9 · SEMUA ELEVASI DALAM SATUAN
EL.REUTER+6.00 RANGKA HOLLOW 40 X 40
PLAFOND GYPSUM 9mm METER (m).
171
9 · TITIK DUGA LANTAI ±0,00 NAIK
10 cm DARI KETINGGIAN AS
30°
2500
JALAN.
GEVEL PASANGAN SETENGAH BATA 1PC : 5PS · SUDUT KEMIRINGAN ATAP 30°
RINK BALK 15/20
FFL = FINISHING FLOOR LEVEL.
EL.LUNAS TEMBOK + RINK BALK+3.50 GL = GROUND LEVEL.
500
EL.PLAFOND+3.00
FD = FLOOR DRAIN.
+3.00
500
870 870
870 870
EL.AMBANG ATAS KUSEN+2.50
+2.80
1800
REFERENSI :
B5 B4
PASANGAN SETENGAH BATA 1PC : 2PS ARS 02, ARS 03, ARS 04, ARS 05
EL.AMBANG BAWAH KUSEN+0.70 DINNING ROOM KITCHEN
WC PJ1 JUDUL TUGAS
700
ASTAMPENG -RUMAH-
EL.PERMUKAAN TANAH KERAS -1.15 PASIR URUG
JUDUL GAMBAR
05 07