DAFTAR URAIAN PEKERJAAN

Pemilik : OLFI KRISTIN


Proyek : Bangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

NO. URAIAN PEKERJAAN


(1) (2)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
2 Pembuatan Bouwplank/Uitzet
II PEKERJAAN TANAH
1 Pek. Galian Tanah
2 Pek. Bor Strouss dia. 30 cm
3 Pek. Urugan Pasir Bawah Pondasi
4 Pek. Urugan Tanah Kembali
5 Pek. Urugan Sirtu
III PEKERJAAN PONDASI
1 Pek. Lantai Kerja Bawah Pondasi
2 Pek. Strouss dia. 30 cm
3 Pek. Pile Cap Type 1
4 Pek. Pile Cap Type 2
5 Pek. Aanstamping
6 Pek. Pondasi Batu Kali 1 Pp : 4 Ps
7 Pek. Rollag Bata

LANTAI 1

IV PEKERJAAN BETON
1 Pek. Beton Rabat tbl. 5 cm
2 Pek. Sloof 15/20
3 Pek. Kolom K1 25/25
4 Pek. Kolom KP 15/15
5 Pek. Balok B1 25/35
6 Pek. Balok B2 20/20
7 Pek. Balok B3 15/20
8 Pek. Tangga
V PEKERJAAN DINDING
1 Pek. Pasangan 1/2 Bata 1 Pc : 4 Pp
2 Pek. Pasangan 1/2 Bata 1 Pc : 2 Pp
3 Pek. Plesteran Dinding 1 Pc : 4 Ps
4 Pek. Plesteran Dinding 1 Pc : 2 Ps
5 Pek. Acian Dinding dan Beton
6 Pek. Pasang Batu Tempel Marmo
VI PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant
2 Pek. Profil List Palfond Kayu
3 Pek. Plafond Gypsum Board tbl. 9 mm
VII PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30
2 Pek. Lantai Keramik 20 x 20
3 Pek. Keramik Dinding Kamar Mandi 20 x 20
4 Pek. List Keramik Dinding Kamar Mandi
5 Pek. Paving Stone
VIII PEKERJAAN PINTU DAN JENDELA
1 Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/15
2 Pek. Pasang Pintu PVC
3 Pek. Pasang Daun Pintu Panil
4 Pek. Pasang Daun Jendela Kayu
5 Pek. Pasang Kaca 5 mm

IX PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pek. Pasangan Kunci Tanam Pintu
2 Pek. Pasangan Engsel Pintu
3 Pek. Pasangan Engsel Jendela
4 Pek. Pasangan Grendel Pintu
5 Pek. Pasangan Hak Angin
X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam
2 Pek. Pengecatan Dinding Luar
3 Pek. Pengecatan Plafond
4 Pek. Pengecatan List Plafond Kayu
5 Pek. Pengecatan Kusen Pintu & Jendela
6 Pek. Pengecatan Daun Pintu
XI PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Box Sekring
2 Pek. Pemasangan Titk Lampu
3 Pek. Pemasangan Stop Kontak
4 Pek. Pemasangan Saklar Tunggal
5 Pek. Pemasangan Saklar Ganda
XII PEKERJAAN SANITASI
1 Pek. Instalasi Air Bersih Pipa PVC 3/4 "
2 Pek. Instalasi Air Bekas Pipa PVC 2,5 "
3 Pek. Instalasi Air Kotor Pipa PVC 3 "
4 Pek. Kloset Duduk Porselen
5 Pek. Kloset Jongkok Porselen
6 Pek. Kran Air
7 Pek. Floor Drain
8 Pek. Bak Kontrol
XIII PEKERJAAN RAILLING
1 Pek. Pasang Railling Pagar Besi Hollow Fins Cat Besi
XIV PEKERJAAN ATAP
1 Pek. Pasangan Gording (8/12)
2 Pek. Pasangan Usuk dan Reng
3 Pek. Pasangan Lisplank (2/20)
4 Pek. Penutup Atap Genteng

LANTAI 2

I PEKERJAAN BETON
1 Pek. Plat Lantai tbl. 12 cm
2 Pek. Kolom K2 20/20
3 Pek. Kolom KP 15/15
4 Pek. Balok B1 25/35
5 Pek. Balok B3 15/20
6 Pek. Ring Gewel 15/15
II PEKERJAAN DINDING
1 Pek. Pasangan 1/2 bata 1 Pc : 4 Pp
2 Pek. Pasangan 1/2 bata 1 Pc : 2 Pp
3 Pek. Plesteran Dinding 1 Pc : 4 Ps
4 Pek. Plesteran Dinding 1 Pc : 2 Ps
5 Pek. Acian Dinding dan Beton
III PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant
2 Pek. Profil List Palfond Gypsum
3 Pek. Plafond Gypsum Board tbl. 9 mm
IV PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30
2 Pek. Lantai Keramik 20 x 20
3 Pek. Keramik Dinding Kamar Mandi 20 x 20
4 Pek. List Keramik Dinding Kamar Mandi
V PEKERJAAN PINTU DAN JENDELA
1 Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/15
2 Pek. Pasang Pintu PVC
3 Pek. Pasang Daun Pintu Panil
4 Pek. Pasang Daun Jendela Kayu
5 Pek. Pasang Kaca 5 mm
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pek. Pemasangan Kunci Tanam Pintu
2 Pek. Pemasangan Engsel Pintu
3 Pek. Pemasangan Engsel Jendela
4 Pasangan Grendel Pintu
5 Pasangan Hak Angin
VII PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam
2 Pek. Pengecatan Dinding Luar
3 Pek. Pengecatan Plafond
4 Pek. Pengecatan List Plafond Kayu
5 Pek. Pengecatan Kusen Pintu & Jendela
6 Pek. Pengecatan Daun Pintu
VIII PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Titk Lampu
2 Pek. Pemasangan Stop Kontak
3 Pek. Pemasangan Saklar Tunggal
4 Pek. Pemasangan Saklar Ganda
IX PEKERJAAN SANITASI
1 Pek. Instalasi Air Bersih Pipa PVC 3/4 "
2 Pek. Instalasi Air Bekas Pipa PVC 2,5 "
3 Pek. Instalasi Air Kotor Pipa PVC 3 "
4 Pek. Kloset Duduk Porselen
5 Pek. Kran Air
6 Pek. Floor Drain
X PEKERJAAN ATAP
1 Pek. Pasangan Kuda-kuda (8/12)
2 Pek. Pasangan Balok Tembok + Nok + Gording + Jurai (8/12)
3 Pek. Pasangan Usuk dan Reng
4 Pek. Pasangan Lisplank (2/20)
5 Pek. Penutup Atap Genteng
6 Pek. Pasangan Bubungan
DAFTAR HARGA SATUAN UPAH

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

NO TENAGA KERJA SATUAN HARGA SATUAN (Rp.)


(1) (2) (3) (4)
1 Pekerja O.H Rp 110,000
2 Tukang Batu O.H Rp 120,000
3 Tukang Kayu O.H Rp 120,000
4 Tukang Besi O.H Rp 120,000
5 Tukang Cat O.H Rp 120,000
6 Tukang Listrik O.H Rp 120,000
7 Tukang Pipa O.H Rp 120,000
8 Kepala Tukang O.H Rp 140,000
9 Mandor O.H Rp 150,000
DAFTAR HARGA SATUAN BAHAN

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

NO TENAGA KERJA SATUAN HARGA SATUAN (Rp.)


(1) (2) (3) (4)

Bahan Tanah dan Pasir


1 PP (Pasir Pasang) m3 Rp 170,000.00
2 PB (Pasir Beton) m3 Rp 260,000.00
3 Pasir Urug m3 Rp 68,000.00
4 Kerikil m3 Rp 260,000.00
5 Koral Beton m3 Rp 272,200.00
6 Sirtu m3 Rp 58,000.00
7 Air Liter Rp 110.00

Bahan Batu dan Bata


1 Bata Merah Uk. 4.5 x 11 x 22 Buah Rp 800.00
2 Batu Pecah Mesin 2/3 m3 Rp 184,000.00
3 Batu Belah 15/20 m3 Rp 130,000.00
4 Batu Alam Tempel Buah Rp 2,500.00

Bahan Semen
1 PC (Portland Cement) Kg Rp 1,476.00
2 Semen Portland 40 Kg Zak Rp 59,040.00
3 Semen Portland 50 Kg Zak Rp 73,800.00
4 Semen Warna Kg Rp 15,300.00

Bahan Besi dan Baja Alumunium


1 Plat Besi Strip Kg Rp 11,000.00
2 Besi Beton Polos Kg Rp 8,500.00
3 Besi Beton Ulir Kg Rp 9,000.00
4 Kawat Beton Kg Rp 26,000.00
5 Besi Hollow 40 x 40 x 2 mm m' Rp 20,000.00
6 Seng Gelombang (0,8 x 1,5) Lembar Rp 46,000.00
7 Pagar Besi Model BRC Unit Rp 396,700.00
8 Plat Besi/Baja 244x 122 Lonjor Rp 514,800.00

Bahan Paku, Skrup Mur Baut


1 Paku Biasa 2" - 5" Kg Rp 16,000.00
2 Paku Kg Rp 19,500.00
3 Paku Skrup Kg Rp 12,000.00
4 Skrup Buah Rp 250.00
5 Paku Triplek/Eternit Kg Rp 20,000.00
6 Paku Klem (No. 4) / Beton Doz Rp 22,000.00
7 Paku Reng/Usuk Kg Rp 14,800.00

Bahan Sanitasi
1 Kloset Jongkok Buah Rp 247,000.00
2 Kloset Duduk Buah Rp 368,000.00
3 Floor Drain Unit Rp 20,000.00
4 Wastafel Buah Rp 358,500.00
5 Kitchen Zink Buah Rp 575,000.00
6 Kran Air Buah Rp 56,000.00
7 Rol TBA Roll Rp 9,000.00
8 Septctank Unit Rp 6,000,000.00
9 Pipa PVC 3/4" panjang 4 m Batang Rp 28,900.00
10 Pipa PVC 4" panjang 4 m Batang Rp 163,000.00
11 Pipa PVC 3" panjang 4 m Batang Rp 97,500.00

Bahan Cat dan Minyak


1 Cat Meni Besi Kg Rp 23,000.00
2 Cat Tembok Dalam Kg Rp 87,000.00
3 Cat Tembok Luar Kg Rp 87,000.00
4 Dempul Tembok (Cat Dasar) Kg Rp 8,000.00
5 Cat Meni Kayu Kg Rp 20,000.00
6 Plamir Kg Rp 47,000.00
7 Cat Kayu Kg Rp 55,000.00
8 Cat Penutup Kg Rp 75,000.00
9 Amplas Lembar Rp 5,500.00
10 Clear Gloss Kg Rp 80,000.00
11 Kuas Buah Rp 10,000.00
12 Minyak Bekistng Liter Rp 30,100.00

Bahan Kayu, Papan dan Triplek


1 Kayu Merant Bekistng m3 Rp 3,350,400.00
2 Kayu Merant (Papan 2/20) m3 Rp 5,000,000.00
3 Kayu Merant (Usuk 5/7) m3 Rp 4,500,000.00
4 Kayu MC Kelas III m3 Rp 4,100,000.00
5 Dolken Kayu Gelam dia. 8-10 cm 4m Batang Rp 39,000.00
6 Balok Kayu Kelas II m3 Rp 4,000,000.00
7 Kayu Kamper 6/12, 6/15 m3 Rp 7,300,000.00
8 Kayu Kamper Papan 2/20, 4/10 m3 Rp 9,445,000.00
9 Plywood tebal 9 mm Lembar Rp 120,000.00
10 Lapis Triplek 0,4 cm Lembar Rp 53,000.00
11 List Kayu m' Rp 8,500.00
12 Lem Kg Rp 91,400.00
13 Pintu PVC Buah Rp 220,000.00

Bahan Penutup Lantai


1 Keramik 30 x 30 m2 Rp 79,500.00
2 Keramik 20 x 20 m2 Rp 52,500.00
3 Plint Keramik 10 x 20 m2 Rp 42,500.00
4 Paving tebal 8 cm m2 Rp 8,900.00

Bahan Penutup Plafond dan Atap


1 Plafond Asbes Lembar Rp 53,200.00
2 Gypsum tebal 9 mm Lembar Rp 63,000.00
3 Tepung Gypsum Kg Rp 2,800.00
4 Genteng Karang Pilang Buah Rp 4,500.00
5 Genteng Wuwung Karang Pilang Buah Rp 13,500.00

Bahan Kunci dan Kaca


1 Kaca Polos 3 mm m2 Rp 75,000.00
2 Kaca Polos 5 mm m2 Rp 165,000.00
3 Kunci Tanam YALE Buah Rp 125,000.00
4 Grendel Jendela Biasa Buah Rp 17,500.00
5 Engsel Pintu Stel Rp 37,000.00
6 Engsel Jendela Stel Rp 29,500.00
7 Hak Angin Sikuan Biasa Buah Rp 15,000.00
8 Sikutan Lurus Jendela Buah Rp 19,000.00

Bahan Instalasi Listrik


1 MCB 900 watt PLN Buah Rp 3,339,600.00
2 Stop Kontak Broco Unit Rp 20,000.00
3 Kabel NYA 500 Volt 2 x 2,5 mm2 m' Rp 14,600.00
4 Pipa Pralon 5/8 Batang Rp 7,000.00
5 Pipa Listrik 5/8 Batang Rp 15,000.00
6 T Doos PVC Buah Rp 5,000.00
7 L Bow Buah Rp 5,000.00
8 Isolator Unit Rp 35,000.00
9 Fitting Plafond Buah Rp 150,000.00
10 Saklar Tunggal Broco Buah Rp 29,500.00
11 Saklar Ganda Broco Buah Rp 36,000.00
12 Klem Buah Rp 1,000.00

Sewa Alat
1 Sewa Alat Bantu Strouss Pile Jam Rp 11,000.00
2 Sewa Stemper Jam Rp 113,700.00
ANALISA HARGA SATUAN PEKERJAAN

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

I PEKERJAAN PERSIAPAN

Jenis Pekerjaan : Pembersihan Lapangan dan Pemerataan Tanah Per 1 m2 (HSPK 2018)
Satuan : m2
Harga Satuan : Rp 20,533.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0504 O.H Rp 150,000.00 Rp 7,561.23
2 Pekerja 0.1010 O.H Rp 110,000.00 Rp 11,105.90
Sub Total Upah Rp 18,667.13
B. Bahan
1-
2-
Sub Total Bahan
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 18,667.13
E. Overhead + Profit (10% + D) Rp 1,866.71
F. Harga Satuan Pekerjaan (D + E) Rp 20,533.85
Dibulatkan Rp 20,533.00

Jenis Pekerjaan : Pengukuran dan Pemasangan 1 m' Bouwplank (UITZET) (HSPK 2018)
Satuan : m'
Harga Satuan : Rp 126,226.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0101 O.H Rp 150,000.00 Rp 1,512.25
2 Kepala Tukang Kayu 0.0050 O.H Rp 140,000.00 Rp 705.71
3 Tukang Kayu 0.1009 O.H Rp 120,000.00 Rp 12,107.38
4 Pekerja 0.1010 O.H Rp 110,000.00 Rp 11,105.90
Sub Total Upah Rp 25,431.25
B. Bahan
1 Paku Biasa 2 - inchi 0.0200 Doz Rp 16,000.00 Rp 320.00
2 Kayu Merant Papan 2/20, 4/10 0.0070 m3 Rp 5,000,000.00 Rp 35,000.00
3 Kayu Merant Usuk 4/6, 5/7 0.0120 m3 Rp 4,500,000.00 Rp 54,000.00
Sub Total Bahan Rp 89,320.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 114,751.25
E. Overhead + Profit (10% + D) Rp 11,475.12
F. Harga Satuan Pekerjaan (D + E) Rp 126,226.37
Dibulatkan Rp 126,226.00

II PEKERJAAN TANAH

Jenis Pekerjaan : Penggalian 1 m3 Tanah Biasa untuk Konstruksi (HSPK 2018)


Satuan : m3
Harga Satuan : Rp 95,782.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0252 O.H Rp 150,000.00 Rp 3,780.61
2 Pekerja 0.7572 O.H Rp 110,000.00 Rp 83,294.28
Sub Total Upah Rp 87,074.89
B. Bahan
1-
2-
Sub Total Bahan
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 87,074.89
E. Overhead + Profit (10% + D) Rp 8,707.49
F. Harga Satuan Pekerjaan (D + E) Rp 95,782.38
Dibulatkan Rp 95,782.00

Jenis Pekerjaan : Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m (HSPK 2018)
Satuan : Titk
Harga Satuan : Rp 202,420.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0726 O.H Rp 150,000.00 Rp 10,890.00
2 Pekerja 1.4539 O.H Rp 110,000.00 Rp 159,929.00
Sub Total Upah Rp 170,819.00
B. Bahan
1-
2-
Sub Total Bahan
C. Peralatan
1 Sewa Alat Bantu Strouss Pile 1.2000 Jam Rp 11,000.00 Rp 13,200.00
2-
Sub Total Peralatan Rp 13,200.00
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 184,019.00
E. Overhead + Profit (10% + D) Rp 18,401.90
F. Harga Satuan Pekerjaan (D + E) Rp 202,420.90
Dibulatkan Rp 202,420.00

Jenis Pekerjaan : Pengurugan 1 m3 Pasir (PADAT) (HSPK 2018)


Satuan : m3
Harga Satuan : Rp 128,072.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0101 O.H Rp 150,000.00 Rp 1,512.25
2 Pekerja 0.3029 O.H Rp 110,000.00 Rp 33,317.71
Sub Total Upah Rp 34,829.96
B. Bahan
1 Pasir Urug 1.2000 m3 Rp 68,000.00 Rp 81,600.00
2-
Sub Total Bahan Rp 81,600.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 116,429.96
E. Overhead + Profit (10% + D) Rp 11,643.00
F. Harga Satuan Pekerjaan (D + E) Rp 128,072.95
Dibulatkan Rp 128,072.00

Jenis Pekerjaan : Pengurugan 1 m3 Tanah Kembali untuk Konstruksi (HSPK 2018)


Satuan : m3
Harga Satuan : Rp 69,399.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0504 O.H Rp 150,000.00 Rp 7,561.23
2 Pekerja 0.5048 O.H Rp 110,000.00 Rp 55,529.52
Sub Total Upah Rp 63,090.75
B. Bahan
1-
2-
Sub Total Bahan
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 63,090.75
E. Overhead + Profit (10% + D) Rp 6,309.07
F. Harga Satuan Pekerjaan (D + E) Rp 69,399.82
Dibulatkan Rp 69,399.00

Jenis Pekerjaan : Pengurugan 1 m3 Sirtu (PADAT) (HSPK 2018)


Satuan : m3
Harga Satuan : Rp 112,360.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0252 O.H Rp 150,000.00 Rp 3,780.61
2 Pekerja 0.2524 O.H Rp 110,000.00 Rp 27,764.76
Sub Total Upah Rp 31,545.37
B. Bahan
1 Sirtu 1.2000 m3 Rp 58,000.00 Rp 69,600.00
2-
Sub Total Bahan Rp 69,600.00
C. Peralatan
1 Sewa Stemper 0.0088 Jam Rp 113,700.00 Rp 1,000.56
2-
Sub Total Peralatan Rp 1,000.56
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 102,145.93
E. Overhead + Profit (10% + D) Rp 10,214.59
F. Harga Satuan Pekerjaan (D + E) Rp 112,360.53
Dibulatkan Rp 112,360.00

III PEKERJAAN PONDASI

Jenis Pekerjaan : Pembuatan 1 m3 Lantai Kerja (bedding) (Permen PUPR 2016)


Satuan : m3
Harga Satuan : Rp 934,472.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.1320 O.H Rp 150,000.00 Rp 19,800.00
2 Kepala Tukang Batu 0.0220 O.H Rp 140,000.00 Rp 3,080.00
3 Tukang Batu 0.2200 O.H Rp 120,000.00 Rp 26,400.00
4 Pekerja 1.3200 O.H Rp 110,000.00 Rp 145,200.00
Sub Total Upah Rp 194,480.00
B. Bahan
1 PC/Portland Cement 200.00 Kg Rp 1,476.00 Rp 295,200.00
2 PB / Pasir Beton 0.5220 m3 Rp 260,000.00 Rp 135,720.00
3 Kr / Krikil 0.8620 m3 Rp 260,000.00 Rp 224,120.00
Sub Total Bahan Rp 655,040.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 849,520.00
E. Overhead + Profit (10% + D) Rp 84,952.00
F. Harga Satuan Pekerjaan (D + E) Rp 934,472.00
Dibulatkan Rp 934,472.00

Jenis Pekerjaan : Pemasangan 1 m3 Batu Kali Belah Kosongan (aanstamping) (HSPK 2018)
Satuan : m3
Harga Satuan : Rp 363,679.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0393 O.H Rp 150,000.00 Rp 5,895.00
2 Kepala Tukang Batu 0.0393 O.H Rp 140,000.00 Rp 5,502.00
3 Tukang Batu 0.3935 O.H Rp 120,000.00 Rp 47,220.00
4 Pekerja 0.7875 O.H Rp 110,000.00 Rp 86,625.00
Sub Total Upah Rp 145,242.00
B. Bahan
1 Pasir Urug 0.4320 m3 Rp 68,000.00 Rp 29,376.00
2 Batu Kali Belah 15/20 cm 1.2000 m3 Rp 130,000.00 Rp 156,000.00
Sub Total Bahan Rp 185,376.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 330,618.00
E. Overhead + Profit (10% + D) Rp 33,061.80
F. Harga Satuan Pekerjaan (D + E) Rp 363,679.80
Dibulatkan Rp 363,679.00

Jenis Pekerjaan : Pekerjaan Pasangan 1 m3 Batu Kali Belah 15/20 cm (1 Pc : 5 Ps) (HSPK 2018)
Satuan : m3
Harga Satuan : Rp 626,523.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0756 O.H Rp 150,000.00 Rp 11,340.00
2 Kepala Tukang Batu 0.0756 O.H Rp 140,000.00 Rp 10,584.00
3 Tukang Batu 0.7567 O.H Rp 120,000.00 Rp 90,804.00
4 Pekerja 1.5144 O.H Rp 110,000.00 Rp 166,584.00
Sub Total Upah Rp 279,312.00
B. Bahan
1 Semen PC 50 kg 0.4320 m3 Rp 396,700.00 Rp 171,374.40
2 Pasir Pasang 0.5440 m3 Rp 170,000.00 Rp 92,480.00
3 Batu Kali Belah 15/20 cm 1.2000 m3 Rp 22,000.00 Rp 26,400.00
Sub Total Bahan Rp 290,254.40
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 569,566.40
E. Overhead + Profit (10% + D) Rp 56,956.64
F. Harga Satuan Pekerjaan (D + E) Rp 626,523.04
Dibulatkan Rp 626,523.00

Jenis Pekerjaan : Pemasangan 1 m2 Pondasi Rollag Bata (Permen PUPR 2016) ( Modifikasi)
Satuan : m2
Harga Satuan : Rp 259,270.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.6000 O.H Rp 150,000.00 Rp 90,000.00
2 Kepala Tukang Batu 0.2000 O.H Rp 140,000.00 Rp 28,000.00
3 Tukang Batu 0.0200 O.H Rp 120,000.00 Rp 2,400.00
4 Pekerja 0.0300 O.H Rp 110,000.00 Rp 3,300.00
Sub Total Upah Rp 123,700.00
B. Bahan
1 Bata Merah 140.000 m3 Rp 800.00 Rp 112,000.00
Sub Total Bahan Rp 112,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 235,700.00
E. Overhead + Profit (10% + D) Rp 23,570.00
F. Harga Satuan Pekerjaan (D + E) Rp 259,270.00
Dibulatkan Rp 259,270.00

IV PEKERJAAN BETON

Jenis Pekerjaan : Pekerjaan 1 m3 Beton K-225 (HSPK 2018)


Satuan : m3
Harga Satuan : Rp 1,107,525.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0282 O.H Rp 150,000.00 Rp 4,234.29
2 Tukang Batu 0.2775 O.H Rp 120,000.00 Rp 33,295.31
5 Pekerja 1.6659 O.H Rp 110,000.00 Rp 183,247.41
Sub Total Upah Rp 220,777.00
B. Bahan
1 Semen PC 40 Kg 9.2750 Zak Rp 59,040.00 Rp 547,596.00
2 Pasir Cor 0.4363 m3 Rp 260,000.00 Rp 113,425.00
3 Batu Pecah Mesin 1/2 cm 0.5511 m3 Rp 184,000.00 Rp 101,393.68
4 Biaya Air 215.00 Liter Rp 110.00 Rp 23,650.00
Sub Total Bahan Rp 786,064.68
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 1,006,841.68
E. Overhead + Profit (10% + D) Rp 100,684.17
F. Harga Satuan Pekerjaan (D + E) Rp 1,107,525.85
Dibulatkan Rp 1,107,525.00

Jenis Pekerjaan : Pekerjaan Pembesian 1 kg dengan Besi Polos (HSPK 2018)


Satuan : kg
Harga Satuan : Rp 25,350.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0807 O.H Rp 150,000.00 Rp 12,105.86
2 Tukang Besi 0.0071 O.H Rp 120,000.00 Rp 847.51
5 Pekerja 0.0071 O.H Rp 110,000.00 Rp 777.41
Sub Total Upah Rp 13,730.78
B. Bahan
1 Besi Beton Polos 1.0500 kg Rp 8,500.00 Rp 8,925.00
2 Kawat Beton 0.0150 kg Rp 26,000.00 Rp 390.00
Sub Total Bahan Rp 9,315.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 23,045.78
E. Overhead + Profit (10% + D) Rp 2,304.58
F. Harga Satuan Pekerjaan (D + E) Rp 25,350.36
Dibulatkan Rp 25,350.00

Jenis Pekerjaan : Pekerjaan Pembesian 1 kg dengan Besi Ulir (HSPK 2018)


Satuan : kg
Harga Satuan : Rp 25,975.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0807 O.H Rp 150,000.00 Rp 12,105.86
2 Tukang Besi 0.0071 O.H Rp 120,000.00 Rp 847.51
5 Pekerja 0.0071 O.H Rp 110,000.00 Rp 777.41
Sub Total Upah Rp 13,730.78
B. Bahan
1 Besi Beton Ulir 1.0500 kg Rp 9,000.00 Rp 9,450.00
2 Kawat Beton 0.0150 m3 Rp 28,900.00 Rp 433.50
Sub Total Bahan Rp 9,883.50
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 23,614.28
E. Overhead + Profit (10% + D) Rp 2,361.43
F. Harga Satuan Pekerjaan (D + E) Rp 25,975.71
Dibulatkan Rp 25,975.00

Jenis Pekerjaan : Pekerjaan 1 m2 Bekistng Pondasi (SNI 2008)


Satuan : m2
Harga Satuan : Rp 145,480.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0100 O.H Rp 150,000.00 Rp 1,500.00
2 Kepala Tukang 0.0200 O.H Rp 140,000.00 Rp 2,800.00
3 Tukang Kayu 0.2600 O.H Rp 120,000.00 Rp 31,200.00
4 Pekerja 0.5200 O.H Rp 110,000.00 Rp 57,200.00
Sub Total Upah Rp 92,700.00
B. Bahan
1 Kayu Kelas III 0.0400 m3 Rp 4,100,000.00 Rp 164,000.00
2 Paku 5 cm - 10 cm 0.3000 Kg Rp 16,000.00 Rp 4,800.00
3 Minyak Bekistng 0.1000 Liter Rp 30,100.00 Rp 3,010.00
Sub Total Bahan Rp 171,810.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 264,510.00
E. Overhead + Profit (10% + D) Rp 26,451.00
F. Harga Satuan Pekerjaan (D + E) Rp 290,961.00
Untuk 2 Kali Pemakaian Rp 145,480.50
Dibulatkan Rp 145,480.00

Jenis Pekerjaan : Pekerjaan 1 m2 Bekistng Sloof (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 158,885.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.2641 O.H Rp 150,000.00 Rp 39,620.84
3 Tukang Kayu 0.2775 O.H Rp 120,000.00 Rp 33,294.11
5 Pekerja 0.5250 O.H Rp 110,000.00 Rp 57,750.69
Sub Total Upah Rp 130,665.64
B. Bahan
1 Paku Usuk 0.3000 Kg Rp 14,800.00 Rp 4,440.00
2 Kayu Merant Bekistng 0.0450 m3 Rp 3,350,400.00 Rp 150,768.00
3 Minyak Bekistng 0.1000 Liter Rp 30,100.00 Rp 3,010.00
Sub Total Bahan Rp 158,218.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 288,883.64
E. Overhead + Profit (10% + D) Rp 28,888.36
F. Harga Satuan Pekerjaan (D + E) Rp 317,772.00
Untuk 2 Kali Pemakaian Rp 158,886.00
Dibulatkan Rp 158,885.00

