ANALISA HARGA SATUAN S.N.

NO. URAIAN KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga

A B C D E F G=(CXE) H = (C X F ) I=(G+H)
I PEKERJAAN PERSIAPAN
ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m 0.00 38,691.56 38,691.56
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - Rp -
Semen Portland 2.500 Kg Rp - Rp -
Pasir Beton 0.005 m3 Rp - Rp -
Koral Beton 0.009 m3 Rp - Rp -
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp - Rp -
Paku Biasa 2" - 5" 0.060 Kg Rp - Rp -
Residu 0.400 Lt Rp - Rp -
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 Rp 13,146.80
Perkerja 0.400 Oh Rp 55,798.00 Rp 22,319.20
Kepala Tukang 0.020 Oh Rp 75,671.00 Rp 1,513.42
Mandor 0.020 Oh Rp 85,607.00 Rp 1,712.14

ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m 0.00 38,691.56 38,691.56
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - 0.00
Semen Portland 2.500 Kg Rp - 0.00
Pasir Beton 1.200 m3 Rp - 0.00
Koral Beton 0.009 m3 Rp - 0.00
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.060 Kg Rp - 0.00
Meni Besi 0.450 Lt Rp - 0.00
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 Rp 13,146.80
Perkerja 0.400 Oh Rp 55,798.00 Rp 22,319.20
Kepala Tukang 0.020 Oh Rp 75,671.00 Rp 1,513.42
Mandor 0.020 Oh Rp 85,607.00 Rp 1,712.14

ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m 0.00 33,111.76 33,111.76
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.000 btg Rp - 0.00
Semen Portland 2.000 Kg Rp - 0.00
Kawat Duri 25.000 Kg Rp - 0.00
Pasir Beton 0.005 m3 Rp - 0.00
Koral Beton 0.009 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.060 Kg Rp - 0.00
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 13,147
Perkerja 0.300 Oh Rp 55,798.00 16,739
Kepala Tukang 0.020 Oh Rp 75,671.00 1,513
Mandor 0.020 Oh Rp 85,607.00 1,712

ANALISA 004 1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank 0.00 13,337.95 13,337.95
Bahan
Kayu Kaso 5 / 7 (borneo) 0.012 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.020 Kg Rp - 0.00
Kayu Papan 3 / 20 borneo 0.007 m3 Rp - 0.00
Tenaga
Tukang Kayu 0.100 Oh Rp 65,734.00 6,573
Perkerja 0.100 Oh Rp 55,798.00 5,580
Kepala Tukang 0.010 Oh Rp 75,671.00 757
Mandor 0.005 Oh Rp 85,607.00 428

ANALISA 005 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - 0.00
Kayu Balok Borneo 0.180 m3 Rp - 0.00
Paku 0.850 Kg Rp - 0.00
Besi Strip 1.100 Kg Rp - 0.00
Semen Portland 35.000 Kg Rp - 0.00
Pasir Pasang 0.150 m3 Rp - 0.00
Pasir Beton 0.100 m3 Rp - 0.00
Koral Beton 0.150 m3 Rp - 0.00
Bata merah kelas I 30.000 bh Rp - 0.00
Seng Plat 0.250 lbr Rp - 0.00
Jendela Nako 2.000 bh Rp - 0.00
Kaca Polos 0.080 m2 Rp - 0.00
Kunci Tanam 0.150 bh Rp - 0.00
Plywood 4 mm 0.060 lbr Rp - 0.00
Tenaga
Tukang Kayu 2.000 Oh Rp - -
Tukang Batu 1.000 Oh Rp - -
Perkerja 2.000 Oh Rp - -
Kepala Tukang 0.300 Oh Rp - -
Mandor 0.050 Oh Rp - -

ANALISA 006 1 m² Pembuatan Gudang Semen dan Alat - alat 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.700 btg Rp - 0.00
Kayu Balok Borneo 0.210 m3 Rp - 0.00
Paku 0.300 Kg Rp - 0.00
Semen Portland 10.500 Kg Rp - 0.00
Pasir Beton 0.030 m3 Rp - 0.00
Koral Beton 0.050 m3 Rp - 0.00
Seng Gelombang BJLS 32 1.500 lbr Rp - 0.00
Tenaga
Tukang Kayu 2.000 Oh Rp - -
Perkerja 1.000 Oh Rp - -
Kepala Tukang 0.200 Oh Rp - -
Mandor 0.050 Oh Rp - -

ANALISA 007 1 m² Pembuatan Rumah Jaga / Konstruksi Kayu 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 3.000 btg Rp - 0.00
Kayu Balok Borneo 0.276 m3 Rp - 0.00
Paku 0.700 Kg Rp - 0.00
Seng Gelombang BJLS 32 1.500 lbr Rp - 0.00
Tenaga
Tukang Kayu 1.500 Oh Rp - -
Perkerja 1.000 Oh Rp - -
Kepala Tukang 0.150 Oh Rp - -
Mandor 0.050 Oh Rp - -

ANALISA 008 Membersihkan Lapangan dan Perataan 0.00 5,500.00 5,500.00


Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 009 1 m² Pembuatan Bedeng Buruh 547,485.00 116,050.00 663,535.00


Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 8,800.00 11,000.00
Kayu Balok Borneo 0.186 m3 1,815,000.00 337,590.00
Paku 0.300 Kg 34,100.00 10,230.00
Semen Portland 18.000 Kg 1,100.00 19,800.00
Pasir Beton 0.030 m3 215,000.00 6,450.00
Koral Beton 0.050 m3 275,000.00 13,750.00
Seng Gelombang BJLS 32 1.500 lbr 60,500.00 90,750.00
Plywood 4 mm 1.350 lbr 42,900.00 57,915.00
Tenaga
Tukang Kayu 2.000 Oh 38,500.00 77,000
Perkerja 1.000 Oh 27,500.00 27,500
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 010 1 m² Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm 2,331,670.00 79,750.00 2,411,420.00


Bahan
Kayu Terentang 0.186 m3 1,540,000.00 286,440.00
Paku 0.300 Kg 34,100.00 10,230.00
Kayu Kaso 5 / 7 (borneo) 1.000 btg 2,035,000.00 2,035,000.00
Tenaga
Tukang Kayu 2.000 Oh 38,500.00 77,000
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 011 1 m² Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 17,600.00 116,050.00 133,650.00


Bahan
Bambu Ø 6 - 8 / 600 cm 1.000 btg 13,200.00 13,200.00
Tali Ijuk 0.250 Kg 17,600.00 4,400.00
Tenaga
Tukang Kayu 2.000 Oh 38,500.00 77,000
Perkerja 1.000 Oh 27,500.00 27,500
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 012 1 m² Pembuatan Jalan Sementara 55,280.00 30,250.00 85,530.00


Bahan
Batu Belah 5 / 20 0.150 m3 209,000.00 31,350.00
Batu Belah 5 / 7 0.090 m3 242,000.00 21,780.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Mandor 0.050 Oh 55,000.00 2,750
ANALISA 013 1 m³ Bongkaran Beton Bertulang 0.00 201,657.50 201,657.50
Tenaga
Perkerja 6.667 Oh 27,500.00 183,343
Mandor 0.333 Oh 55,000.00 18,315

ANALISA 014 1 m³ Bongkaran Dinding Tembok Bata Merah 0.00 185,157.50 185,157.50
Tenaga
Perkerja 6.667 Oh 27,500.00 183,343
Mandor 0.033 Oh 55,000.00 1,815

II PEKERJAAN TANAH
ANALISA 015 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m' 0.00 13,200.00 13,200.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Gali Oh 33,000.00 -
Kepala Tukang Oh 44,000.00 -
Mandor 0.040 Oh 55,000.00 2,200

ANALISA 016 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m' 0.00 17,297.50 17,297.50
Tenaga
Perkerja 0.525 Oh 27,500.00 14,438
Tukang Gali Oh 33,000.00 -
Kepala Tukang Oh 44,000.00 -
Mandor 0.052 Oh 55,000.00 2,860

ANALISA 017 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.735 Oh 27,500.00 20,213
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.073 Oh 55,000.00 4,015

ANALISA 018 1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.625 Oh 27,500.00 17,188
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.062 Oh 55,000.00 3,410

ANALISA 019 1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 1.250 Oh 27,500.00 34,375
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.125 Oh 55,000.00 6,875

ANALISA 020 1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.823 Oh 27,500.00 22,633
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.083 Oh 55,000.00 4,565

ANALISA 021 1 m² Pek. Stripping 1 m 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.005 Oh 55,000.00 275

ANALISA 022 1 m³ Pembuangan Tanah sejauh 150 m 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.192 Oh 27,500.00 5,280
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 023 1 m3 Urugan Tanah Kembali 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.192 Oh 27,500.00 5,280
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.019 Oh 55,000.00 1,045

ANALISA 024 1 m3 Pemadatan tanah 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.050 Oh 55,000.00 2,750
ANALISA 025 1 m3 Pek. Urugan Pasir 105,600.00 #VALUE! #VALUE!
Bahan
Pasir Urug 1.200 m3 88,000.00 105,600.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.010 Oh 55,000.00 550

ANALISA 026 1 m3 Pemasangan Lapisan ijuk 19,800.00 #VALUE! #VALUE!


Bahan
Ijuk 1.200 m3 16,500.00 19,800.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.015 Oh 55,000.00 825

III PEKERJAAN PONDASI


ANALISA 027 1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang 1,231,009.50 44,275.00 1,275,284.50
Bahan
Pasir Urug Darat 0.016 m3 35,750.00 572.00
Pasir Beton 0.080 m3 215,000.00 17,200.00
Koral Beton 0.125 m3 275,000.00 34,375.00
Semen Portland 49.000 Kg 1,100.00 53,900.00
Besi Beton 34.500 Kg 16,000.00 552,000.00
Kawat Beton 0.700 Kg 21,450.00 15,015.00
Kayu Kaso 5 / 7 (borneo) 0.270 m3 2,035,000.00 549,450.00
Paku 0.120 Kg 34,100.00 4,092.00
Minyak Bekisting 0.090 lt 4,950.00 445.50
Plamuur Tembok 0.200 Kg 19,800.00 3,960.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.040 Oh 55,000.00 2,200

ANALISA 028 1 m3 Pasangan Batu kali 1 Pc : 3Ps 710,460.00 69,465.00 779,925.00


Bahan
Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00
Semen Portland 392.000 Kg 1,100.00 431,200.00
Pasir Pasang 0.314 m3 215,000.00 67,510.00
Tenaga
Perkerja 1.500 Oh 27,500.00 41,250
Tukang Batu 0.600 Oh 35,750.00 21,450
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.075 Oh 55,000.00 4,125

ANALISA 029 1 m3 Pasangan Batu kali 1 Pc : 5Ps 478,310.00 69,465.00 547,775.00


Bahan
Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00
Semen Portland 136.000 Kg 1,100.00 149,600.00
Pasir Pasang 0.544 m3 215,000.00 116,960.00
Tenaga
Perkerja 1.500 Oh 27,500.00 41,250
Tukang Batu 0.600 Oh 35,750.00 21,450
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.075 Oh 55,000.00 4,125

IV PEKERJAAN DINDING
ANALISA 030 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata 140,510.00 27,555.00 168,065.00
Bahan
Bata merah kelas I 140.000 bh 605.00 84,700.00
Semen Portland 32.950 Kg 1,100.00 36,245.00
Pasir Pasang 0.091 m3 215,000.00 19,565.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.030 Oh 55,000.00 1,650

ANALISA 031 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata 131,050.00 27,555.00 158,605.00
Bahan
Bata merah kelas I 140.000 bh 605.00 84,700.00
Semen Portland 22.200 Kg 1,100.00 24,420.00
Pasir Pasang 0.102 m3 215,000.00 21,930.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.030 Oh 55,000.00 1,650
ANALISA 032 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata 66,757.00 13,640.00 80,397.00
Bahan
Bata merah kelas I 70.000 bh 605.00 42,350.00
Semen Portland 14.370 Kg 1,100.00 15,807.00
Pasir Pasang 0.040 m3 215,000.00 8,600.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825

ANALISA 033 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata 62,673.00 13,640.00 76,313.00
Bahan
Bata merah kelas I 70.000 bh 605.00 42,350.00
Semen Portland 9.680 Kg 1,100.00 10,648.00
Pasir Pasang 0.045 m3 215,000.00 9,675.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825

V PEKERJAAN PELESTERAN
ANALISA 032 1 m2 Plesteran Dinding 1Pc : 3Ps 11,213.00 12,072.50 23,285.50
Bahan
Semen Portland 6.480 Kg 1,100.00 7,128.00
Pasir Pasang 0.019 m3 215,000.00 4,085.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 033 1 m2 Plesteran Dinding 1Pc : 5Ps 9,482.00 12,072.50 21,554.50


Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Pasir Pasang 0.022 m3 215,000.00 4,730.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 034 1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm 8,075.00 12,072.50 20,147.50
Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Kapur Padam 0.003 m3 176,000.00 528.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 035 1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm 6,090.00 12,072.50 18,162.50
Bahan
Semen Portland 1.840 Kg 1,100.00 2,024.00
Kapur Padam 0.006 m3 176,000.00 1,056.00
Pasir Pasang 0.014 m3 215,000.00 3,010.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 036 1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm 8,265.00 12,072.50 20,337.50
Bahan
Semen Portland 3.000 Kg 1,100.00 3,300.00
Kapur Padam 0.005 m3 176,000.00 880.00
Pasir Pasang 0.019 m3 215,000.00 4,085.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 037 1 m2 Plesteran 1Kp : 1 Sm : 1Ps, tebal 15 mm 3,529.89 12,072.50 15,602.39


Bahan
Semen Merah 0.009 Kg 1,210.00 10.89
Kapur Padam 0.009 m3 176,000.00 1,584.00
Pasir Pasang 0.009 m3 215,000.00 1,935.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 038 1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm 4,465.47 12,072.50 16,537.97


Bahan
Semen Merah 0.007 Kg 1,210.00 8.47
Kapur Padam 0.007 m3 176,000.00 1,232.00
Pasir Pasang 0.015 m3 215,000.00 3,225.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 039 1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm 20,653.00 15,592.50 36,245.50


Bahan
Semen Portland 14.280 Kg 1,100.00 15,708.00
Pasir Pasang 0.023 m3 215,000.00 4,945.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 040 1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm 17,470.00 15,592.50 33,062.50


Bahan
Semen Portland 10.800 Kg 1,100.00 11,880.00
Pasir Pasang 0.026 m3 215,000.00 5,590.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 041 1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm 15,568.00 15,592.50 31,160.50


Bahan
Semen Portland 8.680 Kg 1,100.00 9,548.00
Pasir Pasang 0.028 m3 215,000.00 6,020.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 042 1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm 14,039.00 15,592.50 29,631.50


Bahan
7.29 Semen Portland 7.290 Kg 1,100.00 8,019.00
Pasir Pasang 0.028 m3 215,000.00 6,020.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 043 1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm 13,314.00 15,592.50 28,906.50


Bahan
Semen Portland 6.240 Kg 1,100.00 6,864.00
Pasir Pasang 0.030 m3 215,000.00 6,450.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 044 1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm 5,464.89 15,592.50 21,057.39


Bahan
Semen Merah 0.009 Kg 1,210.00 10.89
Kapur Padam 0.009 m3 176,000.00 1,584.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 045 1 m2 Plesteran 1Pc : 2Ps, tebal 25 mm 19,845.00 16,995.00 36,840.00


