Anda di halaman 1dari 20

DENAH JEMBATAN

2,0 m

TAMPAK SAMPING
Pengaman Jembatan
(Pipa Galvanis )

Tembok Pengaman

PLAT LANTAI BETON

ABUTMEN
M.A. Banjir
2,00 m

M.A.Normal

1,8 m 3.m
DETAIL D POTONGAN C-C
POTONGAN B -B TIANG PAGAR JEMBATAN DETAIL PENULANGAN TIANG

Tiang Pagar Jembatan Plat Beton T= 0,20 m 4O - 10


Beton Cor 1:2:3 (Beton cor 1:2 :3 ) C C

Balok Beton (25/50)


Beton Cor 1:2:3 1,0 m
m m 0,15

0,20 m
0,30 m
m 0,15

0.5m 1.25m 1.25m 0.5m

3,5 m

DETAIL C

Plat Lantai (Beton


Cor 1:2:3)
Balok Tumpuan
(Beton Cor1:2:3)
Balok Utama (Beton DETAIL E
Cor1:2:3) 0.
BALOK TUMPUAN
Abutmen 5
(Pas. Batu 1:4) 0
0.20 m m

0.30 m

O 10 - 12,5

0
Angkur .
2
5
m

0.5 m

0.5 m 0.25 m
PENULANGAN PLAT & BALOK JEMBATAN

6 O 16
O 10 -15

0,20m

6 O 16
0.25m

PONDASI TELAPAK
KOLOM PERKUATAN ABUTMEN
SKALA 1 : 20

0.5 m 1.25 m
A
6 O 16

DETAIL PENULANGAN BALOK UTAMA


DETAIL PONDASI

8 - O 16

2.75M
A

150

1.0M

1.8 M

POTONGAN A - A POTONGAN B - B
PENULANGAN BALOK
DIAFRAGMA
6 O 16 4 - O 16

O 10- 15
0,20 m 0,20 m

0.50m
0.25m

0,30 m 0,30 m

O 8- 10
0
0
8 O 16 8 - 0 16
0.25m 0.20m
0.25m
MEMBANGUN
INDONESIA DARI DESA
PROPINSI

KABUPATEN B

KECAMATAN

DESA

JENIS PRASARANA
JEMBATAN
LOKASI

JUDUL GAMBAR BB
DENAH
POTONGAN

Dibuat Oleh

Diperiksa Oleh

……………………
Mengetahui
Kepala Desa

Nomor Lembar
MEMBANGUN
INDONESIA DARI DESA
PROPINSI

KABUPATEN
D
KECAMATAN

DESA

JENIS PRASARANA
JEMBATAN
LOKASI

JUDUL GAMBAR
DENAH
POTONGAN

Dibuat Oleh

E
Diperiksa Oleh

……………………
Mengetahui
Kepala Desa

Nomor Lembar
MEMBANGUN
INDONESIA DARI DESA
PROPINSI

KABUPATEN

KECAMATAN

6 O 16 DESA

JENIS PRASARANA
JEMBATAN
LOKASI

JUDUL GAMBAR
DENAH
POTONGAN

Dibuat Oleh

Diperiksa Oleh

O 10 - 20

……………………
1.25 m Mengetahui
Kepala Desa

Nomor Lembar
MEMBANGUN
INDONESIA DARI DESA
PROPINSI

KABUPATEN
L

O 10- 15
KECAMATAN

DESA

JENIS PRASARANA
JEMBATAN
LOKASI

JUDUL GAMBAR
DENAH
POTONGAN

Dibuat Oleh

Diperiksa Oleh

……………………
Mengetahui
Kepala Desa

Nomor Lembar
REKAPITULASI RENCANA ANGGARAN BIAYA

Propinsi :
Kabupaten : Jenis Pekerjaan : JEMBATAN
Kecamatan : Pekerjaan : Jembatan Beton
Desa : Ukuran / Dimensi : 3 x 4 meter

Kegiatan : Jembatan Kegiatan :


