PEKERJAAN PERSIAPAN

No Bahan Satuan Jumlah Kebutuhan


1 2 3 4
1 Dolken Kayu Ø 8-10 cm panj. 4m Batang 39.813
2 Kayu Meranti Kaso 5/7 m3 1.015
3 Kayu Meranti Papan 3/20 M3 4.425
4 Kayu Meranti Balok 6/12 m3 1.548
5 Polywood, t=4mm Lbr 1.740
6 Pasir Pasang m3 0.600
7 Pasir Beton 1 m3 0.914
8 Semen Portland Kg 442.125
9 Batu Koral Beton Kali m3 1.466
10 Cat Meni Besi Liter 5.783
11 Cat SEIV Gloss Warna Standar Liter 0.150
12 Paku 2" - 3" Kg 2.580
13 Kunci Tanam Bh 0.600
14 Jendela nako + accessories Set 0.800
15 Paku 2" - 5" Kg 5.646
16 Batu bata merah bakar kualitas I bh 120.000
17 Besi Strip bh 4.400
18 Kaca Polos tebal 3 mm m2 0.320
19 Seng Gelombang BJLS 25, Uk 90 x 180 cm Lbr 18.670
TOTAL
PEKERJAAN PONDASI
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Air Liter 1019.261
2 Bata Merah Buah 233.856
3 Batu Belah 15/20 m3 85.302
4 Batu Split Pecah Mesin 2/3 m3 0.816
5 Besi Beton Polos Kg 31.972
6 Besi Beton Ulir Kg 567.571
7 Kawat Beton Kg 8.565
8 Kayu Kelas III (Papan Albasia) m3 0.416
9 Koral Beton m3 3.533
10 Minyak Bekisting Ltr 1.040
11 Paku 5-10 cm Kg 3.119
12 Pasir Beton 1 m3 0.476
13 Pasir Beton 2 Kg 2.343
14 Pasir Pasang m3 25.148
15 Pasir Urug m3 13.549
16 Semen Portland Kg 12216.907
TOTAL
PEKERJAAN STRUKTUR
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Semen Portland Kg 15410.966
2 Pasir Beton 2 Kg 28994.216
3 Kerikil 2 Kg 43491.324
4 Air Liter 8930.883
5 Besi Beton Ulir Kg 4836.227
6 Kawat Beton Kg 105.807
7 Besi Beton Polos Kg 2570.235
8 Kayu Kelas III (Papan Albasia) m3 22.521
9 Paku 5-10 cm Kg 121.843
10 Minyak Bekisting Liter 68.891
11 Paku 8-12 cm Kg 59.508
12 Balok Kayu Kelas II (Balok Albasia) m3 7.146
13 Triplek 9 mm 120 x 240 Lembar 166.731
14 Dolken Kayu Ø 8-10 cm panj. 4m Batang 1440.342
TOTAL
PEKERJAAN DINDING
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Bata Merah Buah 38537.765
2 Semen Portland Kg 18551.312
3 Pasir Pasang m3 48.202
4 Keramik Dinding 20x25 Roman Polos Buah 1464.440
5 Semen Warna Kg 142.051
TOTAL
PEKERJAAN KUSEN
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Balok Kayu Kamper Samarinda m3 2.506
2 Paku 10 cm Buah 2.610
3 Lem Kayu Kg 33.625
4 Kayu Papan Samarinda m3 0.809
5 Paku 1" - 2,5" Kg 0.971
6 Teakwood, t = 4mm , 90 x 220 mm Lbr 32.369
7 Plat Seng Alumumium Lbr 16.184
8 Papan Kayu m3 0.620
9 Kaca Polos Tebal 5mm Asahi m2 33.132
10 Sealant Kg 1.506
11 Engsel Pintu (Stainless Eks.Otis 4"x3") Buah 42
12 Engsel Jendela (Stainless Eks.Otis 3" x 2,5") Buah 38
13 Kunci Tanam (Eks. Ses Art 2030 40mm SS) Buah 21
14 Kunci Selot Buah 37
15 Pegangan Pintu (BLC AAH 8 SS) Buah 23
16 Kait Angin Buah 19
TOTAL
PEKERJAAN LANTAI
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Ubin Teralux Marmer Buah 979.264
2 Keramik Uk. 20 x 20 Roman Polos (Golongan A) Buah 522.646
3 Keramik Uk. 30 x 30 Roman (Golongan B) Buah 1456.379
4 Pasir Pasang m3 13.879
5 Pasir Urug m3 25.545
6 Semen Portland Kg 3192.355
7 Semen Warna Kg 302.931
8 Tegel Plint warna, 10x30 cm Buah 518.748
9 Tegel Plint warna, 10x40 cm Buah 337.743
10 Urugan Kembali/Perataan Tanah m3 88.674
TOTAL
PEKERJAAN ATAP
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Balok Kayu Borneo Kelas II m3 3.303
2 Besi Strip Tebal 5 mm Kg 45.034
3 Genting Bubungan Beton Buah 188.215
4 Genting Kanmuri Milenio Buah 1646.710
5 Kaso-Kaso (5x7) cm m3 2.096
6 Paku 12 cm Kg 14.864
7 Paku 5-7 cm Kg 49.159
8 Papan Kayu Borneo Super m3 0.782
9 Pasir Pasang m3 9.881
10 Reng (3x4) cm m3 8.533
11 Semen Portland Kg 305.850
TOTAL
PEKERJAAN PLAFOND
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Gypsum Board Tebal 9 mm Lembar 76.597
2 Paku Sekrup Kg 23.147
3 Tripleks (120 x 240) Tebal 6 mm Lembar 32.438
4 Paku Tripleks Kg 2.595
5 List Gypsum m 398.816
6 Lem Kayu Kg 18.128
7 Rangka Metal Hollow 40.40.2mm m 1187.680
8 Assesories (perkuatan las,dll) ls 296.920
TOTAL
PEKERJAAN ELEKTIRIKAL
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Pipa Listrik 5/8" Batang 285
2 Kabel Prima NYM 3x2,5 m' 1445
3 T dus Buah 95
4 L Bow Buah 2
5 Klem Buah 936
6 MCB Domae 1 Phase 25A Buah 1
7 Saklar Tunggal Broco Buah 18
8 Saklar Ganda Broco Buah 5
9 Sikring Buah 1
10 Stop Kontak Broco Buah 13
11 Stop Kontak AC Panasonic Buah 5
12 Stop Kontak Antena TV Broco Buah 6
13 Stop Kontak Telepon Broco Buah 9
14 Las Doof Buah 114
15 Lampu Downlight Panasonic 4 Inch Buah 38
16 Fitting Buah 38
19 Lampu Sorot LED 50 Watt Himawari Buah 1
20 Chandellier Lampu Gantung Hias Buah 2
TOTAL
PEKERJAAN SANITASI
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Closet Duduk Warna Toto Unit 3
2 Perlengkapan Closet Duduk (6% dari bahan) % 3
3 Closet Jongkok Putih INA Unit 1
4 Semen Portland Kg 443.700
5 Pasir Pasang m3 0.722
6 Wastafel Toto L 521V1A Unit 3.600
7 Perlengkapan Wastafel (12% dari bahan) % 3
8 Bathtube Unit 2
9 Perlengkapan Bathtube (20% dari bahan) % 2
10 Pompa Jet Pump 450 Watt Buah 1
11 Bak Mandi Fiberglass Unit 1
12 Perlengkapan Bak Mandi (12% dari bahan) % 1
13 Bak Cuci Piring Unit 1
14 Waterdrain Buah 1
15 Floor Drain Unit 7
16 Roof Drain Unit 11
17 Jet Washer Closet Unit 3
18 Tandon Air 1000L buah 1
19 Perlengkapan Tandon Air (12% dari bahan) % 1
20 Jet Shower Buah 3
21 Perlengkapan Jet Shower Set 3
22 Kran Air Buah 8
23 Seal Tape Buah 0.200
24 Pipa PVC 1/2" Rucika m' 35.058
25 Perlengkapan Pipa PVC 1/2" (35% dari bahan) % 29.215
26 Pipa PVC 3/4 " Rucika m' 98.954
27 Perlengkapan Pipa PVC 3/4" (35% dari bahan) % 82.462
28 Pipa PVC 3" Rucika m' 18.240
29 Perlengkapan Pipa PVC 3" (35% dari bahan) % 15.200
30 Pipa PVC 4" Rucika m' 146.494
31 Perlengkapan Pipa PVC 4" (35% dari bahan) % 114.578
32 Bata Merah Buah 482.946
33 Batu Split Pecah Mesin 1/2 m3 0.053
34 Besi Beton Kg 2.666
35 Pasir Beton 1 m3 9.910
36 Batu Split Pecah Mesin 2/3 m3 0.240
37 Baja Tulangan Kg 4.850
38 Galian Tanah m3 4.500
39 Pipa GIP 1.5 m3 1.200
40 Galian Tanah untuk Rembesan m2 2.250
41 Kerikil 1 m3 1.050
42 Pas. Ijuk m2 5.400
43 Urugan Kembali/Perataan Tanah m3 1.130
44 Plat Penutup Beton m3 0.300
TOTAL
PEKERJAAN PENGECATAN
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Cat Menie Kayu A Kg 50.823
2 Plamuur Kayu Kg 38.117
3 Cat Dasar Kayu Kg 43.199
4 Cat Penutup Kayu (Avian) Kg 66.070
5 Kuas Buah 2.541
6 Pengencer Cat (Tinner) Ltr 7.623
7 Ampelas Lbr 82.387
8 Plamuur Kg 143.664
9 Cat Dasar Dulux Kg 143.664
10 Cat Penutup, 2 x Plafond Kg 58.919
11 Rol cat Buah 2.104
12 Cat Dinding Interior Vinilex Kg 218.551
13 Cat Dinding Eksterior Vinilex Kg 100.265
TOTAL
PEKERJAAN LAIN-LAIN
No Bahan Satuan Jumlah Kebutuhan
1 2 3 4
1 Batu Andesit 3x30 m m2 41.934
2 Besi Siku Kg 10.188
3 Besi Strip 2x3 cm Kg 609.539
4 Beton Tulang m3 0.611
5 Galian Tanah m3 4.585
6 Pas. Batu Belah 1SP:4PP m3 2.038
7 Pasangan Anstamping m3 1.223
8 Pasangan Batu Kali m2 16.563
9 Pasir Beton 1 m3 1.640
10 Pasir Pasang m3 0.989
11 Pengecatan m2 10.188
12 Plesteran+Acian 1SP:4PP m3 13.244
13 Semen Portland Kg 492.126
14 Urugan Pasir m3 0.815
TOTAL
No
Harga Satuan (Rp) Biaya Bahan 1
5 6 = (4 x 5) 2
Rp 25,000.00 Rp 995,312.50 3
Rp 2,400,000.00 Rp 2,436,480.00 4
Rp 3,000,000.00 Rp 13,275,300.00 5
Rp 2,800,000.00 Rp 4,335,072.00 6
Rp 58,300.00 Rp 101,442.00 7
Rp 224,500.00 Rp 134,700.00 8
Rp 250,000.00 Rp 228,562.50 9
Rp 1,100.00 Rp 486,337.50 10
Rp 258,750.00 Rp 379,236.94 11
Rp 20,250.00 Rp 117,095.63 12
Rp 55,000.00 Rp 8,250.00 13
Rp 25,000.00 Rp 64,510.00 14
Rp 125,000.00 Rp 75,000.00 15
Rp 395,000.00 Rp 316,000.00 16
Rp 30,000.00 Rp 169,380.00 17
Rp 700.00 Rp 84,000.00 18
Rp 56,500.00 Rp 248,600.00 19
Rp 80,000.00 Rp 25,600.00 20
Rp 55,000.00 Rp 1,026,850.00 21
Rp 24,507,729.06 22
23
Harga Satuan (Rp) Biaya Bahan 24
5 6 = (4 x 5) 25
Rp 8.00 Rp 8,154.09 26
Rp 700.00 Rp 163,699.20 27
Rp 175,200.00 Rp 14,944,826.04 28
Rp 250,000.00 Rp 203,980.00 29
Rp 9,500.00 Rp 303,736.36 30
Rp 11,425.00 Rp 6,484,497.89 31
Rp 25,000.00 Rp 214,122.56 32
Rp 1,815,000.00 Rp 754,677.00 33
Rp 186,703.00 Rp 659,585.65 34
Rp 16,500.00 Rp 17,151.75 35
Rp 15,000.00 Rp 46,777.50 36
Rp 250,000.00 Rp 118,916.00 37
Rp 179.00 Rp 419.46 38
Rp 224,500.00 Rp 5,645,734.14 39
Rp 153,800.00 Rp 2,083,841.37 40
Rp 1,100.00 Rp 13,438,597.60 41
Rp 45,088,716.61 42
43
Harga Satuan (Rp) Biaya Bahan 44
5 6 = (4 x 5) 45
Rp 1,100.00 Rp 16,952,062.23 46
Rp 179.00 Rp 5,189,964.61 47
Rp 139.00 Rp 6,045,293.98 48
Rp 8.00 Rp 71,447.06 49
Rp 11,425.00 Rp 55,253,889.87 50
Rp 25,000.00 Rp 2,645,164.81 51
Rp 9,500.00 Rp 24,417,230.52 52
Rp 1,815,000.00 Rp 40,875,476.70 53
Rp 15,000.00 Rp 1,827,640.02 54
Rp 16,500.00 Rp 1,136,700.99 55
Rp 15,000.00 Rp 892,620.00 56
Rp 1,705,000.00 Rp 12,183,294.97 57
Rp 111,000.00 Rp 18,507,175.35 58
Rp 25,000.00 Rp 36,008,545.50 59
Rp 222,006,506.63 60
61
Harga Satuan (Rp) Biaya Bahan 62
5 6 = (4 x 5) 63
Rp 700.00 Rp 26,976,435.50 64
Rp 1,100.00 Rp 20,406,442.73 65
Rp 224,500.00 Rp 10,821,306.46 66
Rp 4,675.00 Rp 6,846,257.00 67
Rp 15,000.00 Rp 2,130,760.20 68
Rp 67,181,201.89 69
70
Harga Satuan (Rp) Biaya Bahan 71
5 6 = (4 x 5) 72
Rp 8,500,000.00 Rp 21,296,988.00 73
Rp 15,000.00 Rp 39,148.88 74
Rp 15,000.00 Rp 504,371.33 75
Rp 9,000,000.00 Rp 7,282,946.25 76
Rp 25,000.00 Rp 24,276.49 77
Rp 120,000.00 Rp 3,884,238.00 78
Rp 26,400.00 Rp 427,266.18 79
Rp 5,147,000.00 Rp 3,191,156.47 80
Rp 116,600.00 Rp 3,863,237.69 81
Rp 25,000.00 Rp 37,650.45 82
Rp 41,500.00 Rp 1,743,000.00 83
Rp 35,000.00 Rp 1,330,000.00 84
Rp 210,000.00 Rp 4,410,000.00 85
Rp 35,000.00 Rp 1,295,000.00 86
Rp 200,000.00 Rp 4,600,000.00 87
Rp 25,000.00 Rp 475,000.00 88
Rp 54,404,279.74 89
90
Harga Satuan (Rp) Biaya Bahan 91
5 6 = (4 x 5) 92
Rp 250,000.00 Rp 244,816,065.00 93
Rp 3,520.00 Rp 1,839,714.80 94
Rp 7,727.27 Rp 11,253,837.47 95
Rp 224,500.00 Rp 3,115,734.25 96
Rp 153,800.00 Rp 3,928,883.75 97
Rp 1,100.00 Rp 3,511,590.68 98
Rp 15,000.00 Rp 4,543,960.65 99
Rp 1,348.48 Rp 699,523.31 100
Rp 2,479.17 Rp 837,319.95 101
Rp 50,000.00 Rp 4,433,703.90 102
Rp 278,980,333.75 103
104
Harga Satuan (Rp) Biaya Bahan 105
5 6 = (4 x 5) 106
Rp 4,750,000.00 Rp 15,686,966.30 107
Rp 32,000.00 Rp 1,441,099.30 108
Rp 5,250.00 Rp 988,129.80 109
Rp 11,200.00 Rp 18,443,154.23 110
Rp 3,500,000.00 Rp 7,335,345.43 111
Rp 15,000.00 Rp 222,961.10 112
Rp 16,000.00 Rp 786,544.95 113
Rp 5,500,000.00 Rp 4,302,223.20 114
Rp 224,500.00 Rp 2,218,351.40 115
Rp 3,000,000.00 Rp 25,598,858.54 116
Rp 1,100.00 Rp 336,434.67 117
Rp 77,360,068.91 118
119
Harga Satuan (Rp) Biaya Bahan 120
5 6 = (4 x 5) 121
Rp 65,000.00 Rp 4,978,773.80 122
Rp 40,000.00 Rp 925,892.00 123
Rp 85,000.00 Rp 2,757,187.50 124
Rp 20,000.00 Rp 51,900.00 125
Rp 21,000.00 Rp 8,375,136.00 126
Rp 15,000.00 Rp 271,920.00 127
Rp 22,500.00 Rp 26,722,800.00 128
Rp 5,625.00 Rp 1,670,175.00 129
Rp 45,753,784.30 130
L 131
Harga Satuan (Rp) Biaya Bahan 132
5 6 = (4 x 5) 133
Rp 5,250.00 Rp 1,496,250.00 134
Rp 10,800.00 Rp 15,606,000.00 135
Rp 6,000.00 Rp 570,000.00 136
Rp 1,100.00 Rp 2,200.00 137
Rp 200.00 Rp 187,200.00 138
Rp 56,900.00 Rp 56,900.00 139
Rp 15,000.00 Rp 270,000.00 140
Rp 17,500.00 Rp 87,500.00 141
Rp 30,000.00 Rp 30,000.00 142
Rp 15,000.00 Rp 195,000.00 143
Rp 34,800.00 Rp 174,000.00 144
Rp 38,000.00 Rp 228,000.00 145
Rp 35,000.00 Rp 315,000.00 146
Rp 300.00 Rp 34,200.00 147
Rp 54,000.00 Rp 2,052,000.00 148
Rp 15,000.00 Rp 570,000.00 149
Rp 700,000.00 Rp 700,000.00 150
Rp 6,500,000.00 Rp 13,000,000.00 151
Rp 35,574,250.00 152
153
Harga Satuan (Rp) Biaya Bahan 154
5 6 = (4 x 5) 155
Rp 2,085,000.00 Rp 6,255,000.00 TOTAL
Rp 125,100.00 Rp 375,300.00
Rp 151,250.00 Rp 151,250.00
Rp 1,100.00 Rp 488,070.00
Rp 224,500.00 Rp 162,089.00
Rp 2,602,000.00 Rp 9,367,200.00
Rp 312,240.00 Rp 936,720.00
Rp 2,500,000.00 Rp 5,000,000.00
Rp 500,000.00 Rp 1,000,000.00
Rp 8,250,000.00 Rp 8,250,000.00
Rp 500,000.00 Rp 500,000.00
Rp 60,000.00 Rp 60,000.00
Rp 195,400.00 Rp 195,400.00
Rp 100,000.00 Rp 100,000.00
Rp 198,000.00 Rp 1,386,000.00
Rp 234,000.00 Rp 2,574,000.00
Rp 94,000.00 Rp 282,000.00
Rp 1,200,000.00 Rp 1,200,000.00
Rp 144,000.00 Rp 144,000.00
Rp 94,000.00 Rp 282,000.00
Rp 80,000.00 Rp 240,000.00
Rp 176,000.00 Rp 1,408,000.00
Rp 60,000.00 Rp 12,000.00
Rp 8,125.00 Rp 284,846.25
Rp 2,843.75 Rp 83,080.16
Rp 10,000.00 Rp 989,544.00
Rp 3,500.00 Rp 288,617.00
Rp 58,750.00 Rp 1,071,600.00
Rp 20,562.50 Rp 312,550.00
Rp 95,000.00 Rp 13,916,892.00
Rp 33,250.00 Rp 3,809,718.50
Rp 700.00 Rp 338,062.20
Rp 250,000.00 Rp 13,250.00
Rp 1,720.00 Rp 4,585.52
Rp 250,000.00 Rp 2,477,500.00
Rp 250,000.00 Rp 60,000.00
Rp 12,000.00 Rp 58,200.00
Rp 70,000.00 Rp 315,000.00
Rp 75,000.00 Rp 90,000.00
Rp 56,814.00 Rp 127,831.50
Rp 250,000.00 Rp 262,500.00
Rp 250,000.00 Rp 1,350,000.00
Rp 50,000.00 Rp 56,500.00
Rp 2,537,064.00 Rp 761,119.20
Rp 67,040,425.33
N
Harga Satuan (Rp) Biaya Bahan
5 6 = (4 x 5)
Rp 33,000.00 Rp 1,677,155.79
Rp 21,578.00 Rp 822,492.45
Rp 31,500.00 Rp 1,360,783.22
Rp 55,000.00 Rp 3,633,837.55
Rp 17,500.00 Rp 44,470.04
Rp 25,000.00 Rp 190,585.89
Rp 4,000.00 Rp 329,546.67
Rp 15,000.00 Rp 2,154,963.15
Rp 24,000.00 Rp 3,447,941.04
Rp 23,000.00 Rp 1,355,137.64
Rp 31,000.00 Rp 65,231.78
Rp 23,000.00 Rp 5,026,671.39
Rp 42,100.00 Rp 4,221,177.13
Rp 24,329,993.75

