NO. URAIAN PEKERJAAN JUMLAH BIAYA (Rp.)

A. PEKERJAAN FASILITAS PENDUKUNG


A.1 PEMBANGUNAN TOILET
I. PEKERJAAN TANAH 2,833,230.00
II. PEKERJAAN PASANGAN DAN PLESTERAN 38,564,317.08
III. PEKERJAAN BETON 25,409,328.38
IV. PEKERJAAN KERAMIK 20,845,585.53
V. PEKERJAAN KUSEN DAN PINTU 10,588,702.22
VI. PEKERJAAN SANITASI 11,248,757.75
VII. PEKERJAAN INSTALASI LISTRIK 11,238,000.00
VIII. PEKERJAAN PLAFOND 11,538,671.20
IX. PEKERJAAN PENGECATAN 6,704,463.25
X. PEKERJAAN ATAP 21,302,150.00
XI. PEKERJAAN LAIN-LAIN 2,250,000.00
SUB TOTAL A.1

A.2 PEKERJAAN TAMAN 3,700,000.00


SUB TOTAL A.2

B. PEKERJAAN SALURAN
I. PEKERJAAN TANAH 33,906,060.00
II. PEKERJAAN BETON 1,111,998,382.25
SUB TOTAL B

C. PEKERJAAN PENATAAN PENERANGAN LINGKUNGAN


I. PEKERJAAN PASANG LISTRIK 76,585,000.00
II. PEKERJAAN PEMASANGAN & PEMBELIAN 133,200,000.00
III. PEKERJAAN PENATAAN PJU 290,334,864.70
IV. PEKERJAAN RUMAH GENSET 31,488,802.16
SUB TOTAL C

JUMLAH
PPN 10%
JUMLAH + PPN 10%
TOTAL DIBULATKAN

#REF!
#REF!

#REF!
#REF!
REKAPITULASI

JUMLAH BIAYA (Rp.)

162,523,205.41

3,700,000.00

1,145,904,442.25
531,608,666.86

1,843,736,314.52
184,373,631.45
2,028,109,945.97
2,028,109,000.00
RENCANA ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

Satuan
NO Jenis Barang/Jasa Volume
Unit

A. PEKERJAAN FASILITAS PENDUKUNG 1.00


A.1 PEMBANGUNAN TOILET UMUM 1.00
I. PEKERJAAN TANAH 1.00
1 Pek.Galian Tanah m3 18.80
2 Pek.Urugan Tanah Kembali m3 5.93
3 Pek.Urugan Tanah Baru Peninggian Peil m3 7.24
4 Pek.Urugan Pasir 1.00
a. Urugan Pasir Bawah Pondasi m3 1.05
b. Urugan Pasir Bawah Lantai Keramik m3 2.64
c. Urugan Pasir Bawah Rabat Selasar m3 0.57
Sub Total 1.00

II. PEKERJAAN PASANGAN DAN PLESTERAN 1.00


1 Pek.Pasangan Batu Kosong / Anstamping m3 4.19
2 Pek.Pasangan Batu Kali 1 SP 6 PP m3 12.56
3 Pek.Pasangan Tasram 1.00
a. Pasangan Batu Bata 1 SP 4 PP Tebal 1/2 Bata m2 9.52
b. Plesteran 1 SP 4 PP Tebal 15 mm m2 19.05
c. Acian m2 19.05
4 Pek.Pasangan Dinding 1.00
a. Pasangan Batu Bata 1 SP 6 PP Tebal 1/2 Bata m2 72.81
b. Plesteran 1 SP 6 PP Tebal 15 mm m2 143.57
c. Acian m2 143.57
5. Pek.Pasangan Rollag 1.00
a. Pasangan Batu Bata 1 SP 4 PP Tebal 1/2 Bata m2 19.30
b. Plesteran 1 SP 4 PP Tebal 15 mm m2 15.60
c. Acian m2 15.60
6 Pek.Skonengan Sudut m' 124.64
7. Pek.Pasang Rooster Beton 10 x 20 cm Polos bh 12.00
Sub Total 1.00

III. PEKERJAAN BETON 1.00


1 Pek.Sloof Praktis 12 x 18 cm 1.00
a. Bekisting m2 11.83
b. Pembesian kg 147.17
c. Beton Cor ( Mutu K-175 ) m3 0.71
2 Pek.Kolom Praktis 12 x 12 cm 1.00
a. Bekisting m2 14.66
b. Pembesian kg 216.03
c. Beton Cor ( Mutu K-175 ) m3 0.88
3 Pek.Balok Latiu Atas Kusen 12 x 15 cm 1.00
a. Bekisting m2 9.69
b. Pembesian kg 99.76
c. Beton Cor ( Mutu K-175 ) m3 0.42
4 Pek.Plat Beton Topi - Topi Tebal 10 cm 1.00
a. Bekisting m2 3.14
b. Pembesian kg 20.33
c. Beton Cor ( Mutu K-175 ) m3 0.31
5 Pek.Ring Balk 12 x 18 cm 1.00
a. Bekisting m2 19.94
b. Pembesian kg 234.07
c. Beton Cor ( Mutu K-175 ) m3 1.20
6 Pek.Meja Beton 1.00
Meja Beton Tebal 10 cm 1.00
a. Bekisting m2 2.66
b. Pembesian kg 14.12
c. Beton Cor ( Mutu K-175 ) m3 0.27
Balok Latiu 12 x 15 cm 1.00
a. Bekisting m2 2.16
b. Pembesian kg 23.16
c. Beton Cor ( Mutu K-175 ) m3 0.13
7 Pek.Beton Lantai Kerja Bawah Keramik m3 0.89
8 Pek.Rabat Beton Selasar m3 2.06
Sub Total 1.00

IV. PEKERJAAN KERAMIK 1.00


1 Pek.Pasangan Lantai Keramik 25 x 25 cm Anti Selip m2 24.44
2 Pek.Pasangan Dinding Keramik 25 x 40 cm m2 60.83
3 Pek.Pasangan Lantai Keramik Meja Beton 40 x 40 cm Polos m2 3.71
Putih
4 Pek.Pasangan List Dinding Keramik 10 x 40 cm m' 46.64
Sub Total 1.00

V. PEKERJAAN KUSEN DAN PINTU 1.00


1 Pek.Kusen Alumunium Polos m' 40.72
2 Pek.Kaca Bening Tebal 5 mm m2 2.36
3 Pek.Kaca Cermin Tebal 5 mm m2 6.90
4 Pek.Daun Pintu KM Alumunium Strip ( 70 x 210 cm ) + unit 4.00
Asessories

Sub Total 1.00

VI. PEKERJAAN SANITASI 1.00


1 Pek.Instalasi Pipa Air Bersih PVC 3/4 m' 21.40
2 Pek.Instalasi Pipa Air Kotor PVC 2 m' 14.50
3 Pek.Instalasi Pipa Saluran Tinja PVC 4 m' 8.00
4 Pek.Memasang Closet Jongkok ( Setara INA ) bh 4.00
5 Pek.Floordrain Stainless Steel bh 4.00
6 Pek.Memasang Washtafle Keramik + Asessories ( Setara INA ) bh 4.00

7 Pek.Kran Air Stailess Steel bh 8.00


8 Pek.Ember bh 4.00
9 Pek.Septicktank dan Peresapan unit 1.00
Sub Total 1.00

VII. PEKERJAAN INSTALASI LISTRIK 1.00


1 Pek.MCB unit 2.00
2 Pek.Instalasi Listrik ttk 20.00
3 Pek.Saklar Ganda unit 2.00
4 Pek.Saklar Tunggal unit 6.00
5 Pek.Lampu SL Philips 18 Watt unit 16.00
Sub Total 1.00

VIII. PEKERJAAN PLAFOND 1.00


1 Pek.Rangka Besi Hollow 1 x 35.35.1,5 mm, Untuk Plafond m2 51.76
2 Pek.Langit - Langit Kalsi Board, Uk. ( 120 x 240 ) Tebal 3,5 mm m2 51.76

3 Pek.List Langit - Langit Profil Gypsum ( Besar ) m' 68.60


Sub Total 1.00

IX. PEKERJAAN PENGECATAN 1.00


1 Pek.Cat Dinding ( Kualitas B ) Interior Setara Catylac m2 106.90
2 Pek.Cat Dinding ( Kualitas A ) Eksterior Setara Mowylex m2 77.09
3 Pek.Cat Plafond ( Kualitas B ) Setara Catylac m2 51.76
Sub Total 1.00

X. PEKERJAAN ATAP 1.00


1 Pek.Rangka Atap Baja Ringan m2 63.52
2 Pek.Penutup Atap Cellulose Bitumen 3 mm m2 68.46
Monolayer Model Tile Warna Dual Red 3D 1.00
3 Pek.Listplank GRC Lebar 20 cm Finishing Cat Minyak m' 44.80
Sub Total 1.00

XI. PEKERJAAN LAIN-LAIN 1.00


1 Pek.Uitzet / Pengukuran dan Bouwplank ls 1.00
2 Pek.Pembersihan Lokasi ls 1.00
3 Pek.Papan Nama Kegiatan ls 1.00
Sub Total 1.00
Sub Total A.1 1.00

A.2 PEKERJAAN TAMAN 1.00


1 Pek.Rumput Gajah + Tanam & Pupuk m2 20.00
2 Pek.Pohon Angsanan + tanam & Pupuk bh 2.00
3 Pek.Pohon Palm Ekor tupai + tanam & Pupuk bh 2.00
4 Pek.Pohon Cemara udang + tanam & Pupuk bh 2.00
Sub Total A.2 1.00
Sub Total A.1. + A.2. 1.00

B. PEKERJAAN SALURAN 1.00


I. PEKERJAAN TANAH 1.00
1 Pek.Galian Tanah m3 468.98
2 Pek.Urugan Tanah Kembali m3 156.33
3 Pek.Urugan Pasir Bawah Lantai beton m3 26.05
Sub Total 1.00

II. PEKERJAAN BETON 1.00


1 Pek.Saluran Beton 1.00
a. Bekisting dinding beton (2 x pakai) m2 1,823.80
b. Pembesian kg 51,942.71
c. Beton Cor Dinding Saluran ( Mutu K-175 ) m3 136.79
d. Beton Cor Lantai Saluran ( Mutu K-175 ) m3 52.11
Sub Total 1.00
Sub Total B 1.00

C. PEKERJAAN PENATAAN PENERANGAN LINGKUNGAN 1.00


I. PEKERJAAN PASANG LISTRIK 1.00
1 PB (Pasang Baru) PLN VA 53,000.00
2 UJL (Uang Jaminan Langganan) PLN VA 53,000.00
3 SLO (Sertifikat Lain Operasi) VA 53,000.00
4 Admisnistrasi Instalatir VA 53,000.00
Sub Total 1.00

II. PEKERJAAN PEMASANGAN & PEMBELIAN 1.00


1 Genset 40 KVA Unit 1.00
2 Pembuatan Panel MDP Unit 1.00
3 Pembuatan Panel ATS Unit 1.00
4 NYY 4 x 70 mm2 m' 25.00
5 Pemasangan Panel MDP & ATS Unit 2.00
Sub Total 1.00

III. PEKERJAAN PENATAAN PJU 1.00


1 Pek.Pasang Pondasi Tiang Lampu Bh 30.00
2 Pek.Pasang Tiang Lampu Bh 30.00
3 Pek.Pasang Kabel NYY 4 x 6 mm m' 1,655.00
4 Pek.Pasang Kabel NYM 3 x 2,5 mm m' 240.00
5 Pek.PHB Panel Distribusi unit 1.00
6 Pek.Pemasangan & Lampu LED BRP 210 LED36/CW 27W bh 30.00
7 Pek.Pemasangan MCB bh 30.00
Sub Total 1.00

IV. PEKERJAAN RUMAH GENSET 1.00


1 Pek.Galian tanah m3 4.29
2 Pek.Urugan tanah kembali m3 1.07
3 Pek.Urugan Pasir bawah pondasi m3 0.33
4 Pek.Urugan Pasir bawah lantai m3 0.38
5 Pek.Urugan Tanah Baru Peninggian Peil m3 1.50
6 Pek.Pasangan Batu Kosong / Anstamping m3 1.32
7 Pek.Pasangan Batu Kali 1 SP 6 PP m 2.97
8 Pek.Pasangan Dinding 1.00
a. Pasangan Batu Bata 1 SP 6 PP Tebal 1/2 Bata m2 6.80
b. Plesteran 1 SP 6 PP Tebal 15 mm m2 13.60
c. Acian m2 13.60
9 Pek.Sloof Praktis 15 x 20 cm 1.00
a. Bekisting m2 2.20
b. Pembesian kg 43.20
c. Beton Cor ( Mutu K-175 ) m3 0.33
10 Pek.Lantai beton 1.00
a. Pembesian kg 96.10
b. Beton Cor ( Mutu K-175 ) m3 1.50
11 Pek.Beton Lantai Kerja Bawah Keramik m3 0.38
12 Pek.Dinding besi hollow m2 14.45
13 Pek.Pintu besi hollow m2 6.25
14 Pek.Atap Galvalum Rangka besi hollow m2 22.52
Sub Total 1.00
Sub Total C 1.00
A ANGGARAN BIAYA

Harga Jumlah Biaya

51,000.00 958,800.00
17,000.00 100,810.00
79,400.00 574,856.00
-
281,400.00 295,470.00
281,400.00 742,896.00
281,400.00 160,398.00
2,833,230.00

466,680.00 1,955,389.20
817,875.00 10,272,510.00

120,687.50 1,148,945.00
44,542.00 848,525.10
23,351.25 444,841.31

118,256.00 8,610,219.36
42,992.80 6,172,476.30
23,351.25 3,352,538.96

120,687.50 2,329,268.75
44,542.00 694,855.20
23,351.25 364,279.50
17,622.50 2,196,468.40
14,500.00 174,000.00
38,564,317.08
139,730.00 1,653,005.90
11,839.00 1,742,345.63
956,984.44 679,458.96

180,940.00 2,652,580.40
11,839.00 2,557,579.17
956,984.44 842,146.31

148,665.00 1,440,563.85
11,839.00 1,181,058.64
956,984.44 401,933.47

167,040.00 524,505.60
11,839.00 240,686.87
956,984.44 296,665.18

156,940.00 3,129,383.60
11,839.00 2,771,154.73
956,984.44 1,148,381.33

167,040.00 444,326.40
11,839.00 167,166.68
956,984.44 258,385.80

148,665.00 321,116.40
11,839.00 274,191.24
956,984.44 124,407.98
867,215.00 771,821.35
867,215.00 1,786,462.90
25,409,328.38

198,020.00 4,839,608.80
207,302.50 12,610,211.08
161,015.00 597,365.65

60,000.00 2,798,400.00
20,845,585.53
131,411.00 5,351,055.92
139,892.50 330,146.30
175,000.00 1,207,500.00
925,000.00 3,700,000.00

10,588,702.22

20,453.75 437,710.25
69,915.00 1,013,767.50
85,360.00 682,880.00
409,950.00 1,639,800.00
32,500.00 130,000.00
1,118,650.00 4,474,600.00

72,500.00 580,000.00
72,500.00 290,000.00
2,000,000.00 2,000,000.00
11,248,757.75

110,000.00 220,000.00
145,000.00 2,900,000.00
17,000.00 34,000.00
14,000.00 84,000.00
500,000.00 8,000,000.00
11,238,000.00

135,520.00 7,014,515.20
42,000.00 2,173,920.00

34,260.00 2,350,236.00
11,538,671.20

18,727.00 2,001,916.30
48,427.00 3,733,237.43
18,727.00 969,309.52
6,704,463.25
137,500.00 8,734,000.00
152,500.00 10,440,150.00
-
47,500.00 2,128,000.00
21,302,150.00

1,500,000.00 1,500,000.00
500,000.00 500,000.00
250,000.00 250,000.00
2,250,000.00
162,523,205.41

35,000.00 700,000.00
375,000.00 750,000.00
475,000.00 950,000.00
650,000.00 1,300,000.00
3,700,000.00
166,223,205.41

51,000.00 23,917,980.00
17,000.00 2,657,610.00
281,400.00 7,330,470.00
33,906,060.00

173,415.00 316,274,277.00
11,839.00 614,949,743.69
956,984.44 130,905,902.16
956,984.44 49,868,459.40
1,111,998,382.25
1,145,904,442.25

1,050.00 55,650,000.00
200.00 10,600,000.00
20.00 1,060,000.00
175.00 9,275,000.00
76,585,000.00

64,750,000.00 64,750,000.00
17,250,000.00 17,250,000.00
19,500,000.00 19,500,000.00
700,000.00 17,500,000.00
7,100,000.00 14,200,000.00
133,200,000.00

692,158.63 20,764,758.90
2,724,642.86 81,739,285.80
71,384.00 118,140,520.00
21,640.00 5,193,600.00
3,903,300.00 3,903,300.00
1,905,640.00 57,169,200.00
114,140.00 3,424,200.00
290,334,864.70

51,000.00 218,790.00
17,000.00 18,190.00
281,400.00 92,862.00
281,400.00 106,932.00
79,400.00 119,100.00
466,680.00 616,017.60
817,875.00 2,429,088.75

118,256.00 804,140.80
42,992.80 584,702.08
23,351.25 317,577.00
-
139,730.00 307,406.00
11,839.00 511,444.80
956,984.44 315,804.87

11,839.00 1,137,727.90
956,984.44 1,435,476.67
867,215.00 329,541.70
550,000.00 7,947,500.00
650,000.00 4,062,500.00
450,000.00 10,134,000.00
31,488,802.16
531,608,666.86

#REF!
#REF!

