PEMERIKSAAN CBR LABORATORIUM


35 KALI PUKULAN

PENGUJIAN KEPADATAN : RINGAN / BERAT BERAT ISI YANG DIKEHENDAKI : gr/cm³

PENGEMBANGAN BERAT ISI SEBELUM SESUDAH


Tanggal A Berat Cetakan 4475 4475
Jam B Berat Tanah + Cetakan 11560 11625
Pembacaan C Berat Tanah Basah 7085 7150
Perubahan D Volume Tanah 2061.31 2061.31
E Berat Isi Tanah C/D 3.44 3.47
F Berat Isi Kering (E/100+M)x100% 2.73 2.47
180

160
Kalibrasi = 33.15214 Lbf / div
PENURUNAN PENURUNAN PEMBACAAN BERAT

140 ( MM ) ( INCH ) DIAL ( DIV ) ( LBS )

37.5 0.0125 0.90 29.837

63.5 0.025 1.10 36.467


120
127 0.050 1.90 62.989

190.5 0.075 2.10 69.619


100 0.100 2.20 72.935
254
Berat (lbs)

381 0.150 2.80 92.826

80 508 0.200 3.50 116.032

762 0.300 4.40 145.869

1016 0.400 5.00 165.761


60
1270 0.500 5.20 172.391

40

NILAI CBR ( % )

20 71
0,1" x 100 % = 2.37
3 x 1000
122
0 0,2" x 100 % = 2.71
0.0 0.1 0.2 0.3 0.4 0.5 0.6 3 x 1500

Penurunan (inch)

KADAR AIR SEBELUM SESUDAH


G No. Tin Box 1 2 3 1 2 3
H Berat Tin Box gr 9.71 10.06 9.14 10.11 9.91 14.38
I B.Tin Box + Tanah Basah gr 15.41 16.81 15.34 13.8 15.84 17.48
J B.Tin Box + Tanah Kering gr 14.27 15.42 14.05 12.79 14.15 16.54
K Berat Tanah Kering gr 4.56 5.36 4.91 2.68 4.24 2.16
L Berat Air = I - J gr 1.14 1.39 1.29 1.01 1.69 0.94
M Kadar Air = ( 1/K ) x 100% % 25.00 25.93 26.27 37.69 39.86 43.52
Rata-rata % 25.74 40.35
UNIVERSITAS MUHAMMADIYAH SURAKARTA .
FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A Yani Tromol Pos I, Pabelan, Kartasura, Surakarta, 0217-717417

PEMERIKSAAN CBR LABORATORIUM


10 KALI PUKULAN

PENGUJIAN KEPADATAN : RINGAN / BERAT BERAT ISI YANG DIKEHENDAKI : gr/cm³

PENGEMBANGAN BERAT ISI SEBELUM

Tanggal A Berat Cetakan 4135


Jam B Berat Tanah + Cetakan 7475
Pembacaan C Berat Tanah Basah 3340

Perubahan D Volume Tanah 2122.78


E Berat Isi Tanah C/D 1.57
F Berat Isi Kering (E/100+M)x100% 1.13
200

Kalibrasi = 33.15214 Lbf / div

PENURUNAN PENURUNAN PEMBACAAN BERAT

(DIV ) ( INCH ) DIAL ( DIV ) ( LBS )


150
37.5 0.0125 0.00 0.000

63.5 0.025 0.00 0.000

127 0.050 0.00 0.000

190.5 0.075 0.00 0.000


Berat (lbs)

254 0.100 0.00 0.000


100
381 0.150 0.00 0.000

508 0.200 1.00 33.152

762 0.300 2.00 66.304

1016 0.400 3.00 99.456

50
1270 0.500 4.00 132.609

NILAI CBR ( % )
8
0,1" x 100 % = 0.27
3 x 1000
0
.00000 .10000 .20000 .30000 .40000 .50000 26
0,2" x 100 % = 0.58
3 x 1500
Penurunan (inch)

