IDENTIFIKASI STUKTUR BOX PEDESTRIAN
PROYEK TOL SEMARANG-BATANG SEKSI 1&2
NO NAMA STRUKTUR LOKASI DIM
1 PED TRAGUNG STA.377+300 3.5x4.6
2 PED KARANG GENENG 2 JL KAB STA.382+228.999 8.0x5.1
3 PED TIPE C KAB STA.383+009.628 2.5x3.5
4 PED TIPE A DS.PONOWARENG STA.384+185.309 3.5x3.5
5 BP KEDUNG SEGOG JL. KAB STA.387+410 8.0x5.1
6 BP SENGON STA.388+187.981 5.0x4.6
7 PED GONDANG TIPE C STA.391+650 2.5x3.5
8 PED TYPE A 392+455 3.5x3.5
9 PED KURIPAN STA.393+590 5.0x4.6
10 PED JL KABUPATEN STA.394+019.095 3.5x3.5
11 PED JALAN DESA KEDAWUNG STA.395+750 5.0x4.6
12 PED JL DESA SAWANGAN TIPE B STA.403+114.062 3.0x3.5
13 PED TIPE B STA.404+319.989 3.0x3.5
14 PED JL DESA SAWANGAN 2 TIPE B STA.407+510.288 5.0x4.6
15 PED ROWOSIPIN TIPE C STA.410+354.144 3.0x3.5
16 PED SAMBONGSARI + SAL KANAN STA.412+304.654 8.0x5.1
17 PED JL KABUPATEN STA.412+584.997 5.0x4.6
18 PED SAMBONGSARI SELATAN STA.412+874.789 8.0x5.1
IDENTIFIKASI STUKTUR BOX CULVERT
PROYEK TOL SEMARANG-BATANG SEKSI 1&2