Harga Satuan (Rp) Biaya Bahan


5 6 = (4 x 5)
Rp 180,000.00 Rp 7,548,048.00
Rp 14,980.00 Rp 152,616.24
Rp 3,500.00 Rp 2,133,386.85
Rp 868,448.60 Rp 530,865.26
Rp 70,000.00 Rp 320,922.00
Rp 738,147.00 Rp 1,504,048.33
Rp 402,456.60 Rp 492,027.34
Rp 134,700.00 Rp 2,231,102.78
Rp 250,000.00 Rp 409,987.50
Rp 224,500.00 Rp 222,030.50
Rp 48,622.00 Rp 495,360.94
Rp 97,941.24 Rp 1,297,172.96
Rp 1,100.00 Rp 541,339.04
Rp 153,800.00 Rp 125,353.15
Rp 18,004,260.88
Jenis Bahan Satuan Jumlah Harga
Air Liter 9950.144 Rp 8.00
Ampelas Lbr 82.387 Rp 4,000.00
Assesories (perkuatan las,dll) ls 296.920 Rp 5,625.00
Baja Tulangan Kg 4.850 Rp 12,000.00
Bak Cuci Piring Unit 1.000 Rp 195,400.00
Bak Mandi Fiberglass Unit 1.000 Rp 500,000.00
Balok Kayu Borneo Kelas II m3 3.303 Rp 4,750,000.00
Balok Kayu Kamper Samarinda m3 2.506 Rp 8,500,000.00
Balok Kayu Kelas II (Balok Albasia) m3 7.146 Rp 1,705,000.00
Bata Merah Buah 39254.567 Rp 700.00
Bathtube Unit 2.000 Rp 2,500,000.00
Batu Andesit 3x30 m m2 41.934 Rp 180,000.00
Batu bata merah bakar kualitas I bh 120.000 Rp 700.00
Batu Belah 15/20 m3 85.302 Rp 175,200.00
Batu Koral Beton Kali m3 1.466 Rp 258,750.00
Batu Split Pecah Mesin 1/2 m3 0.053 Rp 250,000.00
Batu Split Pecah Mesin 2/3 m3 1.056 Rp 250,000.00
Besi Beton Kg 2.666 Rp 1,720.00
Besi Beton Polos Kg 2602.207 Rp 9,500.00
Besi Beton Ulir Kg 5403.798 Rp 11,425.00
Besi Siku Kg 10.188 Rp 14,980.00
Besi Strip bh 4.400 Rp 56,500.00
Besi Strip 2x3 cm Kg 609.539 Rp 3,500.00
Besi Strip Tebal 5 mm Kg 45.034 Rp 32,000.00
Beton Tulang m3 0.611 Rp 868,448.60
Cat Dasar Dulux Kg 143.664 Rp 24,000.00
Cat Dasar Kayu Kg 43.199 Rp 31,500.00
Cat Dinding Eksterior Vinilex Kg 100.265 Rp 42,100.00
Cat Dinding Interior Vinilex Kg 218.551 Rp 23,000.00
Cat Meni Besi Liter 5.783 Rp 20,250.00
Cat Menie Kayu A Kg 50.823 Rp 33,000.00
Cat Penutup Kayu (Avian) Kg 66.070 Rp 55,000.00
Cat Penutup, 2 x Plafond Kg 58.919 Rp 23,000.00
Cat SEIV Gloss Warna Standar Liter 0.150 Rp 55,000.00
Chandellier Lampu Gantung Hias Buah 2.000 Rp 6,500,000.00
Closet Duduk Warna Toto Unit 3.000 Rp 2,085,000.00
Closet Jongkok Putih INA Unit 1.000 Rp 151,250.00
Dolken Kayu Ø 8-10 cm panj. 4m Batang 1480.154 Rp 25,000.00
Engsel Jendela (Stainless Eks.Otis 3" x 2,5") Buah 38.000 Rp 35,000.00
Engsel Pintu (Stainless Eks.Otis 4"x3") Buah 42.000 Rp 41,500.00
Fitting Buah 38.000 Rp 15,000.00
Floor Drain Unit 7.000 Rp 198,000.00
Galian Tanah m3 9.085 Rp 70,000.00
Galian Tanah untuk Rembesan m2 2.250 Rp 56,814.00
Genting Bubungan Beton Buah 188.215 Rp 5,250.00
Genting Kanmuri Milenio Buah 1646.710 Rp 11,200.00
Gypsum Board Tebal 9 mm Lembar 76.597 Rp 65,000.00
Jendela nako + accessories Set 0.800 Rp 395,000.00
Jet Shower Buah 3.000 Rp 94,000.00
Jet Washer Closet Unit 3.000 Rp 94,000.00
Kabel Prima NYM 3x2,5 m' 1445.000 Rp 10,800.00
Kaca Polos tebal 3 mm m2 0.320 Rp 80,000.00
Kaca Polos Tebal 5mm Asahi m2 33.132 Rp 116,600.00
Kait Angin Buah 19.000 Rp 25,000.00
Kaso-Kaso (5x7) cm m3 2.096 Rp 3,500,000.00
Kawat Beton Kg 114.371 Rp 25,000.00
Kayu Kelas III (Papan Albasia) m3 22.937 Rp 1,815,000.00
Kayu Meranti Balok 6/12 m3 1.548 Rp 2,800,000.00
Kayu Meranti Kaso 5/7 m3 1.015 Rp 2,400,000.00
Kayu Meranti Papan 3/20 M3 4.425 Rp 3,000,000.00
Kayu Papan Samarinda m3 0.809 Rp 9,000,000.00
Keramik Dinding 20x25 Roman Polos Buah 1464.440 Rp 4,675.00
Keramik Uk. 20 x 20 Roman Polos (Golongan A) Buah 522.646 Rp 3,520.00
Keramik Uk. 30 x 30 Roman (Golongan B) Buah 1456.379 Rp 7,727.27
Kerikil 1 m3 1.050 Rp 250,000.00
Kerikil 2 Kg 43491.324 Rp 139.00
Klem Buah 936.000 Rp 200.00
Koral Beton m3 3.533 Rp 186,703.00
Kran Air Buah 8.000 Rp 176,000.00
Kuas Buah 2.541 Rp 17,500.00
Kunci Selot Buah 37.000 Rp 35,000.00
Kunci Tanam Bh 0.600 Rp 125,000.00
Kunci Tanam (Eks. Ses Art 2030 40mm SS) Buah 21.000 Rp 210,000.00
L Bow Buah 2.000 Rp 1,100.00
Lampu Downlight Panasonic 4 Inch Buah 38.000 Rp 54,000.00
Lampu Sorot LED 50 Watt Himawari Buah 1.000 Rp 700,000.00
Las Doof Buah 114.000 Rp 300.00
Lem Kayu Kg 51.753 Rp 15,000.00
List Gypsum m 398.816 Rp 21,000.00
MCB Domae 1 Phase 25A Buah 1.000 Rp 56,900.00
Minyak Bekisting Ltr 69.930 Rp 16,500.00
Paku 1" - 2,5" Kg 0.971 Rp 25,000.00
Paku 10 cm Buah 2.610 Rp 15,000.00
Paku 12 cm Kg 14.864 Rp 15,000.00
Paku 2" - 3" Kg 2.580 Rp 25,000.00
Paku 2" - 5" Kg 5.646 Rp 30,000.00
Paku 5-10 cm Kg 124.961 Rp 15,000.00
Paku 5-7 cm Kg 49.159 Rp 16,000.00
Paku 8-12 cm Kg 59.508 Rp 15,000.00
Paku Sekrup Kg 23.147 Rp 40,000.00
Paku Tripleks Kg 2.595 Rp 20,000.00
Papan Kayu m3 0.620 Rp 5,147,000.00
Papan Kayu Borneo Super m3 0.782 Rp 5,500,000.00
Pas. Batu Belah 1SP:4PP m3 2.038 Rp 738,147.00
Pas. Ijuk m2 5.400 Rp 250,000.00
Pasangan Anstamping m3 1.223 Rp 402,456.60
Pasangan Batu Kali m2 16.563 Rp 134,700.00
Pasir Beton 1 m3 12.940 Rp 250,000.00
Pasir Beton 2 Kg 28996.559 Rp 179.00
Pasir Pasang m3 99.421 Rp 224,500.00
Pasir Urug m3 39.094 Rp 153,800.00
Pegangan Pintu (BLC AAH 8 SS) Buah 23.000 Rp 200,000.00
Pengecatan m2 10.188 Rp 48,622.00
Pengencer Cat (Tinner) Ltr 7.623 Rp 25,000.00
Perlengkapan Bak Mandi (12% dari bahan) % 1.000 Rp 60,000.00
Perlengkapan Bathtube (20% dari bahan) % 2.000 Rp 500,000.00
Perlengkapan Closet Duduk (6% dari bahan) % 3.000 Rp 125,100.00
Perlengkapan Jet Shower Set 3.000 Rp 80,000.00
Perlengkapan Pipa PVC 1/2" (35% dari bahan) % 29.215 Rp 2,843.75
Perlengkapan Pipa PVC 3" (35% dari bahan) % 15.200 Rp 20,562.50
Perlengkapan Pipa PVC 3/4" (35% dari bahan) % 82.462 Rp 3,500.00
Perlengkapan Pipa PVC 4" (35% dari bahan) % 114.578 Rp 33,250.00
Perlengkapan Tandon Air (12% dari bahan) % 1.000 Rp 144,000.00
Perlengkapan Wastafel (12% dari bahan) % 3.000 Rp 312,240.00
Pipa GIP 1.5 m3 1.200 Rp 75,000.00
Pipa Listrik 5/8" Batang 285.000 Rp 5,250.00
Pipa PVC 1/2" Rucika m' 35.058 Rp 8,125.00
Pipa PVC 3" Rucika m' 18.240 Rp 58,750.00
Pipa PVC 3/4 " Rucika m' 98.954 Rp 10,000.00
Pipa PVC 4" Rucika m' 146.494 Rp 95,000.00
Plamuur Kg 143.664 Rp 15,000.00
Plamuur Kayu Kg 38.117 Rp 21,578.00
Plat Penutup Beton m3 0.300 Rp 2,537,064.00
Plat Seng Alumumium Lbr 16.184 Rp 26,400.00
Plesteran+Acian 1SP:4PP m3 13.244 Rp 97,941.24
Polywood, t=4mm Lbr 1.740 Rp 58,300.00
Pompa Jet Pump 450 Watt Buah 1.000 Rp 8,250,000.00
Rangka Metal Hollow 40.40.2mm m 1187.680 Rp 22,500.00
Reng (3x4) cm m3 8.533 Rp 3,000,000.00
Rol cat Buah 2.104 Rp 31,000.00
Roof Drain Unit 11.000 Rp 234,000.00
Saklar Ganda Broco Buah 5.000 Rp 17,500.00
Saklar Tunggal Broco Buah 18.000 Rp 15,000.00
Seal Tape Buah 0.200 Rp 60,000.00
Sealant Kg 1.506 Rp 25,000.00
Semen Portland Kg 51055.340 Rp 1,100.00
Semen Warna Kg 444.981 Rp 15,000.00
Seng Gelombang BJLS 25, Uk 90 x 180 cm Lbr 18.670 Rp 55,000.00
Sikring Buah 1.000 Rp 30,000.00
Stop Kontak AC Panasonic Buah 5.000 Rp 34,800.00
Stop Kontak Antena TV Broco Buah 6.000 Rp 38,000.00
Stop Kontak Broco Buah 13.000 Rp 15,000.00
Stop Kontak Telepon Broco Buah 9.000 Rp 35,000.00
T dus Buah 95.000 Rp 6,000.00
Tandon Air 1000L buah 1.000 Rp 1,200,000.00
Teakwood, t = 4mm , 90 x 220 mm Lbr 32.369 Rp 120,000.00
Tegel Plint warna, 10x30 cm Buah 518.748 Rp 1,348.48
Tegel Plint warna, 10x40 cm Buah 337.743 Rp 2,479.17
Triplek 9 mm 120 x 240 Lembar 166.731 Rp 111,000.00
Tripleks (120 x 240) Tebal 6 mm Lembar 32.438 Rp 85,000.00
Ubin Teralux Marmer Buah 979.264 Rp 250,000.00
Urugan Kembali/Perataan Tanah m3 89.804 Rp 50,000.00
Urugan Pasir m3 0.815 Rp 153,800.00
Wastafel Toto L 521V1A Unit 3.600 Rp 2,602,000.00
Waterdrain Buah 1.000 Rp 100,000.00
TOTAL

960231550.84
different 0.00
Biaya no Jenis Bahan
Rp 79,601.15 1 Air
Rp 329,546.67 2 Ampelas
Rp 1,670,175.00 3 Assesories (perkuatan las,dll)
Rp 58,200.00 4 Baja Tulangan
Rp 195,400.00 5 Bak Cuci Piring
Rp 500,000.00 6 Bak Mandi Fiberglass
Rp 15,686,966.30 7 Balok Kayu Borneo Kelas II
Rp 21,296,988.00 8 Balok Kayu Kamper Samarinda
Rp 12,183,294.97 9 Balok Kayu Kelas II (Balok Albasia)
Rp 27,478,196.90 10 Bata Merah
Rp 5,000,000.00 11 Bathtube
Rp 7,548,048.00 148 Batu Andesit 3x30 m
Rp 84,000.00 12 Batu bata merah bakar kualitas I
Rp 14,944,826.04 13 Batu Belah 15/20
Rp 379,236.94 14 Batu Koral Beton Kali
Rp 13,250.00 15 Batu Split Pecah Mesin 1/2
Rp 263,980.00 16 Batu Split Pecah Mesin 2/3
Rp 4,585.52 17 Besi Beton
Rp 24,720,966.88 18 Besi Beton Polos
Rp 61,738,387.76 19 Besi Beton Ulir
Rp 152,616.24 149 Besi Siku
Rp 248,600.00 20 Besi Strip
Rp 2,133,386.85 150 Besi Strip 2x3 cm
Rp 1,441,099.30 21 Besi Strip Tebal 5 mm
Rp 530,865.26 151 Beton Tulang
Rp 3,447,941.04 22 Cat Dasar Dulux
Rp 1,360,783.22 23 Cat Dasar Kayu
Rp 4,221,177.13 24 Cat Dinding Eksterior Vinilex
Rp 5,026,671.39 25 Cat Dinding Interior Vinilex
Rp 117,095.63 26 Cat Meni Besi
Rp 1,677,155.79 27 Cat Menie Kayu A
Rp 3,633,837.55 28 Cat Penutup Kayu (Avian)
Rp 1,355,137.64 29 Cat Penutup, 2 x Plafond
Rp 8,250.00 30 Cat SEIV Gloss Warna Standar
Rp 13,000,000.00 31 Chandellier Lampu Gantung Hias
Rp 6,255,000.00 32 Closet Duduk Warna Toto
Rp 151,250.00 33 Closet Jongkok Putih INA
Rp 37,003,858.00 34 Dolken Kayu Ø 8-10 cm panj. 4m
Rp 1,330,000.00 35 Engsel Jendela (Stainless Eks.Otis 3" x 2,5")
Rp 1,743,000.00 36 Engsel Pintu (Stainless Eks.Otis 4"x3")
Rp 570,000.00 37 Fitting
Rp 1,386,000.00 38 Floor Drain
Rp 635,922.00 152 Galian Tanah
Rp 127,831.50 39 Galian Tanah
Rp 988,129.80 40 Galian Tanah untuk Rembesan
Rp 18,443,154.23 41 Genting Bubungan Beton
Rp 4,978,773.80 42 Genting Kanmuri Milenio
Rp 316,000.00 43 Gypsum Board Tebal 9 mm
Rp 282,000.00 44 Jendela nako + accessories
Rp 282,000.00 45 Jet Shower
Rp 15,606,000.00 46 Jet Washer Closet
Rp 25,600.00 47 Kabel Prima NYM 3x2,5
Rp 3,863,237.69 48 Kaca Polos tebal 3 mm
Rp 475,000.00 49 Kaca Polos Tebal 5mm Asahi
Rp 7,335,345.43 50 Kait Angin
Rp 2,859,287.38 51 Kaso-Kaso (5x7) cm
Rp 41,630,153.70 52 Kawat Beton
Rp 4,335,072.00 53 Kayu Kelas III (Papan Albasia)
Rp 2,436,480.00 54 Kayu Meranti Balok 6/12
Rp 13,275,300.00 55 Kayu Meranti Kaso 5/7
Rp 7,282,946.25 56 Kayu Meranti Papan 3/20
Rp 6,846,257.00 57 Kayu Papan Samarinda
Rp 1,839,714.80 58 Keramik Dinding 20x25 Roman Polos
Rp 11,253,837.47 59 Keramik Uk. 20 x 20 Roman Polos (Golongan A)
Rp 262,500.00 60 Keramik Uk. 30 x 30 Roman (Golongan B)
Rp 6,045,293.98 61 Kerikil 1
Rp 187,200.00 62 Kerikil 2
Rp 659,585.65 63 Klem
Rp 1,408,000.00 64 Koral Beton
Rp 44,470.04 65 Kran Air
Rp 1,295,000.00 66 Kuas
Rp 75,000.00 67 Kunci Selot
Rp 4,410,000.00 68 Kunci Tanam
Rp 2,200.00 69 Kunci Tanam (Eks. Ses Art 2030 40mm SS)
Rp 2,052,000.00 70 L Bow
Rp 700,000.00 71 Lampu Downlight Panasonic 4 Inch
Rp 34,200.00 72 Lampu Sorot LED 50 Watt Himawari
Rp 776,291.33 73 Las Doof
Rp 8,375,136.00 74 Lem Kayu
Rp 56,900.00 75 List Gypsum
Rp 1,153,852.74 76 MCB Domae 1 Phase 25A
Rp 24,276.49 77 Minyak Bekisting
Rp 39,148.88 78 Paku 1" - 2,5"
Rp 222,961.10 79 Paku 10 cm
Rp 64,510.00 80 Paku 12 cm
Rp 169,380.00 81 Paku 2" - 3"
Rp 1,874,417.52 82 Paku 2" - 5"
Rp 786,544.95 83 Paku 5-10 cm
Rp 892,620.00 84 Paku 5-7 cm
Rp 925,892.00 85 Paku 8-12 cm
Rp 51,900.00 86 Paku Sekrup
Rp 3,191,156.47 87 Paku Tripleks
Rp 4,302,223.20 88 Papan Kayu
Rp 1,504,048.33 89 Papan Kayu Borneo Super
Rp 1,350,000.00 153 Pas. Batu Belah 1SP:4PP
Rp 492,027.34 90 Pas. Ijuk
Rp 2,231,102.78 154 Pasangan Anstamping
Rp 3,234,966.00 155 Pasangan Batu Kali
Rp 5,190,384.07 91 Pasir Beton 1
Rp 22,319,945.75 156 Pasir Beton 1
Rp 6,012,725.12 92 Pasir Beton 2
Rp 4,600,000.00 94 Pasir Pasang
Rp 495,360.94 157 Pasir Pasang
Rp 190,585.89 95 Pasir Urug
Rp 60,000.00 96 Pegangan Pintu (BLC AAH 8 SS)
Rp 1,000,000.00 158 Pengecatan
Rp 375,300.00 97 Pengencer Cat (Tinner)
Rp 240,000.00 98 Perlengkapan Bak Mandi (12% dari bahan)
Rp 83,080.16 99 Perlengkapan Bathtube (20% dari bahan)
Rp 312,550.00 100 Perlengkapan Closet Duduk (6% dari bahan)
Rp 288,617.00 101 Perlengkapan Jet Shower
Rp 3,809,718.50 102 Perlengkapan Pipa PVC 1/2" (35% dari bahan)
Rp 144,000.00 103 Perlengkapan Pipa PVC 3" (35% dari bahan)
Rp 936,720.00 104 Perlengkapan Pipa PVC 3/4" (35% dari bahan)
Rp 90,000.00 105 Perlengkapan Pipa PVC 4" (35% dari bahan)
Rp 1,496,250.00 106 Perlengkapan Tandon Air (12% dari bahan)
Rp 284,846.25 107 Perlengkapan Wastafel (12% dari bahan)
Rp 1,071,600.00 108 Pipa GIP 1.5
Rp 989,544.00 109 Pipa Listrik 5/8"
Rp 13,916,892.00 110 Pipa PVC 1/2" Rucika
Rp 2,154,963.15 111 Pipa PVC 3" Rucika
Rp 822,492.45 112 Pipa PVC 3/4 " Rucika
Rp 761,119.20 113 Pipa PVC 4" Rucika
Rp 427,266.18 114 Plamuur
Rp 1,297,172.96 115 Plamuur Kayu
Rp 101,442.00 116 Plat Penutup Beton
Rp 8,250,000.00 117 Plat Seng Alumumium
Rp 26,722,800.00 159 Plesteran+Acian 1SP:4PP
Rp 25,598,858.54 118 Polywood, t=4mm
Rp 65,231.78 119 Pompa Jet Pump 450 Watt
Rp 2,574,000.00 120 Rangka Metal Hollow 40.40.2mm
Rp 87,500.00 121 Reng (3x4) cm
Rp 270,000.00 122 Rol cat
Rp 12,000.00 123 Roof Drain
Rp 37,650.45 124 Saklar Ganda Broco
Rp 56,160,874.44 125 Saklar Tunggal Broco
Rp 6,674,720.85 126 Seal Tape
Rp 1,026,850.00 127 Sealant
Rp 30,000.00 129 Semen Portland
Rp 174,000.00 160 Semen Portland
Rp 228,000.00 130 Semen Warna
Rp 195,000.00 131 Seng Gelombang BJLS 25, Uk 90 x 180 cm
Rp 315,000.00 132 Sikring
Rp 570,000.00 133 Stop Kontak AC Panasonic
Rp 1,200,000.00 134 Stop Kontak Antena TV Broco
Rp 3,884,238.00 135 Stop Kontak Broco
Rp 699,523.31 136 Stop Kontak Telepon Broco
Rp 837,319.95 137 T dus
Rp 18,507,175.35 138 Tandon Air 1000L
Rp 2,757,187.50 139 Teakwood, t = 4mm , 90 x 220 mm
Rp 244,816,065.00 140 Tegel Plint warna, 10x30 cm
Rp 4,490,203.90 141 Tegel Plint warna, 10x40 cm
Rp 125,353.15 142 Triplek 9 mm 120 x 240
Rp 9,367,200.00 143 Tripleks (120 x 240) Tebal 6 mm
Rp 100,000.00 144 Ubin Teralux Marmer
Rp 960,231,550.84 145 Urugan Kembali/Perataan Tanah
161 Urugan Pasir
960231550.84 146 Wastafel Toto L 521V1A
147 Waterdrain
MENGHITUNG KEBUTUHAN TENAGA KERJA/HARI JIKA Durasi ditetapkan/TK TAK TERBATAS

DURASI PEKERJAAN PERSIAPAN


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari

TABEL 1. PERHITUNGAN KEBUTUHAN TENAGA KERJA PER HARI DAN PRODUKTIVITAS PER HA
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
A PEKERJAAN PERSIAPAN
A.1 PEKERJAAN PEMBERSIHAN LAPANGAN
Tenaga Kerja:
Pekerja 154.84 oh 0.1 0.09 11.11
Mandor 154.84 oh 0.05 0.045 22.22
Jumlah
A.2 PEKERJAAN PEMBUATAN PAGAR
Tenaga Kerja:
Pekerja 46.08 oh 0.2 0.18 5.56
Tukang Kayu 46.08 oh 0.4 0.36 2.78
Kepala Tukang 46.08 oh 0.02 0.018 55.56
Mandor 46.08 oh 0.02 0.018 55.56
Jumlah
A.3 PEKERJAAN PEMASANGAN DIREKSI KEET
Tenaga Kerja:
Pekerja 12.25 oh 2 1.8 0.56
Tukang Batu 12.25 oh 1 0.9 1.11
Tukang Kayu 12.25 oh 2 1.8 0.56
Kepala Tukang 12.25 oh 0.3 0.27 3.70
Mandor 12.25 oh 0.05 0.045 22.22
Jumlah
A.4 PEKERJAAN PEMBUATAN LOS KERJA
Tenaga Kerja:
Pekerja 12 oh 1 0.9 1.11
Tukang Kayu 12 oh 2 1.8 0.56
Kepala Tukang 12 oh 0.2 0.18 5.56
Mandor 12 oh 0.05 0.045 22.22
Jumlah
A.5 PEKERJAAN PEMBUATAN PAPAN NAMA PROYEK
Tenaga Kerja:
Pekerja 0.72 oh 0.1 0.09 11.11
Jumlah
A.6 PEKERJAAN PEMASANGAN BOUWPLANK
Tenaga Kerja:
A.6

Pekerja 81.3 oh 0.1 0.09 11.11


Tukang Kayu 81.3 oh 0.1 0.09 11.11
Kepala Tukang 81.3 oh 0.01 0.009 111.11
Mandor 81.3 oh 0.005 0.0045 222.22
Jumlah

DURASI PEKERJAAN TANAH


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN TANAH
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
B PEKERJAAN TANAH
B.1 PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1M
Tenaga Kerja:
Pekerja 72.21 oh 0.75 0.675 1.48
Mandor 72.21 oh 0.025 0.0225 44.44
Jumlah
B.2 PENGURUGAN KEMBALI 1 M3 GALIAN TANAH
Tenaga Kerja:
Pekerja 33.10 oh 0.3 0.27 3.70
Mandor 33.10 oh 0.01 0.009 111.11
Jumlah

DURASI PEKERJAAN PONDASI


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN PONDASI
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
C PEKERJAAN PONDASI
C.1 PEKERJAAN PONDASI BATU KALI
C.1.1 PEKERJAAN URUGAN PASIR
Tenaga Kerja:
Pekerja 3.47 oh 0.25 0.225 4.44
Mandor 3.47 oh 0.025 0.0225 44.44
Jumlah
C.1.2 PEKERJAAN PASANGAN AANSTAMPING
Tenaga Kerja:
Pekerja 10.401 oh 0.78 0.702 1.42
Tukang Batu 10.401 oh 0.39 0.351 2.85
C.1.2

Kepala Tukang Batu 10.401 oh 0.039 0.0351 28.49


Mandor 10.401 oh 0.039 0.0351 28.49
Jumlah
C.1.3 PEKERJAAN PASANGAN PONDASI BATU KALI, 1 PC : 34 PP
Tenaga Kerja:
Pekerja 33.273475 oh 1.5 1.35 0.74
Tukang Batu 33.273475 oh 0.75 0.675 1.48
Kepala Tukang Batu 33.273475 oh 0.075 0.0675 14.81
Mandor 33.273475 oh 0.075 0.0675 14.81
Jumlah
C.2 PEKERJAAN PONDASI TELAPAK
C.2.1 PEKERJAAN BEKISTING PONDASI
Tenaga Kerja:
Pekerja 66.07 oh 0.52 0.468 2.14
Tukang Kayu 66.07 oh 0.26 0.234 4.27
Kepala Tukang Kayu 66.07 oh 0.026 0.0234 42.74
Mandor 66.07 oh 0.026 0.0234 42.74
Jumlah
C.2.2 PEKERJAAN COR BETON K225
Tenaga Kerja:
Pekerja 6.305 oh 1.65 1.485 0.67
Tukang Batu 6.305 oh 0.275 0.2475 4.04
Kepala Tukang Batu 6.305 oh 0.028 0.0252 39.68
Mandor 6.305 oh 0.083 0.0747 13.39
Jumlah
C.2.3 PEKERJAAN PEMBESIAN DENGAN BESI ULIR
Tenaga Kerja:
Pekerja 194.05575 oh 0.007 0.0063 158.73
Tukang Batu 194.05575 oh 0.007 0.0063 158.73
Kepala Tukang Batu 194.05575 oh 0.0007 0.00063 1587.30
Mandor 194.05575 oh 0.0004 0.00036 2777.78
Jumlah

