NO URAIAN (Rp)
A BEBAN EKSPLORASI #REF!
D Pembangunan Infrastruktur
I Jalan
II Mess
III Jetty
IV Karyawan
V Kantor
VI Bengkel
VII BBM
TOTAL : #REF!
PERINCIAN BIAYA EKSPLORASI NIKEL REGIONAL
DESA RATA, KEC. TOILI BARAT, KAB. TOILI BARAT, PROPINSI SULAWESI T
VOLUME SATUAN
NO JENIS KEGIATAN PERSONIL & PERALATAN
KEGIATAN BIAYA (Rp)
PEMBORAN SINGLE TUBE
I PEMBORAN REGIONAL
1 Pemboran Nikel spasi 400x400 m 10 Unit 150.00 m 400,000
(h = 15 m)
2 TRANSPORT LAPANGAN
1 Transportasi antar titik jika >100m 10 titik 3,000 m 5,000
target jarak 300 m
3 TRANSPORTASI UNIT MESIN BOR
1 Kendari - Morowali (pp) 1 Unit 2 kali 7,500,000
Jumlah
NO URAIAN DETIL
I Perincian Pajak:
II Termin Pembayaran:
1 Pembayaran I
2 Pembayaran II
TOTAL
JUMLAH
KETERANGAN
BIAYA (Rp)
PEMBORAN SINGLE TUBE
2 Unit Mesin Bor & drill accessories
60,000,000 Pemboran Singe Tube NQ Size
Rata - rata 25 meter / hari
Estimasi kedalaman ± 25 m
15,000,000 Core Recovery > 90 %
90,000,000
88,200,000
97,200,000 Total tagihan setelah dikurangi PPh
99,000,000 Total Tagihan Tanpa dikurangi PPh
Rp 46,500,000
Rp 6,000,000
Rp 4,500,000
Rp 57,000,000
Rp 5,700,000
Rp 62,700,000 Tanpa dikurangi PPh 23 %
Rp 44,779,500
Rp 6,400,000
Rp 4,500,000
Rp 55,679,500
Rp 5,567,950
Rp 61,247,450 Tanpa dikurangi PPh 23 % seperti Invoice sebelumnya
L
Persentase Termin
51.52273089%
48.47726911%
Estimasi Biaya Eksplorasi Regional dan Detail (60 hari)
Vol.
No Kegiatan Sat.
Kegiatan
I Tenaga Kerja di Lapangan
1 Tim Lapangan
Team Leader 60 Hr
Geologis (2 orng x 500,000) 60 hr
geofisika (1 orang) 60 hr
Keuangan 2 bln
Driver (@ 300.000) 2 bln
2 Tenaga Harian Lepas (THL)
Lapangan: 3 orang x (@ Rp 150,000) 60 Hr org
Penjaga Camp: 2 orang 2 bln org
Pembantu: 2 orang (@ 2,500,000) 2 bln org
Kepala Desa: 1 orang 1 Org
Kepala Dusun: 2 orang x (@ Rp 250.000) 2 Org
II Perlengkapan Eksplorasi 1 Ls
III Jasa Pengerjaan
Laboratorium 600 smpl
IV Konsumsi : 10 Org (@1105,000) 60 Hr org
V Bahan Bakar
BBM (60 Hari x 20 ltr) 1200 ltr
VI Perawatan Kendaraan 1 Ls
VII Jasa Sewa
Mobil 60 Hr
Alat Ukur 1 paket (Kompas, Palu Geologi, GPS) 60 Hr
VIII PLN 2 bln
IX Transportasi Kendari - Lokasi Kerja (PP) 4 Org
X Biaya Sosial 1 Ls
0 hari)
700,000 42,000,000
1,000,000 60,000,000
500,000 30,000,000
2,000,000 4,000,000
3,000,000 6,000,000
450,000 27,000,000
5,000,000 10,000,000
5,000,000 10,000,000
1,000,000 1,000,000
500,000 1,000,000
1,000,000 1,000,000
450,000 270,000,000
1,050,000 63,000,000
9,000 10,800,000
4,000,000 4,000,000
1,500,000 90,000,000
500,000 30,000,000
500,000 1,000,000
1,000,000 4,000,000
2,500,000 2,500,000
TOTAL : 667,300,000
Estimasi Biaya Eksplorasi Regional dan Detail (2 bulan)
Vol. Harga Sat. Jumlah
No Kegiatan Sat.
Kegiatan (Rp) (Rp)
I Tenaga Kerja di Lapangan
1 Tim Lapangan
Team Leader 2 bln 700,000 42,000,000
Geologis (2 orng x 500,000) 1 bln 1,000,000 30,000,000
geofisika (1 orang) 1 bln 500,000 15,000,000
Keuangan 1 bln 2,000,000 60,000,000
Driver (@ 300.000) 2 bln 3,000,000 6,000,000
2 Tenaga Harian Lepas (THL)
Lapangan: 3 orang x (@ Rp 150,000) 45 hr org 150,000 6,750,000
Penjaga Camp: 2 orang 30 hr org 150,000 4,500,000
Penginapan (kontrak Rumah) 15 hr 5,000,000 75,000,000
Kepala Desa: 1 orang 1 Org 1,000,000 1,000,000
Kepala Dusun: 2 orang x (@ Rp 500.000) 3 Org 500,000 1,500,000
II Eksplorasi 1 Ls 1,000,000 1,000,000
Survey Geofisika 20 Lintasan 4,000,000 80,000,000
Pengeboran (10 Titik @ 15 m) 87 titik 8,500,000 739,500,000
III Jasa Pengerjaan
Laboratorium 200 smpl 500,000 100,000,000
IV Konsumsi : 10 Org x 2 bulan(@105,000) 600 Hr org 105,000 63,000,000
V Bahan Bakar
BBM ( 2 bulan x 20 ltr) 1200 ltr 14,000 16,800,000
VI Perawatan Kendaraan 1 paket 4,000,000 4,000,000
VII Jasa Sewa
Mobil 2 bln 1,500,000 90,000,000
Alat Ukur 1 paket (Kompas, Palu Geologi, 15 hr 500,000 7,500,000
GPS)
VIII PLN 15 hr 500,000 7,500,000
IX Transportasi Kendari - Lokasi Kerja (PP) 4 Org 1,000,000 4,000,000
X Biaya Sosial 1 Ls 2,500,000 2,500,000
TOTAL : 1,357,550,000