PERBANDINGAN HAR

Kabupaten : Kutai Timur


Kecamatan : Sangatta Utara
Tahun : 2014
Tanggal : 21 Maret 2014

HARGA
No URAIAN SATUAN
TOKO ADIRA INDAH TOKO SUMBER ARTHO TOKO SUMBER ARTHO PT. RIZKY LESTARI
TOKO SAMA JAYA
1 2 ABADI
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 9
I BAHAN
1 Koral Beton M3 535,000.00 - 600,000.00 600,000.00 600,000.00
2 Pasir Beton M3 535,000.00 - 600,000.00 600,000.00 600,000.00
3 Pasir Pasang Ret 650,000.00 - - - 750,000.00
4 Pasir Pasang M3
5 Pasir Urug Ret 250,000.00 - - - 300,000.00
6 Batu Gunung Ret
7 Batu Merah ( Laterit Lokal ) Ret
8 Semen PC 50 Kg Kg - - 75,000.00 78,000.00 -
9 Kayu Perancah M3 - - - - -
10 Paku Kg 18,000.00 20,000.00 17,000.00 17,000.00 -
11 Baut Buah - 35,000.00 - - -
12 Multiplek 9 mm Lbr 135,000.00 - 128,000.00 - -
13 Tanah Urug Biasa Ret 100,000.00 - - 125,000.00 150,000.00
14 Urugan Pilihan (Laterit) Ret - - - - 450,000.00
15 Galam dia. 10 cm panjang 2 m btg - - - - -
16 Papan Ulin 2/20 lmbr
17 Balok Ulin 10/10 btg
18 Balok Ulin 5/10 btg
19 Papan Kayu Meranti 2/20 Lbr
20 Balok Meranti 5/7 M3 - - - - -
No URAIAN SATUAN
TOKO ADIRA INDAH TOKO SUMBER ARTHO TOKO SUMBER ARTHO PT. RIZKY LESTARI
TOKO SAMA JAYA
1 2 ABADI
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 9
21 Balok Meranti 5/7 btg
22 Papan Bekisting M3 - - - - -
23 Besi Beton Polos Ø 8 SNI btg
24 Besi Beton Polos Ø 10 SNI btg
25 Besi Beton Polos Ø 12 SNI btg
26 Besi Beton Polos Ø 14 SNI btg
27 Besi Beton Ulir Ø 13 SNI BTG
28 Besi Beton Ulir Ø 14 SNI btg
29 Besi Beton Ulir Ø 16 SNI btg
30 Besi Beton Ulir Ø 19 SNI btg
31 Besi Beton Polos SNI 12 Kg 82,000.00 95,000.00 98,000.00 90,000.00 -
32 Besi Beton Ulir Kg - - - - -
33 Kawat Beton Kg 20,000.00 25,000.00 18,000.00 20,000.00 -
34 Pipa PVC AW dia. 1,5 Inchi Btg 40,000.00 45,000.00 45,000.00 48,000.00 -
35 Pipa PVC AW dia. 2 Inchi Btg 65,000.00 70,000.00 72,000.00 60,000.00 -
36 Air Bersih M3 - - - - -
37 Bensin (Pertamax) Liter - - - - -
38 Solar Industri Liter - - - - 13,500.00
39 Kerosene / Minyak Tanah Industri Liter - - - - -
40 Pelumas Drum - - - - 5,000,000.00

II ALAT
1 Concrete Mixer Jam - - - - -
2 Dump Truck Jam - - - - 20,833.33
3 Exavator Jam - - - - 250,000.00
4 Concrete Vibrator Jam - - - - 14,583.33
5 Pick Up Tandon Jam - - - - -
6 Stamper Jam - 10,416.67 - - -
7 Alat Bantu ls - - - - -
No URAIAN SATUAN
TOKO ADIRA INDAH TOKO SUMBER ARTHO TOKO SUMBER ARTHO PT. RIZKY LESTARI
TOKO SAMA JAYA
1 2 ABADI
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 9
GAN HARGA SURVEY

HARGA SATUAN

CV. GUNUNG PT. EKA HASNAWATI TOKO SURYA KERAMIK


UD. MAGHFIRAH UD. MUJUR JAYA TOKO KOP. KAS KPC HARGA RATA-RATA KETERANGAN
CANGGAH SEJAHTERA JAYA
( Rp. ) ( Rp. )
10 13 14

