Anda di halaman 1dari 37

PELATIHAN KADER TEKNIK DESA

KABUPATEN GROBOGAN
OLEH : YAHDIYANI ROBBIE

PENYUSUNAN

DETAIL ENGINERING DESIGN

INFRASTRUKTUR DESA
DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN JALAN MAC ADAM LOKASI :
PK :

DESIGN

BATU POKOK 10/15 CM

PASIR URUG T = 5 CM

4% 4%
6% 6% BAHU JALANSIRTU

0.5 L 0.5

Catatan : Satuan Dalam Meter


STA

P 400.00
L 3.00

PERHITUNGAN VOLUME
a. Mac Adam = PXL = 1,200.00 M2
b. Urugan Sirtu Bahu = (0.15 + 0.1) X 0.5 X 1 X 2 X P = 100.00 M3

KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Belah = 240.00 = 240.00 M3
Pasir Urug = 60.00 = 60.00 M3
Sirtu 120.00 = 120.00 M3

ALAT
Sewa Mesin Gilas = 4.80 = 5.00 Hari
-
TENAGA KERJA -
Pekerja = 475.00 = 475.00 HOK
Tukang = = - HOK
DESIGN

TUNGAN VOLUME

AHAN, ALAT DAN TENAGA KERJA


DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN JALAN PAVING DENGAN LOKASI :
KANSTEN BATA PK :

DESIGN

PASIR URUG T = 5 CM PAVING KANSTEN PAS. BATA 10/20 CM


BLOCK

PASIR URUG T = 5 CM

STA

P -
L -

PERHITUNGAN VOLUME
a. Pasir Urug = (0.05 X P X L) + (0.05 X 0.1 X 2 X P) = - M3
b. Paving = PXL = - M2
c. Pas Bata = 0.2 X P X 2 = - M3
d. Plester = (0.1 + 0.2) X 2 X P = - M2
e. Galian Tanah = 0.1 X 0.1 X 2 X P = - M3

KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Bata = - = - bh
Pasir Pasang = - = - M3
Semen (PC) 40kg = - = - Zak
Pasir Urug = - = - M3
Paving Block T=6cm = - = - M2
DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN TALUD ( T ≥ 1.5 M) LOKASI :
PK :

DESIGN LU
La

PLESTER 1 : 5

PIPA DRAINASE
T
TANAH URUG TU

PAS. BATU BELAH 1 : 5


1
'T
5
'Lb
Lb
STA
1 2 3 4 5

P 22.00
T 1.50
T' 0.60 0.40 0.40 0.40 0.40
La 0.30 - - - -
Lb 0.53 - - - -
Lb' 0.63 0.10 0.10 0.10 0.10
I
TU 1.00
LU 1.00

PERHITUNGAN VOLUME
a. Galian Tanah = Lb' X T' X P = 8.25 M3
b. Urugan Tanah Kembali = 1/3 Galian tanah = 2.75 M3
c. Pas. Batu Belah (1 : 5) = [ (La + Lb) X 0.5 X T X P] + [ Lb' X T' X P] = 21.86 M3
e. Plesteran = (La + T) X P = 39.60 M2
f. Urugan Tanah = (1/2xLUxTUxP)-urugan tanah kembali = 8.25 M3

KEBUTUHAN BAHAN DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Belah = 26.24 = 26.00 M3
Semen (PC) 40kg = 81.18 = 81.00 Zak
Pasir Pasang = 13.28 = 13.00 M3
Tanah Urug = 9.90 = 10.00 M3
TENAGA KERJA
Pekerja = 58.67 = 59.00 HOK
Tukang = 24.32 = 24.00 HOK
DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
LOKASI :
PK :

PEKERJAAN TALUD (T< 1,5M)

DESIGN
La LU

PLESTER 1 : 5

PIPA DRAINASE
T
TU

PAS. BATU BELAH 1 : 5

1
'T
5

Lb

STA
1 2 3 4 5

P 35.00 30.00 - - -
T 1.00 1.20 - - -
T' 0.40 0.48 0.40 0.40 0.40
La 0.30 0.30 - - -
Lb 0.45 0.48 - - -
TU 0.30 0.30 - - -
LU 0.20 0.20 - - -
Catatan : Satuan Dalam Meter

