Anda di halaman 1dari 64

RINCIAN BIAYA PEKERJAAN PEMBANGUNAN

JEMBATAN DIA. 100 MM BENTANG 24 M


TAHUN ANGGARAN 2012

HARGA
JUMLAH HARGA
NO. URAIAN VOLUME SATUAN SATUAN
( Rp ) ( Rp )

PEMBUATAN JEMBATAN PIPA Ø 100 MM BENTANG = 24 M


I. PEKERJAAN TANAH
1 Galian 13.13 m3 - -
2 Urugan Tanah Kembali 8.10 m3 - -
3 Urugan Pasir 0.44 m3 - -

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3 - -
2 Abutment beton adk. 1:2:3 4.38 m3 - -
3 Pekerjaan besi tulangan 481.25 kg - -
4 Pekerjaan bekisting 20.78 m2 - -
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3 - -

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 100 mm


1 Pipa GIP dia. 100 mm 28.00 m' Err:509 Err:509
2 Miter Tee with Flange Branch HDPE 100x90 mm 1.00 bh Err:509 Err:509
3 Stub Flange dia. 100 mm, HDPE 2.00 bh Err:509 Err:509
4 Gate Valve dia. 100 mm 1.00 bh Err:509 Err:509
5 Loose Flange dia. 100 mm, Steel 10.00 bh Err:509 Err:509
6 Air Valve dia. 50 mm 1.00 bh - -
7 Bend 45 CI dia. 100 mm
O 4.00 bh Err:509 Err:509

IV. PENGAD/PEMAS. PIPA DAN ACCESSORIES WASH OUT


1 Pipa dia. 90 mm, HDPE 6.00 m' Err:509 Err:509
2 Bend 45 dia. 90mm,HDPE
O 1.00 bh Err:509 Err:509
3 Bend 90 dia. 90mm, HDPE
O 1.00 bh Err:509 Err:509
4 Gate Valve dia. 75mm 1.00 m Err:509 Err:509
5 Street Box 2.00 bh - -

V. PEKERJAAN GELAGAR DAN LAIN-LAIN


1 Profil IWF.250.125 710.40 kg Err:509 Err:509
2 Base Plate T=22 mm 138.16 kg 21,000.00 2,901,360.00
3 Ankur baut dia. 22 mm, L= 30 cm left and right 16.00 bh 9,000.00 144,000.00
4 Sambungan gelagar dari Plat Baja t = 22 mm 87.92 kg 21,000.00 1,846,320.00
5 Mur + Baut dia. 22 mm, untuk sambungan gelagar 64.00 bh 10,000.00 640,000.00
6 Balok penyangga pipa Kayu 8/16 50.00 bh 80,000.00 4,000,000.00
7 Plat pengikat pipa lengkap dgn baut pengikat 50.00 bh 8,000.00 400,000.00
8 Besi pengaman 1.000 unit 375,000.00 375,000.00
JUMLAH Err:509
318.214285714286 JUMLAH per M' Err:509

1/64
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
JEMBATAN DIA. 75 MM BENTANG 30 M
TAHUN ANGGARAN 2012

HARGA
JUMLAH HARGA
NO. URAIAN VOLUME SATUAN SATUAN
( Rp ) ( Rp )

PEMBUATAN JEMBATAN PIPA Ø 75 MM BENTANG = 30 M


I. PEKERJAAN TANAH
1 Galian 15.59 m3 - -
2 Urugan Tanah Kembali 9.93 m3 - -
3 Urugan Pasir 0.44 m3 - -

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3 - -
2 Abutment beton adk. 1:2:3 5.01 m3 - -
3 Pekerjaan besi tulangan 550.55 kg - -
4 Pekerjaan bekisting 23.77 m2 - -
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3 - -

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 75 mm


1 Pipa GIP dia. 75 mm 38.00 m' - -
2 Miter Tee with Flange Branch HDPE 90x63 mm 1.00 bh Err:509 Err:509
3 Stub Flange dia. 90 mm, HDPE 2.00 bh Err:509 Err:509
4 Gate Valve dia. 75 mm 1.00 bh Err:509 Err:509
5 Loose Flange dia. 75 mm, Steel 10.00 bh - -
6 Air Valve dia. 50 mm 1.00 bh - -
7 Bend 45 CI dia. 75 mm
O 4.00 bh - -

IV. PENGAD/PEMAS. PIPA DAN ACCESSORIES WASH OUT


1 Pipa dia. 63 mm, HDPE 6.00 m' - -
2 Bend 45 dia. 63mm,HDPE
O 1.00 bh Err:509 Err:509
3 Bend 90O dia. 63mm, HDPE 1.00 bh Err:509 Err:509
4 Gate Valve dia. 50 mm 1.00 m - -
5 Street Box 2.00 bh - -

V. PEKERJAAN GELAGAR DAN LAIN-LAIN


1 Profil IWF.250.125 888.00 kg Err:509 Err:509
2 Base Plate T=22 mm 138.16 kg 21,000.00 2,901,360.00
3 Ankur baut dia. 22 mm, L= 30 cm left and right 16.00 bh 9,000.00 144,000.00
4 Sambungan gelagar dari Plat Baja t = 22 mm 301.44 kg 21,000.00 6,330,240.00
5 Mur + Baut dia. 22 mm, untuk sambungan gelagar 192.00 bh 10,000.00 1,920,000.00
6 Balok penyangga pipa Kayu 8/16 62.00 bh 80,000.00 4,960,000.00
7 Plat pengikat pipa lengkap dgn baut pengikat 62.00 bh 8,000.00 496,000.00
8 Besi pengaman 1.000 unit 375,000.00 375,000.00
892.80 JUMLAH Err:509
JUMLAH per M' Err:509

2/64
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
JEMBATAN DIA. 100 MM BENTANG 45 M
TAHUN ANGGARAN 2012

NO. URAIAN VOLUME SATUAN

PEMBUATAN JEMBATAN PIPA Ø 100 MM BENTANG = 45


I. PEKERJAAN TANAH
1 Galian 13.13 m3
2 Urugan Tanah Kembali 8.10 m3
3 Urugan Pasir 0.44 m3

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3
2 Abutment beton adk. 1:2:3 4.38 m3
3 Pekerjaan besi tulangan 481.25 kg
4 Pekerjaan bekisting 20.78 m2
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 100 mm


1 Pipa GIP dia. 100 mm 49.00 m'
2 Miter Tee with Flange Branch HDPE 100x90 mm 1.00 bh
3 Stub Flange dia. 100 mm, HDPE 2.00 bh
4 Gate Valve dia. 100 mm 1.00 bh
5 Loose Flange dia. 100 mm, Steel 10.00 bh
6 Air Valve dia. 50 mm 1.00 bh
7 Bend 45O CI dia. 100 mm 4.00 bh

IV. PENGAD/PEMAS. PIPA DAN ACCESSORIES WASH OUT


1 Pipa dia. 90 mm, HDPE 6.00 m'
2 Bend 45O dia. 90mm,HDPE 1.00 bh
3 Bend 90O dia. 90mm, HDPE 1.00 bh
4 Gate Valve dia. 75mm 1.00 m
5 Street Box 2.00 bh

V. PEKERJAAN GELAGAR DAN LAIN-LAIN


1 Profil IWF.250.125 1,332.00 kg
2 Base Plate T=22 mm 138.16 kg
3 Ankur baut dia. 22 mm, L= 30 cm left and right 16.00 bh
4 Sambungan gelagar dari Plat Baja t = 22 mm 87.92 kg
5 Mur + Baut dia. 22 mm, untuk sambungan gelagar 64.00 bh
6 Balok penyangga pipa Kayu 8/16 92.00 bh
7 Plat pengikat pipa lengkap dgn baut pengikat 92.00 bh
8 Besi pengaman 1.000 unit

318.214285714286

3/64
BANGUNAN
ANG 45 M
12

HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )

- -
- -
- -

- -
- -
- -
- -
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -

Err:509 Err:509
21,000.00 2,901,360.00
9,000.00 144,000.00
21,000.00 1,846,320.00
10,000.00 640,000.00
80,000.00 7,360,000.00
8,000.00 736,000.00
375,000.00 375,000.00
JUMLAH Err:509
JUMLAH per M' Err:509

4/64
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
JEMBATAN DIA. 75 MM BENTANG 14 M
TAHUN ANGGARAN 2012

NO. URAIAN VOLUME SATUAN

PEMBUATAN JEMBATAN PIPA Ø 75 MM BENTANG = 14


I. PEKERJAAN TANAH
1 Galian 15.59 m3
2 Urugan Tanah Kembali 9.93 m3
3 Urugan Pasir 0.44 m3

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3
2 Abutment beton adk. 1:2:3 5.01 m3
3 Pekerjaan besi tulangan 550.55 kg
4 Pekerjaan bekisting 23.77 m2
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 75 mm


