VOLUME PEKERJAAN
1 Meja Beton
A. Bekisting 2,000 0,800 6,000 1,600 9,600 M2
V. PEKERJAAN LANTAI
1 Pek. Urugan Tanah Bawah Lantai 51,638 M3
A. Rumah 10,000 4,500 0,150 6,000 40,500 40,500 M3
B. Teras Depan 27,000 1,500 0,150 1,000 6,075 6,075 M3
C. Teras Belakang 27,000 1,250 0,150 1,000 5,063 5,063 M3
X. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding dg Cat Air - 1.478,000 M2
8,427
S K E T S A KET.
S K E T S A KET.