PERHITUNGAN VOLUME
a. Galian Tanah = Lb X T' X P = 13.21 M3
b. Urugan Tanah Kembali = 1/3 Galian tanah = 4.40 M3
c. Pas. Batu Belah = [ (La + Lb) X 0.5 X T X P] + [ Lb X T' X P] = 40.38 M3
e. Plesteran = (La + T) X P = 90.50 M2
f. Urugan Tanah = (1/2XTUXLU)-Urugan tanah kembali = 1.95 M3
DESIGN

TUNGAN VOLUME
DETAIL ENGINERING DESIGN DESA : JAMBON
KECAMATAN : PULOKULON
KABUPATEN : GROBOGAN
PEKERJAAN PLAT DEKER ( L MAX 1.5 M ) LOKASI : DUSUN KALONGAN
PK :

DESIGN

0.5
Pas. Batu Belah 1 : 5

Plat T = 20 cm

T Pas. Batu Belah 1 : 5

STA
'T 0.15
0.1 Lj 4.00
La La L 1.00
Lb L Lb
T 1.30
Dia. 10 mm jarak 15 cm` T' 0.40
La 0.40
20 cm Lb 0.60

PERHITUNGAN VOLUME
A. PEKERJAAN PLAT DEKER
a. Galian Tanah = [ (1/5 X (T+T') X 2) + (Lb + Lb + L) + (Lb +Lb+L)] = 17.27 M3
X 0.5 X (T+T') X Lj
b. Pas. Batu Belah = [ (La + Lb) X 0.5 X T X 2 X Lj] + [ Lb X T' X 2 X Lj]
+ [ L X 0.15 X Lj] = 7.72 M3
c. Urugan Tanah Kembali = 1/3 Galian Tanah = 5.76 M3
B. PEKERJAAN BUK PENGAMAN
a. Pas. Batu Belah = 0.9 x 0.3 x (L + La + La) = 0.49 M3
b. Plesteran = [ (0.9 x 0.3) + ((L + La + La ) X 0.9)] X 4 = 7.56 M2
C. PEKERJAAN PLAT
a. Plat = 0.2 X Lj X (L + La) = 1.12 M3
KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Belah 15/20 = 9.26 = 9.00 M3
Pasir Pasang = 4.73 = 5.00 M3
Semen (PC) 40kg = 38.61 = 39.00 Zak
Pasir Beton = 0.60 = 1.00 M3
Koral Beton 2/3 = 0.91 = 1.00 M3
Besi Beton Dia 10 mm = 14.11 = 14.00 Batang
Kawat Bendrat = 2.02 = 2.00 Kg
Sirtu = 2.02 = 2.00 M3

ALAT

TENAGA KERJA
Pekerja = 38.78 = 39.00 HOK
Tukang = 10.07 = 10.00 HOK
ANALISA HARGA SATUAN PEKERJAAN

NO URAIAN PEKERJAAN KOEF SAT

1 2 3 4
A.2.3.1.1 Menggali 1 m³ tanah biasa sedalam 1 meter
B. Tenaga
Pekerja 0.750 OH
A.2.3.1.9 Mengurug kembali 1 m³ galian sedalam 1 m
B. Tenaga
Pekerja 0.500 OH

A.3.2.1.3 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP


A. Bahan
Batu Belah 15/20 cm 1.200 m³
Portland Cement (PC) 136.000 kg
Pasir Pasang (PP) 0.544 m³
B. Tenaga
Pekerja 1.500 OH
Tukang 0.750 OH
A.44.2.16 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mm (SUDAH ACIAN)
A. Bahan
Portland Cement (PC) 6.912 kg
Pasir Pasang (Ps) 0.035 m³
B. Tenaga
Pekerja 0.400 OH
Tukang 0.200 OH
G.046+G.56 Membuat 1 m³ beton 1 PC : 2 PB : 3 KR + 120 kg besi Beton
A. Bahan
Portland Cement (PC) 336.0000 kg
Pasir Beton (PB) 0.5400 m³
Koral Beton (maksimum 30 mm) 0.8100 m³
Besi Beton U-24 Dia 10mm 12.6000 Btg
Kawat Beton 1.8000 kg
B. Tenaga
Pekerja 6.8000 OH
Tukang 2.1500 OH