Jenis Pekerjaan : Pekerjaan 1 m2 Bekistng Kolom (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 201,420.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0333 O.H Rp 150,000.00 Rp 4,990.41
3 Tukang Kayu 0.3330 O.H Rp 120,000.00 Rp 39,954.37
5 Pekerja 0.6664 O.H Rp 110,000.00 Rp 73,298.96
Sub Total Upah Rp 118,243.74
B. Bahan
1 Paku Usuk 0.3000 Kg Rp 14,800.00 Rp 4,440.00
2 Plywood Uk. 122 244 x 9 mm 0.3500 Lembar Rp 120,000.00 Rp 42,000.00
3 Kayu Merant Bekistng 0.0400 m3 Rp 3,350,400.00 Rp 134,016.00
4 Kayu Merant Balok 4/6, 5/7 0.0150 m3 Rp 4,100,000.00 Rp 61,500.00
5 Minyak Bekistng 0.2000 Liter Rp 30,100.00 Rp 6,020.00
Sub Total Bahan Rp 247,976.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 366,219.74
E. Overhead + Profit (10% + D) Rp 36,621.97
F. Harga Satuan Pekerjaan (D + E) Rp 402,841.72
Untuk 2 Kali Pemakaian Rp 201,420.86
Dibulatkan Rp 201,420.00

Jenis Pekerjaan : Pekerjaan 1 m2 Bekistng Balok (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 208,999.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0333 O.H Rp 150,000.00 Rp 4,990.41
3 Tukang Kayu 0.3330 O.H Rp 120,000.00 Rp 39,954.37
5 Pekerja 0.6664 O.H Rp 110,000.00 Rp 73,298.96
Sub Total Upah Rp 118,243.74
B. Bahan
1 Paku Usuk 0.4000 Kg Rp 14,800.00 Rp 5,920.00
2 Plywood Uk. 122 244 x 9 mm 0.3500 Lembar Rp 120,000.00 Rp 42,000.00
3 Kayu Merant Bekistng 0.0400 m3 Rp 3,350,400.00 Rp 134,016.00
4 Kayu Merant Balok 4/6, 5/7 0.0180 m3 Rp 4,100,000.00 Rp 73,800.00
5 Minyak Bekistng 0.2000 Liter Rp 30,100.00 Rp 6,020.00
Sub Total Bahan Rp 261,756.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 379,999.74
E. Overhead + Profit (10% + D) Rp 37,999.97
F. Harga Satuan Pekerjaan (D + E) Rp 417,999.72
Untuk 2 Kali Pemakaian Rp 208,999.86
Dibulatkan Rp 208,999.00

Jenis Pekerjaan : Pekerjaan 1 m2 Bekistng Lantai (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 202,234.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0333 O.H Rp 150,000.00 Rp 4,990.41
3 Tukang Kayu 0.3330 O.H Rp 120,000.00 Rp 39,954.37
5 Pekerja 0.6664 O.H Rp 110,000.00 Rp 73,298.96
Sub Total Upah Rp 118,243.74
B. Bahan
1 Paku Usuk 0.4000 Kg Rp 14,800.00 Rp 5,920.00
2 Plywood Uk. 122 244 x 9 mm 0.3500 Lembar Rp 120,000.00 Rp 42,000.00
3 Kayu Merant Bekistng 0.0400 m3 Rp 3,350,400.00 Rp 134,016.00
4 Kayu Merant Balok 4/6, 5/7 0.0150 m3 Rp 4,100,000.00 Rp 61,500.00
5 Minyak Bekistng 0.2000 Liter Rp 30,100.00 Rp 6,020.00
Sub Total Bahan Rp 249,456.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 367,699.74
E. Overhead + Profit (10% + D) Rp 36,769.97
F. Harga Satuan Pekerjaan (D + E) Rp 404,469.72
Untuk 2 Kali Pemakaian Rp 202,234.86
Dibulatkan Rp 202,234.00

Jenis Pekerjaan : Pekerjaan 1 m2 Bekistng Dinding (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 195,082.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0333 O.H Rp 150,000.00 Rp 4,990.41
3 Tukang Kayu 0.3330 O.H Rp 120,000.00 Rp 39,954.37
5 Pekerja 0.6664 O.H Rp 110,000.00 Rp 73,298.96
Sub Total Upah Rp 118,243.74
B. Bahan
1 Paku Usuk 0.4000 Kg Rp 14,800.00 Rp 5,920.00
2 Plywood Uk. 122 244 x 9 mm 0.3500 Lembar Rp 120,000.00 Rp 42,000.00
3 Kayu Merant Bekistng 0.0300 m3 Rp 3,350,400.00 Rp 100,512.00
4 Kayu Merant Balok 4/6, 5/7 0.0200 m3 Rp 4,100,000.00 Rp 82,000.00
5 Minyak Bekistng 0.2000 Liter Rp 30,100.00 Rp 6,020.00
Sub Total Bahan Rp 236,452.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 354,695.74
E. Overhead + Profit (10% + D) Rp 35,469.57
F. Harga Satuan Pekerjaan (D + E) Rp 390,165.32
Untuk 2 Kali Pemakaian Rp 195,082.66
Dibulatkan Rp 195,082.00

Jenis Pekerjaan : Pekerjaan1 m2 Bekistng Tangga (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 182,979.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0333 O.H Rp 150,000.00 Rp 4,990.41
3 Tukang Kayu 0.3330 O.H Rp 120,000.00 Rp 39,954.37
5 Pekerja 0.6664 O.H Rp 110,000.00 Rp 73,298.96
Sub Total Upah Rp 118,243.74
B. Bahan
1 Paku Usuk 0.4000 Kg Rp 14,800.00 Rp 5,920.00
2 Plywood Uk. 122 244 x 9 mm 0.3500 Lembar Rp 120,000.00 Rp 42,000.00
3 Kayu Merant Bekistng 0.0300 m3 Rp 3,350,400.00 Rp 100,512.00
4 Kayu Merant Balok 4/6, 5/7 0.0150 m3 Rp 4,100,000.00 Rp 61,500.00
5 Minyak Bekistng 0.1500 Liter Rp 30,100.00 Rp 4,515.00
Sub Total Bahan Rp 214,447.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 332,690.74
E. Overhead + Profit (10% + D) Rp 33,269.07
F. Harga Satuan Pekerjaan (D + E) Rp 365,959.82
Untuk 2 Kali Pemakaian Rp 182,979.91
Dibulatkan Rp 182,979.00

IV.a PEKERJAAN BETON MODIFIKASI

Jenis Pekerjaan : Pek. Strouss dia. 30 cm


Satuan : m3
Harga Satuan : Rp 5,875,618.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 36.8256 kg Rp 25,350.00 Rp 933,528.96
3 Pekerjaan Pembesian Ulir 127.0613 kg Rp 25,975.00 Rp 3,300,417.38
Sub Total Rp 5,341,471.34
D. Overhead + Profit (10% + D) Rp 534,147.13
E. Harga Satuan Pekerjaan (D + E) Rp 5,875,618.48
Dibulatkan Rp 5,875,618.00

Jenis Pekerjaan : Pek. Pile Cap Type 1


Satuan : m3
Harga Satuan : Rp 6,938,714.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Ulir 106.1148 kg Rp 25,975.00 Rp 2,756,333.11
3 Pekerjaan Bekistng 16.8000 kg Rp 145,480.00 Rp 2,444,064.00
Sub Total Rp 6,307,922.11
D. Overhead + Profit (10% + D) Rp 630,792.21
E. Harga Satuan Pekerjaan (D + E) Rp 6,938,714.32
Dibulatkan Rp 6,938,714.00

Jenis Pekerjaan : Pek. Pile Cap Type 2


Satuan : m3
Harga Satuan : Rp 5,620,161.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Ulir 107.0137 kg Rp 25,975.00 Rp 2,779,680.61
3 Pekerjaan Bekistng 8.4000 m3 Rp 145,480.00 Rp 1,222,032.00
Sub Total Rp 5,109,237.61
D. Overhead + Profit (10% + D) Rp 510,923.76
E. Harga Satuan Pekerjaan (D + E) Rp 5,620,161.37
Dibulatkan Rp 5,620,161.00

Jenis Pekerjaan : Pek. Sloof 15/20


Satuan : m3
Harga Satuan : Rp 12,658,840.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 43.7962 kg Rp 25,975.00 Rp 1,137,605.26
3 Pekerjaan Pembesian Ulir 121.7218 kg Rp 25,975.00 Rp 3,161,722.72
4 Pekerjaan Bekistng 38.4000 m2 Rp 158,885.00 Rp 6,101,184.00
Sub Total Rp 11,508,036.97
D. Overhead + Profit (10% + D) Rp 1,150,803.70
E. Harga Satuan Pekerjaan (D + E) Rp 12,658,840.67
Dibulatkan Rp 12,658,840.00

Jenis Pekerjaan : Pek. Kolom K1 25/25


Satuan : m3
Harga Satuan : Rp 9,292,784.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 11.7571 kg Rp 25,350.00 Rp 298,042.25
3 Pekerjaan Pembesian Ulir 229.2493 kg Rp 25,975.00 Rp 5,954,750.49
4 Pekerjaan Bekistng 5.4000 m2 Rp 201,420.00 Rp 1,087,668.00
Sub Total Rp 8,447,985.75
D. Overhead + Profit (10% + D) Rp 844,798.57
E. Harga Satuan Pekerjaan (D + E) Rp 9,292,784.32
Dibulatkan Rp 9,292,784.00

Jenis Pekerjaan : Pek. Kolom KP 15/15


Satuan : m3
Harga Satuan : Rp 5,674,095.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 134.0490 kg Rp 25,350.00 Rp 3,398,142.91
3 Pekerjaan Bekistng 3.2400 m2 Rp 201,420.00 Rp 652,600.80
Sub Total Rp 5,158,268.71
D. Overhead + Profit (10% + D) Rp 515,826.87
E. Harga Satuan Pekerjaan (D + E) Rp 5,674,095.58
Dibulatkan Rp 5,674,095.00
Jenis Pekerjaan : Pek. Balok B1 25/35
Satuan : m3
Harga Satuan : Rp 16,776,373.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 8.0239 kg Rp 25,350.00 Rp 203,405.23
3 Pekerjaan Pembesian Ulir 26.8372 kg Rp 25,975.00 Rp 697,096.98
4 Pekerjaan Bekistng 63.3650 m2 Rp 208,999.00 Rp 13,243,221.64
Sub Total Rp 15,251,248.85
D. Overhead + Profit (10% + D) Rp 1,525,124.88
E. Harga Satuan Pekerjaan (D + E) Rp 16,776,373.73
Dibulatkan Rp 16,776,373.00

Jenis Pekerjaan : Pek. Balok B2 20/20


Satuan : m3
Harga Satuan : Rp 14,782,795.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 43.3733 kg Rp 25,350.00 Rp 1,099,514.33
3 Pekerjaan Pembesian Ulir 246.3230 kg Rp 25,975.00 Rp 6,398,241.01
4 Pekerjaan Bekistng 23.1275 m2 Rp 208,999.00 Rp 4,833,624.37
Sub Total Rp 13,438,904.71
D. Overhead + Profit (10% + D) Rp 1,343,890.47
E. Harga Satuan Pekerjaan (D + E) Rp 14,782,795.18
Dibulatkan Rp 14,782,795.00

Jenis Pekerjaan : Pek. Tangga


Satuan : m3
Harga Satuan : Rp 6,865,671.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 122.1190 kg Rp 25,350.00 Rp 3,095,717.85
4 Pekerjaan Bekistng 11.1394 m2 Rp 182,979.00 Rp 2,038,276.27
Sub Total Rp 6,241,519.13
D. Overhead + Profit (10% + D) Rp 624,151.91
E. Harga Satuan Pekerjaan (D + E) Rp 6,865,671.04
Dibulatkan Rp 6,865,671.00

Jenis Pekerjaan : Pek. Plat Lantai tbl. 12 cm


Satuan : m3
Harga Satuan : Rp 17,123,321.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 48.3410 kg Rp 25,350.00 Rp 1,225,443.84
4 Pekerjaan Bekistng 65.4375 m2 Rp 202,234.00 Rp 13,233,687.38
Sub Total Rp 15,566,656.22
D. Overhead + Profit (10% + D) Rp 1,556,665.62
E. Harga Satuan Pekerjaan (D + E) Rp 17,123,321.84
Dibulatkan Rp 17,123,321.00

Jenis Pekerjaan : Pek. Kolom K2 20/20


Satuan : m3
Harga Satuan : Rp 13,518,686.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 58.6556 kg Rp 25,350.00 Rp 1,486,918.74
3 Pekerjaan Pembesian Ulir 351.5417 kg Rp 25,975.00 Rp 9,131,295.32
4 Pekerjaan Bekistng 2.8000 m2 Rp 201,420.00 Rp 563,976.00
Sub Total Rp 12,289,715.05
D. Overhead + Profit (10% + D) Rp 1,228,971.51
E. Harga Satuan Pekerjaan (D + E) Rp 13,518,686.56
Dibulatkan Rp 13,518,686.00

Jenis Pekerjaan : Pek. Kolom KP 15/15


Satuan : m3
Harga Satuan : Rp 5,461,737.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 35.1655 kg Rp 25,350.00 Rp 891,446.07
3 Pekerjaan Pembesian Ulir 97.9119 kg Rp 25,975.00 Rp 2,543,262.72
4 Pekerjaan Bekistng 2.1000 m2 Rp 201,420.00 Rp 422,982.00
Sub Total Rp 4,965,215.78
D. Overhead + Profit (10% + D) Rp 496,521.58
E. Harga Satuan Pekerjaan (D + E) Rp 5,461,737.36
Dibulatkan Rp 5,461,737.00

Jenis Pekerjaan : Pek. Balok B1 25/35


Satuan : m3
Harga Satuan : Rp 8,469,086.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 59.4291 kg Rp 25,350.00 Rp 1,506,526.88
3 Pekerjaan Pembesian Ulir 160.6080 kg Rp 25,975.00 Rp 4,171,792.18
4 Pekerjaan Bekistng 4.3700 m2 Rp 208,999.00 Rp 913,325.63
Sub Total Rp 7,699,169.69
D. Overhead + Profit (10% + D) Rp 769,916.97
E. Harga Satuan Pekerjaan (D + E) Rp 8,469,086.66
Dibulatkan Rp 8,469,086.00

Jenis Pekerjaan : Pek. Balok B3 15/20


Satuan : m3
Harga Satuan : Rp 10,771,251.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 43.4492 kg Rp 25,350.00 Rp 1,101,436.42
3 Pekerjaan Pembesian Ulir 127.3134 kg Rp 25,975.00 Rp 3,306,966.01
4 Pekerjaan Bekistng 20.4600 m2 Rp 208,999.00 Rp 4,276,119.54
Sub Total Rp 9,792,046.96
D. Overhead + Profit (10% + D) Rp 979,204.70
E. Harga Satuan Pekerjaan (D + E) Rp 10,771,251.66
Dibulatkan Rp 10,771,251.00

Jenis Pekerjaan : Pek. Ring Gewel 15/15


Satuan : m3
Harga Satuan : Rp 9,132,212.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A.
1 Pekerjaan Beton K-225 1.0000 m3 Rp 1,107,525.00 Rp 1,107,525.00
2 Pekerjaan Pembesian Polos 57.6687 kg Rp 25,350.00 Rp 1,461,900.83
3 Pekerjaan Pembesian Ulir 160.8811 kg Rp 25,975.00 Rp 4,178,887.18
4 Pekerjaan Bekistng 7.4340 m2 Rp 208,999.00 Rp 1,553,698.57
Sub Total Rp 8,302,011.57
D. Overhead + Profit (10% + D) Rp 830,201.16
E. Harga Satuan Pekerjaan (D + E) Rp 9,132,212.73
Dibulatkan Rp 9,132,212.00

V PEKERJAAN DINDING

Jenis Pekerjaan : Pemasangan 1 m2 Dinding Batu Merah 1 Pc : 4 Pp Tebal 1/2 Bata (HSPK 2018)
Satuan : m2
Harga Satuan : Rp 99,515.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0101 O.H Rp 150,000.00 Rp 1,512.00
2 Tukang Batu 0.1009 O.H Rp 120,000.00 Rp 12,106.80
3 Pekerja 0.3029 O.H Rp 110,000.00 Rp 33,317.90
Sub Total Upah Rp 46,936.70
B. Bahan
1 Semen PC 40 Kg 0.2300 Zak Rp 59,040.00 Rp 13,579.20
2 Pasir Pasang 0.0430 m3 Rp 170,000.00 Rp 7,310.00
Batu Bata Merah Kelas 1
3 70.000 Press Rp 800.00 Rp 56,000.00
(Uk. 22 x 11 x 4.5 cm)
Sub Total Bahan Rp 76,889.20
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 90,468.40
E. Overhead + Profit (10% + D) Rp 9,046.84
F. Harga Satuan Pekerjaan (D + E) Rp 99,515.24
Dibulatkan Rp 99,515.00
Jenis Pekerjaan : Pemasangan 1 m2 Dinding Batu Merah 1 Pc : 2 Pp Tebal 1/2 Bata (HSPK 2018)
Satuan : m2
Harga Satuan : Rp 117,933.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0101 O.H Rp 150,000.00 Rp 1,512.00
2 Tukang Batu 0.1009 O.H Rp 120,000.00 Rp 12,106.80
3 Pekerja 0.3029 O.H Rp 110,000.00 Rp 33,317.90
Sub Total Upah Rp 46,936.70
B. Bahan
1 Semen PC 40 Kg 0.3790 Zak Rp 59,040.00 Rp 22,376.16
2 Pasir Pasang 0.0380 m3 Rp 170,000.00 Rp 6,460.00
Batu Bata Merah Kelas 1
3 70.000 Press Rp 800.00 Rp 56,000.00
(Uk. 22 x 11 x 4.5 cm)
Sub Total Bahan Rp 84,836.16
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 107,212.32
E. Overhead + Profit (10% + D) Rp 10,721.23
F. Harga Satuan Pekerjaan (D + E) Rp 117,933.55
Dibulatkan Rp 117,933.00

Jenis Pekerjaan : Pemasangan 1 m2 Plesteran Halus 1 Pc : 4 Ps Tebal 1.5 cm (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 73,740.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0151 O.H Rp 150,000.00 Rp 2,268.00
2 Tukang Batu 0.1513 O.H Rp 120,000.00 Rp 18,160.80
3 Pekerja 0.3029 O.H Rp 110,000.00 Rp 33,317.90
Sub Total Upah Rp 53,746.70
B. Bahan
1 Semen PC 50 Kg 0.1248 Zak Rp 73,800.00 Rp 9,210.24
2 Pasir Pasang 0.0240 m3 Rp 170,000.00 Rp 4,080.00
Sub Total Bahan Rp 13,290.24
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 67,036.94
E. Overhead + Profit (10% + D) Rp 6,703.69
F. Harga Satuan Pekerjaan (D + E) Rp 73,740.63
Dibulatkan Rp 73,740.00

Jenis Pekerjaan : Pemasangan 1 m2 Plesteran Halus 1 Pc : 2 Ps Tebal 1.5 cm (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 79,461.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0151 O.H Rp 150,000.00 Rp 2,268.00
2 Tukang Batu 0.1513 O.H Rp 120,000.00 Rp 18,160.80
3 Pekerja 0.3029 O.H Rp 110,000.00 Rp 33,317.90
Sub Total Upah Rp 53,746.70
B. Bahan
1 Semen PC 50 Kg 0.2045 Zak Rp 73,800.00 Rp 15,090.62
2 Pasir Pasang 0.0200 m3 Rp 170,000.00 Rp 3,400.00
Sub Total Bahan Rp 18,490.62
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 72,237.32
E. Overhead + Profit (10% + D) Rp 7,223.73
F. Harga Satuan Pekerjaan (D + E) Rp 79,461.06
Dibulatkan Rp 79,461.00

Jenis Pekerjaan : Pekerjaan 1 m2 Acian (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 71,544.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0101 O.H Rp 150,000.00 Rp 1,512.00
2 Tukang Batu 0.1009 O.H Rp 120,000.00 Rp 12,106.80
3 Pekerja 0.2119 O.H Rp 110,000.00 Rp 23,312.30
Sub Total Upah Rp 36,931.10
B. Bahan
1 Semen PC 50 Kg 0.0650 Zak Rp 73,800.00 Rp 4,797.00
Sub Total Bahan Rp 41,728.10
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 65,040.40
E. Overhead + Profit (10% + D) Rp 6,504.04
F. Harga Satuan Pekerjaan (D + E) Rp 71,544.44
Dibulatkan Rp 71,544.00
Jenis Pekerjaan : Pemasangan 1 m2 Dinding Batu Tempel Hitam (Permen PUPR 2016)
Satuan : m2
Harga Satuan : Rp 28,647.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0350 O.H Rp 150,000.00 Rp 5,250.00
2 Kepala Tukang 0.0350 O.H Rp 140,000.00 Rp 4,900.00
3 Tukang Batu 0.3500 O.H Rp 120,000.00 Rp 42,000.00
4 Pekerja 0.7000 O.H Rp 110,000.00 Rp 77,000.00
Sub Total Upah Rp 129,150.00
B. Bahan
1 Batu Tempel Hitam 1.1000 Buah Rp 2,500.00 Rp 2,750.00
2 Semen Portland 11.7500 Kg Rp 1,476.00 Rp 17,343.00
3 Pasir Pasang 0.0350 m3 Rp 170,000.00 Rp 5,950.00
Sub Total Bahan Rp 26,043.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 26,043.00
E. Overhead + Profit (10% + D) Rp 2,604.30
F. Harga Satuan Pekerjaan (D + E) Rp 28,647.30
Dibulatkan Rp 28,647.00

VI PEKERJAAN LANGIT-LANGIT

Jenis Pekerjaan : Pemasangan 1 m2 Rangka Plafond Kayu Merant (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 62,656.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0180 O.H Rp 150,000.00 Rp 2,700.00
2 Kepala Tukang 0.0350 O.H Rp 140,000.00 Rp 4,900.00
3 Tukang Besi 0.3500 O.H Rp 120,000.00 Rp 42,000.00
4 Pekerja 0.0350 O.H Rp 110,000.00 Rp 3,850.00
Sub Total Upah Rp 53,450.00
B. Bahan
1 Paku Reng 0.1000 Kg Rp 14,800.00 Rp 1,480.00
2 Kayu Merant Usuk 4/6, 5/7 0.0120 m3 Rp 4,500,000.00 Rp 54,000.00
Sub Total Bahan Rp 55,480.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 56,960.00
E. Overhead + Profit (10% + D) Rp 5,696.00
F. Harga Satuan Pekerjaan (D + E) Rp 62,656.00
Dibulatkan Rp 62,656.00

Jenis Pekerjaan : Pemasangan 1 m' List Langit-langit Kayu Profil (Permen PUPR 2016)
Satuan : m'
Harga Satuan : Rp 23,947.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0030 O.H Rp 150,000.00 Rp 450.00
2 Kepala Tukang 0.0050 O.H Rp 140,000.00 Rp 700.00
3 Tukang Kayu 0.0500 O.H Rp 120,000.00 Rp 6,000.00
4 Pekerja 0.0500 O.H Rp 110,000.00 Rp 5,500.00
Sub Total Upah Rp 12,650.00
B. Bahan
1 List kayu Profil 1.0500 m' Rp 8,500.00 Rp 8,925.00
2 Paku 0.0100 Kg Rp 19,500.00 Rp 195.00
Sub Total Bahan Rp 9,120.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 21,770.00
E. Overhead + Profit (10% + D) Rp 2,177.00
F. Harga Satuan Pekerjaan (D + E) Rp 23,947.00
Dibulatkan Rp 23,947.00

Jenis Pekerjaan : Pemasangan 1 m2 Langit-langit Gypsum Board Tebal 9 mm (Permen PUPR 2016)
Satuan : m2
Harga Satuan : Rp 46,972.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0050 O.H Rp 150,000.00 Rp 750.00
2 Kepala Tukang 0.0050 O.H Rp 140,000.00 Rp 700.00
3 Tukang Kayu 0.0500 O.H Rp 120,000.00 Rp 6,000.00
4 Pekerja 0.1000 O.H Rp 110,000.00 Rp 11,000.00
Sub Total Upah Rp 18,450.00
B. Bahan
1 Gypsum Board 0.3640 Lembar Rp 63,000.00 Rp 22,932.00
2 Paku Skrup 0.1100 Kg Rp 12,000.00 Rp 1,320.00
Sub Total Bahan Rp 24,252.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 42,702.00
E. Overhead + Profit (10% + D) Rp 4,270.20
F. Harga Satuan Pekerjaan (D + E) Rp 46,972.20
Dibulatkan Rp 46,972.00

VII PEKERJAAN LANTAI

Jenis Pekerjaan : Pemasangan 1 m2 Tegel Keramik 30 x 30 cm Polos (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 268,273.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0353 O.H Rp 150,000.00 Rp 5,292.90
2 Kepala Tukang 0.0353 O.H Rp 140,000.00 Rp 4,940.04
3 Tukang Batu 0.3531 O.H Rp 120,000.00 Rp 42,375.84
4 Pekerja 0.7067 O.H Rp 110,000.00 Rp 77,741.29
Sub Total Upah Rp 130,350.07
B. Bahan
1 Semen PC 50 Kg 0.2000 Zak Rp 73,800.00 Rp 14,760.00
2 Semen Berwarna Yiyitan 0.5000 Kg Rp 15,300.00 Rp 7,650.00
3 Pasir Pasang 0.0450 m3 Rp 170,000.00 Rp 7,650.00
Keramik Lantai Bermotf
4 1.0500 m2 Rp 79,500.00 Rp 83,475.00
Uk. 30 x 30 cm
Sub Total Bahan Rp 113,535.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 243,885.07
E. Overhead + Profit (10% + D) Rp 24,388.51
F. Harga Satuan Pekerjaan (D + E) Rp 268,273.58
Dibulatkan Rp 268,273.00

Jenis Pekerjaan : Pemasangan 1 m2 Tegel Keramik 20 x 20 cm Polos (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 237,738.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0353 O.H Rp 150,000.00 Rp 5,292.90
2 Kepala Tukang 0.0353 O.H Rp 140,000.00 Rp 4,940.04
3 Tukang Batu 0.3531 O.H Rp 120,000.00 Rp 42,375.84
4 Pekerja 0.7067 O.H Rp 110,000.00 Rp 77,741.29
Sub Total Upah Rp 130,350.07
B. Bahan
1 Semen PC 50 Kg 0.2080 Zak Rp 73,800.00 Rp 15,350.40
2 Semen Berwarna Yiyitan 0.5000 Kg Rp 15,300.00 Rp 7,650.00
3 Pasir Pasang 0.0450 m3 Rp 170,000.00 Rp 7,650.00
Keramik Lantai Bermotf
4 1.0500 m2 Rp 52,500.00 Rp 55,125.00
Uk. 20 x 20 cm
Sub Total Bahan Rp 85,775.40
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 216,125.47
E. Overhead + Profit (10% + D) Rp 21,612.55
F. Harga Satuan Pekerjaan (D + E) Rp 237,738.02
Dibulatkan Rp 237,738.00

Jenis Pekerjaan : Pemasangan 1 m' Plint Keramik 10 cm x 20 cm (Permen PUPR 2016)


Satuan : m'
Harga Satuan : Rp 279,592.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0050 O.H Rp 150,000.00 Rp 750.00
2 Kepala Tukang 0.0350 O.H Rp 140,000.00 Rp 4,900.00
3 Tukang Batu 0.0900 O.H Rp 120,000.00 Rp 10,800.00
4 Pekerja 0.0900 O.H Rp 110,000.00 Rp 9,900.00
Sub Total Upah Rp 26,350.00
B. Bahan
1 Plint Keramik 5.300 Buah Rp 42,500.00 Rp 225,250.00
2 Semen Portland 1.1400 Kg Rp 1,476.00 Rp 1,682.64
3 Pasir Pasang 0.0030 m3 Rp 170,000.00 Rp 510.00
4 Semen Warna 0.0250 Kg Rp 15,300.00 Rp 382.50
Sub Total Bahan Rp 227,825.14
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 254,175.14
E. Overhead + Profit (10% + D) Rp 25,417.51
F. Harga Satuan Pekerjaan (D + E) Rp 279,592.65
Dibulatkan Rp 279,592.00

Jenis Pekerjaan : Pemasangan 1 m2 Paving Block Natural Tebal 6 cm (Permen PUPR 2016)
Satuan : m2
Harga Satuan : Rp 736,322.40
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0013 O.H Rp 150,000.00 Rp 195.00
2 Kepala Tukang 0.0500 O.H Rp 140,000.00 Rp 7,000.00
3 Tukang Batu 0.5000 O.H Rp 120,000.00 Rp 60,000.00
4 Pekerja 0.5000 O.H Rp 110,000.00 Rp 55,000.00
Sub Total Upah Rp 122,195.00
B. Bahan
1 Paving Block 8 cm 1.0100 m2 Rp 8,900.00 Rp 8,989.00
2 Pasir Beton 2.0700 m3 Rp 260,000.00 Rp 538,200.00
Sub Total Bahan Rp 547,189.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 669,384.00
E. Overhead + Profit (10% + D) Rp 66,938.40
F. Harga Satuan Pekerjaan (D + E) Rp 736,322.40
Dibulatkan Rp 736,322.00