1 Pipa GIP dia. 75 mm 22.00 m'
2 Miter Tee with Flange Branch HDPE 90x63 mm 1.00 bh
3 Stub Flange dia. 90 mm, HDPE 2.00 bh
4 Gate Valve dia. 75 mm 1.00 bh
5 Loose Flange dia. 75 mm, Steel 10.00 bh
6 Air Valve dia. 50 mm 1.00 bh
7 Bend 45O CI dia. 75 mm 4.00 bh

IV. PENGAD/PEMAS. PIPA DAN ACCESSORIES WASH OUT


1 Pipa dia. 63 mm, HDPE 6.00 m'
2 Bend 45O dia. 63mm,HDPE 1.00 bh
3 Bend 90O dia. 63mm, HDPE 1.00 bh
4 Gate Valve dia. 50 mm 1.00 m
5 Street Box 2.00 bh

V. PEKERJAAN GELAGAR DAN LAIN-LAIN


1 Profil IWF.200.100 298.20 kg
2 Base Plate T=22 mm 138.16 kg
3 Ankur baut dia. 22 mm, L= 30 cm left and right 16.00 bh
4 Sambungan gelagar dari Plat Baja t = 22 mm 100.48 kg
5 Mur + Baut dia. 22 mm, untuk sambungan gelagar 64.00 bh
6 Balok penyangga pipa Kayu 8/16 30.00 bh
7 Plat pengikat pipa lengkap dgn baut pengikat 30.00 bh
8 Besi pengaman 1.000 unit
892.80

5/64
ANGUNAN
NG 14 M
2

HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )

- -
- -
- -

- -
- -
- -
- -
- -

- -
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
- -

- -
Err:509 Err:509
Err:509 Err:509
- -
- -

Err:509 Err:509
21,000.00 2,901,360.00
9,000.00 144,000.00
21,000.00 2,110,080.00
10,000.00 640,000.00
80,000.00 2,400,000.00
8,000.00 240,000.00
375,000.00 375,000.00
JUMLAH Err:509
JUMLAH per M' Err:509

6/64
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
SYPHON DIA. 110 MM BENTANG 2 M
TAHUN ANGGARAN 2012

NO. URAIAN VOLUME SATUAN

PEMBUATAN SYPHON PIPA Ø 110 MM BENTANG = 2


I. PEKERJAAN TANAH
1 Galian 3.63 m3
2 Urugan Tanah Kembali 1.09 m3
3 Pembuatan bendung 6.00 m'

II. PEKERJAAN PENGADAAN/PEMASANGAN PIPA HDPE DIA. 110 mm


1 Pipa HDPE dia. 100 mm 9.00 m'
2 Bend dia. 110 mm x 45O 4.00 bh
3 Angker Baut dia. 10 mm 4.00 bh
4 Plat Strip 50 x 3 mm 2.00 bh

V. PEKERJAAN LAIN-LAIN
1 Thrust Blok Beton 0.76 m3
2 Selubung beton 2.05 m3
BANGUNAN
ANG 2 M
12

HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )

- -
- -
- -

Err:509 Err:509
Err:509 Err:509
5,000.00 20,000.00
15,000.00 30,000.00

- -
- -
JUMLAH Err:509
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
JEMBATAN DIA. 200 MM BENTANG 25 M
TAHUN ANGGARAN 2012

NO. URAIAN VOLUME SATUAN

PEMBUATAN JEMBATAN PIPA Ø 200 MM BENTANG = 25


I. PEKERJAAN TANAH
1 Galian 15.59 m3
2 Urugan Tanah Kembali 9.93 m3
3 Urugan Pasir 0.44 m3

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3
2 Abutment beton adk. 1:2:3 5.01 m3
3 Pekerjaan besi tulangan 550.55 kg
4 Pekerjaan bekisting 23.77 m2
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 200 mm


1 Pipa GIP dia. 200 mm 29.00 m'
2 Miter Tee with Flange Branch HDPE 200x63 mm 1.00 bh
3 Stub Flange dia. 200 mm, HDPE 2.00 bh
4 Gate Valve dia. 200 mm 1.00 bh
5 Loose Flange dia. 200 mm, Steel 10.00 bh
6 Air Valve dia. 50 mm 1.00 bh
7 Bend 45O CI dia. 200 mm 4.00 bh

IV. PENGAD/PEMAS. PIPA DAN ACCESSORIES WASH OUT


1 Pipa dia. 63 mm, HDPE 6.00 m'
2 Bend 45 dia. 63 mm,HDPE
O 1.00 bh
3 Bend 90O dia. 63 mm, HDPE 1.00 bh
4 Gate Valve dia. 63 mm 1.00 m
5 Street Box 2.00 bh

V. PEKERJAAN GELAGAR DAN LAIN-LAIN


1 IWF 250.125.6.9 mm 532.8000 kg
2 IWF 125.60.6.8 mm 18.4800 kg
3 Base Plate T=22 mm 138.16 kg
4 Ankur baut dia. 22 mm, L= 30 cm left and right 16.00 bh
5 Sambungan gelagar dari Plat Baja t = 22 mm 238.64 kg
6 Mur + Baut dia. 22 mm, untuk sambungan gelagar 152.00 bh
7 Balok penyangga pipa Kayu 8/16 52.00 bh
8 Plat pengikat pipa lengkap dgn baut pengikat 52.00 bh
9 Besi pengaman 1.000 unit
892.80

9/64
MBANGUNAN
ANG 25 M
2

HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )

- -
- -
- -

- -
- -
- -
- -
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
Err:509 Err:509

- -
Err:509 Err:509
Err:509 Err:509
- -
- -

Err:509 Err:509
Err:509 Err:509
21,000.00 2,901,360.00
9,000.00 144,000.00
21,000.00 5,011,440.00
10,000.00 1,520,000.00
80,000.00 4,160,000.00
8,000.00 416,000.00
375,000.00 375,000.00
JUMLAH Err:509
JUMLAH per M' Err:509

10/64
REKAPITULASI
Pekerjaan : Pembangunan Sarana dan Prasarana Rumah Sederhana Sehat PSU (Jaringan Air Bersih) Perumahan Rakyat
Lokasi : Kecamatan Marabahan (Perumahan Rizqi Tarutan Mandiri)
Kabupaten : Barito Kuala
Provinsi : Kalimantan Selatan
TA. : 2012

HARGA
NO URAIAN PEKERJAAN
( Rp )
1 2 3

I PEKERJAN PERSIAPAN

II PEKERJAN PENGADAAN PIPA HDPE DAN ASESORIES

III PEKERJAAN PEMASANGAN PIPA DAN ASESORIES

IV PEKERJAAN PENGADAAN DAN PEMASANGAN CROSSING JALAN LENGKAP DENGAN ACCESSORIES

V PEKERJAAN JEMBATAN PIPA

VI PEKERJAAN LAIN-LAIN

JUMLAH TOTAL

Catatan :
Harga ini sudah termasuk biaya persiapan, mobilisasi dan demobilisasi,
keuntungan, bea materai dan pungutan resmi lainnya serta PPN

11/64
A

12/64
RENCANA ANGGARAN BIAYA
Pekerjaan : Pembangunan Sarana dan Prasarana Rumah Sederhana Sehat PSU (Jaringan Air Bersih) Perumahan Rakyat
Lokasi : Kecamatan Marabahan (Perumahan Rizqi Tarutan Mandiri)
Kabupaten : Barito Kuala
Provinsi : Kalimantan Selatan
TA. : 2012

NO URAIAN PEKERJAAN ANALISA VOLUME SAT HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 7

I PEKERJAN PERSIAPAN
1 Pengukuran & Pemasangan Patok 880.00 M'
2 Dokumentasi Foto 3 phase 3.00 set

Sub Total I

II PEKERJAN PENGADAAN PIPA HDPE DAN ASESORIES


1 Pengadaan Pipa HDPE dia. 63 mm 400.00 m'
2 Pengadaan Pipa HDPE dia. 32 mm 480.00 m'

Pengadaan Asesoris Pipa : #REF!


