000.00
b. Transmisi
BBOt = ((C/T) + (S/E)) x N x Hbop 0.07 /jam 2,922.73
C = = 0.223
T = (Jam) = 1,000.00
S = = 0.0003
E = = 0.657
N = = 100.00
Hbop = (Harga bahan oli) = 43,000.00
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh 0.08 /jam 3,296.83
C = (Dump Truck) 0.62
T = (Jam) 2,000.00
S = (Dump Truck) 0.0003
E = 0.657
N = 100.00
Hbbh = (Harga bahan hydraulik) 43,000.00
- Biaya Bahan Gemok (Grease)
BBG = (S/E) x N x Hbbg 0.01 /jam 575.45
S = (Dump Truck) 0.00009
E = 0.657
N = 100.00
Hbbg = (Harga bahan gemok) 42,000.00
- Biaya Saringan (filter-filter)
BFF = 0,5 (BBM+BBOM+BBOT+BBH+BBG) 0.5 x 240,656.26 /jam 120,328.13
- Biaya Bahan Pokok/ Ban
BBP = Hbp/ T 5,400.00
Hbp = 10,800,000.00
T = (Jam) 2,000.00
- Biaya Supir/ Jam 12,800.00
- Biaya Pemeliharaan/ Perbaikan (f = 90%)
BBP = f x (HP - Hbp)/ UE 90% x 29,420.00 /jam 26,478.00
Dibulatkan 543,272.00
ANALISA HARGA SATUAN ALAT BERAT
I DATA PERALATAN
1. Jenis Peralatan = MOTOR GRADER
2. Tenaga N = - HP
3. Harga = Rp -
4. Umur Kerja = 5.00 Tahun
5. 1 hari kerja = 7.00 Jam
6. Umur Ekonomis (Tahun) UE = 5.00 Thn 10,000.00 Jam
7. Jam kerja per tahun (Tahun) h = 2,000.00
8. Harga Pokok HP = -
9. Harga Bahan Pokok/ Track Hbp = -
10. Harga Sisa (HS) = 10% (HP Hbp) = -
12. Harga Penyusutan (HP - Hbp - HS) = -
II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam -
- Penyusutan D = (HP-Hbp-HS)/ (UE x h) Rp/ jam -
- Bunga Modal Bm = (i= 15% ) i ((UE + 1)/ (2 UE) x (HP/ h)) Rp/ jam -
- Asuransi (P = 2%) Ba = (p= 2% ) p ((UE + 1)/ (2 UE) x (HP/ h)) Rp/ jam -
III BIAYA OPERASIONAL (OPERATIONAL COST) 21,400.00
- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm - /jam -
S = (Solar) = 0.150
E = = 0.547
N = = -
Hbbm = (Harga BBM) = 12,500.00
- Biaya Bahan Oli Pelumas
a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop - /jam -
C = = 0.130
T = (Jam) = 250.00
S = = 0.0005
E = = 0.547
N = = 0.00
Hbop = (Harga bahan oli) = 43,000.00
b. Transmisi
BBOT = ((C/T) + (S/E)) x N x Hbop - /jam -
C = = 0.223
T = (Jam) = 1,000.00
S = = 0.0003
E = = 0.547
N = = 0.00
Hbop = (Harga bahan oli) = 43,000.00
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh - /jam -
C = (Motor Garder) 0.620
T = (Jam) 2,000.00
S = (Motor Grader) 0.00030
E = 0.547
N = 0.00
Hbbh = (Harga bahan hydraulik) 43,000.00
- Biaya Bahan Gemok (Grease)
BBG = (S/E) x N x Hbbg - /jam -
S = (Motor Grader) 0.00009
E = 0.547
N = 0.00
Hbbg = (Harga bahan gemok) 42,000.00