VIII PEKERJAAN PINTU DAN JENDELA

Jenis Pekerjaan : Kusen Pintu/Jendela Kayu Kamper (HSPK 2018)


Satuan : m3
Harga Satuan : Rp 13,196,466.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 1.8147 O.H Rp 150,000.00 Rp 272,204.21
2 Tukang Batu 18.1611 O.H Rp 120,000.00 Rp 2,179,329.24
3 Pekerja 6.0578 O.H Rp 110,000.00 Rp 666,354.21
Sub Total Upah Rp 3,117,887.65
B. Bahan
1 Lem Kayu 1.0000 Kg Rp 91,400.00 Rp 91,400.00
2 Paku Klem (No. 4) /Beton 1.2500 Doz Rp 22,000.00 Rp 27,500.00
3 Kayu Kamper 6/12, 6/15 1.2000 m3 Rp 7,300,000.00 Rp 8,760,000.00
Sub Total Bahan Rp 8,878,900.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 11,996,787.65
E. Overhead + Profit (10% + D) Rp 1,199,678.77
F. Harga Satuan Pekerjaan (D + E) Rp 13,196,466.42
Dibulatkan Rp 13,196,466.00

Jenis Pekerjaan : Pemasangan Daun Pintu PVC (HSPK 2018)


Satuan : Buah
Harga Satuan : Rp 404,855.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0302 O.H Rp 150,000.00 Rp 4,536.74
2 Kepala Tukang 0.0302 O.H Rp 140,000.00 Rp 4,234.29
3 Tukang Kayu 0.6054 O.H Rp 120,000.00 Rp 72,644.30
4 Pekerja 0.6058 O.H Rp 110,000.00 Rp 66,635.43
Sub Total Upah Rp 148,050.75
B. Bahan
1 Daun Pintu PVC 1.0000 Buah Rp 220,000.00 Rp 220,000.00
2-
Sub Total Bahan Rp 220,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 368,050.75
E. Overhead + Profit (10% + D) Rp 36,805.08
F. Harga Satuan Pekerjaan (D + E) Rp 404,855.83
Dibulatkan Rp 404,855.00

Jenis Pekerjaan : Daun Pintu Panil (Kayu Kamper) (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 941,928.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0302 O.H Rp 150,000.00 Rp 4,536.74
2 Tukang Kayu 3.0268 O.H Rp 120,000.00 Rp 363,221.54
3 Pekerja 1.0000 O.H Rp 110,000.00 Rp 110,000.00
Sub Total Upah Rp 477,758.28
B. Bahan
1 Paku Usuk 0.0500 Kg Rp 14,800.00 Rp 740.00
2 Kayu Kamper Papan 2/20, 4/10 0.0400 m3 Rp 9,445,000.00 Rp 377,800.00
Sub Total Bahan Rp 378,540.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 856,298.28
E. Overhead + Profit (10% + D) Rp 85,629.83
F. Harga Satuan Pekerjaan (D + E) Rp 941,928.11
Dibulatkan Rp 941,928.00

Jenis Pekerjaan : Pintu/Jendela Kaca Papan Kayu Kamper (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 683,527.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.2420 O.H Rp 150,000.00 Rp 36,293.90
2 Tukang Kayu 2.0179 O.H Rp 120,000.00 Rp 242,147.69
3 Pekerja 0.8077 O.H Rp 110,000.00 Rp 88,847.23
Sub Total Upah Rp 367,288.81
B. Bahan
1 Lem Kayu 0.3000 Kg Rp 91,400.00 Rp 27,420.00
2 Kayu Kamper Papan 2/20, 4/10 0.0240 m3 Rp 9,445,000.00 Rp 226,680.00
Sub Total Bahan Rp 254,100.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 621,388.81
E. Overhead + Profit (10% + D) Rp 62,138.88
F. Harga Satuan Pekerjaan (D + E) Rp 683,527.70
Dibulatkan Rp 683,527.00

Jenis Pekerjaan : Pemasangan 1 m2 Kaca Mat Tebal 5 mm (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 223,921.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0008 O.H Rp 150,000.00 Rp 120.98
2 Kepala Tukang 0.0151 O.H Rp 140,000.00 Rp 2,117.15
3 Tukang Kayu 0.1513 O.H Rp 120,000.00 Rp 18,161.08
4 Pekerja 0.0151 O.H Rp 110,000.00 Rp 1,665.88
Sub Total Upah Rp 22,065.09
B. Bahan
1 Kaca Polos 5 mm 1.1000 m2 Rp 165,000.00 Rp 181,500.00
Sub Total Bahan Rp 181,500.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 203,565.09
E. Overhead + Profit (10% + D) Rp 20,356.51
F. Harga Satuan Pekerjaan (D + E) Rp 223,921.59
Dibulatkan Rp 223,921.00

IX PEKERJAAN PENGGANTUNG DAN PENGUNCI

Jenis Pekerjaan : Pemasangan Kunci Tanam Besar 2x Putar Kuningan (HSPK 2018)
Satuan : Buah
Harga Satuan : Rp 207,696.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0050 O.H Rp 150,000.00 Rp 756.12
2 Kepala Tukang 0.0101 O.H Rp 140,000.00 Rp 1,411.42
3 Tukang Kayu 0.5045 O.H Rp 120,000.00 Rp 60,536.93
4 Pekerja 0.0101 O.H Rp 110,000.00 Rp 1,110.59
Sub Total Upah Rp 63,815.07
B. Bahan
1 Kunci Tanam Besar (Kuningan) 1.0000 Buah Rp 125,000.00 Rp 125,000.00
Sub Total Bahan Rp 125,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 188,815.07
E. Overhead + Profit (10% + D) Rp 18,881.51
F. Harga Satuan Pekerjaan (D + E) Rp 207,696.57
Dibulatkan Rp 207,696.00

Jenis Pekerjaan : Pemasangan Engsel Kuningan untuk Pintu (HSPK 2018)


Satuan : Stel
Harga Satuan : Rp 64,971.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0008 O.H Rp 150,000.00 Rp 120.98
2 Kepala Tukang 0.0151 O.H Rp 140,000.00 Rp 2,117.15
3 Tukang Kayu 0.1513 O.H Rp 120,000.00 Rp 18,161.08
4 Pekerja 0.0151 O.H Rp 110,000.00 Rp 1,665.88
Sub Total Upah Rp 22,065.09
B. Bahan
1 Engsel Pintu 1.0000 Pasang Rp 37,000.00 Rp 37,000.00
Sub Total Bahan Rp 37,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 59,065.09
E. Overhead + Profit (10% + D) Rp 5,906.51
F. Harga Satuan Pekerjaan (D + E) Rp 64,971.59
Dibulatkan Rp 64,971.00

Jenis Pekerjaan : Pemasangan Engsel Kuningan untuk Jendela (HSPK 2018)


Satuan : Stel
Harga Satuan : Rp 48,625.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0005 O.H Rp 150,000.00 Rp 75.62
2 Kepala Tukang 0.0101 O.H Rp 140,000.00 Rp 1,411.42
3 Tukang Kayu 0.1009 O.H Rp 120,000.00 Rp 12,107.39
4 Pekerja 0.0101 O.H Rp 110,000.00 Rp 1,110.59
Sub Total Upah Rp 14,705.02
B. Bahan
1 Engsel Jendela 1.0000 Pasang Rp 29,500.00 Rp 29,500.00
Sub Total Bahan Rp 29,500.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 44,205.02
E. Overhead + Profit (10% + D) Rp 4,420.50
F. Harga Satuan Pekerjaan (D + E) Rp 48,625.52
Dibulatkan Rp 48,625.00

Jenis Pekerjaan : Pemasangan Grendel Kecil (HSPK 2018)


Satuan : Buah
Harga Satuan : Rp 42,561.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Tukang Kayu 0.1211 O.H Rp 120,000.00 Rp 14,528.86
2 Pekerja 0.0606 O.H Rp 110,000.00 Rp 6,663.55
Sub Total Upah Rp 21,192.40
B. Bahan
1 Grendel Biasa (Kecil) 1.0000 Pasang Rp 17,500.00 Rp 17,500.00
Sub Total Bahan Rp 17,500.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 38,692.40
E. Overhead + Profit (10% + D) Rp 3,869.24
F. Harga Satuan Pekerjaan (D + E) Rp 42,561.64
Dibulatkan Rp 42,561.00

Jenis Pekerjaan : Pemasangan Hak Angn (Sikutan) (HSPK 2018)


Satuan : Stel
Harga Satuan : Rp 44,918.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Tukang Kayu 0.1413 O.H Rp 120,000.00 Rp 16,950.34
2 Pekerja 0.0808 O.H Rp 110,000.00 Rp 8,884.72
Sub Total Upah Rp 25,835.06
B. Bahan
1 Hak Angin Sikuan Biasa 1.0000 Pasang Rp 15,000.00 Rp 15,000.00
Sub Total Bahan Rp 15,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 40,835.06
E. Overhead + Profit (10% + D) Rp 4,083.51
F. Harga Satuan Pekerjaan (D + E) Rp 44,918.56
Dibulatkan Rp 44,918.00

X PEKERJAAN PENGECATAN

Jenis Pekerjaan : Pengecatan Dinding Dalam Baru (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 23,318.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0064 O.H Rp 150,000.00 Rp 952.50
2 Tukang Cat 0.0636 O.H Rp 120,000.00 Rp 7,627.20
3 Pekerja 0.0202 O.H Rp 110,000.00 Rp 2,220.90
Sub Total Upah Rp 10,800.60
B. Bahan
1 Cat Tembok Dalam 2.5 Kg 0.1040 Kaleng Rp 87,000.00 Rp 9,048.00
2 Dempul Tembok 0.1000 Kg Rp 8,000.00 Rp 800.00
3 Kertas Gosok Halus 0.1000 Lembar Rp 5,500.00 Rp 550.00
Sub Total Bahan Rp 10,398.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 21,198.60
E. Overhead + Profit (10% + D) Rp 2,119.86
F. Harga Satuan Pekerjaan (D + E) Rp 23,318.46
Dibulatkan Rp 23,318.00

Jenis Pekerjaan : Pengecatan Dinding Luar Baru (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 23,318.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0064 O.H Rp 150,000.00 Rp 952.50
2 Tukang Cat 0.0636 O.H Rp 120,000.00 Rp 7,627.20
3 Pekerja 0.0202 O.H Rp 110,000.00 Rp 2,220.90
Sub Total Upah Rp 10,800.60
B. Bahan
1 Cat Tembok Luar 2.5 Kg 0.1040 Kaleng Rp 87,000.00 Rp 9,048.00
2 Dempul Tembok 0.1000 Kg Rp 8,000.00 Rp 800.00
3 Kertas Gosok Halus 0.1000 Lembar Rp 5,500.00 Rp 550.00
Sub Total Bahan Rp 10,398.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 21,198.60
E. Overhead + Profit (10% + D) Rp 2,119.86
F. Harga Satuan Pekerjaan (D + E) Rp 23,318.46
Dibulatkan Rp 23,318.00

Jenis Pekerjaan : Pengecatan Kayu (1 Plamir, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
(HSPK 2018)
Satuan : m2
Harga Satuan : Rp 76,550.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0040 O.H Rp 150,000.00 Rp 604.50
2 Tukang Cat 0.1059 O.H Rp 120,000.00 Rp 12,712.80
3 Pekerja 0.0707 O.H Rp 110,000.00 Rp 7,773.70
Sub Total Upah Rp 21,091.00
B. Bahan
1 Cat Kayu 0.1700 Kg Rp 55,000.00 Rp 9,350.00
2 Cat Meni Kayu 0.2000 Kg Rp 20,000.00 Rp 4,000.00
3 Clear Gloss 0.3500 Kg Rp 80,000.00 Rp 28,000.00
4 Plamir Tembok 5 Kg 0.1500 Kaleng Rp 47,000.00 Rp 7,050.00
5 Kuas 4 inchi 0.0100 Buah Rp 10,000.00 Rp 100.00
Sub Total Bahan Rp 48,500.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 69,591.00
E. Overhead + Profit (10% + D) Rp 6,959.10
F. Harga Satuan Pekerjaan (D + E) Rp 76,550.10
Dibulatkan Rp 76,550.00

Jenis Pekerjaan : Pekerjaan Pengecatan Plafond


Satuan : m2
Harga Satuan : Rp 27,701.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0040 O.H Rp 150,000.00 Rp 604.50
2 Tukang Cat 0.1059 O.H Rp 120,000.00 Rp 12,712.80
3 Pekerja 0.0707 O.H Rp 110,000.00 Rp 7,773.70
Sub Total Upah Rp 21,091.00
B. Bahan
1 Dempul Tembok 0.1200 Kg Rp 8,000.00 Rp 960.00
2 Cat Tembok Dalam 0.0360 Kaleng Rp 87,000.00 Rp 3,132.00
Sub Total Bahan Rp 4,092.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 25,183.00
E. Overhead + Profit (10% + D) Rp 2,518.30
F. Harga Satuan Pekerjaan (D + E) Rp 27,701.30
Dibulatkan Rp 27,701.00

XI PEKERJAAN INSTALASI LISTRIK

Jenis Pekerjaan : Pemasangan MCB (Permen PUPR 2016)


Satuan : Buah
Harga Satuan : Rp 4,006,860.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1-
2-
Sub Total Upah
B. Bahan
1 Pipa Listrik 5/8" 3.0000 Batang Rp 15,000.00 Rp 45,000.00
2 Kabel 15.0000 M Rp 14,600.00 Rp 219,000.00
3 T Dus 1.0000 Buah Rp 5,000.00 Rp 5,000.00
4 L Bow 2.0000 Buah Rp 5,000.00 Rp 10,000.00
5 Klem Biasa 24.0000 Buah Rp 1,000.00 Rp 24,000.00
6 MCB 1.0000 Buah Rp 3,339,600.00 Rp 3,339,600.00
Sub Total Bahan Rp 3,642,600.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 3,642,600.00
E. Overhead + Profit (10% + D) Rp 364,260.00
F. Harga Satuan Pekerjaan (D + E) Rp 4,006,860.00
Dibulatkan Rp 4,006,860.00

Jenis Pekerjaan : Pemasangan Titk Lampu Gedung (HSPK 2018)


Satuan : Titk
Harga Satuan : Rp 855,597.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0504 O.H Rp 150,000.00 Rp 7,561.23
2 Tukang Listrik 0.5045 O.H Rp 120,000.00 Rp 60,536.93
3 Pekerja 0.3029 O.H Rp 110,000.00 Rp 33,317.71
Sub Total Upah Rp 101,415.87
B. Bahan
1 Kabel NYM 3 x 2,5 mm 24.0000 m' Rp 14,600.00 Rp 350,400.00
2 Isolator 4.0000 Unit Rp 35,000.00 Rp 140,000.00
3 Fitting Palfon 1.0000 Buah Rp 150,000.00 Rp 150,000.00
4 Pipa Pralon 5/8 3.0000 Batang Rp 7,000.00 Rp 21,000.00
5 T Doos PVC 3.0000 Buah Rp 5,000.00 Rp 15,000.00
Sub Total Bahan Rp 676,400.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 777,815.87
E. Overhead + Profit (10% + D) Rp 77,781.59
F. Harga Satuan Pekerjaan (D + E) Rp 855,597.46
Dibulatkan Rp 855,597.00

Jenis Pekerjaan : Pemasangan Stop Kontak Gedung (HSPK 2018)


Satuan : Titk
Harga Satuan : Rp 242,425.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0504 O.H Rp 150,000.00 Rp 7,561.23
2 Tukang Listrik 0.2018 O.H Rp 120,000.00 Rp 24,214.76
3 Pekerja 0.0010 O.H Rp 110,000.00 Rp 111.06
Sub Total Upah Rp 31,887.05
B. Bahan
1 Kabel NYM 3 x 2,5 mm 10.0000 m' Rp 14,600.00 Rp 146,000.00
2 Stop Kontak 1.0000 Unit Rp 20,000.00 Rp 20,000.00
3 Pipa Pralon 5/8 2.5000 Batang Rp 7,000.00 Rp 17,500.00
4 T Doos PVC 1.0000 Buah Rp 5,000.00 Rp 5,000.00
Sub Total Bahan Rp 188,500.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 220,387.05
E. Overhead + Profit (10% + D) Rp 22,038.71
F. Harga Satuan Pekerjaan (D + E) Rp 242,425.76
Dibulatkan Rp 242,425.00

Jenis Pekerjaan : Pemasangan Saklar Tunggal (HSPK 2018)


Satuan : Titk
Harga Satuan : Rp 67,525.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0504 O.H Rp 150,000.00 Rp 7,561.23
2 Tukang Listrik 0.2018 O.H Rp 120,000.00 Rp 24,214.76
3 Pekerja 0.0010 O.H Rp 110,000.00 Rp 111.06
Sub Total Upah Rp 31,887.05
B. Bahan
1 Saklar Tunggal 1.0000 Unit Rp 29,500.00 Rp 29,500.00
Sub Total Bahan Rp 29,500.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 61,387.05
E. Overhead + Profit (10% + D) Rp 6,138.71
F. Harga Satuan Pekerjaan (D + E) Rp 67,525.76
Dibulatkan Rp 67,525.00

Jenis Pekerjaan : Pemasangan Saklar Ganda (HSPK 2018)


Satuan : Titk
Harga Satuan : Rp 74,675.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0504 O.H Rp 150,000.00 Rp 7,561.23
2 Tukang Listrik 0.2018 O.H Rp 120,000.00 Rp 24,214.76
3 Pekerja 0.0010 O.H Rp 110,000.00 Rp 111.06
Sub Total Upah Rp 31,887.05
B. Bahan
1 Saklar Ganda Simply Switch 1.0000 Unit Rp 36,000.00 Rp 36,000.00
Sub Total Bahan Rp 36,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 67,887.05
E. Overhead + Profit (10% + D) Rp 6,788.71
F. Harga Satuan Pekerjaan (D + E) Rp 74,675.76
Dibulatkan Rp 74,675.00

XII PEKERJAAN SANITASI

Jenis Pekerjaan : Pemasangan Pipa Air Bersih diameter 3/4" (HSPK 2018)
Satuan : m'
Harga Satuan : Rp 26,494.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0018 O.H Rp 150,000.00 Rp 272.21
2 Kepala Tukang 0.0060 O.H Rp 140,000.00 Rp 846.86
3 Tukang Pipa 0.0605 O.H Rp 120,000.00 Rp 7,264.43
4 Pekerja 0.0363 O.H Rp 110,000.00 Rp 3,998.13
Sub Total Upah Rp 12,381.62
B. Bahan
Pipa Plastk PVC Tipe AW
1 0.3000 Batang Rp 28,900.00 Rp 8,670.00
Uk. 3/4 Pj. 4 mtr
Pipa Plastk PVC Tipe AW
2 0.1050 Batang Rp 28,900.00 Rp 3,034.50
Uk. 3/4 Pj. 4 mtr
Sub Total Bahan Rp 11,704.50
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 24,086.12
E. Overhead + Profit (10% + D) Rp 2,408.61
F. Harga Satuan Pekerjaan (D + E) Rp 26,494.73
Dibulatkan Rp 26,494.00

Jenis Pekerjaan : Pemasangan Pipa Air Bekas diameter 3" (HSPK 2018)
Satuan : m'
Harga Satuan : Rp 74,089.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0041 O.H Rp 150,000.00 Rp 620.03
2 Kepala Tukang 0.0136 O.H Rp 140,000.00 Rp 1,905.43
3 Tukang Pipa 0.1362 O.H Rp 120,000.00 Rp 16,344.97
4 Pekerja 0.0818 O.H Rp 110,000.00 Rp 8,995.78
Sub Total Upah Rp 27,866.20
B. Bahan
Pipa Plastk PVC Tipe AW
1 0.3000 Batang Rp 97,500.00 Rp 29,250.00
Uk. 3 inchi Pj. 4 mtr
Pipa Plastk PVC Tipe AW
2 0.1050 Batang Rp 97,500.00 Rp 10,237.50
Uk. 3 inchi Pj. 4 mtr
Sub Total Bahan Rp 39,487.50
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 67,353.70
E. Overhead + Profit (10% + D) Rp 6,735.37
F. Harga Satuan Pekerjaan (D + E) Rp 74,089.07
Dibulatkan Rp 74,089.00

Jenis Pekerjaan : Pemasangan Pipa Air Kotor diameter 3" (HSPK 2018)
Satuan : M
Harga Satuan : Rp 74,089.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0041 O.H Rp 150,000.00 Rp 620.03
2 Kepala Tukang 0.0136 O.H Rp 140,000.00 Rp 1,905.43
3 Tukang Pipa 0.1362 O.H Rp 120,000.00 Rp 16,344.97
4 Pekerja 0.0818 O.H Rp 110,000.00 Rp 8,995.78
Sub Total Upah Rp 27,866.20
B. Bahan
Pipa Plastk PVC Tipe AW
1 0.3000 Batang Rp 97,500.00 Rp 29,250.00
Uk. 3 inchi Pj. 4 mtr
Pipa Plastk PVC Tipe AW
2 0.1050 Batang Rp 97,500.00 Rp 10,237.50
Uk. 3 inchi Pj. 4 mtr
Sub Total Bahan Rp 39,487.50
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 67,353.70
E. Overhead + Profit (10% + D) Rp 6,735.37
F. Harga Satuan Pekerjaan (D + E) Rp 74,089.07
Dibulatkan Rp 74,089.00

Jenis Pekerjaan : Kloset Duduk Porselen (HSPK 2018)


Satuan : Buah
Harga Satuan : Rp 1,006,899.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.1613 O.H Rp 150,000.00 Rp 24,195.93
2 Kepala Tukang 0.0101 O.H Rp 140,000.00 Rp 1,411.42
3 Tukang Pipa 1.1098 O.H Rp 120,000.00 Rp 133,181.23
4 Pekerja 3.3318 O.H Rp 110,000.00 Rp 366,494.81
Sub Total Upah Rp 525,283.40
B. Bahan
Closet Duduk Porselin
1 0.0600 Buah Rp 368,000.00 Rp 22,080.00
(Komplit Warna Puth)
Closet Duduk Porselin
2 1.0000 Buah Rp 368,000.00 Rp 368,000.00
(Komplit Warna Puth)
Sub Total Bahan Rp 390,080.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 915,363.40
E. Overhead + Profit (10% + D) Rp 91,536.34
F. Harga Satuan Pekerjaan (D + E) Rp 1,006,899.74
Dibulatkan Rp 1,006,899.00

Jenis Pekerjaan : Kloset Jongkok Porselen (HSPK 2018)


Satuan : Buah
Harga Satuan : Rp 257,556.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.1512 O.H Rp 150,000.00 Rp 22,683.69
2 Kepala Tukang 0.1613 O.H Rp 140,000.00 Rp 22,582.87
3 Tukang Pipa 0.5134 O.H Rp 120,000.00 Rp 61,610.77
4 Pekerja 1.0000 O.H Rp 110,000.00 Rp 110,000.00
Sub Total Upah Rp 216,877.33
B. Bahan
1 Semen PC 50 Kg 0.1200 Zak Rp 73,800.00 Rp 8,856.00
2 Pasir Pasang 0.0100 m3 Rp 170,000.00 Rp 1,700.00
Closet Jongkok Porselin
3 1.0000 Buah Rp 247,000.00 Rp 247,000.00
Warna Puth
Sub Total Bahan Rp 257,556.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 474,433.33
E. Overhead + Profit (10% + D) Rp 47,443.33
F. Harga Satuan Pekerjaan (D + E) Rp 521,876.66
Dibulatkan Rp 521,876.00

Jenis Pekerjaan : Pemasangan Kran Air (HSPK 2018)


Satuan : Buah
Harga Satuan : Rp 96,467.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0302 O.H Rp 150,000.00 Rp 4,536.74
2 Tukang Pipa 0.1513 O.H Rp 120,000.00 Rp 18,161.08
Sub Total Upah Rp 22,697.81
B. Bahan
1 Kran Air Dia. 3/4 1.0000 Buah Rp 56,000.00 Rp 56,000.00
2 Rol TBA 1.0000 Roll Rp 9,000.00 Rp 9,000.00
Sub Total Bahan Rp 65,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 87,697.81
E. Overhead + Profit (10% + D) Rp 8,769.78
F. Harga Satuan Pekerjaan (D + E) Rp 96,467.59
Dibulatkan Rp 96,467.00

Jenis Pekerjaan : Pemasangan Floor Drain (Permen PUPR 2016)


Satuan : Buah
Harga Satuan : Rp 38,775.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0050 O.H Rp 150,000.00 Rp 750.00
2 Kepala Tukang 0.0100 O.H Rp 140,000.00 Rp 1,400.00
3 Tukang Pipa 0.1000 O.H Rp 120,000.00 Rp 12,000.00
4 Pekerja 0.0100 O.H Rp 110,000.00 Rp 1,100.00
Sub Total Upah Rp 15,250.00
B. Bahan
1 Floor Drain 1.0000 Unit Rp 20,000.00 Rp 20,000.00
Sub Total Bahan Rp 20,000.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 35,250.00
E. Overhead + Profit (10% + D) Rp 3,525.00
F. Harga Satuan Pekerjaan (D + E) Rp 38,775.00
Dibulatkan Rp 38,775.00

Jenis Pekerjaan : Pemasangan Bak Kontrol Pasangan Bata 30x30 Tinggi 35 cm (Permen PUPR 2016)
Satuan : Buah
Harga Satuan : Rp 1,114,095.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 2.1600 O.H Rp 150,000.00 Rp 324,000.00
2 Kepala Tukang 0.7200 O.H Rp 140,000.00 Rp 100,800.00
3 Tukang Batu 0.0720 O.H Rp 120,000.00 Rp 8,640.00
4 Pekerja 0.0110 O.H Rp 110,000.00 Rp 1,210.00
Sub Total Upah Rp 434,650.00
B. Bahan
1 Bata Merah 40.000 Buah Rp 800.00 Rp 32,000.00
2 Semen Portland 44.000 Kg Rp 1,476.00 Rp 64,944.00
3 Pasir Pasang 0.0700 m3 Rp 170,000.00 Rp 11,900.00
4 Pasir Beton 0.0600 m3 Rp 260,000.00 Rp 15,600.00
5 Kerikil 0.0700 m3 Rp 260,000.00 Rp 18,200.00
6 Batu Tulangan 1.6000 Kg Rp 272,200.00 Rp 435,520.00
Sub Total Bahan Rp 578,164.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 1,012,814.00
E. Overhead + Profit (10% + D) Rp 101,281.40
F. Harga Satuan Pekerjaan (D + E) Rp 1,114,095.40
Dibulatkan Rp 1,114,095.00

XIII PEKERJAAN RAILLING

Jenis Pekerjaan : Pemasangan Pagar Besi Model BRC (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 716,144.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Tukang Besi 1.0594 O.H Rp 120,000.00 Rp 127,127.54
2 Pekerja 1.0601 O.H Rp 120,000.00 Rp 127,213.08
Sub Total Upah Rp 254,340.62
B. Bahan
Pagar BRC Dia. 6 mm, panjang
1 Unit Rp 396,700.00 Rp 396,700.00
240 cm, tnggi 120 cm
Sub Total Bahan Rp 396,700.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 651,040.62
E. Overhead + Profit (10% + D) Rp 65,104.06
F. Harga Satuan Pekerjaan (D + E) Rp 716,144.69
Dibulatkan Rp 716,144.00

XIV PEKERJAAN ATAP

Jenis Pekerjaan : Pemasangan Gording Kamper (HSPK 2018)


Satuan : m3
Harga Satuan : Rp 18,720,957.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.7259 O.H Rp 150,000.00 Rp 108,881.68
2 Kepala Tukang 0.1210 O.H Rp 140,000.00 Rp 16,937.15
3 Tukang Kayu 7.2644 O.H Rp 120,000.00 Rp 871,731.69
4 Pekerja 2.4231 O.H Rp 110,000.00 Rp 266,541.68
Sub Total Upah Rp 1,264,092.21
B. Bahan
Plat Besi/Baja 244 x122, tebal
1 15.000 Lonjor Rp 514,800.00 Rp 7,722,000.00
1,8 mm
2 Paku Reng 0.2000 Kg Rp 14,800.00 Rp 2,960.00
3 Kayu Kamper Balok 6/12, 6/15 1.1000 m3 Rp 7,300,000.00 Rp 8,030,000.00
Sub Total Bahan Rp 15,754,960.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 17,019,052.21
E. Overhead + Profit (10% + D) Rp 1,701,905.22
F. Harga Satuan Pekerjaan (D + E) Rp 18,720,957.43
Dibulatkan Rp 18,720,957.00