1 Equal Tee Segmented For HDPE 90 x 90 mm 1.00 bh
2 Reducer 90 x 63 mm 1.00 bh
3 End cap/dop dia. 63 mm 1.00 bh
4 Clamp sadle 63 x 32 mm 5.00 bh

Sub Total II
III PEKERJAAN PEMASANGAN PIPA DAN ASESORIES
Pemasangan pipa termasuk penggalian tanah,
pengeceran, urugan kembali bekas galian:
Galian tanah
1 Galian Tanah Pipa HDPE NP.8 Ø 63 mm 1 71.50 m³
2 Galian Tanah Pipa HDPE NP.8 Ø 32 mm 1 85.80 m³

Pemasangan Pipa HDPE


1 Pemasangan Pipa HDPE dia. 63 mm 6 400.00 m'
2 Pemasangan Pipa HDPE dia. 32 mm 7 480.00 m'

Urugan Kembali Bekas Galian


1 Urugan Kembali Tanah Pipa HDPE NP.8 Ø 63 mm 3 69.73 m³
2 Urugan Kembali Tanah Pipa HDPE NP.8 Ø 32 mm 3 83.68 m³

Sub Total III


IV PEKERJAAN JEMBATAN PIPA

1 Penyeberangan Pipa Dia 90 mm L = 8 m Lampiran 1 1.00 unit

Jumlah IV

V. PEKERJAAN PENGADAAN DAN PEMASANGAN CROSSING JALAN LENGKAP DENGAN ACCESSORIES


1 Crossing jalan Aspal dia. 3"- 90 mm L = 6 m 18 1.00 unit

Jumlah V

VI PEKERJAAN LAIN-LAIN
1 Pengetesan pipa per-400 m tms. acc. & sewa peralatan
a Diameter 63 mm 8 400.00 m'
b Diameter 32 mm 9 480.00 m'

13/64
NO URAIAN PEKERJAAN ANALISA VOLUME SAT HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 7

Jumlah VI

14/64
DAFTAR ANALISA BIAYA PEKERJAAN

HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

1 SNI 2835:2008/6.1/M³ Galian tanah biasa

0.750 Pekerja
0.003 Mandor
Jumlah

2 SNI 2835:2008/6.1/M³ Galian tanah Keras

1.000 Pekerja
0.003 Mandor
Jumlah

3 SNI 2835:2008/6.9/M³Urugan tanah kembali

0.250 Pekerja
0.015 Mandor
Jumlah

4 SNI 2835:2008/6.11/M³
Urugan pasir
1.200 M3 pasir
0.300 Pekerja
0.010 Mandor
Jumlah

5 SNI 2835:2008/6.8/M³Membuang tanah sejauh 15 m

0.330 Pekerja
0.010 Mandor
Jumlah
6 Pemasangan pipa tanam Ø 63 mm /m'
0.167 Mesin sambung pipa BF/EF
0.065 Genset
0.016 Scrapper
0.023 Chain Block (Takel) + kaki tiga
0.005 Truck
0.041 Mandor
0.082 Tukang
0.165 Pekerja
Jumlah

15/64
HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

7 Pemasangan pipa tanam Ø 32 mm /m'


0.167 Mesin sambung pipa BF/EF
0.046 Genset
0.013 Scrapper
0.013 Chain Block (Takel) + kaki tiga
0.005 Truck
0.041 Mandor
0.082 Tukang
0.124 Pekerja
Jumlah

8 Pengetesan Pipa Ø 63 mm p=400 m


3.739 Air bersih
4.000 Pekerja
1.000 Kepala Tukang
1.908 Pompa
0.392 Genset
Jumlah
Biaya Pengetesan Pipa/m¹
9 Pengetesan Pipa Ø 32 mm p=400 m
0.965 Air bersih
4.000 Pekerja
1.000 Kepala Tukang
2.309 Pompa
0.490 Genset
Jumlah
Biaya Pengetesan Pipa/m¹
10 SNI 7394:2008/6.24/M Bekisting beton
0.020 M3 kayu papan Kelas III
0.400 Kg Paku 5 - 12 cm
0.200 Lt Minyak Bekisting
0.008 M3 Balok Kayu bekisting
0.350 Lbr Plywood t = 9 mm
6.000 Dolken galam Ø 8-10 cm
0.660 Pekerja
0.330 Tukang Kayu
0.033 Kepala Tukang
0.033 Mandor
Jumlah

11 SNI 7394:2008/6.8/M³Lantai Kerja Beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66

16/64
HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

326.000 Kg Portland Cement


0.543 M3 Pasir Beton
0.762 M3 Kerikil (maks. 30 mm)
215.000 Lt. Air
1.650 Pekerja
0.275 Tukang Batu
0.028 Kepala Tukang
0.083 Mandor
Jumlah

12 SNI 7394:2008/6.8/M³Beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58

371.000 Kg Portland Cement


0.499 M3 Pasir Beton
0.776 M3 Kerikil (maks. 30 mm)
215.000 Lt. Air
1.650 Pekerja
0.275 Tukang Batu
0.028 Kepala Tukang
0.083 Mandor
Jumlah

13 SNI 7394:2008/6.17/K Pembesian 10 Kg dengan besi ulir


10.500 Kg Besi beton
0.150 Kg Kawat Beton
0.070 Pekerja
0.070 Tukang Besi
0.007 Kepala Tukang
0.004 Mandor
Jumlah
Pembesian 1 Kg

14 SNI 7394:2008/6.32/K Plat beton bertulang (150 kg besi + bekisting)


0.320 Kayu bekisting
3.200 Paku 5 - 12 cm
1.600 Minyak bekisting
157.500 Kg Besi beton
2.250 Kawat beton
336.000 Kg Portland Cement
0.540 M3 Pasir Beton
0.810 M3 Kerikil (maks. 30 mm)
0.120 Kayu balok bekisting

17/64
HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

2.800 Plywood 9 mm
5.300 Pekerja
0.275 Tukang Batu
1.300 Tukang kayu
1.050 Tukang besi
0.265 Kepala Tukang
0.265 Mandor
Jumlah
15 1 M2 Penetrasi Aspal T = 3 cm
Upah
0.080 - Pekerja
0.008 - Mandor
Bahan
2.500 - Aspal
0.030 - Batu pecah 2/3
0.013 - Kayu bakar
0.008 -Taburan abu batu
Alat
1.000 - Menggilas
Jumlah
16 1 M2 Steinslagh T = 7 cm
Upah
0.375 - Pekerja
0.004 - Mandor
Bahan
2.500 - Aspal
0.070 - Batu pecah 5/7
0.013 - Kayu bakar
Alat
1.000 - Menggilas
Jumlah
17 1 M2 Onderlagh T =15 cm
Upah
0.225 - Pekerja
0.011 - Mandor
Bahan
0.180 - Batu belah
0.060 - Batu Pengunci 5/7
Alat
1.000 - Menggilas
Jumlah

18/64
HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

18 1 Unit Crossing jalan aspal dia. 90 mm 3", L = 6 m


0.135 Galian tanah aspal
1.995 Galian tanah keras
1.942 Urugan tanah
0.188 Buangan sisa galian
1.000 Penyambungan pipa dan accessories
Pengadaan Pipa & Acc.
6.000 - Pipa GI dia. 90 mm
2.000 - Loose Flange dia. 90 mm
2.000 - Flange Joint dia. 90 mm
Perbaikan jalan aspal
2.700 - Lapisan penetrasi tebal = 3 cm
2.700 - Lapisan Steinslagh tebal = 7 cm
2.700 - Lapisan Onderlagh tebal = 15 cm
Jumlah

Empiris 22 1 Unit Crossing jalan aspal dia. 150 mm 6", L = 20 m


0.400 Galian tanah aspal -
6.650 Galian tanah keras -
6.873 Urugan tanah #REF!
0.177 Buangan sisa galian -
1.000 Penyambungan pipa dan accessories 1,000

Pengadaan Pipa & Acc.


20.000 - Pipa GI dia. 160 mm - 6" Err:509
2.000 - Loose Flange dia. 160 mm - 6" Err:509
2.000 - Flange Joint dia. 160 mm - 6" Err:509

Perbaikan jalan aspal


8.000 - Lapisan penetrasi tebal = 3 cm -
8.000 - Lapisan Steinslagh tebal = 7 cm -
8.000 - Lapisan Onderlagh tebal = 15 cm -
Jumlah
Empiris 23 1 Unit Crossing jalan aspal dia. 90 mm 3", L = 6 m
0.098 Galian tanah aspal -
1.853 Galian tanah keras -
1.903 Urugan tanah #REF!
0.047 Buangan sisa galian -
1.000 Penyambungan pipa dan accessories 1,000

Pengadaan Pipa & Acc.


6.000 - Pipa GI dia. 90 mm - 3" -

19/64
HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

2.000 - Loose Flange dia. 90 mm - 3" -


2.000 - Flange Joint dia. 90 mm - 3" -

Perbaikan jalan aspal


1.950 - Lapisan penetrasi tebal = 3 cm -
1.950 - Lapisan Steinslagh tebal = 7 cm -
1.950 - Lapisan Onderlagh tebal = 15 cm -
Jumlah

Empiris 1 Pemasangan pipa tanam Ø 200 mm /m'


0.649 Mesin sambung pipa BF/EF -
0.441 Genset -
0.016 Scrapper -
0.023 Chain Block (Takel) + kaki tiga -
7 0.005 Truck -
0.100 Mandor -
0.200 Tukang -
0.400 Pekerja -
Jumlah

Empiris 2 Pemasangan pipa tanam Ø 160 mm /m'


0.582 Mesin sambung pipa BF/EF -
0.405 Genset -
0.016 Scrapper -
8 0.023 Chain Block (Takel) + kaki tiga -
0.005 Truck -
0.078 Mandor -
0.156 Tukang -
0.311 Pekerja -
Jumlah