Bahan
Semen Portland 15.500 Kg 1,100.00 17,050.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 046 1 m2 Plesteran 1Pc : 3Ps, tebal 25 mm 20,450.00 16,995.00 37,445.00


Bahan
Semen Portland 11.750 Kg 1,100.00 12,925.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 047 1 m2 Plesteran 1Pc : 4Ps, tebal 25 mm 18,598.00 16,995.00 35,593.00


Bahan
Semen Portland 9.480 Kg 1,100.00 10,428.00
Pasir Pasang 0.038 m3 215,000.00 8,170.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 048 1 m2 Plesteran 1Pc : 5Ps, tebal 25 mm 17,119.00 16,995.00 34,114.00


Bahan
Semen Portland 7.940 Kg 1,100.00 8,734.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 049 1 m2 Plesteran 1Pc : 2Ps, tebal 30 mm 28,040.00 19,662.50 47,702.50


Bahan
Semen Portland 18.650 Kg 1,100.00 20,515.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 050 1 m2 Plesteran 1Pc : 3Ps, tebal 30 mm 23,950.00 19,662.50 43,612.50


Bahan
Semen Portland 14.150 Kg 1,100.00 15,565.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 051 1 m2 Plesteran 1Pc : 4Ps, tebal 30 mm 21,548.00 19,662.50 41,210.50


Bahan
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 052 1 m2 Plesteran 1Pc : 5Ps, tebal 30 mm 18,684.00 19,662.50 38,346.50


Bahan
Semen Portland 8.190 Kg 1,100.00 9,009.00
Pasir Pasang 0.045 m3 215,000.00 9,675.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 053 1 m2 Berapen 1Pc : 3Ps, tebal 30 mm 12,292.00 7,375.50 19,667.50


Bahan
Semen Portland 7.070 Kg 1,100.00 7,777.00
Pasir Pasang 0.021 m3 215,000.00 4,515.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.008 Oh 55,000.00 440

ANALISA 054 1 m2 Berapen 1Pc : 5Ps, tebal 15 mm 11,182.00 7,375.50 18,557.50


Bahan
Semen Portland 5.670 Kg 1,100.00 6,237.00
Pasir Pasang 0.023 m3 215,000.00 4,945.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.008 Oh 55,000.00 440

ANALISA 055 1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm 14,100.00 15,895.00 29,995.00
Bahan
Semen Portland 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 056 1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm 12,292.00 15,895.00 28,187.00
Bahan
Semen Portland 7.070 Kg 1,100.00 7,777.00
Pasir Pasang 0.021 m3 215,000.00 4,515.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 057 1 m2 Pelesteran Skoring 1Pc : 2Ps 980.00 4,708.00 5,688.00


Bahan
Semen Portland 0.500 Kg 1,100.00 550.00
Pasir Pasang 0.002 m3 215,000.00 430.00
Tenaga
Perkerja 0.057 Oh 27,500.00 1,568
Tukang Batu 0.038 Oh 35,750.00 1,359
Kepala Tukang 0.038 Oh 44,000.00 1,672
Mandor 0.002 Oh 55,000.00 110

ANALISA 058 1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm 330,190.08 2,453.00 332,643.08
Bahan
PC Warna 0.144 Kg 1,320.00 190.08
Batu Granito 15.000 Kg 22,000.00 330,000.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.020 Oh 35,750.00 715
Kepala Tukang 0.002 Oh 44,000.00 88
Mandor 0.005 Oh 55,000.00 275

ANALISA 059 1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm 202,980.80 21,780.00 224,760.80
Bahan
PC Warna 0.440 Kg 1,320.00 580.80
Batu Teraso 11.500 Kg 17,600.00 202,400.00
Tenaga
Perkerja 0.450 Oh 27,500.00 12,375
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.025 Oh 55,000.00 1,375

ANALISA 060 1 m2 Pelesteran Ciprat 1 Pc : 2 Ps 8,192.00 11,715.00 19,907.00


Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Pasir Pasang 0.016 m3 215,000.00 3,440.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825

ANALISA 061 1 m2 Pelesteran Siar Adukan 1 Pc : 2 Ps 8,192.00 7,375.50 15,567.50


Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Pasir Pasang 0.016 m3 215,000.00 3,440.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.008 Oh 55,000.00 440

ANALISA 062 1 m2 Pelesteran Waterfroof Batacote 3 lapis 59,260.00 17,105.00 76,365.00


Bahan
Semen Portland 0.500 Kg 1,100.00 550.00
Batacote 2.900 Kg 19,800.00 57,420.00
Pasir Pasang 0.006 m3 215,000.00 1,290.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.015 Oh 55,000.00 825

ANALISA 063 1 m2 Plesteran Dinding 1 : 3 + ACIAN 14,390.00 12,519.38 26,909.38


Bahan
Semen Portland 8.0000 kg 1,100.00 8,800.00
Pasir Pasang 0.0260 m3 215,000.00 5,590.00
Tenaga
Perkerja 0.2250 org 27,500.00 6,188 0.00
Tukang Batu 0.1525 org 35,750.00 5,452 0.00
Kepala Tukang 0.0100 org 44,000.00 440 0.00
Mandor 0.0080 org 55,000.00 440 0.00

1 m2 Plesteran Dinding 1 : 5 + ACIAN 11,960.00 12,519.38 24,479.38


Bahan
Semen Portland 5.4000 kg 1,100.00 5,940.00
Pasir Pasang 0.0280 m3 215,000.00 6,020.00
Tenaga
Perkerja 0.2250 org 27,500.00 6,188 0.00
Tukang Batu 0.1525 org 35,750.00 5,452 0.00
Kepala Tukang 0.0100 org 44,000.00 440 0.00
Mandor 0.0080 org 55,000.00 440 0.00

III PEKERJAAN KAYU


1m³ Pasang Kusen Pintu dan Jendela Kayu Jati 30,250,000.00 1,039,500.00 31,289,500.00
Bahan
Kayu Balok Jati 1.100 m3 27,500,000.00 30,250,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 20.000 Oh 38,500.00 770,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500

1m³ Pasang Kusen Pintu dan Jendela Kayu Borneo 2,178,000.00 962,500.00 3,140,500.00
Bahan
Kayu Balok Borneo 1.200 m3 1,815,000.00 2,178,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 18.000 Oh 38,500.00 693,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500

1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut 2,442,000.00 962,500.00 3,404,500.00
Bahan
Kayu Balok Damar Laut 1.200 m3 2,035,000.00 2,442,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 18.000 Oh 38,500.00 693,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500

1m² Pasang Pintu Klamp Kayu Kamper 74,965.00 55,660.00 130,625.00


Bahan
Papan Kayu Kamper 0.036 m3 2,035,000.00 73,260.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.018 Oh 55,000.00 990

1m² Pasang Pintu Klamp Kayu Borneo 74,965.00 55,660.00 130,625.00


Bahan
Papan Kayu Borneo 0.036 m3 2,035,000.00 73,260.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.018 Oh 55,000.00 990

1m² Pasang Pintu Panel Kayu Jati 1,375,000.00 137,500.00 1,512,500.00


Bahan
Papan Kayu Jati 0.050 m3 27,500,000.00 1,375,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Pintu Panel Kayu Kamper 81,400.00 137,500.00 218,900.00


Bahan
Papan Kayu Kamper 0.040 m3 2,035,000.00 81,400.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Pintu dan Jendela Kaca Kayu Jati 962,500.00 110,000.00 1,072,500.00
Bahan
Papan Kayu Jati 0.035 m3 27,500,000.00 962,500.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu dan Jendela Kaca Kayu Kamper 71,225.00 110,000.00 181,225.00
Bahan
Papan Kayu Kamper 0.035 m3 2,035,000.00 71,225.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu dan Jendela Kaca Kayu Borneo 71,225.00 110,000.00 181,225.00
Bahan
Papan Kayu Borneo 0.035 m3 2,035,000.00 71,225.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu dan Jendela Jalusi Kayu Borneo 130,240.00 172,700.00 302,940.00
Bahan
Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 3.000 Oh 38,500.00 115,500
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.300 Oh 55,000.00 16,500

1m² Pasang Pintu dan Jendela Jalusi Kayu Kamper 130,240.00 183,700.00 313,940.00
Bahan
Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 3.000 Oh 38,500.00 115,500
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.500 Oh 55,000.00 27,500

1m² Pasang Pintu Plywood rangkap, rangka kayu Jati 585,893.00 103,950.00 689,843.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Plywood rangkap, rangka kayu Kamper 585,893.00 103,950.00 689,843.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Jalusi Mati Kusen Kayu Jati 1,655,115.00 100,925.00 1,756,040.00
Bahan
Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00
Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.025 Oh 55,000.00 1,375

1m² Pasang Jalusi Mati Kusen Kayu Kamper 1,655,115.00 100,925.00 1,756,040.00
Bahan
Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00
Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.025 Oh 55,000.00 1,375

1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo 86,779.00 103,950.00 190,729.00
Bahan
Papan Kayu Borneo 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati 595,100.00 103,950.00 699,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper 595,100.00 103,950.00 699,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Plywood & Formika, rangka Kayu Kamper 133,936.00 131,450.00 265,386.00
Bahan
Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Teakwood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis ) 611,600.00 131,450.00 743,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 0.500 lbr 42,900.00 21,450.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Formika Double, rangka Kayu Jati 670,010.00 141,790.00 811,800.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 1.200 Lt 9,900.00 11,880.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.600 Oh 38,500.00 100,100
Kepala Tukang 0.260 Oh 44,000.00 11,440
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Pintu Formika Double, rangka Kayu Kamper 170,896.00 141,790.00 312,686.00
Bahan
Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 1.200 Lt 9,900.00 11,880.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.600 Oh 38,500.00 100,100
Kepala Tukang 0.260 Oh 44,000.00 11,440
Mandor 0.050 Oh 55,000.00 2,750

1m3 Pasang Konstruksi Kuda - kuda Kayu Jati 30,450,530.00 635,800.00 31,086,330.00
Bahan
Balok Kayu Jati 1.100 m3 27,500,000.00 30,250,000.00
Besi Strip 15.000 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper 2,015,530.00 635,800.00 2,651,330.00
Bahan
Balok Kayu Kamper 1.100 m3 1,650,000.00 1,815,000.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo 1,960,530.00 635,800.00 2,596,330.00
Bahan
Balok Kayu Borneo 1.100 m3 1,600,000.00 1,760,000.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing 1,834,030.00 635,800.00 2,469,830.00
Bahan
Balok Kayu Kruing 1.100 m3 1,485,000.00 1,633,500.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper 24,915.00 7,315.00 32,230.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo 24,315.00 7,315.00 31,630.00
Bahan
Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Genteng Monier Kayu Jati 390,115.00 7,315.00 397,430.00
Bahan
Balok Kayu Jati 0.014 m3 27,500,000.00 385,000.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Genteng Monier Kayu Kamper 28,215.00 7,315.00 35,530.00
Bahan
Balok Kayu Kamper 0.014 m3 1,650,000.00 23,100.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Genteng Beton Kayu Borneo 27,515.00 7,315.00 34,830.00
Bahan
Balok Kayu Borneo 0.014 m3 1,600,000.00 22,400.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Atap Sirap Kayu Kamper 279,070.00 8,778.00 287,848.00
Bahan
Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Kaso + Reng Atap Sirap Kayu Borneo 279,070.00 8,778.00 287,848.00
Bahan
Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati 333,410.00 18,975.00 352,385.00
Bahan
Balok Kayu Jati 0.012 m3 27,500,000.00 330,000.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo 16,357.00 11,825.00 28,182.00
Bahan
Kayu Papan 3 / 20 borneo 0.0072 m3 2,035,000.00 14,652.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper 23,210.00 18,975.00 42,185.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo 23,210.00 18,975.00 42,185.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati 637,615.00 18,920.00 656,535.00
Bahan
Balok Kayu Jati 0.023 m3 27,500,000.00 632,500.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper 43,065.00 18,920.00 61,985.00
Bahan
Balok Kayu Kamper 0.023 m3 1,650,000.00 37,950.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo 41,915.00 18,920.00 60,835.00
Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati 749,320.00 22,577.50 771,897.50
Bahan
Balok Kayu Jati 0.027 m3 27,500,000.00 742,500.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper 51,370.00 22,577.50 73,947.50
Bahan
Balok Kayu Kamper 0.027 m3 1,650,000.00 44,550.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo 50,020.00 22,577.50 72,597.50
Bahan
Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati 199,705.00 11,825.00 211,530.00


Bahan
Papan Kayu Jati 0.0072 m3 27,500,000.00 198,000.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper 16,357.00 11,825.00 28,182.00


Bahan
Papan Kayu Kamper 0.0072 m3 2,035,000.00 14,652.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati 304,205.00 12,738.00 316,943.00


Bahan
Papan Kayu Jati 0.0110 m3 27,500,000.00 302,500.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.110 Oh 27,500.00 3,025
Tukang Kayu 0.220 Oh 38,500.00 8,470
Kepala Tukang 0.022 Oh 44,000.00 968
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper 24,090.00 12,738.00 36,828.00


Bahan
Papan Kayu Kamper 0.0110 m3 2,035,000.00 22,385.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.110 Oh 27,500.00 3,025
Tukang Kayu 0.220 Oh 38,500.00 8,470
Kepala Tukang 0.022 Oh 44,000.00 968
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper 31,553.50 18,975.00 50,528.50


Bahan
Papan Kayu Kamper 0.0145 m3 2,035,000.00 29,507.50
Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper 19,547.00 9,790.00 29,337.00


Bahan
Papan Kayu Kamper 0.0086 m3 2,035,000.00 17,501.00
Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.050 Oh 55,000.00 2,750

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo 19,954.00 9,790.00 29,744.00


Bahan
Papan Kayu Borneo 0.0088 m3 2,035,000.00 17,908.00
Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Rangka Dinding Pemisah Kayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Rangka Dinding Pemisah Kayu Borneo 48,855.00 27,555.00 76,410.00
Bahan
Balok Kayu Borneo 0.0195 m3 1,600,000.00 31,200.00
Papan Kayu Borneo 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper 98,274.00 31,790.00 130,064.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Lem Kayu 0.560 lt 9,900.00 5,544.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Dinding Lambriziring dari papan Kayu jati 201,025.00 95,370.00 296,395.00
Bahan
Papan Kayu Jati 0.007 m3 27,500,000.00 192,500.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Paku Skrup 3.5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 1.800 Oh 38,500.00 69,300
Kepala Tukang 0.180 Oh 44,000.00 7,920
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Plywood tebal 4mm, untuk dinding 18,865.00 3,976.50 22,841.50
Bahan
Plywood 4 mm 0.400 lbr 42,900.00 17,160.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.025 Oh 27,500.00 688
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.0075 Oh 44,000.00 330
Mandor 0.0013 Oh 55,000.00 72

1m² Pasang List Plafond Kayu Profil 18,480.00 1,529.00 20,009.00


Bahan
Kayu Profil 1.050 m' 17,600.00 18,480.00
Tenaga
Perkerja 0.021 Oh 27,500.00 578
Tukang Kayu 0.021 Oh 38,500.00 809
Kepala Tukang 0.0020 Oh 44,000.00 88
Mandor 0.0010 Oh 55,000.00 55

PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr 28,690.00 32,758.00 61,448.00
Bahan
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Beton 0.026 m3 215,000.00 5,590.00
Koral Beton 0.044 m3 275,000.00 12,100.00
Tenaga
Perkerja 1.150 Oh 27,500.00 31,625
Tukang Batu 0.020 Oh 35,750.00 715
Kepala Tukang 0.002 Oh 44,000.00 88
Mandor 0.006 Oh 55,000.00 330