#REF!
#REF!
DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN :

PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN SAT

1 Menggali Tanah Biasa Sedalam 1 m m3


2 Pengurugan Kembali m3
3 Urugan tanah baru padat m3
4 Urugan Pasir m3
5 Pemasang Batu Kosong/Anstamping m3
6 Pasangan Batu Kali 1SP : 6 PP m3
7 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. m2
1SP : 4PP

8 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm m2


9 Pemasangan Acian m2
10 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. m2
1SP : 6PP

11 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm m2


12 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m'
14 Memasang Bekisting untuk Sloof m2
15 Pembesian dg Besi Polos atau Besi Ulir kg
16 Membuat beton mutu f’c = 14,5 Mpa (K175), slump (120 ± 20) mm m3
17 Memasang Bekisting untuk Kolom Praktis m2
18 Memasang Bekisting untuk Balok latiu m2
19 Memasang Bekisting untuk Topi-topi m2
20 Memasang Bekisting untuk Ring balok m2
22 Membuat Beton mutu f’c = 7,4 MPa (K 100) m3
23 Pemasangan Lantai Keramik Antislip 25 x 25 cm m2
24 Pemasangan Dinding Keramik 25x40 cm m2
25 Pemasangan lantai keramik 40 x 40 cm m2
NO. URAIAN PEKERJAAN SAT

26 Pemasangan Kusen Pintu Allumunium Polos m'


27 Pemasangan Kaca bening tebal 5 mm m2
28 Pemasangan Pipa PVC tipe AW Ø ¾" m'
29 Pemasangan Pipa PVC tipe AW Ø 2" m'
30 Pemasangan Pipa PVC tipe AW Ø 4" m'
31 Memasang Closet Jongkok Porselen ( setara INA ) Unit
32 Memasang Wastafel Unit
33 Pemasangan rangka hollow galvanis, untuk plafon m2
34 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup m2
Kualitas B)

35 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup m2
Kualitas A)
NO. URAIAN PEKERJAAN SAT

36 Memasang Langit-langit Kalsi Board, Uk (120x240) tebal 9 mm m2


37 List Langit-Langit Profil gypsum (besar) m'
38 Memasang Bekisting untuk Dinding 2 X Pakai m2
39 1 bh Pasang Pondasi Tiang Lampu Bh
40 1 bh Pasang Tiang Lampu Bh
41 1 m' Pasang Kabel NYY 4 x 6 mm m'
42 1 m' Pasang Kabel NYM 3 x 2,5 mm m'
43 PHB : Panel Distribusi unit
44 Pemasangan & Lampu LED BRP 210 LED36/CW 27W bh
45 Pemasangan 1 bh MCB bh

#REF!
#REF!

#REF!
#REF!
HARGA SATUAN
PEKERJAAN

(Rp)

51,000.00
17,000.00
79,400.00
281,400.00
466,680.00
817,875.00
120,687.50

44,542.00
23,351.25
118,256.00

42,992.80
17,622.50
139,730.00
11,839.00
956,984.44
180,940.00
148,665.00
167,040.00
156,940.00
867,215.00
198,020.00
207,302.50
161,015.00
HARGA SATUAN
PEKERJAAN

(Rp)
131,411.00
139,892.50
20,453.75
69,915.00
85,360.00
409,950.00
1,118,650.00
135,520.00
18,727.00

48,427.00
HARGA SATUAN
PEKERJAAN

(Rp)
42,000.00
34,260.00
173,415.00
692,158.63
2,724,642.86
71,384.00
21,640.00
3,903,300.00
1,905,640.00
114,140.00
ANALISA BIAYA PEKERJAAN LISTRIK

HARGA SATUAN
NO. URAIAN KOEF. SAT.
(Rp.)
1 3 4 5 6

1 1 bh Pasang Pondasi Tiang Lampu


Galian tanah pondasi 0.6720 m3 51,000.00
Urugan tanah kembali 0.1570 m3 17,000.00
Urugan Pasir bawah pondasi 0.0250 m3 281,400.00
Pas. Batu Kali 1 Pc : 6 PS 0.3620 m3 466,680.00
Plesteran 1:4 0.3300 m2 44,542.00
Acian 0.3300 m2 23,351.25
Beton (K-175) 0.1600 m3 956,984.44
Bekisting 0.3200 m2 139,730.00
Besi beton 9.4640 kg 11,839.00
Mur baut 4.0000 bh 10,000.00
Sewa Crane 0.2500 jam 375,000.00
Pekerja 0.0714 org 65,000.00
Mandor 0.0357 org 90,000.00
Operator 0.0357 org 150,000.00

Jumlah

2 1 bh Pasang Tiang Lampu


Tiang PJU 7 meter, 5 " 4" 3" 2" (type parabole) 1.0000 unit 2,500,000.00
Sewa Crane 0.5000 jam 375,000.00
Tukang listrik 0.0714 OH 150,000.00
Pekerja 0.1429 OH 65,000.00
Mandor 0.0714 OH 90,000.00
Operator 0.0714 OH 150,000.00

Jumlah

3 1 m' Pasang Kabel NYY 4 x 6 mm


Galian Tanah 0.0440 m3 51,000.00
Kabel NYY 4 x 6 mm 1.0000 m' 65,000.00
Tukang listrik 0.0240 OH 150,000.00
Mandor 0.0060 OH 90,000.00

Jumlah

4 1 m' Pasang Kabel NYM 3 x 2,5 mm


Kabel NYM 3 x 2,5 mm 1.0000 m' 17,500.00
Tukang listrik 0.0240 org 150,000.00
Mandor 0.0060 org 90,000.00

Jumlah
HARGA SATUAN
NO. URAIAN KOEF. SAT.
(Rp.)
1 3 4 5 6

5 PHB : Panel Distribusi


Box panel 20 x 50 x 70 cm tebal 1,5 mm outdoor 1.0000 unit 1,200,000.00
Elektronik kontaktor 35 amp mitsubishi 1.0000 bh 1,100,000.00
Switch timer panasonic 1.0000 bh 750,000.00
MCB 20 Amp sneider 1.0000 bh 75,000.00
MCB 10 Amp sneider 1.0000 bh 45,000.00
Rel MCB 0.4000 m' 35,000.00
Terminal kabel 16 mm 4 strip 1.0000 bh 60,000.00
Murbaut 12mm x 5 cm 10.0000 bh 1,750.00
Pipa PVC 1/5 inch 8.0000 m' 2,850.00
Grounding 10 mm 1.0000 bh 90,000.00
Pilot lamp 3.0000 bh 15,000.00
Sekring kubur 3.0000 bh 20,000.00
Kabel NYAHY 0,75 mm 8.0000 m' 4,250.00
Tukang listrik 2.0000 org 150,000.00
Mandor 1.0000 org 90,000.00

Jumlah
HARGA SATUAN
NO. URAIAN KOEF. SAT.
(Rp.)
1 3 4 5 6

6 Pemasangan & Lampu LED BRP 210 LED36/CW 27W


Lampu LED BRP 210 LED36/CW 27W 1.0000 unit 1,750,000.00
Isolasi 0.0390 bh 10,000.00
Sewa Crane 0.1500 jam 375,000.00
Tukang listrik 0.5000 org 150,000.00
mandor 0.1000 org 90,000.00
Operator 0.1000 org 150,000.00

Jumlah

7 Pemasangan 1 bh MCB
MCB sneider 1.0000 bh 75,000.00
Box MCB 1.0000 bh 35,000.00
Tukang listrik 0.0240 org 150,000.00
Mandor 0.0060 org 90,000.00

Jumlah

#REF!
#REF!

#REF!
#REF!
IAYA PEKERJAAN LISTRIK

JUMLAH HARGA
(Rp.)
7=(4X6)

34,272.00
2,669.00
7,035.00
168,938.16
14,698.86
7,705.91
153,117.51
44,713.60
112,044.30
40,000.00
93,750.00
4,642.86
3,214.29
5,357.14

692,158.63

2,500,000.00
187,500.00
10,714.29
9,285.71
6,428.57
10,714.29

2,724,642.86

2,244.00
65,000.00
3,600.00
540.00

71,384.00

17,500.00
3,600.00
540.00

21,640.00
JUMLAH HARGA
(Rp.)
7=(4X6)

1,200,000.00
1,100,000.00
750,000.00
75,000.00
45,000.00
14,000.00
60,000.00
17,500.00
22,800.00
90,000.00
45,000.00
60,000.00
34,000.00
300,000.00
90,000.00

3,903,300.00
JUMLAH HARGA
(Rp.)
7=(4X6)

1,750,000.00
390.00
56,250.00
75,000.00
9,000.00
15,000.00

1,905,640.00

75,000.00
35,000.00
3,600.00
540.00

114,140.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN :

PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

1 1.000 m3 Menggali Tanah Biasa Sedalam 1 m

A TENAGA
0.750 OH Pekerja 65,000.00
0.025 OH Mandor 90,000.00

Jumlah

2 1.000 m3 Pengurugan Kembali


Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian

3 1.000 m3 Urugan tanah baru padat

A. TENAGA
0.100 OH Pekerja 65,000.00
0.010 OH Mandor 90,000.00
B. BAHAN
1.200 m3 Tanah urug 60,000.00

Jumlah

4 1.000 m3 Urugan Pasir

A TENAGA
0.300 OH Pekerja 65,000.00
0.010 OH Mandor 90,000.00
B BAHAN
1.200 m3 Pasir Urug 217,500.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

5 1.000 m3 Pemasang Batu Kosong/Anstamping

A Tenaga
0.780 OH Pekerja 65,000.00
0.390 OH Tukang Batu 80,000.00
0.039 OH Kepala Tukang 90,000.00
0.039 OH Mandor 90,000.00
B Bahan
1.200 m3 Batu Belah 236,500.00
0.432 m3 Pasir Urug 217,500.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

6 1.000 m3 Pasangan Batu Kali 1SP : 6 PP

A TENAGA
1.500 OH Pekerja 65,000.00
0.750 OH Tukang Batu 80,000.00
0.075 OH Kepala Tukang 90,000.00
0.075 OH Mandor 90,000.00
B BAHAN
1.200 m3 Batu Belah 236,500.00
117.000 Kg Portland Sement 1,425.00
0.561 m3 Pasir Muntilan 350,000.00

Jumlah

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2


7 1.000 m2
Bata Camp. 1SP : 4PP
A Tenaga
0.300 OH Pekerja 65,000.00
0.100 OH Tukang Batu 80,000.00
0.010 OH Kepala Tukang 90,000.00
0.015 OH Mandor 90,000.00
B Bahan
70.000 Buah Bata Merah 5 x 11 x 22 850.00
11.500 Kg Portland Semen 1,425.00
0.043 m3 Pasir Muntilan 350,000.00

Jumlah

8 1.000 m2 Pemasangan Plesteran 1 SP : 4 Pp Tebal 15 mm

A Tenaga
0.200 OH Pekerja 65,000.00
0.150 OH Tukang batu 80,000.00
0.015 OH Kepala Tukang 90,000.00
0.010 OH Mandor 90,000.00
B Bahan
6.240 Kg Semen Portland 1,425.00
0.024 m3 Pasir Muntilan 350,000.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

9 1.000 m2 Pemasangan Acian

A Tenaga
0.140 OH Pekerja 65,000.00
0.100 OH Tukang batu 80,000.00
0.010 OH Kepala Tukang 90,000.00
0.008 OH Mandor 90,000.00
B Bahan
3.250 Kg Semen Portland 1,425.00

Jumlah

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2


10 1.000 m2
Bata Camp. 1SP : 6PP
A Tenaga
0.300 OH Pekerja 65,000.00
0.100 OH Tukang Batu 80,000.00
0.010 OH Kepala Tukang 90,000.00
0.015 OH Mandor 90,000.00
B Bahan
70.000 Buah Bata Merah 5 x 11 x 22 850.00
8.320 Kg Portland Semen 1,425.00
0.049 m3 Pasir Muntilan 350,000.00

Jumlah

11 1.000 m2 Pemasangan Plesteran 1 SP : 6 Pp Tebal 15 mm

A Tenaga
0.200 OH Pekerja 65,000.00
0.150 OH Tukang batu 80,000.00
0.015 OH Kepala Tukang 90,000.00
0.010 OH Mandor 90,000.00
B Bahan
4.416 Kg Semen Portland 1,425.00
0.027 m3 Pasir Muntilan 350,000.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

12 1.000 m' Pemasangan Plesteran Skoning 1 SP : 2Pp, lebar 10 mm

A Tenaga
0.080 OH Pekerja 65,000.00
0.040 OH Tukang batu 80,000.00
0.040 OH Kepala Tukang 90,000.00
0.004 OH Mandor 90,000.00
B Bahan
0.500 Kg Semen Portland 1,425.00
0.013 m3 Pasir Muntilan 350,000.00

Jumlah

14 1.000 m2 Memasang Bekisting untuk Sloof

A Tenaga
0.520 OH Pekerja 65,000.00
0.260 OH Tukang Kayu 80,000.00
0.026 OH Kepala Tukang 90,000.00
0.026 OH Mandor 90,000.00
B Bahan
0.020 m3 Kayu Klas III 3,750,000.00
0.300 Kg Paku Biasa 2" - 5" 14,000.00
0.100 Ltr Minyak Bekisting 12,500.00

Jumlah

15 10.000 Kg Pembesian dg Besi Polos atau Besi Ulir

A Tenaga
0.070 OH Pekerja 65,000.00
0.070 OH Tukang Besi 80,000.00
0.007 OH Kepala Tukang 90,000.00
0.004 OH Mandor 90,000.00
B Bahan
10.500 Kg Besi Beton (polos/ulir) 10,000.00
0.150 Kg Kawat Beton 15,000.00

Jumlah
Harga Satuan Pekerjaan PER-1 KG (F/10)
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

Membuat beton mutu f’c = 14,5 Mpa (K175), slump (120 ± 20)
16 1.000 m3
mm
A Tenaga
1.650 OH Pekerja 65,000.00
0.275 OH Tukang Batu 80,000.00
0.028 OH Kepala Tukang 90,000.00
0.083 OH Mandor 90,000.00
B Bahan
326.000 Kg Semen Portland 1,425.00
760.000 kg Pasir Beton Muntilan 250.00
1,029.000 kg Kerikil (maksimum 30 mm) 148.15
215.000 ltr Air 50.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

17 1.000 m2 Memasang Bekisting untuk Kolom Praktis

A Tenaga
0.660 OH Pekerja 65,000.00
0.330 OH Tukang Kayu 80,000.00
0.033 OH Kepala Tukang 90,000.00
0.033 OH Mandor 90,000.00
B Bahan
0.020 m3 Kayu Klas III 3,750,000.00
0.300 Kg Paku Biasa 2" - 5" 14,000.00
0.200 Ltr Minyak Bekisting 12,500.00
2.000 Btg Bambu ө 8 -10 PJ. 4 m 12,000.00

Jumlah

18 1.000 m2 Memasang Bekisting untuk Balok latiu

A Tenaga
0.660 OH Pekerja 65,000.00
0.330 OH Tukang Kayu 80,000.00
0.033 OH Kepala Tukang 90,000.00
0.033 OH Mandor 90,000.00
B Bahan
0.200 Kg Paku Biasa 2" - 5" 14,000.00
0.100 Ltr Minyak Bekisting 12,500.00
0.009 m3 Balok Kayu sengon 3,750,000.00
0.175 Lbr Plywood tebal 9mm 135,000.00
1.000 Btg Bambu ө 8 -10 PJ. 4 m 12,000.00

