3 Tanaman Gantung
Vermonika Eliptica ( Lee Kuan Yew), tinggi 500 mm, jumlah 1 pot/planter berisi 9 no
108.00 no
cabang minimal 4, ditanam berjarak 170mm c/c Tanaman Lee Kuan Yew
483,232.75 9,664,655.00
30,624.00 6,737,280.00
45,000.00 540,000.00
s (pupuk organik)
155,782.00 18,693,840.00
35,563.00 3,840,804.00
1,281,500.00 1,281,500.00
44,577.50 508,183.50
65,884.50 751,083.30
2,074,872.25 55,814,063.53
1,270,733.75 6,353,668.75
733,315.00 5,866,520.00
gantung dan
350,718.50 49,451,308.50
127,711.65 6,130,159.20
SUB TOTAL 126,156,486.78
2,472,250.00 2,472,250.00
3,000,000.00 3,000,000.00
595,155.00 13,301,714.25
SUB TOTAL 18,773,964.25
TOTAL 184,407,030.03
ANALISA HARGA SATUAN PEKERJAAN 0.1
A. PEKERJAAN BESI
1 Pemasangan 1 m1 rangka Hollow Steel 4x4 ( 30.30.0.8mm)
Harga
Jumlah
No Uraian Kode Satuan Satuan
Koefisien Harga (Rp.)
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 100,000.00 35,000.00
Tukang besi L.02 OH 0.350 125,000.00 43,750.00
Kepala tukang L.03 OH 0.035 150,000.00 5,250.00
Mandor L.04 OH 0.004 165,000.00 577.50
JUMLAH TENAGA KERJA 84,577.50
B. BAHAN
Besi Hollow 30x30x0.80 mm P= 6 m Btg 3.200 85,000.00 272,000.00
Assesoris (perkuatan,las dll) % ### 2,720.00 81,600.00
JUMLAH HARGA BAHAN 353,600.00
C PERALATAN
Sewa Mesin Las Jam 0.150 7,500.00 1,125.00
JUMLAH HARGA ALAT 1,125.00
D Jumlah ( A + B + C ) 439,302.50
E Overhead & Profit 10% x D (maksimu 43,930.25
F Harga Satuan Pekerjaan 483,232.75
2 Pengadaan dan Penanaman 1 no. Tanaman Gantung Vermonica Eliptica (Lee Kuan Yew)
Harga
Jumlah
No Uraian Kode Satuan Satuan
Koefisien Harga (Rp.)
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 100,000.00 5,000.00
Tukang Landscaping L.02 OH 0.050 125,000.00 6,250.00
Kepala tukang L.03 OH 0.005 150,000.00 750.00
Mandor L.04 OH 0.002 165,000.00 330.00
JUMLAH TENAGA KERJA 12,330.00
B. BAHAN
Vermonica Elliptica (Lee Kuan Yew) no 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
2 Pemasangan 1 M2 ACP
Harga
Jumlah
No Uraian Kode Satuan Satuan
Koefisien Harga (Rp.)
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 100,000.00 4,000.00
Tukang ACP L.02 OH 0.400 125,000.00 50,000.00
Kepala tukang L.03 OH 0.040 150,000.00 6,000.00
Mandor L.04 OH 0.020 165,000.00 3,300.00
JUMLAH TENAGA KERJA 63,300.00
B. BAHAN
ACP ex. Seven M2 1.050 350,000.00 367,500.00
Accessories / Perlengkapan % ### 3,675.00 110,250.00
SATUAN
BAHAN/
No. BAHAN MATERIAL DAN UPAH KERJA HARGA
UPAH
KERJA
1 2 3 4
A. BAHAN BATU, PASIR, TANAH DAN TANAMAN
1 Pasir Pasangan M3 225,000.00
2 Pasir Beton M3 235,000.00
3 Pasir Pasangan Ayakan M3 260,000.00
4 Tanah Humus M3 155,000.00
5 Pupuk Kompos Kg 15,000.00
6 Semen Portland Kg 1,500.00
7 Sika Top 107 Waterproof + katalis Kg 11,250.00
D UPAH KERJA
1 Mandor Lapangan O/H 165,000.00
2 Kepala Tukang O/H 150,000.00
3 Tukang O/H 125,000.00
4 Pembantu Sopir O/H 125,000.00
5 Pembantu Mekanik O/H 150,000.00
6 Pembantu Tukang Listrik O/H 100,000.00
7 Pembantu Operator O/H 125,000.00
8 Mekanik O/H 150,000.00
9 Operator Terlatih O/H 150,000.00
10 Pekerja O/H 100,000.00
11 Sopir Terampil O/H 150,000.00
12 Biaya Pasang Canstein /M' 117,000.00
13 Biaya Pasang Paving /M2
E. SEWA PERALATAN
1 Mesin Las Jam 7,500.00
2 Scafolding hari 25,000.00
KETERANGAN
STANDAR 2017
5
Belum terayak
Belum terayak
sudah tersaring/ayak
bebas bebatuan dan akar
Pupuk organik
Semen Tonasa ###
Sika Top ###
1 no = jumlah cabang
minimal 4 cabang,
tinggi 500mm.
###
SNI
SNI
RD.460
Bahan Plastik (disesuaikan)
Seven
Lebar 20 cm
Rucika - Wafin
Rucika - Wafin
Toto
Toto
1 alat / Jam
1 set/hari