P L T
1 PANJANG PENANGANAN
175 2.2 0.2
VOLUME
NO BAHAN KOEFISIEN SATUAN HARGA BAHAN JUMLAH HARGA
JADI
2 WIRE MESH M8 61.11 61.11 Lbr Rp 610,000.00 Rp 37,277,777.78
3 PASIR 0.54 56.133 9.36 Prah Rp 1,600,000.00 Rp 14,968,800.00
4 KERIKIL 0.73 75.8835 15.18 Prah Rp 1,700,000.00 Rp 25,800,390.00
5 SEMEN 0.00 207.9 207.90 Zak Rp 63,000.00 Rp 13,097,700.00
6 UPAH KERJA 693.00 693.00 M2 Rp 18,000.00 Rp 12,474,000.00
7 PLASTIK ALAS 693.00 693.00 M2 Rp 5,000.00 Rp 3,465,000.00
8 PAPAN MAL 6.25 12.50 Keping Rp 50,000.00 Rp 312,500.00
10 SEWA MOLEN 10.00 10.00 Hari Rp 150,000.00 Rp 1,500,000.00
11 GEROBAK SORONG 2.00 2.00 Bh Rp 300,000.00 Rp 600,000.00
13 JAGA MALAM 2.00 Kegiatan Rp 500,000 Rp 1,000,000.00
Rp 110,496,167.78
GGARAN FISIK
V/M3
103.95