Jenis Pekerjaan : Pemasangan Reng Kamper/Usuk Kamper (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 219,268.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0101 O.H Rp 150,000.00 Rp 1,512.25
2 Kepala Tukang 0.0050 O.H Rp 140,000.00 Rp 705.71
3 Tukang Kayu 0.1009 O.H Rp 120,000.00 Rp 12,107.38
4 Pekerja 0.1010 O.H Rp 110,000.00 Rp 11,105.88
Sub Total Upah Rp 25,431.23
B. Bahan
1 Paku Reng 0.2500 Kg Rp 14,800.00 Rp 3,700.00
2 Kayu Kamper Balok 4/6, 5/7 0.0140 m3 Rp 7,300,000.00 Rp 102,200.00
3 Kayu Kamper Papan 2/20, 4/10 0.0072 m3 Rp 9,445,000.00 Rp 68,004.00
Sub Total Bahan Rp 173,904.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 199,335.23
E. Overhead + Profit (10% + D) Rp 19,933.52
F. Harga Satuan Pekerjaan (D + E) Rp 219,268.75
Dibulatkan Rp 219,268.00

Jenis Pekerjaan : PemasanganLisplank Kayu Kamper 2/20 cm (HSPK 2018)


Satuan : m'
Harga Satuan : Rp 156,624.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0050 O.H Rp 150,000.00 Rp 756.12
2 Kepala Tukang 0.0202 O.H Rp 140,000.00 Rp 2,822.86
3 Tukang Kayu 0.2018 O.H Rp 120,000.00 Rp 24,214.77
4 Pekerja 0.1010 O.H Rp 110,000.00 Rp 11,105.90
Sub Total Upah Rp 38,899.65
B. Bahan
1 Paku Reng 0.1000 Kg Rp 14,800.00 Rp 1,480.00
2 Kayu Kamper Papan 2/20, 4/10 0.0108 m3 Rp 9,445,000.00 Rp 102,006.00
Sub Total Bahan Rp 103,486.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 142,385.65
E. Overhead + Profit (10% + D) Rp 14,238.57
F. Harga Satuan Pekerjaan (D + E) Rp 156,624.22
Dibulatkan Rp 156,624.00

Jenis Pekerjaan : Pemasangan Genteng Karang Pilang/Wisma (HSPK 2018)


Satuan : m2
Harga Satuan : Rp 154,636.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0081 O.H Rp 150,000.00 Rp 1,209.80
2 Kepala Tukang 0.0081 O.H Rp 140,000.00 Rp 1,129.14
3 Tukang Kayu 0.0757 O.H Rp 120,000.00 Rp 9,080.54
4 Pekerja 0.1514 O.H Rp 110,000.00 Rp 16,658.86
Sub Total Upah Rp 28,078.33
B. Bahan
Genteng Karang Pilang/Wisma
1 25.000 Buah Rp 4,500.00 Rp 112,500.00
32 x 31,4 cm
Sub Total Bahan Rp 112,500.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 140,578.33
E. Overhead + Profit (10% + D) Rp 14,057.83
F. Harga Satuan Pekerjaan (D + E) Rp 154,636.17
Dibulatkan Rp 154,636.00

Jenis Pekerjaan : Pemasangan Kuda-kuda Kayu Kamper (Bentang Max 7 m) (HSPK 2018)
Satuan : m3
Harga Satuan : Rp 19,780,217.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 1.2098 O.H Rp 150,000.00 Rp 181,464.74
2 Kepala Tukang 0.2016 O.H Rp 140,000.00 Rp 28,228.59
3 Tukang Kayu 12.107 O.H Rp 120,000.00 Rp 1,452,886.15
4 Pekerja 4.0385 O.H Rp 110,000.00 Rp 444,236.14
Sub Total Upah Rp 2,106,815.62
B. Bahan
Plat Besi/Baja 244 x 122, tebal
1 15 Lonjor Rp 514,800.00 Rp 7,722,000.00
1,8 mm
3 Paku Klem (No. 4)/Beton 5.6000 Doz Rp 22,000.00 Rp 123,200.00
4 Kayu Kamper Balok 6/12, 6/15 1.1000 m3 Rp 7,300,000.00 Rp 8,030,000.00
Sub Total Bahan Rp 15,875,200.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 17,982,015.62
E. Overhead + Profit (10% + D) Rp 1,798,201.56
F. Harga Satuan Pekerjaan (D + E) Rp 19,780,217.18
Dibulatkan Rp 19,780,217.00

Jenis Pekerjaan : Pemasangan Wuwung Genteng Karang Pilang (HSPK 2018)


Satuan : m'
Harga Satuan : Rp 172,418.00
Harga Jumlah
No Uraian Koefisien Satuan
Satuan (Rp) Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3) x (5)
A. Tenaga Kerja
1 Mandor 0.0202 O.H Rp 150,000.00 Rp 3,024.49
2 Kepala Tukang 0.0020 O.H Rp 140,000.00 Rp 282.29
3 Tukang Kayu 0.202 O.H Rp 120,000.00 Rp 24,214.77
4 Pekerja 0.4039 O.H Rp 110,000.00 Rp 44,423.61
Sub Total Upah Rp 71,945.16
B. Bahan
1 Semen PC 50 Kg 0.1600 Zak Rp 73,800.00 Rp 11,808.00
2 Pasir Pasang 0.0323 m3 Rp 170,000.00 Rp 5,491.00
Genteng Wuwung Karang
3 5.0000 Buah Rp 13,500.00 Rp 67,500.00
Pilang/Wisma
Sub Total Bahan Rp 84,799.00
C. Peralatan
1-
2-
Sub Total Peralatan
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A + B + C) Rp 156,744.16
E. Overhead + Profit (10% + D) Rp 15,674.42
F. Harga Satuan Pekerjaan (D + E) Rp 172,418.58
Dibulatkan Rp 172,418.00
URAIAN PERHITUNGAN VOLUME PKERJAAN

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

NO. URAIAN PEKERJAAN


(1) (2)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
p = 18.00 m
l = 12.00 m
L = pxl
= 216.00 m²

2 Pembuatan Bouwplank/Uitzet
p = 18.00 m
l = 12.00 m
K = 2 (p + l)
= 60.00 m'

3 Pembuatan Direksi Kit


p = 5.00 m
l = 5.00 m
L = pxl
= 25.00 m²

II PEKERJAAN TANAH
1 Pek. Galian Tanah
- Pile Cape Type 1
p = 1.00 m
l = 1.00 m
t = 0.30 m
n = 14.00 buah
V1 = (p x l x t )n
= 4.20 m³

- Pile Cap Type 2


p = 1.00 m
l = 1.00 m
t = 0.30 m
n = 7.00 buah
V2 = (p x l x t) n
= 2.10 m³

- Pondasi Batu Kali Type 1


l1 = 1.50 m
l2 = 1.00 m
t = 1.00 m
p = 50.60 m
V3 = ((l1 + l2)/2) x t) x p
= 63.25 m³

- Pondasi Batu Kali Type 2


l1 = 1.30 m
l2 = 1.00 m
t = 1.00 m
p = 36.90 m
V4 = ((l1 + l2)/2) x t) x p
= 42.44 m³

Total Pek. Galian Tanah


V = V1 + V2 + V3 + V4
= 111.99 m³

2 Pek. Bor Strouss dia. 30 cm


d = 0.30 m
t = 3.00 m
n = 21.00 buah
V = ((1/4 x π x d²) x t) x n
= 4.45 m³

3 Pek. Urugan Pasir Bawah Pondasi


- Pondasi Batu Kali
p = 87.50 m
l = 1.00 m
t = 0.05 m
V1 = pxlxt
= 4.38 m³

- Pondasi Rollag Bata


p = 10.85 m
l = 0.30 m
t = 0.05 m
V2 = pxlxt
= 0.16 m³
Total Pek. Urugan Pasir
V = V1 + V2
= 4.54 m³
4 Pek. Urugan Tanah Kembali
- Pondasi Batu Kali Type 1
l1 = 0.30 m
l2 = 0.80 m
t = 0.80 m
p = 50.60 m
V1 = ((l1 + l2)/2) x t) x p
= 22.26 m³

- Pondasi Batu Kali Type 2


l1 = 0.30 m
l2 = 0.85 m
t = 0.80 m
p = 36.90 m
V2 = ((l1 + l2)/2) x t) x p
= 16.97 m³

Total Pek. Urugan Tanah Kembali


V = V1 + V2
= 39.24 m³

5 Pek. Urugan Sirtu


p = 18.00 m
l = 12.00 m
t = 0.05 m
V = pxlxt
= 10.80 m³

III PEKERJAAN PONDASI


1 Pek. Lantai Kerja Bawah Pondasi
- Bawah Pile Cap Type 1
p = 1.00 m
l = 1.00 m
t = 0.05 m
n = 14.00 buah
V1 = (p x l x t )n
= 0.70 m³

- Bawah Pile Cap Type 2


p = 1.00 m
l = 1.00 m
t = 0.05 m
n = 7.00 buah
V2 = (p x l x t) n
= 0.35 m³

Total Pek. Lantai Kerja Bawah Pondasi


V = V1 + V2
= 1.05 m³

2 Pek. Strouss dia. 30 cm


d = 0.30 m
t = 3.00 m
n = 21.00 buah
v = 0,25 x π x d²
= 4.45 m³

3 Pek. Pile Cap Type 1 - Bekistng


p = 1.00 m K = 16.8 m²
l = 1.00 m
t = 0.30 m
n = 14.00 buah
V = pxlxtxn
= 4.20 m³

4 Pek. Pile Cap Type 2 - Bekistng


p = 1.00 m K = 8.40 m²
l = 1.00 m
t = 0.30 m
n = 7.00 buah
V 0 pxlxtxn
= 2.10 m³

5 Pek. Aanstamping
p = 87.50 m
l = 1.00 m
t = 0.20 m
v = pxlxt
= 17.50 m³

6 Pek. Pondasi Batu Kali 1 Pp : 4 Ps


- Type 1
p = 50.60 m
l1 = 0.30 m
l2 = 0.80 m
t = 0.80 m
V1 = p ((l1 + l2)/2) t
= 22.26 m³

- Type 1
p = 36.90 m
l1 = 0.30 m
l2 = 0.85 m
t = 0.80 m
V2 = p ((l1 + l2)/2) t
= 16.97 m³

Total Pek. Pondasi Batu Kali 1 Pp : 4 Ps


V = V1 + V2
= 39.24 m³

7 Pek. Rollag Bata


p = 10.35 m
l = 0.24 m
t = 0.11 m
v = pxlxt
= 0.27 m³

LANTAI 1

IV PEKERJAAN BETON
1 Pek. Beton Rabat tbl. 5 cm
Ix = 3.25 m Ix = 2.10 m
Iy = 1.75 m Iy = 1.35 m
t = 0.05 m t = 0.05 m
V1 = Ix x Iy x t V2 = Ix x Iy x t
= 0.28 m³ = 0.14 m³

Ix = 3.30 m Ix = 2.50 m
Iy = 4.85 m Iy = 2.25 m
t = 0.05 m t = 0.05 m
V3 = Ix x Iy x t V4 = Ix x Iy x t
= 0.80 m³ = 0.28 m³

Ix = 5.00 m Ix = 3.25 m
Iy = 2.10 m Iy = 5.55 m
t = 0.05 m t = 0.05 m
V5 = Ix x Iy x t V6 = Ix x Iy x t
= 0.53 m³ = 0.90 m³

Ix = 1.78 m Ix = 3.60 m
Iy = 1.75 m Iy = 2.80 m
t = 0.05 m t = 0.05 m
V7 = Ix x Iy x t V8 = Ix x Iy x t
= 0.16 m³ = 0.50 m³

Ix = 1.80 m Ix = 2.35 m
Iy = 3.20 m Iy = 3.00 m
t = 0.05 m t = 0.05 m

V9 = Ix x Iy x t V10 = Ix x Iy x t
= 0.29 m³ = 0.35 m³

Ix = 1.43 m Ix = 2.28 m
Iy = 1.85 m Iy = 1.78 m
t = 0.05 m t = 0.05 m
V11 = Ix x Iy x t V12 = Ix x Iy x t
= 0.13 m³ = 0.20 m³

Ix = 1.43 m Ix = 2.28 m
Iy = 1.85 m Iy = 1.78 m
t = 0.05 m t = 0.05 m
V13 = Ix x Iy x t V14 = Ix x Iy x t
= 0.13 m³ = 0.20 m³

Ix = 1.00 m Ix = 1.25 m
Iy = 1.85 m Iy = 1.25 m
t = 0.05 m t = 0.05 m
V15 = Ix x Iy x t V16 = Ix x Iy x t
= 0.09 m³ = 0.08 m³

Ix = 3.10 m
Iy = 1.00 m
t = 0.05 m
V17 = Ix x Iy x t
= 0.16 m³

Total Pek. Rabat Beton tbl. 5 cm


V = V1 + V2 + V3 + V4 + V5 + V6 + V7 + V8 + V9 + V10 + V11 + V12 +
V13 + V14 + V15 + V16 + V17
= 5.23 m³

2 Pek. Sloof 15/20 - Bekistng


p = 96.00 m K = 38.40 m²
b = 0.15 m
h = 0.20 m
V = pxbxh
= 2.88 m³
3 Pek. Kolom K1 25/25 - Bekistng
b = 0.25 m K = 5.40 m²
h = 0.25 m
t = 5.40 m
n = 22.00 buah
V = bxhxtxn
= 7.43 m³

4 Pek. Kolom KP 15/15 - Bekistng


b = 0.15 m K = 3.24 m²
h = 0.15 m
t = 5.40 m
n = 17.00 buah
V = bxhxtxn
= 2.07 m³

5 Pek. Balok B1 25/35 - Bekistng


p = 66.70 m K = 63.37 m²
b = 0.25 m
h = 0.35 buah
V = pxbxh
= 5.84 m³

6 Pek. Balok B2 20/20 - Bekistng


p = 15.20 m K = 9.12 m²
b = 0.20 m
h = 0.20 buah
V = pxbxh
= 0.61 m³

7 Pek. Balok B3 15/20 - Bekistng


p = 42.05 m K = 23.13 m²
b = 0.15 m
h = 0.20 buah
V = pxbxh
= 1.26 m³

8 Pek. Tangga
- Pek. Plat Tangga t = 10 cm - Bekistng
p = 6.10 m K1 = 7.02 m²
l = 0.95 m
t = 0.10 m
V1 = pxlxt
= 0.58 m³
- Pek. Plat Anak Tangga - Bekistng
p = 0.56 m K2 = 1.81 m²
l = 0.95 m
t = 0.18 m
n = 18 m
V2 = 0,5 x p x l x t x n
= 0.86 m³

- Pek. Plat Bordes - Bekistng


p = 0.90 m K3 = 2.31 m²
l = 2.10 m
t = 0.10 m
V3 = pxlxt
= 0.19 m³

Total Pek. Tangga


V = V1 + V2 + V3
= 1.63 m³

Total Bekistng Pek. Tangga


V = K1 + K2 + K3
= 11.14 m³

V PEKERJAAN DINDING
1 Pek. Pasangan 1/2 Bata 1 Pc : 4 Pp
- Luas Dinding
- C1-C3 - E1-E2
p = 3.13 m p = 1.68 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 10.00 m² = 5.36 m²

- G1-G2 - E2-E3
p = 1.68 m p = 1.30 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 5.36 m² = 4.16 m²

- H2-H4 - C3-C4
p = 3.50 m p = 2.00 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 11.20 m² = 6.40 m²

- B3-B4 - B'4-B'5
p = 2.00 m p = 3.10 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 6.40 m² = 9.92 m²

- F5-F6 - H'5-H'6
p = 2.68 m p = 2.63 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 8.56 m² = 8.40 m²

- H''5'-H''6 - H'''1-H'''6
p = 2.13 m p = 11.55 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 6.80 m² = 36.96 m²

- A'1-H'''6 - E2-H2
p = 16.70 m p = 2.65 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 53.44 m² = 8.48 m²

- B3-E3 - B4-D4
p = 5.75 m p = 3.35 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 18.40 m² = 10.72 m²

- G4-H4 - B'5-E5
p = 0.75 m p = 4.80 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 2.40 m² = 15.36 m²

- G5-H'5 - H''5'-H'''5'
p = 1.30 m p = 1.85 m
t = 3.20 m t = 3.20 m
L = pxt L = pxt
= 4.16 m² = 5.92 m²

- H'5''-H''5''
p = 1.85 m
t = 3.20 m
L = pxt
= 5.92 m²
- Luas Gewel
p = 2.43 m
t = 2.60 m
L = (0,5 x p x t) 3
= 9.46 m²

- Total Luas Dinding


L1 = Luas Dinding + Luas Gewel
= 253.78 m²

- Luas Kusen
P1 = 5.74 m²
P2 = 3.12 m²
P3 = 3.78 m²
J1 = 3.57 m²
J1a = 2.30 m²
J2 = 2.52 m²
J3 = 4.15 m²
BV = 0.56 m² +
L2 = 25.73 m²

Total Pek. Pasangan 1/2 Bata 1 Pc : 4 Pp


L = L1 + L2
= 228.05 m²

2 Pek. Pasangan 1/2 Bata 1 Pc : 2 Pp


- Luas Dinding
- C1-C3 - E1-E2
p = 3.13 m p = 1.68 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.63 m² = 0.34 m²

- G1-G2 - E2-E3
p = 1.68 m p = 1.30 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.34 m² = 0.26 m²

- H2-H4 - C3-C4
p = 3.50 m p = 2.00 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.70 m² = 0.40 m²
- B3-B4 - B'4-B'5
p = 2.00 m p = 3.10 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.40 m² = 0.62 m²

- F5-F6 - H'5-H'6
p = 2.68 m p = 2.63 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.54 m² = 0.53 m²

- H''5'-H''6 - H'''1-H'''6
p = 2.13 m p = 11.55 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.43 m² = 2.31 m²

- A'1-H'''6 - E2-H2
p = 16.70 m p = 2.65 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 3.34 m² = 0.53 m²

- B3-E3 - B4-D4
p = 5.75 m p = 3.35 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 1.15 m² = 0.67 m²

- G4-H4 - B'5-E5
p = 0.75 m p = 4.80 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.15 m² = 0.96 m²

- G5-H'5 - H''5'-H'''5'
p = 1.30 m p = 1.85 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.26 m² = 0.37 m²

- H'5''-H''5''
p = 1.85 m
t = 0.20 m
L = pxt
= 0.37 m²

- Total Luas Dinding


L1 = 15.27

- Luas Kusen
P1 = 0.60 m²
P2 = 0.33 m²
P3 = 1.26 m² +
L2 = 2.19 m²

Total Pek. Pasangan 1/2 Bata 1 Pc : 2 Pp


L = L1 - L2
= 13.08 m²

3 Pek. Plesteran Dinding 1 Pc : 4 Ps


L = 2 x Total Pek. Pasangan 1/2 Bata 1 Pc : 4 Ps
= 456.09 m²

4 Pek. Plesteran Dinding 1 Pc : 2 Ps


L = 2 x Total Pek. Pasangan 1/2 Bata 1 Pc : 2 Ps
= 26.16 m²

5 Pek. Acian Dinding dan Beton


- Luas Dinding
- C1-C3 - E1-E2
p = 3.13 m p = 1.68 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 10.63 m² = 5.70 m²

- G1-G2 - E2-E3
p = 1.68 m p = 1.30 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 5.70 m² = 4.42 m²

- H2-H4 - C3-C4
p = 3.50 m p = 2.00 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 11.90 m² = 6.80 m²

- B3-B4 - B'4-B'5
p = 2.00 m p = 3.10 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 6.80 m² = 10.54 m²

- F5-F6 - H'5-H'6
p = 2.68 m p = 2.63 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 9.10 m² = 8.93 m²

- H''5'-H''6 - H'''1-H'''6
p = 2.13 m p = 11.55 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 7.23 m² = 39.27 m²

- A'1-H'''6 - E2-H2
p = 16.70 m p = 2.65 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 56.78 m² = 9.01 m²

- B3-E3 - B4-D4
p = 5.75 m p = 3.35 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 19.55 m² = 11.39 m²

- G4-H4 - B'5-E5
p = 0.75 m p = 4.80 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 2.55 m² = 16.32 m²

- G5-H'5 - H''5'-H'''5'
p = 1.30 m p = 1.85 m
t = 3.40 m t = 3.40 m
L = pxt L = pxt
= 4.42 m² = 6.29 m²

- H'5''-H''5''
p = 1.85 m
t = 3.40 m
L = pxt
= 6.29 m²
- Total Luas Dinding
L1 = 259.59

- Luas Kusen
P1 = 6.34 m²
P2 = 3.44 m²
P3 = 5.04 m²
J1 = 3.57 m²
J1a = 2.30 m²
J2 = 2.52 m²
J3 = 4.15 m²
BV = 0.56 m² +
L2 = 27.92 m²

Total Pek. Acian Dinding dan Beton


L = (L1 - L2) x 2
= 463.33 m²

6 Pek. Pasang Batu Tempel Marmo


t = 7.10 m
l = 0.40 m
L1 = txl
= 2.84 m²

t = 1.00 m
l = 3.20 m
L2 = txl
= 3.20 m²

t = 2.60 m
l = 0.25 m
L3 = txl
= 0.65 m²

Total Pek. Pasang Batu Tempel Marmo


L = L1 + L2 + L3
= 6.69 m²

VI PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant
p = 3.25 m p = 2.10 m
l = 1.75 m l = 1.35 m
L1 = pxl L2 = pxl
= 5.69 m² = 2.84 m²

p = 1.78 m p = 1.28 m
l = 1.85 m l = 1.85 m
L3 = pxl L4 = pxl
= 3.29 m² = 2.37 m²

p = 1.78 m p = 1.00 m
l = 2.28 m l = 1.10 m
L5 = pxl L6 = pxl
= 4.06 m² = 1.10 m²

p = 0.75 m p = 0.75 m
l = 1.50 m l = 1.25 m
L3 = pxl L8 = pxl
L7 = 1.13 m² = 0.94 m²

p = 1.00 m p = 2.35 m
l = 3.10 m l = 2.80 m
L9 = pxl L10 = pxl
= 3.10 m² = 6.58 m²

p = 2.80 m p = 3.10 m
l = 6.10 m l = 7.35 m
L3 = pxl L12 = pxl
L11 = 17.08 m² = 22.79 m²

p = 2.10 m p = 3.30 m
l = 5.00 m l = 4.85 m
L13 = pxl L14 = pxl
= 10.50 m² = 16.01 m²

p = 2.80 m
l = 3.70 m
L15 = pxl
= 10.36 m²
Total Pek. Rangka Plafond Kayu Merant
L = L1 + L2 + L3 + L4 + L5 + L6 + L7 + L8 + L9 + L10 + L11 + L12 + L13
+ L14 + L15
= 107.81 m²

2 Pek. Profil List Palfond Kayu


p = 3.25 m p = 2.10 m
l = 1.75 m l = 1.35 m
L1 = pxl L2 = pxl
= 10.00 m' = 6.90 m'

p = 1.78 m p = 1.28 m
l = 1.85 m l = 1.85 m
L3 = pxl L4 = pxl
= 7.26 m' = 6.26 m'

p = 1.78 m p = 1.00 m
l = 2.28 m l = 1.10 m
L5 = pxl L6 = pxl
= 8.12 m' = 3.20 m'

p = 0.75 m p = 0.75 m
l = 1.50 m l = 1.25 m
L3 = pxl L8 = pxl
L7 = 2.75 m' = 2.50 m'

p = 1.00 m p = 2.35 m
l = 3.10 m l = 2.80 m
L9 = pxl L10 = pxl
= 7.45 m' = 9.50 m'

p = 2.80 m p = 3.10 m
l = 6.10 m l = 7.35 m
L3 = pxl L12 = pxl
L11 = 17.00 m' = 15.05 m'

p = 2.10 m p = 3.30 m
l = 5.00 m l = 4.85 m
L13 = pxl L14 = pxl
= 9.65 m' = 15.50 m'

p = 2.85 m
l = 3.70 m
L15 = pxl
= 9.20 m'

Total Pek. Profil List Plafond Gypsum


L = L1 + L2 + L3 + L4 + L5 + L6 + L7 + L8 + L9 + L10 + L11 + L12 + L13
+ L14 + L15
= 130.34 m'

3 Pek. Plafond Gypsum Board tbl. 9 mm


L = Total Pek. Rangka Plafond Kayu Merant
= 107.81 m²

VII PEKERJAAN LANTAI


1 Pek. Lantai Keramik 30 x 30
p = 3.25 m p = 6.10 m
l = 1.75 m l = 2.80 m
L1 = pxl L2 = pxl
= 5.69 m² 17.08 m²

p = 5.00 m p = 7.85 m
l = 3.25 m l = 2.10 m
L3 = pxl L4 = pxl
= 16.25 m² 16.49 m²

p = 5.00 m p = 7.85 m
l = 3.25 m l = 2.10 m
L5 = pxl L6 = pxl
= 16.25 m² 16.49 m²

p = 7.30 m p = 3.10 m
l = 3.20 m l = 1.00 m
L7 = pxl L8 = pxl
= 23.36 m² 3.10 m²

p = 1.25 m p = 1.50 m
l = 0.75 m l = 0.75 m
L9 = pxl L10 = pxl
= 0.94 m² 1.13 m²

p = 1.10 m p = 2.30 m
l = 1.00 m l = 1.90 m
L11 = pxl L12 = pxl
= 1.10 m² 4.37 m²

Total Pek. Lantai Keramik 30 x 30


L = L1+L2+L3+L4+L5+L6+L7+L8+L9+L10+L11+L12
= 122.23 m²

2 Pek. Lantai Keramik 20 x 20


p = 2.10 m p = 1.30 m
l = 0.70 m l = 0.65 m
L1 = pxl L2 = pxl
= 1.47 m² 0.85 m²

p = 1.00 m p = 1.85 m
l = 0.93 m l = 0.85 m
L3 = pxl L4 = pxl
= 0.93 m² 1.57 m²

p = 1.00 m p = 1.30 m
l = 0.93 m l = 1.05 m
L5 = pxl L6 = pxl
= 0.93 m² 1.37 m²

Total Pek. Lantai Keramik 20 x 20


L = L1+L2+L3+L4+L5+L6
= 7.11 m²

3 Pek. Keramik Dinding Kamar Mandi 20 x 20


p = 3.90 m p = 4.55 m
l = 1.40 m l = 1.40 m
L1 = pxl L2 = pxl
= 5.46 m² 6.37 m²

p = 2.58 m² p = 4.71 m
l = 1.40 m² l = 0.80 m
L3 = 7.11 L4 = pxl
= 3.61 m² 3.77 m²

p = 4.07 m p = 0.54 m
l = 0.80 m l = 0.70 m
L5 = pxl L6 = pxl
= 3.26 m² 0.38 m²

p = 0.75 m p = 0.55 m
l = 0.83 m l = 0.70 m
L7 = pxl L8 = pxl
= 0.62 m² 0.39 m²

Total Pek. Keramik Dinding Kamar Mandi 20 x 20


L = L1+L2+L3+L4+L5+L6+L7+L8
= 23.85 m²
4 Pek. List Keramik Dinding Kamar Mandi
p = 11.03 m
l = 0.10 m
L = pxl
= 1.10 m²

5 Pek. Paving Stone


p = 5.40 m
l = 2.80 m
L = pxl
= 15.12 m²

VIII PEKERJAAN PINTU DAN JENDELA


1 Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/15
- PG - P1
b = 0.06 m b = 0.06 m
h = 0.15 m h = 0.15 m
p = 6.93 m p = 5.41 m
n = 1.00 buah n = 2.00 buah
V1 = bxhxpxn V2 = bxhxpxn
= 0.06 m³ 0.10 m³

- P2 - J1
b = 0.06 m b = 0.06 m
h = 0.15 m h = 0.15 m
p = 4.72 m p = 4.52 m
n = 2.00 buah n = 4.00 buah
V3 = bxhxpxn V4 = bxhxpxn
= 0.08 m³ 0.16 m³

- J1a - J2
b = 0.06 m b = 0.06 m
h = 0.15 m h = 0.15 m
p = 4.56 m p = 6.38 m
n = 2.00 buah n = 1.00 buah
V5 = bxhxpxn V6 = bxhxpxn
= 0.08 m³ 0.06 m³

- J3 - BV
b = 0.06 m b = 0.06 m
h = 0.15 m h = 0.15 m
p = 8.16 m p = 2.30 m
n = 1.00 buah n = 2.00 buah
V7 = bxhxpxn V8 = bxhxpxn
= 0.07 m³ 0.04 m³

Total Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/15
V = V1+V2+V3+V4+V5+V6+V7+V8
= 0.66 m³

2 Pek. Pasang Pintu PVC


N = 3.00 buah

3 Pek. Pasang Daun Pintu Panil


- PG - P1
l = 2.54 m l = 1.40 m
t = 2.15 m t = 2.04 m
n = 1.00 buah n = 2.00 buah
L1 = pxlxn L2 = pxlxn
= 5.46 m² 5.71 m²

- P2
l = 0.71 m
t = 2.04 m
n = 2.00 buah
L3 = pxlxn
= 2.90 m²

Total Pasang Daun Pintu Panil


L = L1+L2+L3
= 14.07 m²

4 Pek. Pasang Daun Jendela Kayu


- J1a - Kaca J1a
l = 0.63 m l = 0.43 m
t = 1.40 m t = 1.20 m
n = 2.00 buah n = 2.00 buah
La = lxtxn Lb = lxtxn
= 1.76 m² 1.03 m²

