PIPA AIR
KOTOR Ø5"
1 2 3 4 5 6 7 8 9 10 11 12
DITANAM
PIPA TEGAK AIR DIBAWAH
KOTOR PADAT LANTAI
Ø4" TURUN KE LT.
BAWAH
BAK KONTROL
40X40 Status:
SEPTICKTANK
BIOFIT
UK. 1,5mx1,5m
PIPA AIR KOTOR
PADAT Ø5"
DITANAM
DIBAWAH LANTAI
Drawing:
KE SALURAN KE SALURAN
DENAH RENCANA
LINGKUNGAN LINGKUNGAN
INSTALASI AIR BEKAS LV.01
ARSITEK ARSITEK
CAD Filename:
-
Project No.
-
DENAH RENCANA INSTALASI AIR BEKAS & AIR HUJAN LV.01 Date:
21 DESEMBER 2018
Sheet No: Revision:
AR.01.02 -
KETERANGAN
1 2 3 4 5 6 7 8 9
PIPA TEGAK AIR 14
KOTOR PADAT
Ø4" TURUN KE LT. PIPA Ø 4" 15
BAWAH
16
PIPA Ø 2,5"
17
PIPA TEGAK AIR
KOTOR CAIR 18
Ø3" TURUN KE LT. 19
BAWAH
27 26 25 24 23 22 21 20
Project:
Drawing:
DENAH RENCANA
INSTALASI AIR BEKAS LV.02
ARSITEK ARSITEK
CAD Filename:
-
Project No.
-
DENAH RENCANA INSTALASI AIR BEKAS & AIR HUJAN LV.02 Date:
21 DESEMBER 2018
Sheet No: Revision:
AR.01.02 -
KETERANGAN
1 2 3 4 5 6 7 8 9
PIPA TEGAK AIR 14
KOTOR PADAT
Ø4" TURUN KE LT. 15
BAWAH
PIPA Ø 4" 16
17
PIPA TEGAK AIR
KOTOR CAIR 18
Ø3" TURUN KE LT. 19
BAWAH
PIPA Ø 2,5" 29 28 27 26 25 24 23 22 21 20
T
PIPA Ø 2,5"
Project:
Drawing:
DENAH RENCANA
INSTALASI AIR BEKAS LV.03
ARSITEK ARSITEK
CAD Filename:
-
Project No.
-
DENAH RENCANA INSTALASI AIR BEKAS & AIR HUJAN LV.03 Date:
21 DESEMBER 2018
Sheet No: Revision:
AR.01.02 -
KETERANGAN
13 14
2 3 4 5 6 7 8 9 10 11 12
15
PIPA TEGAK AIR 16
KOTOR PADAT
Ø4" TURUN KE LT. PIPA Ø 4" 17
BAWAH
18
PIPA Ø 2,5"
19
PIPA TEGAK AIR
KOTOR CAIR 20
Ø3" TURUN KE LT.
BAWAH
21
22
23
T
PIPA TEGAK AIR PIPA TEGAK
HUJAN Ø 2,5" AIR HUJAN Ø
2,5"
PIPA TEGAK AIR PIPA TEGAK AIR HUJAN
HUJAN Ø 2,5" TURUN KE LT.
Ø 2,5" TURUN KE BAWAH
LT. BAWAH
Drawing:
DENAH RENCANA
INSTALASI AIR BEKAS LV.04
ARSITEK ARSITEK
CAD Filename:
-
Project No.
-
DENAH RENCANA INSTALASI AIR BEKAS & AIR HUJAN LV.04 Date:
21 DESEMBER 2018
Sheet No: Revision:
AR.01.02 -
KETERANGAN
PIPA TEGAK AIR PIPA TEGAK AIR HUJAN PIPA TEGAK AIR HUJAN
HUJAN Ø 2,5" Ø 2,5" TURUN KE LT.
Ø 2,5" TURUN KE BAWAH
LT. BAWAH
Status:
FOR
CONSTRUCTION
Project:
Drawing:
DENAH RENCANA
INSTALASI AIR BEKAS LV.01
ARSITEK ARSITEK
CAD Filename:
-
Project No.
-
DENAH RENCANA INSTALASI AIR BEKAS & AIR HUJAN LV.ATAP Date:
21 DESEMBER 2018
Sheet No: Revision:
AR.01.02 -