DURASI PEKERJAAN BETON


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN BETON
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
D PEKERJAAN BETON
D.1 PEKERJAAN SLOOF
D.1.1 PEKERJAAN PEMBUATAN BETON MUTU K-225
D.1.1
Tenaga Kerja:
Pekerja 2.13 oh 1.65 1.485 0.67
Tukang Batu 2.13 oh 0.275 0.2475 4.04
Kepala Tukang Batu 2.13 oh 0.028 0.0252 39.68
Mandor 2.13 oh 0.083 0.0747 13.39
Jumlah
D.1.2 PEKERJAAN PEMBESIAN DENGAN BESI ULIR
Tenaga Kerja:
Pekerja 476.43 oh 0.07 0.063 15.87
Tukang Batu 476.43 oh 0.07 0.063 15.87
Kepala Tukang Batu 476.43 oh 0.007 0.0063 158.73
Mandor 476.43 oh 0.004 0.0036 277.78
Jumlah
D.1.3 PEKERJAAN PEMASANGAN BEKISTING UNTUK SLOOF
Tenaga Kerja:
Pekerja 35.32 oh 0.52 0.468 2.14
Tukang Kayu 35.32 oh 0.26 0.234 4.27
Kepala Tukang Kayu 35.32 oh 0.026 0.0234 42.74
Mandor 35.32 oh 0.026 0.0234 42.74
Jumlah
D.2 PEKERJAAN RINGBALK
D.2.1 PEKERJAAN PEMBUATAN BETON MUTU K-225
Tenaga Kerja:
Pekerja 3.33 oh 1.65 1.485 0.67
Tukang Batu 3.33 oh 0.275 0.2475 4.04
Kepala Tukang Batu 3.33 oh 0.028 0.0252 39.68
Mandor 3.33 oh 0.083 0.0747 13.39
Jumlah
D.2.2 PEKERJAAN PEMBESIAN DENGAN BESI ULIR
Tenaga Kerja:
Pekerja 499.14 oh 0.07 0.063 15.87
Tukang Batu 499.14 oh 0.07 0.063 15.87
Kepala Tukang Batu 499.14 oh 0.007 0.0063 158.73
Mandor 499.14 oh 0.004 0.0036 277.78
Jumlah
D.2.3 PEKERJAAN PEMASANGAN BEKISTING UNTUK RINGBALK
Tenaga Kerja:
Pekerja 48.14 oh 0.52 0.468 2.14
Tukang Kayu 48.14 oh 0.26 0.234 4.27
Kepala Tukang Kayu 48.14 oh 0.026 0.0234 42.74
Mandor 48.14 oh 0.026 0.0234 42.74
Jumlah
D.2 PEKERJAAN KOLOM
D.2.1 PEKERJAAN PEMBUATAN BETON MUTU K-225
Tenaga Kerja:
Pekerja 6.84 oh 1.65 1.485 0.67
Tukang Batu 6.84 oh 0.275 0.2475 4.04
Kepala Tukang Batu 6.84 oh 0.028 0.0252 39.68
Mandor 6.84 oh 0.083 0.0747 13.39
Jumlah
D.2.2 PEKERJAAN PEMBESIAN DENGAN BESI ULIR
Tenaga Kerja:
Pekerja 2961.60 oh 0.07 0.063 15.87
Tukang Batu 2961.60 oh 0.07 0.063 15.87
Kepala Tukang Batu 2961.60 oh 0.007 0.0063 158.73
Mandor 2961.60 oh 0.004 0.0036 277.78
Jumlah
D.2.4 PEKERJAAN PEMASANGAN BEKISTING UNTUK KOLOM
Tenaga Kerja:
Pekerja 79.69 oh 0.52 0.468 2.14
Tukang Kayu 79.69 oh 0.26 0.234 4.27
Kepala Tukang Kayu 79.69 oh 0.026 0.0234 42.74
Mandor 79.69 oh 0.026 0.0234 42.74
Jumlah
D.3 PEKERJAAN BALOK
D.3.1 PEKERJAAN PEMBUATAN BETON MUTU K-225
Tenaga Kerja:
Pekerja 1.25 oh 1.65 1.485 0.67
Tukang Batu 1.25 oh 0.275 0.2475 4.04
Kepala Tukang Batu 1.25 oh 0.028 0.0252 39.68
Mandor 1.25 oh 0.083 0.0747 13.39
Jumlah
D.3.2 PEKERJAAN PEMBESIAN DENGAN BESI ULIR
Tenaga Kerja:
Pekerja 706.83 oh 0.07 0.063 15.87
Tukang Batu 706.83 oh 0.07 0.063 15.87
Kepala Tukang Batu 706.83 oh 0.007 0.0063 158.73
Mandor 706.83 oh 0.004 0.0036 277.78
Jumlah
D.3.4 PEKERJAAN PEMASANGAN BEKISTING UNTUK KOLOM
Tenaga Kerja:
Pekerja 67.50 oh 0.52 0.468 2.14
Tukang Kayu 67.50 oh 0.26 0.234 4.27
Kepala Tukang Kayu 67.50 oh 0.026 0.0234 42.74
Mandor 67.50 oh 0.026 0.0234 42.74
Jumlah
D.4 PEKERJAAN PLAT LANTAI
D.4.1 PEKERJAAN PEMBUATAN BETON MUTU K-225
Tenaga Kerja:
Pekerja 22.06 oh 1.65 1.485 0.67
Tukang Batu 22.06 oh 0.275 0.2475 4.04
Kepala Tukang Batu 22.06 oh 0.028 0.0252 39.68
Mandor 22.06 oh 0.083 0.0747 13.39
Jumlah
D.4.2 PEKERJAAN PEMBESIAN DENGAN BESI POLOS
Tenaga Kerja:
Pekerja 2736.89 oh 0.07 0.063 15.87
Tukang Batu 2736.89 oh 0.07 0.063 15.87
Kepala Tukang Batu 2736.89 oh 0.007 0.0063 158.73
Mandor 2736.89 oh 0.004 0.0036 277.78
Jumlah
D.4.3 PEKERJAAN PEMASANGAN BEKISTING UNTUK PLAT LANTAI
Tenaga Kerja:
Pekerja 183.86 oh 0.66 0.594 1.68
Tukang Kayu 183.86 oh 0.33 0.297 3.37
Kepala Tukang Kayu 183.86 oh 0.033 0.0297 33.67
Mandor 183.86 oh 0.033 0.0297 33.67
Jumlah
D.5 PEKERJAAN PLAT ATAP
D.5.1 PEKERJAAN PEMBUATAN BETON MUTU K-225
Tenaga Kerja:
Pekerja 8.45 oh 1.65 1.485 0.67
Tukang Batu 8.45 oh 0.275 0.2475 4.04
Kepala Tukang Batu 8.45 oh 0.028 0.0252 39.68
Mandor 8.45 oh 0.083 0.0747 13.39
Jumlah
D.5.2 PEKERJAAN PEMBESIAN DENGAN BESI POLOS
Tenaga Kerja:
Pekerja 1324.61 oh 0.07 0.063 15.87
Tukang Batu 1324.61 oh 0.07 0.063 15.87
Kepala Tukang Batu 1324.61 oh 0.007 0.0063 158.73
Mandor 1324.61 oh 0.004 0.0036 277.78
Jumlah
D.5.3 PEKERJAAN PEMASANGAN BEKISTING UNTUK TANGGA
Tenaga Kerja:
Pekerja 84.52 oh 0.52 0.468 2.14
Tukang Kayu 84.52 oh 0.26 0.234 4.27
Kepala Tukang Kayu 84.52 oh 0.026 0.0234 42.74
Mandor 84.52 oh 0.026 0.0234 42.74
Jumlah

DURASI PEKERJAAN DINDING


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN DINDING
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
E PEKERJAAN DINDING
E.1 PEKERJAAN PEMASANGAN DINDING BATA MERAH 1SP:4PP
Tenaga Kerja:
Pekerja 560.91 oh 0.6 0.54 1.85
Tukang Batu 560.91 oh 0.2 0.18 5.56
Kepala Tukang Batu 560.91 oh 0.02 0.018 55.56
Mandor 560.91 oh 0.03 0.027 37.04
Jumlah
E.2 PEKERJAAN PEMASANGAN PLESTERAN 1SP:4PP
Tenaga Kerja:
Pekerja 1166.97 oh 0.3 0.27 3.70
Tukang Batu 1166.97 oh 0.15 0.135 7.41
Kepala Tukang Batu 1166.97 oh 0.015 0.0135 74.07
Mandor 1166.97 oh 0.015 0.0135 74.07
Jumlah
E.2 PEKERJAAN PEMASANGAN DINDING BATA MERAH 1SP:2PP
Tenaga Kerja:
Pekerja 57.91 oh 0.6 0.54 1.85
Tukang Batu 57.91 oh 0.2 0.18 5.56
Kepala Tukang Batu 57.91 oh 0.02 0.018 55.56
Mandor 57.91 oh 0.03 0.027 37.04
Jumlah
E.4 PEKERJAAN PEMASANGAN PLESTERAN 1SP:2PP
Tenaga Kerja:
Pekerja 115.82 oh 0.3 0.27 3.70
Tukang Batu 115.82 oh 0.15 0.135 7.41
Kepala Tukang Batu 115.82 oh 0.015 0.0135 74.07
Mandor 115.82 oh 0.015 0.0135 74.07
Jumlah
E.6 PEKERJAAN PEMASANGAN ACIAN
Tenaga Kerja:
Pekerja 1247.78 oh 0.2 0.18 5.56
Tukang Batu 1247.78 oh 0.1 0.09 11.11
Kepala Tukang Batu 1247.78 oh 0.01 0.009 111.11
Mandor 1247.78 oh 0.01 0.009 111.11
Jumlah

DURASI PEKERJAAN KUSEN


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN KUSEN
NO+A
URAIAN KOEF - PRODUKTIVITAS
331:N3 VOL SAT KOEF
PEKERJAAN 10% TK / HARI
32
F PEKERJAAN KUSEN
F.1 PEKERJAAN PEMBUATAN DAN PEMASANGAN KUSEN PINTU
Tenaga Kerja:
Pekerja 1.35 oh 6 5.4 0.19
Tukang Kayu 1.35 oh 18 16.2 0.06
Kepala Tukang Kayu 1.35 oh 1.8 1.62 0.62
Mandor 1.35 oh 0.3 0.27 3.70
Jumlah
F.3 PEKERJAAN PEMBUATAN DAN PEMASANGAN DAUN PINTU
Tenaga Kerja:
Pekerja 38.25 oh 1.00 0.9 1.11
Tukang Kayu 38.25 oh 3.00 2.7 0.37
Kepala Tukang Kayu 38.25 oh 0.30 0.27 3.70
Mandor 38.25 oh 0.05 0.045 22.22
Jumlah
F.4 PEKERJAAN PEMASANGAN KACA POLOS
Tenaga Kerja:
Pekerja 12.05 oh 0.015 0.0135 74.07
Tukang Kayu 12.05 oh 0.15 0.135 7.41
Kepala Tukang Kayu 12.05 oh 0.015 0.0135 74.07
Mandor 12.05 oh 0.0008 0.00072 1388.89
Jumlah
F.5 PEKERJAAN PEMASANGAN ENGSEL PINTU
Tenaga Kerja:
Pekerja 54.00 oh 0.015 0.0135 74.07
Tukang Kayu 54.00 oh 0.15 0.135 7.41
Kepala Tukang Kayu 54.00 oh 0.015 0.0135 74.07
Mandor 54.00 oh 0.0008 0.00072 1388.89
Jumlah
F.6 PEKERJAAN PEMASANGAN ENGSEL JENDELA
Tenaga Kerja:
Pekerja 44.00 oh 0.015 0.0135 74.07
Tukang Kayu 44.00 oh 0.15 0.135 7.41
F.6

Kepala Tukang Kayu 44.00 oh 0.015 0.0135 74.07


Mandor 44.00 oh 0.0008 0.00072 1388.89
Jumlah
F.7 PEKERJAAN PEMASANGAN KUNCI TANAM
Tenaga Kerja:
Pekerja 9.00 oh 0.01 0.009 111.11
Tukang Kayu 9.00 oh 0.5 0.45 2.22
Kepala Tukang Kayu 9.00 oh 0.05 0.045 22.22
Mandor 9.00 oh 0.005 0.0045 222.22
Jumlah
F.7 PEKERJAAN PEMASANGAN KUNCI TANAM KAMAR MANDI
Tenaga Kerja:
Pekerja 4.00 oh 0.005 0.0045 222.22
Tukang Kayu 4.00 oh 0.5 0.45 2.22
Kepala Tukang Kayu 4.00 oh 0.005 0.0045 222.22
Mandor 4.00 oh 0.0025 0.00225 444.44
Jumlah
F.9 PEKERJAAN PEMASANGAN KUNCI SELOT
Tenaga Kerja:
Pekerja 17.00 oh 0.02 0.018 55.56
Tukang Kayu 17.00 oh 0.2 0.18 5.56
Kepala Tukang Kayu 17.00 oh 0.02 0.018 55.56
Mandor 17.00 oh 0.001 0.0009 1111.11
Jumlah
F.11 PEKERJAAN PEMASANGAN KAIT ANGIN
Tenaga Kerja:
Pekerja 12.00 oh 0.05 0.045 22.22
Tukang Kayu 12.00 oh 0.5 0.45 2.22
Kepala Tukang Kayu 12.00 oh 0.05 0.045 22.22
Mandor 12.00 oh 0.003 0.0027 370.37
Jumlah
F.11 PEKERJAAN PEMASANGAN SPRING KNIP
Tenaga Kerja:
Pekerja 15.00 oh 0.015 0.0135 74.07
Tukang Kayu 15.00 oh 0.15 0.135 7.41
Kepala Tukang Kayu 15.00 oh 0.015 0.0135 74.07
Mandor 15.00 oh 0.008 0.0072 138.89
Jumlah
F.11 PEKERJAAN PEMASANGAN PINTU WC PVC
Tenaga Kerja:
Pekerja 4.00 oh 0.015 0.0135 74.07
Kepala Tukang 4.00 oh 0.015 0.0135 74.07
Mandor 4.00 oh 0.008 0.0072 138.89
Jumlah

DURASI PEKERJAAN LANTAI


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN LANTAI
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
G PEKERJAAN LANTAI
G.1 PEKERJAAN GALIAN TANAH
Tenaga Kerja:
Pekerja 0.29 oh 0.25 0.225 4.44
Mandor 0.29 oh 0.025 0.0225 44.44
Jumlah
G.2 PEKERJAAN URUGAN TANAH PENINGGIAN LANTAI
Tenaga Kerja:
Pekerja 12.29 oh 0.3 0.27 3.70
Mandor 12.29 oh 0.01 0.009 111.11
Jumlah
G.3 PEKERJAAN PEMASANGAN LANTAI KERAMIK ROMAN 40x40
Tenaga Kerja:
Pekerja 203.31 oh 0.7 0.63 1.59
Tukang Batu 203.31 oh 0.35 0.315 3.17
Kepala Tukang Batu 203.31 oh 0.035 0.0315 31.75
Mandor 203.31 oh 0.035 0.0315 31.75
Jumlah
G.4 PEKERJAAN PEMASANGAN LANTAI KERAMIK ROMAN 20x20
Tenaga Kerja:
Pekerja 8.84 oh 0.7 0.63 1.59
Tukang Batu 8.84 oh 0.35 0.315 3.17
Kepala Tukang Batu 8.84 oh 0.035 0.0315 31.75
Mandor 8.84 oh 0.035 0.0315 31.75
Jumlah
G.5 PEKERJAAN PEMASANGAN LANTAI KERAMIK DINDING MARBLE 20x25
Tenaga Kerja:
Pekerja 33.61 oh 0.7 0.63 1.59
Tukang Batu 33.61 oh 0.35 0.315 3.17
Kepala Tukang Batu 33.61 oh 0.035 0.0315 31.75
Mandor 33.61 oh 0.035 0.0315 31.75
Jumlah
G.6 PEKERJAAN PEMASANGAN PLINT LANTAI 10cm
Tenaga Kerja:
G.6

Pekerja 180.67 oh 0.12 0.108 9.26


Tukang Batu 180.67 oh 0.12 0.108 9.26
Kepala Tukang Batu 180.67 oh 0.012 0.0108 92.59
Mandor 180.67 oh 0.006 0.0054 185.19
Jumlah

DURASI PEKERJAAN ATAP


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN ATAP
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
H PEKERJAAN ATAP
H.1 Pemasangan 1m2 Rangka Atap Baja Ringan
Tenaga Kerja:
Pekerja 56.42 oh 0.7604 0.68436 1.46
Tukang Besi 56.42 oh 0.7604 0.68436 1.46
Kepala Tukang Besi 56.42 oh 0.076 0.0684 14.62
Mandor 56.42 oh 0.038 0.0342 29.24
Jumlah
H.2 PEKERJAAN PEMASANGAN GENTENG BETON
Tenaga Kerja:
Pekerja 56.42 oh 0.2 0.18 5.56
Tukang Besi 56.42 oh 0.1 0.09 11.11
Kepala Tukang Besi 56.42 oh 0.01 0.009 111.11
Mandor 56.42 oh 0.01 0.009 111.11
Jumlah
H.3 PEKERJAAN PEMASANGAN NOK DAN JURAI GENTENG BETON
Tenaga Kerja:
Pekerja 9.80 oh 0.4 0.36 2.78
Tukang Besi 9.80 oh 0.2 0.18 5.56
Kepala Tukang Besi 9.80 oh 0.02 0.018 55.56
Mandor 9.80 oh 0.02 0.018 55.56
Jumlah
H.4 PEKERJAAN PEMASANGAN LISTPLANK GRC
Tenaga Kerja:
Pekerja 31.42 oh 0.1 0.09 11.11
Tukang Besi 31.42 oh 0.05 0.045 22.22
Kepala Tukang Besi 31.42 oh 0.005 0.0045 222.22
Mandor 31.42 oh 0.005 0.0045 222.22
Jumlah
DURASI PEKERJAAN PLAFOND
kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN PLAFOND
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
I PEKERJAAN PLAFOND
I.1 PEKERJAAN PEMASANGAN RANGKA BESI HOLLOW 60x60 mm
Tenaga Kerja:
Pekerja 245.07 oh 0.35 0.315 3.17
Tukang Kayu 245.07 oh 0.35 0.315 3.17
Kepala Tukang Kayu 245.07 oh 0.035 0.0315 31.75
Mandor 245.07 oh 0.018 0.0162 61.73
Jumlah
I.2 PEKERJAAN PEMASANGAN PLAFOND GYPSUM
Tenaga Kerja:
Pekerja 245.07 oh 0.1 0.09 11.11
Tukang Kayu 245.07 oh 0.05 0.045 22.22
Kepala Tukang Kayu 245.07 oh 0.005 0.0045 222.22
Mandor 245.07 oh 0.005 0.0045 222.22
Jumlah
I.3 PEKERJAAN PEMASANGAN LIST PLAFOND
Tenaga Kerja:
Pekerja 326.70 oh 0.1 0.09 11.11
Tukang Kayu 326.70 oh 0.05 0.045 22.22
Kepala Tukang Kayu 326.70 oh 0.005 0.0045 222.22
Mandor 326.70 oh 0.005 0.0045 222.22
Jumlah

DURASI PEKERJAAN ELEKTRIKAL


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN ELEKTRIKAL
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
J PEKERJAAN ELEKTRIKAL
J.1 PEKERJAAN PEMASANGAN MCB
Tenaga Kerja:
Tukang Listrik 1.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 1.00 oh 0.03 0.027 37.04
Jumlah
J.2 PEKERJAAN PEMASANGAN KWH METER
Tenaga Kerja:
Tukang Listrik 1.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 1.00 oh 0.03 0.027 37.04
Jumlah
J.3 PEKERJAAN PEMASANGAN SAKLAR TUNGGAL
Tenaga Kerja:
Tukang Listrik 10.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 10.00 oh 0.03 0.027 37.04
Jumlah
J.4 PEKERJAAN PEMASANGAN SAKLAR GANDA
Tenaga Kerja:
Tukang Listrik 10.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 10.00 oh 0.03 0.027 37.04
Jumlah
J.5 PEKERJAAN PEMASANGAN OUTLET POWER SOCKET
Tenaga Kerja:
Tukang Listrik 15.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 15.00 oh 0.03 0.027 37.04
Jumlah
J.6 PEKERJAAN PEMASANGAN STOP KONTAK ANTENA TV
Tenaga Kerja:
Tukang Listrik 2.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 2.00 oh 0.03 0.027 37.04
Jumlah
J.7 PEKERJAAN PEMASANGAB LAMPU PIJAR 60W
Tenaga Kerja:
Tukang Listrik 28.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 28.00 oh 0.03 0.027 37.04
Jumlah
J.8 PEKERJAAN PEMASANGAN LAMPU DOWNLIGHT
Tenaga Kerja:
Tukang Listrik 8.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 8.00 oh 0.03 0.027 37.04
Jumlah
J.9 PEKERJAAN PEMASANGAN LAMPU DOWNLIGHT
Tenaga Kerja:
Tukang Listrik 38.00 oh 0.3 0.27 3.70
Kepala Tukang Listrik 38.00 oh 0.03 0.027 37.04
Jumlah

DURASI PEKERJAAN SANITASI


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN SANITASI
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
K PEKERJAAN SANITASI
K.1 PEKERJAAN PEMASANGAN CLOSET DUDUK
Tenaga Kerja:
Pekerja 3.00 oh 3.3 2.97 0.34
Tukang Batu 3.00 oh 1.1 0.99 1.01
Kepala Tukang Batu 3.00 oh 0.01 0.009 111.11
Mandor 3.00 oh 0.16 0.144 6.94
Jumlah
K.2 PEKERJAAN PEMASANGAN WASTAFEL
Tenaga Kerja:
Pekerja 2.00 oh 1.2 1.08 0.93
Tukang Batu 2.00 oh 1.45 1.305 0.77
Kepala Tukang Batu 2.00 oh 0.15 0.135 7.41
Mandor 2.00 oh 0.06 0.054 18.52
Jumlah
K.3 PEKERJAAN PEMASANGAN BAK CUCI PIRING STAINLESS STEEL
Tenaga Kerja:
Pekerja 1.00 oh 0.03 0.027 37.04
Tukang Batu 1.00 oh 0.3 0.27 3.70
Kepala Tukang Batu 1.00 oh 0.03 0.027 37.04
Mandor 1.00 oh 0.015 0.0135 74.07
Jumlah
K.4 PEKERJAAN PEMASANGAN FLOOR DRAIN
Tenaga Kerja:
Pekerja 9.00 oh 0.01 0.009 111.11
Tukang Batu 9.00 oh 0.1 0.09 11.11
Kepala Tukang Batu 9.00 oh 0.01 0.009 111.11
Mandor 9.00 oh 0.005 0.0045 222.22
Jumlah
K.6 PEKERJAAN PEMASANGAN TANDON AIR
Tenaga Kerja:
Pekerja 1.00 oh 3 2.7 0.37
Tukang Batu 1.00 oh 4.5 4.05 0.25
Kepala Tukang Batu 1.00 oh 0.9 0.81 1.23
Mandor 1.00 oh 0.9 0.81 1.23
Jumlah
K.7 Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
Tenaga Kerja:
K.7

Pekerja 5.00 oh 0.01 0.009 111.11


Tukang Batu 5.00 oh 0.1 0.09 11.11
Kepala Tukang Batu 5.00 oh 0.01 0.009 111.11
Mandor 5.00 oh 0.005 0.0045 222.22
Jumlah
K.8 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
Tenaga Kerja:
Pekerja 59.64 oh 0.036 0.0324 30.86
Tukang Batu 59.64 oh 0.06 0.054 18.52
Kepala Tukang Batu 59.64 oh 0.006 0.0054 185.19
Mandor 59.64 oh 0.002 0.0018 555.56
Jumlah
K.9 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Tenaga Kerja:
Pekerja 28.70 oh 0.036 0.0324 30.86
Tukang Batu 28.70 oh 0.06 0.054 18.52
Kepala Tukang Batu 28.70 oh 0.006 0.0054 185.19
Mandor 28.70 oh 0.002 0.0018 555.56
Jumlah
K.10 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2"
Tenaga Kerja:
Pekerja 2.10 oh 0.054 0.0486 20.58
Tukang Batu 2.10 oh 0.09 0.081 12.35
Kepala Tukang Batu 2.10 oh 0.009 0.0081 123.46
Mandor 2.10 oh 0.003 0.0027 370.37
Jumlah
K.11 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2 1/2"
Tenaga Kerja:
Pekerja 41.16 oh 0.054 0.0486 20.58
Tukang Batu 41.16 oh 0.09 0.081 12.35
Kepala Tukang Batu 41.16 oh 0.009 0.0081 123.46
Mandor 41.16 oh 0.003 0.0027 370.37
Jumlah
K.12 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
Tenaga Kerja:
Pekerja 53.90 oh 0.081 0.0729 13.72
Tukang Batu 53.90 oh 0.135 0.1215 8.23
Kepala Tukang Batu 53.90 oh 0.0135 0.01215 82.30
Mandor 53.90 oh 0.004 0.0036 277.78
Jumlah
K.13 Pemasangan 1 Buah Septictank 2x1.5x2 m
Tenaga Kerja:
Pekerja 1.00 oh 0.081 0.0729 13.72
K.13