Jumlah

19 1.000 m2 Memasang Bekisting untuk Topi-topi

A Tenaga
0.660 OH Pekerja 65,000.00
0.330 OH Tukang Kayu 80,000.00
0.033 OH Kepala Tukang 90,000.00
0.033 OH Mandor 90,000.00
B Bahan
0.200 Kg Paku Biasa 2" - 5" 14,000.00
0.100 Ltr Minyak Bekisting 12,500.00
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT
0.008 m3 Balok Kayu Klas III 3,750,000.00
0.175 Lbr Plywood 9 mm ( 120 x 244 ) 135,000.00
3.000 Btg Bambu e 8 - 10 PJ. 4 m 12,000.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

20 1.000 m2 Memasang Bekisting untuk Ring balok

A Tenaga
0.660 OH Pekerja 65,000.00
0.330 OH Tukang Kayu 80,000.00
0.033 OH Kepala Tukang 90,000.00
0.033 OH Mandor 90,000.00
B Bahan
0.020 m3 Kayu Klas III 3,750,000.00
0.300 Kg Paku Biasa 2" - 5" 14,000.00
0.200 Ltr Minyak Bekisting 12,500.00

Jumlah

22 1.000 m3 Membuat Beton mutu f’c = 7,4 MPa (K 100)

A Tenaga
1.650 OH Pekerja 65,000.00
0.275 OH Tukang Batu 80,000.00
0.028 OH Kepala Tukang 90,000.00
0.083 OH Mandor 90,000.00
B Bahan
247.000 Kg Semen Portland 1,425.00
869.000 kg Pasir Beton Muntilan 250.00
999.000 kg Kerikil (maksimum 30 mm) 148.15
215.000 ltr Air 50.00

Jumlah

23 1.000 m2 Pemasangan Lantai Keramik Antislip 25 x 25 cm

A Tenaga
0.700 OH Pekerja 65,000.00
0.350 OH Tukang Batu 80,000.00
0.035 OH Kepala Tukang 90,000.00
0.035 OH Mandor 90,000.00
B Bahan
17.600 Buah Keramik Antislip 25 x 25 cm 4,750.00
10.400 Kg Portland Semen 1,425.00
1.620 Kg Semen Warna 2,500.00
0.045 m3 Pasir Muntilan 350,000.00
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

24 1.000 m2 Pemasangan Dinding Keramik 25x40 cm

A Tenaga
0.900 OH Pekerja 65,000.00
0.450 OH Tukang Batu 80,000.00
0.045 OH Kepala Tukang 90,000.00
0.045 OH Mandor 90,000.00
B Bahan
11.000 Buah Keramik 25x40 cm 7,300.00
9.300 Kg Portland Semen 1,425.00
0.018 m3 Pasir Muntilan 350,000.00
1.940 Kg Semen Warna 2,500.00

Jumlah

25 1.000 m2 Pemasangan lantai keramik 40 x 40 cm

A Tenaga
0.700 OH Pekerja 65,000.00
0.350 OH Tukang Batu 80,000.00
0.035 OH Kepala Tukang 90,000.00
0.035 OH Mandor 90,000.00
B Bahan
6.630 Buah Keramik 40 x 40 cm 7,541.48
9.800 Kg Portland Semen 1,425.00
0.045 m3 Pasir Muntilan 350,000.00
0.600 Kg Semen Warna 2,500.00

Jumlah

26 1.000 m' Pemasangan Kusen Pintu Allumunium Polos

A Tenaga
0.043 OH Pekerja 65,000.00
0.043 OH Tukang Besi 80,000.00
0.004 OH Kepala Tukang 90,000.00
0.002 OH Mandor 90,000.00
B Bahan
1.100 m' Profil Allumunium 110,000.00
2.000 buah Skrup Fixer 750.00
0.060 Tube Sealant 35,000.00
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT
Jumlah

27 1.000 m2 Pemasangan Kaca bening tebal 5 mm

A Tenaga
0.015 OH Pekerja 65,000.00
0.150 OH Tukang Kayu 80,000.00
0.015 OH Kepala Tukang 90,000.00
0.001 OH Mandor 90,000.00
B Bahan
1.100 m2 Kaca bening tebal 5mm 112,500.00
0.050 Kg Sealant 35,000.00

Jumlah

28 1.000 m' Pemasangan Pipa PVC tipe AW Ø ¾"

A Tenaga
0.036 OH Pekerja 65,000.00
0.060 OH Tukang Pipa 80,000.00
0.006 OH Kepala Tukang 90,000.00
0.002 OH Mandor 90,000.00
B Bahan
1.200 m' Pipa PVC Ø ¾" 8,125.00
35.000 % Perlengkapan 35% x pipa 8,125.00

Jumlah

29 1.000 m' Pemasangan Pipa PVC tipe AW Ø 2"

A Tenaga
0.054 OH Pekerja 65,000.00
0.090 OH Tukang Pipa 80,000.00
0.009 OH Kepala Tukang 90,000.00
0.003 OH Mandor 90,000.00
B Bahan
1.200 m' Pipa PVC Ø 2" 37,500.00
35.000 % Perlengkapan 35% x pipa 37,500.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

30 1.000 m' Pemasangan Pipa PVC tipe AW Ø 4"

A Tenaga
0.036 OH Pekerja 65,000.00
0.060 OH Tukang Pipa 80,000.00
0.006 OH Kepala Tukang 90,000.00
0.002 OH Mandor 90,000.00
B Bahan
1.200 m' Pipa PVC Ø 4" 50,000.00
35.000 % Perlengkapan 35% x pipa 50,000.00

Jumlah

Overhead & Profit


31 1.000 Unit Memasang Closet Jongkok Porselen ( setara INA )

A Tenaga
1.000 OH Pekerja 65,000.00
1.500 OH Tukang Batu 80,000.00
0.150 OH Kepala Tukang 90,000.00
0.160 OH Mandor 90,000.00
B Bahan
1.000 Buah Kloset Jongkok 185,000.00
6.000 Kg Portland Semen 1,425.00
0.010 m3 Pasir Muntilan 350,000.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

32 1.000 Unit Memasang Wastafel

A Tenaga
1.200 OH Pekerja 65,000.00
0.145 OH Tukang Batu 80,000.00
0.150 OH Kepala Tukang 90,000.00
0.100 OH Mandor 90,000.00
B Bahan
1.000 Buah Wastafel 765,000.00
0.300 - Perlengkapan 30% Harga Wastafel 765,000.00
6.000 Kg Portland Semen 1,425.00
0.010 m3 Pasir Muntilan 350,000.00

Jumlah

33 1.000 m2 Pemasangan rangka hollow galvanis, untuk plafon

A Tenaga
0.350 OH Pekerja 65,000.00
0.350 OH Tukang besi 80,000.00
0.035 OH Kepala tukang 90,000.00
0.018 OH Mandor 90,000.00
B Bahan
Rangka metal
4.000 m' Assesoris 10,000.00
hollow galvanis
100% x rangka Ls (perkuatan, las 40,000.00
dll)
Jumlah

Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat


34 1.000 m2
Penutup Kualitas B)
A Tenaga
0.020 OH Pekerja 65,000.00
0.063 OH Tukang Cat 80,000.00
0.006 OH Kepala Tukang 90,000.00
0.003 OH Mandor 90,000.00
B Bahan
0.100 Kg Plamir tembok 7,500.00
0.100 Kg Cat Dasar 30,000.00
0.260 Kg Cat Penutup 2 kali Kualitas B 30,000.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat


35 1.000 m2
Penutup Kualitas A)
A Tenaga
0.020 OH Pekerja 65,000.00
0.063 OH Tukang Cat 80,000.00
0.006 OH Kepala Tukang 90,000.00
0.003 OH Mandor 90,000.00
B Bahan
0.100 Kg Plamir tembok 7,500.00
0.100 Kg Cat Dasar 112,500.00
0.260 Kg Cat Penutup 2 kali Kualitas A 112,500.00

Jumlah

36 1.000 m2 Memasang Langit-langit Kalsi Board, Uk (120x240) tebal 9 mm

A Tenaga
0.100 OH Pekerja 65,000.00
0.050 OH Tukang Kayu 80,000.00
0.005 OH Kepala Tukang 90,000.00
0.005 OH Mandor 90,000.00
B Bahan
0.364 Lbr Kalsi Board 75,000.00
0.110 Kg Paku Sekrup 30,000.00

Jumlah

37 1.000 m1 List Langit-Langit Profil gypsum (besar)

A Tenaga
0.060 OH Pekerja 65,000.00
0.060 OH Tukang Kayu 80,000.00
0.006 OH Kepala Tukang 90,000.00
0.003 OH Mandor 90,000.00
B Bahan
1.050 m' List Profil gypsum 22,500.00
0.150 kg Tepung gypsum 7,500.00

Jumlah
HARGA BAHAN/
NO. KOEF SAT. URAIAN PAKERJAAN
UPAH/ALAT

38 1.000 m2 Memasang Bekisting untuk Dinding 2 X Pakai

A Tenaga
0.660 OH Pekerja 65,000.00
0.330 OH Tukang Kayu 80,000.00
0.033 OH Kepala Tukang 90,000.00
0.033 OH Mandor 90,000.00
B Bahan
0.200 Kg Paku Biasa 2" - 5" 14,000.00
0.100 Ltr Minyak Bekisting 12,500.00
0.010 m3 Balok Kayu Klas III 3,750,000.00
0.175 Lbr Plywood 9 mm ( 120 x 244 ) 135,000.00
1.500 Btg Bambu e 8 - 10 PJ. 4 m 12,000.00
2.000 Buah Formite/Penjaga jarak / Spacer (alat bantu) 7,500.00

Jumlah

#REF!
#REF!

#REF!
#REF!
LISA HARGA SATUAN PEKERJAAN

JUMLAH BIAYA
(Rp.)

48,750.00
2,250.00

51,000.00

17,000.00
embali di hitung dari 1/3 kali koefisien Pekerjaan galian

6,500.00
900.00

72,000.00

79,400.00

19,500.00
900.00

261,000.00

281,400.00
JUMLAH BIAYA
(Rp.)

50,700.00
31,200.00
3,510.00
3,510.00

283,800.00
93,960.00

466,680.00
JUMLAH BIAYA
(Rp.)

97,500.00
60,000.00
6,750.00
6,750.00

283,800.00
166,725.00
196,350.00

817,875.00

19,500.00
8,000.00
900.00
1,350.00

59,500.00
16,387.50
15,050.00

120,687.50

13,000.00
12,000.00
1,350.00
900.00

8,892.00
8,400.00

44,542.00
JUMLAH BIAYA
(Rp.)

9,100.00
8,000.00
900.00
720.00

4,631.25

23,351.25

19,500.00
8,000.00
900.00
1,350.00

59,500.00
11,856.00
17,150.00

118,256.00

13,000.00
12,000.00
1,350.00
900.00

6,292.80
9,450.00

42,992.80
JUMLAH BIAYA
(Rp.)

5,200.00
3,200.00
3,600.00
360.00

712.50
4,550.00

17,622.50

33,800.00
20,800.00
2,340.00
2,340.00

75,000.00
4,200.00
1,250.00

139,730.00

4,550.00
5,600.00
630.00
360.00

105,000.00
2,250.00

118,390.00
11,839.00
JUMLAH BIAYA
(Rp.)

107,250.00
22,000.00
2,520.00
7,470.00

464,550.00
190,000.00
152,444.44
10,750.00

956,984.44
JUMLAH BIAYA
(Rp.)

42,900.00
26,400.00
2,970.00
2,970.00

75,000.00
4,200.00
2,500.00
24,000.00

180,940.00

42,900.00
26,400.00
2,970.00
2,970.00

2,800.00
1,250.00
33,750.00
23,625.00
12,000.00

148,665.00

42,900.00
26,400.00
2,970.00
2,970.00

2,800.00
1,250.00
JUMLAH BIAYA
(Rp.)
28,125.00
23,625.00
36,000.00

167,040.00
JUMLAH BIAYA
(Rp.)

42,900.00
26,400.00
2,970.00
2,970.00

75,000.00
4,200.00
2,500.00

156,940.00

107,250.00
22,000.00
2,520.00
7,470.00

351,975.00
217,250.00
148,000.00
10,750.00

867,215.00

45,500.00
28,000.00
3,150.00
3,150.00

83,600.00
14,820.00
4,050.00
15,750.00
JUMLAH BIAYA
(Rp.)

198,020.00
JUMLAH BIAYA
(Rp.)

58,500.00
36,000.00
4,050.00
4,050.00

80,300.00
13,252.50
6,300.00
4,850.00

207,302.50

45,500.00
28,000.00
3,150.00
3,150.00

50,000.00
13,965.00
15,750.00
1,500.00

161,015.00

2,795.00
3,440.00
387.00
189.00

121,000.00
1,500.00
2,100.00
JUMLAH BIAYA
(Rp.)
131,411.00

975.00
12,000.00
1,350.00
67.50

123,750.00
1,750.00

139,892.50

2,340.00
4,800.00
540.00
180.00

9,750.00
2,843.75

20,453.75

3,510.00
7,200.00
810.00
270.00

45,000.00
13,125.00

69,915.00
JUMLAH BIAYA
(Rp.)

2,340.00
4,800.00
540.00
180.00

60,000.00
17,500.00

85,360.00

65,000.00
120,000.00
13,500.00
14,400.00

185,000.00
8,550.00
3,500.00

409,950.00
JUMLAH BIAYA
(Rp.)

78,000.00
11,600.00
13,500.00
9,000.00

765,000.00
229,500.00
8,550.00
3,500.00

1,118,650.00

22,750.00
28,000.00
3,150.00
1,620.00

40,000.00
40,000.00

135,520.00

1,300.00
5,040.00
567.00
270.00

750.00
3,000.00
7,800.00

18,727.00
JUMLAH BIAYA
(Rp.)
JUMLAH BIAYA
(Rp.)

1,300.00
5,040.00
567.00
270.00

750.00
11,250.00
29,250.00

48,427.00

6,500.00
4,000.00
450.00
450.00

27,300.00
3,300.00

42,000.00

3,900.00
4,800.00
540.00
270.00

23,625.00
1,125.00

34,260.00
JUMLAH BIAYA
(Rp.)

42,900.00
26,400.00
2,970.00
2,970.00

2,800.00
1,250.00
37,500.00
23,625.00
18,000.00
15,000.00

173,415.00
DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH TENAGA KERJA

KEGIATAN :

PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. JENIS MATERIAL SATUAN HARGA


Rp.

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN


1 Tanah urug M3 60,000.00
2 Pasir urug M3 217,500.00
3 Batu belah M3 236,500.00
4 Pasir beton / Muntilan M3 350,000.00
5 Batu bata merah 5x11x22 cm Buah 850.00
6 Semen Portland kg 1,425.00
8 Kayu Klas III m3 3,750,000.00
9 Paku kg 14,000.00
10 Minyak bekisting ltr 12,500.00
11 Besi beton polos kg 10,000.00
12 Kawat beton / Bendrat kg 15,000.00
13 Pasir beton / Muntilan kg 250.00
14 Batu pecah 2-3 cm M3 148.15
15 Air M3 50.00
16 Bambu e 8 - 10 PJ. 4 m Btg 12,000.00
17 Balok Kayu sengon lbr 3,750,000.00
18 Plywood tebal 9 mm (120 x 244) Lbr 135,000.00
19 Keramik Antislip 25 x 25 cm bh 4,750.00
20 Semen warna kg 2,500.00
21 Keramik 25 x 40 cm bh 7,300.00
22 Keramik 40 x 40 cm bh 7,541.48
23 Profil aluminium m' 110,000.00
24 Skrup Fixer Buah 750.00
25 Sealant Tube 35,000.00
26 Kaca bening 5 mm m2 112,500.00
27 Pipa PVC tipe AW dia 3/4" m' 8,125.00
28 Pipa PVC tipe AW dia 2" m' 37,500.00
29 Pipa PVC tipe AW dia 4" m' 50,000.00
30 Kloset Jongkok "INA" bh 185,000.00
31 Wastafel bh 765,000.00
32 Rangka metal m' 10,000.00
33 Plamur Tembok kg 7,500.00
34 Cat tembok dasar kualitas B kg 30,000.00
35 Cat tembok penutup kualitas B kg 30,000.00
NO. JENIS MATERIAL SATUAN HARGA
Rp.
36 Cat tembok dasar Kualitas A kg 112,500.00
37 Cat tembok penutup Kualitas A kg 112,500.00
38 Kalsi Board (120 x 240 x 9) mm LB 75,000.00
39 Paku Sekrup Kg 30,000.00
40 List Profil Gypsum m' 22,500.00
41 Tepung Gypsum kg 7,500.00
42 Formite/Penjaga jarak / Spacer (alat bantu) bh 7,500.00
43 Mur baut bh 10,000.00
44 Tiang PJU 7 meter, 5 " 4" 3" 2" (type parabole) unit 2,500,000.00
45 Kabel NYY 4 x 6 mm m' 65,000.00
46 Kabel NYM 3 x 2,5 mm m' 17,500.00
47 Box panel 20 x 50 x 70 cm tebal 1,5 mm outdoor unit 1,200,000.00
48 Elektronik kontaktor 35 amp mitsubishi bh 1,100,000.00
49 Switch timer panasonic bh 750,000.00
50 MCB 20 Amp sneider bh 75,000.00
51 MCB 10 Amp sneider bh 45,000.00
52 Rel MCB m' 35,000.00
53 Terminal kabel 16 mm 4 strip bh 60,000.00
54 Murbaut 12mm x 5 cm bh 1,750.00
55 Pipa PVC 1/5 inch m' 2,850.00
56 Grounding 10 mm bh 90,000.00
57 Pilot lamp bh 15,000.00
58 Sekring kubur bh 20,000.00
59 Kabel NYAHY 0,75 mm m' 4,250.00
60 Lampu LED BRP 210 LED36/CW 27W unit 1,750,000.00
61 Isolasi bh 10,000.00
62 MCB sneider bh 75,000.00
63 Box MCB bh 35,000.00

B. DAFTAR HARGA SATUAN UPAH TENAGA KERJA

1 Pekerja OH 65,000
2 Tukang OH 80,000
3 Tukang Kepala OH 90,000
4 Mandor OH 90,000
5 Operator OH 150,000
6 Tukang listrik OH 150,000

C. DAFTAR HARGA SATUAN ALAT

1 Sewa Crane jam 375,000

#REF!
NO. JENIS MATERIAL SATUAN HARGA
Rp.
#REF!

