1 Pondasi Sumuran
a Bongkar Area Senderan 2.25 m3 882,004 1,984,509
b Pembesian 1.70 m3 188,820 320,239
c Bekisting Buis beton 60 3.00 m2 267,847 803,540
d Cor Beton 1.70 m3 969,289 1,643,914
7 Decking Lantai
a Bantalan kayu bengkirai 5/7 30.00 m 61,709 1,851,270
b Papan Kayu Ulin 21.00 m2 937,250 19,682,250
Page 1 of 20
HARGA SATUAN PEKERJAAN PERSIAPAN
No. Analisa Uraian Pekerjaan Kode Satuan
HARGA SATUAN PEKERJAAN PERSIAPAN
20 m2, Pembersihan Lahan
TENAGA KERJA
Pekerja L.01 Oh
Tukang L,02 Oh
Kepla Tukang L.03 Oh
Mandor L,04 Oh
BAHAN / MATERIAL
b 1 m3, Pembesian
TENAGA KERJA
Kepala tukang Oh
tukang Oh
mandor
100,000.00
120,000.00
120,000.00
- 100,000.00 -
0.800 120,000.00 96,000.00
0.300 120,000.00 36,000.00
0.005 120,000.00 600.00
Jumlah Tenaga Kerja Rp 132,600.00
185000
0.370 100,000.00 37,000.00 0.2
0.771 120,000.00 92,500.00 0.5
0.308 120,000.00 37,000.00 0.2
0.154 120,000.00 18,500.00 0.1
Jumlah Tenaga Kerja Rp 185,000.00
100,000.00 -
120,000.00 -
120,000.00 -
120,000.00 -
Jumlah Tenaga Kerja Rp -
1 2 3 4