Tukang Batu 1.00 oh 0.135 0.1215 8.23


Kepala Tukang Batu 1.00 oh 0.0135 0.01215 82.30
Mandor 1.00 oh 0.004 0.0036 277.78
Jumlah

DURASI PEKERJAAN PENGECATAN


kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN PENGECATAN
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
L PEKERJAAN PENGECATAN
L.1 PEKERJAAN PENGECATAN DINDING INTERIOR
Tenaga Kerja:
Pekerja 630.27 oh 0.07 0.063 15.87
Tukang Cat 630.27 oh 0.009 0.0081 123.46
Kepala Tukang Cat 630.27 oh 0.006 0.0054 185.19
Mandor 630.27 oh 0.003 0.0027 370.37
Jumlah
L.2 PEKERJAAN PENGECATAN DINDING EKSTERIOR
Tenaga Kerja:
Pekerja 617.52 oh 0.07 0.063 15.87
Tukang Cat 617.52 oh 0.009 0.0081 123.46
Kepala Tukang Cat 617.52 oh 0.006 0.0054 185.19
Mandor 617.52 oh 0.003 0.0027 370.37
Jumlah
L.3 PEKERJAAN PENGECATAN BIDANG KAYU
Tenaga Kerja:
Pekerja 116.69 oh 0.07 0.063 15.87
Tukang Cat 116.69 oh 0.009 0.0081 123.46
Kepala Tukang Cat 116.69 oh 0.006 0.0054 185.19
Mandor 116.69 oh 0.003 0.0027 370.37
Jumlah
L.4 PEKERJAAN PENGECATAN PLAFOND
Tenaga Kerja:
Pekerja 245.07 oh 0.03 0.027 37.04
Tukang Cat 245.07 oh 0.003 0.0027 370.37
Kepala Tukang Cat 245.07 oh 0.0075 0.00675 148.15
Mandor 245.07 oh 0.075 0.0675 14.81
Jumlah
DURASI PEKERJAAN LAIN-LAIN
kebutuhan total tenaga kerja
kebutuhan tenaga kerja per hari
PEKERJAAN LAIN-LAIN
URAIAN KOEF - PRODUKTIVITAS
NO VOL SAT KOEF
PEKERJAAN 10% TK / HARI
M PEKERJAAN LAIN LAIN
M.1 Pekerjaan Pemasangan Railing 1 m2 Rangka Besi Hollow
Tenaga Kerja:
Pekerja 13.55 oh 0.25 0.225 4.44
Tukang Las 13.55 oh 0.25 0.225 4.44
Kepala Tukang Las 13.55 oh 0.025 0.0225 44.44
Mandor 13.55 oh 0.013 0.0117 85.47
Jumlah
M.2 Pekerjaan Realing Pengecatan 1 m2 Permukaan Besi dengan Menie Besi
Tenaga Kerja:
Pekerja 13.55 oh 0.02 0.018 55.56
Tukang Cat 13.55 oh 0.2 0.18 5.56
Kepala Tukang Cat 13.55 oh 0.02 0.018 55.56
Mandor 13.55 oh 0.003 0.0027 370.37
Jumlah
M.3 Pekerjaan Pemasangan 1 buah Tangga Putar Besi
Tenaga Kerja:
Pekerja 1.00 oh 0.07 0.063 15.87
Tukang Besi 1.00 oh 0.07 0.063 15.87
Kepala Tukang Besi 1.00 oh 0.007 0.0063 158.73
Mandor 1.00 oh 0.004 0.0036 277.78
Jumlah
/TK TAK TERBATAS

6 Hari
157.326 orang
26.221 orang / hari

RODUKTIVITAS PER HARI


JUMLAH TK JIKA DURASI
JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

13.936 Rp 95,600 Rp 1,332,243.36 2.787


5
6.968 Rp 131,000 Rp 912,781.80 1.394
20.903 Rp 2,245,025.16 4.181

8.294 Rp 95,600 Rp 792,944.64 4.147


16.589 Rp 109,300 Rp 1,813,155.84 8.294
2
0.829 Rp 120,000 Rp 99,532.80 0.415
0.829 Rp 131,000 Rp 108,656.64 0.415
26.542 Rp 2,814,289.92 12.856

22.050 Rp 95,600 Rp 2,107,980.00 4.410


11.025 Rp 109,300 Rp 1,205,032.50 2.205
22.050 Rp 109,300 Rp 2,410,065.00 5 4.410
3.308 Rp 120,000 Rp 396,900.00 0.662
0.551 Rp 131,000 Rp 72,213.75 0.110
58.984 Rp 6,192,191.25 11.797

10.800 Rp 95,600 Rp 1,032,480.00 3.600


21.600 Rp 109,300 Rp 2,360,880.00 7.200
2.160 Rp 120,000 Rp 259,200.00 3 0.720
0.540 Rp 131,000 Rp 70,740.00 0.180
35.100 Rp 3,723,300.00 11.700

0.065 Rp 95,600 Rp 6,194.88 3 0.022


0.065 Rp 6,194.88 0.022
7.317 Rp 95,600 Rp 699,505.20 3.659
7.317 Rp 109,300 Rp 799,748.10 3.659
0.732 Rp 120,000 Rp 87,804.00 2 0.366
0.366 Rp 131,000 Rp 47,926.35 0.183
15.732 Rp 1,634,983.65 7.866
157.326 Rp 16,615,984.86 48.421

10 Hari
59.604 orang
5.960 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

48.745 Rp 95,600 Rp 4,659,982.33 16.248


3
1.625 Rp 131,000 Rp 212,851.35 0.542
50.369 Rp 4,872,833.68 16.790

8.937 Rp 95,600 Rp 854,370.32 2.979


3
0.298 Rp 131,000 Rp 39,024.59 0.099
9.235 Rp 893,394.90 2.979
59.604 Rp 5,766,228.58 19.769

21 Hari
148.075 orang
7.051 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

0.780 Rp 95,600 Rp 74,575.17 0.390


2
0.078 Rp 131,000 Rp 10,218.98 0.039
0.858 Rp 84,794.15 0.429

7.302 Rp 95,600 Rp 698,023.59 1.825


3.651 Rp 109,300 Rp 399,027.08 0.913
4
0.365 Rp 120,000 Rp 43,809.01 4 0.091
0.365 Rp 131,000 Rp 47,824.84 0.091
11.682 Rp 1,188,684.53 2.921

44.919 Rp 95,600 Rp 4,294,274.68 6.417


22.460 Rp 109,300 Rp 2,454,833.80 3.209
2.246 Rp 120,000 Rp 269,515.15 7 0.321
2.246 Rp 131,000 Rp 294,220.70 0.321
71.871 Rp 7,312,844.34 10.267

30.921 Rp 95,600 Rp 2,956,024.66 15.460


15.460 Rp 109,300 Rp 1,689,819.53 7.730
1.546 Rp 120,000 Rp 185,524.56 2 0.773
1.546 Rp 131,000 Rp 202,530.98 0.773
49.473 Rp 5,033,899.73 24.737

9.363 Rp 95,600 Rp 895,095.63 4.681


1.560 Rp 109,300 Rp 170,561.28 0.780
0.159 Rp 120,000 Rp 19,066.32 2 0.079
0.471 Rp 131,000 Rp 61,698.84 0.235
11.553 Rp 1,146,422.07 5.777

1.223 Rp 95,600 Rp 116,875.90 0.408


1.223 Rp 109,300 Rp 133,624.85 0.408
0.122 Rp 120,000 Rp 14,670.61 3 0.041
0.070 Rp 131,000 Rp 9,151.67 0.023
2.637 Rp 274,323.03 0.879
148.075 Rp 15,040,967.85 45.009

58 Hari
1674.543 orang
28.871 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan
3.160 Rp 95,600 Rp 302,132.04 1.053
0.527 Rp 109,300 Rp 57,571.53 0.176
3
0.054 Rp 120,000 Rp 6,435.68 0.018
0.159 Rp 131,000 Rp 20,825.93 0.053
3.900 Rp 386,965.18 1.300

30.015 Rp 95,600 Rp 2,869,456.52 10.005


30.015 Rp 109,300 Rp 3,280,665.24 10.005
3
3.002 Rp 120,000 Rp 360,182.83 1.001
1.715 Rp 131,000 Rp 224,685.48 0.572
64.747 Rp 6,734,990.06 21.582

16.530 Rp 95,600 Rp 1,580,245.06 3.306


8.265 Rp 109,300 Rp 903,351.38 1.653
5
0.826 Rp 120,000 Rp 99,178.56 0.165
0.826 Rp 131,000 Rp 108,269.93 0.165
26.448 Rp 2,691,044.93 5.290

4.939 Rp 95,600 Rp 472,201.63 1.646


0.823 Rp 109,300 Rp 89,978.45 0.274
3
0.084 Rp 120,000 Rp 10,058.31 0.028
0.248 Rp 131,000 Rp 32,548.80 0.083
6.095 Rp 604,787.19 2.032

31.446 Rp 95,600 Rp 3,006,199.96 10.482


31.446 Rp 109,300 Rp 3,437,004.77 10.482
3
3.145 Rp 120,000 Rp 377,347.28 1.048
1.797 Rp 131,000 Rp 235,392.82 0.599
67.833 Rp 7,055,944.83 22.611

22.530 Rp 95,600 Rp 2,153,822.11 4.506


11.265 Rp 109,300 Rp 1,231,238.27 2.253
5
1.126 Rp 120,000 Rp 135,177.12 0.225
1.126 Rp 131,000 Rp 147,568.36 0.225
36.047 Rp 3,667,805.86 7.209
10.155 Rp 95,600 Rp 970,791.90 3.385
1.692 Rp 109,300 Rp 184,985.28 0.564
3
0.172 Rp 120,000 Rp 20,678.72 0.057
0.511 Rp 131,000 Rp 66,916.57 0.170
12.530 Rp 1,243,372.47 4.177

186.581 Rp 95,600 Rp 17,837,120.26 62.194


186.581 Rp 109,300 Rp 20,393,276.62 62.194
3
18.658 Rp 120,000 Rp 2,238,969.07 6.219
10.662 Rp 131,000 Rp 1,396,690.23 3.554
402.481 Rp 41,866,056.18 134.160

37.294 Rp 95,600 Rp 3,565,349.61 1.243


18.647 Rp 109,300 Rp 2,038,141.80 0.622
30
1.865 Rp 120,000 Rp 223,766.71 0.062
1.865 Rp 131,000 Rp 244,278.66 0.062
59.671 Rp 6,071,536.79 1.989

1.856 Rp 95,600 Rp 177,429.11 0.619


0.309 Rp 109,300 Rp 33,809.28 0.103
3
0.031 Rp 120,000 Rp 3,779.40 0.010
0.093 Rp 131,000 Rp 12,230.17 0.031
2.290 Rp 227,247.95 0.763

44.530 Rp 95,600 Rp 4,257,072.99 14.843


44.530 Rp 109,300 Rp 4,867,134.71 14.843
3
4.453 Rp 120,000 Rp 534,360.63 1.484
2.545 Rp 131,000 Rp 333,339.25 0.848
96.058 Rp 9,991,907.58 32.019

31.589 Rp 95,600 Rp 3,019,914.52 1.053


15.795 Rp 109,300 Rp 1,726,342.35 0.526
30
1.579 Rp 120,000 Rp 189,534.38 0.053
1.579 Rp 131,000 Rp 206,908.37 0.053
50.543 Rp 5,142,699.62 1.685
32.764 Rp 95,600 Rp 3,132,224.25 10.921
5.461 Rp 109,300 Rp 596,848.17 1.820
3
0.556 Rp 120,000 Rp 66,719.12 0.185
1.648 Rp 131,000 Rp 215,903.86 0.549
40.429 Rp 4,011,695.39 13.476

172.424 Rp 95,600 Rp 16,483,737.12 57.475


172.424 Rp 109,300 Rp 18,845,946.31 57.475
3
17.242 Rp 120,000 Rp 2,069,088.34 5.747
9.853 Rp 131,000 Rp 1,290,717.01 3.284
371.943 Rp 38,689,488.78 123.981

109.213 Rp 95,600 Rp 10,440,747.50 7.281


54.606 Rp 109,300 Rp 5,968,481.71 3.640
15
5.461 Rp 120,000 Rp 655,277.04 0.364
5.461 Rp 131,000 Rp 715,344.10 0.364
174.741 Rp 17,779,850.35 11.649

12.551 Rp 95,600 Rp 1,199,861.14 4.184


2.092 Rp 109,300 Rp 228,634.63 0.697
3
0.213 Rp 120,000 Rp 25,558.09 0.071
0.631 Rp 131,000 Rp 82,706.29 0.210
15.487 Rp 1,536,760.15 5.162

83.450 Rp 95,600 Rp 7,977,859.79 27.817


83.450 Rp 109,300 Rp 9,121,130.50 27.817
3
8.345 Rp 120,000 Rp 1,001,405.00 2.782
4.769 Rp 131,000 Rp 624,685.97 1.590
180.014 Rp 18,725,081.26 60.005

39.554 Rp 95,600 Rp 3,781,380.56 13.185


19.777 Rp 109,300 Rp 2,161,636.48 6.592
3
1.978 Rp 120,000 Rp 237,325.14 0.659
1.978 Rp 131,000 Rp 259,079.94 0.659
63.287 Rp 6,439,422.13 21.096
1674.543 Rp 172,866,656.70 470.187

47 Hari
1386.916 orang
29.509 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

302.889 Rp 95,600 Rp 28,956,211.34 15.144


100.963 Rp 109,300 Rp 11,035,264.64 5.048
20
10.096 Rp 120,000 Rp 1,211,556.96 0.505
15.144 Rp 131,000 Rp 1,983,924.52 0.757
429.093 Rp 43,186,957.47 21.455

315.081 Rp 95,600 Rp 30,121,726.39 10.503


157.540 Rp 109,300 Rp 17,219,166.81 5.251
30
15.754 Rp 120,000 Rp 1,890,484.92 0.525
15.754 Rp 131,000 Rp 2,063,779.37 0.525
504.129 Rp 51,295,157.50 16.804

31.270 Rp 95,600 Rp 2,989,442.59 2.085


10.423 Rp 109,300 Rp 1,139,281.99 0.695
15
1.042 Rp 120,000 Rp 125,081.28 0.069
1.564 Rp 131,000 Rp 204,820.60 0.104
44.300 Rp 4,458,626.46 2.953

31.270 Rp 95,600 Rp 2,989,442.59 3.127


15.635 Rp 109,300 Rp 1,708,922.99 1.564
10
1.564 Rp 120,000 Rp 187,621.92 0.156
1.564 Rp 131,000 Rp 204,820.60 0.156
50.033 Rp 5,090,808.10 5.003

224.601 Rp 95,600 Rp 21,471,849.86 12.478


112.300 Rp 109,300 Rp 12,274,441.37 6.239
18
11.230 Rp 120,000 Rp 1,347,605.64 0.624
18
11.230 Rp 131,000 Rp 1,471,136.16 0.624
359.362 Rp 36,565,033.03 19.965
1386.916 Rp 140,596,582.55 66.180

15 Hari
218.694 orang
14.580 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

7.299 Rp 95,600 Rp 697,814.51 1.460


21.898 Rp 109,300 Rp 2,393,445.39 4.380
5
2.190 Rp 120,000 Rp 262,775.34 0.438
0.365 Rp 131,000 Rp 47,810.51 0.073
31.752 Rp 3,401,845.76 6.350

34.423 Rp 95,600 Rp 3,290,806.30 6.885


103.268 Rp 109,300 Rp 11,287,190.21 20.654
5
10.327 Rp 120,000 Rp 1,239,215.76 2.065
1.721 Rp 131,000 Rp 225,468.42 0.344
149.739 Rp 16,042,680.69 29.948

0.163 Rp 95,600 Rp 15,551.99 0.054


1.627 Rp 109,300 Rp 177,806.73 0.542
3
0.163 Rp 120,000 Rp 19,521.32 0.054
0.009 Rp 131,000 Rp 1,136.57 0.003
1.961 Rp 214,016.61 0.654

0.729 Rp 95,600 Rp 69,692.40 0.243


7.290 Rp 109,300 Rp 796,797.00 2.430
3
0.729 Rp 120,000 Rp 87,480.00 0.243
0.039 Rp 131,000 Rp 5,093.28 0.013
8.787 Rp 959,062.68 2.929

0.594 Rp 95,600 Rp 56,786.40 0.198


5.940 Rp 109,300 Rp 649,242.00 1.980
3
3
0.594 Rp 120,000 Rp 71,280.00 0.198
0.032 Rp 131,000 Rp 4,150.08 0.011
7.160 Rp 781,458.48 2.387

0.081 Rp 95,600 Rp 7,743.60 0.027


4.050 Rp 109,300 Rp 442,665.00 1.350
3
0.405 Rp 120,000 Rp 48,600.00 0.135
0.041 Rp 131,000 Rp 5,305.50 0.014
4.577 Rp 504,314.10 1.526

0.018 Rp 95,600 Rp 1,720.80 0.006


1.800 Rp 109,300 Rp 196,740.00 0.600
3
0.018 Rp 120,000 Rp 2,160.00 0.006
0.009 Rp 131,000 Rp 1,179.00 0.003
1.845 Rp 201,799.80 0.615

0.306 Rp 95,600 Rp 29,253.60 0.102


3.060 Rp 109,300 Rp 334,458.00 1.020
3
0.306 Rp 120,000 Rp 36,720.00 0.102
0.015 Rp 131,000 Rp 2,004.30 0.005
3.687 Rp 402,435.90 1.229

0.540 Rp 95,600 Rp 51,624.00 0.180


5.400 Rp 109,300 Rp 590,220.00 1.800
3
0.540 Rp 120,000 Rp 64,800.00 0.180
0.032 Rp 131,000 Rp 4,244.40 0.011
6.512 Rp 710,888.40 2.171

0.203 Rp 95,600 Rp 19,359.00 0.068


2.025 Rp 109,300 Rp 221,332.50 0.675
3
0.203 Rp 120,000 Rp 24,300.00 0.068
0.108 Rp 131,000 Rp 14,148.00 0.036
2.538 Rp 279,139.50 0.846

0.054 Rp 95,600 Rp 5,162.40 0.018


0.054 Rp 120,000 Rp 6,480.00 3 0.018
0.029 Rp 131,000 Rp 3,772.80 0.010
0.137 Rp 15,415.20 0.046
218.694 Rp 23,513,057.12 48.699

10 Hari
293.174 orang
29.317 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

0.065 Rp 95,600 Rp 6,211.01 0.022


3
0.006 Rp 131,000 Rp 851.09 0.002
0.071 Rp 7,062.10 0.024

3.318 Rp 95,600 Rp 317,173.34 1.106


3
0.111 Rp 131,000 Rp 14,487.35 0.037
3.428 Rp 331,660.68 1.143

128.082 Rp 95,600 Rp 12,244,653.54 42.694


64.041 Rp 109,300 Rp 6,999,689.50 21.347
3
6.404 Rp 120,000 Rp 768,492.90 2.135
6.404 Rp 131,000 Rp 838,938.08 2.135
204.931 Rp 20,851,774.02 68.310

5.568 Rp 95,600 Rp 532,264.95 0.557


2.784 Rp 109,300 Rp 304,270.71 0.278
10
0.278 Rp 120,000 Rp 33,405.75 0.028
0.278 Rp 131,000 Rp 36,467.94 0.028
8.908 Rp 906,409.35 0.891
x25

21.177 Rp 95,600 Rp 2,024,503.99 2.647


10.588 Rp 109,300 Rp 1,157,313.21 1.324
8
1.059 Rp 120,000 Rp 127,060.92 0.132
1.059 Rp 131,000 Rp 138,708.17 0.132
33.883 Rp 3,447,586.30 4.235
19.512 Rp 95,600 Rp 1,865,381.62 6.504
19.512 Rp 109,300 Rp 2,132,700.95 6.504
3
1.951 Rp 120,000 Rp 234,148.32 0.650
0.976 Rp 131,000 Rp 127,805.96 0.325
41.952 Rp 4,360,036.84 13.984
293.174 Rp 29,904,529.30 88.587

10 Hari
109.433 orang
10.943 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

38.613 Rp 95,600 Rp 3,691,392.43 4.827


38.613 Rp 109,300 Rp 4,220,389.04 4.827
8
3.859 Rp 120,000 Rp 463,110.96 0.482
1.930 Rp 131,000 Rp 252,781.40 0.241
83.015 Rp 8,627,673.82 10.377

10.156 Rp 95,600 Rp 970,908.06 3.385


5.078 Rp 109,300 Rp 555,022.23 1.693
3
0.508 Rp 120,000 Rp 60,935.65 0.169
0.508 Rp 131,000 Rp 66,521.42 0.169
16.250 Rp 1,653,387.36 5.417

3.528 Rp 95,600 Rp 337,276.80 1.176


1.764 Rp 109,300 Rp 192,805.20 0.588
3
0.176 Rp 120,000 Rp 21,168.00 0.059
0.176 Rp 131,000 Rp 23,108.40 0.059
5.645 Rp 574,358.40 1.882

2.828 Rp 95,600 Rp 270,337.68 0.943


1.414 Rp 109,300 Rp 154,539.27 0.471
3
0.141 Rp 120,000 Rp 16,966.80 0.047
0.141 Rp 131,000 Rp 18,522.09 0.047
4.524 Rp 460,365.84 1.508
109.433 Rp 11,315,785.41 19.183
15 Hari
248.419 orang
16.561 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

77.197 Rp 95,600 Rp 7,380,037.98 19.299


77.197 Rp 109,300 Rp 8,437,637.57 19.299
4
7.720 Rp 120,000 Rp 926,364.60 1.930
3.970 Rp 131,000 Rp 520,087.55 0.993
166.084 Rp 17,264,127.70 41.521

22.056 Rp 95,600 Rp 2,108,582.28 7.352


11.028 Rp 109,300 Rp 1,205,376.80 3.676
3
1.103 Rp 120,000 Rp 132,337.80 0.368
1.103 Rp 131,000 Rp 144,468.77 0.368
35.290 Rp 3,590,765.64 11.763

29.403 Rp 95,600 Rp 2,810,926.80 7.351


14.702 Rp 109,300 Rp 1,606,873.95 3.675
4
1.470 Rp 120,000 Rp 176,418.00 0.368
1.470 Rp 131,000 Rp 192,589.65 0.368
47.045 Rp 4,786,808.40 11.761
248.419 Rp 25,641,701.74 65.046

7 Hari
33.561 orang
4.794 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

0.270 Rp 109,300 Rp 29,511.00 0.135


2
0.027 Rp 120,000 Rp 3,240.00 0.014
0.297 Rp 32,751.00 0.149
0.270 Rp 109,300 Rp 29,511.00 0.054
5
0.027 Rp 120,000 Rp 3,240.00 0.005
0.297 Rp 32,751.00 0.059

2.700 Rp 109,300 Rp 295,110.00 1.350


2
0.270 Rp 120,000 Rp 32,400.00 0.135
2.970 Rp 327,510.00 1.485

2.700 Rp 109,300 Rp 295,110.00 1.350


2
0.270 Rp 120,000 Rp 32,400.00 0.135
2.970 Rp 327,510.00 1.485

4.050 Rp 109,300 Rp 442,665.00 2.025


2
0.405 Rp 120,000 Rp 48,600.00 0.203
4.455 Rp 491,265.00 2.228

0.540 Rp 109,300 Rp 59,022.00 0.270


2
0.054 Rp 120,000 Rp 6,480.00 0.027
0.594 Rp 65,502.00 0.297

7.560 Rp 109,300 Rp 826,308.00 3.780


2
0.756 Rp 120,000 Rp 90,720.00 0.378
8.316 Rp 917,028.00 4.158

2.160 Rp 109,300 Rp 236,088.00 1.080


2
0.216 Rp 120,000 Rp 25,920.00 0.108
2.376 Rp 262,008.00 1.188

10.260 Rp 109,300 Rp 1,121,418.00 5.130


2
1.026 Rp 120,000 Rp 123,120.00 0.513
11.286 Rp 1,244,538.00 5.643
33.561 Rp 3,700,863.00 16.691

10 Hari
53.649 orang
5.365 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

8.910 Rp 95,600 Rp 851,796.00 0.891


2.970 Rp 109,300 Rp 324,621.00 0.297
10
0.027 Rp 120,000 Rp 3,240.00 0.003
0.432 Rp 131,000 Rp 56,592.00 0.043
12.339 Rp 1,236,249.00 1.234