- 600,000.00 500,000.00 550,000.00 583,750.00


- 600,000.00 500,000.00 550,000.00 583,750.00
- 550,000.00 600,000.00 600,000.00 700,000.00
250,000.00
- 250,000.00 275,000.00 400,000.00 275,000.00 275,000.00
800,000.00 900,000.00 900,000.00 900,000.00
450,000.00 400,000.00 450,000.00
75,000.00 73,000.00 75,000.00 73,000.00 76,000.00
- 2,250,000.00 Asumsi
15,000.00 15,000.00 20,000.00 14,000.00 17,400.00
- 10,000.00 3,000.00 35,000.00
- 125,000.00 137,000.00 131,500.00
- 120,000.00 150,000.00 130,000.00 135,000.00 125,000.00
- 450,000.00
- 30,000.00 Asumsi
75,000.00
110,000.00
60,000.00
50,000.00
2,500,000.00 2,500,000.00
CV. GUNUNG PT. EKA HASNAWATI TOKO SURYA KERAMIK
UD. MAGHFIRAH UD. MUJUR JAYA TOKO KOP. KAS KPC HARGA RATA-RATA KETERANGAN
CANGGAH SEJAHTERA JAYA
( Rp. ) ( Rp. )
10 13 14
35,000.00
- 2,250,000.00 Asumsi
55,000.00 51,000.00 46,000.00
80,000.00 75,000.00 67,000.00
115,000.00 100,000.00
180,000.00
135,000.00
195,000.00
215,000.00 190,000.00
350,000.00 292,000.00
90,000.00 91,000.00
190,000.00 190,000.00
40,000.00 25,000.00 18,000.00 21,000.00 24,600.00
75,000.00 65,000.00 60,000.00 58,000.00 50,600.00
100,000.00 85,000.00 77,000.00 80,000.00 73,400.00
- 70,000.00 Asumsi
- 12,900.00 10,500.00 Asumsi
- 13,500.00
- 12,500.00 Asumsi
- 5,000,000.00

- 103,464.84 Asumsi
- 20,833.33
- 250,000.00
- 14,583.33
- 310,469.20 Asumsi
- 10,416.67
- 1,000.00 Asumsi
CV. GUNUNG PT. EKA HASNAWATI TOKO SURYA KERAMIK
UD. MAGHFIRAH UD. MUJUR JAYA TOKO KOP. KAS KPC HARGA RATA-RATA KETERANGAN
CANGGAH SEJAHTERA JAYA
( Rp. ) ( Rp. )
10 13 14
PERBANDINGA
Kabupaten : Kutai Timur
Kecamatan : Sangatta Utara
Tahun : 2014
Tanggal : 21 Maret 2014

No URAIAN SATUAN
TOKO ADIRA INDAH TOKO SUMBER TOKO SUMBER
TOKO SAMA JAYA
ARTHO 1 ARTHO 2
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7
I BAHAN
1 Koral Beton M3 535,000.00 600,000.00 600,000.00
2 Pasir Beton M3 535,000.00 600,000.00 600,000.00
3 Pasir Pasang M3 216,666.67
4 Pasir Urug M3 83,333.33
5 Batu Gunung M3 283,333.33 283,333.00
6 Batu Merah ( Laterit Lokal ) M3
7 Bata Merah Bh 1,000.00 1,100.00
8 Semen PC 50 Kg Kg 1,500.00 1,560.00
9 Kayu Perancah M3
10 Paku Kg 18,000.00 20,000.00 17,000.00 17,000.00
11 Baut Buah 35,000.00
12 Plywood 3 mm Lbr 50,000.00 50,000.00
13 Plywood 4 mm Lbr 61,000.00 64,000.00
14 Multiplek 6 mm Lbr 85,000.00
15 Multiplek 9 mm Lbr 135,000.00 128,000.00
16 Tanah Urug Biasa M3 33,333.33 41,666.67
17 Urugan Pilihan (Laterit) M3
18 Galam dia. 10 cm panjang 2 m btg
19 Papan Ulin 2/20 M3
20 Balok Ulin 10/10 M3
21 Balok Ulin 5/10 M3
22 Papan Kayu Meranti 2/20 M3
23 Balok Meranti 5/7 M3
24 Papan Bekisting M3
25 Besi Beton Polos Ø 6 SNI Kg 10,510.51 12,012.01 10,885.89
26 Besi Beton Polos Ø 8 SNI Kg 9,541.98 10,602.21 9,966.07
27 Besi Beton Polos Ø 10 SNI Kg 9,543.01 10,080.65 9,946.24
28 Besi Beton Polos Ø 12 SNI Kg 7,703.87 8,925.22 9,207.07 8,455.47
29 Besi Beton Polos Ø 14 SNI Kg
30 Besi Beton Ulir Ø 13 SNI Kg
31 Besi Beton Ulir Ø 14 SNI Kg
32 Besi Beton Ulir Ø 16 SNI Kg 11,339.66 8,966.24
33 Besi Beton Ulir Ø 19 SNI Kg
34 Kawat Beton Kg 20,000.00 25,000.00 18,000.00 20,000.00
35 Pipa PVC AW dia. 1,5 Inchi Btg 40,000.00 45,000.00 45,000.00 48,000.00
36 Pipa PVC AW dia. 2 Inchi Btg 65,000.00 70,000.00 72,000.00 60,000.00
37 Air Bersih Ltr
38 Bensin (Pertamax) Liter
39 Solar Industri Liter
40 Kerosene / Minyak Tanah Industri Liter
41 Pelumas Liter