A
PEKERJAAN RENCANA ANGGARAN BIAYA
DESA JAMBON KECAMATAN PULOKULON KABUPATE
Volume JUMLAH TAHUN ANGGARAN 2019

5 6=(3x5) PEKERJAAN : Pembangunan Sarana Prasarana Jalan


PEKERJAAN : Pembangunan Jembatan
VOLUME : P 1M x L 4M x T 1,3M
17.27 12.95 LOKASI : Dusun Krajan
SUMBER DANA : Pendapatan Asli Desa (PAD)

5.76 2.88 URAIAN VOLUME SATUAN


1 2 3
I BAHAN
1 Batu Belah 15/20 9.00 m3
7.72 9.26 2 Pasir Pasang 5.00 m3
8.21 1,116.02 3 Semen (PC) 40kg 39.00 zak
8.21 4.46 4 Pasir Beton 1.00 m3
5 Koral Beton 2/3 1.00 kg
8.21 12.31 6 Besi Beton Dia 10 mm 14.00 btg
8.21 6.15 7 Kawat Bendrat 2.00 kg
8 Sirtu 2.00 m3

7.56 52.25
7.56 0.26
II UPAH
7.56 3.02 1 Pekerja 36.00 HOK
7.56 1.51 2 Tukang 10.00 HOK

JUMLA
1.12 376.32 Biaya Operasiona
1.12 0.60 TO
1.12 0.91
1.12 14.11
1.12 2.02

1.12 7.62 Menyetujui,


1.12 2.41 Kepala Desa Jambon

HARDI, S.Pd
RENCANA ANGGARAN BIAYA
DESA JAMBON KECAMATAN PULOKULON KABUPATEN GROBOGAN
TAHUN ANGGARAN 2019

: Pembangunan Sarana Prasarana Jalan

HARGA SATUAN (Rp) JUMLAH BIAYA (Rp)


4 5 (2x4)

135,000.00 1,215,000.00
330,000.00 1,650,000.00
50,000.00 1,950,000.00
330,000.00 330,000.00
320,000.00 320,000.00
55,000.00 770,000.00
13,500.00 27,000.00
125,000.00 250,000.00
SUB TOTAL I 6,512,000.00

63,000.00 2,268,000.00
72,000.00 720,000.00
SUB TOTAL III 2,988,000.00
JUMLAH : (I+II+III) 9,500,000.00
Biaya Operasional Kegiatan -
TOTAL BIAYA 9,500,000.00

Jambon, 18 Oktober 2019

Dibuat Oleh:
TPK Desa Jambon

MANSUR
DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN SALURAN MD 40 LOKASI :
PK :

DESIGN

0.15 0.15

PLESTER 1 : 5

0.40

PASANGAN BATU BELAH 1 : 5


0.15

0.10

0.25 0.40 0.25


1.20

STA

P 60.00

PERHITUNGAN VOLUME
a. Galian Tanah = (0.9 + 1.2) X 0.5 X 0.65 x P = 40.95 M3
b. Urugan Tanah Kembali = 1/3 Galian Tanah = 13.65 M3
c. Pasangan Batu Belah = [ (0.15 + 0.25) X 0.5 X 0.4 X 2 X P] +
[ 0.25 X 0.25 X 2 X P] + [ 0.15 X 0.4 X P] = 20.70 M3
d. Plesteran = (0,4 + 0.4 + 0.4+0,15+0,15) X P = 90.00 M2
e. Urugan Pasir = (0.25 + 0.4 + 0.25) X 0.1 X P = 5.40 M3

KEBUTUHAN BAHAN DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Belah = 24.84 = 25.00 M3
Semen (PC) 50kg = 57.05 = 57.00 Zak
Pasir Pasang = 11.45 = 11.00 M3

TENAGA KERJA
DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN GORONG-GORONG Æ 30 CM LOKASI :
PK :