- Biaya Saringan (filter-filter)
BFF = 0,5 (BBM+BBOM+BBOT+BBH+BBG) 0.5 0.00 /jam -
- Biaya Bahan Pokok/ Ban
BBP = Hbp/ T 0.00
Hbp = 0.00
T = (Jam) 2,000.00
- Biaya Operator/ Jam 21,400.00
- Biaya Pemeliharaan/ Perbaikan (f = 90%)
BBP = f x (HP - Hbp)/ UE 90% - /jam -
Dibulatkan 21,400.00
TAKSIRAN PRODUKSI ALAT
MENGANGKUT HASIL GALIAN
I ASUMSI
1 Jam kerja efektif per-hari Tk 7.00 Jam
2 ALAT
DUMP TRUCK 100 HP
A. Tenaga Mesin N 100.00 Hp
B. Berat Dump Truck Bo 6.00 Ton
C. Kapasitas Bak Dump Truck qdt 4.00 m3
D. Kapasitas Bucket Pemuat ql 0.80 m3
E. Waktu Siklus Pemuat Ctl 0.95 menit
F. Koefesien Rolling RR 100.00 Kg/Ton
G. Berat Jenis Material Bj 1.70 Ton/m3
H. Kemiringan Medan a 0.00 Derajat
I. Jarak Angkut D 500.00 m
J. Konsentrasi Beban Pada Roda Penggerak R 0.60
K. Perhitungan Waktu Siklus Ct
1. Waktu Muat tm 4.75 menit
qdt
tm = x Ctl
ql
2. Waktu Angkut Bermuatan tam
2.a. Gaya Angkut Pam 768.00 Kg
Sin .a
(
Pam = R ( Bo + qdt . Bj ) RR ±
1000 )
2.b. Kecepatan Angkut Vam 585.94 m/menit
N x 75 x 60
Vam =
Pam
I ASUMSI
1 Jam kerja efektif per-hari Tk 7.00 Jam
2 ALAT
EXCAVATOR 105 HP
A. Tenaga yang tersedia dlm mesin N 105.00 Hp
B. Kapasitas Bucket q 0.80 m3
C. Perhitungan Waktu Siklus Ct
1. Penggalian (Cutting) 25.00 detik
2. Pengangkatan & Swing (Loaded) 15.00 detik
3. Pembuangan (Dumping) 10.00 detik
4. Swing Kembali (Unloaded) 7.00 detik
Jumlah 57.00 detik
0.95 menit
D. Job Factor (Efisiensi Kerja) E 0.602
E. Faktor Konversi Material (Asli - Lepas) CF 1.25
F. Produktifitas Alat Q
60 x q x CF
Q = xE 38.03 m3/jam
Ct
G. Koefesien Alat 0.0263 jam/m3
TAKSIRAN PRODUKSI ALAT
TIMBUNAN TANAH HASIL GALIAN
I ASUMSI
1 Jam kerja efektif per-hari Tk 7.00 Jam
2 ALAT
EXCAVATOR 105 HP
A. Tenaga yang tersedia dlm mesin N 105.00 Hp
B. Kapasitas Bucket q 0.80 m3
C. Perhitungan Waktu Siklus Ct
1. Penggalian 15.00 detik
2. Pengangkatan & Swing (Loaded) 10.00 detik
3. Pembuangan dan Perataan 20.00 detik
4. Swing Kembali (Unloaded) 7.00 detik
Jumlah 52.00 detik
0.87 menit
D. Job Factor (Efisiensi Kerja) E 0.602
E. Faktor Konversi Material (Padat - Lepas) CF 1.43
F. Produktifitas Alat Q
60 x q x CF
Q = xE 47.69 m3/jam
Ct
G. Koefesien Alat 0.0210 jam/m3
TAKSIRAN PRODUKSI ALAT
TIMBUNAN TANAH DIPADATKAN
I ASUMSI
1 Jam kerja efektif per-hari Tk 7.00 Jam
2 ALAT
2.a BULLDOZER 100 Hp
A. Tenaga Pada Mesin N 100.00 Hp
B. Kapasitas Blade q 3.20 m3
C. Berat Alat Operasi Bo 2,204.00 Kg