Catatan: 1 Rit = 3 M3
1 Btg Kayu = 4 m
1 Btg Besi = 12 M (SNI)
Pelumas 1 Drum 100 Liter
PERBANDINGA
Kabupaten : Kutai Timur
Kecamatan : Sangatta Utara
Tahun : 2014
Tanggal : 21 Maret 2014

No URAIAN SATUAN
TOKO ADIRA INDAH TOKO SUMBER TOKO SUMBER
TOKO SAMA JAYA
ARTHO 1 ARTHO 2
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7

II HARGA BARU ALAT


1 Concrete Mixer 0,3 m3 Unit 15,200,000.00
2 Dump Truck 3,5 m3 Unit
3 Exavator Unit
4 Concrete Vibrator Unit
5 Pick Up Unit
6 Stamper Unit 12,500,000.00
7 Water Tanker Unit
8 Jack Hammer Unit
9 Alat Bantu ls
NGAN SURVEY HARGA BAHAN

HARGA SATUAN

PT. RIZKY LESTARI CV. GUNUNG PT. EKA HASNAWATI TOKO SURYA
UD. MAGHFIRAH UD. MUJUR JAYA TOKO KOP. KAS KPC HARGA RATA-RATA
ABADI CANGGAH SEJAHTERA KERAMIK JAYA
( Rp. ) ( Rp. ) ( Rp. )
8 9 10 11 12 13 14 15

600,000.00 600,000.00 500,000.00 550,000.00 569,285.71


600,000.00 600,000.00 500,000.00 550,000.00 569,285.71
250,000.00 183,333.33 250,000.00 200,000.00 200,000.00 216,666.67
100,000.00 83,333.33 91,666.67 133,333.33 91,666.67 97,222.22
300,000.00 266,666.67 300,000.00 300,000.00 300,000.00 290,476.14
150,000.00 133,333.33 150,000.00 144,444.44
1,050.00
1,500.00 1,460.00 1,500.00 1,460.00 1,496.67
2,250,000.00
15,000.00 15,000.00 20,000.00 14,000.00 17,000.00
10,000.00 3,000.00 16,000.00
50,000.00
62,500.00
85,000.00
150,000.00 125,000.00 137,000.00 135,000.00
50,000.00 40,000.00 50,000.00 43,333.33 45,000.00 43,333.33
150,000.00 150,000.00
40,000.00 40,000.00
4,000,000.00 4,687,500.00 4,343,750.00
4,000,000.00 2,750,000.00 3,375,000.00
4,000,000.00 3,000,000.00 3,500,000.00
2,500,000.00 3,125,000.00 2,812,500.00
2,500,000.00 2,500,050.00 2,500,025.00
2,250,000.00
11,136.14
11,662.43 11,662.43 10,814.25 9,754.03 10,571.91
10,080.65 10,752.69 10,080.65 9,005.38 9,927.04
8,455.47 10,804.21 9,394.96 8,992.32
10,339.12 12,406.95 11,373.04
10,817.31 10,817.31
13,440.86 13,440.86
10,021.10 11,339.66 10,021.10 10,337.55
8,408.07 13,079.22 10,911.81 10,799.70
40,000.00 25,000.00 18,000.00 21,000.00 23,375.00
75,000.00 65,000.00 60,000.00 58,000.00 54,500.00
100,000.00 85,000.00 77,000.00 80,000.00 76,125.00
60.00
12,900.00 12,900.00
13,500.00 13,500.00
60,000.00
50,000.00 50,000.00