1 m³ Membuat Beton Tumbuk 1 Pc : 3 Ps : 5 Kr 590,850.00 59,812.50 650,662.50


Bahan
Semen Portland 218.000 Kg 1,100.00 239,800.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.870 m3 275,000.00 239,250.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr 576,250.00 59,812.50 636,062.50


Bahan
Semen Portland 197.000 Kg 1,100.00 216,700.00
Pasir Beton 0.470 m3 215,000.00 101,050.00
Koral Beton 0.940 m3 275,000.00 258,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr 552,100.00 59,812.50 611,912.50


Bahan
Semen Portland 173.000 Kg 1,100.00 190,300.00
Pasir Beton 0.570 m3 215,000.00 122,550.00
Koral Beton 0.870 m3 275,000.00 239,250.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton 1 Pc : 2 Ps : 3 Kr 581,500.00 59,812.50 641,312.50


Bahan
Semen Portland 232.000 Kg 1,100.00 255,200.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr 652,250.00 59,812.50 712,062.50


Bahan
Semen Portland 280.000 Kg 1,100.00 308,000.00
Pasir Beton 0.450 m3 215,000.00 96,750.00
Koral Beton 0.900 m3 275,000.00 247,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr 700,100.00 59,812.50 759,912.50


Bahan
Semen Portland 352.000 Kg 1,100.00 387,200.00
Pasir Beton 0.560 m3 215,000.00 120,400.00
Koral Beton 0.700 m3 275,000.00 192,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr 631,500.00 59,812.50 691,312.50


Bahan
Semen Portland 357.000 Kg 1,100.00 392,700.00
Pasir Beton 0.420 m3 215,000.00 90,300.00
Koral Beton 0.540 m3 275,000.00 148,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr 740,150.00 59,812.50 799,962.50


Bahan
Semen Portland 386.000 Kg 1,100.00 424,600.00
Pasir Beton 0.470 m3 215,000.00 101,050.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr 809,950.00 59,812.50 869,762.50


Bahan
Semen Portland 479.000 Kg 1,100.00 526,900.00
Pasir Beton 0.370 m3 215,000.00 79,550.00
Koral Beton 0.740 m3 275,000.00 203,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Tiang Pancang Prestressed Beton 828,892.00 59,812.50 888,704.50


Bahan
Semen Portland 479.000 Kg 1,100.00 526,900.00
Pasir Beton 0.370 m3 215,000.00 79,550.00
Koral Beton 0.740 m3 275,000.00 203,500.00
Rapidrant 2.460 gln 7,700.00 18,942.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt 708,450.00 124,052.50 832,502.50


Bahan
Semen Portland 336.000 Kg 1,100.00 369,600.00
Pasir Beton 0.540 m3 215,000.00 116,100.00
Koral Beton 0.810 m3 275,000.00 222,750.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt 676,900.00 124,052.50 800,952.50


Bahan
Semen Portland 291.000 Kg 1,100.00 320,100.00
Pasir Beton 0.470 m3 215,000.00 101,050.00
Koral Beton 0.930 m3 275,000.00 255,750.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt 740,300.00 124,052.50 864,352.50


Bahan
Semen Portland 367.000 Kg 1,100.00 403,700.00
Pasir Beton 0.440 m3 215,000.00 94,600.00
Koral Beton 0.880 m3 275,000.00 242,000.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt 763,200.00 124,052.50 887,252.50


Bahan
Semen Portland 400.000 Kg 1,100.00 440,000.00
Pasir Beton 0.480 m3 215,000.00 103,200.00
Koral Beton 0.800 m3 275,000.00 220,000.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt 931,300.00 124,052.50 1,055,352.50


Bahan
Semen Portland 615.000 Kg 1,100.00 676,500.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.520 m3 275,000.00 143,000.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Kedap Air dengan Strorox - 100 769,140.00 124,052.50 893,192.50
Bahan
Semen Portland 400.000 Kg 1,100.00 440,000.00
Pasir Beton 0.480 m3 215,000.00 103,200.00
Koral Beton 0.800 m3 275,000.00 220,000.00
Strorox - 100 1.200 Kg 4,950.00 5,940.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m' Memasang PVC Waterstop lebar 150 mm 36,960.00 2,689.50 39,649.50


Bahan
Waterstop lebar 150 mm 1.050 m' 35,200.00 36,960.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.003 Oh 44,000.00 132
Mandor 0.002 Oh 55,000.00 110

1 m' Memasang PVC Waterstop lebar 200 mm 40,425.00 2,711.50 43,136.50


Bahan
Waterstop lebar 200 mm 1.050 m' 38,500.00 40,425.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0035 Oh 44,000.00 154
Mandor 0.002 Oh 55,000.00 110

1 m' Memasang PVC Waterstop lebar 230 mm 42,735.00 27,802.50 70,537.50


Bahan
Waterstop lebar 230 mm 1.050 m' 40,700.00 42,735.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 m' Memasang PVC Waterstop lebar 250 mm 47,355.00 27,802.50 75,157.50


Bahan
Waterstop lebar 250 mm 1.050 m' 45,100.00 47,355.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 m' Memasang PVC Waterstop lebar 300 mm 53,130.00 27,802.50 80,932.50


Bahan
Waterstop lebar 300 mm 1.050 m' 50,600.00 53,130.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 m' Memasang PVC Waterstop lebar 320 mm 75,075.00 27,802.50 102,877.50


Bahan
Waterstop lebar 320 mm 1.050 m' 71,500.00 75,075.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 Kg Pembesian dengan Besi Polos atau Besi Ulir 17,646.75 490.05 18,136.80
Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00
Kawat Beton 0.015 Kg 21,450.00 321.75
Tenaga
Perkerja 0.007 Oh 27,500.00 193
Tukang Besi 0.007 Oh 35,750.00 250
Kepala Tukang 0.0007 Oh 44,000.00 31
Mandor 0.0003 Oh 55,000.00 17

1 Kg Kabel Presstressed Polos / Strands 17,539.50 354.75 17,894.25


Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00
Kawat Beton 0.010 Kg 21,450.00 214.50
Tenaga
Perkerja 0.005 Oh 27,500.00 138
Tukang Besi 0.005 Oh 35,750.00 179
Kepala Tukang 0.0005 Oh 44,000.00 22
Mandor 0.0003 Oh 55,000.00 17

1 Kg Jaring Kawat Baja 39,707.25 1,773.75 41,481.00


Bahan
Besi Jaring Kawat Baja 1.020 Kg 22,000.00 22,440.00
Kawat Beton 0.805 Kg 21,450.00 17,267.25
Tenaga
Perkerja 0.025 Oh 27,500.00 688
Tukang Besi 0.025 Oh 35,750.00 894
Kepala Tukang 0.0025 Oh 44,000.00 110
Mandor 0.0015 Oh 55,000.00 83

1 m2 Pasang Bekisting 108,955.00 22,737.00 131,692.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.0330 Oh 44,000.00 1,452
Mandor 0.0060 Oh 55,000.00 330

1 m2 Pasangan Stoot Werk 196,537.00 21,560.00 218,097.00


Bahan
Kayu Kaso 5 / 7 (borneo) 0.0882 m3 2,035,000.00 179,487.00
Paku 0.5000 kg 34,100.00 17,050.00
Tenaga
Perkerja 0.1500 org 27,500.00 4,125
Tukang Kayu 0.2000 org 38,500.00 7,700
Kepala Tukang 0.2000 org 44,000.00 8,800
Mandor 0.0170 org 55,000.00 935

1 m2 Pasang Bekisting untuk Pondasi 72,325.00 19,679.00 92,004.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.300 Kg 34,100.00 10,230.00
Minyak Bekisting 0.100 Lt 4,950.00 495.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.260 Oh 38,500.00 10,010
Kepala Tukang 0.0260 Oh 44,000.00 1,144
Mandor 0.0050 Oh 55,000.00 275

1 m2 Pasang Bekisting untuk Sloof 72,325.00 19,679.00 92,004.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.300 Kg 34,100.00 10,230.00
Minyak Bekisting 0.100 Lt 4,950.00 495.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.260 Oh 38,500.00 10,010
Kepala Tukang 0.0260 Oh 44,000.00 1,144
Mandor 0.0050 Oh 55,000.00 275

1 m2 Pasang Bekisting untuk Kolom 132,955.00 22,737.00 155,692.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.0330 Oh 44,000.00 1,452
Mandor 0.0060 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Balok 137,755.00 23,287.00 161,042.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.018 m3 1,600,000.00 28,800.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.0330 Oh 44,000.00 1,452
Mandor 0.0060 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Lantai 163,755.00 22,379.50 186,134.50


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 6.000 btg 7,700.00 46,200.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.330 Oh 35,750.00 11,798
Kepala Tukang 0.033 Oh 44,000.00 1,452
Mandor 0.006 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Dinding 449,755.00 23,287.00 473,042.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 6.000 btg 7,700.00 46,200.00
Formtie / penjaga jarak bekisting 4.000 bh 71,500.00 286,000.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.033 Oh 44,000.00 1,452
Mandor 0.006 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Tangga 117,307.50 23,287.00 140,594.50


Bahan
Kayu Terentang 0.030 m3 1,540,000.00 46,200.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.150 Lt 4,950.00 742.50
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.033 Oh 44,000.00 1,452
Mandor 0.006 Oh 55,000.00 330

1 m³ Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting ) 3,490,992.50 217,195.00 3,708,187.50


Bahan
Kayu Terentang 0.200 m3 1,540,000.00 308,000.00
Paku Biasa 2" - 5" 1.500 Kg 34,100.00 51,150.00
Minyak Bekisting 0.400 Lt 4,950.00 1,980.00
Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00
Kawat Beton 2.250 Kg 21,450.00 48,262.50
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 3.900 Oh 27,500.00 107,250
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 1.040 Oh 38,500.00 40,040
Tukang Besi 1.050 Oh 35,750.00 37,538
Kepala Tukang 0.245 Oh 44,000.00 10,780
Mandor 0.165 Oh 55,000.00 9,075

1 m³ Membuat Sloof Beton Bertulang ( 200 Kg + bekisting ) 4,432,920.00 279,911.50 4,712,831.50


Bahan
Kayu Terentang 0.270 m3 1,540,000.00 415,800.00
Paku Biasa 2" - 5" 2.000 Kg 34,100.00 68,200.00
Minyak Bekisting 0.600 Lt 4,950.00 2,970.00
Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00
Kawat Beton 3.000 Kg 21,450.00 64,350.00
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 4.850 Oh 27,500.00 133,375
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 1.560 Oh 38,500.00 60,060
Tukang Besi 1.400 Oh 35,750.00 50,050
Kepala Tukang 0.331 Oh 44,000.00 14,564
Mandor 0.170 Oh 55,000.00 9,350

1 m³ Membuat Kolom Beton Bertulang ( 300 Kg + bekisting ) 6,961,925.00 454,217.50 7,416,142.50


Bahan
Kayu Terentang 0.400 m3 1,540,000.00 616,000.00
Paku Biasa 2" - 5" 4.000 Kg 34,100.00 136,400.00
Minyak Bekisting 2.000 Lt 4,950.00 9,900.00
Besi Beton Polos 300.000 Kg 16,000.00 4,800,000.00
Kawat Beton 4.500 Kg 21,450.00 96,525.00
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.150 m3 1,815,000.00 272,250.00
Plywood 9 mm 3.500 lbr 49,500.00 173,250.00
Dolken Ø 8 / 4 m 20.000 btg 8,800.00 176,000.00
Tenaga
Perkerja 7.300 Oh 27,500.00 200,750
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 3.300 Oh 38,500.00 127,050
Tukang Besi 2.100 Oh 35,750.00 75,075
Kepala Tukang 0.570 Oh 44,000.00 25,080
Mandor 0.250 Oh 55,000.00 13,750

1 m³ Membuat Balok Beton Bertulang ( 200 Kg + bekisting ) 5,089,290.00 365,722.50 5,455,012.50


Bahan
Kayu Terentang 0.320 m3 1,540,000.00 492,800.00
Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00
Minyak Bekisting 1.600 Lt 4,950.00 7,920.00
Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00
Kawat Beton 3.000 Kg 21,450.00 64,350.00
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.140 m3 1,815,000.00 254,100.00
Plywood 9 mm 2.800 lbr 49,500.00 138,600.00
Dolken Ø 8 / 4 m 16.000 btg 8,800.00 140,800.00
Tenaga
Perkerja 5.960 Oh 27,500.00 163,900
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.800 Oh 38,500.00 107,800
Tukang Besi 1.400 Oh 35,750.00 50,050
Kepala Tukang 0.455 Oh 44,000.00 20,020
Mandor 0.208 Oh 55,000.00 11,440

1 m³ Membuat Balok Beton Bertulang ( 150 Kg + bekisting ) 4,377,702.50 346,005.00 4,723,707.50


Bahan
Kayu Terentang 0.320 m3 1,540,000.00 492,800.00
Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00
Minyak Bekisting 1.600 Lt 4,950.00 7,920.00
Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00
Kawat Beton 2.250 Kg 21,450.00 48,262.50
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.120 m3 1,815,000.00 217,800.00
Plywood 9 mm 2.800 lbr 49,500.00 138,600.00
Dolken Ø 8 / 4 m 32.000 btg 8,800.00 281,600.00
Tenaga
Perkerja 5.800 Oh 27,500.00 159,500
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.800 Oh 38,500.00 107,800
Tukang Besi 1.050 Oh 35,750.00 37,538
Kepala Tukang 0.420 Oh 44,000.00 18,480
Mandor 0.185 Oh 55,000.00 10,175

1 m³ Membuat Dinding Beton Bertulang ( 150 Kg + bekisting ) 4,256,702.50 333,905.00 4,590,607.50


Bahan
Kayu Terentang 0.240 m3 1,540,000.00 369,600.00
Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00
Minyak Bekisting 1.600 Lt 4,950.00 7,920.00
Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00
Kawat Beton 2.250 Kg 21,450.00 48,262.50
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.160 m3 1,815,000.00 290,400.00
Plywood 9 mm 2.800 lbr 49,500.00 138,600.00
Dolken Ø 8 / 4 m 24.000 btg 8,800.00 211,200.00
Tenaga
Perkerja 5.600 Oh 27,500.00 154,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.640 Oh 38,500.00 101,640
Tukang Besi 1.050 Oh 35,750.00 37,538
Kepala Tukang 0.400 Oh 44,000.00 17,600
Mandor 0.193 Oh 55,000.00 10,615

1 m³ Membuat Tangga Beton Bertulang ( 200 Kg + bekisting ) 4,876,715.00 334,042.50 5,210,757.50


Bahan
Kayu Terentang 0.250 m3 1,540,000.00 385,000.00
Paku Biasa 2" - 5" 3.000 Kg 34,100.00 102,300.00
Minyak Bekisting 1.200 Lt 4,950.00 5,940.00
Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00
Kawat Beton 3.000 Kg 21,450.00 64,350.00
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.105 m3 1,815,000.00 190,575.00
Plywood 9 mm 2.500 lbr 49,500.00 123,750.00
Dolken Ø 8 / 4 m 14.000 btg 8,800.00 123,200.00
Tenaga
Perkerja 5.600 Oh 27,500.00 154,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.300 Oh 38,500.00 88,550
Tukang Besi 1.400 Oh 35,750.00 50,050
Kepala Tukang 0.405 Oh 44,000.00 17,820
Mandor 0.202 Oh 55,000.00 11,110