Bobot Bobot
Ukuran : 6 m' x 3,5 m' Ukuran : JUMLAH TOTAL
NO URAIAN Jumlah : 1 Buah Jumlah :
% %
No Rab : 01 No Rab :
DANA DESA SWADAYA DANA DESA SWADAYA DANA DESA Swadaya

I BAHAN 42,060,000 - 75.25 -### - 42,060,000 - 74.13


(Tidak perlu dirinci)

II PERALATAN 2,630,000 - 4.71 -### - 2,630,000 - 4.64


(Tidak perlu dirinci)

III UPAH 11,200,000 - 20.04 -### - 11,200,000 - 19.74


(Tidak perlu dirinci)

Jumlah 55,890,000 - 100 -### - 55,890,000 - 98.50

IV Biaya Operasional TPK 1,5 % 851,117 1.5

Jumlah Total 56,741,123 100.00

Jumlah Biaya Upah 11,200,000 - - - 11,200,000


Jumlah HOK Konstruksi #REF! #REF! - - #REF! Hok

Desa …….. , 20 Februari 2016


Disetujui Oleh : Dibuat Oleh :
Kuasa Pengguna Anggaran / Kepala Desa Kader Teknik Desa KETUA TPK

……………………… ……………….. …………………………….


PROGRAM DANA DESA TAHUN 2016

DESAIN & RENCANA ANGGARAN BIAYA

"JEMBATAN BETON BERTULANG"

DESA
…………………..

KECAMATAN …………….
KABUPATEN ………………….
PROPINSI ………………
Propinsi : Sulawesi Utara Jenis Prasarana : Jembatan

Kabupaten : Minahasa Selatan Volume : 1 Buah


TAKE OFF SHEET
Kecamatan : Tatapaan Panjang : 4 Meter

Desa : Sondaken

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN

A PEKERJAAN JEMBATAN
1 Pekerjaan Galian Tanah
1.1. Galian Tanah
Bangun 1 Panjang = 3.00 m
m 1,00 Tinggi = 1.50 m
Lebar 1 = 1.80 m

Volume = (LxT)xP = 8.10 M3

3,75m

1 1,25

m 1,5
Bangun 2 Panjang = 3.00 m
m 1,80
Tinggi = 3.75 m
m 1,00 Lebar A = 1.50 m
Lebar B = 1.80 m
Volume = (((LA+LB)/2) x T ) x P)-C = 18.56 M3

3,75m 2

TOTAL GALIAN = 26.66 M3

m 1,80

2 PEKERJAAN PASANGAN BATU KALI


2.1. Pek. Pasangan Batu Kali 1 : 5
a. Abutmen
Bangun 1 Panjang = 3.00 m
Lebar 1 = 1.00 m
Lebar 2 = 1.50 m
0,25 Tinggi = 2.75 m
0,75 Jumlah bangun = 2.00 bh
0,75 m 3 Volume = (((L1 + L2)/ 2) x T) x P)xJlh
= (((1,0+1,4)/ 2)*2,75)*4,0)*2 bh = 20.63 M3

Bangun 2 Panjang = 3.00 m


2,0 m
1 Lebar 1 = 1.80 m
Tinggi = 1.00 m
Jumlah bangun = 2.00 bh
1,0 m
2 Volume = ((L1 x T) x P x 2
= ((1,80 x 1,25) x 4,00 x 2 bh = 10.80 M3
1,5 m
0,15 m 0,15 m Bangun 3 Panjang = 3.00 m
Lebar = 0.75 m
Tinggi = 0.75 m
Jumlah bangun = 2.00 bh
Volume = ((L1 x T) x P x Jlh
= ((.0,50 x 0,75) x 4,00 x 2 bh = 4.50 M3

