DAFTAR PERHITUNGAN HARGA MATERIAL
NAMA KEGIATAN : PEMB. SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT TERPADU ( SPALD-T )
LOKASI : DESA JANJI MAULI BARINGIN
KECAMATAN : SAYUR MATINGGI
KABUPATEN : TAPANULI SELATAN
TAHUN ANGGARAN : 2019
HARGA BIAYA
PAJAK
SUMBER MATERIAL MATERIAL DI BIAYA ANGKUT BIAYA MUAT PUNDAK KE
NO JENIS MATERIAL GALIAN C
(QUARRY) QUARRY (Rp/m3) (Rp/m3) LOKASI
10%(Rp/m3)
(Rp/m3) (Rp/m3)
1 2 3 10 11 12 13 14
Dibuat Oleh :
...................................
.................................
PERHITUNGAN HARGA MATERIAL
HARGA
MATERIAL DI
LOKASI
PROYEK
(Rp/m3)
15
355,000.00
311,000.00
300,000.00
267,000.00
256,000.00
300,000.00
256,000.00
100,000.00
940.00
...................................
.................................
DAFAR HARGA SATUAN UPAH DAN MATERIAL
I II III
1 Mandor Oh
2 Kepala Tukang Oh
3 Tukang Oh
4 Pekerja Oh
1 Batu Belah m3
2 Batu Kali m3
3 Kerikil m3
4 Sirtu m3
5 Pasir Beton m3
6 Pasir Pasang m3
7 Pasir urug m3
8 Tanah Timbunan m3
9 Batu bata bh
10 Air Liter
11 Besi beton polos Kg
12 Kawat beton Kg
13 Kayu Klas IV m3
14 Minyak bekisting Liter
15 Paku 2"-3" Kg
16 Paku 5 – 10 cm Kg
17 Paku Ulir ( Seng Genteng ) Kg
18 Semen Portlan Kg
19 Besi plat strip kg
20 Besi strip m'
21 Besi Hollow 30x30x2 mm m'
22 Besi Hollow 30x60x2 mm m'
23 Besi Hollow 30x40 mm btg
24 Besi Hollow 20x40 mm btg
No. Uraian Upah & Bahan Satuan
I II III
25 Kunci Tanam 9" bh
26 Kunci Tanam 6" bh
27 Door holder set
28 Engsel Angin (type paha ayam) Stainless Stell set
29 Engsel Jendela (Kuningan 3") bh
30 Engsel Pintu (Kuningan 4") bh
31 Kunci slot ( Grendel Pintu ) bh
32 Grendel Jendela bh
33 Seng Genteng 0,75 x 1.2 ( 4 susun) 0,3 mm lbr
34 Seng Genteng 0,80 x 1.05 (Tekstur Pasir) 0,35 mm lbr
35 Rabung Genteng Seng 0,80 cm m'
36 Atap Megadeck m2
37 Rabung Megadeck m'
38 Rangka Baja Ringan untuk Genteng m2
39 Rangka Baja Ringan untuk Seng m2
40 Gypsum Board 120x240x0,90 cm lbr
41 Tepung Gypsum kg
42 Kaca Nako (rangka+kaca 5 mm) m2
43 Kaca Nako 6 daun Polos m2
44 Kaca Polos 5 mm m2
45 Kaca Rayben 5 mm m2
46 Kaca Rayben 8 mm m2
47 Kawat nyamuk m2
48 Kayu Keras Klas II m3
49 Kayu Klas III m
50 Dolken kayu Ø 8-10cm pj. 4m btg
51 List kayu profil m'
52 List Profil Gypsum m'
53 Markis Seng m'
54 Lem kayu kg
55 Lem PVC Tube
56 Paku tripleks kg
57 Paku skrup kg
58 Paku 1cm-2.5cm kg
59 Plywood tebal 9mm lbr
60 Plywood tebal 4mm lbr
61 Sealent kg
62 Semen warna kg
63 Seng gel. 3"x6" lbr
64 Seng plat m'
65 Seng plat 3"x6" BJLS 28 lbr
66 Tripleks 4 mm lbr
67 Tripleks 6 mm lbr
68 Triplek 9 mm lbr
No. Uraian Upah & Bahan Satuan
I II III
69 keramik uk. 20x20cm bh
70 keramik uk. 20x25cm bh
71 keramik uk. 25x25cm bh
72 Keramik 40x40cm bh
73 Keramik 60x60cm bh
74 Keramik dinding 20x45cm bh
75 Akustik 60 x 120 lbr
76 Amplas lbr
77 Pengencer/Tinner kg
78 Kuas bh
79 Cat Penutup/Tembok kg
80 Cat dasar kg
81 Plamur Tembok kg
82 Cat meni Perak kg
83 Bak fiberglass ( Bungkus Keramik ) unit
84 Closet jongkok Setara Toto unit
85 Kran Air Ø 1/2" atau 3/4" bh
86 Pipa PVC 1/2" m'
87 Pipa PVC 3/4" m'
88 Pipa PVC 1" m'
89 Pipa PVC 1,25" m'
90 Pipa PVC 1,5" m'
91 Pipa PVC 2" m'
92 Pipa PVC 2,5" m'
93 Pipa PVC 3" AIR LIMBAH VINILON m'
94 Pipa PVC 4" AIR LIMBAH VINILON m'
95 Pipa PVC AW 3" m'
96 Pipa PVC AW 4" m'
97 Pipa Galvanis Putih 3" m'
98 Pipa Hawa Sedang bh
99 Pipa Penguras Bak bh
100 Wastafel Stainless unit
101 Pintu Fiber Plastik KM/WC bh
102 Sealtape bh
103 Floor Drain ( Kuningan ) bh
104 Sewa Dump Truck Jam
105 Excavator 80 - 140 hp unit
106 Alat Bantu set
Dibuat Oleh :
...................................
No. Uraian Upah & Bahan Satuan
I II III
.................................