2.160 Rp 95,600 Rp 206,496.00 0.720


2.610 Rp 109,300 Rp 285,273.00 0.870
3
0.270 Rp 120,000 Rp 32,400.00 0.090
0.108 Rp 131,000 Rp 14,148.00 0.036
5.148 Rp 538,317.00 1.716

0.027 Rp 95,600 Rp 2,581.20 0.009


0.270 Rp 109,300 Rp 29,511.00 0.090
3
0.027 Rp 120,000 Rp 3,240.00 0.009
0.014 Rp 131,000 Rp 1,768.50 0.005
0.338 Rp 37,100.70 0.113

0.081 Rp 95,600 Rp 7,743.60 0.027


0.810 Rp 109,300 Rp 88,533.00 0.270
3
0.081 Rp 120,000 Rp 9,720.00 0.027
0.041 Rp 131,000 Rp 5,305.50 0.014
1.013 Rp 111,302.10 0.338

2.700 Rp 95,600 Rp 258,120.00 0.900


4.050 Rp 109,300 Rp 442,665.00 1.350
3
0.810 Rp 120,000 Rp 97,200.00 0.270
0.810 Rp 131,000 Rp 106,110.00 0.270
8.370 Rp 904,095.00 2.790
0.045 Rp 95,600 Rp 4,302.00 0.015
0.450 Rp 109,300 Rp 49,185.00 0.150
3
0.045 Rp 120,000 Rp 5,400.00 0.015
0.023 Rp 131,000 Rp 2,947.50 0.008
0.563 Rp 61,834.50 0.188

1.932 Rp 95,600 Rp 184,731.32 0.644


3.221 Rp 109,300 Rp 352,007.21 1.074
3
0.322 Rp 120,000 Rp 38,646.72 0.107
0.107 Rp 131,000 Rp 14,063.11 0.036
5.582 Rp 589,448.36 1.861

0.930 Rp 95,600 Rp 88,896.53 0.310


1.550 Rp 109,300 Rp 169,393.14 0.517
3
0.155 Rp 120,000 Rp 18,597.60 0.052
0.052 Rp 131,000 Rp 6,767.46 0.017
2.686 Rp 283,654.73 0.895

0.102 Rp 95,600 Rp 9,756.94 0.034


0.170 Rp 109,300 Rp 18,591.93 0.057
3
0.017 Rp 120,000 Rp 2,041.20 0.006
0.006 Rp 131,000 Rp 742.77 0.002
0.295 Rp 31,132.84 0.098

2.000 Rp 95,600 Rp 191,235.95 0.667


3.334 Rp 109,300 Rp 364,401.83 1.111
3
0.333 Rp 120,000 Rp 40,007.52 0.111
0.111 Rp 131,000 Rp 14,558.29 0.037
5.779 Rp 610,203.59 1.926

3.929 Rp 95,600 Rp 375,642.04 1.310


6.549 Rp 109,300 Rp 715,789.31 2.183
3
0.655 Rp 120,000 Rp 78,586.20 0.218
0.194 Rp 131,000 Rp 25,419.24 0.065
11.327 Rp 1,195,436.78 3.776

0.073 Rp 95,600 Rp 6,969.24 0.024


3
0.122 Rp 109,300 Rp 13,279.95 0.041
3
0.012 Rp 120,000 Rp 1,458.00 0.004
0.004 Rp 131,000 Rp 471.60 0.001
0.210 Rp 22,178.79 0.070
53.649 Rp 5,620,953.38 15.004

8 Hari
133.542 orang
16.693 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

39.707 Rp 95,600 Rp 3,795,968.47 13.236


5.105 Rp 109,300 Rp 557,993.75 1.702
3
3.403 Rp 120,000 Rp 408,412.63 1.134
1.702 Rp 131,000 Rp 222,925.23 0.567
49.917 Rp 4,985,300.08 16.639

38.904 Rp 95,600 Rp 3,719,177.77 12.968


5.002 Rp 109,300 Rp 546,705.79 1.667
3
3.335 Rp 120,000 Rp 400,150.63 1.112
1.667 Rp 131,000 Rp 218,415.55 0.556
48.907 Rp 4,884,449.75 16.302

7.352 Rp 95,600 Rp 702,826.67 0.919


0.945 Rp 109,300 Rp 103,313.00 0.118
8
0.630 Rp 120,000 Rp 75,617.93 0.079
0.315 Rp 131,000 Rp 41,274.79 0.039
9.242 Rp 923,032.39 1.155

6.617 Rp 95,600 Rp 632,581.14 2.206


0.662 Rp 109,300 Rp 72,323.35 0.221
3
1.654 Rp 120,000 Rp 198,508.73 0.551
16.542 Rp 131,000 Rp 2,167,053.58 5.514
25.475 Rp 3,070,466.79 8.492
133.542 Rp 13,863,249.01 42.589
7 Hari
9.660 orang
1.380 orang / hari

JUMLAH TK JIKA DURASI


JUMLAH HARGA JUMLAH
DIKERJAKAN HSD UPAH (HARI)
UPAH TK/HARI
DALAM 1 HARI ditetapkan

3.049 Rp 95,600 Rp 291,460.50 1.016


3.049 Rp 109,300 Rp 333,228.38 1.016
3
0.305 Rp 120,000 Rp 36,585.00 0.102
0.159 Rp 131,000 Rp 20,768.09 0.053
6.561 Rp 682,041.96 2.187

0.244 Rp 95,600 Rp 23,316.84 0.081


2.439 Rp 109,300 Rp 266,582.70 0.813
3
0.244 Rp 120,000 Rp 29,268.00 0.081
0.037 Rp 131,000 Rp 4,792.64 0.012
2.963 Rp 323,960.18 0.988

0.063 Rp 95,600 Rp 6,022.80 0.021


0.063 Rp 109,300 Rp 6,885.90 0.021
3
0.006 Rp 120,000 Rp 756.00 0.002
0.004 Rp 131,000 Rp 471.60 0.001
0.136 Rp 14,136.30 0.045
9.660 Rp 1,020,138.44 3.220
PRODUK. KEL TK YANG DURASI PEKERJAAN PERSIAPAN
KERJA/HARI MENENTUKAN JENIS TK JUMLAH TK (ORG )
Pekerja 62.25
Tukang Kayu 48.00
Tukang Batu 4.00
Kepala Tukang 4.00
2.787
Pekerja Mandor 8.00
Jumlah 126.250

DURASI PEKERJAAN PERSIAPAN


JENIS TK JUMLAH TK (ORG )
Pekerja 62.462
8.294
Tukang Kayu Tukang Kayu 67.556
Tukang Batu 11.025
Kepala Tukang 7.029
Mandor 9.254
Jumlah 157.326

4.410 Tukang Kayu

7.200 Tukang Kayu

0.022 Pekerja
Tukang Kayu
3.659

PRODUK. KEL TK YANG DURASI PEKERJAAN TANAH


KERJA /HARI MENENTUKAN JENIS TK JUMLAH TK (ORG )
Pekerja 57.682
Mandor 1.923
Jumlah 59.604
16.248 Pekerja

2.979 Pekerja

PRODUK. KEL TK YANG DURASI PEKERJAAN PONDASI


KERJA /HARI MENENTUKAN JENIS TK JUMLAH TK (ORG )
Pekerja 94.507
Tukang Batu 28.893
Tukang Kayu 15.460
Kepala Tukang Kayu 1.546
Kepala Tukang Batu 2.892
0.390 Pekerja
Mandor 4.776
Jumlah 148.075

1.825 Pekerja
1.825 Pekerja

6.417 Pekerja

15.460 Pekerja

4.681 Pekerja

0.408 Pekerja

PRODUK. KEL TK YANG DURASI PEKERJAAN BETON


KERJA /HARI MENENTUKAN JENIS TK JUMLAH TK (ORG )
Pekerja 870.581
Tukang Batu 559.350
Tukang Kayu 128.355
Kepala Tukang Batu 55.955
Kepala Tukang Kayu 12.835
Mandor 47.466
1.053 Pekerja
Jumlah 1674.543

10.005 Pekerja

3.306 Pekerja

1.646 Pekerja

10.482 Pekerja

4.506 Pekerja
3.385 Pekerja

62.194 Pekerja

1.243 Pekerja

0.619 Pekerja

14.843 Pekerja

1.053 Pekerja
10.921 Pekerja

57.475 Pekerja

7.281 Pekerja

4.184

27.817

13.185
PRODUK. KEL TK YANG
KERJA /HARI MENENTUKAN

15.144 Pekerja

10.503 Pekerja
DURASI PEKERJAAN DINDING
JENIS TK JUMLAH TK (ORG )
Pekerja 905.112
Tukang Batu 396.863
Kepala Tukang Batu 39.686
Mandor 45.256
2.085 Pekerja
Jumlah 1386.916

3.127 Pekerja

12.478 Pekerja
12.478 Pekerja

PRODUK. KEL TK YANG


KERJA /HARI MENENTUKAN

4.380 Tukang Kayu

20.654 Tukang Kayu


DURASI PEKERJAAN KUSEN
JENIS TK JUMLAH TK (ORG )
Pekerja 44.409
Tukang Kayu 156.358
Kepala Tukang Kayu 15.474
Mandor 2.399
Jumlah 218.640
0.542 Tukang Kayu

2.430 Tukang Kayu

1.980 Tukang Kayu


1.980 Tukang Kayu

1.350 Tukang Kayu

0.600 Tukang Kayu

1.020 Tukang Kayu

1.800 Tukang Kayu

0.675 Tukang Kayu

0.018 Pekerja
PRODUK. KEL TK YANG
KERJA /HARI MENENTUKAN

0.022 Pekerja

1.106 Pekerja

DURASI PEKERJAAN LANTAI


JENIS TK JUMLAH TK (ORG )
42.694 Pekerja
Pekerja 177.722
Tukang Batu 96.926
Kepala Tukang Batu 9.693
Mandor 8.834
Jumlah 293.174

0.557 Pekerja

2.647 Pekerja
6.504 Pekerja

PRODUK. KEL TK YANG


KERJA /HARI MENENTUKAN

4.827 Tukang Kayu

3.385 Tukang Kayu


DURASI PEKERJAAN ATAP
JENIS TK JUMLAH TK (ORG )
Pekerja 55.125
Tukang Besi 46.869
Kepala Tukang Besi 4.685
Mandor 2.755
Jumlah 109.433
1.176 Tukang Kayu

0.943 Tukang Kayu


PRODUK. KEL TK YANG
KERJA /HARI MENENTUKAN

19.299 Pekerja

7.352 Pekerja
DURASI PEKERJAAN PLAFOND
JENIS TK JUMLAH TK (ORG )
Pekerja 128.656
Tukang Kayu 102.927
Kepala Tukang Kayu 10.293
Mandor 6.543
Jumlah 248.419
7.351 Pekerja

PRODUK. KEL TK YANG


KERJA /HARI MENENTUKAN

0.135 Tukang Listrik


0.054 Tukang Listrik

1.350 Tukang Listrik


DURASI PEKERJAAN ELEKTRIKAL
JENIS TK JUMLAH TK (ORG )
Tukang Listrik 30.510
Kepala Tukang Listrik 2.250
Jumlah 32.760
1.350 Tukang Listrik

2.025 Tukang Listrik

0.270 Tukang Listrik

3.780 Tukang Listrik

1.080 Tukang Listrik

5.130 Tukang Listrik


PRODUK. KEL TK YANG
KERJA /HARI MENENTUKAN

0.891 Pekerja

0.870 Tukang Batu

DURASI PEKERJAAN SANITASI


JENIS TK JUMLAH TK (ORG )
Pekerja 22.890
Tukang Batu 26.105
0.090 Tukang Batu
Kepala Tukang Batu 2.754
Mandor 1.900
Jumlah 53.649

0.270 Tukang Batu

1.350 Tukang Batu


0.150 Tukang Batu

1.074 Tukang Batu

0.517 Tukang Batu

0.057 Tukang Batu

1.111 Tukang Batu

2.183 Tukang Batu

0.041 Tukang Batu


0.041 Tukang Batu

PRODUK. KEL TK YANG


KERJA /HARI MENENTUKAN

13.236 Pekerja

12.968 Tukang Cat


DURASI PEKERJAAN PENGECATAN
JENIS TK JUMLAH TK (ORG )
Pekerja 92.579
Tukang Cat 11.714
Kepala Tukang Cat 9.022
Mandor 20.226
Jumlah 133.542
0.919 Tukang Cat

5.514 Tukang Cat


PRODUK. KEL TK YANG DURASI PEKERJAAN LAIN-LAIN
KERJA /HARI MENENTUKAN JENIS TK JUMLAH TK (ORG )
Pekerja 3.356
Tukang Las 3.049
Kepala Tukang Las 0.305
Tukang Cat 2.439
Kepala Tukang Cat 0.244
1.016 Pekerja
Tukang Besi 0.063
Kepala Tukang Besi 0.006
Mandor 0.199
Jumlah 9.660

0.813 Tukang Batu

0.021 Tukang Batu


6 HARI No
JUMLAH TK/HARI HSD JUMLAH UPAH 1
10.375 Rp 95,600 Rp 5,951,081 2
8.000 Rp 109,300 Rp 5,246,400 3
0.667 Rp 109,300 Rp 437,200 4
0.667 Rp 120,000 Rp 480,000 5
1.333 Rp 131,000 Rp 1,048,000 6
21.04 Rp 13,162,681 7
8
6 HARI 9
JUMLAH TK/HARI HSD JUMLAH UPAH 10
10.410 Rp 95,600 Rp 5,971,348 11
11.259 Rp 109,300 Rp 7,383,849 12
1.838 Rp 109,300 Rp 1,205,033 13
1.171 Rp 120,000 Rp 843,437
1.542 Rp 131,000 Rp 1,212,319
26.22 Rp 16,615,985
10 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
5.768 Rp 95,600 Rp 5,514,353
0.192 Rp 131,000 Rp 251,876
5.96 Rp 5,766,229

21 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
4.500 Rp 95,600 Rp 9,034,870
1.376 Rp 109,300 Rp 3,158,047
0.736 Rp 109,300 Rp 1,689,820
0.074 Rp 120,000 Rp 185,525
0.138 Rp 120,000 Rp 347,061
0.227 Rp 131,000 Rp 625,646
7.051 Rp 685,200.00 Rp 15,040,967.85
58 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
15.010 Rp 95,600 Rp 83,227,546
9.644 Rp 109,300 Rp 61,136,985
2.213 Rp 109,300 Rp 14,029,192
0.965 Rp 120,000 Rp 6,714,582
0.221 Rp 120,000 Rp 1,540,259
0.818 Rp 131,000 Rp 6,218,092
28.871 Rp 685,200.00 Rp 172,866,656.70
47.00 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
19.258 Rp 95,600 Rp 86,528,673
8.444 Rp 109,300 Rp 43,377,078
0.844 Rp 120,000 Rp 4,762,351
0.963 Rp 131,000 Rp 5,928,481
29.509 Rp 140,596,582.55
15 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
2.961 Rp 95,600 Rp 4,245,515
10.424 Rp 109,300 Rp 17,089,897
1.032 Rp 120,000 Rp 1,856,852
0.160 Rp 131,000 Rp 314,313
14.576 Rp 23,506,577.12
10 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
17.772 Rp 95,600 Rp 16,990,188
9.693 Rp 109,300 Rp 10,593,974
0.969 Rp 120,000 Rp 1,163,108
0.883 Rp 131,000 Rp 1,157,259
29.317 Rp 29,904,529.30
10 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
5.512 Rp 95,600 Rp 5,269,915
4.687 Rp 109,300 Rp 5,122,756
0.468 Rp 120,000 Rp 562,181
0.276 Rp 131,000 Rp 360,933
10.943 Rp 11,315,785.41
15 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
8.577 Rp 95,600 Rp 12,299,547
6.862 Rp 109,300 Rp 11,249,888
0.686 Rp 120,000 Rp 1,235,120
0.436 Rp 131,000 Rp 857,146
16.561 Rp 25,641,701.74
7 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
4.359 Rp 109,300 Rp 3,334,743
0.321 Rp 120,000 Rp 270,000
4.680 Rp 3,604,743.00
10 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
2.289 Rp 95,600 Rp 2,188,271
2.610 Rp 109,300 Rp 2,853,251
0.275 Rp 120,000 Rp 330,537
0.190 Rp 131,000 Rp 248,894
5.365 Rp 5,620,953.38
8 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
11.572 Rp 95,600 Rp 8,850,554
1.464 Rp 109,300 Rp 1,280,336
1.128 Rp 120,000 Rp 1,082,690
2.528 Rp 131,000 Rp 2,649,669
16.693 Rp 13,863,249.01
7 HARI
JUMLAH TK/HARI HSD JUMLAH UPAH
0.479 Rp 95,600 Rp 320,800
0.436 Rp 109,300 Rp 333,228
0.044 Rp 120,000 Rp 36,585
0.348 Rp 109,300 Rp 266,583
0.035 Rp 120,000 Rp 29,268
0.009 Rp 109,300 Rp 6,886
0.001 Rp 120,000 Rp 756
0.028 Rp 131,000 Rp 26,032
1.380 Rp 1,020,138.44
Jenis Pekerjaan Durasi Kebutuhan TK
Pekerjaan Persiapan 6 157.326
Pekerjaan Tanah 10 59.604
Pekerjaan Pondasi 21 148.075
Pekerjaan Beton 58 1674.543
Pekerjaan Dinding 47 1386.916
Pekerjaan Kusen 15 218.694
Pekerjaan Lantai 10 293.174
Pekerjaan Atap 10 109.433
Pekerjaan Plafond 15 248.419
Pekerjaan Elektrikal 7 33.561
Pekerjaan Sanitasi 10 53.649
Pekerjaan Pengecatan 8 133.542
Pekerjaan Lain-Lain 7 9.660
Kusen
4 53
15 92

Persiaapan Dinding
26 5 53
6 6 47 92

Beton
10 6 64
0 58 64

Pondasi

21

Tanah Sanitasi
3 10
10 82 10

Dinding

47
27
4
27 Beton
Pondasi
21
58

0 Persiapan 6
1 2
0 6 6

10

Tanah
3 27

110
Elektrikal

Atap Plafond Lantai


7 74 8 89 10 99
10 74 15 89 10 99

Pengecatan

Lain-Lain
9 20
92 7

110
Lain-lain 9
120
7

Pintu & Jendela


6 95 7 110

95 15 110

Lantai
10
85 Atap 95
5 8 Plafond
85 10 95

15

Elektrikal

sanitasi

10
Kode Jenis Pekerjaan Durasi
A Pekerjaan Persiapan 6
B Pekerjaan Tanah 10
C Pekerjaan Pondasi 21
D Pekerjaan Beton 58
E Pekerjaan Dinding 47
F Pekerjaan Kusen 15
G Pekerjaan Lantai 10
H Pekerjaan Atap 10
I Pekerjaan Plafond 15
J Pekerjaan Elektrikal 7
K Pekerjaan Sanitasi 10
L Pekerjaan Pengecatan 8
M Pekerjaan Lain-Lain 7

Pengecatan
120
10
120
Cek Kegiatan Kegiatan
Ket. OH/Hari ES LS
Durasi Sebelum Sesudah
Hari 26.22 1 - B, C 0 0
Hari 5.96 1 A K 6 6
Hari 7.05 1 A D, E, K 6 6
Hari 28.87 1 C HJ 27 27
Hari 29.51 1 C F, M 27 27
Hari 14.58 1 E G, L 95 95
Hari 29.32 1 F - 110 110
Hari 10.94 1 D I 85 85
Hari 16.56 1 H - 95 95
Hari 4.79 1 D - 85 85
Hari 5.36 1 B, C - 27 110
Hari 16.69 1 F, M - 110 120
Hari 1.38 1 E L 95 95
EF LF FF TF Ket.
6 6 0 0 Kritis
27 110 11 94
27 27 0 0 Kritis
85 85 0 0 Kritis
95 95 21 21
110 110 0 0 Kritis
120 120 0 0 Kritis
95 95 0 0 Kritis
120 120 10 10
120 120 28 28
120 120 83 83
120 120 2 2
110 120 8 18

Luas Bangunan = 270 m2


Analisis Rasio Tenaga Kerja
Luas Area = 237.00 m2
Jumlah tenaga kerja (x) = 5330.20 Orang
Umur proyek (z) = 120 Hari
Maksimal Tenaga Kerja yang =

�= 5330.10
(�−10%)/𝑧= 120
= 44.417470497 Orang
diambil = 45 Orang

Cek = 5330.10
237.00
= 22.48985848
diambil = 23 Orang
Bulan Agustus September Oktober November Desember
Minggu Ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Minggu 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5
Senin 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6
Hari/Tanggal

Selasa 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7
Rabu 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1
Kamis 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2
Jumat 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 6 13 20 27 3
Sabtu 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4
Jumlah Hari Kerja 6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2 120
Jumlah Hari kerja kumulatif 6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
PROYEK DIMULAI PADA 19 AGUSTUS 2019
PROYEK SELESAI PADA 07 JANUARI 2020
KODE DURASI (HARI) MULAI
No. KEGIA JENIS PEKERJAAN
TAN CPM RK ES RK
1 A Pekerjaan Persiapan 6 6 0 0
2 B Pekerjaan Tanah 10 21 6 6
3 C Pekerjaan Pondasi 21 19 6 8
4 D Pekerjaan Beton 58 58 27 27
5 E Pekerjaan Dinding 47 47 27 48
6 F Pekerjaan Kusen 15 15 95 95
7 G Pekerjaan Lantai 10 10 110 110
8 H Pekerjaan Atap 10 10 85 85
9 I Pekerjaan Plafond 15 15 95 95
10 J Pekerjaan Elektrikal 7 22 85 90
11 K Pekerjaan Sanitasi 10 30 27 85
12 L Pekerjaan Pengecatan 8 8 110 112
13 M Pekerjaan Lain-Lain 7 7 95 103
SELESAI TERLAMBAT (T) FREE TOTAL
EF RK DURASI MULAI T FLOAT FLOAT
6 6 0 0 0 0 0
27 20 11 0 11 11 94
27 27 -2 2 0 0 0
85 85 0 0 0 0 0
95 95 0 21 21 21 21
110 110 0 0 0 0 0
120 120 0 0 0 0 0
95 95 0 0 0 0 0
120 110 0 0 0 10 10
120 112 15 5 20 28 28
120 115 20 58 78 83 83
120 120 0 2 2 2 2
110 110 0 8 8 8 18

: Kritis
PERUBAHAN ES SUCSESOR AKIBAT
PERUBAHAN ES SUCSESOR AKIBAT RK
RK
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
TF/ES Kegiatan Berikutnya Tidak Berubah Tidak Terjadi Keterlambatan
Mulai Durasi Finish Terlambat
NO Jenis Kegiatan TF FF Analisis
ESCPM ESRK TES CPM RK TD EFCPM EFRK Total FF
Total telat < TF, maka umur proyek tetap. Total telat > FF, maka ES dan TF kegiatan
A Pekerjaan Persiapan 0 0 0 6 6 0 6 6 0 0 0 selanjutnya (Beton) Berubah. Perubahannya menjadi : ES-Beton = (1-0)+13 = 14; TF- T=FF
Beton = 98-38-14 = 46

Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
B Pekerjaan Tanah 6 6 0 10 21 11 27 20 11 94 11 T=FF
selanjutnya Tidak Berubah.

Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
C Pekerjaan Pondasi 6 8 2 21 19 -2 27 27 0 0 0 T=FF
selanjutnya Tidak Berubah.

Total telat < TF, maka umur proyek tetap. Total telat < FF, maka ES dan TF kegiatan
D Pekerjaan Beton 27 27 0 58 58 0 85 85 0 0 0 T=FF
selanjutnya Tidak Berubah.

Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
E Pekerjaan Dinding 27 48 21 47 47 0 95 95 21 21 21 T=FF
selanjutnya Tidak Berubah.
Total telat < TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
F Pekerjaan Kusen 95 95 0 15 15 0 110 110 0 0 0 T=FF
selanjutnya Tidak Berubah.
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
G Pekerjaan Lantai 110 110 0 10 10 0 120 120 0 0 0 T=FF
selanjutnya Tidak Berubah.

Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
H Pekerjaan Atap 85 85 0 10 10 0 95 95 0 0 0 T=FF
selanjutnya Tidak Berubah.
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
I Pekerjaan Plafond 95 95 0 15 15 0 120 110 0 10 10 T<FF
selanjutnya Tidak Berubah.

Total telat < TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
J Pekerjaan Elektrikal 85 90 5 7 22 15 120 112 20 28 28 T<FF
selanjutnya Tidak Berubah.

Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
K Pekerjaan Sanitasi 27 85 58 10 30 20 120 115 78 83 83 T<FF
selanjutnya Tidak Berubah.

Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
L Pekerjaan Pengecatan 110 112 2 8 8 0 120 120 2 2 2 T=FF
selanjutnya Tidak Berubah.

Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan
M Pekerjaan Lain-Lain 95 103 8 7 7 0 110 110 8 18 8
selanjutnya Tidak Berubah.
ANALISIS FLOAT
A PEKERJAAN PERSIAPAN
TF = 0
FF = 0
ES CPM = 0 D CPM = 6
ES RK = 0 D RK = 6
T = 0 T = 0

T total = 0
T = 0 ≤ TF = 0
Maka, umur proyek tetap

T = 0 ≤ FF = 0
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju

B PEKERJAAN TANAH
TF = 94
FF = 11
ES CPM = 6 D CPM = 10
ES RK = 6 D RK = 21
T = 0 T = -11

T total = -11
T = -11 ≤ TF = 94
Maka, umur proyek tetap

T = -11 ≤ FF = 11
Total telat < TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju

C PEKERJAAN PONDASI
TF = 0
FF = 0
ES CPM = 6 D CPM = 19
ES RK = 8 D RK = 21
T = 2 T = -2

T total = 0
T = 0 ≤ TF = 0
Maka, umur proyek tetap

T = 0 ≤ FF = 0
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju
D PEKERJAAN BETON
TF = 0
FF = 0
ES CPM = 27 D CPM = 58
ES RK = 27 D RK = 58
T = 0 T = 0

T total = 0
T = 0 ≤ TF = 0
Maka, umur proyek tetap

T = 0 ≤ FF = 0
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju

E PEKERJAAN PINTU DAN JENDELA


TF = 0
FF = 0
ES CPM = 95 D CPM = 15
ES RK = 95 D RK = 15
T = 0 T = 0

T total = 0
T = 0 ≤ TF = 0
Maka, umur proyek tetap

T = 0 ≤ FF = 0
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju

F PEKERJAAN DINDING
TF = 21
FF = 21
ES CPM = 27 D CPM = 47
ES RK = 48 D RK = 47
T = 21 T = 0

T total = 21
T = 21 ≤ TF = 21
Maka, umur proyek tetap

T = 21 ≤ FF = 21
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju
G PEKERJAAN LANTAI
TF = 0
FF = 0
ES CPM = 110 D CPM = 10
ES RK = 110 D RK = 10
T = 0 T = 0

T total = 0
T = 0 ≤ TF = 0
Maka, umur proyek tetap

T = 0 ≤ FF = 0
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju

H PEKERJAAN ATAP
TF = 0
FF = 0
ES CPM = 85 D CPM = 10
ES RK = 85 D RK = 10
T = 0 T = 0

T total = 0
T = 0 ≤ TF = 0
Maka, umur proyek tetap

T = 0 < FF = 0
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju

I PEKERJAAN PLAFOND
TF = 10
FF = 10
ES CPM = 95 D CPM = 15
ES RK = 95 D RK = 15
T = 0 T = 0

T total = 0
T = 0 ≤ TF = 10
Maka, umur proyek tetap

T = 0 ≤ FF = 10
Total telat = TF, maka umur proyek tetap. Total telat = FF, maka ES dan TF kegiatan selanju

J PEKERJAAN ELEKTRIKAL
TF = 28
FF = 28
ES CPM = 85 D CPM = 7
ES RK = 90 D RK = 22
T = 5 T = -15

T total = -10
T = -10 ≤ TF = 28
Maka, umur proyek tetap

T = -10 ≤ FF = 28
TF Kegiatan selanjutnya tidak berubah. Tidak ada kegiatan setelah Pekerjaan Elektrikal

K PEKERJAAN SANITASI
TF = 83
FF = 83
ES CPM = 27 D CPM = 10
ES RK = 85 D RK = 30
T = 58 T = 20

T total = 78
T = 78 ≤ TF = 83
Maka, umur proyek tetap

T = 78 ≤ FF = 83
TF Kegiatan selanjutnya tidak berubah. Tidak ada kegiatan setelah Pekerjaan Sanitasi

L PEKERJAAN LAIN-LAIN
TF = 18
FF = 8
ES CPM = 95 D CPM = 7
ES RK = 103 D RK = 7
T = 8 T = 0

T total = 8
T = 8 ≤ TF = 18
Maka, umur proyek tetap

T = 8 = FF = 8
TF Kegiatan selanjutnya tidak berubah. Tidak ada kegiatan setelah Pekerjaan lain-lain

M PEKERJAAN PENGECATAN
TF = 2
FF = 2
ES CPM = 110 D CPM = 8
ES RK = 112 D RK = 8
T = 2 T = 0

T total = 2
T = 2 = TF = 2
Maka, umur proyek tetap

T = 2 = FF = 2
TF Kegiatan selanjutnya tidak berubah. Tidak ada kegiatan setelah Pekerjaan Pengecatan
SIS FLOAT

aka ES dan TF kegiatan selanjutnya Tidak Berubah.

aka ES dan TF kegiatan selanjutnya Tidak Berubah.

aka ES dan TF kegiatan selanjutnya Tidak Berubah.


aka ES dan TF kegiatan selanjutnya Tidak Berubah.

aka ES dan TF kegiatan selanjutnya Tidak Berubah.

aka ES dan TF kegiatan selanjutnya Tidak Berubah.


aka ES dan TF kegiatan selanjutnya Tidak Berubah.

aka ES dan TF kegiatan selanjutnya Tidak Berubah.

aka ES dan TF kegiatan selanjutnya Tidak Berubah.


setelah Pekerjaan Elektrikal

setelah Pekerjaan Sanitasi

setelah Pekerjaan lain-lain


setelah Pekerjaan Pengecatan
ES CPM-DURASI CPM
Durasi Minggu Ke- Resume Barchart Tenaga Kerja
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Barchart Alternatif 1 (ES CPM, Durasi CPM) ΣY² = 1029408.93
No Jenis Pekerjaan Durasi ES Jumlah Hari Barchart Alternatif 2 (ES CPM, Durasi RK) ΣY² = 1029924.01
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2 Barchart Alternatif 3 (ES RK, Durasi CPM) ΣY² = 931267.34
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120 Barchart Alternatif 4 (ES RK, Durasi RK) ΣY² = 837974.95
6 1 Pekerjaan Persiapan 6 0 6
10 2 Pekerjaan Tanah 10 6 6 4
Digunakan: Barchart Alternatif 4 (ES RK, Durasi RK) ΣY² = 837974.95
21 3 Pekerjaan Pondasi 21 6 6 6 6 3
58 4 Pekerjaan Beton 58 27 3 6 6 6 6 6 6 5 6 6 2
47 5 Pekerjaan Dinding 47 27 3 6 6 6 6 6 6 5 3 Tabel 3.9 Rekapitulasi Tenaga Kerja per Pekerjaan Barchart Alternatif 4
15 6 Pekerjaan Kusen 15 95 6 6 3 Kegiatan Deskripsi Kegiatan Kebutuhan TK/hari Durasi (hari) Total Jumlah TK
10 7 Pekerjaan Lantai 10 110 2 6 2 A Pekerjaan Persiapan 26.221 6 157.326
10 8 Pekerjaan Atap 10 85 4 6 B Pekerjaan Tanah 2.838 21 59.604
15 9 Pekerjaan Plafond 15 95 6 6 3 C Pekerjaan Pondasi 7.793 19 148.075
7 10 Pekerjaan Elektrikal 7 85 4 3 D Pekerjaan Beton 28.871 58 1674.543
10 11 Pekerjaan Sanitasi 10 27 3 6 1 E Pekerjaan Dinding 29.509 47 1386.916
8 12 Pekerjaan Pengecatan 8 110 2 6 F Pekerjaan Kusen 14.580 15 218.694
7 13 Pekerjaan Lain-Lain 7 95 6 1 G Pekerjaan Lantai 29.317 10 293.174
H Pekerjaan Atap 10.943 10 109.433
Durasi Minggu Ke- I Pekerjaan Plafond 16.561 15 248.419
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 J Pekerjaan Elektrikal 1.526 22 33.561
Tahun 2019 K Pekerjaan Sanitasi 1.788 30 53.649
JU MLAH
No Jenis Pekerjaan Durasi Total TK TENAGA 19 A gu - 24 26 Agu - 31 2 Sep - 7 Sep 9 Sep - 14 16 S ep - 21 23 Sep - 28 30 S ep - 5 7 Okt - 12 Okt 14 Okt - 19 21 Okt - 26 28 Okt - 2 4 Nov - 8 11 Nov - 16 18 Nov - 23 25 Nov - 1 22 N ov - 28 30 Nov - 5 6 Nov - 12 12 N ov - 18 18 Nov - 24 18 Nov - 20 L Pekerjaan Pengecatan 16.693 8 133.542
KERJA Agu A gu S ep Sep Sep Okt Okt Okt N ov Nov Nov Nov Des Nov Des Nov N ov Nov Nov
PERHARI
Jumlah Hari M Pekerjaan Lain-Lain 1.380 7 9.660
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2 JUMLAH 4526.596
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
1 Pekerjaan Persiapan 6 157.326 26.221 157.326 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2 Pekerjaan Tanah 10 59.604 5.960 35.763 23.842 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3 Pekerjaan Pondasi 21 148.075 7.051 42.307 42.307 42.307 21.154 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4 Pekerjaan Beton 58 1674.543 28.871 86.614 173.229 173.229 173.229 173.229 173.229 173.229 144.357 173.229 173.229 57.743 0.000 0.000 0.000
5 Pekerjaan Dinding 47 1386.916 29.509 88.527 177.053 177.053 177.053 177.053 177.053 177.053 147.544 88.527 0.000 0.000 0.000
6 Pekerjaan Kusen 15 218.694 14.580 0.000 0.000 0.000 0.000 0.000 0.000 0.000 87.478 87.478 43.739 0.000 0.000
7 Pekerjaan Lantai 10 293.174 29.317 0.000 0.000 0.000 0.000 58.635 175.904 58.635
8 Pekerjaan Atap 10 109.433 10.943 0.000 0.000 0.000 0.000 0.000 0.000 0.000 43.773 65.660
9 Pekerjaan Plafond 15 248.419 16.561 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 99.368 99.368 49.684 0.000 0.000 0.000
10 Pekerjaan Elektrikal 7 33.561 4.794 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 19.178 14.383 0.000 0.000 0.000 0.000 0.000
11 Pekerjaan Sanitasi 10 53.649 5.365 0.000 16.095 32.189 5.365 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
12 Pekerjaan Pengecatan 8 133.542 16.693 33.385 100.156
13 Pekerjaan Lain-Lain 7 9.660 1.380 0.000 0.000 8.280 1.380
Total 4526.596 197.247
Jumlah TK Perminggu 157.326 78.070 66.149 42.307 212.389 382.471 355.647 350.282 350.282 350.282 350.282 291.901 261.755 173.229 120.694 275.169 188.225 93.423 92.020 276.061 58.635
Total TK Kumulatif 157.326 235.395 301.544 343.851 556.240 938.711 1294.358 1644.640 1994.921 2345.203 2695.485 2987.386 3249.141 3422.370 3543.064 3818.232 4006.458 4099.880 4191.900 4467.961 4526.596 OK
Y2 24751.338 6094.871 4375.665 1789.892 45109.139 146284.162 126484.500 122697.261 122697.261 122697.261 122697.261 85206.431 68515.750 30008.140 14567.031 75717.780 35428.703 8727.774 8467.726 76209.534 3438.037
ΣY2 1029408.933

ES CPM - DURASI CPM


4 5 0 .000

4 0 0 .000

3 5 0 .000

3 0 0 .000

2 5 0 .000

2 0 0 .000
382 .4 71
3 55.6 4 7 3 5 0. 28 2 3 5 0 .282 350 .2 8 2 3 50.2 8 2
1 5 0 .000 2 9 1. 90 1
261 .7 55 2 7 5 .169 27 6.0 61

1 0 0 .000 2 1 2.38 9
18 8.2 2 5
1 57. 32 6 1 73.2 2 9
1 2 0.69 4
5 0 .0 00 93 .4 2 3 92 .02 0
78 .0 7 0 6 6. 14 9
4 2 .3 07 58 .6 35
0.0 00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

ES CPM-DURASI RK
Durasi Minggu Ke-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 18 18 18
No Jenis Pekerjaan Durasi ES Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
6 0 6 1 Pekerjaan Persiapan 6 0 6
10 6 21 2 Pekerjaan Tanah 21 6 6 6 6 3
21 6 19 3 Pekerjaan Pondasi 19 6 6 6 6 1
58 27 58 4 Pekerjaan Beton 58 27 3 6 6 6 6 6 6 5 6 6 2
47 27 47 5 Pekerjaan Dinding 47 27 3 6 6 6 6 6 6 5 3
15 95 15 6 Pekerjaan Kusen 15 95 6 6 3
10 110 10 7 Pekerjaan Lantai 10 110 3 6 1
10 85 10 8 Pekerjaan Atap 10 85 4 6
15 95 15 9 Pekerjaan Plafond 15 95 6 6 3
7 85 22 10 Pekerjaan Elektrikal 22 85 4 6 6 6
10 27 30 11 Pekerjaan Sanitasi 30 27 3 6 6 6 6 3
8 110 8 12 Pekerjaan Pengecatan 8 110 2 6
7 95 7 13 Pekerjaan Lain-Lain 7 95 6 1

Durasi Minggu Ke-


1 2 3 4 5 6 7 8 9 10 11 12 13 14 8 9 10 11 12 13 14
JU MLAH Tahun 2019
TENAGA 19 A gu - 24 26 Agu - 31 9 Sep - 14 16 S ep - 21 23 Sep - 28 30 S ep - 5 14 Okt - 19 21 Okt - 26 28 Okt - 2 4 Nov - 8 11 Nov - 16 18 Nov - 23 7 Okt - 12 14 Okt - 19 21 Okt - 26 28 Okt - 2 11 Nov - 16 18 Nov - 23
No Jenis Pekerjaan Durasi Total TK 2 Sep - 7 Sep 7 Okt - 12 Okt 4 Nov - 8 Nov
KERJA Agu A gu S ep Sep Sep Okt Okt Okt N ov Nov Nov Nov Okt Okt Okt Nov Nov Nov
PERHARI Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
1 Pekerjaan Persiapan 6 157.326 26.221 157.326
2 Pekerjaan Tanah 21 59.604 2.838 17.030 17.030 17.030 8.515
3 Pekerjaan Pondasi 19 148.075 7.793 46.760 46.760 46.760 7.793
4 Pekerjaan Beton 58 1674.543 28.871 86.614 173.229 173.229 173.229 173.229 173.229 173.229 144.357 173.229 173.229 57.743
5 Pekerjaan Dinding 47 1386.916 29.509 88.527 177.053 177.053 177.053 177.053 177.053 177.053 147.544 88.527
6 Pekerjaan Kusen 15 218.694 14.580 87.478 87.478 43.739 0.000 0.000
7 Pekerjaan Lantai 10 293.174 29.317 87.952 175.904 29.317
8 Pekerjaan Atap 10 109.433 10.943 43.773 65.660
9 Pekerjaan Plafond 15 248.419 16.561 99.368 99.368 49.684
10 Pekerjaan Elektrikal 22 33.561 1.526 6.102 9.153 9.153 9.153
11 Pekerjaan Sanitasi 30 53.649 1.788 5.365 10.730 10.730 10.730 10.730 5.365
12 Pekerjaan Pengecatan 8 133.542 16.693 33.385 100.156
13 Pekerjaan Lain-Lain 7 9.660 1.380 8.280 1.380
Total 4526.596 188.021
Jumlah TK Perminggu 157.326 63.790 63.790 63.790 196.814 361.012 361.012 361.012 361.012 355.647 350.282 291.901 261.755 173.229 107.618 269.938 197.378 102.576 121.338 276.061 29.317
Total TK Kumulatif 157.326 221.116 284.906 348.696 545.510 906.522 1267.533 1628.545 1989.556 2345.203 2695.485 2987.386 3249.141 3422.370 3529.988 3799.926 3997.305 4099.880 4221.218 4497.279 4526.596 HAYO
Y2 24751.338 4069.199 4069.199 4069.199 38735.773 130329.304 130329.304 130329.304 130329.304 126484.500 122697.261 85206.431 68515.750 30008.140 11581.686 72866.714 38958.130 10521.745 14722.822 76209.534 859.509
ΣY2 1029924.007

ES CPM - DURASI RK
4 0 0. 000

3 5 0. 000

3 0 0. 000

2 5 0. 000

2 0 0. 000
36 1. 01 2 3 61.0 1 2 3 61.0 1 2 36 1 .01 2 35 5 .6 47 350 .2 82
1 5 0. 000 29 1. 9 01
2 61. 75 5 2 69 .93 8 2 76 .0 61

1 0 0. 000 19 6. 814 19 7 .3 78
15 7.3 2 6 1 7 3. 22 9
12 1.3 38
50. 00 0 1 07 .61 8 102 .5 7 6
63. 79 0 6 3. 79 0 63 .79 0
29.3 1 7
0. 00 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

ES RK-DURASI CPM
Durasi Minggu Ke-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 18 18 18
No Jenis Pekerjaan Durasi ES Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
6 1 Pekerjaan Persiapan 6 0 6
10 2 Pekerjaan Tanah 10 6 6 4
21 3 Pekerjaan Pondasi 21 8 4 6 6 5
58 4 Pekerjaan Beton 58 27 3 6 6 6 6 6 6 5 6 6 2
47 5 Pekerjaan Dinding 47 48 6 6 6 6 5 6 6 6
15 6 Pekerjaan Kusen 15 95 6 6 3
10 7 Pekerjaan Lantai 10 110 2 6 2
10 8 Pekerjaan Atap 10 85 4 6
15 9 Pekerjaan Plafond 15 95 6 6 3
7 10 Pekerjaan Elektrikal 7 90 5 2
10 11 Pekerjaan Sanitasi 10 85 4 6
8 12 Pekerjaan Pengecatan 8 112 5 3
7 13 Pekerjaan Lain-Lain 7 103 4 3

Durasi Minggu Ke-


1 2 3 4 5 6 7 8 9 10 11 12 13 14 8 9 10 11 12 13 14
Tahun 2019
JU MLAH
No Jenis Pekerjaan Durasi Total TK TENAGA 19 A gu - 24 26 Agu - 31 2 Sep - 7 Sep 9 Sep - 14 16 S ep - 21 23 Sep - 28 30 S ep - 5 7 Okt - 12 Okt 14 Okt - 19 21 Okt - 26 28 Okt - 2 4 Nov - 8 11 Nov - 16 18 Nov - 23 7 Okt - 12 14 Okt - 19 21 Okt - 26 28 Okt - 2 11 Nov - 16 18 Nov - 23
4 Nov - 8 Nov
KERJA Agu A gu S ep Sep Sep Okt Okt Okt N ov Nov Nov Nov Okt Okt Okt Nov Nov Nov
PERHARI Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
1 Pekerjaan Persiapan 6 157.326 26.221 157.326
2 Pekerjaan Tanah 10 59.604 5.960 35.763 23.842
3 Pekerjaan Pondasi 21 148.075 7.051 28.205 42.307 42.307 35.256
4 Pekerjaan Beton 58 1674.543 28.871 86.614 173.229 173.229 173.229 173.229 173.229 173.229 144.357 173.229 173.229 57.743
5 Pekerjaan Dinding 47 1386.916 29.509 177.053 177.053 177.053 177.053 147.544 177.053 177.053 177.053
6 Pekerjaan Kusen 15 218.694 14.580 87.478 87.478 43.739
7 Pekerjaan Lantai 10 293.174 29.317 58.635 175.904 58.635
8 Pekerjaan Atap 10 109.433 10.943 43.773 65.660
9 Pekerjaan Plafond 15 248.419 16.561 99.368 99.368 49.684
10 Pekerjaan Elektrikal 7 33.561 4.794 23.972 9.589
11 Pekerjaan Sanitasi 10 53.649 5.365 21.460 32.189
12 Pekerjaan Pengecatan 8 133.542 16.693 83.464 50.078
13 Pekerjaan Lain-Lain 7 9.660 1.380 5.520 4.140
Total 4526.596 197.247
Jumlah TK Perminggu 157.326 63.967 66.149 42.307 121.870 173.229 173.229 350.282 350.282 350.282 350.282 291.901 350.282 350.282 300.029 308.667 196.434 98.943 146.239 225.983 58.635
Total TK Kumulatif 157.326 221.293 287.442 329.749 451.619 624.848 798.076 1148.358 1498.640 1848.921 2199.203 2491.104 2841.386 3191.668 3491.697 3800.363 3996.797 4095.740 4241.979 4467.961 4526.596 OK
Y2 24751.338 4091.813 4375.665 1789.892 14852.350 30008.140 30008.140 122697.261 122697.261 122697.261 122697.261 85206.431 122697.261 122697.261 90017.388 95275.173 38586.304 9789.651 21385.709 51068.109 3438.037
ΣY2 931267.337

ES RK - D URASI CPM
4 0 0. 00 0

3 5 0. 00 0

3 0 0. 00 0

2 5 0. 00 0

2 0 0. 00 0
3 5 0. 2 82 35 0 .2 82 3 50 . 28 2 3 5 0.2 82 3 50. 28 2 3 5 0.2 82
1 5 0. 00 0 291 .9 0 1 300 .0 2 9 3 08. 66 7
22 5 .983
1 0 0. 00 0 19 6 .434
1 57.3 2 6 173 .2 2 9 1 73.2 2 9
1 46. 23 9
5 0. 00 0 1 2 1.87 0 9 8 .9 43
63 .9 6 7 6 6. 14 9 5 8.6 35
4 2 .3 07
0. 00 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

ES RK-DURASI RK
Durasi Minggu Ke-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
No Jenis Pekerjaan Durasi ES Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
6 1 Pekerjaan Persiapan 6 0 6
21 2 Pekerjaan Tanah 21 6 6 6 6 3
19 3 Pekerjaan Pondasi 19 8 4 6 6 3
58 4 Pekerjaan Beton 58 27 3 6 6 6 6 6 6 5 6 6 2
47 5 Pekerjaan Dinding 47 48 6 6 6 5 6 6 6 6
15 6 Pekerjaan Kusen 15 95 6 6 3
10 7 Pekerjaan Lantai 10 110 2 6 2
10 8 Pekerjaan Atap 10 85 4 6
15 9 Pekerjaan Plafond 15 95 6 6 3
22 10 Pekerjaan Elektrikal 22 90 5 6 6 5
30 11 Pekerjaan Sanitasi 30 85 4 6 6 6 6 2
8 12 Pekerjaan Pengecatan 8 112 6 2
7 13 Pekerjaan Lain-Lain 7 103 4 3

Durasi Minggu Ke-


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
JU MLAH Tahun 2019

No Jenis Pekerjaan Durasi Total TK TENAGA 19 A gu - 24 26 Agu - 31 2 Sep - 7 Sep 9 Sep - 14 16 S ep - 21 23 Sep - 28 30 S ep - 5 7 Okt - 12 Okt 14 Okt - 19 21 Okt - 26 28 Okt - 2 4 Nov - 8 11 Nov - 16 18 Nov - 23 7 Okt - 12 14 Okt - 19 21 Okt - 26 28 Okt - 2 11 Nov - 16 18 Nov - 23
4 Nov - 8 Nov
KERJA Agu A gu S ep Sep Sep Okt Okt Okt N ov Nov Nov Nov Okt Okt Okt Nov Nov Nov
PERHARI Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
A 1 Pekerjaan Persiapan 6 157.326 26.221 157.326
B 2 Pekerjaan Tanah 21 59.604 2.838 17.030 17.030 17.030 8.515
C 3 Pekerjaan Pondasi 19 148.075 7.793 31.174 46.760 46.760 23.380
D 4 Pekerjaan Beton 58 1674.543 28.871 86.614 173.229 173.229 173.229 173.229 173.229 173.229 144.357 173.229 173.229 57.743
E 5 Pekerjaan Dinding 47 1386.916 29.509 177.053 177.053 177.053 147.544 177.053 177.053 177.053 177.053
F 6 Pekerjaan Kusen 15 218.694 14.580 87.478 87.478 43.739
G 7 Pekerjaan Lantai 10 293.174 29.317 58.635 175.904 58.635
H 8 Pekerjaan Atap 10 109.433 10.943 43.773 65.660
I 9 Pekerjaan Plafond 15 248.419 16.561 99.368 99.368 49.684
J 10 Pekerjaan Elektrikal 22 33.561 1.526 7.628 9.153 9.153 7.628
K 11 Pekerjaan Sanitasi 30 53.649 1.788 7.153 10.730 10.730 10.730 10.730 3.577
L 12 Pekerjaan Pengecatan 8 133.542 16.693 100.156 33.385
M 13 Pekerjaan Lain-Lain 7 9.660 1.380 5.520 4.140
Total 4526.596 188.021
Jumlah TK Perminggu 157.326 48.203 63.790 63.790 118.509 173.229 173.229 173.229 350.282 350.282 350.282 291.901 350.282 350.282 285.723 447.916 206.7279 118.825 181.289 212.866 58.635
Total TK Kumulatif 157.326 205.529 269.319 333.110 451.619 624.848 798.076 971.305 1321.586 1671.868 2022.150 2314.051 2664.333 3014.615 3300.337 3748.253 3954.981 4073.806 4255.095 4467.961 4526.596 OK
Y2 24751.338 2323.572 4069.199 4069.199 14044.484 30008.140 30008.140 30008.140 122697.261 122697.261 122697.261 85206.431 122697.261 122697.261 81637.382 200628.393 42736.435 14119.495 32865.550 45312.109 3438.037
ΣY2 837974.951
Jumlah TK Perhari 26.221 8.034 10.632 10.632 19.752 28.871 28.871 28.871 58.380 58.380 58.380 58.380 58.380 58.380 47.620 74.653 34.455 19.804 36.258 35.478 29.317
Jumlah Mandor yg digunakan 2 1 1 1 1 2 2 2 3 3 3 3 3 3 3 4 2 1 2 2 2