#REF!
#REF!
BACK UP DATA PERH

KEGIATAN : PENGELOLAAN DAN PENYELENGGARAAN KEGIATAN DI BID


PEKERJAAN : PERENCANAAN LANJUTAN PEMBANGUNAN FASPEL LAUT BA
LOKASI : JALAN LAKS. YOS SUDARSO KABUPATEN BATANG JAWA TE
TAHUN ANGGARAN : 2018
PERHITUNGAN : KM & TOILET PUTRA / PUTRI ( 2 UNIT )

NO URAIAN PEKERJAAN DATA PERHIT

PEKERJAAN PEMBANGUNAN KM & TOILET PUTRA / PUTRI ( 2 BANGUNAN ) =


I. PEKERJAAN TANAH
1 Pek. Galian Tanah
~ Pondasi Batu Kali Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
Vertikal = 1.750 +
- 0.075 x
= 1.750 -
= 1.750 +
- 0.075 x
V = 17.450 x

~ Pondasi Batu Kali Selasar Dalam


AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x

V = 21.000 x

~ Rollag KM
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
= 1.500 -
+ 1.500 -
V = 2.700 x

~ Rollag Selasar Luar


AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Depan = 3.000 -
+ 1.000 x
Belakang = 3.000 -
+ 1.000 x

V = 9.700 x

~ Rollag Selasar Dalam


AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x

V = 21.000 x
2 Pek. Urugan Tanah Kembali
~ Pondasi Batu Kali Selasar Dalam
V = 8.900 x
~ Pondasi Batu Kali Selasar
V = - x
~ Rollag KM
V = 0.041 x
~ Rollag Selasar Luar
V = 0.146 x
~ Rollag Selasar Dalam
V = 0.315 x

3 Pek. Urugan Tanah Baru Peninggian Peil


Peninggian Peil ± 0.00 = 0.330 m'

~ Lorong = ± 0.00
AS Tembok = 0.150 (1)
0.075 (2)
Peil ± 0.00 = 0.330 m'

Tinggi = 0.330
Elevasi = - -
Tinggi Urugan = 0.330 -

Lorong = 3.000 -
x 0.180 x

~ Lantai KM Bawah = - 0.10


AS Tembok = 0.150 (1)
0.075 (2)
Peil ± 0.00 = 0.330 m'

Tinggi = 0.330
Elevasi = 0.100 -
Tinggi Urugan = 0.230 -

KM = 1.500 -
x 0.080 x

~ Lantai KM Atas = + 0.15


AS Tembok = 0.150 (1)
0.075 (2)
Peil ± 0.00 = 0.330 m'

Tinggi = 0.330
Elevasi = 0.150 +
Tinggi Urugan = 0.480 -

KM = 1.500 -
x 0.330 x

~ Selasar Dalam = 0.10


AS Tembok = 0.150 (1)
0.075 (2)
Peil ± 0.00 = 0.330 m'

Tinggi = 0.330
Elevasi = 0.100 -
Tinggi Urugan = 0.230 -
Lebar Selasar = 1.000 m'

Depan = 5.000 -
x 0.130
Belakang = 5.000 -
x 0.130
Samping Kanan = 3.500 -
x 0.130
Samping Kanan = 3.500 -
x 0.130

~ Selasar Luar = 0.22


AS Tembok = 0.150 (1)
0.075 (2)
Peil ± 0.00 = 0.330 m'

Tinggi = 0.330
Elevasi = 0.220 -
Tinggi Urugan = 0.110 -
Lebar Selasar = 1.000 m'

Depan = 3.000 -
x 0.010
Belakang = 3.000 -
x 0.010

4 Pek. Urugan Pasir


a. Urugan Pasir Bawah Pondasi
~ Pondasi Batu Kali Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
Vertikal = 1.750 +
- 0.075 x
= 1.750 -
= 1.750 +
- 0.075 x

V = 17.450 x

~ Pondasi Batu Kali Selasar Dalam


AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x
V = 21.000 x

b. Urugan Pasir Bawah Lantai Keramik


~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
x 0.050 x
Lorong = 3.000 -
x 0.050 x

c. Urugan Pasir Bawah Rabat Selasar


~ Selasar Dalam
AS Tembok = 0.150 (1)
0.075 (2)

Lebar Selasar = 1.000 m'

Depan = 5.000 -
x 0.050
Belakang = 5.000 -
x 0.050
Samping Kanan = 3.500 -
x 0.050
Samping Kanan = 3.500 -
x 0.050

~ Selasar Luar
AS Tembok = 0.150 (1)
0.075 (2)

Lebar Selasar = 1.000 m'

Depan = 3.000 -
x 0.050
Belakang = 3.000 -
x 0.050

II. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Pasangan Batu Kosong / Anstamping
~ Pondasi Batu Kali Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
Vertikal = 1.750 +
- 0.075 x
= 1.750 -
= 1.750 +
- 0.075 x

V = 17.450 x

~ Pondasi Batu Kali Selasar Dalam


AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x

V = 21.000 x
2 Pek. Pasangan Batu Kali 1 SP : 6 PP
~ Pondasi Batu Kali Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
= 1.500 +
+ - +
+ - +
+ 0.075 x
Vertikal = 1.750 +
- 0.075 x
= 1.750 -
= 1.750 +
- 0.075 x

V = 0.300 +
2
~ Pondasi Batu Kali Selasar Dalam
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x

V = 0.300 +
2

3 Pek. Pasangan Tasram


a. Pasangan Batu Bata 1 SP : 4 PP Tebal 1/2 Bata
~ Ruangan
AS Kolom Praktis = 0.120 (1)
0.060 (2)
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x

L = 16.430 x
~ Pengurangan
Kusen Pintu & Jendela
Pintu
PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

L = 3.560 x

b. Plesteran 1 SP : 4 PP Tebal 15 mm
~ Ruangan
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Sisi Plesteran = 2 x

Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x

L = 16.430 x

~ Pengurangan
Kusen Pintu & Jendela
Pintu
Sisi Plesteran = 2 x

PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

L = 3.560 x

c. Acian
~ Ruangan
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Sisi Plesteran = 2 x
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x

L = 16.430 x

~ Pengurangan
Kusen Pintu & Jendela
Pintu
Sisi Plesteran = 2 x

PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

L = 3.560 x
4 Pek. Pasangan Dinding
a. Pasangan Batu Bata 1 SP : 6 PP Tebal 1/2 Bata
~ Ruangan
Dinding
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 3.170 -
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x

L = 16.430 x

Gunung - Gunung
AS Kolom Praktis = 0.120 (1)
0.060 (2)
Tinggi = 0.850 -
Jumlah Sisi per GG = 2 x
Jumlah GG = 3 bh

L = 0.500 x
x 2 x

List Kusen
Tebal Ban - Banan = 0.100 m'

Pintu
PKM = 2 bh
= 0.980 +
x 0.100 x
Pintu Latiu = 2 bh
= 1.200 +
x 0.100 x

Jendela
J2 = - bh
= 1.700 +
x 0.100 x

Bouven
BV1 = 4 bh
= 0.980 +
x 0.100 x

~ Pengurangan
Kusen Pintu & Jendela
Pintu
PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x
Jendela
J2 = - bh
= 1.500 x

Bouven
BV1 = 4 bh
= 0.780 x

Balok Latiu
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = - +
- - x
= 1.750 -
= 1.750 -
= - -
= - +
- - x
= - -
= - -
= - -
= - +
- - x
L = 11.540 x

b. Plesteran 1 SP : 6 PP Tebal 15 mm
~ Bangunan
Dinding
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 3.170 -
Sisi Plesteran = 2 x
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x
L = 16.430 x

Gunung - Gunung
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 0.850 -
Jumlah Sisi per GG = 2 x
Jumlah GG = 3 bh
Sisi Plesteran = 2 x

L = 0.500 x
x 2 x

List Kusen
Tebal Ban - Banan = 0.100 m'
Sisi Plesteran = 1 x

Pintu
PKM = 2 bh
= 0.980 +
x 0.100 x
Pintu Latiu = 2 bh
= 1.200 +
x 0.100 x

Jendela
J2 = - bh
= 1.700 +
x 0.100 x

Bouven
BV1 = 4 bh
= 0.980 +
x 0.100 x
~ Pengurangan
Kusen Pintu & Jendela
Sisi Plesteran = 2 x

Pintu
PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

Jendela
J2 = - bh
= 1.500 x

Bouven
BV1 = 4 bh
= 0.780 x

Balok Latiu
AS Kolom Praktis = 0.120 (1)
0.060 (2)
Sisi Plesteran = 2 x

Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = - +
- - x
= 1.750 -
= 1.750 -
= - -
= - +
- - x
= - -
= - -
= - -
= - +
- - x

L = 11.540 x

c. Acian
~ Bangunan
Dinding
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 3.170 -
Sisi Plesteran = 2 x
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x

L = 16.430 x

Gunung - Gunung
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 0.850 -
Jumlah Sisi per GG = 2 x
Jumlah GG = 3 bh
Sisi Plesteran = 2 x

L = 0.500 x
x 2 x

List Kusen
Tebal Ban - Banan = 0.100 m'
Sisi Plesteran = 1 x

Pintu
PKM = 2 bh
= 0.980 +
x 0.100 x
Pintu Latiu = 2 bh
= 1.200 +
x 0.100 x
Jendela
J2 = - bh
= 1.700 +
x 0.100 x

Bouven
BV1 = 4 bh
= 0.980 +
x 0.100 x

~ Pengurangan
Kusen Pintu & Jendela
Sisi Plesteran = 2 x

Pintu
PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

Jendela
J2 = - bh
= 1.500 x

Bouven
BV1 = 4 bh
= 0.780 x

Balok Latiu
AS Kolom Praktis = 0.120 (1)
0.060 (2)
Sisi Plesteran = 2 x

Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = - +
- - x
= 1.750 -
= 1.750 -
= - -
= - +
- - x
= - -
= - -
= - -
= - +
- - x

L = 11.540 x

5 Pek. Pasangan Rollag


a. Pasangan Batu Bata 1 SP : 4 PP Tebal 1/2 Bata
~ KM
AS Tembok = 0.150 (1)
0.075 (2)
Panjang
= 1.500 -

L = 2.700 x

~ Selasar Luar
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Depan = 3.000 -
+ 1.000 x
Belakang = 3.000 -
+ 1.000 x

L = 10.000 x

~ Selasar Dalam
AS Tembok = 0.150 (1)
0.075 (2)

Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x

L = 21.000 x

b. Plesteran 1 SP : 4 PP Tebal 15 mm
~ KM
AS Tembok = 0.150 (1)
0.075 (2)
Sisi Plesteran = - x

Panjang
= 1.500 -

L = 2.700 x

~ Selasar Luar
AS Tembok = 0.150 (1)
0.075 (2)

Sisi Plesteran = 1 x

Panjang
Depan = 3.000 -
+ 1.000 x
Belakang = 3.000 -
+ 1.000 x

L = 10.000 x

~ Selasar Dalam
AS Tembok = 0.150 (1)
0.075 (2)

Sisi Plesteran = 1 x

Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x

L = 21.000 x
c. Acian
~ KM
AS Tembok = 0.150 (1)
0.075 (2)
Sisi Plesteran = - x

Panjang
= 1.500 -

L = 2.700 x

~ Selasar Luar
AS Tembok = 0.150 (1)
0.075 (2)

Sisi Plesteran = 1 x

Panjang
Depan = 3.000 -
+ 1.000 x
Belakang = 3.000 -
+ 1.000 x

L = 10.000 x

~ Selasar Dalam
AS Tembok = 0.150 (1)
0.075 (2)

Sisi Plesteran = 1 x
Panjang
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.075 x
Vertikal = 2.750 +
- 0.075 x
= 2.750 +
- 0.075 x

L = 21.000 x

6 Pek. Skonengan Sudut


Sisi = 2 x

~ Pintu
PKM = 2 bh
= 0.780 +
x 2 x
Pintu Latiu = 2 bh
= 1.000 +
x 2 x

~ Jendela
J2 = - bh
= 1.500 +
x 2 x

~ Bouven
BV1 = 4 bh
= 0.780 +
x 2 x

7 Pek. Pasang Ornamen Beton Relief / Motif Facade


AS Kolom = 0.120 (1)
0.060 (2)

Tinggi = 1.950 -

Panjang
Depan = 1.000 -
+ 1.000 -
Belakang = 1.000 -
+ 1.000 -
Samping Kanan = 2.750 -
+ 2.750 -
Samping Kiri = 2.750 -
+ 2.750 -

L = 14.040 x

8 Pek. Pasang Rooster Beton 10 x 20 cm Polos


L = 3.000 x
9 Pek. Pasang Batu Alam
L = 1.410 +
2

III. PEKERJAAN BETON


Berat Besi per 1 mm
µ =
r =
=
Berat Jenis Besi =
Luas Penampang Besi =
L =

Berat Besi per 1 mm =


x
=
x
=

Gambar = 16 D
=
12 Ø
=
10 Ø
=
8 Ø
=

Stigmat = 16 D
=
12 Ø
=
10 Ø
=
8 Ø
=

Uji Besi = 16 D
=
12 Ø
=
10 Ø
=
8 Ø
=

1 Pek. Sloof Praktis 12 x 18 cm


AS Kolom Praktis = 0.120 (1)
0.060 (2)

Panjang ( Bekesting & Beton )


Horisontal = 1.000 +
+ 1.000 +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.000 +
+ 1.000 +
+ - +
- 0.120 x
Vertikal = 2.750 +
- 0.120 x
= 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x
= 2.750 +
- 0.120 x

Panjang ( Pembesian )
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.120 x
Vertikal = 2.750 +
+ 0.120 x
= 1.750 +
+ 0.120 x
= 1.750 +
= 1.750 +
+ 0.120 x
= 2.750 +
+ 0.120 x

~ Bekesting
= 0.180 x

~ Pembesian
Tulangan Ø12 = 19.070 x
Begel Ø8 = 0.530 x

~ Beton Cor ( Mutu K-175 )


= 0.120 x

2 Pek. Kolom Praktis 12 x 12 cm


Dinding
Jml = 8 bh
Tg = 3.500 m'
GG
Jml = 3 bh
Tg = 0.850 m'
Pagar
Jml = 10 bh
Tg = 2.180 m'

~ Bekesting
Dinding = 0.120 x
GG = 0.120 x
Pagar = 0.120 x

~ Pembesian
Dinding
Tulangan Ø12 = 3.500 x
Begel Ø8 = 0.410 x
GG
Tulangan Ø12 = 0.850 x
Begel Ø8 = 0.410 x
Pagar
Tulangan Ø12 = 2.180 x
Begel Ø8 = 0.410 x