Sangatta, 06 MEI 2014


KEPALA BIDANG PENGAIR

MUH. MUHIR, ST. MT


NIP. 19670603 199312 1 0
INGAN SURVEY HARGA BARU ALAT

HARGA SATUAN

PT. RIZKY LESTARI CV. GUNUNG PT. EKA HASNAWATI TOKO SURYA
UD. MAGHFIRAH UD. MUJUR JAYA TOKO KOP. KAS KPC HARGA BARU ALAT
ABADI CANGGAH SEJAHTERA KERAMIK JAYA
( Rp. ) ( Rp. ) ( Rp. )
8 9 10 11 12 13 14 15

15,200,000.00
306,000,000.00
1,155,000,000.00
7,000,000.00
114,000,000.00
12,500,000.00
305,000,000.00
21,000,000.00
1,000.00
Sangatta, 06 MEI 2014
KEPALA BIDANG PENGAIR

MUH. MUHIR, ST. MT


NIP. 19670603 199312 1 0
HARGA DIBULATKAN KETERANGAN

16 17

569,200.00
569,200.00
216,600.00
97,200.00
290,400.00
144,400.00
1,000.00
1,500.00
2,250,000.00 HSKP
17,000.00
16,000.00
50,000.00
62,500.00
85,000.00
135,000.00
43,300.00
150,000.00
40,000.00
4,343,700.00
3,375,000.00
3,500,000.00
2,812,500.00
2,500,000.00
2,250,000.00 HSKP
11,100.00
10,500.00
9,900.00
8,900.00
11,300.00
10,800.00
13,400.00
10,300.00
10,700.00
23,300.00
54,500.00
76,100.00
60.00 Asumsi
12,900.00
13,500.00
60,000.00 HSKP
50,000.00

Sangatta, 06 MEI 2014


KEPALA BIDANG PENGAIRAN

MUH. MUHIR, ST. MT


NIP. 19670603 199312 1 002
HARGA DIBULATKAN KETERANGAN

16 17

Dealer
Asumsi
Asumsi
Asumsi

Asumsi
Asumsi
Asumsi
Sangatta, 06 MEI 2014
KEPALA BIDANG PENGAIRAN

MUH. MUHIR, ST. MT


NIP. 19670603 199312 1 002
PERBANDIN
Kabupaten : Kutai Timur
Kecamatan : Sangatta Utara
Tahun : 2017
Tanggal :

No URAIAN SATUAN
Toko Surya Toko Sumber
Toko WKM
keramik jaya Arto
( Rp. ) ( Rp. )
1 2 3 4 5 6
BAHAN
I TANAH & PASIR
1 Pasir Urug 1 m³ 300,000
2 Pasir Pasang Lokal 1 m³ 300,000
3 Pasir Beton (Palu) 1 m³ 450,000 600,000
4 Kerikil Beton (Palu) 1 m³ 450,000 600,000
5 Kerikil Beton (Lokal) 1 m³ 450,000
6 Kerikil Sungai (Lokal) 1 m³

7 Sirtu 1 m³

8 Tanah Urug Biasa 1 m³ 125,000


9 Tanah Urug Pilihan 1 m³

10 Agregat Halus Untuk Agregat A 1 m³ 450,000


11 Agregat Kasar Untuk Agregat A/B 1 m³ 450,000
12 Agregat Halus Untuk Hotmix 1 m³ 450,000
13 Agregat Kasar Untuk Hotmix 1 m³ 450,000
14 Agregat C 1 m³

15 Agregat Lokal 1 m³
II BATU, BATA DAN BETON BLOCK

1 Batu Gunung 1 m³ 850,000


2 Stenslah Batu Pecah Tangan 4/6 - 5/7 cm 1 m³

3 Stenslah Batu Pecah Mesin 4/6 - 5/7 cm 1 m³

4 Batu Bata Merah 1 bh 900 950


5 Batu Berongga 1 bh

6 Batako 1 bh 2,500 2,500


7 Kanstin 1 bh

8 Paving Block 1 bh
III SEMEN / KAPUR

1 Beton Ready Mix K-250 1 m³ 1,450,000


2 Beton Ready Mix K-225 1 m³ 1,435,000
3 Beton Ready Mix K-175 1 m³ 1,375,000
4 Portland Semen ( PC) ( 50 kg ) Zak 60,000 62,000
5 Portland Semen Putih ( 40 kg ) Zak 140,000
6 Portland Semen Warna ( 25 kg ) Zak

