ENGINEER ESTIMATE (EE)

VOLUME PEKERJAAN

KEGIATAN PEMBANGUNAN RUMAH KOS


PEKERJAAN PEMBANGUNAN RUMAH KOS
LOKASI PEKANBARU

NO URAIAN PEKERJAAN P L T kg Unit jlh jlh kg M' M2 M3 VOLUME

III. PEKERJAAN STRUKTUR

1 Meja Beton
A. Bekisting 2,000 0,800 6,000 1,600 9,600 M2

B. Pembesian 5,267 6,000 50,560 1,600 50,560 Kg


C. Beton K-100 0,100 6,000 1,600 0,960 0,960 M3

IV. PEKERJAAN DINDING


1 Pek. Pas. Dinding 1/2 Bata ad. 1:4 31,500 31,500 M2
A. Dinding Teras Belakang 1,250 1,500 6,000 11,250
B. Dinding Teras Depan 1,250 1,500 6,000 11,250
C. Dinding Singap Samping 10,000 1,800 1,000 9,000

2 Pek. Plesteran Dinding Bata ad. 1:4 1.433,000 M2


A. Pleseteran Dinding Rumah 6,000 224,000
10,000 3,500 2,000 70,000
9,000 3,500 2,000 63,000
10,000 3,500 2,000 70,000
3,000 3,500 2,000 21,000
44,000
NO URAIAN PEKERJAAN P L T kg Unit jlh jlh kg M' M2 M3 VOLUME

dinding ujung 10,000 3,500 1,000 35,000


10,000 1,800 1,000 9,000

B. Plesteran Teras Belakang 1,250 1,500 6,000 2,000 22,500 22,500 M2


C. Plesteran Teras Depan 1,250 1,500 6,000 2,000 22,500 22,500 M2
D. Keramik Dinding Kaamar Mandi 5,300 1,500 6,000 47,700 47,700 M2

V. PEKERJAAN LANTAI
1 Pek. Urugan Tanah Bawah Lantai 51,638 M3
A. Rumah 10,000 4,500 0,150 6,000 40,500 40,500 M3
B. Teras Depan 27,000 1,500 0,150 1,000 6,075 6,075 M3
C. Teras Belakang 27,000 1,250 0,150 1,000 5,063 5,063 M3

2 Pek. Cor Lantai Beton 34,425 M3


A. Rumah 10,000 4,500 0,100 6,000 27,000 27,000 M3
B. Teras Depan 27,000 1,500 0,100 1,000 4,050 4,050 M3
C. Teras Belakang 27,000 1,250 0,100 1,000 3,375 3,375 M3

3 Pek. Lantai Keramik 40x40 cm - 256,500 M2


A. Rumah 10,000 4,500 6,000 270,000 256,500 M2
B. WC 1,500 1,500 6,000 13,500 13,500 M2

4 Pek. Lantai Keramik 20x20 cm KM 1,500 1,500 6,000 13,500 13,500 M2

VI. PEKERJAAN PINTU DAN JENDELA


1 Daun Pintu Kayu 4,000 6,000 - 24,000 Bh
2 Daun Jendela Kaca Kayu 4,000 6,000 24,000 Bh
3 Kaca Ventilasi 2,000 6,000 12,000 Bh
4 Daun Pintu WC 6,000 6,000 Bh
NO URAIAN PEKERJAAN P L T kg Unit jlh jlh kg M' M2 M3 VOLUME

VII. PEKERJAAN KUNCI DAN ALAT PENGGANTUNG


1 Pas. Kunci tanam 2 slagg 3,000 6,000 18,000 BH
2 Pas. Engsel 3" 2,000 4,000 6,000 48,000 BH
3 Pas. Engsel 4" 2,000 4,000 6,000 48,000 BH
4 Pas. Grendel jendela 2,000 4,000 6,000 48,000 BH
5 Pas. Hak Angin 2,000 4,000 6,000 48,000 BH
6 Pas. Handle Jendela 1,000 4,000 6,000 24,000 BH

VIII. PEKERJAAN PLAFOND


1 Pek. Pas. Plafond Triplek 337,500 M2
A. Rumah 10,000 4,500 6,000 270,000 - 270,000 M2
B. Teras Depan 27,000 1,250 1,000 33,750 - 33,750 M2
C. Teras Belakang 27,000 1,250 1,000 33,750 - 33,750 M2

X. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding dg Cat Air - 1.478,000 M2

A. Dinding Rumah 1.433,000 1.433,000 M2


B. Teras Depan 22,500 M2
C. Teras Belakang 22,500 M2

2 Pek. Pengecatan Plafond dg Cat Air 337,500 M2


NO URAIAN PEKERJAAN P L T kg Unit jlh jlh kg M' M2 M3 VOLUME
S K E T S A KET.

8,427
S K E T S A KET.
S K E T S A KET.
S K E T S A KET.