~ Beton Cor ( Mutu K-175 )


Dinding = 0.120 x
GG = 0.120 x
Pagar = 0.120 x

3 Pek. Balok Latiu Atas Kusen 12 x 15 cm


AS Kolom Praktis = 0.120 (1)
0.060 (2)

Panjang ( Bekesting & Beton )


Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = - +
- - x
= 1.750 -
= 1.750 -
= - -
= - +
- - x
= - -
= - -
= - -
= - +
- - x
Panjang ( Pembesian )
Horisontal = 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
Vertikal = - +
+ - x
= 1.750 +
= 1.750 +
= - +
= - +
+ - x
= - +
= - +
= - +
= - +
+ - x

~ Bekesting
= 0.150 x

~ Pembesian
Tulangan Ø12 = 13.460 x
Begel Ø8 = 0.470 x

~ Beton Cor ( Mutu K-175 )


= 0.120 x

4 Pek. Plat Beton Topi - Topi Tebal 10 cm


Lbr = 0.400 m'
Tbl = 0.100 m'

Overlap ke Samping = 0.100 m'

~ Bekesting
J2 = - bh
= 1.700 x
BV1 = 4 bh
= 0.980 x

~ Pembesian
Tulangan Ø8
J2 = - bh
= 1.770 x
= 0.470 x
BV1 = 4 bh
= 1.050 x
= 0.470 x

~ Beton Cor ( Mutu K-175 )


J2 = - bh
= 1.700 x
BV1 = 4 bh
= 0.980 x

5 Pek. Ring Balk 12 x 18 cm


Dinding
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Panjang ( Bekesting & Beton )


Horisontal = 1.000 +
+ 1.000 +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.000 +
+ 1.000 +
+ - +
- 0.120 x
Vertikal = 2.750 +
- 0.120 x
= 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x
= 2.750 +
- 0.120 x

Panjang ( Pembesian )
Horisontal = 1.000 +
+ 1.000 +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.500 +
+ - +
+ - +
+ 0.120 x
= 1.000 +
+ 1.000 +
+ - +
+ 0.120 x
Vertikal = 2.750 +
+ 0.120 x
= 1.750 +
+ 0.120 x
= 1.750 +
= 1.750 +
+ 0.120 x
= 2.750 +
+ 0.120 x

Gunung - Gunung
Sudut = 30 °
Cos = 30
PI() = 3.143
Derajat Sudut = 180
Rumus Kemiringan = Cos (
= Cos (
= 0.866

Lbr Datar = 3.250 /


Lebar Kemiringan = 1.625 /
Sisi = 2 x
Jumlah GG = 3 bh
Panjang = 1.877 x

~ Bekesting
Dinding = 0.180 x
GG = 0.180 x

~ Pembesian
Dinding
Tulangan Ø12 = 19.070 x
Begel Ø8 = 0.530 x
GG
Tulangan Ø12 = 11.260 x
Begel Ø8 = 0.530 x

~ Beton Cor ( Mutu K-175 )


Dinding = 0.120 x
GG = 0.120 x

6 Pek. Meja Beton


~ Meja Beton Tebal 10 cm
Pjg = 3.000 m'
Lbr = 0.550 m'
Tbl = 0.100 m'
As Tembok = 0.150 (1)
= 0.075 (2)
Dimensi Washbak = 0.400 m'
= 0.400 m'
Jml Lapis Plat = 1 x

~ Bekesting
L = 3.000 x
- 0.400 x
~ Pembesian
V = 2.800 x
= 0.350 x

Pengurangan Washbak = 0.200 x


x 2
= 0.200 x
x 2

~ Beton Cor ( Mutu K-175 )


L = 3.000 x
- 0.400 x

~ Balok Latiu 12 x 15 cm
Panjang = 1.500 +
~ Bekesting
= 0.180 x

~ Pembesian
Tulangan Ø12 = 3.000 x
Begel Ø8 = 0.530 x

~ Beton Cor ( Mutu K-175 )


= 0.120 x

7 Pek. Beton Lantai Kerja Bawah Keramik


~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
x 0.050 x
Lorong = 3.000 -
x 0.050 x

8 Pek. Rabat Beton Selasar


~ Selasar Dalam
AS Tembok = 0.150 (1)
0.075 (2)

Lebar Selasar = 1.000 m'

Depan = 5.000 -
x 0.050
Belakang = 5.000 -
x 0.050
Samping Kanan = 3.500 -
x 0.050
Samping Kanan = 3.500 -
x 0.050

~ Selasar Luar
AS Tembok = 0.150 (1)
0.075 (2)

Lebar Selasar = 1.000 m'

Depan = 3.000 -
x 0.050
Belakang = 3.000 -
x 0.050

IV. PEKERJAAN PENUTUP LANTAI


1 Pek. Pasangan Lantai Keramik 40 x 40 cm Anti Slip
~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
x - x
Lorong = 6.000 -
x - x
2 Pek. Pasangan Lantai Keramik 25 x 25 cm Anti Selip
~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
x - x
Lorong = 6.000 -
x - x

3 Pek. Pasangan Dinding Keramik 25 x 40 cm


~ Dinding Keramik
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi Keramik Dinding = 1.750 m'


Jumlah KM = 2 bh

KM = 1.500 +
+ 1.750 +
+ - +
Lorong KM = 1.440 +
+ 0.750 +
+ - +

4 Pek. Pasangan Lantai Keramik Meja Beton 40 x 40 cm Polos Putih


Pjg = 3.000 m'
Lbr = 0.550 m'
Tbl = 0.100 m'
As Tembok = 0.150 (1)
= 0.075 (2)
Dimensi Washbak = 0.400 m'
= 0.400 m'

L = 3.000 +
- 0.400 x

5 Pek. Pasangan List Dinding Keramik 10 x 25 cm


~ Dinding Keramik
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi Keramik Dinding = - m'


Jumlah KM = 2 bh

KM = 1.500 +
+ 1.750 +
+ - +
Lorong KM = 1.440 +
+ 0.750 +
+ - +

V. PEKERJAAN KUSEN DAN PINTU


1 Pek. Kusen Alumunium Polos
Lbr Alumunium = 0.040 m'

~ Pintu
PKM = 2 bh
Vertikal = 2.140 x
Horisontal = 0.700 x
~ Jendela
J2 = - bh
Vertikal = 1.000 x
Horisontal = 0.690 x

BV1 = 4 bh
Vertikal = 0.600 x
Horisontal = 0.700 x

2 Pek. Kaca Bening Tbl. 5 mm


Lbr Ram Daun Pintu Alumunium = 0.080 m'
Lbr Ram Daun Jendela Alumunium = 0.040 m'

~ Jendela
J2 = - bh
Jendela = 0.530 +
x 2 x
BV1 = 4 bh
= 0.620 +
x 1 x

3 Pek. Kaca Cermin Tebal 5 mm


= 3.000 x
4 Pek. Pintu KM Alumunium Strip ( 70 x 210 cm ) + Asessories

VI. PEKERJAAN SANITASI


1 Pek. Instalasi Pipa Air Bersih PVC 3/4"
Tg Washtafel / Washbak / Kran Air = 0.800 m'
Keluar Bangunan = 0.500 m'

~ Ruangan
KM = 0.800 x
Washtafel = 0.800 x

~ Jalur Pipa
= 0.500 +

2 Pek. Instalasi Pipa Air Kotor PVC 2"


Jalur = 1.500 +
Ke Peresapan = 1.500 +

3 Pek. Instalasi Pipa Saluran Tinja PVC 4"


Jalur = - +
Ke Septictank = 1.000 +

4 Pek. Memasang Closet Duduk / Mono Blok ( Setara INA )


5 Pek. Floordrain Stainless Steel

6 Pek. Memasang Washtafle Keramik + Asessories

7 Pek. Kran Air Stailess Steel

8 Pek. Ember

9 Pek. Septictank dan Peresapan

VII. PEKERJAAN INSTALASI LISTRIK


1 Pek. MCB

2 Pek. Instalasi Listrik


Lampu SL Philips 18 Watt = 8.000
Stop Kontak = 2.000

3 Pek. Saklar Ganda


4 Pek. Saklar Tunggal

5 Pek. Stop Kontak

6 Pek. Lampu SL Philips 18 Watt

VIII. PEKERJAAN INSTALASI LISTRIK


1 Pek. Rangka Besi Hollow 1 x 35.35.1,5 mm, Untuk Plafond
~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
x - x
Lorong = 3.000 -
x - x

~ Selasar
AS Tembok = 0.150 (1)
0.075 (2)

Depan = 1.000 +
x 1.000
Belakang = 1.000 +
x 1.000
Sampinh Kanan = 1.750 +
x 1.000
Samping Kiri = 1.750 +
x 1.000
2 Pek. Langit - Langit Kalsi Board, Uk. ( 120 x 240 ) Tebal 9 mm
~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
x - x
Lorong = 3.000 -
x - x

~ Selasar
AS Tembok = 0.150 (1)
0.075 (2)

Depan = 1.000 +
= 1.000
Belakang = 1.000 +
= 1.000
Sampinh Kanan = 1.750 +
= 1.000
Samping Kiri = 1.750 +
= 1.000

3 Pek. List Langit - Langit Profil Gypsum ( Besar )


~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
+ 1.750 -
x 2
Lorong = 3.000 -
+ 1.750 -
x 1

~ Selasar
AS Tembok = 0.150 (1)
0.075 (2)

Depan = 3.000 +
Belakang = 3.000 +
Samping Kanan = 3.500 +
Samping Kiri = 3.500 +

IX. PEKERJAAN PENGECATAN


Total Pengecatan Dinding Interior & Exterior
Pengecatan Dinding Bangunan
~ Bangunan
Dinding
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 3.170 -
Sisi Plesteran = 2 x
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 1.750 -
= 1.750 +
- 0.120 x

L = 16.430 x

Gunung - Gunung
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 0.850 -
Jumlah Sisi per GG = 2 x
Jumlah GG = 2 bh
Sisi Plesteran = 1 x

L = 0.500 x
x 2 x

List Kusen
Tebal Ban - Banan = 0.100 m'
Sisi Plesteran = 1 x

Pintu
PKM = 2 bh
= 0.780 +
x 0.100 x
Pintu Latiu = 2 bh
= 1.000 +
x 0.100 x

Jendela
J2 = - bh
= 1.500 +
x 0.100 x

Bouven
BV1 = 4 bh
= 0.780 +
x 0.100 x

~ Pengurangan
Kusen Pintu & Jendela
Sisi Plesteran = 2 x

Pintu
PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

Jendela
J2 = - bh
= 1.500 x

Bouven
BV1 = 4 bh
= 0.780 x

Balok Latiu
AS Kolom Praktis = 0.120 (1)
0.060 (2)
Sisi Plesteran = 2 x

Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = - +
- - x
= 1.750 -
= 1.750 -
= - -
= - +
- - x
= - -
= - -
= - -
= - +
- - x

L = 11.540 x

Pasang Ornamen Beton Relief / Motif Facade


AS Kolom = 0.120 (1)
0.060 (2)

Tinggi = 1.950 -
Sisi = 2 x

Panjang
Depan = 1.000 -
+ 1.000 -
Belakang = 1.000 -
+ 1.000 -
Samping Kanan = 2.750 -
+ 2.750 -
Samping Kiri = 2.750 -
+ 2.750 -
L = 14.280 x

1 Pek. Cat Dinding ( Kualitas B ) Interior Setara Catylac


Pengecatan Dinding Bangunan
~ Bangunan
Dinding
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 3.170 -
Sisi Plesteran = 1 x
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ 1.500 +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= 3.500 -
= 1.750 +
- 0.120 x
L = 20.820 x

Gunung - Gunung
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 0.850 -
Jumlah Sisi per GG = 2 x
Jumlah GG = 2 bh
Sisi Plesteran = 1 x

L = 0.500 x
x 2 x

List Kusen
Tebal Ban - Banan = 0.100 m'
Sisi Plesteran = 1 x

Pintu
PKM = 2 bh
= 4.780 +
x 0.100 x
Pintu Latiu = 2 bh
= 5.000 +
x 0.100 x

Jendela
J2 = - bh
= 5.500 +
x 0.100 x

Bouven
BV1 = 4 bh
= 4.780 +
x 0.100 x
~ Pengurangan
Kusen Pintu & Jendela
Sisi Plesteran = 2 x

Pintu
PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

Jendela
J2 = - bh
= 1.500 x

Bouven
BV1 = 4 bh
= 0.780 x

Balok Latiu
AS Kolom Praktis = 0.120 (1)
0.060 (2)
Sisi Plesteran = 2 x

Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = - +
- - x
= 1.750 -
= 1.750 -
= - -
= - +
- - x
= - -
= - -
= - -
= - +
- - x

L = 11.540 x

Pasang Ornamen Beton Relief / Motif Facade


AS Kolom = 0.120 (1)
0.060 (2)

Tinggi = 1.950 -
Sisi = 2 x

Panjang
Depan = 1.000 -
+ 1.000 -
Belakang = 1.000 -
+ 1.000 -
Samping Kanan = 2.750 -
+ 2.750 -
Samping Kiri = 2.750 -
+ 2.750 -
L = 14.280 x

2 Pek. Cat Dinding ( Kualitas A ) Eksterior Setara Mowylex


Pengecatan Dinding Bangunan
~ Bangunan
Dinding
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 3.170 -
Sisi Plesteran = 1 x
Panjang
Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= - +
+ - +
+ - +
- - x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = 1.750 +
- 0.120 x
= - -
= 1.750 +
- 0.120 x
L = 12.040 x

Gunung - Gunung
AS Kolom Praktis = 0.120 (1)
0.060 (2)

Tinggi = 0.850 -
Jumlah Sisi per GG = 2 x
Jumlah GG = 2 bh
Sisi Plesteran = 1 x

L = 0.500 x
x 2 x

List Kusen
Tebal Ban - Banan = 0.100 m'
Sisi Plesteran = 1 x

Pintu
PKM = 2 bh
= 4.780 +
x 0.100 x
Pintu Latiu = 2 bh
= 5.000 +
x 0.100 x

Jendela
J2 = - bh
= 5.500 +
x 0.100 x

Bouven
BV1 = 4 bh
= 4.780 +
x 0.100 x
~ Pengurangan
Kusen Pintu & Jendela
Sisi Plesteran = 2 x

Pintu
PKM = 2 bh
= 0.780 x
Pintu Latiu = 2 bh
= 1.000 x

Jendela
J2 = - bh
= 1.500 x

Bouven
BV1 = 4 bh
= 0.780 x

Balok Latiu
AS Kolom Praktis = 0.120 (1)
0.060 (2)
Sisi Plesteran = 2 x

Horisontal = 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
= 1.500 +
+ - +
+ - +
- 0.120 x
Vertikal = - +
- - x
= 1.750 -
= 1.750 -
= - -
= - +
- - x
= - -
= - -
= - -
= - +
- - x

L = 11.540 x

Pasang Ornamen Beton Relief / Motif Facade


AS Kolom = 0.120 (1)
0.060 (2)

Tinggi = 1.950 -
Sisi = 2 x

Panjang
Depan = 1.000 -
+ 1.000 -
Belakang = 1.000 -
+ 1.000 -
Samping Kanan = 2.750 -
+ 2.750 -
Samping Kiri = 2.750 -
+ 2.750 -
L = 14.280 x

3 Pek. Cat Plafond ( Kualitas B ) Setara Catylac


~ Ruangan
AS Tembok = 0.150 (1)
0.075 (2)

KM = 1.500 -
x - x
Lorong = 3.000 -
x - x

~ Selasar
AS Tembok = 0.150 (1)
0.075 (2)

Depan = 1.000 +
= 1.000
Belakang = 1.000 +
= 1.000
Sampinh Kanan = 1.750 +
= 1.000
Samping Kiri = 1.750 +
= 1.000

X. PEKERJAAN ATAP
Sudut = 30 °
Overhang Lebar Datar Tritisan = 1.000 m'
Overlap Penutup Atap = 0.100 m'

Cos = 30
PI() = 3.143
Derajat Sudut = 180
Rumus Kemiringan = Cos (
= Cos (
= 0.866

1 Pek. Rangka Atap Baja Ringan Profil C


Bidang Persegi Panjang
Lbr Tritisan = 1.000 m'
Lbr Datar = 3.500 /
Lebar Kemiringan = 2.750 /
Sisi = 2 x
a= 1.000 +
= 5.000 x