Empiris 6 Pemasangan accesories Pipa Ø 200 mm /bh


3.700 Mesin sambung pipa BF/EF -
0.945 Pekerja -
0.098 Tukang -
0.010 Mandor -
Jumlah

Empiris 7 Pemasangan accesories Pipa Ø 160 mm /bh


3.100 Mesin sambung pipa BF/EF -

20/64
HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

13 #REF! Pekerja -
#REF! Tukang -
#REF! Mandor -
Jumlah

Empiris 8 Pemasangan accesories Pipa Ø 110 mm /bh


2.300 Mesin sambung pipa BF/EF -
0.500 Pekerja -
0.063 Tukang -
0.025 Mandor -
Jumlah
14 Empiris 9 Pemasangan accesories Pipa Ø 75 mm /bh
1.500 Alat sambung -
0.320 Pekerja -
0.048 Tukang -
0.021 Mandor -
Jumlah

Empiris 10 Pemasangan accesories Pipa Ø 63 mm /bh


#REF! Alat sambung -
#REF! Pekerja -
#REF! Tukang -
15 #REF! Mandor -
Jumlah

1 Unit Pemasangan Box Valve Dia. 200 mm - 8"


0.378 Galian tanah -
0.095 Urugan tanah #REF!
0.157 Buangan sisa galian -
0.126 Urugan pasir -
0.018 Beton K. 225 -
Pengadaan pipa dan accesoris
2.000 Stub Fange dia 200 mm Err:509
16 2.000 Ms Backing Ring 200 mm Err:509
1.000 Gate Valve dia. 200 mm (8") Err:509
0.800 Pipa PVC (selubung Ø 63 mm - 2" ) Err:509
1.000 Box Street -
0.174 Pekerja -
0.012 Tukang Pipa -
0.009 Mandor -

21/64
HARGA
NO.ANALISA ANALISA URAIAN SATUAN
(Rp)
1 1 3 4

1.000 Peralatan dan lain-lain 5,000


Jumlah

Pengetesan Pipa Ø 200 mm p=400 m


37.680 Air bersih -
4.000 Pekerja -
1.000 Kepala Tukang -
2.912 Pompa -
0.588 Genset -
Jumlah
Biaya Pengetesan Pipa/m¹

22/64
A PEKERJAAN

UPAH HARGA JUMLAH


(Rp) BAHAN (Rp)
(Rp)
5 6 7

23/64
UPAH HARGA JUMLAH
(Rp) BAHAN (Rp)
(Rp)
5 6 7

ya Pengetesan Pipa/m¹

ya Pengetesan Pipa/m¹

± 2) cm, w/c = 0,66

24/64
UPAH HARGA JUMLAH
(Rp) BAHAN (Rp)
(Rp)
5 6 7

25/64
UPAH HARGA JUMLAH
(Rp) BAHAN (Rp)
(Rp)
5 6 7

26/64
UPAH HARGA JUMLAH
(Rp) BAHAN (Rp)
(Rp)
5 6 7

- -
- -
#REF! #REF!
- -
1,000 1,000

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

- -
- -
- -
Err:509 Err:509

- -
- -
#REF! #REF!
- -
1,000 1,000

- -

27/64
UPAH HARGA JUMLAH
(Rp) BAHAN (Rp)
(Rp)
5 6 7

- -
- -

- -
- -
- -
#REF! #REF!

- -
- -
- -
- -
- -
- -
- -
- -
- - -

- -
- -
- -
- -
- -
- -
- -
- -
- - -

- -
- -
- -
- -
- - -

- -

28/64
UPAH HARGA JUMLAH
(Rp) BAHAN (Rp)
(Rp)
5 6 7

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! - #REF!

- -
- -
- -
- -
- - -

- -
- -
- -
- -
- - -

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!

- -
#REF! #REF!
- -
- -
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
- -
- -

29/64
UPAH HARGA JUMLAH
(Rp) BAHAN (Rp)
(Rp)
5 6 7

5,000 5,000
5,000 Err:509 Err:509

- -
- -
- -
- -
- -
- - -
-

30/64
DAFTAR UPAH PEKERJA

No. Golongan Pekerja Upah/hari (Rp)

1 Mandor
2 Pekerja
3 Operator
4 Tukang Batu
5 Tukang Kayu
6 Tukang Pipa
7 Tukang Besi
8 Kepala Tukang

DAFTAR HARGA MATERIAL

No Jenis Bahan Satuan Harga (Rp)

1 Batu Gunung M³
2 Pasir Urug M³
3 Pasir Beton M³
4 Portland Cement (PC) Kg
5 Kayu Papan Bekisting M³
6 Balok Bekisting M³
7 Dolken Galam Ø 8 - 10 cm ; 4 m Batang
8 Kerikil Cor M³
9 Air Bersih M³
10 Paku rupa-rupa Kg
11 Kawat beton Kg
12 Besi beton ulir Kg
13 Minyak bekisting liter
14 Plywood t = 3 mm lembar
15 Plywood t = 9 mm lembar
16 Pipa HDPE SNI - PE. 100 SDR.21 PN.8 Ø 32 mm M¹
17 Pipa HDPE SNI - PE. 100 SDR.21 PN.8 Ø 63 mm M¹
18 Pipa GIP dia. 90 mm M¹
19 Pipa GIP dia. 63 mm M¹
20 Loss Flange Steel dia. 75 mm Buah
21 Flange Joint dia. 90 mm Buah
22 Gate Valve CI dia. 63 mm Buah
23 Air Valve dia. 63 mm Buah
24 End cap/dop dia. 63 mm Buah
25 Equal Tee Segmented For HDPE 90 x 90 mm Buah

31/64
No Jenis Bahan Satuan Harga (Rp)

26 Reducer All Flange dia. 90 x 63 mm Buah


27 Clamp sadle 63 x 32 mm Buah
28 Street Box DCI Buah

32/64
No Jenis Bahan Satuan Harga (Rp)

29 Bend 45O CI dia. 90 mm Buah


30 Butt Fussion Hidrolic jam
31 Elektro Fussion jam
32 Genset jam
33 Mobil Truck jam
34 Chain Block (Takel) + kaki tiga jam
35 Scrapper jam
36 Pompa Hari

33/64
DATA HASIL PENGUKURAN KEC. ALALAK KAB. BATOLA

No Patok
No DIA. (mm) JARAK
Dari Ke
1 P1 P2 200 50
2 P2 P3 200 50
3 P3 P4 200 50
4 P4 P5 200 50
5 P5 P6 200 50
6 P6 P7 200 50
7 P7 P8 200 50
8 P8 P9 200 50
9 P9 P10 200 50
10 P10 P11 200 50
11 P11 P12 200 50
12 P12 P13 200 50
13 P13 P14 150 50
14 P14 P15 150 50
15 P15 P16 150 50
16 P16 P17 150 50
17 P17 P18 150 50
18 P18 P19 150 50
19 P19 P20 150 50
20 P20 P21 150 50
21 P21 P22 150 50
22 P22 P23 150 50
23 P23 P24 150 50
24 P24 P25 150 50
25 P25 P26 150 50
26 P26 P27 100 50
27 P27 P28 100 50
28 P28 P29 100 50
29 P29 P30 100 50
30 P30 P31 100 50
31 P31 P32 100 50
32 P32 P33 100 50
33 P33 P34 100 50
34 P34 P35 100 50
35 P35 P36 100 50
36 P36 P37 100 50
37 P37 P38 100 50
38 P38 P39 100 50
39 P39 P40 100 50
40 P40 P41 100 50
41 P41 P42 100 50
42 P42 P43 100 50
No Patok
No DIA. (mm) JARAK
Dari Ke
43 P43 P44 100 50
44 P44 P45 100 50
45 P45 P46 100 50
46 P46 P47 100 50
47 P47 P48 100 50
48 P48 P49 100 50
49 P49 P50 100 50
50 P50 P51 100 50
51 P51 P52 100 50
52 P52 P53 100 50
53 P53 P54 100 50
54 P54 P55 100 50
55 P55 P56 100 50
56 P56 P57 100 50
57 P57 P58 100 50
58 P58 P59 100 50
No Patok
No DIA. (mm) JARAK
Dari Ke
59 P59 P60 100 50
60 P60 P61 100 50
61 P61 P62 100 50
62 P62 P63 100 50
63 P63 P64 100 50
64 P64 P65 100 50
65 P65 P66 100 50
66 P66 P67 100 50
67 P67 P68 100 50
68 P68 P69 100 50
69 P69 P70 100 50
70 P70 P71 100 50
71 P71 P72 100 50
72 P72 P73 100 50
73 P73 P74 100 50
74 P74 P75 100 50
75 P75 P76 100 50
76 P76 P77 75 50
77 P77 P78 75 50
78 P78 P79 75 50
79 P79 P80 75 50
80 P80 P81 75 50
81 P81 P82 75 50
82 P82 P83 75 50
83 P83 P84 75 50
84 P84 P85 75 50
85 P85 P86 75 50
86 P86 P87 75 50
87 P87 P88 75 50
88 P88 P89 75 50
89 P89 P90 75 50
90 P90 P91 75 50
91 P91 P92 75 50
92 P92 P93 75 50
93 P93 P94 75 50
94 P94 P95 75 50
95 P95 P96 75 50
96 P96 P97 75 50
97 P97 P98 75 50
98 P98 P99 75 50
99 P99 P100 75 50
100 P100 P101 75 50
101 P101 P102 75 50
102 P102 P103 75 50
103 P103 P104 75 50
No Patok
No DIA. (mm) JARAK
Dari Ke

