PEKERJAAN PEMBANGUNAN GARDU INDUK 150 KV SUKAMARA 2 LINE BAY, 1 BAY COUPLER, 1 TRAFO BAY
NO URAIAN PEKERJAAN TOTAL HARGA
I PEKERJAAN PRASARANA 11.285.424.968,54
II PEKERJAAN SWITCH YARD 15.289.425.768,61 III PEKERJAAN GEDUNG KONTROL 150 kV 3.354.365.356,25 IV PEKERJAAN POS JAGA 105.255.600,00 V PEKERJAAN GUDANG LIMBAH B3 134.786.912,50
JUMLAH I s/d V 30.169.258.605,90
DIBULATKAN 30.169.258.606 PPN 10 % 3.016.925.861 JUMLAH 33.186.184.467