B PEKERJAAN TANAH
1 B1 Galian tanah 203.54 m3
2 B2 Urugan kembali 153.82 m3
3 B3 Buang sisa galian tanah 1.00 ls
4 B4 Urugan pasir 8.30 m3
C PEKERJAAN PONDASI
1 C1 Pemasangan Batuh Belah 1SP : 3PP 32.07 m3
2 C2 Pasangan pondasi batu kosong 16.53 m3
D PEKERJAAN BETON
1 D1 Membuat mutu beton K200 slum(12±2)cm 11.5 m3
3 D3 Besi D10 213.6 kg
5 D5 Besi Ø8 170.93 kg
6 D6 Memasang Bekisting Untuk sloof (b15,h20cm) 4.4 m2
Terbilang :
SERATUR TIGA BELAS LIMA RATUS DUA PULUH ENAM ENAM RATUS RUPIAH
Direktur Utama
DUMTRUCK
DURASI HARGA
SISA GALIAN 2 120000 240000
BATU KALI DAN BATU KOSONG 3 120000 360000
SEMEN (PICKUP) 2 64000 128000
BATAKO (PICKUP) 500 BATA 2 64000 128000
BESI TULANGAN 1 64000 64000
920000
DAFTAR HARGA SATUAN PEKERJAAN (AHSP)
SUMBER DATA :
DAERAH : KOTA DENPASAR DAN SEKITARNYA
HARGA SATUAN PEKERJAAN PERSIAPAN
Koef
NO. Uraian Kode Satuan Uraian Pekerjaan
AHSP
B BAHAN
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIIT (CONTAH 10%)
F HARGA SATUAN PEKERJA (D+E)
B BAHAN
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJAAN (D+E)
B BAHAN
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJAAN (D+E)
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJA (D+E)
B BAHAN
1.2 m3 BATU BELAH 15/20 Rp255,000.00
202 kg PORTLAND SEMEN Rp1,050.00
0.485 m3 PASIR PASANG Rp300,000.00
C PERALATAN
D JUMLAH A+B+C
E OVERHAED & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJA (D+E)
B BAHAN
0.04 m3 Kayu Klas III (Terentang) Rp2,000,000.00
0.3 Kg Paku Biasa 2"-5" Rp13,500.00
0.1 Ltr Minyak Bekisting Rp9,500.00
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJAAN (D+E)
B BAHAN
0.045 m3 Kayu Klas III (Terentang) Rp2,000,000.00
0.3 Kg Paku Biasa 2"-5" Rp13,500.00
0.1 Ltr Minyak Bekisting Rp9,500.00
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJAAN (D+E)
B BAHAN
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJAAN (D+E)
B BAHAN
299 Kg PORTLAND SEMEN Rp1,050,000.00
799 Kg PASIR BETON Rp260,000.00
1017 Kg Kerikil (MAKSIMUM 30 mm) Rp250,000.00
215 ltr Air Rp15.00
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJAAN (D+E)
B BAHAN
10.5 Kg Besi Beton (Polos) Rp855,000.00
0.15 Kg Kawat Beton Rp14,000.00
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIT (CONTAH 10%)
F HARGA SATUAN PEKERJAAN (D+E)
N (AHSP)
1m
Jumlah Harga
ASLI
Rp12,000.00
Rp11,000.00
Rp6,500.00
Rp425.00
Jumlah Rp29,925.00
Rp29,925.00
Rp2,992.50
Rp32,917.50
Rp113,000.00
Rp105,000.00
Rp97,500.00
Rp5,100.00
Jumlah Rp320,600.00
Rp320,600.00
Rp32,060.00
Rp352,660.00
Rp300,000.00
Rp22,000.00
Rp19,500.00
Rp850.00
Jumlah Rp342,350.00
Rp342,350.00
Rp34,235.00
Rp376,585.00
Rp530,000.00
Rp100,000.00
Rp50,700.00
Rp31,200.00
Rp3,510.00
Rp3,315.00
Jumlah Rp718,725.00
Rp306,000.00
Rp86,400.00
Jumlah Rp392,400.00
Rp1,111,125.00
Rp111,112.50
Rp1,222,237.50
Rp900,000.00
Rp175,000.00
Rp97,500.00
Rp60,000.00
Rp6,750.00
Rp6,375.00
Jumlah Rp1,245,625.00
Rp306,000.00
Rp212,100.00
Rp145,500.00
Jumlah Rp663,600.00
Rp663,600.00
Rp66,360.00
Rp729,960.00
Rp160,000.00
Rp60,000.00
Rp33,800.00
Rp20,800.00
Rp2,340.00
Rp2,210.00
Jumlah Rp279,150.00
Rp80,000.00
Rp4,050.00
Rp950.00
Jumlah Rp85,000.00
Rp85,000.00
Rp8,500.00
Rp93,500.00
Rp170,000.00
Rp60,000.00
Rp33,800.00
Rp20,800.00
Rp2,340.00
Rp2,210.00
Jumlah Rp289,150.00
Rp90,000.00
Rp4,050.00
Rp950.00
Jumlah Rp95,000.00
Rp95,000.00
Rp9,500.00
Rp104,500.00
Rp14,000.00
Rp38,000.00
Rp32,500.00
Rp1,700.00
Jumlah Rp72,200.00
Rp72,200.00
Rp7,220.00
Rp79,420.00
Rp100,000.00
Rp140,000.00
Rp107,250.00
Rp22,000.00
Rp2,520.00
Rp7,055.00
Jumlah Rp278,825.00
Rp313,950,000.00
Rp207,740,000.00
Rp254,250,000.00
Rp3,225.00
Jumlah Rp775,943,225.00
Rp775,943,225.00
Rp77,594,322.50
Rp853,537,547.50
Rp115,000.00
Rp12,000.00
Rp4,550.00
Rp5,600.00
Rp630.00
Rp340.00
Jumlah Rp138,120.00
Rp8,977,500.00
Rp2,100.00
Jumlah Rp8,979,600.00
Rp8,979,600.00
Rp897,960.00
Rp9,877,560.00
DAFTAR HARGA SATUAN PEKERJAAN (AHSP)
SUMBER DATA :
DAERAH : KOTA DENPASAR DAN SEKITARNYA
HARGA SATUAN PEKERJAAN PERSIAPAN
Koef
NO. Uraian Kode Satuan Uraian Pekerjaan
AHSP
1 1 m2 PEKERJAAN GALIAN TANAH BIASA (1m)
A TENAGA
0.563 OH Pekerja Rp100,000.00
0.0563 OH Mandor Rp115,000.00
B BAHAN
C PERALATAN
D JUMLAH A+B+C
E OVERHEAD & PROFIIT (CONTAH 10%)
F HARGA SATUAN PEKERJA (D+E)
2 1 m2
1m
Jumlah Harga
Rp69,051.95
Rp62,774.50
Rp56,300.00
Rp6,474.50
Rp62,774.50
Rp6,277.45
Rp69,051.95