2 Pek. Penutup Atap Onduline Tile, Cellulose Bitumen 3 mm


Monolayer Model Tile Warna Dual Red 3D
Bidang Segitiga
Overlap Penutup Atap = 0.100 m'
Lbr Tritisan = 1.000 +
Lbr Datar = 3.500 /
Lebar Kemiringan = 2.850 /
Sisi = 2 x
a= 1.100 +
= 5.200 x
3 Pek. Listplank GRC Lebar 20 cm Finishing Cat Minyak
AS Tembok = 0.150 (1)
0.075 (2)
Overlap = 0.100 m'
Lbr Tritisan = 1.000 +

Depan = 3.150 +
Belakang = 3.150 +
Samping Kanan = 3.650 +
Samping Kiri = 3.650 +

XI. PEKERJAAN LAIN - LAIN


1 Pek. Uitzet / Pengukuran dan Bouwplank

2 Pek. Pembersihan Lokasi

3 Pek. Papan Nama Kegiatan


ATA PERHITUNGAN

GIATAN DI BIDANG PELABUHAN DAN PENGERUKAN TANAH TAHUN ANGGARAN 2018


FASPEL LAUT BATANG
TANG JAWA TENGAH 51216

DATA PERHITUNGAN VOLUME SAT

2 unit

Lebar = 0.600 m'


Tinggi
Badan Pondasi = 0.600
Anstamping = 0.200
Urugan Pasir = 0.050 +
0.850 m'

1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.750
4 = 3.200
0.075 x 2 = 1.600
1.750
4 = 3.200
+
17.450 m'
0.600 x 0.850 = 8.900

Lebar = 0.600 m'


Tinggi
Badan Pondasi = 0.400
Anstamping = 0.200
Urugan Pasir = 0.050 +
0.650 m'

1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.600 x 0.650 = -

Lebar = 0.100 m'


Tinggi = 0.150 m'

0.150
0.150 = 2.700
+
2.700 m'
0.100 x 0.150 = 0.041

Lebar = 0.100 m'


Tinggi = 0.150 m'

0.150
2 = 4.850
0.150
2 = 4.850
+
9.700 m'

0.100 x 0.150 = 0.146

Lebar = 0.100 m'


Tinggi = 0.150 m'

1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.100 x 0.150 = 0.315


+
9.401
2 x
Volume = 18.801 m³

0.333 = 2.967

0.333 = -

- = -

- = -

- = -
+
2.967
2 x
Volume = 5.933 m³

Spesi + Keramik = 0.050


Lantai Kerja = 0.050
Pasir Urug = 0.050 +
0.150 m'

0.150 = 0.180 m'

0.150 x 1.750 - 0.150


1 = 0.821

Spesi + Keramik = 0.050


Lantai Kerja = 0.050
Pasir Urug = 0.050 +
0.150 m'

0.150 = 0.080 m'

0.150 x 1.000 - 0.075


2 = 0.200

Spesi + Keramik = 0.050


Lantai Kerja = 0.050
Pasir Urug = 0.050 +
0.150 m'

0.150 = 0.330 m'

0.150 x 0.750 - 0.075


2 = 0.601

Spesi + Keramik = -
Lantai Kerja = 0.050
Pasir Urug = 0.050 +
0.100 m'

0.100 = 0.130 m'

0.150 x 1.000 - 0.075


= 0.583
0.150 x 1.000 - 0.075
= 0.583
- x 1.000 - 0.150
= 0.387
- x 1.000 - 0.150
= 0.387

Spesi + Keramik = -
Lantai Kerja = 0.050
Pasir Urug = 0.050 +
0.100 m'

0.100 = 0.010 m'

0.150 x 1.000 - -
= 0.029
0.150 x 1.000 - -
= 0.029
+
3.619
2 x
Volume = 7.238 m³

Lebar = 0.600 m'


Tinggi
Badan Pondasi = -
Anstamping = -
Urugan Pasir = 0.050 +
0.050 m'

1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.750
4 = 3.200
0.075 x 2 = 1.600
1.750
4 = 3.200
+
17.450 m'

0.600 x 0.050 = 0.524

Lebar = 0.600 m'


Tinggi
Badan Pondasi = -
Anstamping = -
Urugan Pasir = 0.050 +
0.050 m'

1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.600 x 0.050 = -
+
0.524
2 x
Volume = 1.047 m³

Tebal = 0.050 m'

0.150 x 1.750 - 0.150


8 = 0.864
0.150 x 1.750 - 0.150
2 = 0.456
+
1.320
2 x
Volume = 2.640 m³

Spesi + Keramik = -
Lantai Kerja = -
Pasir Urug = 0.050 +
0.050 m'

0.150 x 1.000 - 0.075


= 0.224
0.150 x 1.000 - 0.075
= 0.224
- x 1.000 - 0.150
= 0.149
- x 1.000 - 0.150
= 0.149

Spesi + Keramik = -
Lantai Kerja = -
Pasir Urug = 0.050 +
0.050 m'

0.150 x 1.000 - -
= 0.143
0.150 x 1.000 - -
= 0.143
+
0.285
2 x
Volume = 0.570 m³

Lebar = 0.600 m'


Tinggi
Badan Pondasi = -
Anstamping = 0.200
Urugan Pasir = - +
0.200 m'

1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.750
4 = 3.200
0.075 x 2 = 1.600
1.750
4 = 3.200
+
17.450 m'

0.600 x 0.200 = 2.094

Lebar = 0.600 m'


Tinggi
Badan Pondasi = -
Anstamping = 0.200
Urugan Pasir = - +
0.200 m'

1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.600 x 0.200 = -
+
2.094
2 x
Volume = 4.188 m³

Lebar Atas = 0.300 m'


Lebar Bawah = 0.600 m'
Tinggi
Badan Pondasi = 0.800
Anstamping = -
Urugan Pasir = - +
0.800 m'

1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.500 + -
- + -
-
2 = 3.150
1.750
4 = 3.200
0.075 x 2 = 1.600
1.750
4 = 3.200
+
17.450 m'

0.600 x 0.800 x 17.450 = 6.282


Lebar Atas = 0.300 m'
Lebar Bawah = 0.600 m'
Tinggi
Badan Pondasi = 0.800
Anstamping = -
Urugan Pasir = - +
0.800 m'

1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.600 x 0.800 x 21.000 = -

+
6.282
2 x
Volume = 12.564 m³

Tinggi
Dari Sloof Ke ± 0.00 = 0.070
Dari ± 0.00 = 0.300 +
0.370 m'
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
+
16.430 m'

0.370 = 6.079
+
6.079
2 = 1.560

2 = 2.000 +
3.560 m'

0.370 = 1.317
+
1.317
-
4.762
2 x
Luasan = 9.524 m²

Tinggi
Dari Sloof Ke ± 0.00 = 0.070
Dari ± 0.00 = 0.300 +
0.370 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
+
16.430 m'

0.370 x 2 = 12.158
+
12.158

2 = 1.560

2 = 2.000 +
3.560 m'

0.370 x 2 = 2.634
+
2.634
-
9.524
2 x
Luasan = 19.048 m²

Tinggi
Dari Sloof Ke ± 0.00 = 0.070
Dari ± 0.00 = 0.300 +
0.370 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
+
16.430 m'

0.370 x 2 = 12.158
+
12.158

2 = 1.560

2 = 2.000 +
3.560 m'

0.370 x 2 = 2.634
+
2.634
-
9.524
2 x
Luasan = 19.048 m²

Tinggi Dinding = 3.170 m'


Tasram = 0.370 m'
Ring Balk 12/18 = 0.180 m'
0.370 + 0.180 = 2.620 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
+
16.430 m'

2.620 = 43.047

Tinggi GG = 0.850 m'


- = - m'
Ring Balk 12/18 = 0.180 m'
- + 0.180 = 0.670 m'

1.750 - 0.120 x 0.670


3 = 3.276

- + 2.140 + 2.140
2 = -

- + 2.000 + 2.000
2 = -

1.700 + 1.080 + -
- = -

0.980 + 0.600 + -
4 = 1.024
+
47.347

2.140 x 2 = 3.338

2.000 x 2 = 4.000
1.080 x - = -

0.600 x 4 = 1.872

Dimensi = 0.120 m'


0.150 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
-
- = -
0.120 x 1 = 1.630
0.120 x 1 = 1.630
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
11.540 m'

0.150 = 1.731
+
10.941
-
36.406
2 x
Luasan = 72.811 m²

Tinggi Dinding = 3.170 m'


Tasram = 0.370 m'
Ring Balk 12/18 = 0.180 m'
0.370 + 0.180 = 2.620 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
+
16.430 m'
2.620 x 2 = 86.093

Tinggi GG = 0.850 m'


- = - m'
Ring Balk 12/18 = 0.180 m'
- + 0.180 = 0.670 m'

1.750 - 0.120 x 0.670


3 x 2 = 6.553

- + 2.140 + 2.140
2 x 1 = -

- + 2.000 + 2.000
2 x 1 = -

1.700 + 1.080 + -
- x 1 = -

0.980 + 0.600 + -
4 x 1 = 1.024
+
93.670
2.140 x 2 x 2 = 6.677

2.000 x 2 x 2 = 8.000

1.080 x - x 2 = -

0.600 x 4 x 2 = 3.744

Dimensi = 0.120 m'


0.150 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
-
- = -
0.120 x 1 = 1.630
0.120 x 1 = 1.630
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
11.540 m'

0.150 x 2 = 3.462
+
21.883
-
71.787
2 x
Luasan = 143.574 m²

Tinggi Dinding = 3.170 m'


Tasram = 0.370 m'
Ring Balk 12/18 = 0.180 m'
0.370 + 0.180 = 2.620 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
+
16.430 m'

2.620 x 2 = 86.093

Tinggi GG = 0.850 m'


- = - m'
Ring Balk 12/18 = 0.180 m'
- + 0.180 = 0.670 m'

1.750 - 0.120 x 0.670


3 x 2 = 6.553

- + 2.140 + 2.140
2 x 1 = -

- + 2.000 + 2.000
2 x 1 = -
5.500 + 1.080 + -
- x 1 = -

0.980 + 0.600 + -
4 x 1 = 1.024
+
93.670

2.140 x 2 x 2 = 6.677

2.000 x 2 x 2 = 8.000

1.080 x - x 2 = -

0.600 x 4 x 2 = 3.744

Dimensi = 0.120 m'


0.150 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
-
- = -
0.120 x 1 = 1.630
0.120 x 1 = 1.630
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
11.540 m'

0.150 x 2 = 3.462
+
21.883
-
71.787
2 x
Luasan = 143.574 m²

Tinggi di Bawah Muka Tanah = 0.150 m'


Tinggi di Atas Muka Tanah = 0.350 m'
0.150 x 2 = 2.700
+
2.700 m'

0.150 + 0.350 = 1.350

Lebar Selasar = 1.000 m'


Rabat Selasar = 0.050 m'
Tinggi di Bawah Muka Tanah = 0.100 m'
Tinggi di Atas Muka Tanah = 0.100 m'

-
2 = 5.000
-
2 = 5.000
+
10.000 m'

0.100 + 0.100 = 2.000

Lebar Selasar = 1.000 m'


Rabat Selasar = 0.050 m'
Tinggi di Bawah Muka Tanah = 0.100 m'
Tinggi di Atas Muka Tanah = 0.200 m'

1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.100 + 0.200 = 6.300


+
9.650
+
9.650
2 x
Luasan = 19.300 m²

Tinggi di Bawah Muka Tanah = 0.150 m'


Tinggi di Atas Muka Tanah = 0.350 m'

0.150 x 2 = 2.700
+
2.700 m'

0.150 + 0.350 x - = -

Lebar Selasar = 1.000 m'


Rabat Selasar = 0.050 m'
Tinggi di Bawah Muka Tanah = 0.100 m'
Tinggi di Atas Muka Tanah = 0.100 m'

-
2 = 5.000
-
2 = 5.000
+
10.000 m'

0.100 + 0.050 x 1 = 1.500

Lebar Selasar = 1.000 m'


Rabat Selasar = 0.050 m'
Tinggi di Bawah Muka Tanah = 0.100 m'
Tinggi di Atas Muka Tanah = 0.200 m'

1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.100 + 0.200 x 1 = 6.300


+
7.800
+
7.800
2 x
Luasan = 15.600 m²
Tinggi di Bawah Muka Tanah = 0.150 m'
Tinggi di Atas Muka Tanah = 0.350 m'

0.150 x 2 = 2.700
+
2.700 m'

0.150 + 0.350 x - = -

Lebar Selasar = 1.000 m'


Rabat Selasar = 0.050 m'
Tinggi di Bawah Muka Tanah = 0.100 m'
Tinggi di Atas Muka Tanah = 0.100 m'

-
2 = 5.000
-
2 = 5.000
+
10.000 m'

0.100 + 0.050 x 1 = 1.500

Lebar Selasar = 1.000 m'


Rabat Selasar = 0.050 m'
Tinggi di Bawah Muka Tanah = 0.100 m'
Tinggi di Atas Muka Tanah = 0.200 m'
1.500 + 1.500
- + -
-
2 = 5.150
1.500 + 1.500
- + -
-
2 = 5.150
2.750
2 = 5.350
2.750
2 = 5.350
+
21.000 m'

0.100 + 0.200 x 1 = 6.300


+
7.800
+
7.800
2 x
Luasan = 15.600 m²

- + 2.140 + 2.140
2 = 20.240

- + 2.000 + 2.000
2 = 20.000

1.500 + 1.080 + 1.080


- = -

0.780 + 0.600 + 0.600


4 = 22.080
+
62.320
2 x
Panjang = 124.640 m'

Sloof 12 / 18 = 0.180 m'


Ring Balk 12 / 18 = 0.180 m'
Kolom 12 / 12 = 0.120 m'
0.180 + 0.180 = 1.590 m'

0.120
0.120 = 1.760
0.120
0.120 = 1.760
0.120
0.120 = 5.260
0.120
0.120 = 5.260
+
14.040 m'

1.590 = 22.324
+
22.324
2 x
= - m²

2.000 = 6.000
2 x
= 12.000 bh
1.030 x 4.150 x 2 = 10.126

2 x
= - m²

3.1415
1.000 mm
0.001 m
7,850
Luas Lingkaran
1/4 x µ x r²

1/4 x µ x r²
Berat Jenis Besi
0.250 x 3.1415
0.001 x 0.001 x 7,850
0.006165

16.00
0.006165 x 16.00 x 16.00 = 1.578
12
0.006165 x 12.00 x 12.00 = 0.888
10
0.006165 x 10.00 x 10.00 = 0.617
8
0.006165 x 8.00 x 8.00 = 0.395

15.70
0.006165 x 15.70 x 15.70 = 1.520
11.83
0.006165 x 11.83 x 11.83 = 0.863
9.74
0.006165 x 9.74 x 9.74 = 0.585
7.84
0.006165 x 7.84 x 7.84 = 0.379

15.82
0.006165 x 15.82 x 15.82 = 1.543
11.81
0.006165 x 11.81 x 11.81 = 0.860
9.81
0.006165 x 9.81 x 9.81 = 0.593
7.81
0.006165 x 7.81 x 7.81 = 0.376

1.500 + 1.500
- + -
-
4 = -
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + 1.500
- + -
-
4 = -
2.750
2 = -
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
2.750
2 = -
+
16.430 m'

1.500 + 1.500
- + -
-
4 = -
1.500 + -
- + -
-
2 = 3.240
1.500 + -
- + -
-
2 = 3.240
1.500 + -
- + -
-
2 = 3.240
1.500 + 1.500
- + -
-
4 = -
2.750
2 = -
1.750
2 = 3.740
0.120 x 1 = 1.870
1.750
2 = 3.740
2.750
2 = -
+
19.070 m'

10.00 Ø 0.617
8.00 Ø 0.395
Jml Tulangan = 4 bt
Σ Begel = 0.150 m'
Hak Besi = 0.050 m'
Selimut Beton = 0.015 m'
Dimensi = 0.120 m'
0.180 m'
Bidang Sisi Bekesting = 2 sisi

2 x 16.430 = 5.915
2 x
= 11.830 m²

4 x 0.617 = 47.027
127 x 0.395 = 26.558 +
73.584
2 x
= 147.169 kg
0.180 x 16.430 = 0.355
2 x
= 0.710 m³

10.00 D 0.617
8.00 Ø 0.395
Jml Tulangan = 4 bt
Σ Begel = 0.150 m'
Hak Besi = 0.050 m'
Selimut Beton = 0.015 m'
Dimensi = 0.120 m'
0.120 m'
Bidang Sisi Bekesting = 2 sisi
Bidang Sisi Bekesting = 4 sisi