DESIGN
La La

URUGAN TANAH

PLESTERAN PADA
TIAP SAMBUNGAN
T

BUIS BETON d = 30 CM

PAS. BATA 1 : 4
0.05
0.05 URUGAN PASIR

0.3 0.3

DETAIL SAMBUNGAN
DETAIL GORONG-GORONG D 30 CM
GORONG-GORONG D 30 CM
0.3 0.3

0.3
STA

P 4.000
P' 3.0
1
T 0.600
DENAH GORONG-GORONG D 30 CM La 0.540
JML 3.00

PERHITUNGAN VOLUME
a. Galian Tanah = [ (La + 0.3) x 0.5 X P X ( T + 0.05)] + = 3.317
( 0.05 X 0.3 X 0.3 X P') X JML
b. Buis Beton Æ 30 CM = 1 X P X JML = 12.000
c. Pasangan Batu Bata = 0.3 X 0.3 X P' X JML = 0.810
d. Urugan Pasir = 0.05 X 0.3 X P X JML = 0.180
e. Urugan Tanah Kembali = [(La + 0.3) x 0.5 X P X ( T + 0.05)] + = 9.102
( 0.05 X 0.3 X 0.3 X P') - ( 3.14 X 0.15 X 0.15 X P) X JML
f. Plesteran = 3.14 X 0.3 X 0.2 X P' X JML = 1.696

KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Bata = 56.70 = 57.00 bh
Pasir Pasang = 0.04 = - M3
Semen (PC) 40kg = 0.20 = - Zak
Pasir Urug = 0.22 = - M3
Buis Beton Ø 30 cm = 12.00 = 12.00 bh
ALAT

TENAGA KERJA
Pekerja = 7.34 = 7.00 HOK
Tukang = 0.08 = - HOK
DESIGN

0.05

DETAIL GORONG-GORONG D 30 CM

4.000
3.0
0.600
0.540
3.00

UNGAN VOLUME
M3

M1
M2
M3
M3

M2

HAN, ALAT DAN TENAGA KERJA


DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN GORONG-GORONG Æ 40 CM LOKASI :
PK :

DESIGN
La La

URUGAN TANAH

PLESTERAN PADA
TIAP SAMBUNGAN
T T

BUIS BETON d = 40 CM

PAS. BATA 1 : 4
0.05
0.05 URUGAN PASIR 0.05

0.4 0.4

DETAIL SAMBUNGAN
DETAIL GORONG-GORONG D 40 CM
GORONG-GORONG D 40 CM
0.3 0.3

STA
0.4

P 5.000
P' 4.000
1
T 0.800
DENAH GORONG-GORONG D 40 CM La 0.720
JML 1.00

PERHITUNGAN VOLUME
a. Galian Tanah = [ (La + 0.4) x 0.5 X P X ( T + 0.05)] + = 2.404 M3
( 0.05 X 0.4 X 0.3 X P')X JML
b. Buis Beton Æ 40 CM = 1 X P X JML = 5.000 M1
c. Pasangan Batu Bata = 0.4 X 0.3X P'X JML = 0.480 M2
d. Urugan Pasir = 0.05 X 0.4 X P X JML = 0.100 M3
e. Urugan Tanah Kembali = [ (La + 0.4) x 0.5 X P X ( T + 0.05)] + = 1.776 M3
( 0.05 X 0.4 X 0.3 X P') - ( 3.14 X 0.2 X 0.2 X P) X JML
f. Plesteran = 3.14 X 0.4 X 0.2 X P' X JML = 1.005 M2

KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Bata = 33.60 = 34.00 bh
Pasir Pasang = 0.02 = - M3
Semen (PC) 40kg = 0.12 = - Zak
Pasir Urug = 0.12 = - M3
Buis Beton Ø 40 cm = 5.00 = 5.00 bh
DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN GORONG-GORONG Æ 50 CM LOKASI :
PK :

