JADWAL

JENIS PEKERJAAN PEMBANGUNAN JEMBATAN BAJA


TAHUN ANGGARAN 2019
LOKASI DESA NGIMBANG - KABUPATEN TUBAN

BOBOT % JAN
NO URAIAN PEKERJAAN
1 2

I PEKERJAAN PERSIAPAN 1.13 1.13


II PEKERJAAN TANAH 2.69 1.34
III PEKERJAAN PASANGAN 26.91
IV PEKERJAAN PEMBESIAN 6.18 = 1.55
V PEKERJAAN GELAGAR WF 22.23
VI PEKERJAAN BRONJONG 40.87
JUMLAH BOBOT PEKERJAAN (%) 100.00
TARGET PELAKSANAAN PEKERJAAN (%) 1.13 2.89
JUMLAH KOMULATIF PELAKSANAAN PEKERJAAN (%) 1.13 4.02
JADWAL PELAKSANAAN

TEN TUBAN

JANGKA WAKTU PELAKSANAAN BOBOT % JANGKA WAKTU PEMELIHARAAN MINGG


MINGGU KE/PERIODE
3 4 5 6 7 8 1 2

1.13
1.34 2.69
6.73 6.73 6.73 6.73 26.91
1.55 1.55 1.55 6.18
5.56 5.56 5.56 5.56 22.23
10.22 10.22 10.22 10.22 40.87

9.62 13.83 24.05 22.50 15.77 10.22 100.00


13.63 27.46 51.51 74.01 89.78 100.00
NGKA WAKTU PEMELIHARAAN MINGGU KE
KET
3 4 DST
LAPORAN HARIAN KEMAJUAN PEKERJAAN

JENIS PEKERJAAN : PEMBANGUNAN JEMBATAN BAJA


TAHUN ANGGARAN : 2019
LOKASI : DESA NGIMBANG - KABUPATEN TUBAN

No URAIAN PEKERJAAN VOLUME SAT

a b c d

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.000 Ls
2 Pengukuran dan pasang profil/bouwplank 1.000 Ls

II PEKERJAAN TANAH
1 Bor tanah pondasi strauss pile Dia 25 cm - 300 Cm 20.000 Ttk
2 Galian tanah 8.800 M3
3 Urugan Tanah 5.867 M3
5 Urugan Pasir 1.760 M3

III PEKERJAAN PASANGAN


1 Lantai kerja 0.440 M3
2 Strauss pile Dia 30 cm - 300 Cm 2.826 M3
3 Abutmen Pasangan Batu 20.100 M3

VI PEKERJAAN PEMBESIAN
1 Strauss pile Dia 25 cm - 300 Cm 270.403 Kg

V PEKERJAAN GELAGAR WF
1 Pasang WF 200.100.5,5.8 mm 257.666 Kg
2 Pasang Diafragma C 150.50.20.3,2 mm 88.010 Kg
3 Pengelasan 19.760 M1
4 Plat Pengaku 8.892 Kg
5 Lantai Jembatan Plat Bordes, t = 5 mm 252.114 Kg

VIII PEKERJAAN BRONJONG


1 Pasang Trucuk Bambu 64.000 Bh
2 Sayap Abutmen Bronjong 40.000 M3
HARIAN KEMAJUAN PEKERJAAN

PERIODE
MINGGU KE
BULAN KE

JUMLAH HARGA

Rp.
e

500,000.00
400,000.00

398,336.48
516,560.00
771,349.33
463,724.80

408,682.87
3,319,833.50
17,785,485.00

4,942,218.37

7,404,301.67
2,394,664.09
375,854.96
355,680.00
7,244,750.60

480,000.00
32,195,040.00
LAPORAN HARIAN KEMAJUAN PEK

JENIS PEKERJAAN : PEMBANGUNAN JEMBATAN BAJA


L TAHUN ANGGARAN : 2019
LOKASI : DESA NGIMBANG - KABUPATEN TUBAN

No URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pengukuran dan pasang profil/bouwplank