7 Portland Semen Grouting ( 25 kg ) Zak

8 Kapur Pasang 1 m³

9 Kapur / Gamping 1 kg
IV KAYU

1 Kayu Meranti
2 Reng : 2/3, 3/5 1 m³

3 Usuk : 5/7 1 m³

4 Balok 5 x 10 cm - 4 m 1 m³

5 Balok 10 x 10 cm - 4 m 1 m³

6 Papan ( 2 x 20 ) cm 1 m³

7 Papan ( 3 x 20 ) cm 1 m³
8 Papan ( 5 x 20 ) cm 1 m³
Kayu Kruing
9 Reng : 2/3, 3/5 1 m³

10 Usuk : 5/7 1 m³

11 Balok 5 x 10 cm - 4 m 1 m³

12 Balok 10 x 10 cm - 4 m 1 m³

13 Papan ( 2 x 20 ) cm 1 m³

14 Papan ( 3 x 20 ) cm 1 m³

15 Papan ( 5 x 20 ) cm 1 m³
Kayu Bengkirai
16 Reng : 2/3, 3/5 1 m³

17 Usuk : 5/7 1 m³
18 Balok 5 x 10 cm - 4 m 1 m³

19 Balok 10 x 10 cm - 4 m 1 m³

20 Papan ( 2 x 20 ) cm 1 m³

21 Papan ( 3 x 20 ) cm 1 m³

22 Papan ( 5 x 20 ) cm 1 m³
Kayu Ulin
23 Reng : 2/3, 3/5 1 m³

24 Usuk : 5/7 1 m³

25 Balok 5 x 10 cm - 4 m 1 m³

26 Balok 10 x 10 cm - 4 m 1 m³

27 Papan ( 2 x 20 ) cm 1 m³

28 Papan ( 3 x 20 ) cm 1 m³

29 Papan ( 5 x 20 ) cm 1 m³
Kayu Olahan
30 Triplex 3.00 mm 1 lbr 51,000 57,000
31 Triplex 4.00 mm 1 lbr 65,000 68,000
32 Multiplex 6.00 mm 1 lbr 85,000 90,000
33 Multiplex 9.00 mm 1 lbr 125,000 135,000
34 Multiplex 10.00 mm 1 lbr

35 Multiplex 12.00 mm 1 lbr 185,000 195,000


36 Multiplex 18.00 mm 1 lbr 355,000 350,000
37 Plywood ( 30 x 60 ) cm x 4 mm 1 lbr

38 Plywood ( 30 x 60 ) cm x 6 mm 1 lbr

39 Plywood ( 60 x 120 ) cm x 4 mm 1 lbr

40 Plywood ( 60 x 120 ) cm x 6 mm 1 lbr

41 Plywood ( 120 x 240 ) cm x 4 mm 1 lbr 67,000


42 Kayu Dolken ø 8 - 10 cm 1 btg
V BESI DAN ALMUNIUM

1 Besi Beton Polos SNI Ø 6 Btg 30,000 28,000


2 Besi Beton Polos SNI Ø 8 Btg 45,000 43,000
3 Besi Beton Polos SNI Ø 10 Btg 55,000 65,000
4 Besi Beton Polos SNI Ø 12 Btg 120,000 120,000
5 Besi Beton Polos SNI Ø 16 Btg 250,000 180,000
6 Besi Beton Polos SNI Ø 18 Btg 275,000
7 Besi Beton Ulir 1 kg

8 Kawat beton / bendrat RRT 1 kg 30,000 25,000


9 Paku Biasa 3" 1 kg 17,000 16,000
10 Paku Biasa 4" 1 kg 17,000 16,000
11 Paku Biasa 5" 1 kg 19,000
12 Paku Biasa 6" 1 kg

