REKAPITULASI NILAI
NO BAGIAN Nilai Maks Hasil Penilaian
A Persiapan 100
B Pembongkaran timing chain 100
C Pembongkaran cylinder head 100
D Pembongkaran piston and connecting rod 100
E Pemeriksaan Cylinder bore & piston 150
F Pemeriksaan Crank pin & bearing 100
G Pemasangan piston & connecting rod 150
H Pemasangan cylinder head 100
I Pemasangan timing chain cover and oil pan 100
Jumlah 1000
PENGGUNAAN WAKTU
Familiarisasi Pelaksanaan Lomba Istirahat
Start Start Start
Stop Stop Stop
NO I. Pemasangan Timing Chain Cover & Oil Pan YA TDK HASIL KETERANGAN
1 Memasang crank shaft timing gear 10 0
2 Memasang cam shaft timing gear & timing chain 30 0
3 Memasang cam shaft timing gear bolt 10 0
4 Memasang timing belt tensioner 10 0
5 Memasang timing belt cover 10 0
6 Memasang oil pan & gasket 20 0
7 Memasang crank shaft pully and bolt 10 0
JUMLAH 100 0
JURI