Alat 1

Waktu Standby (menit)

Waktu Produktif (menit)

Waktu Repair (menit)

Waktu efektif (menit)

Effesiensi Kerja (%)


Perjalanan Ke Lokasi
Terlambat Awal Shift

Istirahat Lebih Awal

Pulang Lebih Awal


No Tanggal

1 9/2/2019 420 16.04 8.29 22.74 247.00 13.66 112.27 26.73


2 9/4/2019 420 25.83 9.21 26.55 100.89 26.08 231.43 55.10
3 9/6/2019 360 28.83 8.91 35.89 88.92 18.88 178.58 49.60
4 9/9/2019 420 25.44 9.41 21.99 150.66 11.63 200.87 47.83
5 9/11/2019 420 16.58 8.27 21.72 240.80 17.06 115.57 27.52
6 9/13/2019 360 27.39 10.54 18.83 114.53 22.15 166.56 46.27
7 9/16/2019 420 15.82 8.20 30.62 91.01 27.67 246.67 58.73
8 9/18/2019 420 20.91 10.37 18.54 149.16 21.11 199.92 47.60
9 9/20/2019 360 20.50 8.38 23.07 64.92 23.31 219.83 61.06
10 9/23/2019 420 26.17 8.62 25.40 166.37 11.16 182.28 43.40
11 9/25/2019 420 12.05 10.62 32.58 223.89 12.72 128.13 30.51
12 9/27/2019 360 26.27 8.99 36.55 198.74 16.97 72.48 20.13
Rata-Rata 21.82 9.15 26.21 153.07 18.53 171.22 42.87
Alat 2
Waktu Standby (menit)

Waktu Produktf (menit)

Waktu Repair (menit)

Waktu efektf (menit)


Perjalanan Ke Lokasi

Istirahat Lebih Awal


Terlambat Awal Shif

Efesiensi Kerja (%)


Pulang Lebih Awal
No Tanggal

1 9/2/2019 420 28.33 9.34 22.22 219.14 17.13 123.85 29.49


2 9/4/2019 420 25.80 8.32 27.40 95.01 20.24 243.24 57.91
3 9/6/2019 360 14.69 8.79 21.45 113.75 11.82 189.51 52.64
4 9/9/2019 420 21.78 10.48 19.74 153.47 14.04 200.50 47.74
5 ### 420 17.16 9.54 38.47 223.37 23.08 108.36 25.80
6 ### 360 28.86 9.49 24.79 110.23 19.08 167.55 46.54
7 ### 420 14.25 10.93 24.35 99.88 19.96 250.63 59.67
8 ### 420 16.83 8.14 16.69 161.88 16.84 199.61 47.53
9 ### 360 28.22 8.21 24.19 49.61 18.10 231.68 64.36
10 ### 420 24.40 9.90 37.92 147.52 15.90 184.37 43.90
11 ### 420 29.68 9.04 39.58 180.98 19.75 140.97 33.56
12 ### 360 20.82 10.66 32.72 171.60 23.18 101.01 28.06
Rata-Rata 22.57 9.40 27.46 143.87 18.26 178.44 44.77
Alat 3
Waktu Standby (menit)

Waktu Produktf (menit)

Waktu Repair (menit)

Waktu efektf (menit)


Perjalanan Ke Lokasi

Istirahat Lebih Awal


Terlambat Awal Shif

Efesiensi Kerja (%)


Pulang Lebih Awal
No Tanggal

1 9/2/2019 420 13.32 9.74 13.27 233.74 12.91 137.03 32.63


2 9/4/2019 420 23.64 10.31 11.53 95.09 20.67 258.76 61.61
3 9/6/2019 360 25.64 8.31 8.27 97.64 16.50 203.64 56.57
4 9/9/2019 420 15.45 9.01 14.25 158.13 18.92 204.25 48.63
5 ### 420 29.46 10.99 17.71 243.93 8.01 109.90 26.17
6 ### 360 29.05 8.16 15.97 127.98 12.76 166.08 46.13
7 ### 420 13.35 8.45 9.44 111.42 16.70 260.64 62.06
8 ### 420 21.22 8.89 15.66 159.88 10.91 203.44 48.44
9 ### 360 27.77 8.52 13.72 48.66 21.72 239.60 66.56
10 ### 420 16.06 9.66 14.83 185.01 13.92 180.52 42.98
11 ### 420 10.03 9.22 12.68 211.91 21.01 155.15 36.94
12 ### 360 9.93 10.06 14.92 208.57 12.48 104.05 28.90
Rata-Rata 19.58 9.28 13.52 156.83 15.54 185.26 46.47
Geometri

Loading Density (kg/m)


Bench Height (m)

Powder Column (m)


Jumlah Lubang

Hole Length (m)

Volume (BCM)
Stemming (m)
Spacing (m)
Burden (m)
No Tanggal Lokasi

1 9/3/2019 Level 658 37 7.31 1.65 1.61 2.74 1.17 1.65 269.41
2 9/5/2019 Level 665 77 4.55 1.62 1.65 2.76 1.15 1.61 570.07
3 9/7/2019 Level 665 57 3.69 1.70 1.68 2.81 1.18 1.63 459.04
4 ### Level 665 65 3.74 1.63 1.64 2.72 1.17 1.55 472.41
5 ### Level 665 31 3.42 1.67 1.62 2.76 1.19 1.56 231.08
6 ### Level 643 49 5.78 1.65 1.68 2.74 1.16 1.57 373.19
2.21
7 ### Level 643 78 5.84 1.68 1.71 2.75 1.16 1.59 616.69
8 ### Level 643 60 3.52 1.66 1.69 2.82 1.14 1.67 472.73
9 ### Level 670 75 6.94 1.77 1.74 2.76 1.21 1.56 637.78
10 ### Level 670 55 4.63 1.64 1.65 2.77 1.17 1.61 414.61
11 ### Level 670 40 6.12 1.63 1.64 2.71 1.15 1.56 289.23
12 ### Level 670 32 5.68 1.66 1.77 2.78 1.14 1.64 260.74
Rata-rata 5.10 1.66 1.68 2.76 1.17 1.60 2.21 422.25
i

Powder Factor (kg/BCM)


Berat Handak (Kg)
Tonase (Ton)

695.07 45 0.17
1470.78 110 0.19
1184.33 85 0.19
1218.81 65 0.14
596.19 30 0.13
962.83 65 0.17
1591.07 115 0.19
1219.64 75 0.16
1645.46 90 0.14
1069.70 65 0.16
746.22 43 0.15
672.71 35 0.13
1089.40 68.58 0.16