VOLUME ABUTMEN = ( 1+2 ) - 3 = 26.93 M3

b. Tembok Pengarah
Panjang = 1.00 m
Lebar = 0.30 m
Tinggi = 1.00 m
1,0 m
Jumlah bangun = 4.00 bh
Volume = (( L x T ) x P ) x Jlh
= (( 0,30 x 1,00 ) x 1,25 ) x 4 = 1.20 M3
1,0 m
volume total pasangan batu kali = 28.13
Propinsi : Sulawesi Utara Jenis Prasarana : Jembatan

Kabupaten : Minahasa Selatan Volume : 1 Buah


TAKE OFF SHEET
Kecamatan : Tatapaan Panjang : 4 Meter

Desa : Sondaken
PERHITUNGAN VOLUME PEKERJAAN JEMBATAN

2.2. Pek Plesteran + Acian T=1.5 cm 1:4


a. Siar/voeg volume = 6.48 m2
b. Tembok Pengarah dan Balok Pengaman
Tembok Pengarah
Volume = (((0,35*1,0)*3)+((1,,0*1,0)*2)))*4
= 12.20 M2
1,0 Balok Pengaman
L= T = 0.15 m
0,35
Volume = (0,50*1,00)*22 = 11.00 M2
1,0 T
L
c. Lantai Bawah Plat Jembatan Panjang = 4.00 m
Lebar = (2*0,37)+(2*1,0) = 2.74 m2
Volume = (P x L) = 10.96 M2

d Balok Induk Panjang = 4-(3*0,2) = 3.40 m


Lebar = (2*0,3)+0,25 = 0.85 m
Jumlah bangun = 3.00 bh
Volume = (3,4*0,85*3) = 8.67 M2

e. Balok Diafragma Panjang = 3,5-(3*0,25) = 2.75 m


Lebar = (2*0,5)+0,8 = 1.8 m
Volume = (3,4*0,85*3) = 4.95 M2

TOTAL VOLUME PLESTERAN = 54.26 M2


Propinsi : Sulawesi Utara Jenis Prasarana : Jembatan

Kabupaten : Minahasa Selatan Volume : 1 Buah


TAKE OFF SHEET
Kecamatan : Tatapaan Panjang : 4 Meter

Desa : Sondaken

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN

2.3 #REF!

2,00
BANGUN 1 Panjang 1 = 2.00 m
Panjang 2 = 0.70 m
Tinggi 1 = 1.20 m
1,2 1,2
Tinggi 2 = 1.20 m
Jumlah bangun = 2.00 bh
Volume = (((P1+P2)/2)*((T1+T2)/2))*Jlh
= (((2+1,2)/2)*((2,0+1,2)/2)*2 = 3.24 M2

1,80

2,00

BANGUN 2 Panjang 1 = 2.00 m


1,2 1,2
Panjang 2 = 0.70 m
Tinggi 1 = 1.20 m
Tinggi 2 = 1.20 m
Jumlah bangun = 2.00 bh
Volume = (((P1+P2)/2)*((T1+T2)/2))*Jlh
= (((2+1,2)/2)*((2,0+1,2)/2)*2 = 3.24 M2

1,80
TOTAL PEK. SIAR/VOEG = 6.48 M2

3 PEKERJAAN COR BETON BERTULANG 1:2:3


36.30 m2
Panjang 2 = 0,5 m
Lebar 1 = 0.20 m
Lebar 2 = 0,30 m
Tinggi 1 = 2,7 m
Tinggi 2 = 1m
Jumlah bangun = 4 buah
Volume = (((L1+L2)/ 2)xP1)xT1)+((L1+L2)/2)xP2)xT2)xJ
= (((((0,20+0,30)/2)*1,5)*2,7)+(((0,20+0,30)/2)*0,5))*1)*4
= m3
3,1. Pek. Pengecoran Campuran 1:2:3
a. Pek. Cor Plat Lantai

Panjang = 4.00
Lebar Bersih = 2.25 (= 3m - ( 3 x lebar balok ) )
3m Tebal = 0.20
0,2 m Volume = (0.20x2,25)x4,0 = 1.80 M3