HARGA SATUAN UPAH DAN MATERIAL
IV
-
150,000.00
120,000.00
80,000.00
355,000.00
311,000.00
300,000.00
267,000.00
256,000.00
300,000.00
256,000.00
100,000.00
940.00
-
18,000.00
20,000.00
3,745,000.00
15,000.00
23,000.00
23,000.00
39,000.00
1,700.00
32,000.00
15,000.00
22,000.00
45,000.00
31,000.00
44,000.00
Harga Tahun 2019
IV
183,000.00
153,000.00
69,000.00
30,000.00
15,000.00
22,000.00
15,000.00
6,000.00
112,000.00
186,000.00
80,000.00
94,000.00
37,000.00
291,000.00
281,000.00
134,000.00
75,000.00
258,000.00
160,000.00
240,000.00
309,000.00
1,009,000.00
24,000.00
7,312,000.00
5,529,000.00
45,000.00
6,000.00
19,000.00
41,000.00
55,000.00
12,000.00
24,000.00
39,000.00
23,000.00
251,000.00
106,000.00
11,000.00
4,000.00
94,000.00
21,000.00
106,000.00
95,000.00
134,000.00
225,000.00
Harga Tahun 2019
IV
3,000.00
5,000.00
5,000.00
16,000.00
59,000.00
9,000.00
10,000.00
17,000.00
33,000.00
16,000.00
35,000.00
20,000.00
48,000.00
79,000.00
602,000.00
434,000.00
27,000.00
6,000.00
9,000.00
13,000.00
20,000.00
23,000.00
29,000.00
43,000.00
63,483.33
78,275.00
58,000.00
96,000.00
212,000.00
27,000.00
8,000.00
450,000.00
450,000.00
6,000.00
26,000.00
246,000.00
1,923,538,000.00
140,000.00
Dibuat Oleh :
...................................
Harga Tahun 2019
IV
.................................
ANALISA BIAYA KONSTRUKSI BANGUNAN
A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Pengurugan Kembali 1 M3 Galian Tanah
( Pengurugan Kembali 1 m3 Galian dihitung Dari 1/3 kali Dari Koefisien Pekerjaan Galian )
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Sirtu urug 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Pengurugan 1 m3 Tanah
A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Tanah m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala Tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu Kali m3 1.200
Semen Portland Kg 163.000
Pasir Pasang m3 0.520
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN PEKERJAAN BETON
Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175), Slump (12 ± 2) cm, w/c = 0,66
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Membuat 1 m3 Beton Mutu f'c = 19,3 MPa (K-225), Slump (12 ± 2) cm, w/c = 0,58
A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
1. Semen Portland kg 371.000
2. Pasir Beton m3 0.499
3. Kerikil(Maks 30mm) m3 0.654
4. Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0070
Tukang Besi L.02 OH 0.0070
Kepala Tukang L.03 OH 0.0007
Mandor L.04 OH 0.0004
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (polos/ulir) kg 1.050
Kawat beton kg 0.015
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 Bekisting untuk Sloof
A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu Klas IV m3 0.045
Paku 5 cm - 10 cm kg 0.300
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Klas III m3 0.040
Paku 5 cm - 10 cm kg 0.400
Minyak bekisting Liter 0.200
Kayu Keras Klas II m3 0.015
Plywood tebal 9 mm Lbr 0.350
Dolken kayu ø 8-10 cm - panj 4 m Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 Bekisting untuk Balok
A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Klas III m3 0.040
Paku 5 cm - 10 cm kg 0.400
Minyak bekisting Liter 0.200
Kayu Keras Klas II m3 0.018
Plywood tebal 9 mm Lbr 0.350
Dolken kayu ø 8-10 cm - panj 4 m Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN PEKERJAAN PASANGAN DINDING
Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1SP :4PP
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN PEKERJAAN SANITASI
A TENAGA
Pekerja L.01 OH 0.081
Tukang Batu L.02 OH 0.135
Kepala tukang L.03 OH 0.0135
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3" M 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A BIAYA KONSTRUKSI BANGUNAN
80,000.00 8,000.00
- -
8,000.00
8,000.00
8,000.00
80,000.00 60,000.00
- -
60,000.00
60,000.00
60,000.00
80,000.00 72,000.00
- -
72,000.00
72,000.00
72,000.00
A.2.3.1.9
ihitung Dari 1/3 kali Dari Koefisien Pekerjaan Galian )
80,000.00 40,000.00
- -
40,000.00
40,000.00
40,000.00
80,000.00 24,000.00
- -
24,000.00
267,000.00 320,400.00
320,400.00
344,400.00
344,400.00
gurugan 1 m3 Tanah A.2.3.1.14