L1 = La - Lb
= 0.73 m²

- J2 - Kaca J2
l = 0.63 m l = 0.43 m
t = 1.63 m t = 1.43 m
n = 2.00 buah n = 2.00 buah
La = lxtxn Lb = lxtxn
= 2.05 m² 1.23 m²

L2 = La - Lb
= 0.82 m²

- J3 - Kaca J3
l = 0.63 m l = 0.43 m
t = 1.83 m t = 1.63 m
n = 3.00 buah n = 3.00 buah
La = lxtxn Lb = lxtxn
= 3.46 m² 2.10 m²

L3 = La - Lb
= 1.36 m²
Total Pek. Pasang Daun Jendela Kayu
L = L1+L2+L3
= 2.91 m²

5 Pek. Pasang Kaca 5 mm


- J1 - J1a
l = 0.39 m l = 0.43 m
t = 1.63 m t = 1.20 m
n = 4.00 buah n = 2.00 buah
L1 = pxlxn L2 = pxlxn
= 2.54 m² 1.03 m²

- J2 - J3
l = 0.43 m l = 0.43 m
t = 1.43 m t = 1.63 m
n = 2.00 buah n = 3.00 buah
L3 = pxlxn L4 = pxlxn
= 1.23 m² 2.10 m²

- BV
l = 0.15 m
t = 0.68 m
n = 4.00 buah
L5 = pxlxn
= 0.41 m²

Total Pek. Pasang Kaca 5 mm


L = L1+L2+L3+L4+L5
= 7.32 m²

IX PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pek. Pasangan Kunci Tanam Pintu
P1 = 2.00 buah
P2 = 2.00 buah
P3 = 3.00 buah +
N = 7.00 buah

2 Pek. Pasangan Engsel Pintu


PG = 1.00 buah
P1 = 2.00 buah
P2 = 2.00 buah
P3 = 3.00 buah +
N = 8.00 buah
= 4.00 stel
3 Pek. Pasangan Engsel Jendela
J1a = 4.00 buah
J2 = 6.00 buah
J3 = 4.00 buah +
N = 14.00 buah
= 7.00 stel

4 Pek. Pasangan Grendel Pintu


J1a = 4.00 buah
J2 = 4.00 buah
J3 = 6.00 buah +
N = 14.00 buah
= 7.00 stel

5 Pek. Pasangan Hak Angin


J1a = 2.00 buah
J2 = 3.00 buah
J3 = 3.00 buah +
N = 8.00 buah
= 4.00 stel

X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam
Total Pek. Plesteran Dinding 1 Pc : 4 Ps
L1 = L/2
= 228.045 m²

Total Pek. Plesteran Dinding 1 Pc : 2 Ps


L2 = L/2
= 13.08 m²

Total Pek. Pengecatan Dinding Dalam


L = L1 + L2
= 241.12 m²

2 Pek. Pengecatan Dinding Luar


Total Pek. Plesteran Dinding 1 Pc : 4 Ps
L1 = L/2
= 228.045 m²

Total Pek. Plesteran Dinding 1 Pc : 2 Ps


L2 = L/2
= 13.08 m²
Total Pek. Pengecatan Dinding Luar
L = L1 + L2
= 241.12 m²

3 Pek. Pengecatan Plafond


p = 2.00 m p = 3.50 m
l = 2.00 m l = 5.00 m
L1 = pxl L2 = pxl
= 4.00 m² = 17.50 m²

p = 3.00 m p = 1.75 m
l = 3.25 m l = 3.25 m
L3 = pxl L4 = pxl
= 9.75 m² = 5.69 m²

p = 3.25 m p = 2.25 m
l = 4.50 m l = 6.50 m
L5 = pxl L6 = pxl
= 14.63 m² = 14.63 m²

p = 1.50 m
l = 3.75 m
L7 = pxl
= 5.63 m²

Total Pek. Pengecatan Plafond


L = L1+L2+L3+L4+L5+L6+L7
= 71.81 m²

4 Pek. Pengecatan List Plafond Kayu


p = 3.25 m p = 2.10 m
l = 1.75 m l = 1.35 m
K = (p + l) 2 K = (p + l) 2
= 10.00 m = 6.90 m
L1 = 4.00 m² L2 = 2.76 m²

p = 1.78 m p = 1.28 m
l = 1.85 m l = 1.85 m
K = (p + l) 2 K = (p + l) 2
= 7.26 m = 6.26 m
L3 = 2.90 m² L4 = 2.50 m²

p = 1.78 m p = 1.00 m
l = 2.28 m l = 1.10 m
K = (p + l) 2 K = (p + l) 2
= 8.12 m = 3.20 m
L5 = 3.25 m² L6 = 1.28 m²

p = 0.75 m p = 0.75 m
l = 1.50 m l = 1.25 m
K = (p + l) 2 K = (p + l) 2
= 2.75 m = 2.50 m
L7 = 1.10 m² L8 = 1.00 m²

p = 1.00 m p = 2.35 m
l = 3.10 m l = 2.80 m
K = (p + l) 2 K = (p + l) 2
= 7.45 m = 9.50 m
L9 = 2.98 m² L10 = 3.80 m²

p = 2.80 m p = 3.10 m
l = 6.10 m l = 7.35 m
K = (p + l) 2 K = (p + l) 2
= 17.00 m = 15.05 m
L11 = 6.80 m² L12 = 6.02 m²

p = 2.10 m p = 3.30 m
l = 5.00 m l = 4.85 m
K = (p + l) 2 K = (p + l) 2
= 9.65 m = 15.50 m
L13 = 3.86 m² L14 = 6.20 m²

p = 2.85 m
l = 3.70 m
K = (p + l) 2
= 9.20 m
L15 = 3.68 m²

Total Pek. Pengecatan List Plafond Kayu


L = L1+L2+L3+L4+L5+L6+L7+L8+L9+L10+L11+L12+L13
+K14+K15
= 52.14 m²

5 Pek. Pengecatan Kusen Pintu & Jendela


PG = 1.871 m²
P1 = 2.921 m²
P2 = 2.549 m²
J1 = 4.882 m²
J1a = 2.057 m²
J2 = 1.334 m²
J3 = 1.677 m²
BV = 0.810 m² +
18.10 m²

6 Pek. Pengecatan Daun Pintu


- P1 - P2
l = 1.40 m l = 0.71 m
t = 2.04 m t = 2.04 m
L1 = lxt L2 = lxt
= 5.712 m² = 2.8968 m²

- PG
l = 2.54 m
t = 2.15 m
L3 = lxt
= 5.461 m²

Total Pek. Pengecatan Daun Pintu dan Jendela


L = L1 + L2 + L3
= 14.070 m²

XI PEKERJAAN INSTALASI LISTRIK


1 Pek. Pemasangan Box Sekring
N = 1.00 buah

2 Pek. Pemasangan Titk Lampu


N = 14.00 buah

3 Pek. Pemasangan Stop Kontak


N = 5.00 buah

4 Pek. Pemasangan Saklar Tunggal


N = 6.00 buah

5 Pek. Pemasangan Saklar Ganda


N = 4.00 buah

XII PEKERJAAN SANITASI


1 Pek. Instalasi Air Bersih Pipa PVC 3/4 "
P = 41.64 m'

2 Pek. Instalasi Air Bekas Pipa PVC 2,5 "


P = 37.39 m'

3 Pek. Instalasi Air Kotor Pipa PVC 3 "


P = 37.73 m'

4 Pek. Kloset Duduk Porselen


N = 2.00 buah

5 Pek. Kloset Jongkok Porselen


N = 1.00 buah

6 Pek. Kran Air


N = 7.00 buah

7 Pek. Floor Drain


N = 3.00 buah

8 Pek. Bak Kontrol


N = 1.00 buah

XIII PEKERJAAN RAILLING


1 Pek. Pasang Railling Pagar Besi Hollow Fins Cat Besi
N = 3.00 unit

XIV PEKERJAAN ATAP


1 Pek. Pasangan Gording (8/12)
b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 4.30 m p = 4.60 m
V1 = bxhxp V2 = bxhxp
= 0.052 m³ = 0.055 m³

b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 5.40 m p = 6.40 m
V3 = bxhxp V4 = bxhxp
= 0.065 m³ = 0.077 m³

Total Pek. Pasangan Gording (8/12)


V = V1 + V2 + V3 + V4
= 0.25 m³

2 Pek. Pasangan Usuk dan Reng


p = 3.70 m p = 0.95 m
l = 4.30 m l = 3.85 m
L1 = pxl L2 = pxl
= 15.91 m² = 3.66 m²

p = 0.60 m p = 1.90 m
l = 1.05 m l = 1.90 m
L3 = pxl L4 = pxl
= 0.63 m² = 1.805 m²
p = 1.97 m
l = 1.97 m
L5 = pxl
= 1.94 m²

Total Pek. Pasangan Usuk dan Reng


L = L1 + L2 + L3 + L4 + L5
= 23.94 m²

3 Pek. Pasangan Lisplank (2/20)


P = 9.50 m'

4 Pek. Penutup Atap Genteng


p = 3.70 m p = 0.95 m
l = 4.30 m l = 3.85 m
L1 = pxl L2 = pxl
= 15.91 m² = 3.66 m²

p = 0.60 m p = 1.90 m
l = 1.05 m l = 1.90 m
L3 = pxl L4 = pxl
= 0.63 m² = 1.805 m²

p = 1.97 m
l = 1.97 m
L5 = pxl
= 1.94 m²

Total Pek. Penutup Atap Genteng


L = L1 + L2 + L3 + L4 + L5
= 23.94 m²

LANTAI 2

I PEKERJAAN BETON
1 Pek. Plat Lantai tbl. 12 cm
Ix = 2.00 m Ix = 3.50 m
Iy = 2.00 m Iy = 2.50 m
t = 0.12 m t = 0.12 m
V1 = Ix x Iy x t V2 = Ix x Iy x t
= 0.48 m³ = 1.05 m³

- Bekistng - Bekistng
L1 = Ix x Iy L2 = Ix x Iy
= 4.00 m² = 8.75 m²

Ix = 3.50 m Ix = 2.50 m
Iy = 2.50 m Iy = 2.25 m
t = 0.12 m t = 0.12 m
V3 = Ix x Iy x t V4 = Ix x Iy x t
= 1.05 m³ = 0.68 m³

- Bekistng - Bekistng
L3 = Ix x Iy L4 = Ix x Iy
= 8.75 m² = 5.63 m²

Ix = 3.25 m Ix = 3.25 m
Iy = 2.00 m Iy = 1.75 m
t = 0.12 m t = 0.12 m
V5 = Ix x Iy x t V6 = Ix x Iy x t
= 0.78 m³ = 0.68 m³

- Bekistng - Bekistng
L5 = Ix x Iy L6 = Ix x Iy
= 6.50 m² = 5.69 m²

Ix = 3.25 m Ix = 3.00 m
Iy = 2.50 m Iy = 2.50 m
t = 0.12 m t = 0.12 m
V7 = Ix x Iy x t V8 = Ix x Iy x t
= 0.98 m³ = 0.90 m³

- Bekistng - Bekistng
L7 = Ix x Iy L8 = Ix x Iy
= 8.13 m² = 7.50 m²

Ix = 3.50 m
Iy = 3.00 m
t = 0.12 m
V9 = Ix x Iy x t
= 1.26 m³

- Bekistng
L9 = Ix x Iy
= 10.50 m²

Total Pek. Plat Lantai tbl. 12 cm


V = V1 + V2 + V3 + V4 + V5 + V6 + V7 + V8 + V9
= 7.85 m³
Total Bekistng Plat Lantai tbl. 12 cm
V = L1 + L2 + L3 + L4 + L5 + L6 + L7 + L8 + L9
= 65.44 m²

2 Pek. Kolom K2 20/20 - Bekistng


b = 0.20 m L = 2.8 m²
h = 0.20 m
t = 3.50 m
n = 17.00 buah
V = bxhxtxn
= 2.38 m³

3 Pek. Kolom KP 15/15 - Bekistng


b = 0.15 m L = 2.1 m²
h = 0.15 m
t = 3.50 m
n = 11.00 buah
V = bxhxtxn
= 0.87 m³

4 Pek. Balok B1 25/35 - Bekistng


p = 4.60 m L = 4.37 m²
b = 0.25 m
h = 0.35 buah
V = pxbxh
= 0.40 m³

5 Pek. Balok B3 15/20 - Bekistng


p = 51.15 m L = 20.46 m²
b = 0.15 m
h = 0.20 m
V = pxbxh
= 1.53 m³

6 Pek. Ring Gewel 15/15 - Bekistng


p = 24.78 m L = 7.43 m²
b = 0.15 m
h = 0.15 m
V = pxbxh
= 0.56 m³

II PEKERJAAN DINDING
1 Pek. Pasangan 1/2 bata 1 Pc : 4 Pp
- Luas Dinding
- G1-G2 - E1-E2
p = 1.68 m p = 1.68 m
t = 3.10 m t = 3.10 m
L = pxt L = pxt
= 5.19 m² = 5.19 m²

- E1-G1 - E1-G2
p = 1.50 m p = 1.85 m
t = 3.10 m t = 3.10 m
L = pxt L = pxt
= 4.65 m² = 5.74 m²

- G2-H2 - E2-E3
p = 0.85 m p = 1.35 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 2.81 m² = 4.46 m²

- C1-C3 - H2-H4
p = 3.13 m p = 3.60 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 10.31 m² = 11.88 m²

- B3-B4 - B'4-B'5
p = 2.00 m p = 3.10 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 6.60 m² = 10.23 m²

- D'4-D'5 - G4-G5
p = 3.10 m p = 3.00 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 10.23 m² = 9.90 m²

- C1-E1 - B3-E3
p = 4.50 m p = 6.05 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 14.85 m² = 19.97 m²

- B4-D4 - D'4-H4
p = 3.40 m p = 3.60 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 11.22 m² = 11.88 m²
- B'5-G5 - Gewel 1
p = 6.40 m p = 8.45 m
t = 3.30 m t = 2.60 m
L = pxt L = pxt
= 21.12 m² = 10.60 m²

- Gewel 2 - Gewel 3
p = 8.45 m p = 7.50 m
t = 2.60 m t = 2.60 m
L = pxt L = pxt
= 10.60 m² = 9.36 m²

- Total Luas Dinding


L1 = 196.77 m²

- Luas Kusen
P1 = 2.87 m²
P2 = 3.12 m²
P3 = 1.26 m²
J1 = 1.79 m²
J1b = 2.13 m²
J2 = 5.04 m²
J3 = 4.15 m²
BV = 0.28 m² +
L2 = 20.63 m²

Total Pek. Pasangan 1/2 Bata 1 Pc : 4 Pp


L = L1 - L2
= 176.13 m²

2 Pek. Pasangan 1/2 bata 1 Pc : 2 Pp


- Luas Dinding
- G1-G2 - E1-E2
p = 1.68 m p = 1.68 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.34 m² = 0.34 m²

- E1-G1 - E2-G2
p = 1.50 m p = 1.85 m
t = 0.20 m t = 0.20 m
L = pxt L = pxt
= 0.30 m² = 0.37 m²

- Total Luas Dinding


L1 = 1.34 m²
- Luas Kusen
P3 = 0.42 m² +
L2 = 0.42 m²

Total Pek. Pasangan 1/2 Bata 1 Pc : 2 Pp


L = L1 - L2
= 0.92 m²

3 Pek. Plesteran Dinding 1 Pc : 4 Ps


L = 2 x Total Pek. Pasangan 1/2 Bata 1 Pc : 4 Ps
= 352.27 m²

4 Pek. Plesteran Dinding 1 Pc : 2 Ps


L = 2 x Total Pek. Pasangan 1/2 Bata 1 Pc : 2 Ps
= 1.84 m²

5 Pek. Acian Dinding dan Beton


- Luas Dinding
- G1-G2 - E1-E2
p = 1.68 m p = 1.68 m
t = 3.30 m t = 3.30 m

L = pxt L = pxt
= 5.53 m² = 5.53 m²

- E1-G1 - E1-G2
p = 1.50 m p = 1.85 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 4.95 m² = 6.11 m²

- G2-H2 - E2-E3
p = 0.85 m p = 1.35 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 2.81 m² = 4.46 m²

- C1-C3 - H2-H4
p = 3.13 m p = 3.60 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 10.31 m² = 11.88 m²

- B3-B4 - B'4-B'5
p = 2.00 m p = 3.10 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 6.60 m² = 10.23 m²

- D'4-D'5 - G4-G5
p = 3.10 m p = 3.00 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 10.23 m² = 9.90 m²

- C1-E1 - B3-E3
p = 4.50 m p = 6.05 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 14.85 m² = 19.97 m²

- B4-D4 - D'4-H4
p = 3.40 m p = 3.60 m
t = 3.30 m t = 3.30 m
L = pxt L = pxt
= 11.22 m² = 11.88 m²

- B'5-G5 - Gewel 1
p = 6.40 m p = 8.45 m
t = 3.30 m t = 2.60 m
L = pxt L = pxt
= 21.12 m² = 10.60 m²

- Gewel 2 - Gewel 3
p = 8.45 m p = 7.50 m
t = 2.60 m t = 2.60 m
L = pxt L = pxt
= 10.60 m² = 9.36 m²

- Total Luas Dinding


L1 = 198.11 m²

- Luas Kusen
P1 = 3.17 m²
P2 = 3.44 m²
P3 = 1.68 m²
J1 = 1.79 m²
J1b = 2.13 m²
J2 = 5.04 m²
J3 = 4.15 m²
BV = 0.28 m² +
L2 = 21.68 m²

Total Pek. Acian Dinding dan Beton


L = (L1 - L2) x 2
= 352.85 m²

III PEKERJAAN LANGIT-LANGIT


1 Pek. Rangka Plafond Kayu Merant
p = 2.00 m p = 3.50 m
l = 2.00 m l = 5.00 m
L1 = pxl L2 = pxl
= 4.00 m² = 17.50 m²

p = 3.00 m p = 1.75 m
l = 3.25 m l = 3.25 m
L3 = pxl L4 = pxl
= 9.75 m² = 5.69 m²

p = 3.25 m p = 2.25 m
l = 4.50 m l = 6.50 m
L5 = pxl L6 = pxl
= 14.63 m² = 14.63 m²

p = 1.50 m
l = 3.75 m
L3 = pxl
L7 = 5.63 m²
Total Pek. Rangka Plafond Kayu Merant
L = L1 + L2 + L3 + L4 + L5 + L6 + L7
= 71.81 m²

2 Pek. Profil List Palfond Gypsum


p = 2.00 m p = 3.50 m
l = 2.00 m l = 5.00 m
K1 = 2 x (p + l) K2 = 2 x (p + l)
= 8.00 m' = 17.00 m'

p = 3.00 m p = 1.75 m
l = 3.25 m l = 3.25 m
K3 = 2 x (p + l) K4 = 2 x (p + l)
= 12.50 m' = 10.00 m'

p = 3.25 m p = 2.25 m
l = 4.50 m l = 6.50 m
K5 = 2 x (p + l) K6 = 2 x (p + l)
= 14.15 m' = 13.90 m'
p = 2.95 m
l = 3.75 m
K7 = 2 x (p + l)
= 11.15 m'

Total Pek. Profil List Plafond Gypsum


L = K1 + K2 + K3 + K4 + K5 + K6 + K7
= 86.70 m'

3 Pek. Plafond Gypsum Board tbl. 9 mm


L = Total Pek. Rangka Plafond Kayu Merant
= 71.81 m²

IV PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30
p = 4.85 m p = 3.60 m
l = 3.30 m l = 1.40 m
L1 = pxl L2 = pxl
= 16.01 m² 5.04 m²

p = 3.60 m p = 4.35 m
l = 2.10 m l = 3.25 m
L3 = pxl L4 = pxl
= 7.56 m² 14.14 m²

p = 3.25 m p = 3.25 m
l = 1.60 m l = 2.85 m

L5 = pxl L6 = pxl
= 5.20 m² 9.26 m²

Total Pek. Lantai Keramik 30 x 30


L = L1+L2+L3+L4+L5+L6
= 57.21 m²

2 Pek. Lantai Keramik 20 x 20


p = 1.85 m p = 1.00 m
l = 0.85 m l = 0.95 m
L1 = pxl L2 = pxl
= 1.57 m² 0.95 m²

Total Pek. Lantai Keramik 20 x 20


L = L1+L2
= 2.52 m²
3 Pek. Keramik Dinding Kamar Mandi 20 x 20
k = 7.20 m - Luas Kusen
l = 2.10 m P3 = 1.68 m²
L1 = kxl
= 15.12 m²

Total Pek. Keramik Dinding Kamar Mandi 20 x 20


L = L1 - P3
= 13.44 m²

4 Pek. List Keramik Dinding Kamar Mandi


p = 6.40 m
l = 0.10 m
L = L1+L2
= 0.64 m²

V PEKERJAAN PINTU DAN JENDELA


1 Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/15
- P1 - P2
b = 0.06 m b = 0.06 m
h = 0.15 m h = 0.15 m
p = 5.41 m p = 4.72 m
n = 1.00 buah n = 2.00 buah
V1 = bxhxpxn V2 = bxhxpxn
= 0.05 m³ 0.08 m³

- J1 - J1b
b = 0.06 m b = 0.06 m
h = 0.15 m h = 0.15 m
p = 8.16 m p = 4.52 m
n = 1.00 buah n = 2.00 buah

V3 = bxhxpxn V4 = bxhxpxn
= 0.07 m³ 0.08 m³

- J2 - J3
b = 0.06 m b = 0.06 m
h = 0.15 m h = 0.15 m
p = 6.38 m p = 8.16 m
n = 1.00 buah n = 1.00 buah
V5 = bxhxpxn V6 = bxhxpxn
= 0.06 m³ 0.07 m³

- BV
b = 0.06 m
h = 0.15 m
p = 2.30 m
n = 1.00 buah
V7 = bxhxpxn
= 0.02 m³

Total Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/15
V = V1+V2+V3+V4+V5+V6+V7
= 0.44 m³

2 Pek. Pasang Pintu PVC


N = 1.00 buah

3 Pek. Pasang Daun Pintu Panil


- P1 - P2
l = 1.40 m l = 0.71 m
t = 2.04 m t = 2.04 m
n = 1.00 buah n = 2.00 buah
L1 = pxlxn L2 = pxlxn
= 2.86 m² 2.90 m²

Total Pasang Daun Pintu Panil


L = L1+L2
= 5.75 m²
4 Pek. Pasang Daun Jendela Kayu
- J2 - Kaca J2
l = 0.63 m l = 0.43 m
t = 1.63 m t = 1.43 m
n = 2.00 buah n = 2.00 buah
La = lxtxn Lb = lxtxn
= 2.05 m² 1.23 m²

L1 = La - Lb
= 0.82 m²
- J3 - Kaca J3
l = 0.63 m l = 0.43 m
t = 1.83 m t = 1.63 m
n = 1.00 buah n = 1.00 buah
La = lxtxn Lb = lxtxn
= 1.15 m² 0.70 m²

L2 = La - Lb
= 0.45 m²

Total Pek. Pasang Daun Jendela Kayu


L = L1+L2
= 1.28 m²
5 Pek. Pasang Kaca 5 mm
- J1 - J1b
l = 0.39 m l = 0.59 m
t = 1.63 m t = 2.88 m
n = 2.00 buah n = 1.00 buah
L1 = pxlxn L2 = pxlxn
= 1.27 m² 1.70 m²

- J2 - J3
l = 0.43 m l = 0.43 m
t = 1.43 m t = 1.63 m
n = 1.00 buah n = 1.00 buah
L3 = pxlxn L4 = pxlxn
= 0.61 m² 0.70 m²

- BV
l = 0.15 m
t = 0.68 m
n = 1.00 buah
L5 = pxlxn
= 0.10 m²

Total Pek. Pasang Kaca 5 mm


L = L1+L2+L3+L4+L5
= 4.39 m²

VI PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pek. Pemasangan Kunci Tanam Pintu
P1 = 1.00 buah
P2 = 2.00 buah +
N = 3.00 buah

2 Pek. Pemasangan Engsel Pintu


P1 = 6.00 buah
P2 = 3.00 buah +
N = 9.00 buah

3 Pek. Pemasangan Engsel Jendela


J2 = 2.00 buah
J3 = 6.00 buah +
N = 8.00 buah
= 4.00 stel

4 Pasangan Grendel Pintu


J2 = 2.00 buah
J3 = 3.00 buah +
N = 5.00 buah
= 2.50 stel

5 Pasangan Hak Angin


J2 = 4.00 buah
J3 = 6.00 buah +
N = 10.00 buah

VIII PEKERJAAN PENGECATAN


1 Pek. Pengecatan Dinding Dalam
Total Pek. Plesteran Dinding 1 Pc : 4 Ps
L1 = L/2
= 176.13 m²

Total Pek. Plesteran Dinding 1 Pc : 2 Ps


L2 = L/2
= 0.92 m²

Total Pek. Pengecatan Dinding Dalam


L = L1 + L2
= 177.05 m²

2 Pek. Pengecatan Dinding Luar


Total Pek. Plesteran Dinding 1 Pc : 4 Ps
L1 = L/2
= 176.13 m²

Total Pek. Plesteran Dinding 1 Pc : 2 Ps


L2 = L/2
= 0.92 m²

Total Pek. Pengecatan Dinding Luar


L = L1 + L2
= 177.05 m²
3 Pek. Pengecatan Plafond
p = 2.00 m p = 3.50 m
l = 2.00 m l = 5.00 m
L1 = pxl L2 = pxl
= 4.00 m = 17.50 m

p = 3.00 m p = 1.75 m
l = 3.25 m l = 3.25 m
L3 = pxl L4 = pxl
= 9.75 m = 5.69 m
p = 3.25 m p = 2.25 m
l = 4.50 m l = 6.50 m
L5 = pxl L6 = pxl
= 14.63 m = 14.63 m

p = 1.50 m
l = 3.75 m
L7 = pxl
= 5.63 m

Total Pek. Pengecatan Plafond


L = L1+L2+L3+L4+L5+L6+L7
= 71.81 m

4 Pek. Pengecatan List Plafond Kayu


p = 2.00 m p = 3.50 m
l = 2.00 m l = 5.00 m
K = (p + l) 2 K = (p + l) 2
= 8.00 m = 17.00 m
L1 = 3.20 m² L2 = 6.80 m²

p = 3.00 m p = 1.75 m
l = 3.25 m l = 3.25 m
K = (p + l) 2 K = (p + l) 2
= 12.50 m = 10.00 m
L3 = 5.00 m² L4 = 4.00 m²

p = 3.25 m p = 2.25 m
l = 4.50 m l = 6.50 m
K = (p + l) 2 K = (p + l) 2
= 14.15 m = 13.90 m
L5 = 5.66 m² L6 = 5.56 m²

p = 2.95 m
l = 3.75 m
K = (p + l) 2
= 11.15 m
L7 = 4.46 m²

Total Pek. Pengecatan List Plafond Kayu


K = L1+L2+L3+L4+L5+L6+L7
= 34.68 m

5 Pek. Pengecatan Kusen Pintu & Jendela


P1 = 2.921 m²
P2 = 2.549 m²
J1 = 2.441 m²
J1b = 1.812 m²
J2 = 1.334 m²
J3 = 1.677 m² +
12.73 m²

6 Pek. Pengecatan Daun Pintu


- P1 - P2
l = 1.40 m l = 0.71 m
t = 2.04 m t = 2.04 m
L1 = lxt L2 = lxt
= 2.856 m² = 2.8968 m²
Total Pek. Pengecatan Daun Pintu
L = L1 + L2
= 5.75 m

VIII PEKERJAAN INSTALASI LISTRIK


1 Pek. Pemasangan Titk Lampu
N = 7.00 buah

2 Pek. Pemasangan Stop Kontak


N = 4.00 buah

3 Pek. Pemasangan Saklar Tunggal


N = 3.00 buah

4 Pek. Pemasangan Saklar Ganda


N = 2.00 buah

IX PEKERJAAN SANITASI
1 Pek. Instalasi Air Bersih Pipa PVC 3/4 "
P = 2.64 m'

2 Pek. Instalasi Air Bekas Pipa PVC 2,5 "


P = 1.84 m'

3 Pek. Instalasi Air Kotor Pipa PVC 3 "


P = 0.65 m'

4 Pek. Kloset Duduk Porselen


N = 1.00 buah
5 Pek. Kran Air
N = 2.00 buah

5 Pek. Floor Drain


N = 1.00 buah

X PEKERJAAN ATAP
1 Pek. Pasangan Kuda-kuda (8/12)
b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 8.70 m p = 5.00 m
V1 = bxhxp V2 = bxhxp
= 0.104 m³ = 0.060 m³

b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 5.00 m p = 2.85 m
V3 = bxhxp V4 = bxhxp
= 0.060 m³ = 0.034 m³

b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 2.00 m p = 2.00 m
V5 = bxhxp V6 = bxhxp
= 0.024 m³ = 0.024 m³

b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 1.70 m p = 1.70 m
V7 = bxhxp V8 = bxhxp
= 0.020 m³ = 0.020 m³

b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 0.90 m p = 1.25 m
V9 = bxhxp V10 = bxhxp
= 0.054 m³ = 0.015 m³

b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 1.25 m p = 2.10 m
V11 = bxhxp V12 = bxhxp
= 0.030 m³ = 0.050 m³

b = 0.08 m
h = 0.15 m
p = 2.10 m

V13 = bxhxp
= 0.050 m³
Total Pek. Pasangan Kuda-kuda (8/12)
V = V1+V2+V3+V4+V5+V6+V7+V8+V9+10+V11+V12+V13
= 0.55 m³