4,0 m

b. Pek. Cor Balok Utama


Panjang = 4.00
Lebar = 0.25
Tinggi = 0.30
Jumlah = 3.00
0,3m Volume = (0.20x0.50)x4)X3 = 0.90 M3

0,25

c. Pek. Cor Balok Diafragma


Panjang = 2.25 = 3 - (3x0,25)
Lebar = 0.20
Tebal = 0.30
Jumlah = 3.00
3m Volume = (0.20x0.30)x2,25)X3 = 0.41 M3
Propinsi : Sulawesi Utara Jenis Prasarana : Jembatan

Kabupaten : Minahasa Selatan Volume : 1 Buah


TAKE OFF SHEET
Kecamatan : Tatapaan Panjang : 4 Meter

Desa : Sondaken Lokasi

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN

d. Pek. Cor Balok Tumpuan


3m Panjang = 3.00
0,5 Lebar = 1.25
Tebal = 0.25
0,25
Jumlah = 2.00
Volume = ( 1,25 x 0,25 ) x 3 x 2 = 1.88 M3

0,25 0,5

e. Pek. Cor Balok Pengaman dan Pengarah Jembatan


Tinggi = 1.00 m
Lebar = 0.15 m
0,80M Tebal = 0.15 m
Jumlah = 10 bh
Volume = ( 0,15 x 0,15 ) x 1,0 x 10 = 0.23 M3
1,0 m

1,4 m Tinggi = 1.40 m


Lebar = 0.15 m
T T Tebal = 0.15 m
L Jumlah = 12 bh
Volume = ( 0,15 x 0,15 ) x 1,4 x 12 = 0.38 M3
TOTAL VOLUME COR BETON BERTULANG = 5.58 M2
3.2. Pek. Penulangan
a. Penulangan Plat Lantai
Tulangan Memanjang Ø 12
Panjang = 2(a)+b+c = 624 cm = 6.24 m
c Jumlah = (300/15)+1 21 Alur
ba c 2
= (24 x 2) x 6.24 = 262.1 m = 262 / 12 = 21.84 Ujg
1 3
= 22 Ujg
O = 12 - 15 Tulangan Melintang Ø 12
O = 12 - 10 O = 12 - 20
1 = 3 Panjang = 2(a)+d = 360 cm = 3.6 m
Jumlah = (400/20)+1 21 Alur
d
1 = (31 x 2) x 3.6 = 223.2 m = 223 / 12 = 18.60 Ujg
e h e = 19 Ujg
b f g g 2
a d 3 2 Panjang = 2a+2b+2e+4f+2g+h 446 cm = 4.46 m
Ket : a = 7,5 e = 83 f Jumlah = (400/20)+1 31 Alur
b = 15 = 17 g = = (31 x 1) x 4.5 138 m = 138 /12 = 11.52 Ujg
c = 595 48 h = 12 Ujg
d = 345 71

TOTAL BESI O 12 TULANGAN LANTAI = 53 Ujg


b. Penulangan Balok Induk

4 O 16
6 - O 16

150 3000 150

O 8 - 10 8 - O 16 O 8 - 15

Tulangan Memanjang O 16
140 140 Panjang = (2x10)+(2x140)+(2x40)+290 = 670 cm = 6.7 m
1.10 40 290 Jumlah = 2 Alur 3 Balok = (6,7 x 2)x3 = 40 m

2. Panjang = (2x10)+590 = 610 cm = 6.1 m


10 590 Jumlah = 10 Alur 3 Balok = (6,1 x 10)x3 = 183 m
JUMLAH PANJANG = 223.2 M = 18.6 Ujg
3. BEGEL O 10 = 19 Ujg
20
Panjang = (2x6)+(2x20)+(2x44) = 140 cm = 1.40 m
44 Jumlah = (2x(150)/10)+(300/15)+1 = 51 Alur
6
= 51 Alur 3 Balok = 214 m = 17.85 Ujg
Propinsi : Sulawesi Utara Jenis Prasarana : Jembatan

