No Item Pekerjaan Satuan Vol Unit Price Install Harga

SPK Utama
1 Pekerjaan Mekanikal, Elektrikal, Plumbing ls 1.00 681,372,109 681,372,109
681,372,109
Addendum-1
1 Pipa Air Hujan, dia 300mm m' 117.36 649,000 224,000 102,455,280
2 Pipa Air Hujan, dia 200mm m' 8.00 300,000 149,300 3,594,400
3 Pipa Air Hujan, dia 100mm m' 43.52 82,100 74,700 6,823,936
4 Pipa Air Hujan, dia 80mm m' 128.55 48,400 56,000 13,420,620
5 Pipa Air Hujan, dia 20mm m' 198.67 19,900 14,000 6,734,913
6 Biaya bobokan lebar 50cm tebal 10 cm m' 38.52 50,000 1,926,000

TOTAL 134,955,149

Pembulatan 135,000,000
PPN 10% 13,500,000
GRAND TOTAL 148,500,000
# Terbilang : Seratus Empat Puluh Delapan Juta Lima Ratus Ribu Rupiah

Project
Logistic Finance Cost Control Manager Sub.Con