2 x 3.500 x 8 = 6.720
2 x 0.850 x 3 = 0.612
4 x 2.180 x 10 = - +
7.332
2 x
= 14.664 m²

4 x 8 x 0.617 = 69.048
23 x 8 x 0.395 = 29.766

4 x 3 x 0.617 = 6.288
6 x 3 x 0.395 = 2.912

4 x 10 x 0.617 = -
18 x 10 x 0.395 = - +
108.014
2 x
= 216.028 kg
0.120 x 3.500 x 8 = 0.403
0.120 x 0.850 x 3 = 0.037
0.120 x 2.180 x 10 = - +
0.440
2 x
= 0.880 m³

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
-
- = -
0.120 x 1 = 1.630
0.120 x 1 = 1.630
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
11.540 m'
1.500 + -
- + -
-
2 = 3.240
1.500 + -
- + -
-
2 = 3.240
1.500 + -
- + -
-
2 = 3.240
-
- = -
0.120 x 1 = 1.870
0.120 x 1 = 1.870
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
13.460 m'

10.00 Ø 0.617
8.00 Ø 0.395
Jml Tulangan = 4 bt
Σ Begel = 0.150 m'
Hak Besi = 0.050 m'
Selimut Beton = 0.015 m'
Dimensi = 0.120 m'
0.150 m'
2 + 0.120 x 11.540 = 4.847
2 x
= 9.694 m²

4 x 0.617 = 33.192
90 x 0.395 = 16.690 +
49.882
2 x
= 99.764 kg

0.150 x 11.540 = 0.208


2 x
= 0.415 m³

8.00 Ø 0.395
- Ø -
Jml Tulangan = - bt
Σ Besi = 0.150 m'
Hak Besi = 0.050 m'
Selimut Beton = 0.015 m'

0.400 x 0 = -

0.400 x 4 = 1.568
+
1.568
2 x
= 3.136 m²

3 x - x 0.395 = -
12 x - x 0.395 = -
3 x 4 x 0.395 = 4.971
7 x 4 x 0.395 = 5.192
+
10.164
2 x
= 20.328 kg

0.400 x 0.100 x 0 = -

0.400 x 0.100 x 4 = 0.157


+
0.157
2 x
= 0.314 m³

- + -
- + -
-
2 = -
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
- + -
- + -
-
2 = -
2.750
2 = -
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
2.750
2 = -
+
16.430 m'

- + -
- + -
-
2 = -
1.500 + -
- + -
-
2 = 3.240
1.500 + -
- + -
-
2 = 3.240
1.500 + -
- + -
-
2 = 3.240
- + -
- + -
-
2 = -
2.750
2 = -
1.750
2 = 3.740
0.120 x 1 = 1.870
1.750
2 = 3.740
2.750
2 = -
+
19.070 m'

30 x PI() / 180 )
30 x 3.143 / 180 )

2 = 1.625 m'
0.866 = 1.877 m'

2 x 3 = 11.260 m'

10.00 Ø 0.617
8.00 Ø 0.395
Jml Tulangan = 4 bt
Σ Begel = 0.150 m'
Hak Besi = 0.050 m'
Selimut Beton = 0.015 m'
Dimensi = 0.120 m'
0.180 m'
Bidang Sisi Bekesting = 2 sisi
2 x 16.430 = 5.915
2 x 11.260 = 4.053 +
9.968
2 x
= 19.937 m²

4 x 0.617 = 47.027
127 x 0.395 = 26.558

4 x 0.617 = 27.766
75 x 0.395 = 15.684 +
117.035
2 x
= 234.069 kg

0.180 x 16.430 = 0.355


0.180 x 11.260 = 0.243 +
0.598
2 x
= 1.196 m³

10.00 Ø 0.617
- Ø -
Jml Tulangan = - bt
Σ Besi = 0.150 m'
Hak Besi = 0.050 m'
Selimut Beton = 0.150 m'

0.550
0.400 x 2 = 1.330
1.330
2 x
= 2.660 m²

2 x 1 x 0.617 = 3.452
19 x 1 x 0.617 = 4.100 +
7.552

1 x 1 x 0.617
= 0.247
1 x 1 x 0.617
= 0.247 +
0.493
-
7.059
+
7.059
2 x
= 14.118 kg

0.550
0.400 x 2 x 0.100 = 0.133
0.133
2 x
= 0.266 m³

1.500 = 3.000 m'

10.00 Ø 0.617
8.00 Ø 0.395
Jml Tulangan = 4 bt
Σ Begel = 0.150 m'
Hak Besi = 0.050 m'
Selimut Beton = 0.015 m'
Dimensi = 0.120 m'
0.180 m'
Bidang Sisi Bekesting = 2 sisi
2 x 3.000 = 1.080
2 x
= 2.160 m²

4 x 0.617 = 7.398
20 x 0.395 = 4.182 +
11.580
2 x
= 23.161 kg

0.180 x 3.000 = 0.065


2 x
= 0.130 m³

Tebal = 0.050 m'

0.150 x 1.750 - 0.150


2 = 0.216
0.150 x 1.750 - 0.150
1 = 0.228
+
Volume = 0.444
2 x
= 0.888 m³

Spesi + Keramik = -
Lantai Kerja = 0.050
Pasir Urug = - +
0.050 m'

0.150 x 1.000 - 0.075


= 0.224
0.150 x 1.000 - 0.075
= 0.224
- x 1.000 - 0.150
= 0.149
- x 1.000 - 0.150
= 0.149

Spesi + Keramik = -
Lantai Kerja = -
Pasir Urug = 0.050 +
0.050 m'

0.150 x 1.000 - -
= 0.143
0.150 x 1.000 - -
= 0.143
+
Volume = 1.031
2 x
= 2.062 m³

Tebal = - m'

0.150 x 1.750 - 0.150


2 = -
0.150 x 1.500 - 0.150
1 = 7.898
+
Volume = 7.898
2 x
= - m²
Tebal = - m'

0.150 x 1.750 - 0.150


2 = 4.320
0.150 x 1.500 - 0.150
1 = 7.898
+
Volume = 12.218
2 x
= 24.435 m²

0.720 + 1.750
- + -
- x 1.750 x 2 = 20.020
3.000 + 0.750
- + -
- x 1.750 x 1 = 10.395
+
Luasan = 30.415
2 x
= 60.830 m²
0.100 x 0.550 + 0.100
0.400 = 1.855 +
1.855
2 x
= 3.710 m²

0.720 + 1.750
- + -
- x - x 2 = 11.440
3.000 + 0.750
- + -
- x - x 2 = 11.880
+
Luasan = 23.320
2 x
= 46.640 m²

2 = 4.280
1 = 0.700 +
4.980 x 2 = 9.960
3 = 3.000
4 = 2.760 +
5.760 x - = -

2 = 1.200
2 = 1.400 +
2.600 x 4 = 10.400
+
Panjang = 20.360
2 x
= 40.720 m'

Nat Kusen = 0.010 m'

Jml Daun = 2 bh
0.020 x 0.840 + 0.020
- = -
Jml Daun = 1 bh
0.020 x 0.440 + 0.020
4 = 1.178
+
Luasan = 1.178
2 x
= 2.355 m²

1.150 x 1 = 3.450
+
Luasan = 3.450
2 x
= 6.900 m²
Jumlah = 2.000
2 x
= 4.000 unit

Peninggian Peil = 1.000 m'

2 = 1.600
2 = 1.600

1.500 + 3.500 + 2.000 = 7.500


+
10.700
2 x
= 21.400 m'

1.750 + 1.000 = 4.250


1.500 = 3.000
+
7.250
2 x
= 14.500 m'

- = -
1.500 + 1.500 = 4.000
+
4.000
2 x
= 8.000 m'

2.000
2 x
= 4.000 bh

2.000
2 x
= 4.000 bh

2.000
2 x
= 4.000 bh

4.000
2 x
= 8.000 bh

2.000
2 x
= 4.000 bh

1.000
1 x
= 1.000 unit

1.000
2 x
= 2.000 unit

= 8.000
= 2.000
+
10.000
2 x
= 20.000 ttk

1.000
2 x
= 2.000 unit

3.000
2 x
= 6.000 unit

2.000
2 x
= 4.000 unit

8.000
2 x
= 16.000 unit

Tebal = - m'

0.150 x 1.750 - 0.150


2 = 4.320
0.150 x 1.750 - 0.150
1 = 4.560

Lebar Selasar = 1.000 m'

1.500 + 1.500 + 1.000


= 5.000
1.500 + 1.500 + 1.000
= 5.000
1.750 + - + -
= 3.500
1.750 + - + -
= 3.500
+
Volume = 25.880
2 x
= 51.760 m²

Tebal = - m'

0.150 x 1.750 - 0.150


2 = 4.320
0.150 x 1.750 - 0.150
1 = 4.560

Lebar Selasar = 1.000 m'

1.500 + 1.500 + 1.000


= 5.000
1.500 + 1.500 + 1.000
= 5.000
1.750 + - + -
= 3.500
1.750 + - + -
= 3.500
+
Volume = 25.880
2 x
= 51.760 m²

0.150 x 2
0.150 x 2
= 11.800
0.150 x 2
0.150 x 2
= 8.900
0.150 = 3.150
0.150 = 3.150
0.150 = 3.650
0.150 = 3.650
+
Volume = 34.300
2 x
= 68.600 m'

Tinggi Dinding = 3.170 m'


Tasram = - m'
Ring Balk 12/18 = - m'
- + - = 3.170 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 1 = 1.630
1.750
2 = 3.260
+
16.430 m'

3.170 x 2 = 104.166

Tinggi GG = 0.850 m'


- = - m'
Ring Balk 12/18 = 0.180 m'
- + 0.180 = 0.670 m'

1.750 - 0.120 x 0.670


2 x 1 = 2.184

- + 2.140 + 2.140
2 x 1 = -

- + 2.000 + 2.000
2 x 1 = -

1.500 + 1.080 + -
- x 1 = -

0.780 + 0.600 + -
4 x 1 = 0.864
+
107.214

2.140 x 2 x 2 = 6.677

2.000 x 2 x 2 = 8.000

1.080 x - x 2 = -

0.600 x 4 x 2 = 3.744

Dimensi = 0.120 m'


0.150 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
-
- = -
0.120 x 1 = 1.630
0.120 x 1 = 1.630
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
11.540 m'

0.150 x 2 = -
+
18.421
-
Luasan = 88.794 m²

Sloof 12 / 18 = - m'
Ring Balk 12 / 18 = - m'
Kolom 12 / 12 = - m'
- + - = 1.950 m'

-
- = 2.000
0.120
0.120 = 1.760
0.120
0.120 = 5.260
0.120
0.120 = 5.260
+
14.280 m'

1.950 x 2.000 = -
+
Luasan = - m²
+
Luasan Total = 88.794
2 x
= 177.587 m²

Tinggi Dinding = 3.170 m'


Tasram = - m'
Ring Balk 12/18 = - m'
- + - = 3.170 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + 1.500
- + -
-
4 = 5.520
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
0.120 x 2 = 3.260
1.750
2 = 3.260
+
20.820 m'

3.170 x 1 = 65.999

Tinggi GG = 0.850 m'


- = - m'
Ring Balk 12/18 = 0.180 m'
- + 0.180 = 0.670 m'

1.750 - 0.120 x 0.670


2 x 1 = -

- + 2.140 + 2.140
2 x 1 = -

- + 2.000 + 2.000
2 x 1 = -

3.060 + 1.080 + -
- x 1 = -

4.780 + 0.600 + -
4 x 1 = -
+
65.999

2.140 x 2 x 2 = 6.677

2.000 x 2 x 1 = 4.000

1.080 x - x 2 = -

0.600 x 4 x 1 = 1.872

Dimensi = 0.120 m'


0.150 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
-
- = -
0.120 x 1 = 1.630
0.120 x 1 = 1.630
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
11.540 m'

0.150 x 2 = -
+
12.549
-
Luasan = 53.451 m²

Sloof 12 / 18 = - m'
Ring Balk 12 / 18 = - m'
Kolom 12 / 12 = - m'
- + - = 1.950 m'

-
- = 2.000
0.120
0.120 = 1.760
0.120
0.120 = 5.260
0.120
0.120 = 5.260
+
14.280 m'

1.950 x 2.000 = -
+
Luasan = - m²
+
Luasan Total = 53.451
2 x
= 106.901 m²

Tinggi Dinding = 3.170 m'


Tasram = - m'
Ring Balk 12/18 = - m'
- + - = 3.170 m'

1.500 + -
- + -
-
2 = 2.760
- + -
- + -
-
- = -
1.500 + -
- + -
-
2 = 2.760
1.750
2 = 3.260
- x - = -
1.750
2 = 3.260
+
12.040 m'

3.170 x 1 = 38.167

Tinggi GG = 0.850 m'


- = - m'
Ring Balk 12/18 = 0.180 m'
- + 0.180 = 0.670 m'

1.750 - 0.120 x 0.670


2 x 1 = 2.184

- + 2.140 + 2.140
2 x 1 = -

- + 2.000 + 2.000
2 x 1 = -

3.060 + 1.080 + -
- x 1 = -

4.780 + 0.600 + -
4 x 1 = 4.064
+
44.415

2.140 x 2 x 2 = -

2.000 x 2 x 1 = 4.000

1.080 x - x 2 = -

0.600 x 4 x 1 = 1.872

Dimensi = 0.120 m'


0.150 m'

1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
1.500 + -
- + -
-
2 = 2.760
-
- = -
0.120 x 1 = 1.630
0.120 x 1 = 1.630
- x - = -
-
- = -
- x - = -
- x - = -
- x - = -
-
- = -
+
11.540 m'

0.150 x 2 = -
+
5.872
-
Luasan = 38.543 m²

Sloof 12 / 18 = - m'
Ring Balk 12 / 18 = - m'
Kolom 12 / 12 = - m'
- + - = 1.950 m'

-
- = 2.000
0.120
0.120 = 1.760
0.120
0.120 = 5.260
0.120
0.120 = 5.260
+
14.280 m'
1.950 x 2.000 = -
+
Luasan = - m²
+
Luasan Total = 38.543
2 x
= 77.086 m²

Tebal = - m'

0.150 x 1.750 - 0.150


2 = 4.320
0.150 x 1.750 - 0.150
1 = 4.560

Lebar Selasar = 1.000 m'

1.500 + 1.500 + 1.000


= 5.000
1.500 + 1.500 + 1.000
= 5.000
1.750 + - + -
= 3.500
1.750 + - + -
= 3.500
+
Volume = 25.880
2 x
= 51.760 m²
30 x PI() / 180 )
30 x 3.143 / 180 )

2 + 1.000 = 2.750 m'


0.866 = 3.176 m'

3.000 + 1.000 = 5.000


3.176 x 2 = 31.758
+
Luasan = 31.758
2 x
= 63.516 m²

0.100 = 1.100 m'


2 + 1.100 = 2.850 m'
0.866 = 3.291 m'

3.000 + 1.100 = 5.200


3.291 x 2 = 34.229
+
Luasan = 34.229
2 x
= 68.459 m²
0.100 = 1.100 m'

1.100 + 1.100 = 5.350


1.100 + 1.100 = 5.350
1.100 + 1.100 = 5.850
1.100 + 1.100 = 5.850
+
22.400
2 x
= 44.800 m'

1.000 ls

1.000 ls

1.000 ls
PERHITUNGAN VOLUME (BACK UP

KEGIATAN : PENGELOLAAN DAN PENYELENGGARAAN KEGIATAN


PEKERJAAN : LANJUTAN PEMBANGUNAN FASILITAS PELABUHAN
TAHUN ANGGARAN : 2019

NO URAIAN PEKERJAAN / PERHITUNGAN VOLUME

PEKERJAAN RUMAH GENSET


1. PEKERJAAN GALIAN TANAH PONDASI
FOOT PLAT
FOOT PLAT A (1,5X1,5) = 12 bh
1.7 X 1.7 X
= 4.624 X 12
FOOT PLAT B (1X1) = 0 bh
1.2 X 1.2 X
= 2.304 X 0

PONDASI BATU BELAH=


tritisan Panjang = 0
0 X 0.6 X
Dlm gdng Panjang H =
Panjang V=
Panjang = 11
11 X 0.6 X

2. PEKERJAAN URUGAN TANAH KEMBALI


0.000 X
` 4.290 X

3. PEKERJAAN URUGAN PASIR BAWAH PONDASI


A. Bawah pondasi Foot plate
FOOT PLAT A (1,5X1,5) = 12 bh
1.50 X 1.5 X
0.11 X 12
FOOT PLAT 8 (1X1) = 0 bh
1.50 X 1.5 X
NO URAIAN PEKERJAAN / PERHITUNGAN VOLUME