1 m³ Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 69,238.50 4,279.00 73,517.50
Bahan
Kayu Terentang 0.002 m3 1,540,000.00 3,080.00
Paku Biasa 2" - 5" 0.010 Kg 34,100.00 341.00
Besi Beton Polos 3.000 Kg 16,000.00 48,000.00
Kawat Beton 0.450 Kg 21,450.00 9,652.50
Semen Portland 4.000 Kg 1,100.00 4,400.00
Pasir Beton 0.006 m3 215,000.00 1,290.00
Koral Beton 0.009 m3 275,000.00 2,475.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Batu 0.020 Oh 35,750.00 715
Tukang Kayu 0.020 Oh 38,500.00 770
Tukang Besi 0.020 Oh 35,750.00 715
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.003 Oh 55,000.00 165

1 m³ Membuat Ring Balok Beton Bertulang (10 x 15) cm 79,087.50 17,712.75 96,800.25
Bahan
Kayu Albasiah 0.003 m3 495,000.00 1,485.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Besi Beton Polos 3.600 Kg 16,000.00 57,600.00
Kawat Beton 0.050 Kg 21,450.00 1,072.50
Semen Portland 5.500 Kg 1,100.00 6,050.00
Pasir Beton 0.009 m3 215,000.00 1,935.00
Koral Beton 0.015 m3 275,000.00 4,125.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Batu 0.330 Oh 35,750.00 11,798
Tukang Kayu 0.033 Oh 38,500.00 1,271
Tukang Besi 0.033 Oh 35,750.00 1,180
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

V PEKERJAAN PENTUP ATAP


1m² Pasang Atap Genteng Palentong Kecil 41,250.00 7,804.50 49,054.50
Bahan
Genteng Palentong 25.000 bh 1,650.00 41,250.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m² Pasang Atap Genteng Kodok / Glazzur 126,500.00 7,804.50 134,304.50


Bahan
Genteng Kodok 25.000 bh 5,060.00 126,500.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m² Pasang Atap Genteng Palentong Super / Besar 29,040.00 7,139.00 36,179.00
Bahan
Genteng Palentong Super 12.000 bh 2,420.00 29,040.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.060 Oh 38,500.00 2,310
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Genteng Bubung Palentong 40,430.00 19,690.00 60,120.00


Bahan
Genteng Bubung Palentong 5.000 bh 4,950.00 24,750.00
Semen Portland 8.000 Kg 1,100.00 8,800.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.002 Oh 55,000.00 110

1m' Pasang Genteng Bubung Kodok Glazzur 54,180.00 19,690.00 73,870.00


Bahan
Genteng Bubung Kodok 5.000 bh 7,700.00 38,500.00
Semen Portland 8.000 Kg 1,100.00 8,800.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.002 Oh 55,000.00 110

1m' Pasang Genteng Bubung Palentong Besar 35,480.00 19,690.00 55,170.00


Bahan
Genteng Bubung Palentong 4.000 bh 4,950.00 19,800.00
Semen Portland 8.000 Kg 1,100.00 8,800.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.002 Oh 55,000.00 110

1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm 232,705.00 7,122.50 239,827.50


Bahan
Roof Light Fiberglass 0.600 lbr 385,000.00 231,000.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 13,992.00 7,529.50 21,521.50
Bahan
Asbes Gelombang 0.500 lbr 19,800.00 9,900.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 15,972.00 7,529.50 23,501.50
Bahan
Asbes Gelombang 0.600 lbr 19,800.00 11,880.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 15,972.00 7,238.00 23,210.00
Bahan
Asbes Gelombang 0.600 lbr 19,800.00 11,880.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 18,942.00 7,238.00 26,180.00
Bahan
Asbes Gelombang 0.750 lbr 19,800.00 14,850.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 11,022.00 7,238.00 18,260.00
Bahan
Asbes Gelombang 0.350 lbr 19,800.00 6,930.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 12,408.00 7,238.00 19,646.00
Bahan
Asbes Gelombang 0.420 lbr 19,800.00 8,316.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 12,804.00 7,122.50 19,926.50
Bahan
Asbes Gelombang 0.440 lbr 19,800.00 8,712.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 14,190.00 7,122.50 21,312.50
Bahan
Asbes Gelombang 0.510 lbr 19,800.00 10,098.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 19,932.00 7,122.50 27,054.50
Bahan
Asbes Gelombang 0.800 lbr 19,800.00 15,840.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 11,418.00 7,122.50 18,540.50
Bahan
Asbes Gelombang 0.370 lbr 19,800.00 7,326.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 11,616.00 7,122.50 18,738.50
Bahan
Asbes Gelombang 0.380 lbr 19,800.00 7,524.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 13,200.00 7,122.50 20,322.50
Bahan
Asbes Gelombang 0.460 lbr 19,800.00 9,108.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 13,794.00 7,122.50 20,916.50
Bahan
Asbes Gelombang 0.490 lbr 19,800.00 9,702.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 15,378.00 7,122.50 22,500.50
Bahan
Asbes Gelombang 0.570 lbr 19,800.00 11,286.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m' Pasang Bubung Stel Gelombang 0.92m 252,120.00 7,914.50 260,034.50


Bahan
Asbes Gelombang 2.400 lbr 19,800.00 47,520.00
Paku Pancing 60 x 230 6.000 Kg 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel Gelombang 0.92m 252,120.00 7,914.50 260,034.50


Bahan
Asbes Gelombang 2.400 lbr 19,800.00 47,520.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel Gelombang 1.05m 246,180.00 7,914.50 254,094.50


Bahan
Asbes Gelombang 2.100 lbr 19,800.00 41,580.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel Gelombang 1.08m 245,190.00 7,914.50 253,104.50


Bahan
Asbes Gelombang 2.050 lbr 19,800.00 40,590.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Paten 0.92m 208,560.00 7,914.50 216,474.50


Bahan
Nok Paten 1.200 lbr 3,300.00 3,960.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Paten 1.05m 208,560.00 7,914.50 216,474.50


Bahan
Nok Paten 1.200 lbr 3,300.00 3,960.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Paten 1.08m 208,560.00 7,914.50 216,474.50


Bahan
Nok Paten 1.200 lbr 3,300.00 3,960.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel rata 0.92m 209,440.00 9,317.00 218,757.00


Bahan
Nok Stel rata 1.100 lbr 4,400.00 4,840.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel rata 1.05m 209,440.00 7,914.50 217,354.50


Bahan
Nok Stel rata 1.100 lbr 4,400.00 4,840.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220
1m² Pasang Atap Genteng Beton 92,983.00 10,340.00 103,323.00
Bahan
Genteng Beton 11.000 lbr 8,360.00 91,960.00
Paku Biasa 2" - 5" 0.030 bh 34,100.00 1,023.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Atap Genteng Aspal 92,378.00 17,732.00 110,110.00


Bahan
Genteng Aspal 6.900 lbr 11,000.00 75,900.00
Plywood 4 mm 0.350 lbr 42,900.00 15,015.00
Paku Biasa 1/2" - 1" 0.030 Kg 34,100.00 1,023.00
Plastic Aerator 0.500 Bh 880.00 440.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.003 Oh 44,000.00 132
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Atap Genteng Metal 51,475.60 9,845.00 61,320.60


Bahan
Genteng Metal 1.020 lbr 43,780.00 44,655.60
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.001 Oh 55,000.00 55

1m² Pasang Atap Sirap 34,320.00 15,730.00 50,050.00


Bahan
Genteng Sirap 60.000 lbr 458.33 27,500.00
Paku Biasa ½" - 1" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.166 Oh 27,500.00 4,565
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Nok Genteng Beton 51,045.00 20,680.00 71,725.00


Bahan
Genteng Beton 3.500 lbr 8,360.00 29,260.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Semen abu -abu 10.800 Kg 1,100.00 11,880.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Semen Warna 1.000 Kg 1,320.00 1,320.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.020 Oh 55,000.00 1,100

1m' Pasang Nok Genteng Aspal 29,305.00 14,492.50 43,797.50


Bahan
Genteng Aspal 2.000 lbr 11,000.00 22,000.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Balok Kayu Borneo 0.0035 Kg 1,600,000.00 5,600.00
Tenaga
Perkerja 0.125 Oh 27,500.00 3,438
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.006 Oh 55,000.00 330

1m' Pasang Nok Genteng Metal 44,055.00 14,025.00 58,080.00


Bahan
Genteng Decra Bond 1.100 lbr 38,500.00 42,350.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.013 Oh 55,000.00 715

1m' Pasang Nok Genteng Metal 44,055.00 14,025.00 58,080.00


Bahan
Genteng Decra Bond 1.100 lbr 38,500.00 42,350.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.013 Oh 55,000.00 715

1m' Pasang Nok Sirap 27,291.00 14,492.50 41,783.50


Bahan
Seng Plat 3" x 6" BJLS 28 0.400 Lbr 38,500.00 15,400.00
Paku Biasa ½" - 1" 0.060 Kg 34,100.00 2,046.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Papan Kayu Borneo tebal 3cm 0.004 m3 2,035,000.00 8,140.00
Tenaga
Perkerja 0.125 Oh 27,500.00 3,438
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Atap Seng Gelombang 35,332.00 6,204.00 41,536.00


Bahan
Seng Gelombang 3" x 6" BJLS 28 0.700 Lbr 49,500.00 34,650.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.060 Oh 38,500.00 2,310
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Atap Nok Seng 12,914.00 3,789.50 16,703.50


Bahan
Seng Plat 3" x 6" BJLS 28 0.300 Lbr 38,500.00 11,550.00
Paku Biasa ½" - 1" 0.040 Kg 34,100.00 1,364.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Atap Alluminium 46,882.00 3,982.00 50,864.00


Bahan
Atap Alluminium Gelombang tebal 0.55 1.050 m2 44,000.00 46,200.00
Paku Hak Pnjang 15 cm 0.020 Kg 34,100.00 682.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Nok Alluminium 9,284.00 42,240.00 51,524.00


Bahan
Nok standar 40 cm 18, swg 22 1.200 m2 6,600.00 7,920.00
Paku Hak Pnjang 15 cm 0.040 Kg 34,100.00 1,364.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 1.000 Oh 38,500.00 38,500
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Alluminium Foil / Sisalation 4,042.50 6,710.00 10,752.50


Bahan
Sisalation / Alluminium Foil 1.050 m2 3,850.00 4,042.50
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.050 Oh 38,500.00 1,925
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.008 Oh 55,000.00 440

VII PEKERJAAN LANGIT - LANGIT


1 m2 Pas. Rangka Plapond Kayu Kls I (Hanya Rangka) 45,617.00 16,046.25 61,663.25
Bahan
Kayu Balok Borneo 0.0210 m3 1,815,000.00 38,115.00
Paku 0.2200 kg 34,100.00 7,502.00
Tenaga
Perkerja 0.1875 org 27,500.00 5,156 0.00
Tukang Kayu 0.2250 org 38,500.00 8,663 0.00
Kepala Tukang 0.0375 org 44,000.00 1,650 0.00
Mandor 0.0105 org 55,000.00 578 0.00

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm 48,741.00 3,910.50 52,651.50


Bahan
Pelat Asbes tebal 5 mm 1.100 lbr 44,000.00 48,400.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0015 Oh 55,000.00 83

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm 42,691.00 3,910.50 46,601.50


Bahan
Pelat Asbes tebal 4 mm 1.100 lbr 38,500.00 42,350.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0015 Oh 55,000.00 83

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm 42,691.00 3,910.50 46,601.50
Bahan
Pelat Asbes tebal 4 mm 1.100 lbr 38,500.00 42,350.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0015 Oh 55,000.00 83

1 m² Langit - langit Akustik ( 30 x 30 )cm 570,955.00 6,963.00 577,918.00


Bahan
Akustik 30 x 30 cm 11.500 lbr 49,500.00 569,250.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Akustik ( 30 x 60 )cm 314,325.00 6,105.00 320,430.00


Bahan
Akustik 30 x 60 cm 5.800 lbr 53,900.00 312,620.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Akustik ( 60 x 120 )cm 100,705.00 6,105.00 106,810.00


Bahan
Akustik Arm Strong Ukuran 30 x 120 cm 1.500 lbr 66,000.00 99,000.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm 16,467.00 6,407.50 22,874.50


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm 16,467.00 6,407.50 22,874.50


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm 16,467.00 6,407.50 22,874.50


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm 16,467.00 6,407.50 22,874.50


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm 30,723.00 6,407.50 37,130.50


Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr 82,500.00 29,700.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm 30,723.00 6,407.50 37,130.50


Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr 82,500.00 29,700.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Gypsum 28,023.00 6,407.50 34,430.50


Bahan
Gypsum 0.360 lbr 75,000.00 27,000.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Kayu Jati 662,046.00 31,790.00 693,836.00


Bahan
Papan Kayu Jati 0.024 m3 27,500,000.00 660,000.00
Paku 0.010 Kg 34,100.00 341.00
Paku Sekrup 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0100 Oh 55,000.00 550

1 m² Langit - langit Kayu Ramin 3,804.24 31,790.00 35,594.24


Bahan
Papan Kayu Ramin 0.024 lbr 73,260.00 1,758.24
Paku 0.010 Kg 34,100.00 341.00
Paku Sekrup 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0100 Oh 55,000.00 550

1 m² Langit - langit Kayu Kamper 50,886.00 31,790.00 82,676.00


Bahan
Papan Kayu Kamper 0.024 lbr 2,035,000.00 48,840.00
Paku 0.010 Kg 34,100.00 341.00
Paku Sekrup 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0100 Oh 55,000.00 550

1 m² Langit - langit Softboard 33,748.00 20,955.00 54,703.00


Bahan
Softboard 4' x 8' x 4mm 0.350 lbr 93,500.00 32,725.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Akustik 60 x 120 cm + rangka Alluminium 379,885.00 25,987.50 405,872.50


Bahan
Profil Alluminium " T " 3.600 m' 71,500.00 257,400.00
Kawat seng polos 0.150 Kg 20,900.00 3,135.00
Ramset / Dinabolt 1.000 bh 12,100.00 12,100.00
Akustik Armstrom 60 x 120cm 1.500 lbr 71,500.00 107,250.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.0075 Oh 55,000.00 413

1 m² List Langit - langit Kayu Profil 16,071.00 3,685.00 19,756.00


Bahan
List Kayu Profil 1.100 m' 14,300.00 15,730.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Kayu 0.050 Oh 38,500.00 1,925
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Plywood 4 mm + RangkaKayu Borneo 55,577.00 25,327.50 80,904.50


Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku 0.060 Kg 34,100.00 2,046.00
Plywood 4 mm 0.390 lbr 42,900.00 16,731.00
Tenaga
Perkerja 0.270 Oh 27,500.00 7,425
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.040 Oh 44,000.00 1,760
Mandor 0.0135 Oh 55,000.00 743

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo 43,026.00 19,173.00 62,199.00
Bahan
Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00
Paku 0.060 Kg 34,100.00 2,046.00
Asbes 1.100 lbr 19,800.00 21,780.00
Tenaga
Perkerja 0.180 Oh 27,500.00 4,950
Tukang Kayu 0.320 Oh 38,500.00 12,320
Kepala Tukang 0.032 Oh 44,000.00 1,408
Mandor 0.0090 Oh 55,000.00 495