13 Paku Ulin 3" 1 kg 19,000 20,000


14 Paku Ulin 4" 1 kg 19,000 20,000
15 Paku Ulin 5" 1 kg 22,000
16 Paku Ulin 6" 1 kg

17 Paku Ulin 7" 1 kg

18 Baut segala ukuran 1 kg


VI PERPIPAAN AIR BERSIH

1 Pipa PVC type AW Ø 1/2" 1 ljr 28,000 20,000


2 Pipa PVC type AW Ø 3/4" 1 ljr 30,000 28,000
3 Pipa PVC type AW Ø 1" 1 ljr 40,000 35,000
4 Pipa PVC type AW Ø 1 1/2" 1 ljr 55,000 58,000
5 Pipa PVC type AW Ø 2" 1 ljr 90,000 75,000
6 Pipa PVC type AW Ø 2 1/2" 1 ljr 145,000 105,000
7 Pipa PVC type AW Ø 3" 1 ljr 195,000 135,000
8 Pipa PVC type AW Ø 4" 1 ljr 295,000 235,000
9 Pipa PVC type AW Ø 6" 1 ljr 700,000
10 Pipa PVC type AW Ø 8" 1 ljr 1,100,000
11 Shock PVC Ø 1/2" 1 bh 2,500 3,000
12 Shock PVC Ø 3/4" 1 bh 3,500 3,000
13 Shock PVC C Ø 1" 1 bh 5,000 4,000
14 Shock PVC Ø 1 1/2" 1 bh 5,000 5,000
15 Shock PVC Ø 2" 1 bh 7,000 7,000
16 Shock PVC Ø 2 1/2" 1 bh 12,000 10,000
17 Shock PVC Ø 3" 1 bh 15,000 12,000
18 Shock PVC Ø 4" 1 bh 25,000 12,000
19 Knee PVC Ø 1/2" 1 bh 2,500 3,000
20 Knee PVC Ø 3/4" 1 bh 3,500 3,000
21 Knee PVC Ø 1" 1 bh 5,000 4,000
22 Knee PVC Ø 1 1/2" 1 bh 5,000 5,000
23 Knee PVC Ø 2" 1 bh 7,000 7,000
24 Knee PVC Ø 2 1/2" 1 bh 12,000 12,000
25 Knee PVC Ø 3" 1 bh 15,000 15,000
26 Knee PVC Ø 4" 1 bh 25,000 20,000
27 Pipa Galvanis Ø 1/2" 1 ljr

28 Pipa Galvanis Ø 3/4" 1 ljr

29 Pipa Galvanis Ø 1" 1 ljr

30 Pipa Galvanis Ø 1 1/2" 1 ljr

31 Pipa Galvanis Ø 2" 1 ljr

32 Pipa Galvanis Ø 2 1/2" 1 ljr

33 Pipa Galvanis Ø 3" 1 ljr

34 Pipa Galvanis Ø 4" 1 ljr

35 Shock Galvanis Ø 1/2" 1 bh

36 Shock Galvanis Ø 3/4" 1 bh

37 Shock Galvanis Ø 1" 1 bh

38 Shock Galvanis Ø 1 1/2" 1 bh

39 Shock Galvanis Ø 2" 1 bh

40 Shock Galvanis Ø 2 1/2" 1 bh

41 Shock Galvanis Ø 3" 1 bh

42 Shock Galvanis Ø 4" 1 bh

43 Knee Galvanis Ø 1/2" 1 bh

44 Knee Galvanis Ø 3/4" 1 bh

45 Knee Galvanis Ø 1" 1 bh

46 Knee Galvanis Ø 1 1/2" 1 bh

47 Knee Galvanis Ø 2" 1 bh

48 Knee Galvanis Ø 2 1/2" 1 bh

49 Knee Galvanis Ø 3" 1 bh

50 Knee Galvanis Ø 4" 1 bh

51 Gete Valve Ø 1/2" 1 bh

52 Gete Valve Ø 3/4" 1 bh

53 Gete Valve Ø 1" 1 bh


54 Gete Valve Ø 1 1/2" 1 bh

55 Gete Valve Ø 2" 1 bh

56 Gete Valve Ø 2 1/2" 1 bh

57 Gete Valve Ø 3" 1 bh

58 Gete Valve Ø 4" 1 bh

59 Stop Valve Ø 1/2" 1 bh 15,000


60 Stop Valve Ø 3/4" 1 bh 18,000
61 Stop Valve Ø 1" 1 bh 25,000
62 Stop Valve Ø 1 1/2" 1 bh 35,000
63 Stop Valve Ø 2" 1 bh 45,000
64 Stop Valve Ø 2 1/2" 1 bh

