RAB Kanopi
RAB Kanopi
SKETSA PERHITUNGAN
Volume kanopi
V = 9.00 x 6.50
= 58.50 m2
6.50
9.00
Page 1 of 3
RENCANA ANGGARAN BIAYA
DESA PANDANMULYO KECAMATAN TAJINAN
TAHUN ANGGARAN 2019
Harga Satuan
No. Uraian Volume Satuan
(Rp)
1 2 3 4 5
I. Belanja Modal Honor Tim Pelaksana
1 Honor TPK 2 Orang 200,000
II. Belanja Modal Upah Tenaga Kerja
1 Pekerja 7 OH 75,000
2 Tukang 34 OH 90,000
III. Belanja Modal Bahan Baku
1 Besi Hollow 4 x 4 Zincromate 24 btg 40,000
2 Besi Hollow 2 x 4 Zincromate 8 btg 36,000
3 Kawat Las 1 pak 62,000
4 Atap spandek zincalum 64 m 50,000
5 Sekrup spandek 12 x 50 (250) pcs 2 dus 120,000
IV. Belanja Modal Sewa Peralatan
1 -
2 -
TOTAL BIAYA
........................... .............................
RENCANA ANGGARAN BIAYA
DESA PANDANMULYO KECAMATAN TAJINAN
TAHUN ANGGARAN 2019
Jumlah
(Rp)
6=5x3
400,000
400,000
3,585,000
525,000
3,060,000
4,750,000
960,000
288,000
62,000
3,200,000
240,000
0
-
-
8,735,000