Jumlah TenagaK erja Perminggu


5 0 0. 00 0
4 5 0. 00 0
4 0 0. 00 0

3 5 0. 00 0
3 0 0. 00 0

2 5 0. 00 0
447 .9 16
2 0 0. 00 0
3 5 0. 28 2 35 0 .282 3 50.2 8 2 3 50. 28 2 35 0.2 82
1 5 0. 00 0 2 91. 90 1 285 .7 2 3
1 0 0. 00 0 2 0 6. 728 2 12 .86 6
15 7 .3 26 17 3 .2 29 1 73 .22 9 1 7 3.22 9 18 1 .2 89
5 0. 0 00 1 1 8. 509 1 1 8 .825
4 8. 20 3 6 3 .7 90 6 3.7 9 0 58 .6 3 5
0. 0 00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Minggu Ke-19
Tenaga Kerja yang digunakan
G Pekerjaan Lantai 58.63 orang
J Pekerjaan Elektrikal 7.63 orang
K Pekerjaan Sanitasi 10.73 orang
L Pekerjaan Pengecatan 100.16 orang
M Pekerjaan Lain-Lain 4.14 orang
Total tenaga kerja yang digunakan 181.29 orang
Durasi pekerjaan Minggu Ke-19 5 hari

G. Pekerjaan Lantai
Total Rasio 58.63 TK/Rasio Durasi Pekerjaan 2 hari
Tenaga Kerja Jumlah TK/hari TK/Rasio Jumlah TK/minggu Harga Satuan Biaya Upah
Pekerja 17.77 30.31% 35.54 Rp 95,600.00 Rp 3,398,037.69
Tukang Batu 9.69 16.53% 19.39 Rp 109,300.00 Rp 2,118,794.87
Kepala Tukang Batu 0.97 1.65% 1.94 Rp 120,000.00 Rp 232,621.58
Mandor 0.88 1.51% 1.77 Rp 131,000.00 Rp 231,451.72
Total 29.32 50% 58.63 Rp 5,980,905.86

J. Pekerjaan Elektrikal
Total Rasio 7.63 TK/Rasio Durasi Pekerjaan 5 hari
Tenaga Kerja Jumlah TK/hari TK/Rasio Jumlah TK/minggu Harga Satuan Biaya Upah
Tukang Listrik 1.39 18.18% 6.93 Rp 109,300.00 Rp 757,896.14
Kepala Tukang Listrik 0.10 1.34% 0.51 Rp 120,000.00 Rp 61,363.64
Total 1.49 20% 7.45 Rp 819,259.77

K. Pekerjaan Sanitasi
Total Rasio 10.73 TK/Rasio Durasi Pekerjaan 6 hari
Tenaga Kerja Jumlah TK/hari TK/Rasio Jumlah TK/minggu Harga Satuan Biaya Upah
Pekerja 0.76 7.11% 4.58 Rp 95,600.00 Rp 437,654.16
Tukang Batu 0.87 8.11% 5.22 Rp 109,300.00 Rp 570,650.27
Kepala Tukang Batu 0.09 0.86% 0.55 Rp 120,000.00 Rp 66,107.45
Mandor 0.06 0.59% 0.38 Rp 131,000.00 Rp 49,778.79
Total 1.79 17% 10.73 Rp 1,124,190.68

L. Pekerjaan Pengecatan
Total Rasio 100.16 TK/Rasio Durasi Pekerjaan 6 hari
Tenaga Kerja Jumlah TK/hari TK/Rasio Jumlah TK/minggu Harga Satuan Biaya Upah
Pekerja 11.57 11.55% 69.43 Rp 95,600.00 Rp 6,637,915.54
Tukang Cat 1.46 1.46% 8.79 Rp 109,300.00 Rp 960,251.92
Kepala Tukang Cat 1.13 1.13% 6.77 Rp 120,000.00 Rp 812,017.43
Mandor 2.53 2.52% 15.17 Rp 131,000.00 Rp 1,987,251.86
Total 16.69 17% 100.16 Rp 10,397,436.75

M. Pekerjaan Lain-Lain
Total Rasio 4.14 TK/Rasio Durasi Pekerjaan 3 hari
Tenaga Kerja Jumlah TK/hari TK/Rasio Jumlah TK/minggu Harga Satuan Biaya Upah
Pekerja 0.48 11.58% 1.44 Rp 95,600.00 Rp 137,485.77
Upah
Minggu ke- Pekerjaan
Hasil Perhitungan % thd Perhitungan
Pekerjaan Persiapan Rp 16,615,984.86 100%
1
TOTAL Rp 16,615,984.86 100%
Pekerjaan Tanah Rp 1,647,493.88 34%
2 Pekerjaan Pondasi Rp 3,166,519.55 66%
TOTAL Rp 4,814,013.43 100%
Pekerjaan Tanah Rp 1,647,493.88 26%
3 Pekerjaan Pondasi Rp 4,749,779.32 74%
TOTAL Rp 6,397,273.20 100%
Pekerjaan Tanah Rp 1,647,493.88 26%
4 Pekerjaan Pondasi Rp 4,749,779.32 74%
TOTAL Rp 6,397,273.20 100%
Pekerjaan Tanah Rp 823,746.94 7%
Pekerjaan Pondasi Rp 2,374,889.66 20%
5
Pekerjaan Beton Rp 8,941,378.80 74%
TOTAL Rp 12,140,015.40 100%
Pekerjaan Beton Rp 17,882,757.59 100%
6
TOTAL Rp 17,882,757.59 100%
Pekerjaan Beton Rp 17,882,757.59 100%
7
TOTAL Rp 17,882,757.59 100%
Pekerjaan Beton Rp 17,882,757.59 100%
8
TOTAL Rp 17,882,757.59 100%
Pekerjaan Beton Rp 17,882,757.59 50%
9 Pekerjaan Dinding Rp 17,948,499.90 50%
TOTAL Rp 35,831,257.49 100%
Pekerjaan Beton Rp 17,882,757.59 50%
10 Pekerjaan Dinding Rp 17,948,499.90 50%
TOTAL Rp 35,831,257.49 100%
Pekerjaan Beton Rp 17,882,757.59 50%
11 Pekerjaan Dinding Rp 17,948,499.90 50%
TOTAL Rp 35,831,257.49 100%
Pekerjaan Beton Rp 14,902,297.99 50%
12 Pekerjaan Dinding Rp 14,957,083.25 50%
TOTAL Rp 29,859,381.24 100%
Pekerjaan Beton Rp 17,882,757.59 50%
13 Pekerjaan Dinding Rp 17,948,499.90 50%
TOTAL Rp 35,831,257.49 100%
Pekerjaan Beton Rp 17,882,757.59 50%
14 Pekerjaan Dinding Rp 17,948,499.90 50%
TOTAL Rp 35,831,257.49 100%
Pekerjaan Beton Rp 5,960,919.20 20%
Pekerjaan Dinding Rp 17,948,499.90 61%
15 Pekerjaan Atap Rp 4,526,314.17 16%
Pekerjaan Sanitasi Rp 749,460.45 3%
TOTAL Rp 29,185,193.71 100%
Pekerjaan Dinding Rp 17,948,499.90 39%

16
Pekerjaan Kusen Rp 9,404,823.50 20%
Pekerjaan Atap Rp 6,789,471.25 15%
16 Pekerjaan Plafond Rp 10,256,680.70 22%
Pekerjaan Elektrikal Rp 819,259.77 2%
Pekerjaan Sanitasi Rp 1,124,190.68 2%
TOTAL Rp 46,342,925.79 100%
Pekerjaan Kusen Rp 9,404,790.71 43%
Pekerjaan Plafond Rp 10,256,680.70 47%
17 Pekerjaan Elektrikal Rp 983,111.73 5%
Pekerjaan Sanitasi Rp 1,124,190.68 5%
TOTAL Rp 21,768,773.81 100%
Pekerjaan Kusen Rp 4,702,411.75 38%
Pekerjaan Plafond Rp 5,128,340.35 41%
Pekerjaan Elektrikal Rp 983,111.73 8%
18
Pekerjaan Sanitasi Rp 1,124,190.68 9%
Pekerjaan Lain-Lain Rp 582,936.25 5%
TOTAL Rp 12,520,990.75 100%
Pekerjaan Lantai Rp 5,980,905.86 32%
Pekerjaan Elektrikal Rp 819,259.77 4%
Pekerjaan Sanitasi Rp 1,124,190.68 6%
19
Pekerjaan Pengecatan Rp 10,397,436.75 55%
Pekerjaan Lain-Lain Rp 437,202.19 2%
TOTAL Rp 18,758,995.25 100%
Pekerjaan Lantai Rp 17,942,717.58 82%
Pekerjaan Sanitasi Rp 374,730.23 2%
20
Pekerjaan Pengecatan Rp 3,465,812.25 16%
TOTAL Rp 21,783,260.05 100%
Pekerjaan Lantai Rp 5,980,905.86 100%
21
TOTAL Rp 5,980,905.86 100%
TOTAL Rp 465,369,546.78
Rp 465,369,546.78
ah Minggu ke- Hasil Perhitungan Hasil Analisis
Hasil Analisis 1 Rp 16,615,985 Rp 16,553,400
Rp 16,553,400.00 2 Rp 4,814,013 Rp 4,447,000
Rp 16,553,400.00 3 Rp 6,397,273 Rp 6,112,800
Rp 1,521,891.33 4 Rp 6,397,273 Rp 6,112,800
Rp 2,925,108.67 5 Rp 12,140,015 Rp 12,054,300
Rp 4,447,000.00 6 Rp 17,882,758 Rp 17,443,800
Rp 1,574,233.31 7 Rp 17,882,758 Rp 17,443,800
Rp 4,538,566.69 8 Rp 17,882,758 Rp 17,526,000
Rp 6,112,800.00 9 Rp 35,831,257 Rp 35,750,400
Rp 1,574,233.31 10 Rp 35,831,257 Rp 35,750,400
Rp 4,538,566.69 11 Rp 35,831,257 Rp 35,750,400
Rp 6,112,800.00 12 Rp 29,859,381 Rp 29,404,500
Rp 817,930.82 13 Rp 35,831,257 Rp 35,750,400
Rp 2,358,121.59 14 Rp 35,831,257 Rp 35,750,400
Rp 8,878,247.59 172,866,656.70 15 Rp 29,185,194 Rp 28,620,600
Rp 12,054,300.00 16 Rp 46,342,926 Rp 45,821,400
Rp 17,443,800.00 17 Rp 21,768,774 Rp 21,400,200
Rp 17,443,800.00 18 Rp 12,520,991 Rp 11,790,500
Rp 17,443,800.00 19 Rp 18,758,995 Rp 18,598,400
Rp 17,443,800.00 20 Rp 21,783,260 Rp 21,697,800
Rp 17,526,000.00 21 Rp 5,980,906 Rp 5,436,400
Rp 17,526,000.00 TOTAL Rp 465,369,547 Rp 459,215,700
Rp 17,842,403.02
Rp 17,907,996.98 OKE OKE
Rp 35,750,400.00
Rp 17,842,403.02
Rp 17,907,996.98 0.1875
Rp 35,750,400.00
Rp 17,842,403.02
Rp 17,907,996.98
Rp 35,750,400.00
Rp 14,675,274.67
Rp 14,729,225.33
Rp 29,404,500.00
Rp 17,842,403.02
Rp 17,907,996.98
Rp 35,750,400.00
Rp 17,842,403.02
Rp 17,907,996.98
Rp 35,750,400.00
Rp 5,845,603.96
Rp 17,601,282.39
Rp 4,438,751.67
Rp 734,961.98
Rp 28,620,600.00
Rp 17,746,514.26
Rp 9,298,985.16
Rp 6,713,065.10
Rp 10,141,255.88
Rp 810,040.13
Rp 1,111,539.46
Rp 45,821,400.00
Rp 9,245,555.30 baru sampe 15
Rp 10,083,021.68
Rp 966,466.36
Rp 1,105,156.66
Rp 21,400,200.00
Rp 4,428,066.98
Rp 4,829,146.36
Rp 925,755.72
Rp 1,058,603.94
Rp 548,927.00
Rp 11,790,500.00
Rp 5,929,703.49
Rp 812,246.11
Rp 1,114,566.51
Rp 10,308,424.58
Rp 433,459.31
Rp 18,598,400.00
Rp 17,872,324.73
Rp 373,260.08
Rp 3,452,215.18
Rp 21,697,800.00
Rp 5,436,400.00
Rp 5,436,400.00
Rp 459,215,700.00
selisih Upah
No Pekerjaan
Rp 62,585 Hasil Perhitungan
Rp 367,013 A Pekerjaan Persiapan Rp 16,615,984.86
Rp 284,473 B Pekerjaan Tanah Rp 5,766,228.58
Rp 284,473 C Pekerjaan Pondasi Rp 15,040,967.85
Rp 85,715 D Pekerjaan Beton Rp 172,866,656.70
Rp 438,958 E Pekerjaan Dinding Rp 140,596,582.55
Rp 438,958 F Pekerjaan Kusen Rp 23,512,025.96
Rp 356,758 G Pekerjaan Lantai Rp 29,904,529.30
Rp 80,857 H Pekerjaan Atap Rp 11,315,785.41
Rp 80,857 I Pekerjaan Plafond Rp 25,641,701.74
Rp 80,857 J Pekerjaan Elektrikal Rp 3,604,743.00
Rp 454,881 K Pekerjaan Sanitasi Rp 5,620,953.38
Rp 80,857 L Pekerjaan Pengecatan Rp 13,863,249.01
Rp 80,857 M Pekerjaan Lain-Lain Rp 1,020,138.44
Rp 564,594 Total Rp 465,369,546.78
Rp 521,526
Rp 368,574 OKE
Rp 730,491
Rp 160,595
Rp 85,460
Rp 544,506
Upah
Tabel Rekapitulasi Perbandingan Upah Tenaga Kerja RAB, RAB -
Hasil Analisis
Rp 16,553,400.00
Kegiatan Deskripsi Kegiatan RAB BID PRICE
Rp 5,488,288.78
Rp 14,360,363.64 A Pekerjaan Persiapan Rp 18,462,205.40
Rp 171,024,741.33 B Pekerjaan Tanah Rp 6,406,920.65
Rp 139,617,006.87 C Pekerjaan Pondasi Rp 16,712,186.50
Rp 22,972,607.45 D Pekerjaan Beton Rp 190,153,322.37
Rp 29,238,428.22 E Pekerjaan Dinding + pengecatan Rp 156,218,508.95
Rp 11,151,816.77 F Pekerjaan Pintu dan Jendela Rp 26,125,619.02
Rp 25,053,423.92 G Pekerjaan Lantai Rp 33,227,254.77
Rp 3,514,508.33 H Pekerjaan Atap Rp 12,573,095.20
Rp 5,498,088.64 I Pekerjaan Plafond Rp 28,491,016.09
Rp 13,760,639.76 J Pekerjaan Elektrikal Rp 3,965,217.30
Rp 982,386.31 K Pekerjaan Sanitasi Rp 6,516,133.66
Rp 459,215,700.00 L Pekerjaan Lain-lain Rp 1,133,487.15
M Pekerjaan Pengecatan Rp 15,403,610.01
OKE Jumlah Total Rp 515,388,577.08

Berdasarkan rekapitulasi diatas maka,


1) Berdasarkan Tabel RAB 10%,
Selisih total upah = RAB Bid Price - Total Upah TK (-10% )
Rp 515,388,577.08
Rp 50,019,030.30

Keuntungan = Rp 50,019,030.30
Rp 515,388,577.08

2) Berdasarkan Tabel RAB Analisa TK,


Selisih total upah = RAB Bid Price - Total Upah Analisa TK
Rp 515,388,577.08
Rp 56,172,877.08

Keuntungan = Rp 56,172,877.08
Rp 515,388,577.08
enaga Kerja RAB, RAB -10% dan Hasil Analisis Per Pekerjaan

KONTROL
RAB Upah - 10% RAB ANALISA TK
PERHTIUNGAN
Rp 16,615,984.86 Rp 16,615,984.86 Rp 16,553,400.00
Rp 5,766,228.58 Rp 5,766,228.58 Rp 5,488,288.78
Rp 15,040,967.85 Rp 15,040,967.85 Rp 14,360,363.64
Rp 172,866,656.70 Rp 172,866,656.70 Rp 171,024,741.33
Rp 140,596,582.55 Rp 140,596,582.55 Rp 139,617,006.87
Rp 23,512,025.96 Rp 23,512,025.96 Rp 22,972,607.45
Rp 29,904,529.30 Rp 29,904,529.30 Rp 29,238,428.22
Rp 11,315,785.41 Rp 11,315,785.41 Rp 11,151,816.77
Rp 25,641,701.74 Rp 25,641,701.74 Rp 25,053,423.92
Rp 3,604,743.00 Rp 3,604,743.00 Rp 3,514,508.33
Rp 5,620,953.38 Rp 5,620,953.38 Rp 5,498,088.64
Rp 1,020,138.44 Rp 1,020,138.44 Rp 13,760,639.76
Rp 13,863,249.01 Rp 13,863,249.01 Rp 982,386.31
Rp 465,369,546.78 Rp 465,369,546.78 Rp 459,215,700.00

- Total Upah TK (-10% )


- Rp 465,369,546.78

x 100 = 9.71%

e - Total Upah Analisa TK


- Rp 459,215,700

x 100 = 10.90%
Rp 0.10
Rp 0.10
Rp 0.10
Rp 0.09
Rp 0.10
Rp 0.10
Rp 0.10
Rp 0.10
Rp 0.10
Rp 0.1
Rp 0.14
Rp 0.10
Rp 0.10
ES RK-DURASI RK
Durasi Minggu Ke-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
No Jenis Pekerjaan Durasi ES Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
6 1 Pekerjaan Persiapan 6 0 6
21 2 Pekerjaan Tanah 21 6 6 6 6 3
19 3 Pekerjaan Pondasi 19 8 4 6 6 3
58 4 Pekerjaan Beton 58 27 3 6 6 6 6 6 6 5 6 6 2
35 5 Pekerjaan Dinding 47 48 6 6 6 5 6 6 6 6
15 6 Pekerjaan Kusen 15 95 6 6 3
10 7 Pekerjaan Lantai 10 110 2 6 2
10 8 Pekerjaan Atap 10 85 4 6
15 9 Pekerjaan Plafond 15 95 6 6 3
22 10 Pekerjaan Elektrikal 22 90 5 6 6 5
30 11 Pekerjaan Sanitasi 30 85 4 6 6 6 5 3
8 12 Pekerjaan Pengecatan 8 112 5 3
7 13 Pekerjaan Lain-Lain 7 103 4 3

Durasi Minggu Ke-


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Tahun 2019

19 Agu - 24 26 Agu - 31 16 Sep - 21 23 Sep - 28 30 Sep - 5 14 Okt - 19 21 Okt - 26 28 Okt - 2 4 Nov - 8 11 Nov - 16 18 Nov - 23 25 Nov - 30 02 Des - 07 09 Des - 14 16 Des - 21 23 Des - 27 6 Jan - 7
No Jenis Pekerjaan Durasi Biaya Bahan Bobot 2 Sep - 7 Sep 9 Sep - 14 Sep 7 Okt - 12 Okt 30 Des - 4 Jan
Agu Agu Sep Sep Okt Okt Okt Nov Nov Nov Nov Nov Des Des Des Des Jan

Jumlah Hari
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
A 1 Pekerjaan Persiapan 6 Rp 30,388,950.02 1.876 1.876
B 2 Pekerjaan Tanah 21 - 0.000 0.000 0.000 0.000 0.000
C 3 Pekerjaan Pondasi 19 Rp 54,531,505.83 3.366 0.709 1.063 1.063 0.531
D 4 Pekerjaan Beton 58 Rp 1,252,519,932.07 77.304 3.998 7.997 7.997 7.997 7.997 7.997 7.997 6.664 7.997 7.997 2.666
E 5 Pekerjaan Dinding 47 Rp 113,127,954.17 6.982 0.891 0.891 0.891 0.743 0.891 0.891 0.891 0.891
F 6 Pekerjaan Kusen 15 Rp 35,887,856.62 2.215 0.886 0.886 0.443
G 7 Pekerjaan Lantai 10 Rp 23,721,129.06 1.464 0.293 0.878 0.293
H 8 Pekerjaan Atap 10 Rp 10,842,120.80 0.669 0.268 0.401
I 9 Pekerjaan Plafond 15 Rp 38,167,378.67 2.356 0.942 0.942 0.471
J 10 Pekerjaan Elektrikal 22 Rp 13,932,300.00 0.860 0.195 0.235 0.235 0.195
K 11 Pekerjaan Sanitasi 30 Rp 30,545,696.01 1.885 0.251 0.377 0.377 0.377 0.314 0.189
L 12 Pekerjaan Pengecatan 8 Rp 10,806,369.92 0.667 0.417 0.250
M 13 Pekerjaan Lain-Lain 7 Rp 5,790,710.13 0.357 0.204 0.153
Total Rp 1,620,261,903.29 100.000
Jumlah Bobot Perminggu 1.876 0.709 1.063 1.063 4.530 7.997 7.997 7.997 8.888 8.888 8.888 7.407 8.888 8.888 4.076 3.694 2.4398 1.730 1.372 1.317 0.293
Total Bobot Kumulatif 1.876 2.584 3.647 4.710 9.240 17.237 25.233 33.230 42.119 51.007 59.895 67.302 76.190 85.078 89.154 92.848 95.288 97.018 98.390 99.707 100.000

BARCHART BAHAN
Pekerjaan Persiapan 30388950.02 10.000
Pekerjaan Tanah 0 8.888 8.888 8.888 8.888 8.888
9.000
7.997 7.997 7.997
Pekerjaan Pondasi 54531505.83 8.000 7.407
Pekerjaan Beton 1252519932 7.000
Pekerjaan Pintu dan Jendela 35887856.62 6.000
Pekerjaan Dinding 113127954.2 5.000 4.530
4.076
Pekerjaan Lantai 23721129.06 4.000 3.694
Pekerjaan Atap 10842120.8 3.000 2.440
1.876 1.730
Pekerjaan Plafond 38167378.67 2.000 1.372 1.317
1.063 1.063
Pekerjaan Listrik 13932300 1.000 0.709
0.293
Pekerjaan Sanitasi 30545696.01 0.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Pekerjaan Lain-lain 5790710.125
Pekerjaan Pengecatan 10806369.92 Jumlah Bobot Per Minggu

Err:504

Err:504

HAYO
Minggu Ke-1
Bobot Pekerjaan
A Pekerjaan Persiapan 1.88
Total Bobot Pekerjaan 1.88
Durasi pekerjaan Minggu Ke-1 6