5,150.00
LAK KAB. BATOLA

KET

IPA ALALAK
BELOKAN

BELOKAN/CROSSING PIPA L =10 M dia. 200 mm


JEMBATAN PIPA L = 25 M dia. 200 mm

600

CROSSING PIPA L = 20 M dia. 150 mm

JEMBATAN PIPA L = 12 M dia. 100 mm 650

JEMBATAN PIPA L = 2 M dia. 150 mm


KET

SIMPANGAN PERUM ARTA RAYA

JEMBATAN PIPA L = 45 M dia. 100 mm & CROSSING 6 M dia. 100 mm


KET

KANTOR DESA BERANGAS TIMUR

MESJID & KE PERUM BERANGAS PERMATA INDAH

BATAS BERANGAS TIMUR & BERANGAS

KANTOR DESA BERANGAS


2,500
JEMBATAN PIPA L = 24 M Dia. 75 mm

JEMBATAN PIPA L = 30 M DIA. 75 mm

PERSIMPANGAN/KANTOR DESA BERANGAS BARAT


JEMBATAN PIPA L = 14 M
KET

1,400
5,150
Biaya 1 kontener dari jakarta ke Banjarmasin

26,000,000.00
Bongkar muat 1 x 2,600,000.00
28,600,000.00

Volume Kontener 12 x 2,5 x 3 90.00 m3

Pipa HDPE 200 mm NP. 8


- 1 rol 100.00 m
-1 kontener = 8.00 rol
800.00 m'
Hrg/m'/kontener 35,750.00
Harga /m' 308,820.00

Biaya dari pelabuhan ke lokasi

By sewa Truck perjam 3.00 500,000.00 1,500,000.00


By bongkar muat 6.00 250,000.00 1,500,000.00
3,000,000.00
1 truck 4 rol 400.00 m'

Biaya / m' 7,500.00


Total Biaya 352,070.00

By + pajak + keuntungan 10% 436,566.80 416,907.00


437,000.00 127,746.80
0.41

Biaya 1 kontener dari jakarta ke Banjarmasin

26,000,000.00
Bongkar muat 1 x 2,600,000.00
28,600,000.00

Volume Kontener 12 x 2,5 x 3 90.00 m3

Pipa HDPE 160 mm NP. 8


- 1 rol 100.00 m
-1 kontener = 8.00 rol
800.00 m'
Hrg/m'/kontener 35,750.00
Harga /m' 248,820.00
Biaya dari pelabuhan ke lokasi

By sewa Truck perjam 3.00 500,000.00 1,500,000.00


By bongkar muat 6.00 250,000.00 1,500,000.00
3,000,000.00
1 truck 4 rol 400.00 m'

Biaya / m' 7,500.00


Total Biaya 292,070.00

By + pajak + keuntungan 10% 362,166.80 335,907.00


363,000.00 113,346.80
0.46

Biaya 1 kontener dari jakarta ke Banjarmasin

26,000,000.00
Bongkar muat 2 x 2,600,000.00
28,600,000.00

Volume Kontener 12 x 2,5 x 3 90.00 m3

Pipa HDPE 110 mm


- 1 rol 100.00 m
-1 kontener = 15.00 rol
1,500.00 m'
Hrg/m'/kontener 19,066.67
Harga /m' 118,800.00

Biaya dari pelabuhan ke lokasi

By sewa Truck perjam 3.00 500,000.00 1,500,000.00


By bongkar muat 6.00 250,000.00 1,500,000.00
3,000,000.00
1 truck 4 rol 400.00 m'

Biaya / m' 7,500.00


Total Biaya 145,366.67

By + pajak + keuntungan 10% 180,254.67 160,380.00


181,000.00 61,454.67
0.52
By dipotong /12 m' - 6 m'

9,200.00 3,066.67 m'

9,326.09
308,820.00

7,500.00
325,646.09

403,801.15
94,981.15
0.31

Rata-rata 420,183.97

By dipotong /12 m' - 6 m'

9,200.00 3,066.67 m'

9,326.09
248,820.00
7,500.00
265,646.09

329,401.15
80,581.15
0.32

Rata-rata 345,783.97

By dipotong /12 m' - 6 m'

9,200.00 4,600.00 m'

6,217.39
118,800.00

7,500.00
132,517.39

164,321.57
45,521.57
0.38
Rata-rata 172,288.12
Biaya 1 kontener dari jakarta ke Banjarmasin

26,000,000.00
Bongkar muat 2 x 2,600,000.00
28,600,000.00

Volume Kontener 12 x 2,5 x 3 90.00 m3

Pipa HDPE 75 mm
- 1 rol 200.00 m
-1 kontener = 15.00 rol
3,000.00 m'
Hrg/m'/kontener 9,533.33
Harga /m' 63,910.00

Biaya dari pelabuhan ke lokasi

By sewa Truck perjam 1.00 500,000.00 500,000.00


By bongkar muat 2.00 250,000.00 500,000.00
1,000,000.00
1 truck 7 rol 1,400.00 m'

Biaya / m' 714.29


74,157.62

By + pajak + keuntungan 10% 91,955.45 86,278.50


92,000.00 28,045.45
0.44

Biaya 1 kontener dari jakarta ke Banjarmasin

26,000,000.00
Bongkar muat 1 x 2,600,000.00
28,600,000.00

Volume Kontener 12 x 2,5 x 3 90.00 m3

Pipa HDPE 75 mm
- 1 rol 250.00 m
-1 kontener = 17.00 rol
4,250.00 m'
Hrg/m'/kontener 6,729.41
Harga /m' 44,660.00

Biaya dari pelabuhan ke lokasi

By sewa Truck perjam 1 X 500,000.00 -


By bongkar muat 2.00 250,000.00 500,000.00
500,000.00
1 truck 7 rol 1,400.00 m'

Biaya / m' 357.14


51,746.55

By + pajak + keuntungan 10% 64,165.73 60,291.00


65,000.00 19,505.73
0.44
By dipotong /12 m' - 6 m'

9,200.00 8,740.00 m'

3,272.31
63,910.00

714.29
67,896.60

84,191.78
20,281.78
0.32

Rata-rata 88,073.61
24,163.61
0.38

By dipotong /12 m'

9,200.00 25,500.00 m'

1,121.57
44,660.00

357.14
46,138.71

57,212.00
12,552.00
0.28

Rata-rata 60,688.86
16,028.86
0.36
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
JEMBATAN DIA. 75 MM BENTANG 40 M
TAHUN ANGGARAN 2012

HARGA SATUAN JUMLAH HARGA


NO. URAIAN VOLUME
SATUAN ( Rp ) ( Rp )

PEMBUATAN JEMBATAN PIPA Ø 75 MM BENTANG = 45 M


I. PEKERJAAN TANAH
1 Galian 15.59 m3 - -
2 Urugan Tanah Kembali 9.93 m3 - -
3 Urugan Pasir 0.44 m3 - -

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3 - -
2 Abutment beton adk. 1:2:3 5.01 m3 - -
3 Pekerjaan besi tulangan 550.55 kg - -
4 Pekerjaan bekisting 23.77 m2 - -
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3 - -

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 75 mm


1 Pipa GIP dia. 75 mm 53.00 m' - -
2 Miter Tee with Flange Branch HDPE 90x63 mm 1.00 bh Err:509 Err:509
3 Stub Flange dia. 90 mm, HDPE 2.00 bh Err:509 Err:509
4 Gate Valve dia. 75 mm 1.00 bh Err:509 Err:509
5 Loose Flange dia. 75 mm, Steel 10.00 bh - -
6 Air Valve dia. 50 mm 1.00 bh - -
7 Bend 45 CI dia. 75 mm
O 4.00 bh - -

IV. PENGAD/PEMAS. PIPA DAN ACCESSORIES WASH OUT


1 Pipa dia. 63 mm, HDPE 6.00 m' - -
2 Bend 45 dia. 63mm,HDPE
O 1.00 bh Err:509 Err:509
3 Bend 90O dia. 63mm, HDPE 1.00 bh Err:509 Err:509
4 Gate Valve dia. 50 mm 1.00 m - -
5 Street Box 2.00 bh - -

V. PEKERJAAN GELAGAR DAN LAIN-LAIN


1 Profil IWF.250.125 1,332.00 kg Err:509 Err:509
2 Base Plate T=22 mm 138.16 kg 21,000.00 2,901,360.00
3 Ankur baut dia. 22 mm, L= 30 cm left and right 16.00 bh 9,000.00 144,000.00
4 Sambungan gelagar dari Plat Baja t = 22 mm 489.84 kg 21,000.00 10,286,640.00
5 Mur + Baut dia. 22 mm, untuk sambungan gelagar 312.00 bh 10,000.00 3,120,000.00
6 Balok penyangga pipa Kayu 8/16 92.00 bh 80,000.00 7,360,000.00
7 Plat pengikat pipa lengkap dgn baut pengikat 92.00 bh 8,000.00 736,000.00
8 Besi pengaman 1.000 unit 375,000.00 375,000.00
892.80 JUMLAH Err:509
JUMLAH per M' Err:509