II PEKERJAAN TANAH
1 Bor tanah pondasi strauss pile Dia 25 cm - 300 Cm
2 Galian tanah
3 Urugan Tanah
5 Urugan Pasir

III PEKERJAAN PASANGAN


1 Lantai kerja
2 Strauss pile Dia 30 cm - 300 Cm
3 Abutmen Pasangan Batu

VI PEKERJAAN PEMBESIAN
1 Strauss pile Dia 25 cm - 300 Cm

V PEKERJAAN GELAGAR WF
1 Pasang WF 200.100.5,5.8 mm
2 Pasang Diafragma C 150.50.20.3,2 mm
3 Pengelasan
4 Plat Pengaku
5 Lantai Jembatan Plat Bordes, t = 5 mm

VIII PEKERJAAN BRONJONG


1 Pasang Trucuk Bambu
2 Sayap Abutmen Bronjong
TOTAL
DI BULATKAN
RAN HARIAN KEMAJUAN PEKERJAAN

HARI : Rabu
TANGGAL : 2/10/2019

JUMLAH HARGA
VOLUME BOBOT (%) VOLUME

Rp.

500,000.00 1.000 Ls 0.63% 1.00 Ls


400,000.00 1.000 Ls 0.50% 0.00 Ls

398,336.48 20.000 Ttk 0.50% 0.00 Ttk


516,560.00 8.800 M3 0.65% 0.00 M3
771,349.33 5.867 M3 0.96% 0.00 M3
463,724.80 1.760 M3 0.58% 0.00 M3

408,682.87 0.440 M3 0.51% 0.00 M3


3,319,833.50 2.826 M3 4.15% 0.00 M3
17,785,485.00 20.100 M3 22.24% 0.00 M3

4,942,218.37 270.403 Kg 6.18% 0.00 Kg

7,404,301.67 257.666 Kg 9.26% 0.00 Kg


2,394,664.09 88.010 Kg 2.99% 0.00 Kg
375,854.96 19.760 M1 0.47% 0.00 M1
355,680.00 8.892 Kg 0.44% 0.00 Kg
7,244,750.60 252.114 Kg 9.06% 0.00 Kg

480,000.00 64.000 Bh 0.60% 0.00 Bh


32,195,040.00 40.000 M3 40.27% 0.00 M3
79,956,481.67 TOTAL 100.00% 1.00
79,956,000.00
2/10/2019
10/10/2019
LAPORAN HARIAN KEMAJUAN PEKERJAAN

JENIS PEKERJAAN : PEMBANGUNAN JEMBATAN BAJA


TAHUN ANGGARAN : 2019
LOKASI : DESA NGIMBANG - KABUPATEN TUBAN

No URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pengukuran dan pasang profil/bouwplank

II PEKERJAAN TANAH
1 Bor tanah pondasi strauss pile Dia 25 cm - 300 Cm
2 Galian tanah
3 Urugan Tanah
5 Urugan Pasir

III PEKERJAAN PASANGAN


1 Lantai kerja
2 Strauss pile Dia 30 cm - 300 Cm
3 Abutmen Pasangan Batu

VI PEKERJAAN PEMBESIAN
1 Strauss pile Dia 25 cm - 300 Cm

V PEKERJAAN GELAGAR WF
1 Pasang WF 200.100.5,5.8 mm
2 Pasang Diafragma C 150.50.20.3,2 mm
3 Pengelasan
4 Plat Pengaku
5 Lantai Jembatan Plat Bordes, t = 5 mm

VIII PEKERJAAN BRONJONG


1 Pasang Trucuk Bambu
2 Sayap Abutmen Bronjong
TOTAL
DI BULATKAN
PEKERJAAN

HARI : Kamis
TANGGAL : 3/10/2019

JUMLAH HARGA
VOLUME BOBOT (%) VOLUME

Rp.