80,000.00 20,000.00
- -
20,000.00
100,000.00 120,000.00
120,000.00
140,000.00
140,000.00
80,000.00 120,000.00
120,000.00 90,000.00
150,000.00 11,250.00
- -
221,250.00
311,000.00 373,200.00
1,700.00 277,100.00
300,000.00 156,000.00
806,300.00
1,027,550.00
1,027,550.00
TUAN PEKERJAAN BETON A.4.1.1
80,000.00 132,000.00
120,000.00 33,000.00
150,000.00 4,200.00
- -
169,200.00
1,700.00 554,200.00
256,000.00 139,008.00
300,000.00 192,900.00
- -
886,108.00
1,055,308.00
1,055,308.00
80,000.00 132,000.00
120,000.00 33,000.00
150,000.00 4,200.00
- -
169,200.00
1,700.00 630,700.00
256,000.00 127,744.00
300,000.00 196,200.00
- -
954,644.00
1,123,844.00
1,123,844.00
80,000.00 560.00
120,000.00 840.00
150,000.00 105.00
- -
1,505.00
18,000.00 18,900.00
20,000.00 300.00
19,200.00
20,705.00
20,705.00
n 1 m2 Bekisting untuk Sloof A.4.1.1.21
80,000.00 41,600.00
120,000.00 31,200.00
150,000.00 3,900.00
- -
76,700.00
3,745,000.00 168,525.00
23,000.00 6,900.00
15,000.00 1,500.00
176,925.00
253,625.00
253,625.00
80,000.00 52,800.00
120,000.00 39,600.00
150,000.00 4,950.00
- -
97,350.00
5,529,000.00 221,160.00
23,000.00 9,200.00
15,000.00 3,000.00
7,312,000.00 109,680.00
251,000.00 87,850.00
45,000.00 90,000.00
520,890.00
618,240.00
618,240.00
n 1 m2 Bekisting untuk Balok A.4.1.1.23
80,000.00 52,800.00
120,000.00 39,600.00
150,000.00 4,950.00
- -
97,350.00
5,529,000.00 221,160.00
23,000.00 9,200.00
15,000.00 3,000.00
7,312,000.00 131,616.00
251,000.00 87,850.00
45,000.00 90,000.00
542,826.00
640,176.00
640,176.00
80,000.00 52,800.00
120,000.00 39,600.00
150,000.00 4,950.00
- -
97,350.00
5,529,000.00 221,160.00
23,000.00 9,200.00
15,000.00 3,000.00
7,312,000.00 109,680.00
251,000.00 87,850.00
45,000.00 270,000.00
700,890.00
798,240.00
798,240.00
PEKERJAAN PASANGAN DINDING A.4.4.1
80,000.00 24,000.00
120,000.00 12,000.00
150,000.00 1,500.00
- -
37,500.00
940.00 65,800.00
1,700.00 19,550.00
300,000.00 12,900.00
98,250.00
135,750.00
135,750.00
80,000.00 24,000.00
120,000.00 18,000.00
150,000.00 2,250.00
- -
44,250.00
1,700.00 10,608.00
300,000.00 7,200.00
17,808.00
62,058.00
62,058.00
UAN PEKERJAAN SANITASI A.5.1.1
80,000.00 6,480.00
120,000.00 16,200.00
150,000.00 2,025.00
- -
24,705.00
63,483.33 76,180.00
761.80 26,663.00
102,843.00
127,548.00
127,548.00
80,000.00 6,480.00
120,000.00 16,200.00
150,000.00 2,025.00
- -
24,705.00
78,275.00 93,930.00
939.30 32,875.50
126,805.50
151,510.50
151,510.50
NAMA KEGIATAN : PEMB. SISTEM PENGELOLAAN AIR LIMBAH
DOMESTIK TERPUSAT ( SPALD-T )
LOKASI : DESA JANJI MAULI BARINGIN
TAHUN ANGGARAN : 2019
SUMBER DANA : DAK
)))
)))))) ( (( ) (
)) (
I. PEKERJAAN PERSIAPAN )
)
)
1. Papan Nama Kegiatan )
2. Biaya Photo Dokumentasi )
3. Biaya Pengukuran dan Pemasangan Bowplank )
)
4. Pembersihan Lokasi Pekerjaan uk ) 9.50 x 6.00
)
)
II. PEKERJAAN TANAH
1. Galian Tanah
Panjang lebar tinggi
1 PT Galian Tanah Untuk Ipal uk 9.50 x 6.00 x 2.30
33 PT Galian Tanah Bak Kontrol uk 0.70 x 0.70 x 0.60
10 PT Galian Tanah mainhole uk 0.90 x 0.90 x 0.60
33 PT Galian Tanah Greasetrap uk 0.50 x 0.50 x 0.60
1 PT Galian Tanah pipa diameter 4'' uk 474.00 x 0.30 x 0.55
1 PT Galian Tanah Pipa diameter 3'' uk 515.00 x 0.30 x 0.55
2. Urugan Kembali
3. Urugan Pasir
4. Tanah Timbunan
1 PT Tanah Timbunan dibawah Lantai uk 9.50 x 6.00 x 0.60
2. Plesteran
1 PT Plesteran Dinding uk 2.00 x Pas. Bata
V. PEKERJAAN BETON
1. Beton K. 225
10 PT Tiang Kolom Utama Lantai 2 uk 0.20 x 0.20 x 1.75
2 PT Balok Sloof Memanjang uk 0.20 x 0.20 x 9.50
2 PT Balok Sloof Melintang uk 0.20 x 0.20 x 6.00
2 PT Ring Balok Memanjang uk 0.20 x 0.20 x 9.50
2 PT Ring Balok Melintang uk 0.20 x 0.20 x 6.00
1 PT Cor Lantai uk 9.50 x 6.00 x 0.10
2. Beton K. 175
1 PT Lantai Kerja Rumah IPAL uk 5.70 x 9.20 x 0.10
Untuk 4 x Pakai
4. Bekisting Untuk kolom
Untuk 4 x Pakai
Untuk 4 x Pakai
Untuk 1 x Pakai
= 1.00 Ls
= 1.00 Ls
= 1.00 Ls
= 57.00 m2
= 131.10 m³
= 9.70 m³
= 4.86 m³
= 4.95 m³
= 78.21 m³
= 84.98 m³
= 313.80 m³
= 78.45 m³
= 2.85 m³
= 0.81 m³
= 0.41 m³
= 14.84 m³
= 18.91 m³
= 34.20 m³
= 34.20 m³
0.60 = 4.85 m³
0.60 = 3.06 m³
= 7.91 m³
= 24.70 m²
= 15.60 m²
= 40.30 m²
= 40.30 m²