1 m² Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo 351,466.00 25,025.00 376,491.00
Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku 0.060 Kg 34,100.00 2,046.00
Akustik 30 x 60 cm 5.800 lbr 53,900.00 312,620.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.040 Oh 44,000.00 1,760
Mandor 0.0130 Oh 55,000.00 715

1 m² Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo 614,496.00 29,540.50 644,036.50
Bahan
Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00
Paku 0.060 Kg 34,100.00 2,046.00
Akustik 30 x 30 cm 11.500 lbr 49,500.00 569,250.00
Tenaga
Perkerja 0.310 Oh 27,500.00 8,525
Tukang Kayu 0.470 Oh 38,500.00 18,095
Kepala Tukang 0.047 Oh 44,000.00 2,068
Mandor 0.0155 Oh 55,000.00 853

IX PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok 1,859,000.00 138,919.00 1,997,919.00
Bahan
Kloset Duduk / Monoblok 1.000 bh 1,430,000.00 1,430,000.00
Perlengkapan 30% Dari bahan 429,000.00 429,000.00
Tenaga
Perkerja 3.300 Oh 27,500.00 90,750
Tukang Batu 1.100 Oh 35,750.00 39,325
Kepala Tukang 0.001 Oh 44,000.00 44
Mandor 0.1600 Oh 55,000.00 8,800

Memasang 1 buah Kloset Jongkok Porselen 173,750.00 155,925.00 329,675.00


Bahan
Kloset Jongkok Porselen 1.000 bh 165,000.00 165,000.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.500 Oh 35,750.00 53,625
Kepala Tukang 1.500 Oh 44,000.00 66,000
Mandor 0.1600 Oh 55,000.00 8,800

Memasang 1 buah Kloset Jongkok Teraso 117,485.00 100,375.00 217,860.00


Bahan
Kloset Jongkok Teraso 1.000 bh 104,500.00 104,500.00
Bata merah kelas I 7.000 bh 605.00 4,235.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.500 Oh 35,750.00 53,625
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.1100 Oh 55,000.00 6,050

Memasang 1 buah Urinoir 652,250.00 73,150.00 725,400.00


Bahan
Urinoir 1.000 bh 495,000.00 495,000.00
Perlengkapan 30% Harga Urinoir 148,500.00 148,500.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.000 Oh 35,750.00 35,750
Kepala Tukang 0.100 Oh 44,000.00 4,400
Mandor 0.1000 Oh 55,000.00 5,500

Memasang 1 buah Wastafel 563,150.00 91,437.50 654,587.50


Bahan
Urinoir 1.000 bh 495,000.00 495,000.00
Perlengkapan 12% Harga Urinoir 59,400.00 59,400.00
Semen Abu -abu 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.450 Oh 35,750.00 51,838
Kepala Tukang 0.150 Oh 44,000.00 6,600
Mandor 0.1000 Oh 55,000.00 5,500

Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³ 140,750.00 93,692.50 234,442.50
Bahan
Bak Teraso 1.000 bh 132,000.00 132,000.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 2.100 Oh 27,500.00 57,750
Tukang Batu 0.750 Oh 35,750.00 26,813
Kepala Tukang 0.070 Oh 44,000.00 3,080
Mandor 0.1100 Oh 55,000.00 6,050

Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m³ 233,640.00 175,835.00 409,475.00
Bahan
Bak Fiberglass 1.000 bh 198,000.00 198,000.00
Perlengkapan 18% Harga Bak 35,640.00 35,640.00
Tenaga
Perkerja 1.800 Oh 27,500.00 49,500
Tukang Batu 2.700 Oh 35,750.00 96,525
Kepala Tukang 0.540 Oh 44,000.00 23,760
Mandor 0.1100 Oh 55,000.00 6,050

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ 420,284.00 301,950.00 722,234.00
Bahan
Bata merah kelas I 0.400 m3 605.00 242.00
Semen Portland 120.000 Kg 1,100.00 132,000.00
Pasir Pasang 0.300 m3 215,000.00 64,500.00
Porselen ( 11 x 11 ) cm 360.000 bh 598.95 215,622.00
Semen Nat 6.000 Kg 1,320.00 7,920.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Batu 3.000 Oh 35,750.00 107,250
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.3000 Oh 55,000.00 16,500

Memasang 1 buah Badkip Porselen 858,000.00 #VALUE! #VALUE!


Bahan
Badkip 1.000 bh 715,000.00 715,000.00
Perlengkapan 20% harga Badkip 143,000.00 143,000.00
Tenaga
Perkerja - Oh 27,500.00 #VALUE!
Tukang Batu 0.075 Oh 35,750.00 2,681
Kepala Tukang 0.750 Oh 44,000.00 33,000
Mandor 0.2500 Oh 55,000.00 13,750

Memasang 1 buah Bak Fiberglass volume 1 m³ air 221,760.00 332,475.00 554,235.00


Bahan
Bak Fiberglass 1.000 bh 198,000.00 198,000.00
Perlengkapan 12% Harga Bak 23,760.00
Tenaga
Perkerja 3.000 Oh 27,500.00 82,500
Tukang Batu 4.500 Oh 35,750.00 160,875
Kepala Tukang 0.900 Oh 44,000.00 39,600
Mandor 0.9000 Oh 55,000.00 49,500

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 154,111.00 2,992.00 157,103.00
Bahan
Pipa Tanah 1.600 bh 93,500.00 149,600.00
Semen Portland 0.680 Kg 1,100.00 748.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Pasir Urug 0.011 m3 88,000.00 968.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.003 Oh 44,000.00 132
Mandor 0.0025 Oh 55,000.00 138

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 154,799.00 4,191.00 158,990.00
Bahan
Pipa Tanah 1.600 bh 93,500.00 149,600.00
Semen Portland 0.870 Kg 1,100.00 957.00
Pasir Pasang 0.014 m3 215,000.00 3,010.00
Pasir Urug 0.014 m3 88,000.00 1,232.00
Tenaga
Perkerja 0.080 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.004 Oh 44,000.00 176
Mandor 0.0070 Oh 55,000.00 385

Memasang 1 m' Pipa Beton Ø 5 cm - 20 cm 115,427.35 7,045.50 122,472.85


Bahan
Pipa Beton 1.100 bh 88,000.00 96,800.00
Bata merah kelas I 0.270 m3 605.00 163.35
Semen Portland 3.920 Kg 1,100.00 4,312.00
Pasir Pasang 0.056 m3 215,000.00 12,040.00
Pasir Urug 0.024 m3 88,000.00 2,112.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0070 Oh 55,000.00 385

Memasang 1 m' Pipa Beton Ø 30 cm - 100 cm 127,649.75 19,123.50 146,773.25


Bahan
Pipa Beton 1.100 bh 88,000.00 96,800.00
Bata merah kelas I 0.550 m3 605.00 332.75
Semen Portland 10.300 Kg 1,100.00 11,330.00
Pasir Pasang 0.061 m3 215,000.00 13,115.00
Pasir Urug 0.069 m3 88,000.00 6,072.00
Tenaga
Perkerja 0.380 Oh 27,500.00 10,450
Tukang Batu 0.190 Oh 35,750.00 6,793
Kepala Tukang 0.019 Oh 44,000.00 836
Mandor 0.0190 Oh 55,000.00 1,045

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm 121,287.73 125,232.25 246,519.98
Bahan
Bata merah kelas I 0.145 m3 605.00 87.73
Semen Portland 44.000 Kg 1,100.00 48,400.00
Pasir Pasang 0.070 m3 215,000.00 15,050.00
Batu Kerikil 0.070 m3 275,000.00 19,250.00
Besi Beton 1.600 Kg 16,000.00 25,600.00
Pasir Beton 0.060 m3 215,000.00 12,900.00
Tenaga
Perkerja 3.200 Oh 27,500.00 88,000
Tukang Batu 1.015 Oh 35,750.00 36,286
Kepala Tukang 0.0015 Oh 44,000.00 66
Mandor 0.0160 Oh 55,000.00 880

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm 179,251.25 61,932.75 241,184.00
Bahan
Bata merah kelas I 0.250 m3 605.00 151.25
Semen Portland 77.000 Kg 1,100.00 84,700.00
Pasir Pasang 0.130 m3 215,000.00 27,950.00
Batu Kerikil 0.020 m3 275,000.00 5,500.00
Besi Beton 2.600 Kg 16,000.00 41,600.00
Pasir Beton 0.090 m3 215,000.00 19,350.00
Tenaga
Perkerja 1.420 Oh 27,500.00 39,050
Tukang Batu 0.473 Oh 35,750.00 16,910
Kepala Tukang 0.0470 Oh 44,000.00 2,068
Mandor 0.0710 Oh 55,000.00 3,905

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm 277,659.46 97,548.00 375,207.46
Bahan
Bata merah kelas I 0.371 m3 605.00 224.46
Semen Portland 114.000 Kg 1,100.00 125,400.00
Pasir Pasang 0.184 m3 215,000.00 39,560.00
Batu Koral 0.033 m3 275,000.00 9,075.00
Besi Beton 4.850 Kg 16,000.00 77,600.00
Pasir Beton 0.120 m3 215,000.00 25,800.00
Tenaga
Perkerja 2.160 Oh 27,500.00 59,400
Tukang Batu 0.720 Oh 35,750.00 25,740
Kepala Tukang 0.0720 Oh 44,000.00 3,168
Mandor 0.1080 Oh 55,000.00 5,940
Tukang Gali 0.1000 Oh 33,000.00 3,300

Memasang 1 m' Pipa Galvanis Ø ½" 201,500.00 6,583.50 208,083.50


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0270 Oh 55,000.00 1,485

Memasang 1 m' Pipa Galvanis Ø ¾" 201,500.00 6,583.50 208,083.50


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0270 Oh 55,000.00 1,485

Memasang 1 m' Pipa Galvanis Ø 1" 201,500.00 6,583.50 208,083.50


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0270 Oh 55,000.00 1,485

Memasang 1 m' Pipa Galvanis Ø 1½" 201,500.00 10,494.00 211,994.00


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.108 Oh 27,500.00 2,970
Tukang Batu 0.180 Oh 35,750.00 6,435
Kepala Tukang 0.0180 Oh 44,000.00 792
Mandor 0.0054 Oh 55,000.00 297

Memasang 1 m' Pipa Galvanis Ø 3" #VALUE! 10,494.00 #VALUE!


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 #VALUE!
Tenaga
Perkerja 0.108 Oh 27,500.00 2,970
Tukang Batu 0.180 Oh 35,750.00 6,435
Kepala Tukang 0.0180 Oh 44,000.00 792
Mandor 0.0054 Oh 55,000.00 297

Memasang 1 m' Pipa Galvanis Ø 4" 28,416.67 13,120.25 41,536.92


Bahan
Pipa Galvanis D 4" 1.200 m' 18,333.33 22,000.00
Perlengkapan 35% Harga Pipa 6,416.67 6,416.67
Tenaga
Perkerja 0.135 Oh 27,500.00 3,713
Tukang Batu 0.225 Oh 35,750.00 8,044
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0068 Oh 55,000.00 374

Memasang 1 m' Pipa PVC tipe AW Ø ½" 3,912.98 3,498.00 7,410.98


Bahan
Pipa PVC D 1/2" 1.200 m' 2,524.50 3,029.40
Perlengkapan 35% Harga Pipa 883.58 883.58
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø ¾" 6,146.53 3,498.00 9,644.53


Bahan
Pipa PVC tipe AW Ø ¾" 1.200 m' 3,965.50 4,758.60
Perlengkapan 35% Harga Pipa 1,387.93 1,387.93
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 1" 8,439.75 3,498.00 11,937.75


Bahan
Pipa PVC tipe AW Ø 1" 1.200 m' 5,445.00 6,534.00
Perlengkapan 35% Harga Pipa 1,905.75 1,905.75
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 1½" 28,626.95 3,498.00 32,124.95


Bahan
Pipa PVC tipe AW Ø 1½" 1.200 m' 18,469.00 22,162.80
Perlengkapan 35% Harga Pipa 6,464.15 6,464.15
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 2" 31,073.63 5,247.00 36,320.63


Bahan
Pipa PVC tipe AW Ø 2" 1.200 m' 20,047.50 24,057.00
Perlengkapan 35% Harga Pipa 7,016.63 7,016.63
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0027 Oh 55,000.00 149

Memasang 1 m' Pipa PVC tipe AW Ø 2½" 51,150.00 3,498.00 54,648.00


Bahan
Pipa PVC tipe AW Ø 2½" 1.200 m' 33,000.00 39,600.00
Perlengkapan 35% Harga Pipa 11,550.00 11,550.00
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 3" 61,763.63 7,873.25 69,636.88


Bahan
Pipa PVC tipe AW Ø 3" 1.200 m' 39,847.50 47,817.00
Perlengkapan 35% Harga Pipa 13,946.63 13,946.63
Tenaga
Perkerja 0.081 Oh 27,500.00 2,228
Tukang Batu 0.135 Oh 35,750.00 4,826
Kepala Tukang 0.0135 Oh 44,000.00 594
Mandor 0.0041 Oh 55,000.00 226

Memasang 1 m' Pipa PVC tipe AW Ø 4" 90,365.00 7,873.25 98,238.25


Bahan
Pipa PVC tipe AW Ø 4" 1.200 m' 58,300.00 69,960.00
Perlengkapan 35% Harga Pipa 20,405.00 20,405.00
Tenaga
Perkerja 0.081 Oh 27,500.00 2,228
Tukang Batu 0.135 Oh 35,750.00 4,826
Kepala Tukang 0.0135 Oh 44,000.00 594
Mandor 0.0041 Oh 55,000.00 226

Memasang 1 bh Bak Cuci Piring Stainles Steel 566,500.00 12,952.50 579,452.50


Bahan
Bak cuci Stainless steel 1.000 bh 495,000.00 495,000.00
Water Drain + Asesories 1.000 set 71,500.00 71,500.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Batu 0.300 Oh 35,750.00 10,725
Kepala Tukang 0.0300 Oh 44,000.00 1,320
Mandor 0.0015 Oh 55,000.00 83

Memasang 1 bh Bak Cuci Piring Teraso 489,250.00 21,587.50 510,837.50


Bahan
Bak cuci Teraso 1.000 bh 385,000.00 385,000.00
Water Drain + Asesories 1.000 set 71,500.00 71,500.00
Semen Portland 20.000 Kg 1,100.00 22,000.00
Pasir Pasang 0.050 m3 215,000.00 10,750.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.0500 Oh 44,000.00 2,200
Mandor 0.0025 Oh 55,000.00 138

Memasang 1 bh Kran Ø ¾" atau ½" 33,123.75 4,565.00 37,688.75


Bahan
Kran Air 1.000 bh 33,000.00 33,000.00
Seal tape 0.025 bh 4,950.00 123.75
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.0100 Oh 44,000.00 440
Mandor 0.0050 Oh 55,000.00 275

Memasang 1 bh Floor Drain 33,000.00 4,565.00 37,565.00


Bahan
Kran Air 1.000 bh 33,000.00 33,000.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.0100 Oh 44,000.00 440
Mandor 0.0050 Oh 55,000.00 275

VII PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Pasang Rangka Atap Baja 23,100.00 2,590.50 25,690.50
Bahan
Besi Profil WF 1.100 Kg 19,800.00 21,780.00
Meni Besi 0.080 Kg 16,500.00 1,320.00
Tenaga
Perkerja 0.006 Oh 27,500.00 165
Tukang Besi 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0003 Oh 55,000.00 17