500,000.00 1.000 Ls 0.63% 1.00 Ls


400,000.00 1.000 Ls 0.50% 1.00 Ls

398,336.48 20.000 Ttk 0.50% 0.00 Ttk


516,560.00 8.800 M3 0.65% 0.00 M3
771,349.33 5.867 M3 0.96% 0.00 M3
463,724.80 1.760 M3 0.58% 0.00 M3

408,682.87 0.440 M3 0.51% 0.00 M3


3,319,833.50 2.826 M3 4.15% 0.00 M3
17,785,485.00 20.100 M3 22.24% 0.00 M3

4,942,218.37 270.403 Kg 6.18% 0.00 Kg

7,404,301.67 257.666 Kg 9.26% 0.00 Kg


2,394,664.09 88.010 Kg 2.99% 0.00 Kg
375,854.96 19.760 M1 0.47% 0.00 M1
355,680.00 8.892 Kg 0.44% 0.00 Kg
7,244,750.60 252.114 Kg 9.06% 0.00 Kg

480,000.00 64.000 Bh 0.60% 0.00 Bh


32,195,040.00 40.000 M3 40.27% 0.00 M3
79,956,481.67 TOTAL 100.00% 2.000
79,956,000.00
2/10/2019
10/10/2019
LAPORAN HARIAN KEMAJUAN PEKERJAAN

JENIS PEKERJAAN : PEMBANGUNAN JEMBATAN BAJA


TAHUN ANGGARAN : 2019
LOKASI : DESA NGIMBANG - KABUPATEN TUBAN

No URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pengukuran dan pasang profil/bouwplank

II PEKERJAAN TANAH
1 Bor tanah pondasi strauss pile Dia 25 cm - 300 Cm
2 Galian tanah
3 Urugan Tanah
5 Urugan Pasir

III PEKERJAAN PASANGAN


1 Lantai kerja
2 Strauss pile Dia 30 cm - 300 Cm
3 Abutmen Pasangan Batu

VI PEKERJAAN PEMBESIAN
1 Strauss pile Dia 25 cm - 300 Cm

V PEKERJAAN GELAGAR WF
1 Pasang WF 200.100.5,5.8 mm
2 Pasang Diafragma C 150.50.20.3,2 mm
3 Pengelasan
4 Plat Pengaku
5 Lantai Jembatan Plat Bordes, t = 5 mm

VIII PEKERJAAN BRONJONG


1 Pasang Trucuk Bambu
2 Sayap Abutmen Bronjong
TOTAL
DI BULATKAN
PEKERJAAN

HARI : Sabtu
TANGGAL : 4/10/2019

JUMLAH HARGA
VOLUME BOBOT (%) VOLUME

Rp.

500,000.00 1.000 Ls 0.63% 1.00 Ls


400,000.00 1.000 Ls 0.50% 1.00 Ls

398,336.48 20.000 Ttk 0.50% 0.00 Ttk


516,560.00 8.800 M3 0.65% 2.20 M3
771,349.33 5.867 M3 0.96% 0.00 M3
463,724.80 1.760 M3 0.58% 0.00 M3

408,682.87 0.440 M3 0.51% 0.00 M3


3,319,833.50 2.826 M3 4.15% 0.00 M3
17,785,485.00 20.100 M3 22.24% 0.00 M3

4,942,218.37 270.403 Kg 6.18% 0.00 Kg

7,404,301.67 257.666 Kg 9.26% 0.00 Kg


2,394,664.09 88.010 Kg 2.99% 0.00 Kg
375,854.96 19.760 M1 0.47% 0.00 M1
355,680.00 8.892 Kg 0.44% 0.00 Kg
7,244,750.60 252.114 Kg 9.06% 0.00 Kg

480,000.00 64.000 Bh 0.60% 0.00 Bh


32,195,040.00 40.000 M3 40.27% 0.00 M3
79,956,481.67 TOTAL 100.00% 4.200
79,956,000.00
2/10/2019
10/10/2019
LAPORAN HARIAN KEMAJUAN PEKERJAAN

