( Sunarto )
: Jl Anggrek I Rt 02 Rw 04 Siberi
Satuan
m3
m3
kg
hok
hok
hok
hok
hok
hok
m3
hok
hok
M2
m3
kg
hok
hok
hok
hok
m3
Jam
Jam
hok
hok
hok
hok
hok
hok
hok
hok
Ltr
hok
hok
Masukin data hany
(1) Bahan
BAHAN
1 # Kayu 2/20 m3 2,500,000.00 20,000.00 2,520,000.00
2 Kayu 5/7x3m m3 2,500,000.00 26,500.00
3 # Paku biasa ( 2" - 5" ) kg 17,000.00 - 17,000.00
4 # Pasir urug m3 125,000.00 - 125,000.00
5 # Beton Ready Mix K 175 m3 934,900.00 18,698.00 953,598.00
6 # Pompa Beton m3 250,000.00 - 250,000.00
7 # Concrete Vibrator m3 250,000.00 - 250,000.00
8 Besi beton polos Φ 8 kg 10,000.00 44,700.00 perbatang
9 bendrat kg 17,000.00
10# Plastik m2 2,000.00
Upah
Upah Kebutuhan Upah
1 Pekerja hok 75,000 122.34
2 Tukang hok 95,000 12.62
Kepala tukang -
3 Kepala Kelompok / Mandor hok - 17.70
Keterangaan
1 Desa : Banjarejo
2 Lokasi : Jl Anggrek I Rt 02 Rw 04 Siberi
3 Volume : 86 m x 3,5 m x 0,1 m
4 Penanggung jawab kegiatan ( Sunarto )
Lebar = 3.50 m
panjang jalan 86.00 m
Masukin data hanya disini saja
Kebutuhan Bahan
9,175,125.00
1,198,947.50
0.10
0.05
TIME SCHEDULE / JADUAL RENCANA KEGIATAN
I Pekerjaan Persiapan
I Pengukuran dan pemasangan Bouwplank
Volume = P X L X asumsi
= 86.00 X 3.50 301.00
86.00
III Pekerjaan Tanah
a Urugan Pasir
Panjang = 86.00
0.05 Lebar = 3.50
Tinggi = 0.05
3.50
Volume = P X L X T
= 86.00 X 3.50 X 0.05 15.05
V Mengecor Beton Ready Mix mutu f'c=14,5 MPa (K175), slum (12±2) cm (A.4.1.1.5)
Panjang = 86.00
0.10 Lebar = 3.50
Tinggi = 0.10
3.50
Volume = P X L X T
= 86.00 X 3.50 X 0.10 30.10
VI Pemadatan Beton dengann penusuk besi beton Volume = P X L X T
= 86.00 X 3.50 X 0.10 30.10
VII Bongkar 1m2 bekisting secara biasa Volume = P X L
= 86.00 X 3.50 301.00
V B.28.cMenyirami 100 m² permukaan beton menggun Volume = P X L X T
= 86.00 X 3.50 / 100.00 3.01
Disiapkan Oleh :
Penanggungjawab Kegiat
( Sunarto )
VOLUME
: Jalan Rabat Beton
: 86 m x 3,5 m x 0,1 m
: Jl Anggrek I Rt 02 R
Volume
m'
m2
m3
m3
m3 5.02
m3
m2
m2
Disiapkan Oleh :
Penanggungjawab Kegiatan
( Sunarto )
RENCANA ANGGARAN BELANJA
Total Biaya Dana Desa dan Swadaya ( termasuk pajak PPN dan PPH ) Rp 4
Pembulatan Total Biaya Dana Desa dan Swadaya ( termasuk pajak PPN dan PPH ) Rp 43
Penanggungjawab K
( Sunarto )
[
Penanggu
x 0,1 m
Rt 02 Rw 04 Siberi
UMLAH BIAYA
DANA DESA
9=5X7
-
-
1,140,000.00
9,150,000.00
10,290,000.00 10,374,072.50 10,374,072.50
1,580,000.00
2,250,000.00
28,047,000.00
68,000.00
722,000.00
106,000.00
12,000.00
32,785,000.00 32,919,338.00 #REF!
