ELTech Indonesia LEMBAR PERHITUN

Jln. A.H. Nasution Komplek Milala Mas No. 8


ABT 1B
The Spirit of Engineering
PAKET
NO. KONTRAK 7.3(4) Baja Tulangan U39
TANGGAL
Kode Diameter Dimensi Tekukan (mm)
Bentuk Jarak (mm)
Tulangan (mm) a b c d e f
ABT 1B
A1 D 19 200 95 705 2,660 705 95
A2 D 16 200 80 393 860 1,076 860 393
A3 D 13 65 11,935 1,965 65
A4 D 13 65 11,935 1,965 65
A5 D 13 1,000 65 2,660 65
A6 D 13 1,000 65 889 65
A7 D 19 200 95 2,583 376 95
A8 D 13 300 65 11,935 1,965 65
A9 D 13 900 65 760 65
A10 D 13 200 65 400 1,348 65
A11 D 13 65 11,935 1,978 65
A12 D 19 200 95 1,438 151 95
A13 D 16 200 80 200 807 80
A14 D 13 300 65 11,935 1,978 65
A15 D 13 200 65 200 509 780 1,141 65
A16 D 13 65 11,935 807 65
A17 D 22 750 110 450 110

P= 14.000 m
H=
Disetujui oleh Diperiksa oleh
ELTech Indonesia LEMBAR PERHITUN
Jln. A.H. Nasution Komplek Milala Mas No. 8
ABT 1B
The Spirit of Engineering
PAKET
NO. KONTRAK 7.3(4) Baja Tulangan U39
TANGGAL
Kode Diameter Dimensi Tekukan (mm)
Bentuk Jarak (mm)
Tulangan (mm) a b c d e f
Wing Wall ABT 1B
W1-01 D 16 200 80
W1-02 D 16
W1-03 D 16
W1-04 D 16
W1-05 D 16
W1-06 D 16
W1-07 D 16
W1-08 D 16
W1-09 D 16
W1-10 D 16
W1-11 D 16
W2-01 D 19 200
W2-02 D 19
W2-03 D 19
W2-04 D 19
W2-05 D 19
W2-06 D 19
W2-07 D 19
W2-08 D 19

W3 D 19

W4 D 19
W5 D 13 200 566

W6 D 13
W7 D 13
Disetujui oleh Diperiksa oleh
ELTech Indonesia LEMBAR PERHITUN
Jln. A.H. Nasution Komplek Milala Mas No. 8
ABT 1B
The Spirit of Engineering
PAKET
NO. KONTRAK 7.3(4) Baja Tulangan U39
TANGGAL
Kode Diameter Dimensi Tekukan (mm)
Bentuk Jarak (mm)
Tulangan (mm) a b c d e f
Plat Injak ABT 1B
S1 D 16 198

S2 D 16 300

S3 D 13 300

Balok Joint Slab Lantai ke ABT 1B


U1 D 19 100 95 11,905 2,095 95
U2 D 16 100 80 800 1,150 800 1,150 80
U3 D 13 1000/1000 130 740 130
Disetujui oleh Diperiksa oleh
KONTRAKTOR
RHITUNGAN
KONSULTAN
T 1B

angan U39 Ulir

Overlap Berat
Total Panjang Satuan Jumlah Berat (Kg)
g n x Dx40 (m) Kg/m

x - 4.260 2.230 71 674.49


80 x - 3.742 1.580 71 419.78
1 x 520 14.550 1.040 28 423.70
1 x 520 14.550 1.040 4 60.53
x - 2.790 1.040 15 43.52
x - 1.019 1.040 30 31.79
x - 3.149 2.230 142 997.16
1 x 520 14.550 1.040 12 181.58
x - 0.890 1.040 16 14.81
x - 1.878 1.040 71 138.67
1 x 520 14.563 1.040 5 75.73
x - 1.779 2.230 71 281.67
x - 1.167 1.580 71 130.91
1 x 520 14.563 1.040 4 60.58
x - 2.760 1.040 71 203.80
1 x 520 13.392 1.040 10 139.28
x - 0.670 2.980 20 39.93

Sub Total 3,917.93


Jumlah segmen 1
Total 3,917.93
Dibuat oleh
KONTRAKTOR
RHITUNGAN
KONSULTAN
T 1B

angan U39 Ulir

Overlap Berat
Total Panjang Satuan Jumlah Berat (Kg)
g n x Dx40 (m) Kg/m

x - 0.080 1.580 2 0.25


x - - 1.580 6 -
x - - 1.580 2 -
x - - 1.580 2 -
x - - 1.580 2 -
x - - 1.580 2 -
x - - 1.580 2 -
x - - 1.580 2 -
x - - 1.580 2 -
x - - 1.580 2 -
x - - 1.580 2 -
-
x - - 2.230 2 -
x - - 2.230 2 -
x - - 2.230 2 -
x - - 2.230 2 -
x - - 2.230 2 -
x - - 2.230 2 -
x - - 2.230 2 -
x - - 2.230 2 -
-
x - - 2.230 12 -
-
x - - 2.230 2 -
-
x - 0.566 1.040 13 7.65
-
x - -- 1.040 2 -
x - - 1.040 10 -
Sub Total 7.91
Jumlah segmen 2
Total 15.81
Dibuat oleh
KONTRAKTOR
RHITUNGAN
KONSULTAN
T 1B

angan U39 Ulir

Overlap Berat
Total Panjang Satuan Jumlah Berat (Kg)
g n x Dx40 (m) Kg/m

x - - 1.578 87 -

x - - 1.578 30 -

x - - 1.042 18 -

Sub Total -
Jumlah segmen 1
Total -

1 x 760 14.095 2.226 20 627.51


x - 4.060 1.578 140 896.94
x - 1.000 1.042 30 31.26
Sub Total 1,555.70
Jumlah segmen 1
Total 1,555.70
Total ABT 1B 5,489.45
Dibuat oleh
0.30 0.3 300 300

0.30 0.3 300 300


0.30 0.3 300 300

0.30 0.3 300 300


12.94
86.2666667

0.30 0.3 300 300

0.30 0.3 300 300