(Rp) (Rp)
A PEKERJAAN PONDASI
1 Galian tanah pondasi m3 21.84 25,400 554,736
Pasangan Pondasi Batu Kosong
2 (aanstamping) tebal 20 cm m3 5.46 361,635 1,974,527
Pasangan Pondasi Batu adukan 1pc : 5
3 psr m3 12.29 627,675 7,710,987
4 Urugan tanah pondasi m3 4.1 12,175 49,857
PEKERJAAN BETON (adukan
B 1pc:2psr:3krikil)
Sloof Beton Tulang 15/20 (180 kg besi
1 + bekisting) 4dia. 12 ring 8-15 m3 2.17 4,308,980 9,359,105
Kolom, 15/20 (180 kg besi +
2 bekisting) 4dia.12 , ring 8 -15 m3 2.15 4,975,850 10,700,068
45,487,790
56,572,916
12,434,508
8,708,617
15,329,884
19,013,612
3,017,480
11,658,829
14,824,901
197,338,644
197,338,000
NO URAIAN PEKERJAAN Satuan Volume Harga Satuan Jumlah
(Rp) (Rp)
A PEKERJAAN PENDAHULUAN
1 Pek Pengukuran ls
Bongkaran dinding kamar m2
56,572,916
15,329,884
12,434,508
45,487,790
8,708,617
19,013,612
3,017,480
11,658,829
14,824,901
197,338,644
197,338,000