= 80.60 m²
= 80.60 m²
= 0.70 m³
= 0.76 m³
= 0.48 m³
= 0.76 m³
= 0.48 m³
= 5.70 m³
= 8.88 m³
= 5.24 m³
= 5.24 m³
= 95.05 kg
= 14.52 kg
= 74.19 kg
= 14.23 kg
= 49.27 kg
= 9.00 kg
= 74.19 kg
= 14.23 kg
= 49.27 kg
= 9.00 kg
= 681.17 kg
= 337.28 kg
= 1,421.40 kg
= - m²
= 7.60 m²
= - m²
= 4.80 m²
= 12.40 m²
= 3.10 m²
= 28.80 m²
= 28.80 m²
= 7.20 m²
= 7.60 m²
= 4.80 m²
= 12.40 m²
= 3.10 m²
= 57.00 m²
= 57.00 m²
= 28.50 m²
= 515.00 m'
= 474.00 m'
DAFTAR PERHITUNGAN VOLUME
NAMA KEGIATAN : PEMB. SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT TERPADU (
LOKASI : DESA JANJI MAULI BARINGIN
KECAMATAN : SAYUR MATINGGI
KABUPATEN : TAPANULI SELATAN
TAHUN ANGGARAN : 2019
I. PEKERJAAN PERSIAPAN
2. Urugan Pasir
2 PT Urugan Pasir dibawah Pondasi Memanjang uk 0.05 x 0.50 x 15.00
1 PT Urugan Pasir dibawah Pondasi Memanjang uk 0.05 x 0.50 x 3.00
3 PT Urugan Pasir dibawah Pondasi Melintang uk 0.05 x 0.50 x 8.00
1 PT Urugan Pasir dibawah Pondasi Teras Memanjang uk 0.05 x 0.50 x 15.00
2 PT Urugan Pasir dibawah Pondasi Teras Melintang uk 0.05 x 0.50 x 2.00
1 PT Urugan Pasir dibawah Lantai Ruang Lab uk 0.05 x 7.88 x 14.88
1 PT Urugan Pasir dibawah Lantai Teras uk 0.05 x 2.00 x 14.88
3. Urugan Kembali
1 PT Urugan Kembali Pondasi uk 0.25 x 20.69
4. Timbunan Tanah Dipadatkan
1. Beton K 225
Total Pasangan Dinding Bata Setelah dikurangi luasan Kosen uk 204.64 - 36.20
3. Pas. Konstruksi Kuda-kuda Kayu kaki kuda- kuda depan uk 0.06 x 0.12 x 7.76
kaki kuda2 belakang uk 0.06 x 0.12 x 5.93
ikatan angin uk 0.06 x 0.12 x 8.47 x 2.00
tiang makelar uk 0.06 x 0.12 x 2.01
skoor tegak uk 0.05 x 0.10 x 1.07 x 2.00
skoor miring uk 0.05 x 0.10 x 2.40 x 2.00
6 PT Kuda-kuda Kayu
2. Pengecatan Plafond
1 PT Pengecatan Plafond uk Sama dengan Luas Plafond
1. Pemasangan Wastafel
2. Pipa Pvc diameter 3"
1. Meja serbaguna
2. Kursi Bundar
3. Meja guru 1/2 biro
4. Kursi Guru
5. Papan tulis
6. Lemari
Dihitung oleh :
...................................
.................................
RHITUNGAN VOLUME
= 1.00 Ls
= 1.00 Ls
= 1.00 Ls
= 120.00 m²
= 8.25 m³
= 0.83 m³
= 6.60 m³
= 4.13 m³
= 0.88 m³
= 20.69 m³
= 0.75 m³
= 0.08 m³
= 0.60 m³
= 0.38 m³
= 0.10 m³
= 5.86 m³
= 1.49 m³
= 9.26 m³
= 5.17 m³
= 5.86 m³
= 1.49 m³
= 7.35 m³
= 6.75 m³
= 0.73 m³
= 5.85 m³
= 3.66 m³
= 0.98 m³
= 17.97 m³
= 1.50 m²
= 1.60 m²
= 1.50 m²
= 0.40 m²
= 5.00 m²
= 0.90 m³
= 0.09 m³
= 0.72 m³
= 0.96 m³
= 0.53 m³
= 0.78 m³
= 0.08 m³
= 0.62 m³
= 0.45 m³
= 0.12 m³
= 0.66 m³
= 5.91 m³
= 78.62 kg
= 19.22 kg
= 9.55 kg
= 2.71 kg
= 65.84 kg
= 15.89 kg
= 172.24 kg
= 27.59 kg
= 46.13 kg
= 11.33 kg
= 78.52 kg
= 17.85 kg
= 9.50 kg
= 2.06 kg
= 65.70 kg
= 14.76 kg
= 39.26 kg
= 1.49 kg
= 39.31 kg
= 0.37 kg
= 14.14 kg
= 0.74 kg
= 29.26 kg
= 46.75 kg
= 808.83 kg
= 12.00 m²
= 9.60 m²
= 21.60 m²
= 4.32 m²
= 14.82 m²
= 10.56 m²
= 25.38 m²
= 5.08 m²
= 12.00 m²
= 9.60 m²
= 21.60 m²
= 4.32 m²
= 114.05 m²
= 73.01 m²
= 1.26 m²
= 16.32 m²
= 204.64 m²
= 3.98 m²
= 5.27 m²
= 24.97 m²
= 1.98 m²
= 36.20 m²
= 168.44 m²
= 336.88 m²
= 0.03 m³
= 0.02 m³
= - m³
= 0.01 m³
= 0.06 m³
= 0.02 m³
= 0.02 m³
= 0.31 m³
= 0.31 m³
= 0.16 m³
= 0.02 m³
= 0.02 m³
= 0.01 m³
= 0.01 m³
= 0.01 m³
= 0.004 m³
= 0.002 m³
= 1.02 m³
= 2.94 m²
= 3.78 m²
= 6.72 m²
= 12.96 m²
= 12.96 m²
= 3.00 bh
= 12.00 bh
= 6.00 bh
= 54.00 bh
= 54.00 bh
= 54.00 bh
= 27.00 bh
= 27.00 bh
= 3.00 bh
= 9.83 m²
= 133.62 m²
= 102.51 m²
= 236.13 m²
= 17.00 m'
= 17.00 m'
= 0.06 m³
= 0.04 m³
= 0.12 m³
= 0.01 m³
= 0.01 m³
= 0.02 m³
= 0.26 m³
= 1.56 m³
= 0.81 m³
= 33.60 m'
= 27.38 m'
= 60.98 m'
= 93.61 m²
= 22.35 m²
= 27.97 m²
= 14.88 m²
= 27.38 m²
= 186.19 m²
= 186.19 m²
= 93.61 m²
= 22.35 m²
= 27.97 m²
= 143.93 m²
= 8.80 m²
= 8.80 m²
= 1.00 Unit
= 10.00 bh
= 4.00 bh
= 1.00 bh
= 3.00 bh
= 10.00 bh
= 1.18 m²
= 0.65 m²
= 1.55 m²
= 9.47 m²
= 0.86 m²
= 2.02 m²
= 11.33 m²
= 11.52 m²
= 22.03 m²
= 18.14 m²
= 0.74 m²
= 0.62 m²
= 0.42 m²
= 0.53 m²
= 1.75 m²
= 0.48 m²
= 0.27 m²
= 5.88 m²
= 7.56 m²
= 6.48 m²
= 4.86 m²
= 12.20 m²
= - m'
= 120.54 m²
= 186.19 m²
= 336.88 m²
= 4.00 bh
= 18.00 m'
= 2.00 bh
= 4.00 bh
= 1.00 bh
= 1.00 bh
= 1.00 bh
= 1.00 bh
...................................