1 m² Pasang Pintu Besi Baja 495,000.00 47,520.00 542,520.00


Bahan
Pintu Besi Baja 1.000 m2 495,000.00 495,000.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Besi Konstruksi 0.650 Oh 38,500.00 25,025
Kepala Tukang 0.0650 Oh 44,000.00 2,860
Mandor 0.0320 Oh 55,000.00 1,760

1 m² Pasang Jendela Besi 495,000.00 74,208.75 569,208.75


Bahan
Jendela Besi 1.000 m2 495,000.00 495,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.1050 Oh 44,000.00 4,620
Mandor 0.00525 Oh 55,000.00 289

1 m² Pasang Jendela Besi Tahan Api 715,000.00 79,915.00 794,915.00


Bahan
Jendela Besi Tahan Api 1.000 m2 715,000.00 715,000.00
Tenaga
Perkerja 1.022 Oh 27,500.00 28,105
Tukang Besi Konstruksi 1.200 Oh 38,500.00 46,200
Kepala Tukang 0.1200 Oh 44,000.00 5,280
Mandor 0.0060 Oh 55,000.00 330

1 m² Pasang Pintu gulung besi 495,000.00 84,810.00 579,810.00


Bahan
Pintu gulung besi 1.000 m2 495,000.00 495,000.00
Tenaga
Perkerja 1.200 Oh 27,500.00 33,000
Tukang Besi Konstruksi 1.200 Oh 38,500.00 46,200
Kepala Tukang 0.1200 Oh 44,000.00 5,280
Mandor 0.0060 Oh 55,000.00 330

1 m² Pasang Pintu Lipat 715,000.00 74,206.00 789,206.00


Bahan
Pintu Lipat 1.000 m2 715,000.00 715,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.1050 Oh 44,000.00 4,620
Mandor 0.0052 Oh 55,000.00 286

1 m² Pasang Pintu Suncreen Allumunium 385,000.00 36,740.00 421,740.00


Bahan
Suncreen Allumunium 1.000 m2 385,000.00 385,000.00
Tenaga
Perkerja 0.080 Oh 27,500.00 2,200
Tukang Besi Konstruksi 0.800 Oh 38,500.00 30,800
Kepala Tukang 0.080 Oh 44,000.00 3,520
Mandor 0.004 Oh 55,000.00 220

1 m² Pasang Rolling Door 715,000.00 91,531.00 806,531.00


Bahan
Rolling Door 1.000 m2 715,000.00 715,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.500 Oh 38,500.00 57,750
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.0052 Oh 55,000.00 286

1 m² Pasang Pintu Allumunium 385,000.00 74,206.00 459,206.00


Bahan
Pintu Allumunium 1.000 m2 385,000.00 385,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.0052 Oh 55,000.00 286

1 m² Pasang Venetions Blinds 143,000.00 24,736.25 167,736.25


Bahan
Venetions Blinds 1.000 m2 143,000.00 143,000.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.00175 Oh 55,000.00 96

1 m² Pasang Vertikals Blinds 143,000.00 24,736.25 167,736.25


Bahan
Venetions Blinds 1.000 m2 143,000.00 143,000.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.00175 Oh 55,000.00 96

1 m² Pasang Terali Besi 202,400.00 79,761.00 282,161.00


Bahan
Terali Besi 2 x 3 11.500 m' 17,600.00 202,400.00
Tenaga
Perkerja 1.200 Oh 27,500.00 33,000
Tukang Las 1.200 Oh 38,500.00 46,200
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.0006 Oh 55,000.00 33

1 m² Pasang Kawat Harmonika 197,945.00 7,067.50 205,012.50


Bahan
Kawat Harmonika 1.100 m2 176,000.00 193,600.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 m² Pasang Kawat Nyamuk 52,745.00 7,067.50 59,812.50


Bahan
Kawat Nyamuk 1.100 m2 44,000.00 48,400.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 m² Pasang Kawat Kassa 76,945.00 7,067.50 84,012.50


Bahan
Kawat Kassa 1.100 m2 66,000.00 72,600.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 m² Pasang Kawat Burung 46,695.00 7,067.50 53,762.50


Bahan
Kawat Burung 1.100 m2 38,500.00 42,350.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 m² Pasang Jendela Nako & Tralis 11,860.75 14,135.00 25,995.75


Bahan
Jendela Nako 1.100 m2 9,900.00 10,890.00
Paku Biasa ½" - 1" atau Sekrup 0.020 Kg 34,100.00 682.00
Besi Strip 0.0250 m2 11,550.00 288.75
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0010 Oh 55,000.00 55

1 m² Pasang Talang Datar , Seng BJLS 28 46,447.50 20,693.75 67,141.25


Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr 38,500.00 19,250.00
Paku Biasa ½" - 1" atau Sekrup 0.015 Kg 34,100.00 511.50
Papan Kayu Borneo 0.0096 m3 2,035,000.00 19,536.00
Flincote / Meni Besi 0.2500 Kg 28,600.00 7,150.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 m² Pasang Talang Miring , Seng BJLS 28 67,006.50 17,668.75 84,675.25


Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr 38,500.00 19,250.00
Paku Biasa ½" - 1" atau Sekrup 0.015 Kg 34,100.00 511.50
Papan Kayu Borneo 0.0190 m3 2,035,000.00 38,665.00
Flincote / Meni Besi 0.3000 Kg 28,600.00 8,580.00
Tenaga
Perkerja 0.040 Oh 27,500.00 1,100
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 28 62,700.00 14,918.75 77,618.75


Bahan
Seng Gelombang 3" x 6" BJLS 28 0.300 Lbr 49,500.00 14,850.00
Paku Biasa ½" - 1" atau Sekrup 0.100 Kg 34,100.00 3,410.00
Papan Kayu Borneo 0.0190 m3 2,035,000.00 38,665.00
Besi Strip 0.5000 Kg 11,550.00 5,775.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 24 57,750.00 14,918.75 72,668.75


Bahan
Seng Plat 3 x 6 BJLS 24 0.300 Lbr 33,000.00 9,900.00
Paku Biasa ½" - 1" atau Sekrup 0.100 Kg 34,100.00 3,410.00
Papan Kayu Borneo 0.0190 m3 2,035,000.00 38,665.00
Besi Strip 0.5000 Kg 11,550.00 5,775.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

VI PEKERJAAN KUNCI DAN KACA


1 Buah Pasang Kunsi Tanam Antik 220,000.00 27,555.00 247,555.00
Bahan
Kunsi Tanam Antik 1.000 Bh 220,000.00 220,000.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.003 Oh 55,000.00 165

1 Buah Pasang Kunsi Tanam Biasa 99,000.00 20,240.00 119,240.00


Bahan
Kunsi Tanam Biasa 1.000 Bh 99,000.00 99,000.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1 Buah Pasang Kunsi Tanam Kamar Mandi 132,000.00 19,745.00 151,745.00


Bahan
Kunsi Tanam Kamar Mandi 1.000 Bh 132,000.00 132,000.00
Tenaga
Perkerja 0.005 Oh 27,500.00 138
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.0025 Oh 55,000.00 138

1 Buah Pasang Kunsi Silinder 165,000.00 19,621.25 184,621.25


Bahan
Kunsi Silinder 1.000 Bh 165,000.00 165,000.00
Tenaga
Perkerja 0.005 Oh 27,500.00 138
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.00025 Oh 55,000.00 14

1 Buah Pasang Engsel Pintu 30,250.00 6,888.75 37,138.75


Bahan
Engsel Pintu 1.000 Bh 30,250.00 30,250.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Engsel Jendela Kupu - kupu 27,500.00 4,592.50 32,092.50


Bahan
Engsel Jendela 1.000 Bh 27,500.00 27,500.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.00050 Oh 55,000.00 28
1 Buah Pasang Engsel Angin 33,000.00 9,680.00 42,680.00
Bahan
Engsel Angin 1.000 Bh 33,000.00 33,000.00
Tenaga
Perkerja 0.020 Oh 27,500.00 550
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.01000 Oh 55,000.00 550

1 Buah Pasang Spring Knip 3,850.00 6,888.75 10,738.75


Bahan
Spring Knip 1.000 Bh 3,850.00 3,850.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kait angin 38,500.00 6,888.75 45,388.75


Bahan
Kait Angin 1.000 Bh 38,500.00 38,500.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Door Closer 165,000.00 22,962.50 187,962.50


Bahan
Door Closer 1.000 Bh 165,000.00 165,000.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.00250 Oh 55,000.00 138

1 Buah Pasang Kunci Selot 22,000.00 9,185.00 31,185.00


Bahan
Kunci Selot 1.000 Bh 22,000.00 22,000.00
Tenaga
Perkerja 0.020 Oh 27,500.00 550
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.001 Oh 55,000.00 55

1 Buah Pasang Pegangan Pintu / Door Holder 231,000.00 22,962.50 253,962.50


Bahan
Door Holder 1.000 Bh 231,000.00 231,000.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.0025 Oh 55,000.00 138

1 Buah Pasang Door Stop 165,000.00 4,592.50 169,592.50


Bahan
Door Stop 1.000 Bh 165,000.00 165,000.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 Buah Pasang Rel Pintu Dorong 275,000.00 27,555.00 302,555.00


Bahan
Rel Pintu Dorong 1.000 Bh 275,000.00 275,000.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0030 Oh 55,000.00 165

1 Buah Pasang Kunci Lemari 27,500.00 11,481.25 38,981.25


Bahan
Kunci Lemari 1.000 Bh 27,500.00 27,500.00
Tenaga
Perkerja 0.025 Oh 27,500.00 688
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69
1 Buah Pasang Kaca tebal 3 mm 78,650.00 6,888.75 85,538.75
Bahan
Kaca Polos 1.100 m2 71,500.00 78,650.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca tebal 5 mm 78,650.00 6,888.75 85,538.75


Bahan
Kaca Polos 1.100 m2 71,500.00 78,650.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca tebal 8 mm 78,650.00 7,576.25 86,226.25


Bahan
Kaca Polos 1.100 m2 71,500.00 78,650.00
Tenaga
Perkerja 0.0165 Oh 27,500.00 454
Tukang Kayu 0.165 Oh 38,500.00 6,353
Kepala Tukang 0.0165 Oh 44,000.00 726
Mandor 0.00080 Oh 55,000.00 44

1 Buah Pasang Kaca Buram tebal 12 mm 102,850.00 11,481.25 114,331.25


Bahan
Kaca Buram 1.100 m2 93,500.00 102,850.00
Tenaga
Perkerja 0.0250 Oh 27,500.00 688
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.0250 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 Buah Pasang Kaca Cermin tebal 5 mm 96,800.00 6,888.75 103,688.75


Bahan
Kaca Cermin 1.100 m2 88,000.00 96,800.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca Cermin tebal 6 mm 96,800.00 6,888.75 103,688.75


Bahan
Kaca Cermin 1.100 m2 88,000.00 96,800.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca Cermin tebal 8 mm 96,800.00 7,576.25 104,376.25


Bahan
Kaca Cermin 1.100 m2 88,000.00 96,800.00
Tenaga
Perkerja 0.0165 Oh 27,500.00 454
Tukang Kayu 0.165 Oh 38,500.00 6,353
Kepala Tukang 0.0165 Oh 44,000.00 726
Mandor 0.00080 Oh 55,000.00 44

1 Buah Pasang Kaca Wireglass tebal 5 mm 145,200.00 6,888.75 152,088.75


Bahan
Kaca Wireglass 1.100 m2 132,000.00 145,200.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca Patri tebal 5 mm 423,500.00 6,888.75 430,388.75


Bahan
Kaca Patri 1.100 m2 385,000.00 423,500.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
1 m² Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm 56,243.30 12,380.50 68,623.80
Bahan
Ubin Abu -abu 40 x40 cm 6.630 bh 6,160.00 40,840.80
Semen Portland 9.800 Kg 1,100.00 10,780.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm 56,752.05 12,883.75 69,635.80


Bahan
Ubin Abu -abu 30 x 30 cm 11.870 bh 3,465.00 41,129.55
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50

Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715

1 m² Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm 55,152.50 13,387.00 68,539.50


Bahan
Ubin Abu -abu 20 x 20 cm 26.500 bh 1,540.00 40,810.00
Semen Portland 10.400 Kg 1,100.00 11,440.00
Pasir Pasang 0.0135 m3 215,000.00 2,902.50

Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.130 Oh 35,750.00 4,648
Kepala Tukang 0.0130 Oh 44,000.00 572
Mandor 0.0135 Oh 55,000.00 743

1 m² Pasang Lantai Ubin Warna ukuran 40 x 40 cm 55,949.80 12,380.50 68,330.30


Bahan
Ubin Warna 40 x 40 cm 6.630 bh 6,160.00 40,840.80
Semen Portland 8.160 Kg 1,100.00 8,976.00
Pasir Pasang 0.0230 m3 215,000.00 4,945.00
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Warna ukuran 30 x 30 cm 56,458.55 12,380.50 68,839.05


Bahan
Ubin Warna 30 x 30 cm 11.870 bh 3,465.00 41,129.55
Semen Portland 8.360 Kg 1,100.00 9,196.00
Pasir Pasang 0.0230 m3 215,000.00 4,945.00
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Warna ukuran 20 x 20 cm 56,579.00 13,387.00 69,966.00


Bahan
Ubin Warna 20 x 20 cm 26.500 bh 1,540.00 40,810.00
Semen Portland 8.760 Kg 1,100.00 9,636.00
Pasir Pasang 0.0230 m3 215,000.00 4,945.00
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.130 Oh 35,750.00 4,648
Kepala Tukang 0.0130 Oh 44,000.00 572
Mandor 0.0135 Oh 55,000.00 743

1 m² Pasang Lantai Ubin Teraso ukuran 40 x 40 cm 48,490.50 12,380.50 60,871.00


Bahan
Ubin Teraso 40 x 40 cm 6.250 bh 5,280.00 33,000.00
Semen Portland 8.800 Kg 1,100.00 9,680.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teraso ukuran 30 x 30 cm 23,209.20 12,883.75 36,092.95


Bahan
Ubin Teraso 30 x 30 cm 1.870 bh 2,970.00 5,553.90
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.5400 Kg 1,320.00 2,032.80

Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715

1 m² Pasang Lantai Ubin Granito ukuran 40 x 40 cm 224,464.10 12,402.50 236,866.60


Bahan
Ubin Granito 40 x 40 cm 6.930 bh 29,920.00 207,345.60
Semen Portland 9.800 Kg 1,100.00 10,780.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Granito ukuran 30 x 30 cm 217,374.60 12,883.75 230,258.35


Bahan
Ubin Granito 30 x 30 cm 11.870 bh 16,830.00 199,772.10
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.5000 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm 98,518.50 12,380.50 110,899.00


Bahan
Ubin Teralux Kerang 40 x 40 cm 6.250 bh 13,200.00 82,500.00
Semen Portland 8.800 Kg 1,100.00 9,680.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm 104,774.48 12,380.50 117,154.98


Bahan
Ubin Teralux Kerang 30 x 30 cm 11.807 bh 7,425.00 87,666.98
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.1250 Kg 1,320.00 1,485.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm 286,116.00 12,380.50 298,496.50


Bahan
Ubin Teralux Marmer 60 x 60 cm 5.600 bh 47,520.00 266,112.00
Semen Portland 8.190 Kg 1,100.00 9,009.00
Pasir Pasang 0.0450 m3 215,000.00 9,675.00
Semen Warna 1.0000 Kg 1,320.00 1,320.00
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm 148,018.50 29,326.00 177,344.50