Kabupaten : Minahasa Selatan Volume : 1 Buah


TAKE OFF SHEET
Kecamatan : Tatapaan Panjang : 4 Meter

Desa : Sondaken Lokasi


PERHITUNGAN VOLUME PEKERJAAN JEMBATAN

c. Penulangan Balok Diafragma

= 18 Ujg

1. Tulangan Memanjang O 12 Panjang = (2x7,5)+295 = 310 cm = 3.1 m


295 Jumlah = 6 Alur 3 Balok = (3,6 x 6)x3 = 55.8 m
7,5 JUMLAH PANJANG = 55.8 M = 4.65 Ujg
16
= 5 Ujg
2. BEGEL O 8
Panjang = (2x6)+(2x24)+(2x16) = 92 cm = 0.92 m
24
Jumlah = ((2x37,5)+(100x2))/15)+4 = 22.33 Alur
6
= 22 Alur 3 Balok = 62 m = 5.14 Ujg
6 Ujg

d. Penulangan Balok Tumpuan

25 50

50

25

1. Tulangan Memanjang O 12 Panjang = (2x7,5)+295 = 310 cm = 3.1 m


Jumlah = 16 Alur 3 Balok = (3,6 x 16)x3 = 148.8 m
345
JUMLAH PANJANG = 148.8 M = 12.4 Ujg
7,5
20 = 13 Ujg

Panjang = (2x6)+(2x20)+(4x45) = 232 cm = 2.32 m


2. BEGEL O 10 45 45 Jumlah = (300/12,5)+1 = 25 Alur
45
= 25 Alur 2 Balok = 116 m = 9.67 Ujg
6 = 10 Ujg
20
6
45

f. Penulangan Balok Pengaman dan Balok Pengarah Jembatan


1. Tiang Pengaman Tiang Pengarah = 6 buah

Tulangan Memanjang O 10 Panjang = (2x5)+120 = 130 cm = 1.3 m


5 Jumlah = 4 Alur 6 Balok = (1,3x4)x10 = 31.2 m
JUMLAH PANJANG = 31.2 M = 2.6 Ujg
100 = 3 Ujg
120 Begel O 8
Panjang = (2x6)+(4x12) = 60 cm = 0.60 m
5 5 12 Jumlah = (100/15)+1 = 7.667 Alur
20 12 = 8 Alur 6 Balok = 28 m = 2.30 Ujg
= 3 Ujg

Pipa Galvanis O 2 " Panjang = (4 x 4) = 16 m = 3 Ujg

4,0 m
Total Volume Besi O 8 mm = 9 Ujung
Total Volume Besi O 10 mm = 31 Ujung
Total Volume Besi O 12 mm = 71 Ujung
Total Volume Besi O 16 mm = 19 Ujung

Total Volume Pipa Galvanis O 2" = 3 Ujung


Propinsi : Sulawesi Utara Jenis Prasarana : Jembatan

Kabupaten : Minahasa Selatan Volume : 1 Buah


TAKE OFF SHEET
Kecamatan : Tatapaan Panjang : 4 Meter

Desa : Sondaken Lokasi 0

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN

4. Pekerjaan Mall dan Perancah


4.1 Pek. Mal/Bekisting
a. Balok Tumpuan

Panjang = 3.00 m
Tinggi = (0,25+0,5) 0.75 m
Jumlah = 2.00 bh
Luas = 4.50 m2
b. Balok Utama Panjang 4.00 m
Lebar + Tinggi 0.85 m
Jumlah 3.00 bh
Luas = 10.20 m2

b. Balok Diafragma Panjang 2.00 m


Lebar + Tinggi 0.80 m
Jumlah 3.00 bh
Luas = 4.80 m2

d. Lantai Jembatan Panjang 4.00 m


Lebar + Tinggi 3.15 m
Jumlah 1.00 bh
Luas = 12.60 m2
e. Balok Pengaman dan Pengarah Tinggi 1.00 m
Lebar + Tinggi 0.60 m
Jumlah 22.00 bh
Luas = 13.20 m2