.................................
DAFTAR PERHITUNGAN VOLUME
) )))))))) ( (( ) (
)) (
I. PEKERJAAN TANAH )
)
1. Galian Tanah )
)
RKB ) Lebar Tinggi
3 PT Gal. Tanah Pondasi Melintang uk )) 0.50 x 0.55 x
1 PT Gal. Tanah Pondasi Teras Melintang uk ) 0.20 x 0.40 x
)
2 PT Gal. Tanah Pondasi Memanjang uk ) 0.50 x 0.55 x
3 PT Gal. Tanah Pondasi memanjang uk 0.50 x 0.55 x
2. Urugan Kembali
3 PT Urugan Kembali uk 0.25 x 5.87
1 PT Urugan Kembali uk 0.25 x 0.57
2 PT Urugan Kembali uk 0.25 x 1.58
3 PT Urugan Kembali uk 0.25 x 1.55
3. Urugan Pasir
Pondasi
3 PT Pondasi melintang uk 0.50 x 0.05 x
1 PT Pondasi melintang uk 0.20 x 0.05 x
2 PT Pondasi melintang uk 0.50 x 0.05 x
3 PT Pondasi melintang uk 0.50 x 0.05 x
Lantai Jamban
4 PT Ruang Jamban uk 1.63 x 0.05 x
1 PT Teras dalam Jamban uk 0.88 x 0.05 x
1 PT Teras Luar Jamban uk 1.02 x 0.05 x
4. Pemadatan Tanah
Lantai
4 PT Ruang Jamban uk 1.63 x 0.10 x
1 PT Ruang Teras Dalam Jamban uk 0.88 x 0.10 x
1 PT Teras Luar Jamban uk 1.02 x 0.10 x
1 PT Pot Bunga uk 0.30 x 0.30 x
II. PEKERJAAN PONDASI
Pondasi Batu Kali Camp. 1 : 4
Jamban Lebar Tinggi
3 PT Pas. Batu Kali Camp. 1 :4 Melintang uk 0.25 + 0.50 x 0.50 x
2
1 PT Pas. Batu Kali Camp. 1 :4 Teras Melin uk 0.20 x 0.40 x
2 PT Pas. Batu Kali Camp. 1 :4 Memanjanguk 0.25 + 0.50 x 0.50 x
2
3 PT Pas. Batu Kali Camp. 1 :4 Melintang uk 0.25 + 0.50 x 0.50 x
2
V. PEKERJAAN BETON
1. Beton K. 225 ) (
12 PT Cor Kolom Praktis uk. 12 x 12 cm uk 0.12 x 0.12 x 2.80
3 PT Cor Tiang Teras Uk. 15 x 15 cm uk 0.15 x 0.15 x 2.90
2 PT Cor Tiang Dinding Pot Bunga Uk. 12 x uk 0.12 x 0.12 x 1.30
3 PT Cor Balok Sloof Melintang uk. 15 x 2 uk 0.15 x 0.20 x 7.12
2 PT Cor Balok Sloof Memanjang Uk. 15 x uk 0.15 x 0.20 x 2.88
3 PT Cor Balok Sloof Memanjang Uk. 15 x uk 0.15 x 0.20 x 1.88
3 PT Cor Ring Balok Melintang Uk. 12 x 20uk 0.12 x 0.15 x 7.12
2 PT Cor Ring Balok Memanjang Uk. 12 x uk 0.12 x 0.15 x 2.88
3 PT Cor Ring Balok Memanjang Uk. 12 x 2uk 0.12 x 0.15 x 1.88
Bak air Jamban
4 PT Cor Bak Jamban Melintang uk 1.03 x 0.10 x 0.70 x
uk 0.60 x 0.10 x 0.70 x
Lantai Bak Jamban uk 0.83 x 0.10 x 0.60
4 PT Dudukan Jamban uk 0.60 x 0.30 x 0.80
Pakai 4x
Pakai 4x
Pakai 4x
5. Pas. Listplank
2 PT Depan dan Belakang uk 7.12
2 PT Samping Kiri dan Kanan uk 6.30
1. Keramik Uk. 20 x 20 cm
4 PT Lantai Ruang Jamban uk 1.08 x 1.63
Dudukan kloset uk 0.60 x 0.80
Bak Kamar Mandi
4 PT Bak Kamar mandi Melintang Luar uk 1.03 x 0.70
4 PT Bak Kamar Mandi Memanjang Luar uk 0.80 x 0.40
4 PT Bak Kamar mandi Melintang Dalam uk 0.83 x 0.60 x 2
4 PT Bak Kamar mandi Memanjang Dalam uk 0.60 x 0.60 x 2
4 PT Atas Bak Kamar Mandi uk 0.10 x 3.26 x 1
4 PT Lantai Bak Kamar Mandi uk 0.83 x 0.60 x 1
Dinding Pot Bunga
1 PT Dinding Pot Bunga Depan uk 1.10 x 5.00
1 PT Dinding Pot Bunga Belakang uk 1.50 x 5.00
1 PT Atas, Samping Kiri dan Kanan Dindinguk 0.12 x 8.00
2. Keramik Uk. 40 x 40 cm
1 PT Teras Depan Jamban uk 0.88 x 6.88
1 PT Teras Depan Jamban uk 0.62 x 7.12
2 PT Teras Depan Jamban uk 1.06 x 0.40
1 Sama dengan Luas Plesteran - Luas Pot Bunga, Dinding Pot Bunga dan Bak kamar man
Luas Plesteran
2. Pengecatan Plafond
Sama dengan Luas Plafond
1 Klosed Jongkok
2 Pipa PVC Ø 4"
3 Pipa PVC Ø 3"
4 Pipa PVC Ø 3/4"
5 Kran 3/4"
6 Floor Drain
ESTIK TERPUSAT TERPADU ( SPALD-T )
((
Panjang
7.12 = 5.87 m³
7.12 = 0.57 m³
2.88 = 1.58 m³
1.88 = 1.55 m³