DESIGN
La La

URUGAN TANAH

PLESTERAN PADA
TIAP SAMBUNGAN
T T

BUIS BETON d = 50 CM

PAS. BATA 1 : 4
0.05
0.05 URUGAN PASIR 0.05

0.5 0.5

DETAIL SAMBUNGAN
DETAIL GORONG-GORONG D 50 CM
GORONG-GORONG D 50 CM
0.3 0.3

STA
0.5

P 5.000
P' 4.000
1
T 1.000
DENAH GORONG-GORONG D 50 CM La 0.900
JML 1.00

PERHITUNGAN VOLUME
a. Galian Tanah = [ (La + 0.5) x 0.5 X P X ( T + 0.05)] + = 3.705 M3
( 0.05 X 0.5 X 0.3 X P') X JML
b. Buis Beton Æ 50 CM = 1X P X JML = 5.000 M1
c. Pasangan Batu Bata = 0.3 X 0.5 X P' X JML = 0.600 M2
d. Urugan Pasir = 0.05 X 0.5 X P X JML = 0.125 M3
e. Urugan Tanah Kembali = [(La + 0.5) x 0.5 X P X ( T + 0.05)] + = 2.724 M3
( 0.05 X 0.5 X 0.3 X P') - ( 3.14 X 0.25 X 0.25 X P) X JML
f. Plesteran = 3.14 X 0.5 X 0.2 X P'X JML = 1.256 M2

KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Bata = 42.00 = 42.00 bh
Pasir Pasang = 0.03 = - M3
Semen (PC) 40kg = 0.15 = - Zak
Pasir Urug = 0.15 = - M3
Buis Beton Ø 50 cm = 5.00 = 5.00 bh
DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN GORONG-GORONG Æ 60 CM LOKASI :
PK :

DESIGN
La La

URUGAN TANAH

PLESTERAN PADA
TIAP SAMBUNGAN
T

BUIS BETON d = 60 CM

PAS. BATA 1 : 4
0.05
0.05 URUGAN PASIR

0.6 0.6

DETAIL SAMBUNGAN
DETAIL GORONG-GORONG D 60 CM
GORONG-GORONG D 60 CM
0.3 0.3

STA
0.6

P 5.000
P' 4.000
1
T 1.200
DENAH GORONG-GORONG D 60 CM La 1.080
JML 5.00

PERHITUNGAN VOLUME
a. Galian Tanah = [ (La + 0.6) x 0.5 X P X ( T + 0.05)] = 26.430
+ ( 0.05 X 0.6 X 0.3 X P') X JML
b. Buis Beton Æ 60 CM = 1 X P X JML = 25.000
c. Pasangan Batu Bata = 0.3 X 0.6 X P' XJML = 3.600
d. Urugan Pasir = 0.05 X 0.6 X PX JML = 0.750
e. Urugan Tanah Kembali = [(La + 0.6) x 0.5 X P X ( T + 0.05)] + = 19.365
( 0.05 X 0.6 X 0.3 X P') - ( 3.14 X 0.3 X 0.3 X P) X JML
f. Plesteran = 3.14 X 0.6 X 0.2 X P' X JML = 7.536

KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Bata = 252.00 = 252.00 bh
Pasir Pasang = 0.16 = - M3
Semen (PC) 40kg = 0.87 = 1.00 Zak
Pasir Urug = 0.90 = 1.00 M3
Buis Beton Ø 60 cm = 25.00 = 25.00 bh
ALAT

TENAGA KERJA
Pekerja = 30.81 = 31.00 HOK
Tukang = 0.36 = - HOK
DESIGN

0.05

DETAIL GORONG-GORONG D 60 CM

5.000
4.000
1.200
1.080
5.00

RHITUNGAN VOLUME
M3

M1
M2
M3
M3

M2

AN BAHAN, ALAT DAN TENAGA KERJA


DETAIL ENGINERING DESIGN DESA :
KECAMATAN :
KABUPATEN :
PEKERJAAN GORONG-GORONG Æ 100 CM LOKASI :
PK :