51/64
RENCANA ANGGARAN BIAYA INSTALASI PAKET IPA
KAPASITAS 2,5 L/DTK s/d 50 L/DTK
KAPASITAS
NO PEKERJAAN VOL UNIT
2,5 Lt/dtk 5 Lt/dtk 10 Lt/dtk 20 Lt/dtk
PEKERJAAN PERSIAPAN
1 Pembersihan lokasi,perataan tanah 1 ls Rp 2,100,000 Rp 3,000,000 Rp 4,000,000 Rp 5,100,000
2 Pengukuran Bouw plank + patok,papan p 1 ls Rp 2,300,000 Rp 2,600,000 Rp 3,200,000 Rp 4,100,000
3 Direksi keet 1 ls Rp 3,800,000 Rp 4,400,000 Rp 4,800,000 Rp 5,100,000
4 Dokumentasi dan Pelaporan 1 ls Rp 2,100,000 Rp 2,700,000 Rp 3,000,000 Rp 3,200,000
Rp 10,300,000 Rp 12,700,000 Rp 15,000,000 Rp 17,500,000
PENGADAAN & PEMASANGAN PAKET IPA
1 Paket IPA dengan sistem self washing 1 unit Rp 382,000,000 Rp 704,000,000 Rp 1,156,000,000 Rp 1,477,000,000
2 Pompa dosing lengkap 3 unit Rp 91,000,000 Rp 123,000,000 Rp 137,000,000 Rp 156,000,000
3 Tanki Bahan Kimia 3 unit Rp 8,000,000 Rp 8,000,000 Rp 8,000,000 Rp 11,000,000
4 Mixer pengaduk di tanki bahan kimia 3 unit Rp 20,000,000 Rp 20,000,000 Rp 21,000,000 Rp 21,000,000
5 Install/erection paket IPA 1 ls Rp 20,000,000 Rp 23,000,000 Rp 30,000,000 Rp 38,000,000
6 Transportasi/pengiriman Jkt-Lokasi 1 ls Rp 39,000,000 Rp 71,000,000 Rp 116,000,000 Rp 148,000,000
Rp 560,000,000 Rp 949,000,000 Rp 1,468,000,000 Rp 1,851,000,000
PENGADAAN & PEMASANGAN PERALATAN M & E
1 Genset lengkap dengan panel dan accesoris
A. kapasitas 12 KVA 1 unit Rp 70,000,000
B. Kapasitas 25 KVA 1 unit Rp 132,000,000
C. Kapasitas 45 KVA 1 unit Rp 219,000,000
D. Kapasitas 60 KVA 1 unit Rp 245,000,000
E. Kapasitas 80 KVA 1 unit
F. Kapasitas 125 KVA 1 unit
G. Kapasitas 225 KVA 1 unit
2 Pompa Air Baku Non Clogging lengkap accesoris
A. Q = 2,5 l/dt k. H = 15 m 1 unit Rp 60,000,000
B. Q = 5,5 l/dt k. H = 15 m 1 unit Rp 78,000,000
C. Q = 11 l/dt k. H = 15 m 1 unit Rp 100,000,000
D. Q = 22 l/dt k. H = 15 m 1 unit Rp 139,000,000
E. Q = 33 l/dt k. H = 15 m 1 unit
F. Q = 44 l/dt k. H = 15 m 1 unit
G. Q = 55 l/dt k. H = 15 m 1 unit
3 Perpipaan air baku maximum 12 m 1 ls Rp 13,000,000 Rp 13,000,000 Rp 18,000,000 Rp 23,000,000
4 Pompa Air Bersih Centrifugal
A. Q = 2,5 l/dt k. H = 40 m 1 unit Rp 39,000,000
B. Q = 5 l/dt k. H = 40 m 1 unit Rp 49,000,000
C. Q = 10 l/dt k. H = 40 m 1 unit Rp 88,000,000
D. Q = 20 l/dt k. H = 40 m 1 unit Rp 97,000,000
E. Q = 30 l/dt k. H = 40 m 1 unit
F. Q = 40 l/dt k. H = 40 m 1 unit
G. Q = 50 l/dt k. H = 40 m 1 unit
5 Perpipaan pompa air bersih maximum 1 1 ls Rp 14,000,000 Rp 17,000,000 Rp 20,000,000 Rp 25,000,000
6 Water Meter Induk
A. Ø 2 " 1 unit Rp 21,000,000
B. Ø 4 " 1 unit Rp 37,000,000
C. Ø 6 " 1 unit Rp 62,000,000
D. Ø 8 " 1 unit Rp 79,000,000
E. Ø 10 " 1 unit
F. Ø 12 " 1 unit
JUMLAH Rp 777,000,000 Rp 1,287,700,000 Rp 1,990,000,000 Rp 2,476,500,000
PA

S
30 Lt/dtk 40 Lt/dtk 50 Lt/dtk

Rp 5,700,000 Rp 6,400,000 Rp 8,700,000


Rp 4,800,000 Rp 5,400,000 Rp 7,000,000
Rp 5,400,000 Rp 6,000,000 Rp 8,000,000
Rp 3,600,000 Rp 4,200,000 Rp 4,370,000
Rp 19,500,000 Rp 22,000,000 Rp 28,070,000

Rp 1,931,000,000 Rp 2,185,000,000 Rp 2,438,000,000


Rp 170,000,000 Rp 181,000,000 Rp 218,000,000
Rp 11,000,000 Rp 12,000,000 Rp 12,000,000
Rp 21,000,000 Rp 21,000,000 Rp 21,000,000
Rp 53,000,000 Rp 85,000,000 Rp 101,000,000
Rp 194,000,000 Rp 219,000,000 Rp 244,000,000
Rp 2,380,000,000 Rp 2,703,000,000 Rp 3,034,000,000

Rp 263,000,000
Rp 429,000,000
Rp 542,000,000

Rp 173,000,000
Rp 193,000,000
Rp 242,000,000
Rp 28,000,000 Rp 32,000,000 Rp 45,000,000

Rp 133,000,000
Rp 149,000,000
Rp 170,000,000
Rp 290,000,000 Rp 33,000,000 Rp 50,000,000

Rp 97,000,000
Rp 114,000,000 Rp 114,000,000
Rp 3,383,500,000 Rp 3,675,000,000 Rp 4,225,070,000
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : PEMBUATAN BANGUNAN KANTOR 66 M2 = 1 UNIT

LOKASI : KECAMATAN TABUKAN

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6.000 7

A. PEMBUATAN BANGUNAN KANTOR 66 M2 = 1 UNIT

I PEKERJAAN PENDAHULUAN

1 Pengukuran dan Pemasangan Bouwplank 2 46.00 M' 36,805.500 1,693,053.00

2 Pembersihan Lokasi 1 126.00 M2 8,888.000 1,119,888.00

JUMLAH I 2,812,941.00

II PEKERJAAN TANAH

1 Galian Tanah Biasa 3 115.50 M3 22,170.400 2,560,681.20

2 Urugan Pasir dipadatkan 5 6.54 M3 117,162.600 766,243.40

3 Urugan Kembali 6 57.75 M3 10,627.140 613,717.34

JUMLAH II 3,940,641.939

III PEKERJAAN PEMBESIAN

1 Pekerjaan Tulangan Besi 40 1,000.05 Kg 22,519.610 22,520,654.62

JUMLAH III 22,520,654.6217

IV PEKERJAAN RANGKA BAWAH DAN LANTAI

1 Pondasi Cerucuk Kayu Galam dia.10 CM - 4 M - 486.00 Pot 7,300.000 3,547,800.00

2 Meruncing Tiang 8 486.00 Pot 20,256.500 9,844,659.00

3 Memancang Tiang Pancang 10 1,944.00 M' 6,461.290 12,560,747.76

4 Pek. Bekesting Pondasi 41 97.20 M2 96,326.060 9,362,893.03

5 Pek. Bekesting sloof 42 37.32 M2 96,326.060 3,595,177.54

6 Beton Cor Pondasi & Sloof 1:2:3 37 34.89 M3 819,141.680 28,578,255.89

7 Sloof Kayu Ulin 10/10 26 1.20 M3 7,389,120.000 8,866,944.00

8 Lantai Papan Kayu Ulin 3/20 22 18.90 M2 157,440.500 2,975,625.45

9 Plesteran Lantai T = 50 mm 18 18.90 M2 119,880.758 2,265,746.33

54/64
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : PEMBUATAN BANGUNAN KANTOR 66 M2 = 1 UNIT