= 9.57 m³
= 4.40 m³
= 0.14 m³
= 0.79 m³
= 1.16 m³
6.49 m³
7.12 = 0.53 m³
7.12 = 0.07 m³
2.88 = 0.14 m³
1.88 = 0.14 m³
1.88 = 0.613 m³
6.88 = 0.303 m³
6.88 = 0.351 m³
2.15 m³
1.88 = 1.23 m³
6.88 = 0.61 m³
6.88 = 0.70 m³
4.80 = 0.43 m³
= 2.97 m³
Panjang
7.00 = 3.94 m³
7.00 = 0.56 m³
3.87 = 1.45 m³
1.88 = 1.06 m³
= 7.01 m³
2.80 = 36.51 m²
2.80 = 26.32 m²
2.80 = 4.93 m²
1.30 = 6.19 m²
= 5.00 m²
= 0.28 m²
0.50 = 3.97 m²
83.20 m²
= 5.93 m²
= 1.98 m²
= 7.91 m²
= 75.29 m²
= ### m²
= ### m²
tbl
0.05 = 0.09 m³
0.05 = 0.02 m³
= 0.11 m³
= 5.32 m2
= 4 bh
= 8 bh
= 4 bh
= 0.48 m³
= 0.20 m³
= 0.04 m³
= 0.64 m³
= 0.17 m³
= 0.17 m³
= 0.38 m³
= 0.10 m³
= 0.10 m³
2 = 0.58 m³
2 = 0.34 m³
= 0.20 m³
= 0.58 m³
= 3.95 m³
Brt/m'
0.62 = ### Kg
0.22 = 13.46 Kg
0.62 = 27.90 Kg
0.22 = 4.55 Kg
0.62 = 10.52 Kg
0.22 = 1.05 Kg
0.62 = 59.67 Kg
0.22 = 13.31 Kg
0.62 = 18.75 Kg
0.22 = 2.64 Kg
0.62 = 20.68 Kg
0.22 = 3.70 Kg
0.62 = 59.30 Kg
0.22 = 9.50 Kg
0.62 = 18.50 Kg
0.22 = 2.64 Kg
0.62 = 20.31 Kg
0.22 = 2.64 Kg
= ### Kg
7.12 = 8.54 m²
2.88 = 2.30 m²
1.88 = 2.26 m²
13.10 m²
= 3.28 m²
2.80 = 8.06 m²
2.90 = 5.22 m²
1.30 = 0.62 m²
13.90 m²
= 3.48 m²
7.12 = 8.54 m²
2.88 = 2.30 m²
1.88 = 2.26 m²
8.54 m²
= 2.14 m²
= 30.10 m²
= 30.10 m²
= ### m²
= 9.120 m'
= 9.120 m'
2 = 0.06 m³
1 = 0.005 m³
1 = 0.01 m³
1 = 0.003 m³
2 = 0.02 m³
2 = 0.04 m³
2 = 0.02 m³
0.158 m³
= 0.158 m³
= 0.47 m³
= 0.28 m³
= 0.28 m³
= 14.24 m'
= 12.60 m'
= 26.84 m'
= 12.26 m²
= 14.38 m²
= 11.82 m²
= 10.58 m²
= 49.04 m²
= 49.04 m²
= 14.04 m'
= 9.14 m'
= 15.90 m'
= 14.28 m'
= 53.36 m'
= 7.04 m2
= 1.92 m2
= 2.88 m2
= 1.28 m2
= 3.98 m2
= 2.88 m2
= 1.30 m2
= 1.99 m2
= 5.50 m2
= 7.50 m2
= 0.96 m2
= 37.25 m2
= 6.05 m2
= 4.41 m2
= 0.85 m2
= 11.32 m2
ak kamar mandi
= ### m2
= 15.04 m2
= 6.52 m2
= 3.40 m2
= 12.43 m2
= 4.76 m2
= 0.28 m2
= 42.43 m2
= ### m2
= 49.04 m2
= 3.34 m2
= 0.69 m2
= 5.37 m2
= 9.40 m2
= 6.00 bh
= 4.00 bh
= 1.00 bh
= 1.00 bh
= 6.00 bh
= 4.00 bh
= 28.00 m
= 28.00 m
= 10.00 m
= 4.00 bh
= 4.00 bh
RENCANA ANGGARAN BIAYA
NAMA KEGIATAN : PEMB. SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT TERP
LOKASI : DESA JANJI MAULI BARINGIN
KECAMATAN : SAYUR MATINGGI
KABUPATEN : TAPANULI SELATAN
TAHUN ANGGARAN : 2019
1 2 4 5
A. PEKERJAAN PERSIAPAN
1. Biaya Pembuatan/Pemasangan Plank Nama Kegiatan Ls 1.00
2. Biaya Photo Dokumentasi Ls 1.00
3. Biaya Pembersihan Lokasi m² 57.00
4 Biaya Pengadaan/Sewa Alat Kerja dan Keselamatan Kerja Ls 1.00
B. PEKERJAAN FISIK
I Pekerjaan IPAL
1. Instalasi IPAL Pabrikan Ls 1.00
2. Pekerjaan Rumah IPAL
2.1 Pekerjaan Tanah
A. GALIAN TANAH
UPAH GALIAN TANAH
- Upah Galian Tanah Untuk Rumah IPAL Kedalaman 2,3m m³ 131.10
- Upah Galian Tanah Untuk Bak Kontrol Kedalaman 0,6m m³ 9.70
- Upah Galian Tanah Untuk Manhole Kedalaman 0,6m m³ 4.86
- Upah Galian Tanah Untuk Greasetrap Kedalaman 0,6m m³ 4.95
- Upah Galian Tanah Untuk Pipanisasi PVC Ø 3" m³ 84.98
- Upah Galian Tanah Untuk Pipanisasi PVC Ø 4" m³ 78.21
UPAH URUGAN SIRTU
- Upah Urugan Sirtu Urug Dibawah Rumah IPAL t; 5 cm m³ 2.85
- Upah Urugan Sirtu Urug Dibawah Galian Bak kontrol t; 5 cm m³ 0.81
- Upah Urugan Sirtu Urug Dibawah Galian Manhole t; 5 cm m³ 0.41
- Upah Urugan Sirtu Urug Dibawah Galian Pipa t; 5 cm m³ 14.84
ANGGARAN BIAYA
6 7
569,546.66 569,546.66
1,500,000.00 1,500,000.00
30,000.00 1,710,000.00
5,100,000.00 5,100,000.00
Jumlah