D. Berat Jenis Material Bj 1,700.00 Kg/m3
E. Koefesien Traksi Kt 0.70 Tanah Liat, Basah
F. Derajat Kemiringan a 0.00 Derajat
G. Jarak Menggusur D 30.00 m
H. Perhitungan Waktu Siklus Ct
1. Waktu Gusur tg
1.a. Kekuatan Gusur Pg 5,350.80 Kg
Pg = ( Bo + Bj .q ) ( Kt ± Sin.a )
1.b. Kecepatan Gusur Vg 5.05 Km/Jam
84.10 m/menit
Vg = 270 ( PgN )
1.c. Waktu Gusur tg 0.36 menit
D
tg = ( )
Vg
2. Waktu Mundur tm
2.a. Kekuatan Mundur Pm 1,542.80 Kg
Pm = Bo ( Kt ± Sin.a )
2.b. Kecepatan Mundur Vm 17.50 Km/Jam
291.68 m/menit
Vm = 270 ( PmN )
2.c. Waktu Mundur tm 0.10 menit
D
tm = ( )
Vm
3. Waktu Tetap tt 0.10 menit
J. Tenaga Kerja
1. Kebutuhan Tenaga : Pekerja P 4.0000 Orang
Mandor M 1.0000 Orang
2. Koefesien Tenaga : Pekerja = (Tk x P)/Qt 0.0237 Jam
Mandor = (Tk x M)/Qt 0.0059 Jam
Q= ( 1.000 x V xnW x H x CF ) x E
H. Koefesien Alat 0.0112 Jam/m3
TAKSIRAN PRODUKSI ALAT
MENYUSUN BATU Uk. > 1.000 Kg
I ASUMSI
1 Jam kerja efektif per-hari Tk 7.00 Jam
2 ALAT
EXCAVATOR 105 HP
A. Tenaga yang tersedia dlm mesin N 105.00 Hp
B. Kapasitas Bucket q 0.80 m3
C. Perhitungan Waktu Siklus Ct
1. Pengangkatan & Swing (Loaded) 25.00 detik
2. Pembuangan (Dumping) 7.00 detik
3. Penyusunan (Piling) 120.00 detik
4. Swing Kembali (Unloaded) 5.00 detik
Jumlah 157.00 detik
2.62 menit
D. Job Factor (Efisiensi Kerja) E 0.602
E. Faktor Konversi Material (Asli - Lepas) CF 0.77
F. Produktifitas Alat Q
60 x q x CF
Q = xE 8.51 m3/jam
Ct
G. Produktifitas Alat per Hari Qt = (Tk x Q) Qt 59.54 m3/hari
H. Koefesien Alat 0.1176 jam/m3
I. Tenaga Kerja
1. Kebutuhan Tenaga : Pekerja P 2.0000 Orang
Mandor M 1.0000 Orang
2. Koefesien Tenaga : Pekerja = (Tk x P)/Qt 0.2352 Jam
Mandor = (Tk x M)/Qt 0.1176 Jam
TABULASI JOB FAKTOR ( E )
FAKTOR
N0. JENIS ALAT E TOTAL
ECO EAM Em EM
1 2 3 4 5 6 7=3x4x5x6
PEKERJAAN Cuaca = Terang, Segar Medan = Sedang Material = Sedang Manajemen = Sedang
GALIAN
Operator = Baik Alat = Baik
PEKERJAAN Cuaca = Terang, Segar Medan = Sedang Material = Sedang Manajemen = Sedang
MENYUSUN BATU
Operator = Baik Alat = Baik
PEKERJAAN Cuaca = Terang, Segar Medan = Sedang Material = Sedang Manajemen = Sedang
MENGANGKUT
MATERIAL Operator = Baik Alat = Baik
PEKERJAAN Cuaca = Terang, Segar Medan = Sedang Material = Sedang Manajemen = Sedang
MEMADATKAN
MATERIAL Operator = Baik Alat = Baik
PEKERJAAN Cuaca = Terang, Segar Medan = Sedang Material = Sedang Manajemen = Sedang
MERATAKAN
MATERIAL Operator = Baik Alat = Baik