65 Stop Valve Ø 3" 1 bh

66 Stop Valve Ø 4" 1 bh

67 Lem PVC 1 kg 45,000


VII LAIN - LAIN

1 Kawat Bronjong

2 Bensin

3 Solar Industri

4 Karosine / Minyak Tanah

5 Aspal kg 10,500
6 Pelumas

1 Btg Kayu = 4 m
1 Btg Besi = 12 M (SNI)
Pelumas 1 Drum 100 Liter
PERBANDI
Kabupaten : Kutai Timur
Kecamatan : Sangatta Utara
Tahun : 2017
Tanggal :

No URAIAN SATUAN
Toko WKM

( Rp. ) ( Rp. ) ( Rp. )


1 2 3 4 5 6

II SEWA ALAT
1 Dump Truck 4 Ton 1 Jam
2 Dump Truck 6 Ton 1 Jam 300,000
3 Generator Set 1 Jam
4 Motor Grader > 100 HP 1 Jam 800,000
5 Vibrator Roller 5 - 8 T 1 Jam 450,000
6 Exavator 80 - 140 HP 1 Jam 580,000
7 Exavator Long Arm 1 Jam
8 Bull Dozer 1 Jam 875,000
9 Water Tankker 3000 - 4500 L 1 Jam 350,000
10 Wheel Loader 1.0 - 1.6 M3 1 Jam 550,000
11 Tandem Roller 6 - 8 T 1 Jam 450,000
12 Concrete Mixer (Molen) 0.3 - 0.6 M3 1 hr
13 Concrete Vibrator 1 hr
14 Truk Mixer (Agitator) 1 Jam 550,000
15 Stamper 1 hr
16 Winch Pancang Ulin / Alat Pancang 1 hr
17 Waterpass 1 hr
18 Teodolite 1 hr
19 Water Pump 70 - 100 mm 1 hr
20 Submersible Pump (Pompa Penyedot Lumpur) 1 hr
21 Mobil Doble Gardan (Doble Cabin) 1 hr
22 Mobil Toyota Kijang Inova 1 hr
23 Mobil Toyota Avanza 1 hr
PERBANDINGAN SURVEY HARGA BAHAN

HARGA SATUAN

toko samping Bintang Timur


Toko sgt lma Toko rudina Bumi Arto 2
deler Cemerlang
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
7 8 9 10 11 12 13

400,000 300,000
600,000
550,000 600,000
550,000

130,000
150,000
950,000

1,000 1,000

3,000 2,500

63,000 62,000
98,000 90,000
57,000 60,000
66,000 68,000 70,000
88,000 95,000 90,000
125,000 130,000 130,000

275,000 235,000
335,000 385,000 385,000
30,000 38,000
51,000 40,000 55,000
76,000 50,000 85,000
110,000 75,000 120,000
145,000

25,000 22,000 25,000 20,000


24,000 18,000 16,000 18,000 18,000
24,000 18,000 16,000 18,000 18,000
24,000 20,000 16,000 18,000
24,000 16,000
30,000 20,000 20,000 20,000 20,000
30,000 20,000 20,000 20,000 20,000
30,000 20,000 20,000
30,000 20,000
30,000 20,000
30,000 5000/pcs

25,000 19,000 17,000 20,000 20,000


33,000 25,000 22,000 28,000 28,000
44,000 35,000 32,000 38,000
75,000 60,000 45,000 65,000
90,000 70,000 75,000 85,000
130,000 100,000 120,000 120,000
185,000 145,000 135,000 165,000
300,000 220,000 225,000 240,000 270,000
700,000 400,000 625,000
1,100,000 900,000 135,000
3,000 3,000 2,000 2,000 2,000
4,000 3,500 3,000 3,000 3,000
5,000 4,000 5,000 4,000 4,000
8,000 4,500 4,000 5,000
12,000 5,000 5,000 5,000 5,000
20,000 7,000 8,000 6,000 8,000
30,000 8,000 12,000 6,000 12,000
60,000 10,000 18,000 10,000 15,000
3,000 3,000 2,000 3,000 2,000
4,000 3,500 3,000 4,000 3,000
5,000 5,000 4,000 5,000 4,000
10,000 7,000 5,000 6,000 5,000
180,000 7,000 8,000 7,000 5,000
250,000 9,000 10,000 10,000 10,000
40,000 12,000 18,000 120,000 15,000
70,000 18,000 20,000 18,000 18,000
5,000
6,000
10,000
18,000
25,000
45,000
65,000
110,000
6,000
8,000
12,000
25,000
35,000
60,000
95,000
165,000
95,000
110,000
185,000
400,000
650,000
1,550,000
2,000,000
3,800,000
80,000
115,000
190,000
420,000
680,000
1,590,000
2,080,000
3,875,000
50,000
PERBANDINGAN SURVEY HARGA BARU ALAT