150,000,000 150,000,000.00
100,000.00 13,110,000.00
50,000.00 485,000.00
50,000.00 243,000.00
50,000.00 247,500.00
70,000.00 5,948,600.00
70,000.00 5,474,700.00
25,000.00 71,250.00
25,000.00 20,250.00
25,000.00 10,250.00
25,000.00 371,000.00
- Upah Urugan Kembali ( Dihitung 1/3 x hasil galian ) m³ 78.45
BAHAN URUGAN SIRTU
- Bahan Urugan Sirtu Urug Dibawah Rumah IPAL t; 5 cm m³ 2.85
- Bahan Urugan Sirtu Urug Dibawah Galian Bak kontrol t; 5 cm m³ 0.81
- Bahan Urugan Sirtu Urug Dibawah Galian Manhole t; 5 cm m³ 0.41
- Bahan Urugan Sirtu Urug Dibawah Galian Pipa t; 5 cm m³ 14.84
- Bahan Urugan Kembali ( Dihitung 1/3 x hasil galian ) m³ 78.45
B. TIMBUNAN TANAH IPAL
UPAH TIMBUNAN TANAH
- Upah Timbunan Tanah dipadatkan Rumah IPAL m³ 34.20
BAHAN TIMBUNAN TANAH
- Bahan Timbunan Tanah dipadatkan Rumah IPAL m³ 34.20
2.2 Pekerjaan Pondasi IPAL
UPAH
- Pondasi Batu Kali Camp. 1 : 4 Pondasi Rumah IPAL m³ 7.91
25,000.00 1,961,250.00
267,000.00 760,950.00
267,000.00 216,270.00
267,000.00 109,470.00
267,000.00 3,962,280.00
267,000.00 20,946,150.00
25,000.00 855,000.00
100,000.00 3,420,000.00
220,000.00 1,740,200.00
BAHAN
- Pondasi Batu Kali Camp. 1 : 4 Pondasi Rumah IPAL m³ 7.91
2.3 Pekerjaan Beton
A. COR BETON
UPAH
- Cor Beton Tiang Kolom uk. 20 x 20 cm m³ 0.70
- Cor Beton Sloof uk. 20 x 20 cm m³ 1.24
- Cor Beton Ring Balok uk. 20 x 20 cm m³ 1.24
- Cor Beton Lantai Penutup Rumah IPAL t; 5 cm m³ 5.70
- Cor Beton Lantai Kerja Rumah IPAL t; 10 cm m³ 5.24
BAHAN
- Cor Beton Tiang Kolom uk. 20 x 20 cm m³ 0.70
- Cor Beton Sloof uk. 20 x 20 cm m³ 1.24
- Cor Beton Ring Balok uk. 20 x 20 cm m³ 1.24
- Cor Beton Lantai Penutup Rumah IPAL t; 5 cm m³ 5.70
- Cor Beton Lantai Kerja Rumah IPAL t; 10 cm m³ 5.24
B. PEMBESIAN
UPAH
- Pembesian dengan Besi Beton kg 1,421.40
BAHAN
- Pembesian dengan Besi Beton kg 1,421.40
C. KAYU
UPAH
- Kayu Bekisting Untuk Balok Sloof m² 3.10
- Kayu Bekisting Untuk Kolom m² 7.20
- Kayu Bekisting Untuk Ring Balok m² 3.10
- Kayu Bekisting Untuk Lantai m² 28.50
700,000.00 5,537,000.00
160,000.00 112,000.00
160,000.00 198,400.00
160,000.00 198,400.00
160,000.00 912,000.00
160,000.00 838,400.00
950,000.00 665,000.00
950,000.00 1,178,000.00
950,000.00 1,178,000.00
950,000.00 5,415,000.00
950,000.00 4,978,000.00
1,500.00 2,132,100.00
19,000.00 27,006,600.00
76,000.00 235,600.00
76,000.00 547,200.00
76,000.00 235,600.00
76,000.00 2,166,000.00
BAHAN
- Kayu Bekisting Untuk Balok Sloof m² 3.10
- Kayu Bekisting Untuk Kolom m² 7.20
- Kayu Bekisting Untuk Ring Balok m² 3.10
- Kayu Bekisting Untuk Lantai m² 28.50
2.4 Pekerjaan Pas. Dinding Bata
A. PEMASANGAN DINDING BATA
UPAH
- Pas. Dinding Bata Camp. 1SP : 4PP Rumah IPAL m² 40.30
BAHAN
- Pas. Dinding Bata Camp. 1SP : 4PP Rumah IPAL m² 40.30
B. PLESTERAN DINDING BATA
UPAH
- Plesteran Dinding Bata Camp. 1SP : 4PP Rumah IPAL m² 80.60
BAHAN
- Plesteran Dinding Bata Camp. 1SP : 4PP Rumah IPAL m² 80.60
2.5 Pekerjaan Pipanisasi
A. PIPA INDUK
UPAH
- Pemasangan Pipa PVC Ø 4" Pj. 474 m' m' 474.00
BAHAN
- Pemasangan Pipa PVC Ø 4" Pj. 474 m' m' 474.00
- Accessories Untuk Pipa PVC Ø 4" Pj. 474 m' % 25.00
100,000.00 310,000.00
100,000.00 720,000.00
100,000.00 310,000.00
100,000.00 2,850,000.00
37,000.00 1,491,100.00
98,000.00 3,949,400.00
44,000.00 3,546,400.00
18,000.00 1,450,800.00
24,000.00 11,376,000.00
78,275.00 37,102,350.00