2 Pek. Pasangan Balok Tembok + Nok + Gording + Jurai (8/12)


b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 4.35 m p = 5.80 m
V1 = bxhxp V2 = bxhxp
= 0.209 m³ = 0.348 m³

b = 0.08 m b = 0.08 m
h = 0.15 m h = 0.15 m
p = 5.20 m p = 4.85 m
V3 = bxhxp V4 = bxhxp
= 0.062 m³ = 0.058 m³

b = 0.08 m
h = 0.15 m
p = 3.90 m
V5 = bxhxp
= 0.140 m³

Total Pek. Pasangan Balok Tembok + Nok + Gording + Jurai (8/12)


V = V1 + V2 + V3 + V4+V5
= 0.82 m³

3 Pek. Pasangan Usuk dan Reng


p = 4.35 m p = 4.80 m
l = 4.40 m l = 5.00 m
L1 = pxl L2 = pxl
= 19.14 m² = 24.00 m²

p = 3.55 m p = 4.35 m
l = 5.05 m l = 4.55 m
L3 = pxl L4 = pxl
= 17.93 m² = 9.90 m²

p = 1.25 m p = 1.00 m
l = 3.75 m l = 1.10 m
L3 = pxl L4 = pxl
= 4.69 m² = 0.55 m²
Total Pek. Pasangan Usuk dan Reng
L = L1 + L2 + L3 + L4 + +L6
= 76.20 m²

4 Pek. Pasangan Lisplank (2/20)


P = 35.75 m'

5 Pek. Penutup Atap Genteng


p = 4.35 m p = 4.80 m
l = 4.40 m l = 5.00 m
L1 = pxl L2 = pxl
= 19.14 m² = 24.00 m²

p = 3.55 m p = 4.35 m
l = 5.05 m l = 4.55 m
L3 = pxl L4 = pxl
= 17.93 m² = 9.90 m²

p = 1.25 m p = 1.00 m
l = 3.75 m l = 1.10 m
L3 = pxl L4 = pxl
= 4.69 m² = 0.55 m²

Total Pek. Penutup Atap Genteng


L = L1 + L2 + L3 + L4 + +L6
= 76.20 m²

6 Pek. Pasangan Bubungan


P = 9.45 m'
V10 + V11 + V12 +
+ L11 + L12 + L13
+ L11 + L12 + L13
DAFTAR VOLUME PEKERJAAN

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

NO URAIAN VOLUME SATUAN


(1) (2) (3) (4)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 216.00 m²
2 Pembuatan Bouwplank/Uitzet 60.00 m'
II PEKERJAAN TANAH
1 Pek. Galian Tanah 111.99 m³
2 Pek. Bor Strouss dia. 30 cm 4.45 m³
3 Pek. Urugan Pasir Bawah Pondasi 4.54 m³
4 Pek. Urugan Tanah Kembali 39.24 m³
5 Pek. Urugan Sirtu 10.80 m³
III PEKERJAAN PONDASI
1 Pek. Lantai Kerja Bawah Pondasi 1.05 m³
2 Pek. Strouss dia. 30 cm 4.45 m³
3 Pek. Pile Cap Type 1 4.20 m³
4 Pek. Pile Cap Type 2 2.10 m³
5 Pek. Aanstamping 17.50 m³
6 Pek. Pondasi Batu Kali 1 Pp : 4 Ps 39.24 m³
7 Pek. Rollag Bata 0.27 m³
LANTAI 1

IV PEKERJAAN BETON
1 Pek. Beton Rabat tbl. 5 cm 5.23 m³
2 Pek. Sloof 15/20 2.88 m³
3 Pek. Kolom K1 25/25 7.43 m³
4 Pek. Kolom KP 15/15 2.07 m³
5 Pek. Balok B1 25/35 5.84 m³
6 Pek. Balok B2 20/20 0.61 m³
7 Pek. Balok B3 15/20 1.26 m³
8 Pek. Tangga 1.63 m³
V PEKERJAAN DINDING
1 Pek. Pasangan 1/2 Bata 1 Pc : 4 Pp 228.05 m²
2 Pek. Pasangan 1/2 Bata 1 Pc : 2 Pp 13.08 m²
3 Pek. Plesteran Dinding 1 Pc : 4 Ps 456.09 m²
4 Pek. Plesteran Dinding 1 Pc : 2 Ps 26.16 m²
5 Pek. Acian Dinding dan Beton 463.33 m²
6 Pek. Pasang Batu Tempel Marmo 6.69 m²

VI PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant 107.81 m²
2 Pek. Profil List Palfond Kayu 130.34 m'
3 Pek. Plafond Gypsum Board tbl. 9 mm 107.81 m²
VII PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30 122.23 m²
2 Pek. Lantai Keramik 20 x 20 7.11 m²
3 Pek. Keramik Dinding Kamar Mandi 20 x 20 23.85 m²
4 Pek. List Keramik Dinding Kamar Mandi 1.10 m²
5 Pek. Paving Stone 15.12 m²
VIII PEKERJAAN PINTU DAN JENDELA
1 Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/ 0.66 m³
2 Pek. Pasang Pintu PVC 3.00 buah
3 Pek. Pasang Daun Pintu Panil 14.07 m²
4 Pek. Pasang Daun Jendela Kayu 2.91 m²
5 Pek. Pasang Kaca 5 mm 7.32 m²
IX PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pek. Pasangan Kunci Tanam Pintu 7.00 buah
2 Pek. Pasangan Engsel Pintu 4.00 stel
3 Pek. Pasangan Engsel Jendela 7.00 stel
4 Pek. Pasangan Grendel Pintu 7.00 stel
5 Pek. Pasangan Hak Angin 4.00 stel
X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 241.12 m²
2 Pek. Pengecatan Dinding Luar 241.12 m²
3 Pek. Pengecatan Plafond 71.81 m²
4 Pek. Pengecatan List Plafond Kayu 52.14 m²
5 Pek. Pengecatan Kusen Pintu & Jendela 18.10 m²
6 Pek. Pengecatan Daun Pintu 14.0698 m²
XI PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Box Sekring 1.00 buah
2 Pek. Pemasangan Titk Lampu 14.00 buah
3 Pek. Pemasangan Stop Kontak 5.00 buah
4 Pek. Pemasangan Saklar Tunggal 6.00 buah
5 Pek. Pemasangan Saklar Ganda 4.00 buah
XII PEKERJAAN SANITASI
1 Pek. Instalasi Air Bersih Pipa PVC 3/4 " 41.64 m'
2 Pek. Instalasi Air Bekas Pipa PVC 2,5 " 37.39 m'
3 Pek. Instalasi Air Kotor Pipa PVC 3 " 37.73 m'
4 Pek. Kloset Duduk Porselen 2.00 buah
5 Pek. Kloset Jongkok Porselen 1.00 buah
6 Pek. Kran Air 7.00 buah
7 Pek. Floor Drain 3.00 buah
8 Pek. Bak Kontrol 1.00 buah
XIII PEKERJAAN RAILLING
1 Pek. Pasang Railling Pagar Besi Hollow Fins Cat Besi 3.00 unit

XIII PEKERJAAN ATAP


1 Pek. Pasangan Gording (8/12) 0.25 m³
2 Pek. Pasangan Usuk dan Reng 23.94 m²
3 Pek. Pasangan Lisplank (2/20) 9.50 m'
4 Pek. Penutup Atap Genteng 23.94 m²

LANTAI 2

I PEKERJAAN BETON
1 Pek. Plat Lantai tbl. 12 cm 7.85 m³
2 Pek. Kolom K2 20/20 2.38 m³
3 Pek. Kolom KP 15/15 0.87 m³
4 Pek. Balok B1 25/35 0.40 m³
5 Pek. Balok B3 15/20 1.53 m³
6 Pek. Ring Gewel 15/15 0.56 m³
II PEKERJAAN DINDING
1 Pek. Pasangan 1/2 bata 1 Pc : 4 Pp 176.13 m²
2 Pek. Pasangan 1/2 bata 1 Pc : 2 Pp 0.92 m²
3 Pek. Plesteran Dinding 1 Pc : 4 Ps 352.27 m²
4 Pek. Plesteran Dinding 1 Pc : 2 Ps 1.84 m²
5 Pek. Acian Dinding dan Beton 352.85 m²
III PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant 71.81 m²
2 Pek. Profil List Palfond Gypsum 86.70 m'
3 Pek. Plafond Gypsum Board tbl. 9 mm 71.81 m²
IV PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30 57.21 m²
2 Pek. Lantai Keramik 20 x 20 2.52 m²
3 Pek. Keramik Dinding Kamar Mandi 20 x 20 13.44 m²
4 Pek. List Keramik Dinding Kamar Mandi 0.64 m²
V PEKERJAAN PINTU DAN JENDELA
1 Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/ 0.44 m³
2 Pek. Pasang Pintu PVC 1.00 buah
3 Pek. Pasang Daun Pintu Panil 5.75 m²
4 Pek. Pasang Daun Jendela Kayu 1.28 m²
5 Pek. Pasang Kaca 5 mm 4.39 m²
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pek. Pemasangan Kunci Tanam Pintu 3.00 buah
2 Pek. Pemasangan Engsel Pintu 9.00 buah
3 Pek. Pemasangan Engsel Jendela 4.00 stel
4 Pasangan Grendel Pintu 2.50 stel
5 Pasangan Hak Angin 10.00 buah
VII PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 177.05 m²
2 Pek. Pengecatan Dinding Luar 177.05 m²
3 Pek. Pengecatan Plafond 71.81 m
4 Pek. Pengecatan List Plafond Kayu 34.68 m
5 Pek. Pengecatan Kusen Pintu & Jendela 12.73 m²
6 Pek. Pengecatan Daun Pintu 5.75 m
VIII PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Titk Lampu 7.00 buah
2 Pek. Pemasangan Stop Kontak 4.00 buah
3 Pek. Pemasangan Saklar Tunggal 3.00 buah
4 Pek. Pemasangan Saklar Ganda 2.00 buah
IX PEKERJAAN SANITASI
1 Pek. Instalasi Air Bersih Pipa PVC 3/4 " 2.64 m'
2 Pek. Instalasi Air Bekas Pipa PVC 2,5 " 1.84 m'
3 Pek. Instalasi Air Kotor Pipa PVC 3 " 0.65 m'
4 Pek. Kloset Duduk Porselen 1.00 buah
5 Pek. Kran Air 2.00 buah
6 Pek. Floor Drain 1.00 buah
X PEKERJAAN ATAP
1 Pek. Pasangan Kuda-kuda (8/12) 0.55 m³
2 Pek. Pasangan Balok Tembok + Nok + Gording 0.82 m³
+ Jurai (8/12)
3 Pek. Pasangan Usuk dan Reng 76.20 m²
4 Pek. Pasangan Lisplank (2/20) 35.75 m'
5 Pek. Penutup Atap Genteng 76.20 m²
6 Pek. Pasangan Bubungan 9.45 m'
TABEL BERAT BESI

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

Polos Ulir
Diameter Panjang Berat Diameter Panjang Berat
(mm) (m) (kg) (mm) (m) (kg)
6 1 0.22 6 1 0.22
8 1 0.39 8 1 0.39
9 1 0.50 9 1 0.50
10 1 0.62 10 1 0.62
12 1 0.89 12 1 0.89
13 1 1.04 13 1 1.04
14 1 1.21 14 1 1.21
16 1 1.58 16 1 1.58
19 1 2.23 19 1 2.23
22 1 2.98 22 1 2.98
25 1 3.85 25 1 3.85
28 1 4.83 28 1 4.83
32 1 6.31 32 1 6.31
36 1 7.99 36 1 7.99
BAR BENDING SCHEDULE (BESTAT)

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

1 Pile Cap Type 1


n = 14 Buah
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)+(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Ulir
1 0.016 1.58 2.39 280.00 282.39 445.68 5.02 0.04 56.00
5.00

0.096
0.200
0.900
0.200
0.900
0.096

Total Berat Besi Ulir 445.68


2 Pile Cap Type 2
n = 7 Buah
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)+(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Ulir
1 0.016 1.58 2.39 140.00 142.39 224.73 5.02 0.04 28.00
5.00

0.096
0.200
0.900
0.200
0.900
0.096

Total Berat Besi Ulir 224.73

3 Strouss (p = 3 m ; d = 30 cm)
n = 21 Buah
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Polos
1 K = 0.942 0.008 0.39 0.94 441.00 415.42 163.91 12.74 0.696 36.75
12.00 37.00
Besi Ulir
2 0.078 0.013 1.04 3.23 168.00 542.81 565.54 3.71 2.307 56.00
0.15 3.00 56.00
2.925
0.078

Total Berat Besi Polos 163.91

Total Berat Besi Ulir 565.54

4 Sloof
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
1 Segmen N1-J1 17.00 Besi Ulir
0.012 0.89 12.00 4.00 48.00 42.61 1.00 12 4.00
11.92 1.00 4.00
0.08

Besi Ulir
5.56 0.012 0.89 5.64 4.00 22.56 20.03 2.13 12 2.00
0.08 2.00 2.00

Besi Polos
0.05 0.008 0.39 0.48 114.33 55.20 21.78 25.00 12 4.57
0.05 115.00 25.00 5.00
0.07
0.07
0.12
0.12

2 Segmen E2-H2 2.45 Besi Ulir


0.012 0.89 2.53 4.00 10.12 8.98 4.74 12 1.00
2.37 4.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 17.33 8.64 3.41 25.00 12 0.69
0.05 18.00 25.00 1.00
0.07
0.07
0.12
0.12

3 Segmen B3-E3 5.50 Besi Ulir


0.012 0.89 5.58 4.00 22.32 19.81 2.15 12 2.00
5.42 2.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 37.67 18.24 7.20 25.00 12 1.51
0.05 38.00 25.00 2.00
0.07
0.07
0.12
0.12
4 Segmen A4-D4 3.60 Besi Ulir
0.012 0.89 3.68 4.00 14.72 13.07 3.26 12 1.33
3.52 3.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 25.00 12.00 4.73 25.00 12 1.00
0.05 25.00 25.00 1.00
0.07
0.07
0.12
0.12

5 Segmen G4-H4 0.50 Besi Ulir


0.012 0.89 0.58 4.00 2.32 2.06 20.69 12 0.20
0.42 20.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 4.33 2.40 0.95 25.00 12 0.17
0.05 5.00 25.00 1.00
0.07
0.07
0.12
0.12

6 Segmen L5-K5 7.55 Besi Ulir


0.012 0.89 7.63 4.00 30.52 27.09 1.57 12 4.00
7.47 1.00 4.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 51.33 24.96 9.85 25.00 12 2.05
0.05 52.00 25.00 3.00
0.07
0.07
0.12
0.12

7 Segmen K7-I7 1.50 Besi Ulir


0.012 0.89 1.58 4.00 6.32 5.61 7.59 12 0.57
1.42 7.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 11.00 5.28 2.08 25.00 12 0.44
0.05 11.00 25.00 1.00
0.07
0.07
0.12
0.12

8 Segmen N8-J8 16.50 Besi Ulir


0.012 0.89 12.00 4.00 48.00 42.61 1.00 0 4.00
11.92 1.00 4.00
0.08

Besi Ulir
5.06 0.012 0.89 5.14 4.00 20.56 18.25 2.33 1.72 2.00
0.08 2.00 2.00

Besi Polos
0.05 0.008 0.39 0.48 111.00 53.28 21.02 25.00 0 4.44
0.05 111.00 25.00 5.00
0.07
0.07
0.12
0.12

9 Segmen B3-B4 1.75 Besi Ulir


0.012 0.89 1.83 4.00 7.32 6.50 6.56 12 0.67
1.67 6.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 12.67 6.24 2.46 25.00 12 0.51
0.05 13.00 25.00 1.00
0.07
0.07
0.12
0.12

10 Segmen C1-C4 4.50 Besi Ulir


0.012 0.89 4.58 4.00 18.32 16.26 2.62 12 2.00
4.42 2.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 31.00 14.88 5.87 25.00 12 1.24
0.05 31.00 25.00 2.00
0.07
0.07
0.12
0.12

11 Segmen L4-L5 2.95 Besi Ulir


0.012 0.89 3.03 4.00 12.12 10.76 3.96 12 1.33
2.87 3.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 20.67 10.08 3.98 25.00 12 0.83
0.05 21.00 25.00 1.00
0.07
0.07
0.12
0.12

12 Segmen C5-C8 2.50 Besi Ulir


0.012 0.89 2.58 4.00 10.32 9.16 4.65 12 1.00
2.42 4.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 17.67 8.64 3.41 25.00 12 0.71
0.05 18.00 25.00 1.00
0.07
0.07
0.12
0.12

13 Segmen E1-E2 2.85 Besi Ulir


0.012 0.89 2.93 4.00 11.72 10.40 4.10 12 1.00
2.77 4.00 1.00
0.08
0.08
Besi Polos
0.05 0.008 0.39 0.48 20.00 9.60 3.79 25.00 12 0.80
0.05 20.00 25.00 1.00
0.07
0.07
0.12
0.12

14 Segmen F5-F8 2.60 Besi Ulir


0.012 0.89 2.68 4.00 10.72 9.52 4.48 12 1.00
2.52 4.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 18.33 9.12 3.60 25.00 12 0.73
0.05 19.00 25.00 1.00
0.07
0.07
0.12
0.12

15 Segmen G1-G2 1.60 Besi Ulir


0.012 0.89 1.68 4.00 6.72 5.97 7.14 12 0.57
1.52 7.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 11.67 5.76 2.27 25.00 12 0.47
0.05 12.00 25.00 1.00
0.07
0.07
0.12
0.12

16 Segmen G4-G5 3.25 Besi Ulir


0.012 0.89 3.33 4.00 13.32 11.82 3.60 12 1.33
3.17 3.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 22.67 11.04 4.36 25.00 12 0.91
0.05 23.00 25.00 1.00
0.07
0.07
0.12
0.12

17 Segmen H2-H4 3.25 Besi Ulir


0.012 0.89 3.33 4.00 13.32 11.82 3.60 12 1.33
3.17 3.00 2.00
0.08
0.08
Besi Polos
0.05 0.008 0.39 0.48 22.67 11.04 4.36 25.00 12 0.91
0.05 23.00 25.00 1.00
0.07
0.07
0.12
0.12

18 Segmen K5-K8 2.55 Besi Ulir


0.012 0.89 2.63 4.00 10.52 9.34 4.56 12 1.00
2.47 4.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 18.00 8.64 3.41 25.00 12 0.72
0.05 18.00 25.00 1.00
0.07
0.07
0.12
0.12

19 Segmen I6-I8 2.05 Besi Ulir


0.012 0.89 2.13 4.00 8.52 7.56 5.63 12 0.80
1.97 5.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 14.67 7.20 2.84 25.00 12 0.59
0.05 15.00 25.00 1.00
0.07
0.07
0.12
0.12

20 Segmen J1-J8 11.55 Besi Ulir


0.012 0.89 11.63 4.00 46.52 41.30 1.03 12 4.00
11.47 1.00 4.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 78.00 37.44 14.77 25.00 12 3.12
0.05 78.00 25.00 4.00
0.07
0.07
0.12
0.12
Total Berat Besi Polos 126.13

Total Berat Besi Ulir 350.56

5 Kolom K1
n = 22 Buah
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)+(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Ulir
1 5.70 0.016 1.58 6.13 176.00 1078.53 1702.18 1.96 5.9 176.00
0.64 1.00
5.20
0.192
0.096

Besi Polos
0.06 0.01 0.62 0.80 177.00 141.60 87.30 15.00 0.0 11.80
0.06 177.00 15.00 12.00
0.17
0.17
0.17
0.17

Total Berat Besi Ulir 1702.18

Total Berat Besi Polos 87.30

6 Kolom KP
n = 17 Buah
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)+(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Polos
1 5.70 0.01 0.62 6.20 68.00 421.60 259.92 1.94 5.8 68.00
0.06 1.00
5.62
0.12
0.4

Besi Polos
0.048 0.008 0.39 0.38 114.33 42.99 16.96 31.91 0.3 3.69
0.048 115.00 31.00 4.00
0.07
0.07
0.07
0.07

Total Berat Besi Polos 276.88

7 Balok Type B1
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
1 Segmen C1-G1 6.00 Besi Ulir
0.016 1.58 6.65 4.00 26.61 41.99 1.80 5.35 4.00
0.096 1.00 4.00
6.46
0.096

Besi Ulir
0.096 0.016 1.58 3.73 2.00 7.46 11.78 3.22 12 0.67
3.54 3.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 2.15 4.00 8.61 13.59 5.58 1.24 0.80
1.960 5.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 49.00 49.00 30.21 12.00 0 4.08
0.06 12.00 5.00
0.17
0.17
0.27
0.27

2 Segmen B3-E5 5.50 Besi Ulir


0.016 1.58 6.15 4.00 24.61 38.84 1.95 5.85 4.00
0.096 1.00 4.00
5.96
0.096

Besi Ulir
0.096 0.016 1.58 3.48 2.00 6.96 10.99 3.45 1.55 0.67
3.29 3.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 2.03 4.00 8.11 12.80 5.92 1.87 0.80
1.835 5.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 45.00 45.00 27.74 12.00 0.00 3.75
0.06 12.00 4.00
0.17
0.17
0.27
0.27
3 Segmen A4-H4 8.60 Besi Ulir
0.016 1.58 9.25 4.00 37.01 58.41 1.30 2.75 4.00
0.096 1.00 4.00
9.06
0.096

Besi Ulir
0.096 0.016 1.58 5.03 2.00 10.06 15.88 2.38 1.94 1.00
4.84 2.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 2.80 4.00 11.21 17.69 4.28 0.79 1.00
2.610 4.00 1.00
0.096
Besi Polos
0.06 0.01 0.62 1.00 69.80 69.80 43.03 12.00 0.00 5.82
0.06 12.00 6.00
0.17
0.17
0.27
0.27

4 Segmen L5-G5 6.20 Besi Ulir


0.016 1.58 6.85 4.00 27.41 43.26 1.75 5.15 4.00
0.096 1.00 4.00
6.66
0.096

Besi Ulir
0.096 0.016 1.58 3.83 2.00 7.66 12.10 3.13 0.50 0.67
3.64 3.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 2.20 4.00 8.81 13.90 5.45 0.99 0.80
2.010 5.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 50.60 50.60 31.19 12.00 0.00 4.22
0.06 12.00 5.00
0.17
0.17
0.27
0.27

5 Segmen C8-K8 7.60 Besi Ulir


0.016 1.58 8.25 4.00 33.01 52.09 1.45 3.75 4.00
0.096 1.00 4.00
8.06
0.096

Besi Ulir
0.096 0.016 1.58 4.53 2.00 9.06 14.31 2.65 2.94 1.00
4.34 2.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 2.55 4.00 10.21 16.11 4.70 1.79 1.00
2.360 4.00 1.00
0.096
Besi Polos
0.06 0.01 0.62 1.00 61.80 61.80 38.10 12.00 0.00 5.15
0.06 12.00 6.00
0.17
0.17
0.27
0.27

6 Segmen B3-B4 1.75 Besi Ulir


0.016 1.58 2.40 4.00 9.61 15.16 5.00 2.39 1.00
0.096 4.00 1.00
2.21
0.096

Besi Ulir
0.096 0.016 1.58 1.61 2.00 3.21 5.07 7.47 0.75 0.29
1.415 7.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.09 4.00 4.36 6.88 11.01 0.02 0.36
0.898 11.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 15.00 15.00 9.25 12.00 0.00 1.25
0.06 12.00 2.00
0.17
0.17
0.27
0.27
7 Segmen C1-C3 3.00 Besi Ulir
0.016 1.58 3.65 4.00 14.61 23.05 3.29 1.04 1.33
0.096 3.00 2.00
3.46
0.096

Besi Ulir
0.096 0.016 1.58 2.23 2.00 4.46 7.05 5.38 0.84 0.40
2.04 5.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.40 4.00 5.61 8.85 8.56 0.78 0.50
1.210 8.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 25.00 25.00 15.41 12.00 0.00 2.08
0.06 12.00 3.00
0.17
0.17
0.27
0.27

8 Segmen C4-C8 5.50 Besi Ulir


0.016 1.58 6.15 4.00 24.61 38.84 1.95 5.85 4.00
0.096 1.00 4.00
5.96
0.096
Besi Ulir
0.096 0.016 1.58 3.48 2.00 6.96 10.99 3.45 1.55 0.67
3.29 3.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 2.03 4.00 8.11 12.80 5.92 1.87 0.80
1.835 5.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 45.00 45.00 27.74 12.00 0.00 3.75
0.06 12.00 4.00
0.17
0.17
0.27
0.27

9 Segmen D1-D8 10.75 Besi Ulir


0.016 1.58 11.40 4.00 45.61 71.98 1.05 0.60 4.00
0.096 1.00 4.00
11.21
0.096

Besi Ulir
0.096 0.016 1.58 6.11 2.00 12.21 19.28 1.96 5.89 2.00
5.915 1.00 2.00
0.096

Besi Ulir
0.096 0.016 1.58 3.34 4.00 13.36 21.08 3.59 1.98 1.33
3.148 3.00 2.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 87.00 87.00 53.64 12.00 0.00 7.25
0.06 12.00 8.00
0.17
0.17
0.27
0.27

10 Segmen E1-E2 1.60 Besi Ulir


0.016 1.58 2.25 4.00 9.01 14.22 5.33 0.74 0.80
0.096 5.00 1.00
2.06
0.096

Besi Ulir
0.096 0.016 1.58 1.53 2.00 3.06 4.84 7.83 1.28 0.29
1.34 7.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.05 4.00 4.21 6.64 11.41 0.43 0.36
0.860 11.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 13.80 13.80 8.51 12.00 0.00 1.15
0.06 12.00 2.00
0.17
0.17
0.27
0.27

11 Segmen F5-F8 2.60 Besi Ulir


0.016 1.58 3.25 4.00 13.01 20.53 3.69 2.24 1.33
0.096 3.00 2.00
3.06
0.096

Besi Ulir
0.096 0.016 1.58 2.03 2.00 4.06 6.41 5.91 1.84 0.40
1.84 5.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.30 4.00 5.21 8.22 9.22 0.28 0.44
1.110 9.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 21.80 21.80 13.44 12.00 0.00 1.82
0.06 12.00 2.00
0.17
0.17
0.27
0.27

12 Segmen G1-G2 1.60 Besi Ulir


0.016 1.58 2.25 4.00 9.01 14.22 5.33 0.74 0.80
0.096 5.00 1.00
2.06
0.096

Besi Ulir
0.096 0.016 1.58 1.53 2.00 3.06 4.84 7.83 1.28 0.29
1.34 7.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.05 4.00 4.21 6.64 11.41 0.43 0.36
0.860 11.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 13.80 13.80 8.51 12.00 0.00 1.15
0.06 12.00 2.00
0.17
0.17
0.27
0.27

13 Segmen H2-H4 3.25 Besi Ulir


0.016 1.58 3.90 4.00 15.61 24.63 3.08 0.29 1.33
0.096 3.00 2.00
3.71
0.096

Besi Ulir
0.096 0.016 1.58 2.36 2.00 4.71 7.44 5.09 0.22 0.40
2.165 5.00 1.00
0.096
Besi Ulir
0.096 0.016 1.58 1.46 4.00 5.86 9.25 8.19 0.28 0.50
1.273 8.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 27.00 27.00 16.65 12.00 0.00 2.25
0.06 12.00 3.00
0.17
0.17
0.27
0.27

14 Segmen G4-G5 2.75 Besi Ulir


0.016 1.58 3.40 4.00 13.61 21.48 3.53 1.79 1.33
0.096 3.00 2.00
3.21
0.096

Besi Ulir
0.096 0.016 1.58 2.11 2.00 4.21 6.65 5.70 1.47 0.40
1.915 5.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.34 4.00 5.36 8.46 8.96 1.28 0.50
1.148 8.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 23.00 23.00 14.18 12.00 0.00 1.92
0.06 12.00 2.00
0.17
0.17
0.27
0.27

Total Berat Besi Polos 337.60

Total Berat Besi Ulir 779.21

8 Balok Type B2
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
1 Segmen A4-A5 3.00 Besi Ulir
0.016 1.58 3.65 4.00 14.61 23.05 3.29 1.04 1.33
0.096 3.00 2.00
3.46
0.096

Besi Ulir
0.096 0.016 1.58 2.23 1.00 2.23 3.52 5.38 0.84 0.20
2.04 5.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.40 2.00 2.80 4.43 8.56 0.78 0.25
1.210 8.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 0.60 25.00 15.00 9.25 20.00 0.00 1.25
0.06 20.00 2.00
0.12
0.12
0.12
0.12