Total Volume Mall = 45.30 M2

4.1 Pek. Perancah (4 x 3,0) m Luas Total 12.00 M2

4. Pekerjaan Pengecatan

Luas Pek. Pengecatan Luas Pekerjaan Plesteran

Tembok Pengarah 4 bh + 6 Balok Pengaman 54.26 m2

Dibuat oleh
FT
ANALISA HARGA SATUAN

I. Analisa Jembatan

No. Total
Uraian Volume
Volume

1. 1 M3 Galian Tanah Biasa


0.75 HOK Pekerja 0.00 26.66 20.00

2 1 M3 Timbunan
0.4 HOK Pekerja 45 18.00

3 1 M3 Pekerjaan Pasangan batu 1:5 0.04514


1.1 HOK Pekerja 0.00 28.13 30.94
0.6 HOK Tukang 28.13 16.88
2.2 Zak Semen 0.00 28.13 61.89
1.1 M3 Batu kali 15/20 28.13 30.94
0.06 HOK Kepala tukang 0.00 28.13 1.69
0.52 M3 Pasir pasang 0.00 28.13 14.63

4 1 M3 Pekerjaan siar/voeg 1:3


0.91 Zak Semen Tonasa 6.48 5.90
0.16 M3 pasir pasang 0.00 6.48 1.04
0.78 Hok Pekerja 0.00 6.48 5.05
0.39 Hok Tukang 0.00 6.48 2.53
0.00
5 1 M3 Pekerjaan plesteran 1:4
0.08 Zak semen 0.00 54.26 4.34
0.024 M3 Pasir halus 54.26 1.30
0.3 Hok Pekerja 0.00 54.26 16.28
0.15 Hok Tukang 0.00 54.26 8.14
0.015 Hok Kepala Tukang 0.00 54.26 0.81

6 1 M3 Pekerjaan Acian
0.065 Zak semen 54.26 3.53
0.1 HOK pekerja 54.26 5.43
0.07 HOK tukang 54.26 3.80
0.007 HOK Kepala tukang 54.26 0.38
0.00
7 1 M3 Pekerjaan beton bertulang cor 1:2:3
Ujg besi diameter 8mm 9.00
Ujg besi diameter 10m ### 0.00 31.00
Ujg besi diameter 12mm 71.00
Ujg besi diameter 16mm 19.00
6.4 Zak Semen 0.00 5.58 35.73
0.8 M3 kerikil/batu pecah 0.00 5.58 4.46
0.56 M3 pasir pasang 0.00 5.58 3.12
1.5 kg kawat bendrat 5.58 8.37
2 kg paku biasa 5.58 11.16
0.35 M3 Papan Mal 0.00 5.58 1.95
1.65 Hok pekerja 0.00 5.58 9.21
0.25 Hok Tukang 0.00 5.58 1.40
0.025 Hok Kepala Tukang 0.00 5.58 0.14
0.00
8 1 M3 Pekerjaan pengecatan tiang pagar&kepala jembatan
0.054 kaleng cat tembok @5kg 0.00 47.78 2.58
0.05 Hok Pekerja 0.00 47.78 2.39
0.025 Hok Tukang 0.00 47.78 1.19
0.01 Hok Kepala tukang 47.78 0.48

9 1 M3 Pekerjaan Pasang angkur 2 buah


0.125 Ujg besi diameter 16mm pjg 1m 0.00 2.00 0.25
0.125 Hok Pekerja 2 0.25
0.025 Hok Tukang 0 2 0.05
0.0125 Hok Kepala tukang 2.00 0.03
0.00
10 1 M3 Pekerjaan Pasang pipa besi (pagar jembatan)
1.05 Ujg pipa besi diameter 2" panjang 0.00 6 6.30
0.007 Hok Pekerja 6.00 0.04
0.007 Hok tukang 6.00 0.04
0.0007 Hok kepala tukang 0.00 6 0.00