KADAR AIR SEBELUM


G No. Tin Box 1 2 3
H Berat Tin Box gr 3.99 3.4 3.8
I B.Tin Box + Tanah Basah gr 8.32 7.89 7.18
J B.Tin Box + Tanah Kering gr 6.79 6.29 5.99
K Berat Tanah Kering gr 2.8 2.89 2.19
L Berat Air = I - J gr 1.53 1.6 1.19
M Kadar Air = ( 1/K ) x 100% % 35.71 34.60 45.66
Rata-rata % 38.66
UNIVERSITAS MUHAMMADIYAH SURAKARTA
FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A Yani Tromol Pos I, Pabelan, Kartasura, Surakarta, 0217-717417

PEMERIKSAAN CBR LABORATORIUM


10 KALI PUKULAN

PENGUJIAN KEPADATAN : RINGAN / BERAT BERAT ISI YANG DIKEHENDAKI : gr/cm³

PENGEMBANGAN BERAT ISI SEBELUM SESUDAH


Tanggal 8/12/10 9/12/10 10/12/10 11/12/10 A Berat Cetakan 7697 7697
Jam 14:57 14:57 14:57 14:57 B Berat Tanah + Cetakan 10459 10985
Pembacaan 0.00 0.35 0.42 0.51 C Berat Tanah Basah 2762 3288
Perubahan 0.00 0.35 0.77 1.28 D Volume Tanah 2122.78 2146.11
E Berat Isi Tanah C/D 1.30 1.53
F Berat Isi Kering (E/100+M)x100% 0.59 0.56

24

22 Kalibrasi = 57.80053 Lbf / div


WAKTU PENURUNAN PEMBACAAN BERAT
20
( MIN ) ( INCH ) DIAL ( DIV ) ( LBS )
0.25 0.0125 0.00 0.000
18
0.5 0.0250 0.00 0.000
16 1 0.0500 0.02 0.000
1.5 0.0750 0.03 0.000
14
2 0.1000 0.09 0.000
Berat (lbs)

3 0.1500 0.25 0.000


12
4 0.2000 0.31 0.000

10 6 0.3000 0.39 0.000


8 0.4000 0.40 0.000
8
10 0.5000 0.42 0.000

4 NILAI CBR ( % )
10.2
2
0,1" x 100 % = 0.340
3 x 1000
18.1
0 0,2" x 100 % = 0.402
.000 .100 .200 .300 .400 .500 3 x 1500
Penurunan (inch)

Δx = 0.03

KADAR AIR SEBELUM SESUDAH


G No. Tin Box 1 2 3 1 2 3
H Berat Tin Box gr 8 8 8 7 7 7
I B.Tin Box + Tanah Basah gr 59 49 55 34 36 44
J B.Tin Box + Tanah Kering gr 50 41 47 25 27 33
K Berat Tanah Kering gr 42 33 39 18 20 26
L Berat Air = I - J gr 9 8 8 9 9 11
M Kadar Air = ( 1/K ) x 100% % 21.43 24.24 20.51 50.00 45.00 42.31
Rata-rata % 22.06 45.77

UNIVERSITAS MUHAMMADIYAH SURAKARTA


FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A Yani Tromol Pos I, Pabelan, Kartasura, Surakarta, 0217-717417

PEMERIKSAAN CBR LABORATORIUM


30 KALI PUKULAN

PENGUJIAN KEPADATAN : RINGAN / BERAT BERAT ISI YANG DIKEHENDAKI : gr/cm³

PENGEMBANGAN BERAT ISI SEBELUM SESUDAH


Tanggal 8/12/10 9/12/10 10/12/10 11/12/10 A Berat Cetakan 6973 6973
Jam 14:57 14:57 14:57 14:57 B Berat Tanah + Cetakan 10192 10591
Pembacaan 0.00 0.70 0.85 0.95 C Berat Tanah Basah 3219 3618
Perubahan 0.00 0.70 1.55 2.50 D Volume Tanah 2122.78 2168.32
E Berat Isi Tanah C/D 1.52 1.67
F Berat Isi Kering (E/100+M)x100% 0.68 0.63
120