0.11 X 0
PONDASI BATU BELAH=
tritisan Panjang = 0
0 X 0.6 X
Dlm gdng Panjang = 11.0
11 X 0.6 X

4. PEKERJAAN URUGAN PASIR BAWAH LANTAI


Dalam Gedung
2.50 X 3.00 X

5. PEKERJAAN URUGAN TANAH PENINGGIAN PEIL


Dalam Gedung
2.50 X 3.00 X
NO URAIAN PEKERJAAN / PERHITUNGAN VOLUME

6. PEKERJAAN TRUCUK BAMBU DIA 10 CM, PJ 100 CM, JARAK 30 CM


FOOT PLAT A (1,5X1,5) = 12 bh
4 X 4 X
16 X 12
FOOT PLAT B (1X1) = 0 bh
4 X 4 X
16 X 0

7. PEKERJAAN AANSTAMPENG

11.0 X 0.6 X

8. PEKERJAAN PASANGAN BATU KALI

Dalam Gedung

0.3 + 0.6 /

0.45 X 0.6 X

9. PEKERJAAN PASANGAN BATU BATA 1 : 6

Pas. Batu bata 1:4 Trasram Panjang H =

Panjang V =

H=

8.5 X

10. PEKERJAAN PLESTERAN 1 : 6

6.8 X

11. PEKERJAAN ACIAN

13.6 +
NO URAIAN PEKERJAAN / PERHITUNGAN VOLUME

12. PEKERJAAN BALOK SLOOF 15X20


Panjang = 11 Panjang = 11
BEKESTING

0.2 X

BESI Æ10 BEGEL Æ8 11.0 74.3333333333

4 X 11.0 X

0.54 X 75 X

BETON

0.15 X 0.2 X
NO URAIAN PEKERJAAN / PERHITUNGAN VOLUME

13. PEKERJAAN LANTAI BETON

BESI Æ10
BID. I 12.5
2.5 X 13 X

2.5 X 13 X

3 X 15 X

3 X 15 X

BETON

2.5 X 3.000 X

14. PEKERJAAN LANTAI KERJA BAWAH LANTAI


2.50 X 3.00 X

15. PEKERJAAN DINDING BESI HOLLOW


8.50 X
16. PEKERJAAN PINTU BESI HOLLOW
2.50 X
17. PEKERJAAN ATAP GALVALUM RANGKA HOLLOW
2.89 X 3.90 X
AN VOLUME (BACK UP DATA)

DAN PENYELENGGARAAN KEGIATAN DIBIDANG PELABUHAN DAN PENGERUKAN


BANGUNAN FASILITAS PELABUHAN LAUT BATANG

N / PERHITUNGAN VOLUME VOLUME

H= 1.6
1.6
= 0
H= 1.6
1.6
= 0

0.4 = 0.000

0.65 = 4.290
4.290 M3

0.50 = 0.000 M3
0.25 = 1.073 M3
= 1.073 M3

0.05
= 0

0.05
N / PERHITUNGAN VOLUME VOLUME

= 0

0.05 = 0.000

0.05 = 0.330
= 0.330 M3

0.05 = 0.375
0.375 M3

0.2 = 1.500
1.500 M3
N / PERHITUNGAN VOLUME VOLUME

1
= 0 M'

1
= 0 M'
= 0 M'

0.2 = 1.32 M3

2 = 0.45

11 = 2.97 M3

= 2.970 M3

2.500

6.000

8.500 M'

0.8

0.8 = 6.8 M2

= 6.8 M2

2 = 13.6 M2

0.000 = 13.600 M2
N / PERHITUNGAN VOLUME VOLUME

11.0 = 2.2 M2

0.62 = 27.28 KG

0.393 = 15.917 KG

= 43.197 KG

11 = 0.330 M3
N / PERHITUNGAN VOLUME VOLUME

15

0.62 = 20.15 KG

0.62 = 20.15 KG

0.62 = 27.9 KG

0.62 = 27.9 KG

= 96.1 KG

0.2 = 1.500 M3

0.05 = 0.375
= 0.375 M3

1.7 = 14.450 M2

2.5 = 6.250 M2

2.0 = 22.517 M2
BACK UP PERHITUNGAN VOLUME

KEGIATAN : PENGELOLAAN DAN PENYELENGGARAAN KEGIATAN DIBIDANG PELABUHAN DAN PENGERUKAN


PEKERJAAN : LANJUTAN PEMBANGUNAN FASILITAS PELABUHAN LAUT BATANG

URAIAN (PERHITUNGAN)

PEKERJAAN SALURAN
I. PEK. TANAH
SALURAN A
1 Galian Tanah
PANJANG = 292.858 M
TGG LBR PJG
Volume = 0.9 x 0.8 x 292.858 x 1 = 210.86 m3

2 Urugan tanah kembali


= 210.858 / 3 = 70.29 m3

SALURAN B
1 Galian Tanah
PANJANG = 167.6 M
TGG LBR PJG
Volume = 0.9 x 0.8 x 167.6 x 1 = 120.67 m3

2 Urugan tanah kembali


= 120.672 / 3 = 40.22 m3

SALURAN C
1 Galian Tanah
PANJANG = 190.9 M
TGG LBR PJG
Volume = 0.9 x 0.8 x 190.9 x 1 = 137.45 m3

2 Urugan tanah kembali


= 137.448 / 3 = 45.82 m3

SALURAN D
1 Galian Tanah
PANJANG = M
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3

2 Urugan tanah kembali


= 0.000 / 3 = 0.00 m3

SALURAN E
1 Galian Tanah
PANJANG = M
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3

2 Urugan tanah kembali


= 0.000 / 3 = 0.00 m3

SALURAN F
1 Galian Tanah
PANJANG = M
URAIAN (PERHITUNGAN)
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3

2 Urugan tanah kembali


= 0.000 / 3 = 0.00 m3

SALURAN G
1 Galian Tanah
PANJANG = M
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3

2 Urugan tanah kembali


= 0.000 / 3 = 0.00 m3

TOTAL. VOLUME GALIAN TANAH

TOTAL. VOLUME URUGAN TANAH KEMBALI


URAIAN (PERHITUNGAN)

II. PEK. BETON

1 Pek. Beton Saluran K. 175


a. Beton
panjang = 651.36 m
lebar = 0.15 m
tinggi = 0.70 m Jumlah
volume = 651.36 x 0.15 x 0.70 x 2 = 136.79 m3

b. Pembesian
panjang = 651.36 m
jrk besi = 0.15 m
S besi = 651.36 / 0.15 = 4343.00 Bh
Æ10-15 = 4343 x 0.617 x 2.400 = 6,425.90 Kg
S besi = 2.40 / 0.15 = 17.00 Bh
Æ10-15 = 17 x 0.617 x 4343.000 = 45,516.81 Kg
Jumlah +
Volume = 51942.71 Kg

c. Bekisting sisi
= 651.36 x 0.70 x 4.00 = 1,823.80 m2
+
= 1,823.80 m2

2 Pek. Lantai Beton


a. Beton
panjang = 651.36 m
lebar = 0.80 m
tinggi = 0.10 m Jumlah
volume = 651.36 x 0.8 x 0.10 x 1 = 52.11 m3

2 Pek. Urugan pasir bawah lantai beton


a. Beton
panjang = 651.36 m
lebar = 0.80 m
tinggi = 0.05 m Jumlah
volume = 651.36 x 0.8 x 0.05 x 0 = 26.05 m3
PEKERJAAN PLAT DEKKER
I. Pek. Beton Plat Dekker Tbl 20 cm
a. Beton
panjang = 397.66 m
lebar = 0.80 m
tinggi = 0.15 m Jumlah
volume = 397.66 x 0.8 x 0.15 x 1 = 47.72 m3

b. Pembesian
panjang = 397.66 m
jrk besi = 0.15 m
S besi = 397.66 / 0.15 = 2652.00 Bh
S besi = 0.80 / 0.15 = 6.00 Bh
Æ10-15 = 2652 x 0.617 x 2.000 = 3,269.92 Kg
Æ10-15 = 6 x 0.62 x 2.000 = 3,269.92 Kg
+
Volume = 6539.83 Kg

c. Bekisting
URAIAN (PERHITUNGAN)
= 397.66 x 0.15 x 2.00 = 119.30 m2
= = - m2
+
= 119.30 m2
(PERHITUNGAN) VOLUME

210.858 m3

70.286 m3

120.672 m3

40.224 m3

137.448 m3

45.816 m3

- m3

- m3

- m3

- m3

- m3
(PERHITUNGAN) VOLUME

- m3

- m3

- m3

468.978 m3

156.326 m3
(PERHITUNGAN) VOLUME

136.785 m3

51,942.714 Kg

1,823.802 m2

52.109 m3

26.054 m3

47.719 m3

6,539.832 Kg
(PERHITUNGAN) VOLUME
119.298 m2
BACK UP PERHITUNGAN VOLUME

KEGIATAN :
PEKERJAAN :

URAIAN (PERHITUNGAN)

PEKERJAAN SALURAN
I. PEK. TANAH
SALURAN A
1 Galian Tanah
PANJANG = 430 M
TGG LBR PJG
Volume = 0.9 x 0.8 x 430 x 1 = 309.60 m3

2 Urugan tanah kembali


= 309.600 / 3 = 103.20 m3

SALURAN B
1 Galian Tanah
PANJANG = 167.6 M
TGG LBR PJG
Volume = 0.9 x 0.8 x 167.6 x 1 = 120.67 m3

2 Urugan tanah kembali


= 120.672 / 3 = 40.22 m3

SALURAN C
1 Galian Tanah
PANJANG = 146.7 M
TGG LBR PJG
Volume = 0.9 x 0.8 x 146.7 x 1 = 105.62 m3

2 Urugan tanah kembali


= 105.624 / 3 = 35.21 m3

SALURAN D
1 Galian Tanah
PANJANG = M
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3

2 Urugan tanah kembali


= 0.000 / 3 = 0.00 m3

SALURAN E
1 Galian Tanah
PANJANG = M
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3
2 Urugan tanah kembali
= 0.000 / 3 = 0.00 m3

SALURAN F
1 Galian Tanah
PANJANG = M
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3

2 Urugan tanah kembali


= 0.000 / 3 = 0.00 m3

SALURAN G
1 Galian Tanah
PANJANG = M
TGG LBR PJG
Volume = 0.9 x 0.8 x 0 x 1 = 0.00 m3

2 Urugan tanah kembali


= 0.000 / 3 = 0.00 m3

TOTAL. VOLUME GALIAN TANAH

TOTAL. VOLUME URUGAN TANAH KEMBALI

II. PEK. BETON

1 Pek. Beton Saluran K. 175


a. Beton
panjang = 744.30 m
lebar = 0.15 m
tinggi = 0.80 m Jumlah
volume = 744.30 x 0.15 x 0.80 x 2 = 178.63 m3

b. Pembesian
panjang = 744.30 m
jrk besi = 0.15 m
S besi = 744.30 / 0.15 = 4963.00 Bh
Æ10-15 = 4963 x 0.617 x 2.000 = 6,119.38 Kg
S besi = 0.80 / 0.15 = 6.00 Bh
Æ10-15 = 6 x 0.617 x 2.000 = 7.40 Kg
S besi = 744.30 / 0.15 = 4963.00 Bh
Æ10-15 = 4963 x 0.617 x 1.000 = 3,059.69 Kg
Jumlah +
Volume = 9186.47 Kg

c. Bekisting sisi
= 744.30 x 0.80 x 4.00 = 2,381.76 m2
+
= 2,381.76 m2

2 Pek. Lantai Beton Saluran


a. Beton
panjang = 744.30 m
lebar = 0.80 m
tinggi = 0.10 m Jumlah
volume = 744.30 x 0.8 x 0.10 x 1 = 59.54 m3

PEKERJAAN PLAT DEKKER


I. Pek. Beton Plat Dekker Tbl 20 cm
a. Beton
panjang = 744.30 m
lebar = 0.80 m
tinggi = 0.20 m Jumlah
volume = 744.30 x 0.8 x 0.20 x 1 = 119.09 m3

b. Pembesian
panjang = 744.30 m
jrk besi = 0.15 m
S besi = 744.30 / 0.15 = 4963.00 Bh
S besi = 0.80 / 0.15 = 6.00 Bh
Æ10-15 = 4963 x 0.617 x 2.000 = 6,119.38 Kg
Æ10-15 = 6 x 0.62 x 2.000 = 6,119.38 Kg
+
Volume = 12238.76 Kg

c. Bekisting
= 744.30 x 0.80 = 595.44 m2
= 744.30 x 0.20 = - m2
+
= 595.44 m2
AN (PERHITUNGAN) VOLUME

309.60 m3

103.20 m3

120.67 m3

40.22 m3

105.62 m3

35.21 m3

0.00 m3

0.00 m3

0.00 m3
0.00 m3

0.00 m3

0.00 m3

0.00 m3

0.00 m3

535.90 m3

178.63 m3

178.63 m3

9,186.47 Kg

2381.76 m2

59.54 m3
119.09 m3

12,238.76 Kg

595.44 m2
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
:

No. Mata Pembayaran Bobot


Bulan I Bulan II
1 2 3 4 5 6 7

A. PEKERJAAN FASILITAS PENDUKUNG


A.1 PEMBANGUNAN TOILET
I. PEKERJAAN TANAH 0.154 0.051 0.051 0.051
II. PEKERJAAN PASANGAN DAN PLESTERAN 2.092 0.232 0.232 0.232 0.232 0.232
III. PEKERJAAN BETON 1.378 0.459 0.459
IV. PEKERJAAN KERAMIK 1.131
V. PEKERJAAN KUSEN DAN PINTU 0.574
VI. PEKERJAAN SANITASI 0.610 0.102
VII. PEKERJAAN INSTALASI LISTRIK 0.610
VIII. PEKERJAAN PLAFOND 0.626
IX. PEKERJAAN PENGECATAN 0.364
X. PEKERJAAN ATAP 1.155
XI. PEKERJAAN LAIN-LAIN 0.122 0.005 0.005 0.005 0.005 0.005 0.005 0.005

A.2 PEKERJAAN TAMAN 0.201

B. PEKERJAAN SALURAN
I. PEKERJAAN TANAH 1.839 0.153 0.153
II. PEKERJAAN BETON 60.312

C. PEKERJAAN PENATAAN PENERANGAN LINGKUNGAN


I. PEKERJAAN PASANG LISTRIK 4.154
II. PEKERJAAN PEMASANGAN & PEMBELIAN 7.224
III. PEKERJAAN PENATAAN PJU 15.747
IV. PEKERJAAN RUMAH GENSET 1.708

Total 100.000 0.056 0.056 0.288 0.237 0.237 0.850 0.951


Total Komulatif 0.056 0.112 0.400 0.637 0.874 1.724 2.675
JADWAL WAKTU PELAKSANAAN

Waktu Pelaksanaan

Bulan III Bulan IV Bulan V


8 9 10 11 12 13 14 15 16 17 18 19 20

0.232 0.232 0.232 0.232


0.459
0.283 0.283 0.283 0.283
0.574
0.102 0.102 0.102 0.102 0.102
0.305 0.305
0.313 0.313
0.182
0.578 0.578
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

0.100 0.100

0.153 0.153 0.153 0.153 0.153 0.153 0.153 0.153 0.153 0.153
5.483 5.483 5.483 5.483 5.483 5.483 5.483 5.483 5.483 5.483 5.483

1.038 1.038 1.038 1.038


1.806 1.806 1.806

0.171 0.171 0.171 0.171

0.951 1.070 6.553 6.469 6.541 6.228 6.600 5.743 6.679 6.950 8.603 8.503 7.646
3.627 4.697 11.249 17.718 24.259 30.488 37.087 42.830 49.509 56.459 65.063 73.566 81.212
Keterangan
Bulan VI Bulan VII
21 22 23 24 25 26

Jangka waktu pelaksanaan


pekerjaan = 180 ( seratus
delapan puluh) hari kalender

Jangka waktu pemeliharaan


pekerjaan = 180 ( seratus
delapan puluh ) hari kalender

0.182
0.005 0.005 0.005 0.005 0.005 0.005

1.806
3.937 3.937 3.937 3.937
0.171 0.171 0.171 0.171 0.171 0.171

6.100 4.112 4.112 4.112 0.175 0.175


87.312 91.425 95.537 99.649 99.825 100.000

#REF!
#REF!
#REF!
#REF!

Anda mungkin juga menyukai