JENIS PEKERJAAN : PEMBANGUNAN JEMBATAN BAJA


TAHUN ANGGARAN : 2019
LOKASI : DESA NGIMBANG - KABUPATEN TUBAN

No URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pengukuran dan pasang profil/bouwplank

II PEKERJAAN TANAH
1 Bor tanah pondasi strauss pile Dia 25 cm - 300 Cm
2 Galian tanah
3 Urugan Tanah
5 Urugan Pasir

III PEKERJAAN PASANGAN


1 Lantai kerja
2 Strauss pile Dia 30 cm - 300 Cm
3 Abutmen Pasangan Batu

VI PEKERJAAN PEMBESIAN
1 Strauss pile Dia 25 cm - 300 Cm

V PEKERJAAN GELAGAR WF
1 Pasang WF 200.100.5,5.8 mm
2 Pasang Diafragma C 150.50.20.3,2 mm
3 Pengelasan
4 Plat Pengaku
5 Lantai Jembatan Plat Bordes, t = 5 mm

VIII PEKERJAAN BRONJONG


1 Pasang Trucuk Bambu
2 Sayap Abutmen Bronjong
TOTAL
DI BULATKAN
PEKERJAAN

HARI : Minggu
TANGGAL : 5/10/2019

JUMLAH HARGA
VOLUME BOBOT (%) VOLUME

Rp.

500,000.00 1.000 Ls 0.63% 1.00 Ls


400,000.00 1.000 Ls 0.50% 1.00 Ls

398,336.48 20.000 Ttk 0.50% 0.00 Ttk


516,560.00 8.800 M3 0.65% 2.20 M3
771,349.33 5.867 M3 0.96% 0.00 M3
463,724.80 1.760 M3 0.58% 0.00 M3

408,682.87 0.440 M3 0.51% 0.00 M3


3,319,833.50 2.826 M3 4.15% 0.00 M3
17,785,485.00 20.100 M3 22.24% 0.00 M3

4,942,218.37 270.403 Kg 6.18% 0.00 Kg

7,404,301.67 257.666 Kg 9.26% 0.00 Kg


2,394,664.09 88.010 Kg 2.99% 0.00 Kg
375,854.96 19.760 M1 0.47% 0.00 M1
355,680.00 8.892 Kg 0.44% 0.00 Kg
7,244,750.60 252.114 Kg 9.06% 0.00 Kg

480,000.00 64.000 Bh 0.60% 0.00 Bh


32,195,040.00 40.000 M3 40.27% 0.00 M3
79,956,481.67 TOTAL 100.00% 4.200
79,956,000.00
2/10/2019
10/10/2019
LAPORAN HARIAN KEMAJUAN PEKERJAAN

JENIS PEKERJAAN : PEMBANGUNAN JEMBATAN BAJA


TAHUN ANGGARAN : 2019
LOKASI : DESA NGIMBANG - KABUPATEN TUBAN

No URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pengukuran dan pasang profil/bouwplank

II PEKERJAAN TANAH
1 Bor tanah pondasi strauss pile Dia 25 cm - 300 Cm
2 Galian tanah
3 Urugan Tanah
5 Urugan Pasir

III PEKERJAAN PASANGAN


1 Lantai kerja
2 Strauss pile Dia 30 cm - 300 Cm
3 Abutmen Pasangan Batu

VI PEKERJAAN PEMBESIAN
1 Strauss pile Dia 25 cm - 300 Cm

V PEKERJAAN GELAGAR WF
1 Pasang WF 200.100.5,5.8 mm
2 Pasang Diafragma C 150.50.20.3,2 mm
3 Pengelasan
4 Plat Pengaku
5 Lantai Jembatan Plat Bordes, t = 5 mm

VIII PEKERJAAN BRONJONG


1 Pasang Trucuk Bambu
2 Sayap Abutmen Bronjong
TOTAL
DI BULATKAN
PEKERJAAN

HARI : Senin
TANGGAL : 6/10/2019

JUMLAH HARGA
VOLUME BOBOT (%) VOLUME

Rp.