110

Kalibrasi = 57.80053 Lbf / div


100
WAKTU PENURUNAN PEMBACAAN BERAT
( MIN ) ( INCH ) DIAL ( DIV ) ( LBS )
90
0.25 0.0125 0.00 0.000

80 0.5 0.0250 0.03 0.000


1 0.0500 0.60 0.000
70 1.5 0.0750 0.90 0.000
Berat (lbs)

2 0.1000 0.99 0.000


60
3 0.1500 1.00 0.000
4 0.2000 1.16 0.000
50
6 0.3000 1.74 0.000

40 8 0.4000 1.97 0.000


10 0.5000 2.05 0.000
30

20
NILAI CBR ( % )

10 47
0,1" x 100 % = 1.567
3 x 1000
0 79
.000 .100 .200 .300 .400 .500 0,2" x 100 % = 1.756
3 x 1500
Penurunan (inch)

Δx = 0.005

KADAR AIR SEBELUM SESUDAH


G No. Tin Box 1 2 3 1 2 3
H Berat Tin Box gr 9 9 9 8 7 7
I B.Tin Box + Tanah Basah gr 50 48 50 29 35 33
J B.Tin Box + Tanah Kering gr 42 40 42 22 27 26
K Berat Tanah Kering gr 33 31 33 14 20 19
L Berat Air = I - J gr 8 8 8 7 8 7
M Kadar Air = ( 1/K ) x 100% % 24.24 25.81 24.24 50.00 40.00 36.84
Rata-rata % 24.76 42.28

UNIVERSITAS MUHAMMADIYAH SURAKARTA


FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A Yani Tromol Pos I, Pabelan, Kartasura, Surakarta, 0217-717417

PEMERIKSAAN CBR LABORATORIUM


65 KALI PUKULAN

PENGUJIAN KEPADATAN : RINGAN / BERAT BERAT ISI YANG DIKEHENDAKI : gr/cm³

PENGEMBANGAN BERAT ISI SEBELUM SESUDAH


Tanggal 8/12/10 9/12/10 10/12/10 11/12/10 A Berat Cetakan 7772 7772
Jam 14:57 14:57 14:57 14:57 B Berat Tanah + Cetakan 11389 11664
Pembacaan 0.00 0.60 0.76 0.78 C Berat Tanah Basah 3617 3892
Perubahan 0.00 0.60 1.36 2.14 D Volume Tanah 2122.78 2161.81
E Berat Isi Tanah C/D 1.70 1.80
F Berat Isi Kering (E/100+M)x100% 0.81 0.74
360

340

320
Kalibrasi = 57.80053 Lbf / div
300 WAKTU PENURUNAN PEMBACAAN BERAT
280 ( MIN ) ( INCH ) DIAL ( DIV ) ( LBS )

260 0.25 0.0125 0.01 0.000


0.5 0.0250 0.26 0.000
240
1 0.0500 0.52 0.000
220
1.5 0.0750 1.05 0.000
200
2 0.1000 1.83 0.000
Berat (lbs)

180 3 0.1500 2.91 0.000

160 4 0.2000 3.83 0.000

140
6 0.3000 5.10 0.000
8 0.4000 5.74 0.000
120
10 0.5000 6.10 0.000
100

80

60 NILAI CBR ( % )
40 130
0,1" x 100 % = 4.333
20 3 x 1000
230
0 0,2" x 100 % = 5.111
.000 .100 .200 .300 .400 .500 3 x 1500
Penurunan (inch)

Δx = 0.02

KADAR AIR SEBELUM SESUDAH


G No. Tin Box 1 2 3 1 2 3
H Berat Tin Box gr 9 9 9 7 8 7
I B.Tin Box + Tanah Basah gr 45 41 47 38 38 39
J B.Tin Box + Tanah Kering gr 37 34 39 29 30 30
K Berat Tanah Kering gr 28 25 30 22 22 23
L Berat Air = I - J gr 8 7 8 9 8 9
M Kadar Air = ( 1/K ) x 100% % 28.57 28.00 26.67 40.91 36.36 39.13
Rata-rata % 27.75 38.80
10.2

18.1
47

79
130