2 Segmen M5-L5 1.35 Besi Ulir


0.016 1.58 2.00 4.00 8.01 12.64 5.99 1.99 0.80
0.096 5.00 1.00
1.81
0.096

Besi Ulir
0.096 0.016 1.58 1.41 1.00 1.41 2.22 8.53 0.74 0.13
1.215 8.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 0.99 2.00 1.98 3.12 12.13 0.13 0.17
0.798 12.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 0.60 11.80 7.08 4.36 20.00 0.00 0.59
0.06 20.00 1.00
0.12
0.12
0.12
0.12

3 Segmen E2-E5 4.85 Besi Ulir


0.016 1.58 5.50 4.00 22.01 34.73 2.18 1.00 2.00
0.096 2.00 2.00
5.31
0.096

Besi Ulir
0.096 0.016 1.58 3.16 1.00 3.16 4.98 3.80 2.53 0.33
2.965 3.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.86 2.00 3.73 5.89 6.44 0.81 0.33
1.673 6.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 0.60 39.80 23.88 14.72 20.00 0.00 1.99
0.06 20.00 2.00
0.12
0.12
0.12
0.12

4 Segmen E2-E5 3.75 Besi Ulir


0.016 1.58 4.40 4.00 17.61 27.79 2.73 3.20 2.00
0.096 2.00 2.00
4.21
0.096

Besi Ulir
0.096 0.016 1.58 2.61 1.00 2.61 4.11 4.60 1.57 0.25
2.415 4.00 1.00
0.096

Besi Ulir
0.096 0.016 0.62 1.59 2.00 3.18 5.05 7.55 0.87 0.29
1.398 7.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 0.60 31.00 18.60 11.47 20.00 0.00 1.55
0.06 20.00 2.00
0.12
0.12
0.12
0.12

5 Segmen C3-C4 2.25 Besi Ulir


0.016 1.58 2.90 4.00 11.61 18.32 4.14 0.39 1.00
0.096 4.00 1.00
2.71
0.096

Besi Ulir
0.096 0.016 1.58 1.86 1.00 1.86 2.93 6.46 0.86 0.17
1.665 6.00 1.00
0.096
Besi Ulir
0.096 0.016 1.58 1.21 2.00 2.43 3.83 9.88 1.07 0.22
1.023 9.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 0.60 19.00 11.40 7.03 20.00 0.00 0.95
0.06 20.00 1.00
0.12
0.12
0.12
0.12

Total Berat Besi Polos 46.83

Total Berat Besi Ulir 156.63

9 Balok Type B3
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
1 Segmen N1-C1 5.10 Besi Ulir
0.016 1.58 5.75 4.00 23.01 36.31 2.09 0.50 2.00
0.096 2.00 2.00
5.56
0.096

Besi Polos
0.05 0.008 0.39 0.48 35.00 16.66 6.57 25.21 0.10 1.40
0.05 25.00 2.00
0.07
0.07
0.12
0.12

2 Segmen N8-C8 4.95 Besi Ulir


0.016 1.58 5.60 4.00 22.41 35.37 2.14 0.80 2.00
0.096 2.00 2.00
5.41
0.096

Besi Polos
0.05 0.008 0.39 0.48 34.00 16.18 6.39 25.21 0.10 1.36
0.05 25.00 2.00
0.07
0.07
0.12
0.12

3 Segmen L4-L5 2.95 Besi Ulir


0.016 1.58 3.60 4.00 14.41 22.74 3.33 1.19 1.33
0.096 3.00 2.00
3.41
0.096

Besi Polos
0.05 0.008 0.39 0.48 20.67 9.84 3.88 25.21 0.10 0.83
0.05 25.00 1.00
0.07
0.07
0.12
0.12

4 Segmen G5-K5 1.10 Besi Ulir


0.016 1.58 1.75 4.00 7.01 11.06 6.85 1.49 0.67
0.096 6.00 1.00
1.56
0.096

Besi Polos
0.05 0.008 0.39 0.48 8.33 3.97 1.57 25.21 0.10 0.33
0.05 25.00 1.00
0.07
0.07
0.12
0.12

5 Segmen G1-J1 5.10 Besi Ulir


0.016 1.58 5.75 4.00 23.01 36.31 2.09 0.50 2.00
0.096 2.00 2.00
5.56
0.096

Besi Polos
0.05 0.008 0.39 0.48 35.00 16.66 6.57 25.21 0.10 1.40
0.05 25.00 2.00
0.07
0.07
0.12
0.12

6 Segmen K5-K8 2.55 Besi Ulir


0.016 1.58 3.20 4.00 12.81 20.21 3.75 2.39 1.33
0.096 3.00 2.00
3.01
0.096

Besi Polos
0.05 0.008 0.39 0.48 18.00 8.57 3.38 25.21 0.10 0.72
0.05 25.00 1.00
0.07
0.07
0.12
0.12

7 Segmen K7-I7 1.70 Besi Ulir


0.016 1.58 2.35 4.00 9.41 14.85 5.10 0.24 0.80
0.096 5.00 1.00
2.16
0.096

Besi Polos
0.05 0.008 0.39 0.48 12.33 5.87 2.32 25.21 0.10 0.49
0.05 25.00 1.00
0.07
0.07
0.12
0.12
8 Segmen K8-J8 3.55 Besi Ulir
0.016 1.58 4.20 4.00 16.81 26.53 2.86 3.60 2.00
0.096 2.00 2.00
4.01
0.096

Besi Polos
0.05 0.008 0.39 0.48 24.67 11.74 4.63 25.21 0.10 0.99
0.05 25.00 1.00
0.07
0.07
0.12
0.12

9 Segmen I6-I8 2.05 Besi Ulir


0.016 1.58 2.70 4.00 10.81 17.06 4.44 1.19 1.00
0.096 4.00 1.00
2.51
0.096

Besi Polos
0.05 0.008 0.39 0.48 14.67 6.98 2.75 25.21 0.10 0.59
0.05 25.00 1.00
0.07
0.07
0.12
0.12
10 Segmen I6-J6 1.70 Besi Ulir
0.016 1.58 2.35 4.00 9.41 14.85 5.10 0.24 0.80
0.096 5.00 1.00
2.16
0.096

Besi Polos
0.05 0.008 0.39 0.48 12.33 5.87 2.32 25.21 0.10 0.49
0.05 25.00 1.00
0.07
0.07
0.12
0.12

11 Segmen J1-J8 11.30 Besi Ulir


0.016 1.58 11.95 4.00 47.81 75.45 1.00 0.05 4.00
0.096 1.00 4.00
11.76
0.096

Besi Polos
0.05 0.008 0.39 0.48 76.33 36.33 14.34 25.21 0.10 3.05
0.05 25.00 4.00
0.07
0.07
0.12
0.12

Total Berat Besi Polos 54.72

Total Berat Besi Ulir 310.74


Total Berat Besi Ulir 310.74

10 Plat Lantai
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)

1 Bentang 200 x 200


Tulangan Iy Lapangan 2.00 0.01 0.62 1.12 7.67 8.59 5.29 10.71 0.80 0.77
1.00 8.00 10.00 1.00
0.06
0.06

Tulangan Ix Lapangan 2.00 0.01 0.62 1.12 7.67 8.59 5.29 10.71 0.80 0.77
1.00 8.00 10.00 1.00
0.06
0.06

Tulangan Iy Tumpuan 2.00 0.01 0.62 0.72 15.33 11.04 6.81 16.67 0.48 0.96
0.50 16.00 16.00 1.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 2.00 0.01 0.62 0.72 15.33 11.04 6.81 16.67 0.48 0.96
0.50 16.00 16.00 1.00
0.06
0.10
0.06

2 Bentang 350 x 250


Tulangan Iy Lapangan 3.50 0.01 0.62 1.87 16.00 29.92 18.45 6.42 0.78 2.67
1.75 16.00 6.00 3.00
0.06
0.06

Tulangan Ix Lapangan 2.50 0.01 0.62 1.37 6.00 8.22 5.07 8.76 1.04 0.75
1.25 6.00 8.00 1.00
0.06
0.06

Tulangan Iy Tumpuan 3.50 0.01 0.62 0.85 32.00 27.04 16.67 14.20 0.17 2.29
0.63 32.00 14.00 3.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 2.50 0.01 0.62 0.85 18.67 15.77 9.72 14.20 0.17 1.33
0.63 19.00 14.00 2.00
0.06
0.10
0.06

3 Bentang 350 x 250


Tulangan Iy Lapangan 3.50 0.01 0.62 1.87 16.00 29.92 18.45 6.42 0.78 2.67
1.75 16.00 6.00 3.00
0.06
0.06

Tulangan Ix Lapangan 2.50 0.01 0.62 1.37 6.00 8.22 5.07 8.76 1.04 0.75
1.25 6.00 8.00 1.00
0.06
0.06
Tulangan Iy Tumpuan 3.50 0.01 0.62 0.85 32.00 27.04 16.67 14.20 0.17 2.29
0.63 32.00 14.00 3.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 2.50 0.01 0.62 0.85 18.67 15.77 9.72 14.20 0.17 1.33
0.63 19.00 14.00 2.00
0.06
0.10
0.06

4 Bentang 250 x 225


Tulangan Iy Lapangan 2.50 0.01 0.62 1.37 10.17 13.93 8.59 8.76 1.04 1.27
1.25 11.00 8.00 2.00
0.06
0.06

Tulangan Ix Lapangan 2.25 0.01 0.62 1.25 7.67 9.55 5.88 9.64 0.79 0.85
1.13 8.00 9.00 1.00
0.06
0.06

Tulangan Iy Tumpuan 2.50 0.01 0.62 0.78 20.33 15.91 9.81 15.34 0.26 1.36
0.56 21.00 15.00 2.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 2.25 0.01 0.62 0.78 17.00 13.30 8.20 15.34 0.26 1.13
0.56 17.00 15.00 2.00
0.06
0.10
0.06

5 Bentang 325 x 200


Tulangan Iy Lapangan 3.25 0.01 0.62 1.75 16.00 27.92 17.21 6.88 1.53 2.67
1.63 16.00 6.00 3.00
0.06
0.06

Tulangan Ix Lapangan 2.00 0.01 0.62 1.12 3.50 3.92 2.42 10.71 0.80 0.35
1.00 4.00 10.00 1.00
0.06
0.06

Tulangan Iy Tumpuan 3.25 0.01 0.62 0.72 32.00 23.04 14.20 16.67 0.48 2.00
0.50 32.00 16.00 2.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 2.00 0.01 0.62 0.72 15.33 11.04 6.81 16.67 0.48 0.96
0.50 16.00 16.00 1.00
0.06
0.10
0.06

6 Bentang 325 x 175


Tulangan Iy Lapangan 3.25 0.01 0.62 1.75 16.83 29.37 18.11 6.88 1.53 2.81
1.63 17.00 6.00 3.00
0.06
0.06
Tulangan Ix Lapangan 1.75 0.01 0.62 1.00 1.83 1.82 1.12 12.06 0.06 0.15
0.88 2.00 12.00 1.00
0.06
0.06
Tulangan Iy Tumpuan 3.25 0.01 0.62 0.66 33.67 22.14 13.65 18.25 0.17 1.87
0.44 34.00 18.00 2.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 1.75 0.01 0.62 0.66 13.67 8.99 5.54 18.25 0.17 0.76
0.44 14.00 18.00 1.00
0.06
0.10
0.06

7 Bentang 325 x 250


Tulangan Iy Lapangan 3.25 0.01 0.62 1.75 14.33 25.01 15.42 6.88 1.53 2.39
1.63 15.00 6.00 3.00
0.06
0.06

Tulangan Ix Lapangan 2.50 0.01 0.62 1.37 6.83 9.36 5.77 8.76 1.04 0.85
1.25 7.00 8.00 1.00
0.06
0.06

Tulangan Iy Tumpuan 3.25 0.01 0.62 0.85 28.67 24.22 14.93 14.20 0.17 2.05
0.63 29.00 14.00 3.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 2.50 0.01 0.62 0.85 18.67 15.77 9.72 14.20 0.17 1.33
0.63 19.00 14.00 2.00
0.06
0.10
0.06

8 Bentang 300 x 250


Tulangan Iy Lapangan 3.00 0.01 0.62 1.62 12.67 20.52 12.65 7.41 0.66 1.81
1.50 13.00 7.00 2.00
0.06
0.06

Tulangan Ix Lapangan 2.50 0.01 0.62 1.37 7.67 10.50 6.48 8.76 1.04 0.96
1.25 8.00 8.00 1.00
0.06
0.06

Tulangan Iy Tumpuan 3.00 0.01 0.62 0.85 25.33 21.41 13.20 14.20 0.17 1.81
0.63 26.00 14.00 2.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 2.50 0.01 0.62 0.85 18.67 15.77 9.72 14.20 0.17 1.33
0.63 19.00 14.00 2.00
0.06
0.10
0.06

9 Bentang 350 x 300


Tulangan Iy Lapangan 3.50 0.01 0.62 1.87 14.33 26.80 16.52 6.42 0.78 2.39
1.75 15.00 6.00 3.00
0.06
0.06

Tulangan Ix Lapangan 3.00 0.01 0.62 1.62 9.33 15.12 9.32 7.41 0.66 1.33
1.50 10.00 7.00 2.00
0.06
0.06

Tulangan Iy Tumpuan 3.50 0.01 0.62 0.97 28.67 27.81 17.14 12.37 0.36 2.39
0.75 29.00 12.00 3.00
0.06
0.10
0.06

Tulangan Ix Tumpuan 3.00 0.01 0.62 0.97 22.00 21.34 13.16 12.37 0.36 1.83
0.75 22.00 12.00 2.00
0.06
0.10
0.06

Total Berat Besi Polos 379.60

11 Tangga
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Polos
1 0.01 0.62 4.12 32.00 131.84 81.28 2.91 1.46 16.00
0.06 32.00 2.00 16.00
4.00
0.06
Besi Polos
2 0.008 0.39 0.95 102.00 96.49 38.07 12.68 1.06 8.50
0.05 102.00 12.00 9.00
0.85
0.05
Besi Polos
3 0.008 0.39 0.67 115.00 76.59 30.22 18.02 1.00 6.39
0.05 115.00 18.00 7.00
0.22
0.35
0.05
Besi Polos
4 Bordes 0.01 0.62 4.12 17.00 70.04 43.18 2.91 1.46 8.50
0.06 17.00 2.00 9.00
4.00
0.06
Besi Polos
5 0.008 0.39 0.95 17.00 16.08 6.35 12.68 1.06 1.42
0.05 17.00 12.00 2.00
0.85
0.05

Total Berat Besi Polos 199.10

12 Kolom K2
n = 17 Buah
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
No Sketsa Pemotongan
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)+(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Ulir
1 3.50 0.016 1.58 3.90 136.00 530.13 836.67 3.08 0.3 45.33
0.192 3.00 46.00
3.61
0.096

Besi Polos
2.65 0.01 0.62 0.60 377.40 226.44 139.60 20.00 0.0 18.87
0.06 378.00 20.00 19.00
0.06
0.12
0.12
0.12
0.12

Total Berat Besi Polos 139.60

Total Berat Besi Ulir 836.67

13 Kolom K3
n = 11 Buah
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)+(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
Besi Ulir
1 3.50 0.01 0.62 3.79 88.00 333.52 205.62 3.17 0.63 29.33
0.12 3.00 30.00
3.61
0.06

Besi Polos
2.65 0.008 0.39 0.38 205.33 77.21 30.46 31.91 0.34 6.62
0.048 206.00 31.00 7.00
0.048
0.07
0.07
0.07
0.07

Total Berat Besi Polos 30.46

Total Berat Besi Ulir 205.62

14 Balok Type B1
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
1 Segmen A4-A5 3.00 Besi Ulir
0.016 1.58 3.65 4.00 14.61 23.05 3.29 1.04 1.33
0.096 3.00 2.00
3.46
0.096

Besi Ulir
0.096 0.016 1.58 2.23 2.00 4.46 7.05 5.38 0.84 0.40
2.04 5.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.40 4.00 5.61 8.85 8.56 0.78 0.50
1.210 8.00 1.00
0.096

Besi Polos
0.06 0.01 0.62 1.00 25.00 25.00 15.41 12.00 0.00 2.08
0.06 12.00 3.00
0.17
0.17
0.27
0.27

2 Segmen A5-L5 1.60 Besi Ulir


0.016 1.58 2.25 4.00 9.01 14.22 5.33 0.74 0.80
0.096 5.00 1.00
2.06
0.096

Besi Ulir
0.096 0.016 1.58 1.53 2.00 3.06 4.84 7.83 1.276 0.29
1.34 7.00 1.00
0.096

Besi Ulir
0.096 0.016 1.58 1.05 4.00 4.21 6.64 11.41 0.43 0.36
0.860 11.00 1.00
0.096
Besi Polos
0.06 0.01 0.62 1.00 13.80 13.80 8.51 12.00 0.00 1.15
0.06 12.00 2.00
0.17
0.17
0.27
0.27

Total Berat Besi Polos 23.92

Total Berat Besi Ulir 64.64

15 Balok Type B3
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
1 Segmen C1-G1 6.00 Besi Ulir
0.012 0.89 6.08 4.00 24.32 21.59 1.97 5.92 4.00
5.92 1.00 4.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 41.00 19.52 7.70 25.21 0.00 1.64
0.05 25.00 2.00
0.07
0.07
0.12
0.12
2 Segmen E2-H2 2.55 Besi Ulir
0.012 0.89 2.63 4.00 10.52 9.34 4.56 1.48 1.00
2.47 4.00 1.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 18.00 8.57 3.38 25.21 0.00 0.72
0.05 25.00 1.00
0.07
0.07
0.12
0.12
3 Segmen B3-E3 5.60 Besi Ulir
0.012 0.89 5.68 4.00 22.72 20.17 2.11 0.64 2.00
5.52 2.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 38.33 18.25 7.20 25.21 0.00 1.53
0.05 25.00 2.00
0.07
0.07
0.12
0.12

4 Segmen A4-D4 3.70 Besi Ulir


0.012 0.89 3.78 4.00 15.12 13.42 3.17 0.66 1.33
3.62 3.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 25.67 12.22 4.82 25.21 0.00 1.03
0.05 25.00 2.00
0.07
0.07
0.12
0.12

5 Segmen K4-H4 3.45 Besi Ulir


0.012 0.89 3.53 4.00 14.12 12.54 3.40 1.41 1.33
3.37 3.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 24.00 11.42 4.51 25.21 0.00 0.96
0.05 25.00 1.00
0.07
0.07
0.12
0.12

6 Segmen C5-G5 5.95 Besi Ulir


0.012 0.89 6.03 4.00 24.12 21.41 1.99 5.97 4.00
5.87 1.00 4.00
0.08
0.080
Besi Polos
0.05 0.008 0.39 0.48 40.67 19.36 7.64 25.21 0.00 1.63
0.05 25.00 2.00
0.07
0.07
0.12
0.12

7 Segmen B3-B4 1.75 Besi Ulir


0.012 0.89 1.83 4.00 7.32 6.50 6.56 1.02 0.67
1.67 6.00 1.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 12.67 6.03 2.38 25.21 0.00 0.51
0.05 25.00 1.00
0.07
0.07
0.12
0.12

8 Segmen L4-L5 2.95 Besi Ulir


0.012 0.89 3.03 4.00 12.12 10.76 3.96 2.91 1.33
2.87 3.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 20.67 9.84 3.88 25.21 0.00 0.83
0.05 25.00 1.00
0.07
0.07
0.12
0.12

9 Segmen C1-C4 5.00 Besi Ulir


0.012 0.89 5.08 4.00 20.32 18.04 2.36 1.84 2.00
4.92 2.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 34.33 16.34 6.45 25.21 0.00 1.37
0.05 25.00 2.00
0.07
0.07
0.12
0.12

10 Segmen K4-K5 2.95 Besi Ulir


0.012 0.89 3.03 4.00 12.12 10.76 3.96 2.91 1.33
2.87 3.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 20.67 9.84 3.88 25.21 0.00 0.83
0.05 25.00 1.00
0.07
0.07
0.12
0.12

11 Segmen E1-E3 3.45 Besi Ulir


0.012 1.58 3.53 4.00 14.12 22.28 3.40 1.41 1.33
3.37 3.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 24.00 11.42 4.51 25.21 0.00 0.96
0.05 25.00 1.00
0.07
0.07
0.12
0.12

12 Segmen G1-G2 1.60 Besi Ulir


0.012 0.89 1.68 4.00 6.72 5.97 7.14 0.24 0.57
1.52 7.00 1.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 11.67 5.55 2.19 25.21 0.00 0.47
0.05 25.00 1.00
0.07
0.07
0.12
0.12
13 Segmen G4-G5 2.75 Besi Ulir
0.012 0.89 2.83 4.00 11.32 10.05 4.24 0.68 1.00
2.67 4.00 1.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 19.33 9.20 3.63 25.21 0.00 0.77
0.05 25.00 1.00
0.07
0.07
0.12
0.12

14 Segmen H2-H4 3.45 Besi Ulir


0.012 0.89 3.53 4.00 14.12 12.54 3.40 1.41 1.33
3.37 3.00 2.00
0.08
0.080

Besi Polos
0.05 0.008 0.39 0.48 24.00 11.42 4.51 25.21 0.00 0.96
0.05 25.00 1.00
0.07
0.07
0.12
0.12
Total Berat Besi Polos 66.67

Total Berat Besi Ulir 195.36

16 Ring Gewel
Berat Panjang Jumlah Total Total Jumlah Kebutuhan
Dia. Besi Sisa
No Sketsa Pemotongan Besi Pot. Pot. Panjang Berat Pot. Besi
(m) (kg/m) (m) (buah) (m) (kg) (m) (lonjor)
(1) (2) (3) (4) (5) (6) (7)=(5)x(6)(8)=(7)x(4) (9)=12/(5) (10)=12-(5)x(9) (11)=(6)/(9)
1 Segmen 1 4.67 Besi Ulir
0.012 0.89 4.75 4.00 19.00 16.87 2.53 2.50 2.00
4.59 2.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 32.13 15.30 6.03 25.21 0.00 1.29
0.05 25.00 2.00
0.07
0.07
0.12
0.12

2 Segmen 2 2.44 Besi Ulir


0.012 0.89 2.52 4.00 10.08 8.95 4.76 1.92 1.00
2.36 4.00 1.00
0.08
0.08
Besi Polos
0.05 0.008 0.39 0.48 17.27 8.22 3.24 25.21 0.00 0.69
0.05 25.00 1.00
0.07
0.07
0.12
0.12

3 Segmen 3 4.67 Besi Ulir


0.012 0.89 4.75 4.00 19.00 16.87 2.53 2.50 2.00
4.59 2.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 32.13 15.30 6.03 25.21 0.00 1.29
0.05 25.00 2.00
0.07
0.07
0.12
0.12

4 Segmen 4 5.89 Besi Ulir


0.012 0.89 5.97 4.00 23.88 21.20 2.01 0.06 2.00
5.81 2.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 40.27 19.17 7.56 25.21 0.00 1.61
0.05 25.00 2.00
0.07
0.07
0.12
0.12

5 Segmen 5 2.44 Besi Ulir


0.012 0.89 2.52 4.00 10.08 8.95 4.76 1.92 1.00
2.36 4.00 1.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 17.27 8.22 3.24 25.21 0.00 0.69
0.05 25.00 1.00
0.07
0.07
0.12
0.12

6 Segmen 6 4.67 Besi Ulir


0.012 0.89 4.75 4.00 19.00 16.87 2.53 2.50 2.00
4.59 2.00 2.00
0.08
0.08

Besi Polos
0.05 0.008 0.39 0.48 32.13 15.30 6.03 25.21 0.00 1.29
0.05 25.00 2.00
0.07
0.07
0.12
0.12

Total Berat Besi Polos 32.15

Total Berat Besi Ulir 89.70


RENCANA ANGGARAN BIAYA

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

Harga Jumlah
No Uraian Pekerjaan Volume Satuan
Satuan (Rp.) Harga (Rp.)
(1) (2) (3) (4) (5) (6) = (3) x (5)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 216.00 m² 20,533.00 4,435,128.00
2 Pembuatan Bouwplank/Uitzet 60.00 m' 126226 7,573,560.00
Sub Total 12,008,688.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah 111.99 m³ 95,782.00 10,726,147.27
2 Pek. Bor Strouss dia. 30 cm 4.45 m³ 202,420.00 900,961.30
3 Pek. Urugan Pasir Bawah Pondasi 4.54 m³ 128,072.00 581,158.72
4 Pek. Urugan Tanah Kembali 39.24 m³ 69,399.00 2,723,077.96
5 Pek. Urugan Sirtu 10.80 m³ 112,360.00 1,213,488.00
Sub Total 16,144,833.25
III PEKERJAAN PONDASI
1 Pek. Lantai Kerja Bawah Pondasi 1.05 m³ 934,472.00 981,195.60
2 Pek. Strouss dia. 30 cm 4.45 m³ 5,875,618.00 26,152,081.94
3 Pek. Pile Cap Type 1 4.20 m³ 6,938,714.00 29,142,598.80
4 Pek. Pile Cap Type 2 2.10 m³ 5,620,161.00 11,802,338.10
5 Pek. Aanstamping 17.50 m³ 363,679.00 6,364,382.50
6 Pek. Pondasi Batu Kali 1 Pp : 4 Ps 39.24 m³ 626,523.00 24,583,509.47
7 Pek. Rollag Bata 0.27 m² 259,270.00 70,842.93
Sub Total 99,096,949.35

LANTAI 1

IV PEKERJAAN BETON
1 Pek. Beton Rabat tbl. 5 cm 5.23 m³ 1,107,525.00 5,793,203.01
2 Pek. Sloof 15/20 2.88 m³ 12,658,840.00 36,457,459.20
3 Pek. Kolom K1 25/25 7.43 m³ 9,292,784.00 68,998,921.20
4 Pek. Kolom KP 15/15 2.07 m³ 5,674,095.00 11,719,843.22
5 Pek. Balok B1 25/35 5.84 m³ 16,776,373.00 97,911,106.92
6 Pek. Balok B2 20/20 0.61 m³ 14,782,795.00 8,987,939.36
7 Pek. Balok B3 15/20 1.26 m³ 10,771,251.00 13,587,933.14
8 Pek. Tangga 1.63 m³ 6,865,671.00 11,193,378.06
Sub Total 254,649,784.11
V PEKERJAAN DINDING
1 Pek. Pasangan 1/2 Bata 1 Pc : 4 Pp 228.05 m² 99,515.00 22,693,898.18
2 Pek. Pasangan 1/2 Bata 1 Pc : 2 Pp 13.08 m² 117,933.00 1,542,327.77
3 Pek. Plesteran Dinding 1 Pc : 4 Ps 456.09 m² 73,740.00 33,632,076.60
4 Pek. Plesteran Dinding 1 Pc : 2 Ps 26.16 m² 79,461.00 2,078,381.92
5 Pek. Acian Dinding dan Beton 463.33 m² 71,544.00 33,148,553.06
6 Pek. Pasang Batu Tempel Marmo 6.69 m² 28,647.00 191,648.43
Sub Total 93,286,885.96
VI PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant 107.81 m² 62,656.00 6,755,219.05
2 Pek. Profil List Palfond Kayu 130.34 m' 23,947.00 3,121,251.98
3 Pek. Plafond Gypsum Board tbl. 9 mm 107.81 m² 46,972.00 5,064,258.00
Sub Total 14,940,729.02
VII PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30 122.23 m² 268,273.00 32,791,008.79
2 Pek. Lantai Keramik 20 x 20 7.11 m² 237,738.00 1,690,911.53
3 Pek. Keramik Dinding Kamar 23.85 m² 237,738.00 5,670,407.91
Mandi 20 x 20
4 Pek. List Keramik Dinding 1.10 m² 279,592.00 308,389.98
Kamar Mandi
5 Pek. Paving Stone 15.12 m² 736,322.40 11,133,194.69
Sub Total 51,593,912.89
VIII PEKERJAAN PINTU DAN JENDELA
1 Pek. Pasang Kusen Pintu & Jendela 0.66 m³ 13,196,466.00 8,731,243.78
Kayu Kelas II (6/15)
2 Pek. Pasang Pintu PVC 3.00 buah 404,855.00 1,214,565.00
3 Pek. Pasang Daun Pintu Panil 14.07 m² 941,928.00 13,252,738.57
Pek. Pasang Daun Jendela Kayu 2.91 m² 683,527.00 1,990,430.62
4 Pek. Pasang Kaca 5 mm 7.32 m² 223,921.00 1,638,049.29
Sub Total 26,827,027.27
IX PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pek. Pasangan Kunci Tanam Pintu 7.00 buah 207,696.00 1,453,872.00
2 Pek. Pasangan Engsel Pintu 4.00 stel 64,971.00 259,884.00
3 Pek. Pasangan Engsel Jendela 7.00 stel 48,625.00 340,375.00
4 Pek. Pasangan Grendel Pintu 7.00 stel 42,561.00 297,927.00
5 Pek. Pasangan Hak Angin 4.00 stel 44,918.00 179,672.00
Sub Total 2,531,730.00
X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 241.12 m² 23,318.00 5,622,506.11
2 Pek. Pengecatan Dinding Luar 241.12 m² 23,318.00 5,622,506.11
3 Pek. Pengecatan Plafond 71.81 m² 27,701.00 1,989,278.06
4 Pek. Pengecatan List Plafond Kayu 52.14 m² 76,550.00 3,991,010.80
5 Pek. Pengecatan Kusen Pintu 18.10 m² 76,550.00 1,385,616.24
& Jendela
6 Pek. Pengecatan Daun Pintu 14.07 m² 76,550.00 1,077,043.19
Sub Total 19,687,960.52
XI PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Box Sekring 1.00 buah 4,006,860.00 4,006,860.00
2 Pek. Pemasangan Titk Lampu 14.00 buah 855,597.00 11,978,358.00
3 Pek. Pemasangan Stop Kontak 5.00 buah 242,425.00 1,212,125.00
4 Pek. Pemasangan Saklar Tunggal 6.00 buah 67,525.00 405,150.00
5 Pek. Pemasangan Saklar Ganda 4.00 buah 74,675.00 298,700.00
Sub Total 17,901,193.00
XII PEKERJAAN SANITASI
1 Pek. Instalasi Air Bersih Pipa PVC 3/4 " 41.64 m' 26,494.00 1,103,210.16
2 Pek. Instalasi Air Bekas Pipa PVC 2,5 " 37.39 m' 74,089.00 2,770,187.71
3 Pek. Instalasi Air Kotor Pipa PVC 3 " 37.73 m' 74,089.00 2,795,377.97
4 Pek. Kloset Duduk Porselen 2.00 buah 1,006,899.00 2,013,798.00
5 Pek. Kloset Jongkok Porselen 1.00 buah 257,556.00 257,556.00
7 Pek. Kran Air 7.00 buah 96,467.00 675,269.00
8 Pek. Floor Drain 3.00 buah 38,775.00 116,325.00
9 Pek. Bak Kontrol 1.00 buah 1,114,095.00 1,114,095.00
Sub Total 10,845,818.84
XIII PEKERJAAN RAILLING
1 Pek. Pasang Railling Pagar Besi Hollow Fin 3.00 unit 716,144.00 2,148,432.00
Sub Total 2,148,432.00
XIV PEKERJAAN ATAP
1 Pek. Pasangan Gording (8/12) 0.25 m³ 18,720,957.00 4,650,285.72
2 Pek. Pasangan Usuk dan Reng 23.94 m² 219,268.00 5,249,922.76
3 Pek. Pasangan Lisplank (2/20) 9.50 m' 156,624.00 1,487,928.00
4 Pek. Penutup Atap Genteng 23.94 m² 154,636.00 3,702,442.02
Sub Total 15,090,578.50

