SINAR SOSRO
PABRIK GRESIK
NAMA PROYEK
BANG.KANTOR, KANVAS,
GUDANG MATERIAL
LOKASI
Jl.Raya Cangkir KM 21, Dsn. Gading,
Kec.Driyorejo-Gresik
KONSULTAN PENGKAJI
ADY SUCIPTO, ST
PENGKAJI 1
ANDI PRASETYO, ST
PENGKAJI 2
INDRI SURYAWATI,ST.MT
PENGKAJI 3
JUDUL GAMBAR
KOORDINAT G
-7.362362,
112.636890
G
J J
KODE GAMBAR
1 1
1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
B 7.30 30.00 PT.SINAR SOSRO
7.30 30.00
PABRIK GRESIK
NAMA PROYEK
7.50
7.50
BANG.KANTOR, KANVAS,
GUDANG MATERIAL
7.50
LOKASI
7.50
Jl.Raya Cangkir KM 21, Dsn. Gading,
Kec.Driyorejo-Gresik
7.50
7.50
GBJ
KONSULTAN PENGKAJI
TERAS
7.50
7.50
A
A
7.50
7.50
ADY SUCIPTO, ST
7.50
PENGKAJI 1
7.50
ANDI PRASETYO, ST
7.50
7.50
PENGKAJI 2
7.50
INDRI SURYAWATI,ST.MT
7.50
GUDANG LOGISTIK
TERAS
PENGKAJI 3
JUDUL GAMBAR
7.50
G
SITE PLAN 1:1000
7.50
U DENAH 1:100
TAMPAK ATAS 1:100
7.50
7.50
G
TERAS
KANTOR
H
7.50
7.50
H 37.30
37.30
B I
TAMPAK ATAS
DENAH A1 SKALA 1: 100
A1 SKALA 1: 100
I
GUDANG 2
X
J J
KODE GAMBAR
B
SITE PLAN ARS
A1 SKALA 1: 1000
K
NO.LBR JML.LBR K
A 1 1
1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
PT.SINAR SOSRO
PABRIK GRESIK
NAMA PROYEK
KANTOR , KANVAS, GUDANG
MATERIAL
LOKASI
Jl.Raya Cangkir KM 21, Dsn. Gading,
Kec.Driyorejo-Gresik
KONSULTAN PENGKAJI
ADY SUCIPTO, ST
PENGKAJI 1
A1
TAMPAK DEPAN SKALA 1: 100 ANDI PRASETYO, ST
PENGKAJI 2
INDRI SURYAWATI,ST.MT
PENGKAJI 3
JUDUL GAMBAR SKALA
G
TAMPAK DEPAN 1:100
POTONGAN MEMANJANG 1:100
Regel
H
H PEDESTAL 50X30
7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50
I 82.49
A1
POTONGAN B-B
SKALA 1: 100
J J
KODE GAMBAR
ARS
K
NO.LBR JML.LBR K
1 1
1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
PT.SINAR SOSRO
PABRIK GRESIK
NAMA PROYEK
KANTOR , KANVAS, GUDANG
MATERIAL
LOKASI
Jl.Raya Cangkir KM 21, Dsn. Gading,
Kec.Driyorejo-Gresik
KONSULTAN PENGKAJI
A1
TAMPAK SAMPING SKALA 1: 100
ADY SUCIPTO, ST
PENGKAJI 1
ANDI PRASETYO, ST
PENGKAJI 2
BUBUNGAN GALVALUM 0,3mm
WF 300.150.6,5.9
TERAS GBJ
G
7.30
A1
POTONGAN A-A I
SKALA 1: 500
J J
KODE GAMBAR
ARS
K
NO.LBR JML.LBR K
1 1
1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
PT.SINAR SOSRO
PABRIK GRESIK
NAMA PROYEK
WF 300.150.6,5.9 WF 300.150.6,5.9
BANG.KANTOR, KANVAS,
30
PLAT SIRIP PENGAKU 12mm PLAT SIRIP PENGAKU 10mm GUDANG MATERIAL
PLAT PLENDES 16mm PLAT PLENDES 16mm
1 1
ANGKUR 19 ANGKUR 19
LOKASI
45
100
KERAMIK 40x40 KASAR KERAMIK 40x40 KASAR
RABAT tb. 7cm RABAT tb. 7cm
PASIR URUG tb. 10cm PEDESTAL 30/50 PASIR URUG tb. 10cm PEDESTAL 30/50
TANAH URUG TANAH URUG KONSULTAN PENGKAJI
10 7
10 7
30
30
13
13
SLOOF 20/30 SLOOF 20/30
LANTAI KERJA 5cm LANTAI KERJA 5cm
5
155
155
BAUT ANGKUR 19
ADY SUCIPTO, ST
180
180
WF 300.150.6,5.9
PENGKAJI 1
300
PLAT SIRIP PENGAKU 12mm
500
8- 14 100 8- 14
PLAT PLENDES 16mm
8 - 150 8 - 150
ANDI PRASETYO, ST
12 - 150 15 12 - 150
PENGKAJI 2
250
20
20
12 - 150 12 - 150
5
5
LANTAI KERJA 5cm LANTAI KERJA 5cm
33 30 33 GB. POTONGAN 1-1 25 50 25 INDRI SURYAWATI,ST.MT
100
A1 SKALA 1 : 10 100
PENGKAJI 3
12 - 150
JUDUL GAMBAR
G
35
12 - 150 DETAIL PONDASI 1 : 10
STROUS 25
100
30
200
PEDESTAL 30/50
G
50
35
12 - 150
12 - 150
H
25 50 25
100
50 8- 14
8- 12
20
8 - 150
18 - 150
30
18 - 150
25
5- 12
30
J J
KODE GAMBAR
GB. DETAIL PEDESTAL 30/50 GB. DETAIL SLOOF 20/30 GB. DETAIL STROUS 25
A1 SKALA 1 : 10
A1 SKALA 1 : 10
A1 SKALA 1 : 10 ARS
K
NO.LBR JML.LBR K
1 1
1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
PT.SINAR SOSRO
PABRIK GRESIK
NAMA PROYEK
BANG.KANTOR, KANVAS,
GUDANG MATERIAL
LOKASI
Jl.Raya Cangkir KM 21, Dsn. Gading,
ATAP ZINCALUME
Kec.Driyorejo-Gresik
3 1 STIFF PLAT 8mm
5.9
. 1 50.6,
300 PLAT SAMBUNG 10mm
WF
GORDING C150.65.20.2,3 KONSULTAN PENGKAJI
6 .8 VOUTE WF 300.150.6,5.9
.60.