500,000.00 1.000 Ls 0.63% 1.00 Ls


400,000.00 1.000 Ls 0.50% 1.00 Ls

398,336.48 20.000 Ttk 0.50% 6.67 Ttk


516,560.00 8.800 M3 0.65% 2.20 M3
771,349.33 5.867 M3 0.96% 0.00 M3
463,724.80 1.760 M3 0.58% 0.00 M3

408,682.87 0.440 M3 0.51% 0.00 M3


3,319,833.50 2.826 M3 4.15% 0.00 M3
17,785,485.00 20.100 M3 22.24% 0.00 M3

4,942,218.37 270.403 Kg 6.18% 0.00 Kg

7,404,301.67 257.666 Kg 9.26% 0.00 Kg


2,394,664.09 88.010 Kg 2.99% 0.00 Kg
375,854.96 19.760 M1 0.47% 0.00 M1
355,680.00 8.892 Kg 0.44% 0.00 Kg
7,244,750.60 252.114 Kg 9.06% 0.00 Kg

480,000.00 64.000 Bh 0.60% 0.00 Bh


32,195,040.00 40.000 M3 40.27% 0.00 M3
79,956,481.67 TOTAL 100.00% 10.867
79,956,000.00
2/10/2019
10/10/2019
LAPORAN HARIAN KEMAJUAN PEKERJAAN

JENIS PEKERJAAN : PEMBANGUNAN JEMBATAN BAJA


TAHUN ANGGARAN : 2019
LOKASI : DESA NGIMBANG - KABUPATEN TUBAN

No URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pengukuran dan pasang profil/bouwplank

II PEKERJAAN TANAH
1 Bor tanah pondasi strauss pile Dia 25 cm - 300 Cm
2 Galian tanah
3 Urugan Tanah
5 Urugan Pasir

III PEKERJAAN PASANGAN


1 Lantai kerja
2 Strauss pile Dia 30 cm - 300 Cm
3 Abutmen Pasangan Batu

VI PEKERJAAN PEMBESIAN
1 Strauss pile Dia 25 cm - 300 Cm

V PEKERJAAN GELAGAR WF
1 Pasang WF 200.100.5,5.8 mm
2 Pasang Diafragma C 150.50.20.3,2 mm
3 Pengelasan
4 Plat Pengaku
5 Lantai Jembatan Plat Bordes, t = 5 mm

VIII PEKERJAAN BRONJONG


1 Pasang Trucuk Bambu
2 Sayap Abutmen Bronjong
TOTAL
DI BULATKAN
PEKERJAAN

HARI : Selasa
TANGGAL : 7/10/2019

JUMLAH HARGA
VOLUME BOBOT (%) VOLUME

Rp.

500,000.00 1.000 Ls 0.63% 1.00 Ls


400,000.00 1.000 Ls 0.50% 1.00 Ls

398,336.48 20.000 Ttk 0.50% 6.67 Ttk


516,560.00 8.800 M3 0.65% 2.20 M3
771,349.33 5.867 M3 0.96% 0.00 M3
463,724.80 1.760 M3 0.58% 0.00 M3

408,682.87 0.440 M3 0.51% 0.00 M3


3,319,833.50 2.826 M3 4.15% 0.00 M3
17,785,485.00 20.100 M3 22.24% 0.00 M3

4,942,218.37 270.403 Kg 6.18% 0.00 Kg

7,404,301.67 257.666 Kg 9.26% 0.00 Kg


2,394,664.09 88.010 Kg 2.99% 0.00 Kg
375,854.96 19.760 M1 0.47% 0.00 M1
355,680.00 8.892 Kg 0.44% 0.00 Kg
7,244,750.60 252.114 Kg 9.06% 0.00 Kg

480,000.00 64.000 Bh 0.60% 0.00 Bh


32,195,040.00 40.000 M3 40.27% 0.00 M3
79,956,481.67 TOTAL 100.00% 10.867
79,956,000.00
2/10/2019
10/10/2019