32,919,338.00 43,293,411
-
-
75,000.00
24,000.00
99,000.00
100,000.00
250,000.00
162,000.00
15,000.00
30,000.00
25,000.00
150,000.00
732,000.00
43,906,000.00 43,293,410.50 20,748,150
Harga
43,906,000.00 1,458,671 m3
bangunan
- -
HARGA M3 HARGA M2
Disiapkan Oleh :
Penanggungjawab Kegiatan
[ ]
0
RENCANA ANGGARAN BIAYA
ANGGARAN SUMBER
KODE URAIAN
VOLUME HARGA JUMLAH DANA
2 BELANJA
2 Bidang Pelaksanaan Pembangunan
2.3 Sub Bidang Pekerjaan Umum dan Penataan Ruang
2.3.09 Rabat Beton Jl Anggrek I Rt 02 Rw 04 Siberi
Belanja Alat Tulis Kantor Rp 52,000.00 DDS
01. Kertas HVS 200 lembar Rp 200.00 Rp 40,000.00
02. Bolpoin 4 buah Rp 3,000.00 Rp 12,000.00
Jumlah Rp 43,500,000.00
0
0
RENCANA ANGGARAN BELANJA
VOLUME HARGA
Pembulata
No Uraian Satuan SATUAN
Total SWA Dana Desa n Volume ( Rp )
1 2 3 4 5 6 7
1 TENAGA KERJA
1 Mandor/kepala kelompok 17.70 17.70 HOK 0.00
2 Kepala Tukang 0.00 0.00 HOK 0.00
3 Tukang 12.62 12.62 15.00 HOK 95,000.00
4 Pekerja 122.34 0.00 122.34 130.00 HOK 75,000.00
Sub total tenaga kerja (1)
2. BAHAN
1 Kayu tahun(papan 2/20) 79.01 79.01 70.00 btg 20,000.00
2 Pasir Urug 18.06 18.06 16.00 m3 125,000.00
3 # Beton Ready Mix K 175 30.10 30.10 30.00 m3 934,900.00
4 Paku ( 2" - 5" ) 4.52 4.52 4.00 kg 17,000.00
5 Plastik 361.20 361.20 360.00 m2 2,000.00
6 Kayu 5/7 4.87 4.87 6.00 m2 26,500.00
Air 60.20 60.20 60.00 m2 200.00
Sub total Bahan (2)
2. ALAT
1 # Pompa Beton 0.00 Jam 250,000.00
2 Grobag sorong 0.00 bh 200,000.00
3 Ember 5 5.00 bh 15,000.00
4 Benang 5 5.00 bh 12,000.00
Sub total Alat kerja (3)
4 ADMINISTRASI
1 Papan nama proyek 1 1.00 bh 100,000.00
2 Prasasti 1 1.00 bh 250,000.00
3 ATK 1 1.00 ls 44,000.00
4 Meterai
Materai Rp 3.000 6 6.00 lembar 3,000.00
Materai Rp 6.000 8 8.00 lembar 6,000.00
5 Photo kegiatan 10 10.00 lbr 2,500.00
6 Pembuatan RAB DAN DESAI 1.00 1.00 lbr 150,000.00
Sub total Administrasi (4)
Jumlah Biaya ( termasuk pajak PPN dan PPH )
Total Biaya Dana Desa dan Swadaya ( termasuk pajak PPN dan PPH )
Pembulatan Total Biaya Dana Desa dan Swadaya ( termasuk pajak PPN dan PPH )
JA
JUMLAH BIAYA
8= 3 X 5 9=5X7
- -
-
- 1,425,000.00
- 9,750,000.00
- 11,175,000.00 10,374,073
-
- 1,400,000.00 1,580,000
- 2,000,000.00 2,250,000
- 28,047,000.00 28,047,000
- 68,000.00 68,000
- 720,000.00 722,000
- 159,000.00 106,000
- 12,000.00 12,000
- 32,406,000.00 32,919,338
-
- -
- -
- 75,000.00
- 60,000.00
- 135,000.00
- 100,000.00
- 250,000.00
- 44,000.00
- 18,000.00
- 48,000.00
- 25,000.00
- 150,000.00
- 635,000.00
- 44,351,000.00
Rp 44,351,000.00
Rp 44,351,000.00
Penanggungjawab Kegiatan
( SUTRISNO ) ( SUSILOWATI )
Pembangunan Desa
02 Rw 04 Siberi
anuari s/d Desember
m x 3,5 m x 0,1 m
DD
SWD
KET
SUMBER DANA DESA 44,077,468 44,351,000.00
DANA SWADAIA -
HOK 44,077,468 44,351,000 273,533
PEKERJA 122.3 0.00
TUKANG 12.6 0.0
DD & SWD
DD
591,000
200000
791,000
DD ATK 44,000.00
FOTOKOPI 50000
ADD
DD
DD
DD
SWADAYA
GAMBAR DESAIN
0.10 m
0.05 m PROVINSI
JAWA TENGAH
KABUPATEN
3.50 m A-A KENDAL
POT. MELINTANG JALAN
KECAMATAN
Sket/ Deletasi BOJA
DESA
Dibuat oleh :
Panjang Jalan :
86.00 M A A
A A
( ……………………………..…
Diverifikasi & Disetujui Ole
86.00 m
( ……………………………..…
( ……………………………..…
3.50 m 3.50 m
Dibuat oleh :
…………………………..…. )
erifikasi & Disetujui Oleh :
…………………………..…. )
DENAH JALAN BETON
…………………………..…. )
………………………….. )
Beton K 175
Kayu Tahun 2/20 Pasir urug
JALAN BETON
m
POT. MELINTA
Sket/
Deletasi 3.50
Beton K 1
Panjang Jalan :
86.00 M
A A
A A
86.00 m
Beton K 175
3.50 m m
3.50
Beton K 175
POT. MEMANJANG JALAN
Pasir urug
0.10 m PROVINSI
0.05 m JAWA TENGAH
KABUPATEN
Kendal
KECAMATAN
POT. MELINTANG JALAN A-A
Boja
DESA
Blimbing
LOKASI
Beton K 175 : Jl Anggrek I Rt 02 Rw 04 Siberi
Judul Gambar
Digambar oleh
( Sunarto )
Diverifikasi & Disetujui Oleh :
(……………………..)