LOKASI : KECAMATAN TABUKAN

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6.000 7

10 Pas.Lantai Keramik 30 x 30 50 126.00 M2 146,527.582 18,462,475.33

JUMLAH IV 100,060,324.33

V PEKERJAAN RANGKA BADAN DAN DINDING

1 Beton Cor Kolom Dinding dan Ringbalk 1:2:3 37 4.21 M3 819,141.680 3,448,996.04

2 Pek. Bekesting Kolom 43 36.96 M2 163,170.140 6,030,768.37

3 Pek. Bekesting Ringbalk 44 17.10 M2 260,802.060 4,459,715.23

4 Dinding Bata camp. 1 : 4 13 200.75 M3 143,612.242 28,829,583.13

5 Plesteran Dinding Bata camp. 1 : 4 t = 15 mm 19 401.49 M2 34,698.980 13,931,362.88

6 Acian 20 401.49 M2 49,652.454 19,935,063.06

JUMLAH V 76,635,488.72

VI PEKERJAAN RANGKA KAP

1 Kuda-kuda 6/12, gording 6/12, balok gapit 5/10 28 1.30 M3 4,936,088.000 6,416,914.40

- Beugel Plat - 24.00 Bh 9,000.000 216,000.00

- Baut dia. 16 mm - 26.00 Bh 1,000.000 26,000.00

2 Listplank Ulin 3/20 34 42.00 M' 169,603.900 7,123,363.80

3 List Plafond dari Kayu Lanan 35 58.50 M' 68,171.100 3,988,009.35

JUMLAH VI 17,770,287.55

VII PEKERJAAN ATAP DAN PLAFOND

1 Rangka Atap (Kasau 5/7, Reng 2/3) 31 101.12 M2 247,333.750 25,010,388.80

2 Atap Genteng Metal (setara Multi Roof) - 101.12 M2 187,800.000 18,990,336.00

3 Papan reuter+pemuung atap genteng metal 30 13.00 M' 90,635.820 1,178,265.66

4 Plafond Plywood dan Rangka Kayu Lanan 33 84.00 M2 149,719.240 12,576,416.16

JUMLAH VII 57,755,406.62

VIII PEKERJAAN KUSEN, PINTU DAN JENDELA

55/64
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : PEMBUATAN BANGUNAN KANTOR 66 M2 = 1 UNIT

LOKASI : KECAMATAN TABUKAN

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6.000 7

1 Kusen Kayu Ulin 6/15 36 0.75 M3 8,603,150.000 6,426,553.05

2 Daun Pintu Double Teakwood (termasuk rangka) - 2.16 M2 85,000.000 183,600.00

3 Pemasangan Kaca Bening t = 5 mm - 6.40 M2 97,800.000 625,920.00

4 Daun Jendela - 14.16 M2 60,000.000 849,600.00

5 Ram Angin dari Kayu Ulin diberi Kawat Nyamuk - 5.00 M2 45,000.000 225,000.00

6 Ventilasi - 14.00 Bh 45,000.000 630,000.00

7 Pemasangan Ven 9 14.00 Pasang 43,995.600 615,938.40

JUMLAH VIII 9,556,611.45

IX PEKERJAAN PERLENGKAPAN PINTU/JENDELA

1 Kunci Tanam 2 Slaag (setara SES) - 7.00 Bh 104,300.000 730,100.00

2 Kunci Tanam 1 Slaag (setara SES) - 1.00 Bh 90,000.000 90,000.00

3 Engsel Pintu 3" - 24.00 Bh 13,900.000 333,600.00

4 Engsel Jendela 2" - 38.00 Bh 12,000.000 456,000.00

5 Grendel Jendela - 19.00 Bh 3,800.000 72,200.00

6 Kait Angin Jendela - 38.00 Bh 3,700.000 140,600.00

7 Pegangan Jendela - 19.00 Bh 7,500.000 142,500.00

JUMLAH IX 1,965,000.00

X PEKERJAAN PENGECATAN

1 Plamir 1 x (cat dasar baru) 53 401.49 M2 15,082.100 6,055,342.49

2 Cat Tembok 2 x 55 401.49 M2 12,812.970 5,144,304.95

JUMLAH X 11,199,647.44

XI PEKERJAAN SANITAIR

1 Pemasangan Instalasi air bersih lengkap dgn bah Taksir 1.00 Ls 500,000.000 500,000.00

2 Pengadaan dan pemasangan closet jongkok - 1.00 Bh 118,200.000 118,200.00

3 Bak KM finishing keramik - 1.00 Bh 350,000.000 350,000.00

4 Saringan lantai KM - 1.00 Bh 12,500.000 12,500.00

5 Kran air dia. 1/2 " - 2.00 Bh 22,200.000 44,400.00

6 Perpipaan air kotor Taksir 1.00 Ls 500,000.000 500,000.00

JUMLAH XI 1,525,100.00

XII PEKERJAAN INSTALASI LISTRIK

56/64
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : PEMBUATAN BANGUNAN KANTOR 66 M2 = 1 UNIT

LOKASI : KECAMATAN TABUKAN

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6.000 7

1 Instalasi Titik Lampu/Stop Kontak/Lampu Taksir 9.00 Titik 150,000.000 1,350,000.00

2 Lampu TL 2x20 Watt + Pelindung - 1.00 Bh 100,000.000 100,000.00

3 Lampu TL 1x20 Watt + Pelindung - 5.00 Bh 50,000.000 250,000.00

4 Lampu Pijar 40 Watt - 2.00 Bh 8,000.000 16,000.00

5 Lampu Pijar 25 Watt - 2.00 Bh 6,000.000 12,000.00

6 Stop Kontak 100 Watt - 6.00 Bh 15,000.000 90,000.00

7 Saklar Ganda - 3.00 Bh 30,000.000 90,000.00

8 Saklar Tunggal - 4.00 Bh 25,000.000 100,000.00

9 Zekering Kast - 1.00 Bh 150,000.000 150,000.00

JUMLAH XII 2,158,000.00

JUMLAH TOTAL 307,900,103.67

57/64
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : RUMAH JAGA IPA KECAMATAN ALALAK (36 m2)

LOKASI : KECAMATAN ALALAK

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6 7

I PEKERJAAN PENDAHULUAN

1 Pengukuran dan Pemasangan Bouwplank 2 36.00 M' 36,806 1,324,998

2 Pembersihan Lokasi 1 80.00 M2 8,888 711,040

JUMLAH I 2,036,038

II PEKERJAAN TANAH

1 Galian Tanah Biasa 3 60.80 M3 22,170 1,347,960

2 Urugan Pasir dipadatkan 5 3.86 M3 117,163 451,779

3 Urugan Kembali 6 30.40 M3 10,627 323,065

JUMLAH II 2,122,804

III PEKERJAAN PEMBESIAN

1 Pekerjaan Tulangan Besi 40 2,002.30 Kg 22,520 45,091,083

JUMLAH III 45,091,083

IV PEKERJAAN RANGKA BAWAH DAN LANTAI

1 Pengadaan & Pemancangan Galam dia.10 CM - 4 M Ls 180.00 Pot 7,300 1,314,000

2 Meruncing Tiang 8 180.00 Pot 20,257 3,646,170

3 Membuat Lubang dan Pen 9 180.00 Psg 43,996 7,919,208

4 Memancang Tiang Pancang 10 720.00 M' 6,461 4,652,129

5 Pek. Bekesting Pondasi 41 39.44 M3 96,326 3,799,100

6 Pek. Bekesting sloof 42 47.62 M3 96,326 4,586,951

7 Beton Cor Pondasi & Sloof 1:2:3 37 13.45 M3 819,142 11,015,039

8 Sloof Kayu Ulin 10/10 26 1.29 M3 7,389,120 9,531,965

9 Pengadaan papan ulin - 0.50 M3 6,764,200 3,348,279

58/64
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : RUMAH JAGA IPA KECAMATAN ALALAK (36 m2)