A. Pekerjaan Persiapan
Bobot 1.88 Durasi 6 hari
No Bahan Kebutuhan/hari Kebutuhan/minggu Harga Satuan Biaya Bahan
1 Dolken Kayu φ 8 - 10 / 400 cm 13.50 81.001 Rp 29,600.00 Rp 2,397,614.80
2 Kayu Meranti Kaso 5/7 0.20 1.195 Rp 2,400,000.00 Rp 2,868,480.00
3 Kayu Meranti Papan 3/20 0.83 4.973 Rp 3,000,000.00 Rp 14,919,300.00
4 Kayu Meranti Balok 6/12 0.16 0.976 Rp 2,800,000.00 Rp 2,731,680.00
5 Polywood, t=4mm 0.32 1.935 Rp 58,300.00 Rp 112,810.50
6 Pasir pasang 0.31 1.838 Rp 135,278.00 Rp 248,573.33
7 Pasir Beton 0.26 1.585 Rp 210,540.00 Rp 333,705.90
8 Semen Portland 107.46 644.750 Rp 1,379.40 Rp 889,368.15
9 Batu Koral Beton Kali 0.41 2.438 Rp 148,100.00 Rp 360,993.75
10 Cat Besi 3.46 20.736 Rp 49,500.00 Rp 1,026,432.00
11 Cat SEIV Gloss Warna Standar 0.01 0.072 Rp 55,000.00 Rp 3,960.00
12 Paku 2" - 3" 0.27 1.626 Rp 25,000.00 Rp 40,650.00
13 Kunci Tanam 0.31 1.838 Rp 101,650.00 Rp 186,781.88
14 Jendela nako + accessories 0.41 2.450 Rp 395,000.00 Rp 967,750.00
15 Paku 2" - 5" 1.09 6.545 Rp 17,500.00 Rp 114,534.00
16 Batu bata merah bakar kualitas I 61.25 367.500 Rp 798.00 Rp 293,265.00
17 Besi Strip 2.25 13.475 Rp 13,420.43 Rp 180,840.26
18 Kaca Polos tebal 3 mm 0.16 0.980 Rp 94,380.00 Rp 92,492.40
19 Seng Gelombang BJLS 25, Uk 90 x 180 cm 8.49 50.943 Rp 51,425.00 Rp 2,619,718.06
Total Rp 30,388,950.02
Bobot 1.88
REKAP BAHAN
Upah RAB Material Minggu ke- Biaya Bahan Bobot Biaya (%)
Minggu ke- Pekerjaan No Pekerjaan
Hasil Perhitungan Bobot Hasil Analisis Bid Price RAB Hasil Analisis 1 Rp 30,388,950.02 1.88%
Pekerjaan Persiapan Rp 30,388,950.02 1.876 Rp 30,388,950.02 A Pekerjaan Persiapan Rp 30,388,950.02 Rp 30,388,950.02 2 Rp 11,480,317.02 0.71%
1
TOTAL Rp 30,388,950.02 1.876 Rp 30,388,950.02 B Pekerjaan Tanah Rp - Rp - 3 Rp 17,220,475.52 1.06%
Pekerjaan Tanah Rp - 0.000 Rp - C Pekerjaan Pondasi Rp 54,531,505.83 Rp 54,531,505.83 4 Rp 17,220,475.52 1.06%
2 Pekerjaan Pondasi Rp 11,480,317.02 0.709 Rp 11,480,317.02 D Pekerjaan Beton Rp 1,252,519,932.07 Rp 1,252,519,932.07 5 Rp 73,395,751.49 4.53%
TOTAL Rp 11,480,317.02 0.709 Rp 11,480,317.02 E Pekerjaan Dinding Rp 35,887,856.62 Rp 113,127,954.17 6 Rp 129,571,027.46 8.00%
Pekerjaan Tanah Rp - 0.000 Rp - F Pekerjaan Kusen Rp 113,127,954.17 Rp 35,887,856.62 7 Rp 129,571,027.46 8.00%
3 Pekerjaan Pondasi Rp 17,220,475.52 1.063 Rp 17,220,475.52 G Pekerjaan Lantai Rp 23,721,129.06 Rp 23,721,129.06 8 Rp 129,571,027.46 8.00%
TOTAL Rp 17,220,475.52 1.063 Rp 17,220,475.52 H Pekerjaan Atap Rp 10,842,120.80 Rp 10,842,120.80 9 Rp 144,012,893.95 8.89%
Pekerjaan Tanah Rp - 0.000 Rp - I Pekerjaan Plafond Rp 38,167,378.67 Rp 38,167,378.67 10 Rp 144,012,893.95 8.89%
4 Pekerjaan Pondasi Rp 17,220,475.52 1.063 Rp 17,220,475.52 J Pekerjaan Elektrikal Rp 13,932,300.00 Rp 13,932,300.00 11 Rp 144,012,893.95 8.89%
TOTAL Rp 17,220,475.52 1.063 Rp 17,220,475.52 K Pekerjaan Sanitasi Rp 30,545,696.01 Rp 30,545,696.01 12 Rp 120,010,744.95 7.41%
Pekerjaan Tanah Rp - 0.000 Rp - L Pekerjaan Pengecatan Rp 10,806,369.92 Rp 10,806,369.92 13 Rp 144,012,893.95 8.89%
Pekerjaan Pondasi Rp 8,610,237.76 0.531 Rp 8,610,237.76 M Pekerjaan Lain-Lain Rp 5,790,710.13 Rp 5,790,710.13 14 Rp 144,012,893.95 8.89%
5
Pekerjaan Beton Rp 64,785,513.73 3.998 Rp 64,785,513.73 Total Rp 1,620,261,903.29 Rp 1,620,261,903.29 15 Rp 66,041,816.76 4.08%
TOTAL Rp 73,395,751.49 4.530 Rp 73,395,751.49 16 Rp 59,844,804.11 3.69%
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46 17 Rp 39,530,951.50 2.44%
6
TOTAL Rp 129,571,027.46 7.997 Rp 129,571,027.46 18 Rp 28,028,881.66 1.73%
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46 19 Rp 22,237,321.07 1.37%
7
TOTAL Rp 129,571,027.46 7.997 Rp 129,571,027.46 20 Rp 21,339,635.76 1.32%
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46 21 Rp 4,744,225.81 0.29%
8
TOTAL Rp 129,571,027.46 7.997 Rp 129,571,027.46 ∑ Rp 1,620,261,903.290 85%
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46
9 Pekerjaan Dinding Rp 14,441,866.49 0.891 Rp 14,441,866.49
TOTAL Rp 144,012,893.95 8.888 Rp 144,012,893.95
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46
10 Pekerjaan Dinding Rp 14,441,866.49 0.891 Rp 14,441,866.49
TOTAL Rp 144,012,893.95 8.888 Rp 144,012,893.95
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46
11 Pekerjaan Dinding Rp 14,441,866.49 0.891 Rp 14,441,866.49
TOTAL Rp 144,012,893.95 8.888 Rp 144,012,893.95
Pekerjaan Beton Rp 107,975,856.21 6.664 Rp 107,975,856.21
12 Pekerjaan Dinding Rp 12,034,888.74 0.743 Rp 12,034,888.74
TOTAL Rp 120,010,744.95 7.407 Rp 120,010,744.95
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46
13 Pekerjaan Dinding Rp 14,441,866.49 0.891 Rp 14,441,866.49
TOTAL Rp 144,012,893.95 8.888 Rp 144,012,893.95
Pekerjaan Beton Rp 129,571,027.46 7.997 Rp 129,571,027.46
14 Pekerjaan Dinding Rp 14,441,866.49 0.891 Rp 14,441,866.49
TOTAL Rp 144,012,893.95 8.888 Rp 144,012,893.95
Pekerjaan Beton Rp 43,190,342.49 2.666 Rp 43,190,342.49
Pekerjaan Dinding Rp 14,441,866.49 0.891 Rp 14,441,866.49
15 Pekerjaan Atap Rp 4,336,848.32 0.268 Rp 4,336,848.32
Pekerjaan Sanitasi Rp 4,072,759.47 0.251 Rp 4,072,759.47
TOTAL Rp 66,041,816.76 4.076 Rp 66,041,816.76
Pekerjaan Dinding Rp 14,441,866.49 0.891 Rp 14,441,866.49
Pekerjaan Kusen Rp 14,355,142.65 0.886 Rp 14,355,142.65
Pekerjaan Atap Rp 6,505,272.48 0.401 Rp 6,505,272.48
16 Pekerjaan Plafond Rp 15,266,951.47 0.942 Rp 15,266,951.47
Pekerjaan Elektrikal Rp 3,166,431.82 0.195 Rp 3,166,431.82
Pekerjaan Sanitasi Rp 6,109,139.20 0.377 Rp 6,109,139.20
TOTAL Rp 59,844,804.11 3.694 Rp 59,844,804.11
Pekerjaan Kusen Rp 14,355,142.65 0.886 Rp 14,355,142.65
Pekerjaan Plafond Rp 15,266,951.47 0.942 Rp 15,266,951.47
17 Pekerjaan Elektrikal Rp 3,799,718.18 0.235 Rp 3,799,718.18
Pekerjaan Sanitasi Rp 6,109,139.20 0.377 Rp 6,109,139.20
TOTAL Rp 39,530,951.50 2.440 Rp 39,530,951.50
Pekerjaan Kusen Rp 7,177,571.32 0.443 Rp 7,177,571.32
Pekerjaan Plafond Rp 7,633,475.73 0.471 Rp 7,633,475.73
Pekerjaan Elektrikal Rp 3,799,718.18 0.235 Rp 3,799,718.18
18
Pekerjaan Sanitasi Rp 6,109,139.20 0.377 Rp 6,109,139.20
Pekerjaan Lain-Lain Rp 3,308,977.21 0.204 Rp 3,308,977.21
TOTAL Rp 28,028,881.66 1.730 Rp 28,028,881.66
Pekerjaan Lantai Rp 4,744,225.81 0.293 Rp 4,744,225.81

19
Pekerjaan Elektrikal Rp 3,166,431.82 0.195 Rp 3,166,431.82
Pekerjaan Sanitasi Rp 5,090,949.33 0.314 Rp 5,090,949.33
19
Pekerjaan Pengecatan Rp 6,753,981.20 0.417 Rp 6,753,981.20
Pekerjaan Lain-Lain Rp 2,481,732.91 0.153 Rp 2,481,732.91
TOTAL Rp 22,237,321.07 1.372 Rp 22,237,321.07
Pekerjaan Lantai Rp 14,232,677.44 0.878 Rp 14,232,677.44
Pekerjaan Sanitasi Rp 3,054,569.60 0.189 Rp 3,054,569.60
20
Pekerjaan Pengecatan Rp 4,052,388.72 0.250 Rp 4,052,388.72
TOTAL Rp 21,339,635.76 1.317 Rp 21,339,635.76
Pekerjaan Lantai Rp 4,744,225.81 0.293 Rp 4,744,225.81
21
TOTAL Rp 4,744,225.81 0.293 Rp 4,744,225.81
TOTAL Rp 1,620,261,903.29 100 Rp 1,620,261,903.29
Rekapitulasi Hasil Analisis Upah dan Bahan

Harga Hasil Analisis Harga Bid Price


No Deskripsi Kegiatan
Upah Bahan Total Bobot Upah Bahan Total Bobot
1 Pekerjaan Persiapan Rp 16,553,400.00 Rp 30,388,950.02 Rp 46,942,350.02 2.26% Rp 18,462,205.40 Rp 30,388,950.02 Rp 48,851,155.42 2.29%
2 Pekerjaan Tanah Rp 5,488,288.78 Rp - Rp 5,488,288.78 0.26% Rp 6,406,920.65 Rp - Rp 6,406,920.65 0.30%
3 Pekerjaan Pondasi Rp 14,360,363.64 Rp 54,531,505.83 Rp 68,891,869.46 3.31% Rp 16,712,186.50 Rp 54,531,505.83 Rp 71,243,692.32 3.34%
4 Pekerjaan Beton Rp 171,024,741.33 Rp 1,252,519,932.07 Rp 1,423,544,673.41 68.46% Rp 190,153,322.37 Rp 1,252,519,932.07 Rp 1,442,673,254.45 67.55%
5 Pekerjaan Dinding Rp 139,617,006.87 Rp 113,127,954.17 Rp 252,744,961.03 12.15% Rp 156,218,508.95 Rp 35,887,856.62 Rp 192,106,365.57 9.00%
6 Pekerjaan Kusen Rp 22,972,607.45 Rp 35,887,856.62 Rp 58,860,464.07 2.83% Rp 26,125,619.02 Rp 113,127,954.17 Rp 139,253,573.19 6.52%
7 Pekerjaan Lantai Rp 29,238,428.22 Rp 23,721,129.06 Rp 52,959,557.28 2.55% Rp 33,227,254.77 Rp 23,721,129.06 Rp 56,948,383.83 2.67%
8 Pekerjaan Atap Rp 11,151,816.77 Rp 10,842,120.80 Rp 21,993,937.57 1.06% Rp 12,573,095.20 Rp 10,842,120.80 Rp 23,415,216.01 1.10%
9 Pekerjaan Plafond Rp 25,053,423.92 Rp 38,167,378.67 Rp 63,220,802.59 3.04% Rp 28,491,016.09 Rp 38,167,378.67 Rp 66,658,394.76 3.12%
10 Pekerjaan Elektrikal Rp 3,514,508.33 Rp 13,932,300.00 Rp 17,446,808.33 0.84% Rp 3,965,217.30 Rp 13,932,300.00 Rp 17,897,517.30 0.84%
11 Pekerjaan Sanitasi Rp 5,498,088.64 Rp 30,545,696.01 Rp 36,043,784.64 1.73% Rp 6,516,133.66 Rp 30,545,696.01 Rp 37,061,829.66 1.74%
12 Pekerjaan Pengecatan Rp 13,760,639.76 Rp 10,806,369.92 Rp 24,567,009.68 1.18% Rp 15,403,610.01 Rp 10,806,369.92 Rp 26,209,979.92 1.23%
13 Pekerjaan Lain-Lain Rp 982,386.31 Rp 5,790,710.13 Rp 6,773,096.43 0.33% Rp 1,133,487.15 Rp 5,790,710.13 Rp 6,924,197.28 0.32%
Total Rp 459,215,700.00 Rp 1,620,261,903.29 Rp 2,079,477,603.29 100% Rp 515,388,577.08 Rp 1,620,261,903.29 Rp 2,135,650,480.37 100%

Berdasarkan Tabel Bid Price dan Analisis, maka:


Selisih total biaya = RAB Bid Price - RAB Hasil Analisis
Rp 2,135,650,480.37 - Rp 2,079,477,603
Rp 56,172,877.08

Keuntungan = Rp 56,172,877.08
x 100 = 2.63%
Rp 2,135,650,480.37
REKAPITULASI DENAH DURASI

Minggu ke-
Durasi Early Start 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

No Deskripsi Kegiatan Biaya (Upah + Bahan) Bobot 19 Agu - 24 Agu


26 Agu - 31 Agu2 Sep - 7 Sep 9 Sep - 14 Sep16 Sep - 21 Sep
23 Sep - 28 Sep30 Sep - 5 Okt 7 Okt - 12 Okt14 Okt - 19 Okt
21 Okt - 26 Okt28 Okt - 2 Nov 4 Nov - 8 Nov11 Nov - 16 Nov
18 Nov - 23 Nov25 Nov - 30 Nov 02 Des - 07 Des09 Des - 14 Des16 Des - 21 Des23 Des - 27 Des30 Des - 4 Jan 6 Jan - 7 Jan
ES (LF -
(CPM) (RK) ES (CPM) ES (RK)
Durasi)
6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 5 6 2
6 12 18 24 30 36 42 48 54 60 66 71 77 83 89 95 101 107 112 118 120
6.00
1 Pekerjaan Persiapan Rp 48,851,155.424 2.287% 6 6 0 0 0 6
6 6
6 4
2 Pekerjaan Tanah Rp 6,406,920.648 0.300% 10 21 6 6 100 6 6 6 3
1 6 3 10
6 6 6 3
3 Pekerjaan Pondasi Rp 71,243,692.324 3.336% 21 19 6 8 6 4 6 6 3
6 6 6 3 21
3 6 6 6 6 6 6 5 6 6 2
4 Pekerjaan Beton Rp 1,442,673,254.446 67.552% 58 58 27 27 27 3 6 6 6 6 6 6 5 6 6 2
3 6 6 6 6 6 6 5 6 6 2 58
3 6 6 6 6 6 6 5 3
5 Pekerjaan Dinding Rp 192,106,365.571 8.995% 47 47 27 48 48 6 6 6 5 6 6 6 6
6 6 6 5 6 6 6 6 47
6 6 3
6 Pekerjaan Kusen Rp 139,253,573.190 6.520% 15 15 95 95 95 6 6 3
6 6 3 15
2 6 2
7 Pekerjaan Lantai Rp 56,948,383.835 2.667% 10 10 110 110 110 2 6 2
2 6 2 10
4 6
8 Pekerjaan Atap Rp 23,415,216.006 1.096% 10 10 85 85 85 4 6
4 6 10
6 6 3
9 Pekerjaan Plafond Rp 66,658,394.761 3.121% 15 15 95 95 105 6 6 3
2 5 6 2 15
4 3
10 Pekerjaan Elektrikal Rp 17,897,517.300 0.838% 7 22 85 90 113 5 6 6 5
5 2 7
3 6 1
11 Pekerjaan Sanitasi Rp 37,061,829.663 1.735% 10 30 27 85 110 4 6 6 6 5 3
2 6 2 10
2 6
12 Pekerjaan Pengecatan Rp 26,209,979.922 1.227% 8 8 110 112 112 5 3
6 2 8
6 1
13 Pekerjaan Lain-Lain Rp 6,924,197.275 0.324% 7 7 95 103 113 4 3
5 2 7
JUMLAH Rp 2,135,650,480.365 100.000%
ES CPM dan Durasi CPM 6 12 10 6 12 18 13 12 12 12 12 10 9 6 10 27 13 6 4 12 2
Jumlah Bobot Biaya Rencana (Minggu) ES RK dan Durasi RK 6 10 12 12 9 6 6 6 12 12 12 10 12 12 16 35 24 22 20 12 2
ES (LF - Durasi) dan Durasi CPM 6 6 6 6 6 6 6 6 12 12 12 10 12 12 12 18 7 11 12 34 12
ES CPM dan Durasi CPM 6 18 28 34 46 64 77 89 101 113 125 135 144 150 160 187 200 206 210 222 224
Jumlah Bobot Biaya Rencana (Kumulatif) ES RK dan Durasi RK 6 16 28 40 49 55 61 67 79 91 103 113 125 137 153 188 212 234 254 266 268
ES (LF - Durasi) dan Durasi CPM 6 12 18 24 30 36 42 48 60 72 84 94 106 118 130 148 155 166 178 212 224

BANANA CURVE

Minggu ke-
Durasi Early Start 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

No Deskripsi Kegiatan Biaya (Upah + Bahan) Bobot 19 Agu - 2426


Agu
Agu - 31 Agu
2 Sep - 7 Sep
9 Sep - 14 16
SepSep - 2123
Sep
Sep - 28 Sep
30 Sep - 5 Okt
7 Okt - 12 14
OktOkt - 1921
Okt
Okt - 26 28
OktOkt - 2 Nov
4 Nov - 8 Nov
11 Nov - 1618
Nov
Nov - 23 Nov
25 Nov - 30 Nov
02 Des - 07 09
DesDes - 14 16
DesDes - 21 23
DesDes - 27 Des
30 Des - 4 Jan
6 Jan - 7 Jan
ES (LF -
(CPM) (RK) ES (CPM) ES (RK)
Durasi)
6 6 6 6 6 6 5 5 6 6 5 6 6 6 5 6 6 5 6 6 6
6 12 18 24 30 36 41 46 52 58 63 69 75 81 46 52 58 63 69 75 81
2.287% 1
1 Pekerjaan Persiapan Rp 48,851,155.424 2.287% 6 6 0 0 0 2.287% 2
2.287% 3
0.180% 0.120% 1
2 Pekerjaan Tanah Rp 6,406,920.648 0.300% 10 21 6 6 100 0.086% 0.086% 0.086% 0.043% 2
0.381% 2.287% 1.144% 3
0.953% 0.953% 0.953% 0.477% 1
3 Pekerjaan Pondasi Rp 71,243,692.324 3.336% 21 19 6 8 6 0.702% 1.053% 1.053% 0.527% 2
0.953% 0.953% 0.953% 0.477% 3
3.494% 6.988% 6.988% 6.988% 6.988% 6.988% 6.988% 5.823% 6.988% 6.988% 2.329% 1
4 Pekerjaan Beton Rp 1,442,673,254.446 67.552% 58 58 27 27 27 3.494% 6.988% 6.988% 6.988% 6.988% 6.988% 6.988% 5.823% 6.988% 6.988% 2.329% 2
3.494% 6.988% 6.988% 6.988% 6.988% 6.988% 6.988% 5.823% 6.988% 6.988% 2.329% 3
0.574% 1.148% 1.148% 1.148% 1.148% 1.148% 1.148% 0.957% 0.574% 1
5 Pekerjaan Dinding Rp 192,106,365.571 8.995% 47 47 27 48 48 1.148% 1.148% 1.148% 0.957% 1.148% 1.148% 1.148% 1.148% 2
1.148% 1.148% 1.148% 0.957% 1.148% 1.148% 1.148% 1.148% 3
2.608% 2.608% 1.304% 1
6 Pekerjaan Kusen Rp 139,253,573.190 6.520% 15 15 95 95 95 2.608% 2.608% 1.304% 2
2.608% 2.608% 1.304% 3
0.533% 1.600% 0.533% 1
7 Pekerjaan Lantai Rp 56,948,383.835 2.667% 10 10 110 110 110 0.533% 1.600% 0.533% 2
0.533% 1.600% 0.533% 3
0.439% 0.658% 1
8 Pekerjaan Atap Rp 23,415,216.006 1.096% 10 10 85 85 85 0.439% 0.658% 2
0.439% 0.658%
1.248% 1.248% 0.624% 1
9 Pekerjaan Plafond Rp 66,658,394.761 3.121% 15 15 95 95 105 1.248% 1.248% 0.624% 2
0.416% 1.040% 1.248% 0.416% 3
0.479% 0.359% 1
10 Pekerjaan Elektrikal Rp 17,897,517.300 0.838% 7 22 85 90 113 0.190% 0.229% 0.229% 0.190% 2
0.599% 0.239% 3
0.521% 1.041% 0.174% 1
11 Pekerjaan Sanitasi Rp 37,061,829.663 1.735% 10 30 27 85 110 0.231% 0.347% 0.347% 0.347% 0.289% 0.174% 2
0.347% 1.041% 0.347% 3
0.307% 0.920% 1
12 Pekerjaan Pengecatan Rp 26,209,979.922 1.227% 8 8 110 112 112 0.767% 0.460% 2
0.920% 0.307% 3
0.278% 0.046% 1
13 Pekerjaan Lain-Lain Rp 6,924,197.275 0.324% 7 7 95 103 113 0.185% 0.139% 2
0.232% 0.093% 3
JUMLAH Rp 2,135,650,480.365 100.000%
ES CPM dan Durasi CPM 2.287% 1.133% 1.073% 0.953% 5.065% 9.178% 8.310% 8.136% 8.136% 8.136% 8.136% 6.780% 7.562% 6.988% 3.247% 5.152% 3.903% 1.928% 0.840% 2.520% 0.533% 1
Jumlah Bobot Biaya Rencana (Minggu) ES RK dan Durasi RK 2.287% 0.788% 1.139% 1.139% 4.064% 6.988% 6.988% 6.988% 8.136% 8.136% 8.136% 6.780% 8.136% 8.136% 4.148% 6.200% 4.432% 2.689% 1.919% 2.234% 0.533% 2
ES (LF - Durasi) dan Durasi CPM 2.287% 0.953% 0.953% 0.953% 3.971% 6.988% 6.988% 6.988% 8.136% 8.136% 8.136% 6.780% 8.136% 8.136% 3.478% 3.756% 2.989% 4.008% 3.065% 2.670% 2.490% 3
ES CPM dan Durasi CPM 2.287% 3.421% 4.494% 5.447% 10.512% 19.690% 28.000% 36.136% 44.273% 52.409% 60.546% 67.326% 74.888% 81.876% 85.123% 90.275% 94.178% 96.106% 96.946% 99.467% 100.000%
Jumlah Bobot Biaya Rencana (Kumulatif) ES RK dan Durasi RK 2.287% 3.075% 4.215% 5.354% 9.417% 16.406% 23.394% 30.382% 38.518% 46.655% 54.791% 61.572% 69.708% 77.844% 81.992% 88.192% 92.625% 95.314% 97.233% 99.467% 100.000%
ES (LF - Durasi) dan Durasi CPM 2.287% 3.241% 4.194% 5.147% 9.117% 16.106% 23.094% 30.082% 38.218% 46.355% 54.491% 61.272% 69.408% 77.544% 81.022% 84.779% 87.768% 91.776% 94.840% 97.510% 100.000%

0% 2.287% 3.421% 4.494% 5.447% 10.512% 19.690% 28.000% 36.136% 44.273% 52.409% 60.546% 67.326% 74.888% 81.876% 85.123% 90.275% 94.178% 96.106% 96.946% 99.467% 100.000%
0% 2.287% 3.075% 4.215% 5.354% 9.417% 16.406% 23.394% 30.382% 38.518% 46.655% 54.791% 61.572% 69.708% 77.844% 81.992% 88.192% 92.625% 95.314% 97.233% 99.467% 100.000%
0% 2.287% 3.241% 4.194% 5.147% 9.117% 16.106% 23.094% 30.082% 38.218% 46.355% 54.491% 61.272% 69.408% 77.544% 81.022% 84.779% 87.768% 91.776% 94.840% 97.510% 100.000%

Keterangan
ES (LF - Durasi) dan Durasi CPM
ES RK dan Durasi RK
ES CPM dan Durasi CPM

Anda mungkin juga menyukai