9,275,587.50 9,275,587.50
B. PIPA DISTRIBUSI/SR
UPAH
- Pemasangan Pipa PVC Ø 3" Pj. 515 m' m' 515.00
BAHAN
- Pemasangan Pipa PVC Ø 3" Pj. 515 m' m' 515.00
- Accessories Untuk Pipa PVC Ø 3" Pj. 515 m' % 25.00
C. NON FISIK
II ATK (Alat Tulis Kantor)
III Makan dan Minum
IV Lainnya
24,000.00 12,360,000.00
63,483.33 32,693,916.67
8,173,479.17 8,173,479.17
800,000.00 26,400,000.00
900,000.00 9,900,000.00
500,000.00 15,500,000.00
400,000.00 13,200,000.00
500,000.00 5,500,000.00
300,000.00 9,300,000.00
700,000.00 12,600,000.00
3,000,000.00 6,000,000.00
10,000,000.00 10,000,000.00
10,000,000.00 10,000,000.00
6,125,000.00 6,125,000.00
522,500,000.00
522,500,000.00
NAMA KEGIATAN : PEMB. SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT TERPADU ( SPALD-T )
LOKASI : DESA JANJI MAULI BARINGIN
KECAMATAN : SAYUR MATINGGI
KABUPATEN : TAPANULI SELATAN
TAHUN ANGGARAN : 2019
1 2 3 4
A. PEKERJAAN PERSIAPAN
1. Biaya Pembuatan/Pemasangan Plank Nama Kegiatan 569,546.66 1.00
2. Biaya Photo Dokumentasi 1,500,000.00 1.00
3. Biaya Pembersihan Lokasi 1,710,000.00 57.00
B. PEKERJAAN FISIK
Pekerjaan IPAL
1. Instalasi IPAL Pabrikan 150,000,000.00 1.00
2. Pekerjaan Rumah IPAL
2.1 Pekerjaan Tanah
- Upah Galian Tanah Untuk Rumah IPAL Kedalaman 2,3m 13,110,000.00 131.10
- Upah Galian Tanah Untuk Bak Kontrol Kedalaman 0,6m 485,000.00 9.70
- Upah Galian Tanah Untuk Manhole Kedalaman 0,6m 243,000.00 4.86
- Upah Galian Tanah Untuk Greasetrap Kedalaman 0,6m 247,500.00 4.95
- Upah Galian Tanah Untuk Pipanisasi PVC Ø 3" 5,948,600.00 84.98
- Upah Galian Tanah Untuk Pipanisasi PVC Ø 4" 5,474,700.00 78.21
- Upah Urugan Sirtu Urug Dibawah Rumah IPAL t; 5 cm 71,250.00 2.85
- Upah Urugan Sirtu Urug Dibawah Galian Bak kontrol t; 5 20,250.00 0.81
- Upah Urugan Sirtu Urug Dibawah Galian Manhole t; 5 c 10,250.00 0.41
- Upah Urugan Sirtu Urug Dibawah Galian Pipa t; 5 cm 371,000.00 14.84
- Upah Urugan Kembali ( Dihitung 1/3 x hasil galian ) 1,961,250.00 78.45
- Upah Timbunan Tanah dipadatkan Rumah IPAL 855,000.00 34.20
2.2 Pekerjaan Pondasi IPAL
- Pondasi Batu Kali Camp. 1 : 4 Pondasi Rumah IPAL 1,740,200.00 7.91
2.3 Pekerjaan Beton
- Cor Beton Tiang Kolom uk. 20 x 20 cm 112,000.00 0.70
- Cor Beton Sloof uk. 20 x 20 cm 198,400.00 1.24
- Cor Beton Ring Balok uk. 20 x 20 cm 198,400.00 1.24
- Cor Beton Lantai Penutup Rumah IPAL t; 5 cm 912,000.00 5.70
- Cor Beton Lantai Kerja Rumah IPAL t; 10 cm 838,400.00 5.24
- Pembesian dengan Besi Beton 2,132,100.00 1,421.40
- Kayu Bekisting Untuk Balok Sloof 235,600.00 3.10
- Kayu Bekisting Untuk Kolom 547,200.00 7.20
- Kayu Bekisting Untuk Ring Balok 235,600.00 3.10
- Kayu Bekisting Untuk Lantai 2,166,000.00 28.50
2.4 Pekerjaan Pas. Dinding Bata
- Pas. Dinding Bata Camp. 1SP : 4PP Rumah IPAL 1,491,100.00 40.30
- Plesteran Dinding Bata Camp. 1SP : 4PP Rumah IPAL 3,546,400.00 80.60
5 6
REKAPITULASI RENCANA ANGGARAN BIAYA
NAMA KEGIATAN : PEMB. SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT TERPADU ( SPALD-T
LOKASI : DESA JANJI MAULI BARINGIN
KECAMATAN : SAYUR MATINGGI
KABUPATEN : TAPANULI SELATAN
TAHUN ANGGARAN : 2019
I PEKERJAAN PERSIAPAN
II PEKERJAAN FISIK
................................ .................................
................................
YA
Jumlah Total (
Rupiah )
-
12,600,000.00
12,600,000.00
12,600,000.00
tinggi, 2019