125 VOUTE WF 125.60.6.8 2
WF
PLAT SAMBUNG 12mm BUBUNGAN GALVALUM 0.3mm
BAUT 16 ATAP ZINCALUME
3
1 PLAT SAMBUNG 12mm
WF BAUT 16
.9
50.6,5 30 0.15 GORDING C150.65.20.2,3
F300.1 0.6,
5.9
BESI POLOS 12 W STIFF PLAT 8mm
ATAP ZINCALUME VOUTE WF 300.150.6,5.9
GORDING C150.65.20.2,3 2
CANAL C150.65.20.2,3
ANDI PRASETYO, ST
PENGKAJI 2
GB. DETAIL C GB. DETAIL D
A1 SKALA 1 : 25
A1 SKALA 1 : 25
INDRI SURYAWATI,ST.MT
PENGKAJI 3
JUDUL GAMBAR
G
DETAIL 1 : 10
ATAP ZINCALUME
I
GB. DETAIL E
A1 SKALA 1 : 25
J J
KODE GAMBAR
ARS
K
NO.LBR JML.LBR K
1 1
1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
PT.SINAR SOSRO
PABRIK GRESIK
NAMA PROYEK
BANG.KANTOR, KANVAS,
GUDANG MATERIAL
LOKASI
Jl.Raya Cangkir KM 21, Dsn. Gading,
Kec.Driyorejo-Gresik
BAUT 16 + RING BAUT 16 + RING
KONSULTAN PENGKAJI
26.6
BAUT 16 + RING
32
13.3
RAFTER WF 300.150.6,5.9 RAFTER WF WF 300.150.6,5.9 RAFTER WF 125.60.6.8
38.7
51.6
BAUT 16 + RING
62
25.4
BAUT 16 + RING BAUT 16 + RING VOUTE WF 125.60.6.8
30
31
VOUTE WF WF 300.150.6,5.9 VOUTE WF WF 300.150.6,5.9 ADY SUCIPTO, ST
6
PENGKAJI 1
PLAT SAMBUNG tb. 12mm GB. POTONGAN 4-4
PLAT SAMBUNG tb. 12mm
A1 SKALA 1 : 10
12.5 13 ANDI PRASETYO, ST
GB. POTONGAN 1-1 GB. POTONGAN 2-2 PENGKAJI 2
A1 A1 SKALA 1 : 10
SKALA 1 : 10
INDRI SURYAWATI,ST.MT
PENGKAJI 3
JUDUL GAMBAR
G
DETAIL SAMBUNGAN 1 : 10
BESI POLOS 14
MUR 14
H
20
J J
KODE GAMBAR
ARS
K
NO.LBR JML.LBR K
1 1
1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
TANAH HAK
(SOSRO)
TANAH HAK
(SOSRO)
UDITCH 30.40.120
TANAH HAK
(SOSRO)
UNGOFTABLE DRAINAGE 20cm x 40
CONTROL BOX 1m x 1M
UDITCH 30.40.120
UDITCH 30.40.120
82.50
0
UDITCH 30.40.12
UDITCH 30.40.12
0 TERAS
TERAS
TERAS
TANAH HAK
7.30
(SOSRO)
TANAH HAK
37.30
(SOSRO)
UDITCH 30.40.120
0
UDITCH 30.40.12
7.50 7.50
UDITCH 30.40.12
0
7.50 7.50
7.50 7.50
7.50 7.50
7.50 7.50
7.50
UDITCH 30.40.120
JALAN
DA
SU
NG
AI A1 SKALA 1: 100
UDITCH 30.40.120
TANAH HAK
(SOSRO)
TANAH HAK
(SOSRO)
TANAH HAK
(SOSRO)