LANTAI 2

I PEKERJAAN BETON
1 Pek. Plat Lantai tbl. 12 cm 7.85 m³ 17,123,321.00 134,460,878.15
2 Pek. Kolom K2 20/20 2.38 m³ 13,518,686.00 32,174,472.68
3 Pek. Kolom KP 15/15 0.87 m³ 5,461,737.00 4,731,229.68
4 Pek. Balok B1 25/35 0.40 m³ 8,469,086.00 3,408,807.12
5 Pek. Balok B3 15/20 1.53 m³ 10,771,251.00 16,528,484.66
6 Pek. Ring Gewel 15/15 0.56 m³ 9,132,212.00 5,091,664.80
Sub Total 196,395,537.08
II PEKERJAAN DINDING
1 Pek. Pasangan 1/2 bata 1 Pc : 4 Pp 176.13 m² 99,515.00 17,527,975.01
2 Pek. Pasangan 1/2 bata 1 Pc : 2 Pp 0.92 m² 117,933.00 108,498.36
3 Pek. Plesteran Dinding 1 Pc : 4 Ps 352.27 m² 73,740.00 25,976,242.32
4 Pek. Plesteran Dinding 1 Pc : 2 Ps 1.84 m² 79,461.00 146,208.24
5 Pek. Acian Dinding dan Beton 352.85 m² 71,544.00 25,244,157.31
Sub Total 69,003,081.24
III PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant 71.81 m² 62,656.00 4,499,484.00
2 Pek. Profil List Palfond Gypsum 86.70 m' 23,947.00 2,076,204.90
3 Pek. Plafond Gypsum Board tbl. 9 mm 71.81 m² 46,972.00 3,373,176.75
Sub Total 9,948,865.65
IV PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30 x 30 57.21 m² 268,273.00 15,346,556.97
2 Pek. Lantai Keramik 20 x 20 2.52 m² 237,738.00 599,694.11
3 Pek. Keramik Dinding Kamar 13.44 m² 237,738.00 3,195,198.72
Mandi 20 x 20
4 Pek. List Keramik Dinding Kamar 0.64 m² 279,592.00 178,938.88
Mandi
Sub Total 19,320,388.67
V PEKERJAAN PINTU DAN JENDELA
1 Pek. Pasang Kusen Pintu & Jendela 0.44 m³ 13,196,466.00 5,805,389.32
Kayu Kelas II (6/15)
2 Pek. Pasang Pintu PVC 1.00 buah 404,855.00 404,855.00
3 Pek. Pasang Daun Pintu Panil 5.75 m² 941,928.00 5,418,723.40
4 Pek. Pasang Daun Jendela Kayu 1.28 m² 683,527.00 872,180.45
5 Pek. Pasang Kaca 5 mm 4.39 m² 223,921.00 982,654.92
Sub Total 13,483,803.09
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pek. Pemasangan Kunci Tanam Pintu 3.00 buah 207,696.00 623,088.00
2 Pek. Pemasangan Engsel Pintu 9.00 buah 64,971.00 584,739.00
3 Pek. Pemasangan Engsel Jendela 4.00 stel 48,625.00 194,500.00
4 Pasangan Grendel Pintu 2.50 stel 42,561.00 106,402.50
5 Pasangan Hak Angin 10.00 buah 44,918.00 449,180.00
Sub Total 1,957,909.50
VII PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 177.05 m² 23,318.00 4,128,545.17
2 Pek. Pengecatan Dinding Luar 177.05 m² 23,318.00 4,128,545.17
3 Pek. Pengecatan Plafond 71.81 m 27,701.00 1,989,278.06
4 Pek. Pengecatan List Plafond Kayu 34.68 m 76,550.00 2,654,754.00
5 Pek. Pengecatan Kusen Pintu & Jendela 12.73 m² 76,550.00 974,726.46
6 Pek. Pengecatan Daun Pintu 5.75 m 76,550.00 440,376.84
Sub Total 14,316,225.71
VIII PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Titk Lampu 7.00 buah 855,597.00 5,989,179.00
2 Pek. Pemasangan Stop Kontak 4.00 buah 242,425.00 969,700.00
3 Pek. Pemasangan Saklar Tunggal 3.00 buah 67,525.00 202,575.00
4 Pek. Pemasangan Saklar Ganda 2.00 buah 74,675.00 149,350.00
Sub Total 7,310,804.00
IX PEKERJAAN SANITASI
1 Pek. Instalasi Air Bersih Pipa PVC 3/4 " 2.64 m' 26,494.00 69,944.16
2 Pek. Instalasi Air Bekas Pipa PVC 2,5 " 1.84 m' 74,089.00 136,323.76
3 Pek. Instalasi Air Kotor Pipa PVC 3 " 0.65 m' 74,089.00 48,157.85
4 Pek. Kloset Duduk Porselen 1.00 buah 1,006,899.00 1,006,899.00
5 Pek. Kran Air 2.00 buah 96,467.00 192,934.00
7 Pek. Floor Drain 1.00 buah 38,775.00 38,775.00
Sub Total 1,493,033.77
X PEKERJAAN ATAP
1 Pek. Pasangan Kuda-kuda (8/12) 0.55 m³ 19,780,217.00 10,823,734.74
2 Pek. Pasangan Balok Tembok + Nok 0.82 m³ 18,720,957.00 15,309,998.63
+ Gording + Jurai (8/12)
3 Pek. Pasangan Usuk dan Reng 76.20 m² 219,268.00 16,708,495.69
4 Pek. Pasangan Lisplank (2/20) 35.75 m' 156,624.00 5,599,308.00
5 Pek. Penutup Atap Genteng 76.20 m² 154,636.00 11,783,456.50
6 Pek. Pasangan Bubungan 9.45 m' 172,418.00 1,629,350.10
Sub Total 61,854,343.66
REKAPITULASI RENCANA ANGGARAN BIAYA

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

No Uraian Pekerjaan Jumlah Harga (Rp.)


(1) (2) (3)
I PEKERJAAN PERSIAPAN 12,008,688.00
II PEKERJAAN TANAH 16,144,833.25
III PEKERJAAN PONDASI 99,096,949.35
IV PEKERJAAN BETON 451,045,321.19
V PEKERJAAN DINDING 162,289,967.20
VI PEKERJAAN LANGIT-LANGIT 24,889,594.67
VII PEKERJAAN LANTAI 70,914,301.56
VIII PEKERJAAN PINTU DAN JENDELA 40,310,830.36
IX PEKERJAAN PENGGANTUNG DAN PENGUNCI 4,489,639.50
X PEKERJAAN PENGECATAN 34,004,186.23
XI PEKERJAAN INSTALASI LISTRIK 25,211,997.00
XII PEKERJAAN SANITASI 25,211,997.00
XIII PEKERJAAN RAILLING 2,148,432.00
XIV PEKERJAAN ATAP 76,944,922.15

GRAND TOTAL 1,044,711,659.45


DIBULATKAN 1,044,711,660.00
ANALISA KEBUTUHAN BAHAN

Pemilik : OLFI KRISTIN


Proyek : Pembangunan Rumah Tinggal 2 Lantai
Konsultan : PT. PCY
Kontraktor : PT. LGL
Lokasi : Surabaya

ANALISA KEBUTUHAN BAHAN


NO URAIAN VOLUME SATUAN
KOEFISIEN SATUAN VOLUME
(1) (2) (3) (4) (5) (6) (7) = (3) x (5)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 216.00 m² - - -

2 Pembuatan Bouwplank/Uitzet 60.00 m'


- Paku Biasa 2 - inchi 0.0200 Doz 1.2000
- Kayu Merant Papan 2/20, 0.0070 m3 0.4200
- Kayu Merant Usuk 4/6, 5/7 0.0120 m3 0.7200
II PEKERJAAN TANAH
1 Pek. Galian Tanah 111.99 m³ - - -

2 Pek. Bor Strouss dia. 30 cm 4.45 m³ - - -

3 Pek. Urugan Pasir Bawah Pondasi 4.54 m³


- Pasir Urug 1.2000 m3 5.4453

4 Pek. Urugan Tanah Kembali 39.24 m³ - - -

5 Pek. Urugan Sirtu 10.80 m³


- Sirtu 1.2000 m3 12.9600
III PEKERJAAN PONDASI
1 Pek. Lantai Kerja Bawah Pondasi 1.05 m³
- PC/Portland Cement 200.0000 Kg 210.0000
- PB / Pasir Beton 0.5220 m3 0.5481
- Kr / Krikil 0.8620 m3 0.9051

2 Pek. Strouss dia. 30 cm


a. Pekerjaan Beton Strouss K-225 4.45 m³
- Semen PC 40 Kg 9.2750 Zak 41.2826
- Pasir Cor 0.4363 m3 1.9417
- Batu Pecah Mesin 1/2 cm 0.5511 m3 2.4527
- Biaya Air 215.0000 Liter 956.9543

b. Pekerjaan Pembesian Polos 163.91 Kg


- Besi Beton Polos 1.0500 Kg 172.1043
- Kawat Beton 0.0150 Kg 2.4586

c. Pekerjaan Pembesian Ulir 565.54 Kg


- Besi Beton Ulir 1.0500 Kg 593.8207
- Kawat Beton 0.0150 Kg 8.4832

3 Pek. Pile Cap Type 1


a. Pekerjaan Beton Strouss K-225 4.20 m³
- Semen PC 40 Kg 9.2750 Zak 38.9550
- Pasir Cor 0.4363 m3 1.8323
- Batu Pecah Mesin 1/2 cm 0.5511 m3 2.3144
- Biaya Air 215.0000 Liter 903.0000

b. Pekerjaan Pembesian Ulir 445.68 Kg


- Besi Beton Ulir 1.0500 Kg 467.9665
- Kawat Beton 0.0150 Kg 6.6852
c. Pekerjaan Bekistng Pondasi 16.8 m²
- Kayu Kelas III 0.0400 m3 0.6720
- Paku 5 cm - 10 cm 0.3000 Kg 5.0400
- Minyak Bekistng 0.1000 Liter 1.6800

4 Pek. Pile Cap Type 2


a. Pekerjaan Beton Strouss K-225 2.10 m³
- Semen PC 40 Kg 9.2750 Zak 19.4775
- Pasir Cor 0.4363 m3 0.9161
- Batu Pecah Mesin 1/2 cm 0.5511 m3 1.1572
- Biaya Air 215.0000 Liter 451.5000

b. Pekerjaan Pembesian Ulir 224.73 Kg


- Besi Beton Ulir 1.0500 Kg 235.9652
- Kawat Beton 0.0150 Kg 3.3709

c. Pekerjaan Bekistng Pondasi 8.40 m²


- Kayu Kelas III 0.0400 m3 0.3360
- Paku 5 cm - 10 cm 0.3000 Kg 2.5200
- Minyak Bekistng 0.1000 Liter 0.8400

5 Pek. Aanstamping 17.50 m³


- Pasir Urug 0.4320 m3 7.5600
- Batu Kali Belah 15/20 cm 1.2000 m3 21.0000

6 Pek. Pondasi Batu Kali 1 Pp : 4 Ps 39.24 m³


- Semen PC 50 kg 0.4320 m3 16.9508
- Pasir Pasang 0.5440 m3 21.3455
- Batu Kali Belah 15/20 cm 1.2000 m3 47.0856
7 Pek. Rollag Bata 0.27 m²
- Bata Merah 140.0000 m3 38.2536

LANTAI 1

IV PEKERJAAN BETON
1 Pek. Beton Rabat tbl. 5 cm 5.23 m³
- Semen PC 40 Kg 9.2750 Zak 48.5153
- Pasir Cor 0.4363 m3 2.2819
- Batu Pecah Mesin 1/2 cm 0.5511 m3 2.8824
- Biaya Air 215.0000 Liter 1124.6145

2 Pek. Sloof 15/20


a. Pekerjaan Beton Strouss K-225 2.88 m³
- Semen PC 40 Kg 9.2750 Zak 26.7120
- Pasir Cor 0.4363 m3 1.2564
- Batu Pecah Mesin 1/2 cm 0.5511 m3 1.5870
- Biaya Air 215.0000 Liter 619.2000

b. Pekerjaan Pembesian Polos 126.13 Kg


- Besi Beton Polos 1.0500 kg 132.4396
- Kawat Beton 0.0150 kg 1.8920

c. Pekerjaan Pembesian Ulir 350.56 Kg


- Besi Beton Ulir 1.0500 kg 368.0866
- Kawat Beton 0.0150 m3 5.2584

d. Pekerjaan Bekistng Sloof 38.40 m²


- Paku Usuk 0.3000 Kg 11.5200
- Kayu Merant Bekistng 0.0450 m3 1.7280
- Minyak Bekistng 0.1000 Liter 3.8400
3 Pek. Kolom K1 25/25
a. Pekerjaan Beton Strouss K-225 7.43 m³
- Semen PC 40 Kg 9.2750 Zak 68.8669
- Pasir Cor 0.4363 m3 3.2392
- Batu Pecah Mesin 1/2 cm 0.5511 m3 4.0916
- Biaya Air 215.0000 Liter 1596.3750

b. Pekerjaan Pembesian Polos 87.30 Kg


- Besi Beton Polos 1.0500 kg 91.6612
- Kawat Beton 0.0150 kg 1.3094

c. Pekerjaan Pembesian Ulir 1702.18 Kg


- Besi Beton Ulir 1.0500 kg 1787.2848
- Kawat Beton 0.0150 m3 25.5326

d. Pekerjaan Bekistng Kolom 5.40 m²


- Paku Usuk 0.3000 Kg 1.6200
- Plywood Uk. 122 244 x 9 mm 0.3500 Lembar 1.8900
- Kayu Merant Bekistng 0.0400 m3 0.2160
- Kayu Merant Balok 4/6, 5/ 0.0150 m3 0.0810
- Minyak Bekistng 0.2000 Liter 1.0800

4 Pek. Kolom KP 15/15


a. Pekerjaan Beton Strouss K-225 2.07 m³
- Semen PC 40 Kg 9.2750 Zak 19.1575
- Pasir Cor 0.4363 m3 0.9011
- Batu Pecah Mesin 1/2 cm 0.5511 m3 1.1382
- Biaya Air 215.0000 Liter 444.0825

b. Pekerjaan Pembesian Polos 276.88 Kg


- Besi Beton Polos 1.0500 kg 290.7222
- Kawat Beton 0.0150 kg 4.1532

c. Pekerjaan Bekistng Kolom 3.24 m²


- Paku Usuk 0.3000 Kg 0.9720
- Plywood Uk. 122 244 x 9 mm 0.3500 Lembar 1.1340
- Kayu Merant Bekistng 0.0400 m3 0.1296
- Kayu Merant Balok 4/6, 5/ 0.0150 m3 0.0486
- Minyak Bekistng 0.2000 Liter 0.6480

5 Pek. Balok B1 25/35


a. Pekerjaan Beton Strouss K-225 5.84 m³
- Semen PC 40 Kg 9.2750 Zak 54.1312
- Pasir Cor 0.4363 m3 2.5461
- Batu Pecah Mesin 1/2 cm 0.5511 m3 3.2161
- Biaya Air 215.0000 Liter 1254.7938

b. Pekerjaan Pembesian Polos 337.60 Kg


- Besi Beton Polos 1.0500 kg 354.4752
- Kawat Beton 0.0150 kg 5.0639

c. Pekerjaan Pembesian Ulir 779.21 Kg


- Besi Beton Ulir 1.0500 kg 818.1691
- Kawat Beton 0.0150 m3 11.6881

d. Pekerjaan Bekistng Balok 63.37 m²


- Paku Usuk 0.4000 Kg 25.3460
- Plywood Uk. 122 244 x 9 mm 0.3500 Lembar 22.1778
- Kayu Merant Bekistng 0.0400 m3 2.5346
- Kayu Merant Balok 4/6, 5/ 0.0180 m3 1.1406
- Minyak Bekistng 0.2000 Liter 12.6730

6 Pek. Balok B2 20/20


a. Pekerjaan Beton Strouss K-225 0.61 m³
- Semen PC 40 Kg 9.2750 Zak 5.6392
- Pasir Cor 0.4363 m3 0.2652
- Batu Pecah Mesin 1/2 cm 0.5511 m3 0.3350
- Biaya Air 215.0000 Liter 130.7200

b. Pekerjaan Pembesian Polos 46.83 Kg


- Besi Beton Polos 1.0500 kg 49.1708
- Kawat Beton 0.0150 kg 0.7024

c. Pekerjaan Pembesian Ulir 156.63 Kg


- Besi Beton Ulir 1.0500 kg 164.4602
- Kawat Beton 0.0150 m3 2.3494

d. Pekerjaan Bekistng Balok 7.02 m²


- Paku Usuk 0.4000 Kg 2.8060
- Plywood Uk. 122 244 x 9 mm 0.3500 Lembar 2.4553
- Kayu Merant Bekistng 0.0400 m3 0.2806
- Kayu Merant Balok 4/6, 5/ 0.0180 m3 0.1263
- Minyak Bekistng 0.2000 Liter 1.4030

7 Pek. Balok B3 15/20


a. Pekerjaan Beton Strouss K-225 1.26 m²
- Semen PC 40 Kg 9.2750 Zak 11.7004
- Pasir Cor 0.4363 m3 0.5503
- Batu Pecah Mesin 1/2 cm 0.5511 m3 0.6952
- Biaya Air 215.0000 Liter 271.2225

b. Pekerjaan Pembesian Polos 54.72 Kg


- Besi Beton Polos 1.0500 kg 57.4513
- Kawat Beton 0.0150 kg 0.8207
c. Pekerjaan Pembesian Ulir 310.74 Kg
- Besi Beton Ulir 1.0500 kg 326.2733
- Kawat Beton 0.0150 m3 4.6610

d. Pekerjaan Bekistng Balok 23.13 m²


- Paku Usuk 0.4000 Kg 9.2510
- Plywood Uk. 122 244 x 9 mm 0.3500 Lembar 8.0946
- Kayu Merant Bekistng 0.0400 m3 0.9251
- Kayu Merant Balok 4/6, 5/ 0.0180 m3 0.4163
- Minyak Bekistng 0.2000 Liter 4.6255

8 Pek. Tangga
a. Pekerjaan Beton Strouss K-225 1.63 m²
- Semen PC 40 Kg 9.2750 Zak 15.1214
- Pasir Cor 0.4363 m3 0.7112
- Batu Pecah Mesin 1/2 cm 0.5511 m3 0.8984
- Biaya Air 215.0000 Liter 350.5231

b. Pekerjaan Pembesian Polos 199.10 Kg


- Besi Beton Polos 1.0500 kg 209.0503
- Kawat Beton 0.0150 kg 2.9864

d. Pekerjaan Bekistng Tangga 7.02 m²


- Paku Usuk 0.4000 Kg 2.8060
- Plywood Uk. 122 244 x 9 mm 0.3500 Lembar 2.4553
- Kayu Merant Bekistng 0.0300 m3 0.2105
- Kayu Merant Balok 4/6, 5/ 0.0150 m3 0.1052
- Minyak Bekistng 0.1500 Liter 1.0523

V PEKERJAAN DINDING
1 Pek. Pasangan 1/2 Bata 1 Pc : 4 Pp 228.05 m²
- Semen PC 40 Kg 0.2300 Zak 52.4504
- Pasir Pasang 0.0430 m3 9.8059
- Batu Bata Merah Kelas 1 (Uk. 22 x 11 x 4.5 cm) 70.0000 Press 15963.1500

2 Pek. Pasangan 1/2 Bata 1 Pc : 2 Pp 13.08 m²


- Semen PC 40 Kg 0.3790 Zak 4.9566
- Pasir Pasang 0.0380 m3 0.4970
- Batu Bata Merah Kelas 1 (Uk. 22 x 11 x 4.5 cm) 70.0000 Press 915.4600

3 Pek. Plesteran Dinding 1 Pc : 4 Ps 456.09 m²


- Semen PC 50 Kg 0.1248 Zak 56.9200
- Pasir Pasang 0.0240 m3 10.9462

4 Pek. Plesteran Dinding 1 Pc : 2 Ps 26.16 m²


- Semen PC 50 Kg 0.2045 Zak 5.3484
- Pasir Pasang 0.0200 m3 0.5231

5 Pek. Acian Dinding dan Beton 463.33 m²


- Semen PC 50 Kg 0.0650 Zak 30.1165

6 Pek. Pasang Batu Tempel Marmo 6.69 m²


- Batu Tempel Hitam 1.1000 Buah 7.3590
- Semen Portland 11.7500 Kg 78.6075
- Pasir Pasang 0.0350 m3 0.2342

VI PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Merant 107.81 m²
- Paku Reng 0.1000 Kg 10.7814
- Kayu Merant Usuk 4/6, 5/7 0.0120 m3 1.2938

2 Pek. Profil List Palfond Kayu 130.34 m'


- List kayu Profil 1.0500 m' 136.8570
- Paku 0.0100 Kg 1.3034
3 Pek. Plafond Gypsum Board tbl. 9 mm 107.81 m²
- Gypsum Board 0.3640 Lembar 39.2444
- Paku Skrup 0.1100 Kg 11.8596

VII PEKERJAAN LANTAI


1 Pek. Lantai Keramik 30 x 30 122.23 m²
- Semen PC 50 Kg 0.2000 Zak 24.4460
- Semen Berwarna Yiyitan 0.5000 Kg 61.1150
- Pasir Pasang 0.0450 m3 5.5004
- Keramik Lantai Bermotf Uk. 30 x 30 cm 1.0500 m2 128.3415

2 Pek. Lantai Keramik 20 x 20 7.11 m²


- Semen PC 50 Kg 0.2080 Zak 1.4794
- Semen Berwarna Yiyitan 0.5000 Kg 3.5563
- Pasir Pasang 0.0450 m3 0.3201
- Keramik Lantai Bermotf Uk. 20 x 20 cm 1.0500 m2 7.4681

3 Pek. Keramik Dinding Kamar Mandi 20 x 20 23.85 m²


- Semen PC 50 Kg 0.2080 Zak 4.9611
- Semen Berwarna Yiyitan 0.5000 Kg 11.9258
- Pasir Pasang 0.0450 m3 1.0733
- Keramik Lantai Bermotf Uk. 20 x 20 cm 1.0500 m2 25.0441

4 Pek. List Keramik Dinding Kamar Mandi 1.10 m²


- Plint Keramik 5.3000 Buah 5.8459
- Semen Portland 1.1400 Kg 1.2574
- Pasir Pasang 0.0030 m3 0.0033
- Semen Warna 0.0250 Kg 0.0276

5 Pek. Paving Stone 15.12 m²


- Paving Block 8 cm 1.0100 m2 15.2712
- Pasir Beton 2.0700 m3 31.2984

VIII PEKERJAAN PINTU DAN JENDELA


1 Pek. Pasang Kusen Pintu & Jendela Kayu Kelas II 6/15 0.66 m³
- Lem Kayu 1.0000 Kg 0.6616
- Paku Klem (No. 4) /Beton 1.2500 Doz 0.8270
- Kayu Kamper 6/12, 6/15 1.2000 m3 0.7940

2 Pek. Pasang Pintu PVC 3.00 buah


- Daun Pintu PVC 1.0000 Buah 3.0000
3 Pek. Pasang Daun Pintu Panil 14.07 m²
- Paku Usuk 0.0500 Kg 0.7035
- Kayu Kamper Papan 2/20, 4/10 0.0400 m3 0.5628

4 Pek. Pasang Daun Jendela Kayu 2.91 m²


- Lem Kayu 0.3000 Kg 0.8736
- Kayu Kamper Papan 2/20, 4/10 0.0240 m3 0.0699

5 Pek. Pasang Kaca 5 mm 7.32 m²


- Kaca Polos 5 mm 1.1000 m2 8.0468

IX PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pek. Pasangan Kunci Tanam Pintu 7.00 buah
- Kunci Tanam Besar (Kuningan) 1.0000 Buah 7.0000

2 Pek. Pasangan Engsel Pintu 4.00 stel


- Engsel Pintu 1.0000 Pasang 4.0000

3 Pek. Pasangan Engsel Jendela 7.00 stel


- Engsel Jendela 1.0000 Pasang 7.0000

4 Pek. Pasangan Grendel Pintu 7.00 stel


- Grendel Biasa (Kecil) 1.0000 Pasang 7.0000

5 Pek. Pasangan Hak Angin 4.00 stel


- Hak Angin Sikuan Biasa 1.0000 Pasang 4.0000

X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 241.12 m²
- Cat Tembok Dalam 2.5 Kg 0.1040 Kaleng 25.0768
- Dempul Tembok 0.1000 Kg 24.1123
- Kertas Gosok Halus 0.1000 Lembar 24.1123

2 Pek. Pengecatan Dinding Luar 241.12 m²


- Cat Tembok Luar 2.5 Kg 0.1040 Kaleng 25.0768
- Dempul Tembok 0.1000 Kg 24.1123
- Kertas Gosok Halus 0.1000 Lembar 24.1123

3 Pek. Pengecatan Plafond 71.81 m²


- Dempul Tembok 0.1200 Kg 8.6175
- Cat Tembok Dalam 0.0360 Kaleng 2.5853

4 Pek. Pengecatan List Plafond Kayu 52.14 m²


- Cat Kayu 0.1700 Kg 8.8631
- Cat Meni Kayu 0.2000 Kg 10.4272
- Clear Gloss 0.3500 Kg 18.2476
- Plamir Tembok 5 Kg 0.1500 Kaleng 7.8204
- Kuas 4 inchi 0.0100 Buah 0.5214

5 Pek. Pengecatan Kusen Pintu & Jendela 18.10 m²


- Cat Kayu 0.1700 Kg 3.0771
- Cat Meni Kayu 0.2000 Kg 3.6202
- Clear Gloss 0.3500 Kg 6.3353
- Plamir Tembok 5 Kg 0.1500 Kaleng 2.7151
- Kuas 4 inchi 0.0100 Buah 0.1810

6 Pek. Pengecatan Daun Pintu 14.07 m²


- Cat Kayu 0.1700 Kg 3.0771
- Cat Meni Kayu 0.2000 Kg 3.6202
- Clear Gloss 0.3500 Kg 6.3353
- Plamir Tembok 5 Kg 0.1500 Kaleng 2.7151
- Kuas 4 inchi 0.0100 Buah 0.1810