LOKASI : KECAMATAN ALALAK

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6 7

10 Pek. Lantai Papan Kayu Ulin 3/20 22 43.50 M2 157,441 6,848,662

11 Plesteran Lantai T = 50 mm 18 43.50 M3 119,881 5,214,813

12 Pas.Lantai Keramik 30 x 30 50 43.50 M2 72,300 3,145,050

JUMLAH IV 65,021,365

V PEKERJAAN RANGKA BADAN DAN DINDING

1 Beton Cor Kolom Dinding dan Ringbalk 1:2:3 37 2.83 M3 819,142 2,318,949

2 Pek. Bekesting Kolom 43 42.84 M3 163,170 6,990,209

3 Pek. Bekesting Ringbalk 44 14.65 M2 260,802 3,819,707

4 Dinding Bata camp. 1 : 4 13 81.43 M2 143,612 11,694,747

5 Plesteran Dinding Bata camp. 1 : 4 t = 15 mm 19 162.87 M2 34,699 5,651,270

6 Acian 48 162.87 M2 125,286 20,404,786

JUMLAH V 50,879,668

VI PEKERJAAN RANGKA KAP

1 Kuda-kuda 6/12, gording 6/12, balok gapit 5/10 dan n 25 0.46 M3 4,936,088 2,270,600

- Beugel Plat - 20.00 Bh 9,000 180,000

- Baut dia. 16 mm - 22.00 Bh 1,000 22,000

2 Listplank Ulin 3/20 31 42.00 M' 169,604 7,123,364

3 List Plafond dari Kayu Lanan 32 35.50 M' 68,171 2,420,074

JUMLAH VI 12,016,038

VII PEKERJAAN ATAP DAN PLAFOND

1 Rangka Atap (Kasau 5/7, Reng 2/3) 31 71.52 M2 247,334 17,689,310

2 Atap Genteng Metal (setara Prima Roof) - 71.52 M2 187,800 13,431,456

3 Papan reuter+pemuung atap genteng metal 30 17.88 M' 90,636 1,620,568

4 Plafond Plywood dan Rangka Kayu Lanan 33 64.00 M2 149,719 9,582,031

JUMLAH VII 42,323,366

VIII PEKERJAAN KUSEN, PINTU DAN JENDELA

59/64
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : RUMAH JAGA IPA KECAMATAN ALALAK (36 m2)

LOKASI : KECAMATAN ALALAK

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6 7

1 Kusen Kayu Ulin 5/10 36 0.32 M3 8,603,150 2,763,332

2 Daun Pintu Double Teakwood (termasuk rangka) - 9.64 M2 85,000 819,400

3 Pemasangan Kaca Bening t = 5 mm - 7.10 M2 97,800 694,380

4 Daun Jendela - 7.79 M2 60,000 467,400

5 Ram Angin dari Kayu Ulin diberi Kawat Nyamuk Alumu - 4.59 M2 45,000 206,550

6 Ventilasi - 17.00 Bh 45,000 765,000

7 Pemasangan Ven 9 17.00 Psg 43,996 747,925

JUMLAH VIII 6,463,987

IX PEKERJAAN PERLENGKAPAN PINTU/JENDELA

1 Kunci tanam 2 slaag setara merk yalle - 4.00 Psg 104,300 417,200

2 Kunci Tanam 1 Slaag (setara SES) - 1.00 Psg 90,000 90,000

3 Engsel Pintu 4" 15.00 Bh 13,900 208,500

4 Engsel Jendela 3" - 12.00 Bh 12,000 144,000

5 Grendel Jendela - 6.00 Bh 3,800 22,800

6 Kait Angin Jendela - 12.00 Bh 3,700 44,400

7 Pegangan Jendela - 6.00 Bh 7,500 45,000

JUMLAH IX 971,900

X PEKERJAAN PENGECATAN

1 Plamir 1 x (cat dasar baru) 53 163.07 M2 15,082 2,459,372

2 Cat Tembok 2 x 55 162.87 M2 12,813 2,086,792

JUMLAH X 4,546,164

XI PEKERJAAN SANITAIR

1 Pemasangan Instalasi air bersih lengkap dgn bahan Taksir 1.00 Ls 500,000 500,000

2 Pengadaan dan pemasangan closet jongkok - 1.00 Bh 118,200 118,200

3 Bak KM finishing keramik - 1.00 Bh 350,000 350,000

4 Saringan lantai KM - 1.00 Bh 12,500 12,500

5 Kran air dia. 1/2 " - 2.00 Bh 22,200 44,400

6 Perpipaan air kotor Taksir 1.00 Ls 250,000 250,000

JUMLAH XI 1,275,100

60/64
RINCIAN RENCANA ANGGARAN BIAYA

Pekerjaan : RUMAH JAGA IPA KECAMATAN ALALAK (36 m2)

LOKASI : KECAMATAN ALALAK

KABUPATEN : BARITO KUALA

PROPINSI : KALIMANTAN SELATAN

HARGA SATUAN JUMLAH HARGA


No. PEKERJAAN ANALISA VOL SATUAN

( Rp ) ( Rp )

1 2 3 4 5 6 7

XII PEKERJAAN INSTALASI LISTRIK

1 Instalasi Titik Lampu/Stop Kontak/Lampu Taksir 7.00 Titik 150,000 1,050,000

2 Lampu TL 2x20 Watt + Pelindung - 1.00 Bh 100,000 100,000

3 Lampu TL 1x20 Watt + Pelindung - 1.00 Bh 50,000 50,000

4 Lampu Pijar 40 Watt - 2.00 Bh 8,000 16,000

5 Lampu Pijar 25 Watt - 2.00 Bh 6,000 12,000

6 Stop Kontak - 4.00 Bh 15,000 60,000

7 Saklar Ganda - 2.00 Bh 30,000 60,000

8 Saklar Tunggal - 3.00 Bh 25,000 75,000

9 Zekering Kast - 1.00 Bh 150,000 150,000

JUMLAH XII 1,573,000

JUMLAH TOTAL 234,320,513

61/64
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
JEMBATAN DIA. 75 MM BENTANG 100 M
TAHUN ANGGARAN 2012

HARGA SATUAN
NO. URAIAN VOLUME SATUAN
( Rp )

PEMBUATAN JEMBATAN PIPA Ø 75 MM BENTANG = 100 M


I. PEKERJAAN TANAH
1 Galian 15.59 m3 -
2 Urugan Tanah Kembali 9.93 m3 -
3 Urugan Pasir 0.44 m3 -

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3 -
2 Abutment beton adk. 1:2:3 5.01 m3 -
3 Pekerjaan besi tulangan 550.55 kg -
4 Pekerjaan bekisting 23.77 m2 -
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3 -

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 75 mm


1 Pipa GIP dia. 75 mm 108.00 m' -
2 Miter Tee with Flange Branch HDPE 90x63 mm 1.00 bh Err:509
3 Stub Flange dia. 90 mm, HDPE 2.00 bh Err:509
4 Gate Valve dia. 75 mm 1.00 bh Err:509
5 Loose Flange dia. 75 mm, Steel 10.00 bh -
6 Air Valve dia. 50 mm 1.00 bh -
7 Bend 45 CI dia. 75 mm
O 4.00 bh -

IV. PENGAD/PEMAS. PIPA DAN ACCESSORIES WASH OUT


1 Pipa dia. 63 mm, HDPE 6.00 m' -
2 Bend 45 dia. 63mm,HDPE
O 1.00 bh Err:509
3 Bend 90O dia. 63mm, HDPE 1.00 bh Err:509
4 Gate Valve dia. 50 mm 1.00 m -
5 Street Box 2.00 bh -

V. PEKERJAAN GELAGAR DAN LAIN-LAIN


1 Profil IWF.250.125 2,960.00 kg Err:509
2 Base Plate T=22 mm 138.16 kg 21,000.00
3 Ankur baut dia. 22 mm, L= 30 cm left and right 16.00 bh 9,000.00
4 Sambungan gelagar dari Plat Baja t = 22 mm 1,180.64 kg 21,000.00
5 Mur + Baut dia. 22 mm, untuk sambungan gelagar 752.00 bh 10,000.00
6 Balok penyangga pipa Kayu 8/16 202.00 bh 80,000.00
7 Plat pengikat pipa lengkap dgn baut pengikat 202.00 bh 8,000.00
8 Besi pengaman 1.000 unit 375,000.00
892.80 JUMLAH
JUMLAH per M'
JUMLAH HARGA
( Rp )

-
-
-

-
-
-
-
-

-
Err:509
Err:509
Err:509
-
-
-

-
Err:509
Err:509
-
-

Err:509
2,901,360.00
144,000.00
24,793,440.00
7,520,000.00
16,160,000.00
1,616,000.00
375,000.00
Err:509
Err:509
LAMPIRAN 1
RINCIAN BIAYA PEKERJAAN PEMBANGUNAN
JEMBATAN DIA. 90 MM BENTANG 8 M
TAHUN ANGGARAN 2012

HARGA SATUAN JUMLAH HARGA


NO. URAIAN VOLUME SATUAN
( Rp ) ( Rp )

PEMBUATAN JEMBATAN PIPA Ø 90 MM BENTANG = 8 M


I. PEKERJAAN TANAH
1 Galian 15.59 m3
2 Urugan Tanah Kembali 10.77 m3
3 Urugan Pasir 0.44 m3

II. PEKERJAAN STRUKTUR


1 Lantai kerja beton adk. 1:3:5 (K-175) 0.22 m3
2 Abutment beton adk. 1:2:3 4.17 m3
3 Pekerjaan besi tulangan 458.15 kg
4 Pekerjaan bekisting 19.78 m2
5 Thrust block beton adk. 1:2:3 (K.225) 0.16 m3

III. PEKERJAAN PENGADAAN/PEMASANGAN PIPA GIP DIA. 90 mm


1 Pipa GIP dia. 90 mm 16.00 m'
2 Loose Flange dia. 90 mm, Steel 10.00 bh
3 Air Valve dia. 50 mm 1.00 bh
4 Bend 45 CI dia. 90 mm
O 4.00 bh

JUMLAH