DESIGN
La La

URUGAN TANAH

PLESTERAN PADA
TIAP SAMBUNGAN
T T

BUIS BETON d = 100 CM

PAS. BATA 1 : 4
0.05
0.05 URUGAN PASIR 0.05

1 1

DETAIL SAMBUNGAN
DETAIL GORONG-GORONG D 100 CM
GORONG-GORONG D 100 CM
0.3 0.3

STA
1

P 5.000
P' 4.000
0,5
T 1.500
DENAH GORONG-GORONG D 100 CM La 1.600
JML 1.00

PERHITUNGAN VOLUME
a. Galian Tanah = [ (La + 1) x 0.5 X P X ( T + 0.05)] + = 6.500 M3
( 0.05 X 1 X 0.3 X P') X JML
b. Buis Beton Æ 100 CM = 2X PX JML = 10.000 M1
c. Pasangan Batu Bata = 0.3 X 2 X P' X JML = 2.400 M2
d. Urugan Pasir = 0.05 X 1 X P X JML = 0.250 M3
e. Urugan Tanah Kembali = [(La + 0.6) x 0.5 X P X ( T + 0.05)] + = 2.575 M3
( 0.05 X 0.6 X 0.3 X P') - ( 3.14 X 0.5 X 0.5 X P) X JML
f. Plesteran = 3.14 X 1 X 0.2 X P' X JML = 2.512 M2

KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA

BAHAN Dibulatkan
Batu Bata = 168.00 = 168.00 bh
Pasir Pasang = 0.11 = - M3
Semen (PC) 40kg = 0.58 = 1.00 Zak
Pasir Urug = 0.30 = - M3
Buis Beton Ø100 cm = 10.00 = 10.00 bh
RENCANA ANGGARAN BIAYA
DESA ............... KECAMATAN ..................... KABUPATEN GROBOGAN
TAHUN ANGGARAN ...........

BIDANG :
PEKERJAAN :
VOLUME :
LOKASI :
SUMBER DANA :

URAIAN VOLUME SATUAN HARGA SATUAN (Rp)


1 2 3 4
I BAHAN
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
SUB TOTAL I
II ALAT
1 - -
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -

SUB TOTAL II
III UPAH
1 Pekerja HOK -
2 Tukang HOK -
SUB TOTAL III
JUMLAH : (I+II+III)
Biaya Operasional Kegiatan
TOTAL BIAYA

Desa .......................................20.....

Menyetujui, Dibuat Oleh:


Kepala Desa .............................. TPK Desa ............................
................................................ ..........................................................
EN GROBOGAN

JUMLAH BIAYA (Rp)


5 (2x4)

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

.........................20.....

K Desa ............................
...................................................
PROVINSI

JAWA TENGAH

KABUPATEN

GROBOGAN

KECAMATAN

PULOKULON
DESA

JAMBON
PEKERJAAN

.................
LOKASI

.................
DIBUAT OLEH
TPK

KUSYANTO
DIFASILITASI OLEH
PENDAMPING DESA

NUR FITRI YUNI, S. AP


DISETUJUI OLEH

.................
SUTIYO
DENAH LOKASI PEMBANGUNAN JEMBATAN
DUSUN KALONGAN

U
0.5

'T

SMPN 2 PULOKULON
B

20 cm

KE
NGRIJO

G MASJID

LOKASI
KEG. PAD
TH 2019
KE KAYEN
DETAIL PLAT DEKER

PROVINSI
Pas. Batu Belah 1 : 5 JAWA TENGAH

Plat T = 20 cm KABUPATEN

Pas. Batu Belah 1 : 5 GROBOGAN

0.15 KECAMATAN
0.1
La La
Lb Lb
PULOKULON
L

DESA
Dia. 10 mm jarak 15 cm`
JAMBON
20 cm
PEKERJAAN

RABAT BETON

LOKASI

DSN TEMPLRK

DIBUAT OLEH
TPK

MANSUR
DIFASILITASI OLEH
PENDAMPING DESA

PUJI PRIYANTO
DISETUJUI OLEH
KEPALA DESA

HARDI, S.Pd
PROVINSI

JAWA TENGAH

KABUPATEN

GROBOGAN

KECAMATAN

PULOKULON

DESA

JAMBON

PEKERJAAN

RABAT BETON

LOKASI

DSN TEMPLRK

DIBUAT OLEH
TPK

MANSUR
DIFASILITASI OLEH
PENDAMPING DESA

PUJI PRIYANTO
DISETUJUI OLEH
KEPALA DESA

HARDI, S.Pd