0.00

Rekap

Bahan
Semen 111.38 112.00
Batu 15/20 30.94 31.00
Kerikil 4.46 5.00
Pasir Pasang 19.05 20.00
Besi dia 8 9.00 9.00
Besi dia 10 31.00 31.00
Besi dia 12 71.00 71.00
Besi dia 16 19.25 20.00
Pipa Besi dia 2 inc 6.3 7
Papan Mal 1.953 2
Bendrat 8.37 9

Pekerja 89.59 90
Tukang 30.23 31
Kepala Tukang 3.53 4
PROGRAM DANA DESA
RENCANA ANGGARAN BIAYA

Propinsi : No. RAB


Kabupaten : Jenis Kegiatan
Kecamatan : Pekerjaan
Desa : Ukuran / Dimensi

VOLUME
Dari dana Kategori Harga
No. URAIAN Dari SAT.
TOTAL DANA Biaya. Satuan
Swadaya
DESA
I BAHAN
1 Batu Kali 15/20 31.00 31.00 M3 275,000
2 Pasir pasang 20.00 20.00 M3 200,000
3 Pasir halus 1.50 1.50 M3 200,000
4 Semen tonasa @50kg 112.00 112.00 Sak 70,000
5 kerikil/batu pecah 5.0000 5.0000 M3 375,000
6 Besi diameter 8mm 9.0000 9.0000 btng 40,000
7 Besi diameter 10mm 31.0000 31.0000 btng 65,000
8 Besi diameter 12mm 53.0000 53.0000 btng 70,000
9 Besi diameter 16mm 20.0000 20.0000 btng 225,000
10 kayu kls III/mal 2.0 2.0 M3 1,500,000
11 Kawat bendrat 9.0 9.0 kg 25,000
12 Paku biasa 11.0 11.0 kg 25,000
13 cat tembok @5kg 3.0 3.0 kaleng 150,000
14 pipa besi diameter 2 inch p= 6m 6.0 6.0 Unit 500,000
15 Bambu perancah diameter 10cm 43.0 43.0 buah 20,000
16 cat minyak @1kg (avian) 15.0 15.0 kaleng 75,000
Sub Total 1)
II ALAT
1 Ember 15 15 Bh 8,000
2 Sekop 10 10 Bh 60,000
3 pacul 3 3 Bh 60,000
4 Gerobak dorong ARTCO 4 4 Bh 425,000
5 Snar 3 3 Roll 10,000

Sub Total 2)
III UPAH
1. Pekerja 90 90 HOK 80,000
2. Tukang 35 35 HOK 100,000
3. Kep Tukang 4 4 HOK 125,000
Sub Total 3)
Total biaya (Rp)
Dari DANA DESA :
-Bahan & Tenaga
Dari Swadaya :
-Uang Tunai

Disetujui Oleh,
PjOK Ketua TPK
NIP. ……………………..
YA

: 01
Jenis Kegiatan : Jembatan
Pekerjaan : Jembatan
Ukuran / Dimensi : (4 & 3 ) M2

BIAYA

Swadaya DANA DESA


TOTAL (Rp)
(Rp) (Rp)

8,525,000 - 8,525,000
4,000,000 4,000,000
300,000 - 300,000
7,840,000 - 7,840,000
1,875,000 1,875,000
360,000 360,000
2,015,000 2,015,000
3,710,000 3,710,000
4,500,000 4,500,000
3,000,000 3,000,000
225,000 225,000
275,000 275,000
450,000 450,000
3,000,000 3,000,000
860,000 860,000
1,125,000 1,125,000
42,060,000 - 42,060,000

120,000 - 120,000
600,000 - 600,000
180,000 - 180,000
1,700,000 - 1,700,000
30,000 - 30,000

2,630,000 2,630,000

7,200,000 - 7,200,000
3,500,000 - 3,500,000
500,000 - 500,000
11,200,000 - 11,200,000
55,890,000 - 55,890,000
55,890,000
-Bahan & Tenaga -
-Uang Tunai

FT

Anda mungkin juga menyukai