HARGA SATUAN

( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )


7 8 9 10 11 12 13
HARGA RATA- HARGA
KETERANGAN
RATA DIBULATKAN
( Rp. ) ( Rp. )
14 15 16 17

333,333.33 333,300.00
450,000.00 450,000.00
550,000.00 550,000.00
533,333.33 533,300.00
450,000.00 450,000.00
- -
- -
127,500.00 127,500.00
150,000.00 150,000.00
450,000.00 450,000.00
450,000.00 450,000.00
450,000.00 450,000.00
450,000.00 450,000.00
- -
- -
- -
900,000.00 900,000.00
- -
- -
962.50 900.00
- -
2,625.00 2,600.00
- -
- -
- -
1,450,000.00 1,450,000.00
1,435,000.00 1,435,000.00
1,375,000.00 1,375,000.00
61,750.00 61,700.00
109,333.33 109,300.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
56,250.00 56,200.00
67,400.00 67,400.00
89,600.00 89,600.00
129,000.00 129,000.00
- -
222,500.00 222,500.00
362,000.00 362,000.00
- -
- -
- -
- -
67,000.00 67,000.00
- -
- -
31,500.00 31,500.00
46,800.00 46,800.00
66,200.00 66,200.00
109,000.00 109,000.00
191,666.67 191,600.00
275,000.00 275,000.00
- -
24,500.00 24,500.00
18,142.86 18,100.00
18,142.86 18,100.00
19,400.00 19,400.00
20,000.00 20,000.00
21,285.71 21,200.00
21,285.71 21,200.00
23,000.00 23,000.00
25,000.00 25,000.00
25,000.00 25,000.00
15,000.00 15,000.00
- -
21,285.71 21,200.00
27,714.29 27,700.00
37,333.33 37,300.00
59,666.67 59,600.00
80,833.33 80,800.00
120,000.00 120,000.00
160,000.00 160,000.00
255,000.00 255,000.00
606,250.00 606,200.00
808,750.00 808,700.00
2,500.00 2,500.00
3,285.71 3,200.00
4,428.57 4,400.00
5,250.00 5,200.00
6,571.43 6,500.00
10,142.86 10,100.00
13,571.43 13,500.00
21,428.57 21,400.00
2,642.86 2,600.00
3,428.57 3,400.00
4,571.43 4,500.00
6,142.86 6,100.00
31,571.43 31,500.00
44,714.29 44,700.00
33,571.43 33,500.00
27,000.00 27,000.00
- -
- -
- -
- -
- -
- -
- -
- -
5,000.00 5,000.00
6,000.00 6,000.00
10,000.00 10,000.00
18,000.00 18,000.00
25,000.00 25,000.00
45,000.00 45,000.00
65,000.00 65,000.00
110,000.00 110,000.00
6,000.00 6,000.00
8,000.00 8,000.00
12,000.00 12,000.00
25,000.00 25,000.00
35,000.00 35,000.00
60,000.00 60,000.00
95,000.00 95,000.00
165,000.00 165,000.00
95,000.00 95,000.00
110,000.00 110,000.00
185,000.00 185,000.00
400,000.00 400,000.00
650,000.00 650,000.00
1,550,000.00 1,550,000.00
2,000,000.00 2,000,000.00
3,800,000.00 3,800,000.00
47,500.00 47,500.00
66,500.00 66,500.00
107,500.00 107,500.00
227,500.00 227,500.00
362,500.00 362,500.00
795,000.00 795,000.00
2,080,000.00 2,080,000.00
3,875,000.00 3,875,000.00
47,500.00 `
- -
- -
- -
- -
- -
5,250.00 5,200.00
- -

KEPALA BIDANG SUMBER DAYA AIR


MUH. MUHIR, ST. MT
NIP. 19670603 199312 1 002
HARGA BARU HARGA
KETERANGAN
ALAT DIBULATKAN
( Rp. ) ( Rp. )
14 15 16 17
KEPALA BIDANG SUMBER DAYA AIR

MUH. MUHIR, ST. MT


NIP. 19670603 199312 1 002