Mengetahui
Kepala Desa
(……………………..)
Lembar…….Dari……….Lembar
0
DOKUMENTASI KEGIATAN PRASARANA
Desa
: Banjarejo
Jenis Prasana
Pembangunan
: Jalan Rabat Beton
Titik : 1
Kondisi 0%
Desa
: Banjarejo
Jenis Prasana
Pembangunan
: Jalan Rabat Beton
Titik : 2
Kondisi 0%
Desa
: Banjarejo
Jenis Prasana
Pembangunan
: Jalan Rabat
Beton
Titik : 3
Kondisi 0%
PETA LOKASI JALAN RABAT BETON
KABUPATEN
Kendal
KECAMATAN
Boja
U DESA
Pemakaman Umum
Blimbing
Lokasi Jalan Rabat Beton
LOKASI
: Jl Anggrek I Rt 02 Rw 04 Siberi
Judul Gambar
Digambar oleh
Sekolahan Dasar
Kantor Desa
( Sunarto )
Diverifikasi & Disetujui Oleh :
............Jalan
(……………………..)
Mengetahui
Kepala Desa
(……………………..)
Lembar…….Dari……….Lembar
A.Herliyanto
PETA LOKASI JALAN RABAT BETON
RABAT BETON
PROVINSI
JAWA TENGAH
U KABUPATEN
Kendal
KECAMATAN
Boja
DESA
Blimbing
LOKASI
: Jl Anggrek I Rt 02 Rw 04 Siberi
Judul Gambar
Digambar oleh
( Sunarto )
Diverifikasi & Disetujui Oleh :
(……………………..)
Mengetahui
Kepala Desa
(……………………..)
Lembar…….Dari……….Lembar
PROVINSI
AWA TENGAH
KABUPATEN
Kendal
KECAMATAN
Boja
DESA
Blimbing
LOKASI
ek I Rt 02 Rw 04 Siberi
udul Gambar
an Rabat Beton
igambar oleh
( Sunarto )
asi & Disetujui Oleh :
…………………..)
Mengetahui
Kepala Desa
…………………..)
….Dari……….Lembar
PROGRAM PEMBANGUNAN DAN
PEMBERDAYAAN MASYARAKAT DESA
( P3MD )
KABUPATEN : Kendal
KECAMATAN : Boja
DESA : Banjarejo
TAHUN
ANGGARAN
2018
DATA RENCANA KEGIATAN
(…………………………) (…………………………)
eton
m3
Jiwa
Kerjasama
Pihak
Ketiga
awab Kegiatan
………………)
RENCANA DAN REALISASI KEGIATAN
Rencana Kegiatan
Rincian
No. Satuan Harga Satuan Jumlah Biaya
Penggunaan Volume
(Rp) (Rp)
(1) (2) (3) (4) (5) (6)=(4)x(5)
1 Tenaga Kerja
1 Mandor/kepala kelom Hok
2 Kepala Tukang Hok
3 Tukang Hok 12.62 95,000.00 1,198,947.50
4 Pekerja Hok 122.34 75,000.00 9,175,125.00
Sub Total Tenaga Rp 10,374,072.50
2 Bahan/Material
1 Kayu tahun (papan 2 btg 79.01 20,000.00 1,580,250.00
2 Pasir Urug m3 18.06 125,000.00 2,257,500.00
4 # Beton Ready Mix m3 30.10 934,900.00 28,140,490.00
6 Paku ( 2" - 5" ) kg 4.52 17,000.00 76,755.00
10 Plastik m2 361.20 2,000.00 722,400.00
Pajak 0 0.00 32,785,000.00
Sub Total Bahan/ Material Rp 32,777,395.00
3 ALAT
13 # Pompa Beton - 0.00 250,000.00 -
13 Grobag sorong - 0.00 200,000.00 -
14 Ember 5 bh 15,000.00 #VALUE!
15 Benang 2 bh 12,000.00 #VALUE!
16 Err:509 Err:509 Err:509 Err:509 Err:509
17 Sub total alat (4) 0 0.00 732,000.00 -
Sub Total Alat #VALUE!
JUMLAH TOTAL (Rp) #VALUE!
Dibulatkan #VALUE!
………………………2017
SASI KEGIATAN
Realisasi Kegiatan
jumlah orang
39.00 95,000.00 3,705,000.00 3
130.00 75,000.00 9,750,000.00 10
Rp 13,455,000.00
1 colt
125.00 btg 20,000.00 2,500,000.00 1.25
9.00 colt 250,000.00 2,250,000.00 Truk
325.00 zak 65,000.00 21,125,000.00 14023.5
9.00 kg 14,000.00 126,000.00
730.00 m2 2,000.00 1,460,000.00
1.00 m2 5,000,000.00 5,000,000.00
Rp 27,461,000.00
harga per M3
250,000.00 200,000.00
harga per M3
920,876.50