Bahan
Ubin Teralux Marmer 40 x 40 cm 6.250 bh 21,120.00 132,000.00
Semen Portland 8.800 Kg 1,100.00 9,680.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga
Perkerja 0.6720 Oh 27,500.00 18,480
Tukang Batu 0.224 Oh 35,750.00 8,008
Kepala Tukang 0.0220 Oh 44,000.00 968
Mandor 0.0340 Oh 55,000.00 1,870

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm 158,618.10 34,826.00 193,444.10


Bahan
Ubin Teralux Marmer 30 x 30 cm 11.870 bh 11,880.00 141,015.60
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.5000 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.7000 Oh 27,500.00 19,250
Tukang Batu 0.340 Oh 35,750.00 12,155
Kepala Tukang 0.0340 Oh 44,000.00 1,496
Mandor 0.0350 Oh 55,000.00 1,925

1 m² Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm 8,697.50 3,019.50 11,717.00


Bahan
Plint Ubin PC Abu - abu 15 x 20 cm 5.300 bh 1,155.00 6,121.50
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0040 m3 215,000.00 860.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm 6,438.15 3,019.50 9,457.65


Bahan
Plint Ubin PC Abu -abu 10 x 30 cm 3.530 bh 1,155.00 4,077.15
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0030 m3 215,000.00 645.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm 5,859.00 3,019.50 8,878.50


Bahan
Plint Ubin PC Abu - abu 10 x 40 cm 2.650 bh 1,320.00 3,498.00
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0030 m3 215,000.00 645.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 20 cm 6,879.80 3,019.50 9,899.30


Bahan
Plint Ubin PC Warna 10 x 20 cm 5.300 bh 880.00 4,664.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1900 Kg 1,320.00 250.80

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165
1 m² Pasang Plint Ubin PC Warna ukuran 10 x 30 cm 7,030.60 3,019.50 10,050.10
Bahan
Plint Ubin PC Warna 10 x 30 cm 3.330 bh 1,320.00 4,395.60
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 40 cm 6,761.00 4,026.00 10,787.00


Bahan
Plint Ubin PC Warna 10 x 40 cm 2.650 bh 1,760.00 4,664.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Plint Ubin Teraso ukuran 10 x 30 cm 6,688.95 4,026.00 10,714.95


Bahan
Plint Ubin Teraso 10 x 30 cm 3.530 bh 1,155.00 4,077.15
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1900 Kg 1,320.00 250.80

Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Plint Ubin Teraso ukuran 10 x 40 cm 6,178.00 4,026.00 10,204.00


Bahan
Plint Ubin Teraso 10 x 40 cm 2.650 bh 1,540.00 4,081.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Plint Ubin Granito ukuran 10 x 40 cm 21,919.00 3,019.50 24,938.50


Bahan
Plint Ubin Granito 10 x 40 cm 2.650 bh 7,480.00 19,822.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin Granito ukuran 10 x 30 cm 21,316.30 28,611.00 49,927.30


Bahan
Plint Ubin Granito 10 x 30 cm 3.330 bh 5,610.00 18,681.30
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm 10,885.00 28,611.00 39,496.00


Bahan
Plint Ubin Teralux Kerang 10 x 40 cm 2.500 bh 3,300.00 8,250.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm 10,876.75 28,611.00 39,487.75


Bahan
Plint Ubin Teralux Kerang 10 x 30 cm 3.330 bh 2,475.00 8,241.75
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm 16,099.00 28,611.00 44,710.00


Bahan
Plint Ubin Teralux Marmer 10 x 60 cm 1.700 bh 7,920.00 13,464.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm 15,835.00 28,611.00 44,446.00


Bahan
Plint Ubin Teralux Marmer 10 x 40 cm 2.500 bh 5,280.00 13,200.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm 15,821.80 28,611.00 44,432.80


Bahan
Plint Ubin Teralux Marmer 10 x 30 cm 3.330 bh 3,960.00 13,186.80
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Teraso Cor ditempat 118.80 28,611.00 28,729.80


Bahan
Bahan Teraso Cor 0.0036 m3 33,000.00 118.80

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Teralux Cor ditempat, tebal 3 cm 118.80 28,611.00 28,729.80


Bahan
Bahan Teraso Cor 0.0036 m3 33,000.00 118.80

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
1 m² Pasang Ubin Tahan Asam 178,970.20 14,190.00 193,160.20
Bahan
Ubin Tahan Asam 1.0500 m2 143,000.00 150,150.00
Semen Tanam Asam 14.1400 Kg 1,430.00 20,220.20
Pasir Pasang 0.0400 m3 215,000.00 8,600.00

Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0135 Oh 55,000.00 743

1 m² Pasang Lantai Keramik Artistik 10 x 20 cm 32,108.00 32,752.50 64,860.50


Bahan
Ubin Keramik Artistik 10 x 20 cm 5.0000 bh 1,716.00 8,580.00
Semen Portland 11.3800 Kg 1,100.00 12,518.00
Pasir Pasang 0.0420 m3 215,000.00 9,030.00
Semen Warna 1.5000 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm 9,235.00 6,336.00 15,571.00


Bahan
Plint Keramik Artistik 10 x 20 cm 5.000 bh 1,320.00 6,600.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm 35,661.40 6,336.00 41,997.40


Bahan
Plint Keramik Artistik 10 x 10 cm 5.000 bh 6,600.00 33,000.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1200 Kg 1,320.00 158.40

Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm 4,813.60 6,336.00 11,149.60


Bahan
Plint Keramik Artistik 5 x 20 cm 5.000 bh 660.00 3,300.00
Semen Portland 0.850 Kg 1,100.00 935.00
Pasir Pasang 0.0022 m3 215,000.00 473.00
Semen Warna 0.0800 Kg 1,320.00 105.60

Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m' Pasang Plint Vinyl tanpa adukan 15,620.00 5,632.00 21,252.00


Bahan
Lt. Vinyl Karet 30 x 30 kwl I 3.500 bh 2,200.00 7,700.00
Lem Vinyl 0.080 Kg 99,000.00 7,920.00

Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.080 Oh 35,750.00 2,860
Kepala Tukang 0.0080 Oh 44,000.00 352
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Lantai Keramik 10 x 20 cm 62,028.00 32,752.50 94,780.50


Bahan
Ubin Keramik 10 x 20 cm 50.000 bh 770.00 38,500.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 15 x 15 cm 72,533.00 32,752.50 105,285.50


Bahan
Ubin Keramik 15 x 15 cm 44.000 bh 1,113.75 49,005.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 20 x 20 cm 73,028.00 32,752.50 105,780.50


Bahan
Ubin Keramik 20 x 20 cm 25.000 bh 1,980.00 49,500.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 25 x 25 cm 73,028.00 32,752.50 105,780.50


Bahan
Ubin Keramik 25 x 25 cm 16.000 bh 3,093.75 49,500.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 15 x 20 cm 75,503.00 32,752.50 108,255.50


Bahan
Ubin Keramik 15 x 20 cm 35.000 bh 1,485.00 51,975.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 33 x 33 cm 77,433.50 32,752.50 110,186.00


Bahan
Ubin Keramik 33 x 33 cm 10.000 bh 5,390.55 53,905.50
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 33 x 33 cm anti slip 89,412.50 32,752.50 122,165.00


Bahan
Ubin Keramik 33 x 33 cm anti slip 10.000 bh 6,588.45 65,884.50
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 10 x 33 cm 77,433.50 32,752.50 110,186.00


Bahan
Ubin Keramik 10 x 33 cm 33.000 bh 1,633.50 53,905.50
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Mozaik 30 x 30 cm, ex lokal 92,590.00 32,752.50 125,342.50


Bahan
Mozaik 30 x 30 cm 12.000 bh 5,500.00 66,000.00
Semen Portland 14.150 Kg 1,100.00 15,565.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Semen Warna 2.000 Kg 1,320.00 2,640.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Marmer 177,026.00 32,752.50 209,778.50


Bahan
Marmer 1.052 M2 143,000.00 150,436.00
Semen Portland 14.150 Kg 1,100.00 15,565.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Semen Warna 2.000 Kg 1,320.00 2,640.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Karpet 100% Wool 219,450.00 11,968.00 231,418.00


Bahan
Feltex 100% Wool - T - 21 1.050 m2 176,000.00 184,800.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00

Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Pasang Lantai Karpet 100% Wool, 20% Nylon 127,050.00 11,968.00 139,018.00
Bahan
Carpet 80% Wool, 20% Nylon 1.050 m2 88,000.00 92,400.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00

Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Pasang Underlyer, tebal 6 mm 99,330.00 8,448.00 107,778.00


Bahan
Underlyer, tebal 6 mm / Rubber Corrugated 1.050 m2 94,600.00 99,330.00

Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Pasang Lantai Karpet 63,525.00 11,968.00 75,493.00


Bahan
Carpet 1.050 m2 27,500.00 28,875.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Pasang Lantai Parquet Jati 244,200.00 33,715.00 277,915.00


Bahan
Parquet Jati 1.050 m2 176,000.00 184,800.00
Lem Vinyl 0.600 Kg 99,000.00 59,400.00

Tenaga
Perkerja 0.6500 Oh 27,500.00 17,875
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0325 Oh 55,000.00 1,788

1 m² Pasang Dinding Porselen 11 x 11 cm, putih 57,165.00 38,775.00 95,940.00


Bahan
Porselen 11 x 11 cm putih 83.000 Bh 495.00 41,085.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.0500 Oh 44,000.00 2,200
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 11 x 11 cm, warna 66,295.00 38,775.00 105,070.00


Bahan
Porselen 11 x 11 cm warna 83.000 Bh 605.00 50,215.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.0500 Oh 44,000.00 2,200
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 15 x 15 cm, putih 66,198.75 36,217.50 102,416.25


Bahan
Porselen 15 x 15 cm putih 45.000 Bh 1,113.75 50,118.75
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 15 x 15 cm, warna 77,336.25 36,217.50 113,553.75


Bahan
Porselen 15 x 15 cm warna 45.000 Bh 1,361.25 61,256.25
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 10 x 20 cm, warna 76,580.00 36,217.50 112,797.50


Bahan
Porselen 10 x 20 cm warna 50.000 Bh 1,210.00 60,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 20 x 20 cm, warna 76,580.00 36,217.50 112,797.50


Bahan
Porselen 20 x 20 cm warna 25.000 Bh 2,420.00 60,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik Artistik 10 x 20 cm, warna 786,080.00 36,217.50 822,297.50


Bahan
Keramik Artistik 10 x 20 cm 100.000 Bh 7,700.00 770,000.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik Artistik 5 x 20 cm, warna 731,080.00 36,217.50 767,297.50


Bahan
Keramik Artistik 5 x 20 cm 100.000 Bh 7,150.00 715,000.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 10 x 20 cm 208,580.00 36,217.50 244,797.50


Bahan
Keramik 10 x 20 cm 50.000 Bh 3,850.00 192,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 15 x 15 cm 189,330.00 36,217.50 225,547.50


Bahan
Keramik 15 x 15 cm 45.000 Bh 3,850.00 173,250.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 20 x 20 cm 112,330.00 23,705.00 136,035.00


Bahan
Keramik 20 x 20 cm 25.000 Bh 3,850.00 96,250.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 10 x 20 cm 208,580.00 23,168.75 231,748.75


Bahan
Keramik 10 x 20 cm 50.000 Bh 3,850.00 192,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0300 Oh 55,000.00 1,650
1 m² Pasang Dinding Marmer 166,899.00 47,822.50 214,721.50
Bahan
Marmer 1.020 M2 143,000.00 145,860.00
Semen Abu -abu 12.440 Kg 1,100.00 13,684.00
Pasir Pasang 0.025 m3 215,000.00 5,375.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.7200 Oh 27,500.00 19,800
Tukang Batu 0.650 Oh 35,750.00 23,238
Kepala Tukang 0.0650 Oh 44,000.00 2,860
Mandor 0.0350 Oh 55,000.00 1,925

1 m² Pasang Dinding Bata Klinker 5 x 5 x 24 cm 107,059.00 32,752.50 139,811.50


Bahan
Bata Pelapis Klinker 80.000 Bh 1,100.00 88,000.00
Semen Abu -abu 12.440 Kg 1,100.00 13,684.00
Pasir Pasang 0.025 m3 215,000.00 5,375.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Batu Paros 309,200.00 32,752.50 341,952.50


Bahan
Batu Paros 1.050 Bh 275,000.00 288,750.00
Semen Abu -abu 11.750 Kg 1,100.00 12,925.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Batu Tempel Hitam 112,850.00 32,752.50 145,602.50


Bahan
Batu Tempel Hitam 1.050 Bh 88,000.00 92,400.00
Semen Abu -abu 11.750 Kg 1,100.00 12,925.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Vinyl Karet 30 x 30 cm KL I 144,045.00 10,560.00 154,605.00


Bahan
Vinyl Karet 30 x 30 cm KL I 11.050 Bh 9,900.00 109,395.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Lantai Vinyl Karet 30 x 30 cm KL II 131,890.00 10,560.00 142,450.00


Bahan
Vinyl Karet 30 x 30 cm KL II 11.050 Bh 8,800.00 97,240.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Lantai Vinyl Asbes 30 x 30 cm 107,580.00 10,560.00 118,140.00


Bahan
Vinyl Asbes 30 x 30 cm 11.050 Bh 6,600.00 72,930.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Lantai Vinyl Motif Kembang 30 x 30 cm 125,812.50 10,560.00 136,372.50


Bahan
Vinyl Motif Kembang ex DN 11.050 Bh 8,250.00 91,162.50
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Wall Covering lebar 50 cm 23,188.00 27,918.00 51,106.00


Bahan
Vinyl Wall Covering lebar 50 cm 1.100 m2 19,580.00 21,538.00
Lem 0.250 Kg 6,600.00 1,650.00
Tenaga
Perkerja 0.7500 Oh 27,500.00 20,625
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Floor Hardener Ferrovax 92,400.00 8,448.00 100,848.00


Bahan
Floor Hardener Ferrovax 3.000 Kg 30,800.00 92,400.00
Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Floor Hardener Mastercron 154,000.00 8,448.00 162,448.00


Bahan
Floor Hardener Ferrovax 5.000 Kg 30,800.00 154,000.00
Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Plint Kayu 2 x 10 cm 67,705.00 8,778.00 76,483.00


Bahan
Papan Kayu Jati 0.002 m3 27,500,000.00 66,000.00
Paku Skrup 3.5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

VI PEKERJAAN PENGECATAN
1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama 357.50 #VALUE! #VALUE!
Bahan
Soda Api 0.050 Kg 7,150.00 357.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138

1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat 192.50 #VALUE! #VALUE!
Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 192.50 #VALUE! #VALUE!
Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138

1 m² Menyabun Permukaan Tembok Lama 192.50 #VALUE! #VALUE!


Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138
1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. 577,500.00 159,500.00 737,000.00
Bahan
Pasir Silika 40.000 Kg 13,200.00 528,000.00
BBM 10.000 Ltr 4,950.00 49,500.00
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle sewa / Hr
Tenaga
Perkerja 1.6000 Oh 27,500.00 44,000
Tukang Cat 1.600 Oh 33,000.00 52,800
Kepala Tukang 0.8000 Oh 44,000.00 35,200
Mandor 0.5000 Oh 55,000.00 27,500

1 m² Mendempul dan Menggosok Kayu 2,464.00 2,733.50 5,197.50


Bahan
Dempul Jadi 0.080 Kg 23,100.00 1,848.00
Minyak Cat 0.020 Kg 27,500.00 550.00
Batu Apung 0.010 Kg 6,600.00 66.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.040 Oh 33,000.00 1,320
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Lama 7,084.00 4,867.50 11,951.50


Bahan
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Penutup 0.170 Kg 13,200.00 2,244.00
Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.075 Oh 33,000.00 2,475
Kepala Tukang 0.0075 Oh 44,000.00 330
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 15,290.00 2,623.50 17,913.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.260 Kg 27,500.00 7,150.00

Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.009 Oh 33,000.00 297
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.350 Kg 27,500.00 9,625.00

Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.105 Oh 33,000.00 3,465
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.350 Kg 27,500.00 9,625.00

Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.105 Oh 33,000.00 3,465
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138

1 m² Pelaburan Bidang Kayu dengan Teak Oil 7,920.00 6,088.50 14,008.50


Bahan
Teak Oil 0.360 Ltr 22,000.00 7,920.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.063 Oh 33,000.00 2,079
Kepala Tukang 0.0630 Oh 44,000.00 2,772
Mandor 0.0025 Oh 55,000.00 138
1 m² Pelaburan Bidang Kayu dengan Pelitur 49,511.00 6,088.50 55,599.50
Bahan
Pelitur 0.150 Ltr 38,500.00 5,775.00
Pelitur Jadi 0.372 Ltr 88,000.00 32,736.00
Ampelas 2.000 Lbr 5,500.00 11,000.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.063 Oh 33,000.00 2,079
Kepala Tukang 0.0630 Oh 44,000.00 2,772
Mandor 0.0025 Oh 55,000.00 138

1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter 5,390.00 #VALUE! #VALUE!
Bahan
Residu atau Ter 0.350 Ltr 15,400.00 5,390.00
Tenaga
Perkerja 0.1000 Oh 27,500.00 2,750
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0060 Oh 55,000.00 330

1 m² Pelaburan Bidang Kayu dengan Vernis 6,897.00 10,521.50 17,418.50


Bahan
Vernis 0.150 Ltr 34,100.00 5,115.00
Dempul 0.050 Kg 23,100.00 1,155.00
Ampelas 0.100 Lbr 5,500.00 550.00
Kuas 0.010 Bh 7,700.00 77.00
Tenaga
Perkerja 0.1600 Oh 27,500.00 4,400
Tukang Cat 0.160 Oh 33,000.00 5,280
Kepala Tukang 0.0160 Oh 44,000.00 704
Mandor 0.0025 Oh 55,000.00 138

1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 6,512.00 3,043.70 9,555.70
Bahan
Plamir 0.100 Kg 19,800.00 1,980.00
Cat Dasar 0.100 Kg 11,000.00 1,100.00
Cat Tembok vinilex 0.260 Kg 13,200.00 3,432.00
Tenaga
Perkerja 0.0200 Oh 27,500.00 550
Tukang Cat 0.063 Oh 33,000.00 2,079
Kepala Tukang 0.0063 Oh 44,000.00 277
Mandor 0.0025 Oh 55,000.00 138

1 m² Melabur Tembok dengan Kapur Sirih 5,302.00 4,299.90 9,601.90


Bahan
Ampelas 0.100 Lbr 5,500.00 550.00
Alang - alang 0.250 ikat 6,600.00 1,650.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Kapur Sirih 0.150 Kg 880.00 132.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat 0.001 Oh 33,000.00 33
Kepala Tukang 0.0001 Oh 44,000.00 4
Mandor 0.0025 Oh 55,000.00 138

1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 3,234.00 1,424.50 4,658.50
Bahan
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Kapur Sirih 0.300 Kg 880.00 264.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.005 Oh 33,000.00 165
Kepala Tukang 0.0005 Oh 44,000.00 22
Mandor 0.0025 Oh 55,000.00 138

1 m² Pemasangan Wall Paper 47,960.00 7,375.50 55,335.50


Bahan
Wall Paper 1.200 m3 38,500.00 46,200.00
Perekat 0.200 Kg 8,800.00 1,760.00
Tenaga
Perkerja 0.0200 Oh 27,500.00 550
Tukang Cat 0.200 Oh 33,000.00 6,600
Kepala Tukang 0.0020 Oh 44,000.00 88
Mandor 0.0025 Oh 55,000.00 138

1 m² Pengecatan Permukaan Baja dengan Meni Besi 1,727.00 8,580.00 10,307.00


Bahan
Meni Besi 0.100 Kg 16,500.00 1,650.00
Kuas 0.010 Bh 7,700.00 77.00
Tenaga
Perkerja 0.0200 Oh 27,500.00 550
Tukang Cat 0.200 Oh 33,000.00 6,600
Kepala Tukang 0.0200 Oh 44,000.00 880
Mandor 0.0100 Oh 55,000.00 550

1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 4,697.00 15,702.50 20,399.50
Bahan
Meni Besi 0.100 Kg 16,500.00 1,650.00
Kuas 0.010 Bh 7,700.00 77.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Cat 0.225 Oh 33,000.00 7,425
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0075 Oh 55,000.00 413

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um 7,524.00 1,765.50 9,289.50
Bahan
Meni ( Read Lead ) A 0.100 Kg 9,900.00 990.00
Meni ( Read Lead ) B 0.100 Kg 12,100.00 1,210.00
Alluminium C 0.040 Kg 27,500.00 1,100.00
Alluminium B 0.040 Kg 29,700.00 1,188.00
Pengencer 0.010 Ltr 6,600.00 66.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Tenaga
Perkerja 0.0060 Oh 27,500.00 165
Tukang Cat 0.006 Oh 33,000.00 198
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0075 Oh 55,000.00 413

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um 4,950.00 3,003.00 7,953.00
Bahan
Meni Besi 0.300 Kg 16,500.00 4,950.00
Tenaga
Perkerja 0.0060 Oh 27,500.00 165
Tukang Cat 0.060 Oh 33,000.00 1,980
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um 4,136.00 64,350.00 68,486.00
Bahan
Cat Dasar 0.110 Kg 11,000.00 1,210.00
Cat Antara 0.170 Kg 11,000.00 1,870.00
Cat Penutup 0.080 Kg 13,200.00 1,056.00
Tenaga
Perkerja 0.5000 Oh 27,500.00 13,750
Tukang Cat 0.800 Oh 33,000.00 26,400
Kepala Tukang 0.3000 Oh 44,000.00 13,200
Mandor 0.2000 Oh 55,000.00 11,000

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um 3,300.00 53,900.00 57,200.00
Bahan
Cat Dasar 0.300 Kg 11,000.00 3,300.00
Tenaga
Perkerja 0.4000 Oh 27,500.00 11,000
Tukang Cat 0.700 Oh 33,000.00 23,100
Kepala Tukang 0.2000 Oh 44,000.00 8,800
Mandor 0.2000 Oh 55,000.00 11,000
NO JENIS UPAH SPESIFIKASI harga real SATUAN

Pekerja / knek Rp 55,798.00 Oh


Tukang gali Rp 65,734.00 Oh
Kepala tukang batu Rp 75,671.00 Oh
Tukang batu Rp 65,734.00 Oh
Kepala tukang kayu Rp 75,671.00 Oh
Tukang kayu Rp 65,734.00 Oh
Kepala tukang besi Rp 75,671.00 Oh
Tukang besi Rp 65,718.00 Oh
Kepala tukang cat Rp 75,671.00 Oh
Tukang Cat Rp 65,734.00 Oh
Tukang aspalt Rp 65,734.00 Oh
Mandor/ pengawas Rp 85,607.00 Oh
Instalator Rp 75,671.00 Oh
Pembantu instalator Rp 65,718.00 Oh
Tukang babat rumput Rp 55,798.00 Oh
Tukang taman Rp 65,734.00 Oh
Kepala tukang pasang pipa Rp 65,734.00 Oh
Tukang pasang pipa Rp 55,798.00 Oh
Operator alat besar Rp 85,607.00 Oh
Pembantu operator alat besar Rp 65,734.00 Oh
Tukang las Rp 65,734.00 Oh

NO JENIS BAHAN SPESIFIKASI harga real SATUAN

Akustik 30 x 30 cm Rp - lbr
Akustik 30 x 60 cm Rp - lbr
Akustik Arm Strong Ukuran 30 x 120 cm Rp - lbr
Akustik Armstrom 60 x 120cm Rp - lbr
Alang - alang Rp - ikat
Alluminium B Rp - Kg
Alluminium C Rp - Kg
Ampelas Rp - Lbr
Asbes Rp - lbr
Asbes Gelombang Rp - lbr
Atap Alluminium Gelombang tebal 0.55 Rp - m2
Badkip Rp - bh
Bahan Teraso Cor Rp - m3
Bak Teraso Rp - bh
Bak cuci Stainless steel Rp - bh
Bak cuci Teraso Rp - bh
Bak Fiberglass Rp - bh
Balok Kayu Borneo Rp - m3
Balok Kayu Jati Rp - m3
Balok Kayu Kamper Rp - m3
Balok Kayu Kruing Rp - m3
Bambu Ø 6 - 8 / 600 cm Rp - btg
Bata merah kelas I Rp - bh
Bata Pelapis Klinker Rp - Bh
Batacote Rp - Kg
Batu Apung Rp - Kg
Batu Belah 15 / 20 Rp - m3
Batu Belah 5 / 20 Rp - m3
Batu Belah 5 / 7 Rp - m3
Batu Granito Rp - Kg
Batu Kerikil Rp - m3
Batu Koral Rp - m3
Batu Paros Rp - Bh
Batu Tempel Hitam Rp - Bh
Batu Teraso Rp - Kg
BBM Rp - Ltr
Besi Beton Rp - Kg
Besi Beton ( Polos / Ulir ) Rp - Kg
Besi Beton Polos Rp - Kg
Besi Jaring Kawat Baja Rp - Kg
Besi Profil WF Rp - Kg
Besi Strip Rp - Kg
Carpet Rp - m2
Carpet 80% Wool, 20% Nylon Rp - m2
Cat Tembok vinilex vinilex Rp - Kg
Cat Antara Rp - Kg
Cat Dasar Rp - Kg
Cat Meni Rp - Kg
Cat Penutup Rp - Kg
Cat Kayu glotek Rp - Kg
Dempul Rp - Kg
Dempul Jadi Rp - Kg
Dolken Kayu Galam Ø 8 - 10 / 4m Rp - btg
Dolken Kayu Ø 8 - 10/400 cm Rp - btg
Dolken Ø 8 / 4 m Rp - btg
Door Closer Rp - Bh
Door Holder Rp - Bh
Door Stop Rp - Bh
Engsel Angin Rp - Bh
Engsel Jendela Rp - Bh
Engsel Pintu Rp - Bh
Feltex 100% Wool - T - 21 Rp - m2
Flincote / Meni Besi Rp - Kg
Floor Hardener Ferrovax Rp - Kg
Formika 4' x 3' Rp - lbr
Formtie / penjaga jarak bekisting Rp - bh
Genteng Aspal Rp - lbr
Genteng Beton Rp - lbr
Genteng Bubung Kodok Rp - bh
Genteng Bubung Palentong Rp - bh
Genteng Decra Bond Rp - lbr
Genteng Kodok Rp - bh
Genteng Metal Rp - lbr
Genteng Palentong Rp - bh
Genteng Palentong Super Rp - bh
Genteng Sirap Rp - lbr
Gypsum Rp - lbr
Ijuk Rp - m3
Jendela Besi Rp - m2
Jendela Besi Tahan Api Rp - m2
Jendela Nako Rp - bh
Kaca Buram Rp - m2
Kaca Cermin Rp - m2
Kaca Patri Rp - m2
Kaca Polos Rp - m2
Kaca Wireglass Rp - m2
Kait Angin Rp - Bh
Kapur Padam Rp - m3
Kapur Sirih Rp - Kg
Kaso 5 / 7 ( albasiah ) Rp - m3
Kawat Beton Rp - Kg
Kawat Burung Rp - m2
Kawat Duri Rp - Kg
Kawat Harmonika Rp - m2
Kawat Kassa Rp - m2
Kawat Nyamuk Rp - m2
Kawat seng polos Rp - Kg
Kayu Albasiah Rp - m3
Kayu Balok Borneo Rp - m3
Kayu Balok Damar Laut Rp - m3
Kayu Balok Jati Rp - m3
Kayu Kaso 5 / 7 (borneo) Rp - m3
Kayu Papan 3 / 20 borneo Rp - m3
Kayu Profil Rp - m'
Kayu Terentang Rp - m3
Keramik 10 x 20 cm Rp - Bh
Keramik 15 x 15 cm Rp - Bh
Keramik 20 x 20 cm Rp - Bh
Keramik Artistik 10 x 20 cm Rp - Bh
Keramik Artistik 5 x 20 cm Rp - Bh
Kloset Duduk / Monoblok Rp - bh
Kloset Jongkok Porselen Rp - bh
Kloset Jongkok Teraso Rp - bh
Kompresor, Blasting Pot , Selang Dan Nozzle Rp - hr
Koral Beton Rp - m3
Kran Air Rp - bh
Kuas Rp - Bh
Kunci Lemari Rp - Bh
Kunci Selot Rp - Bh
Kunci Tanam Rp - bh
Kunsi Silinder Rp - Bh
Kunsi Tanam Antik Rp - Bh
Kunsi Tanam Biasa Rp - Bh
Kunsi Tanam Kamar Mandi Rp - Bh
Lem Rp - Kg
Lem Kayu Rp - Lt
Lem Vinyl Rp - Kg
List Kayu Profil Rp - m'
Lt. Vinyl Karet 30 x 30 kwl I Rp - bh
Marmer Rp - M2
Meni ( Read Lead ) A Rp - Kg
Meni ( Read Lead ) B Rp - Kg
Meni Besi Rp - Lt
Minyak Bekisting Rp - lt
Minyak Cat Rp - Kg
Mozaik 30 x 30 cm Rp - bh
Nok Paten Rp - lbr
Nok standar 40 cm 18, swg 22 Rp - m2
Nok Stel rata Rp - lbr
Paku Rp - Kg
Paku Biasa ½" - 1" Rp - Kg
Paku Biasa ½" - 1" atau Sekrup Rp - Kg
Paku Biasa 1/2" - 1" Rp - Kg
Paku Biasa 2" - 5" Rp - Kg
Paku Hak Pnjang 15 cm Rp - Kg
Paku Hak Pnjang 15 cm Rp - Kg
Paku Pancing 60 x 230 Rp - Kg
Paku Sekrup Rp - Kg
Paku Skrup 3.5" Rp - Kg
Papan Kayu Borneo Rp - m3
Papan Kayu Borneo tebal 3cm Rp - m3
Papan Kayu Jati Rp - m3
Papan Kayu Kamper Rp - m3
Papan Kayu Ramin Rp - lbr
Parquet Jati Rp - m2
Pasir Beton Rp - m3
Pasir Pasang Rp - m3
Pasir Silika Rp - Kg
Pasir Urug Rp - m3
Pasir Urug Darat Rp - m3
PC Warna Rp - Kg
Pelat Asbes tebal 4 mm Rp - lbr
Pelat Asbes tebal 5 mm Rp - lbr
Pelitur Rp - Ltr
Pelitur Jadi Rp - Ltr
Pengencer Rp - Ltr
Perancah Kayu Rp - m3
Perekat Rp - Kg
Pintu Allumunium Rp - m2
Pintu Besi Baja Rp - m2
Pintu gulung besi Rp - m2
Pintu Lipat Rp - m2
Pipa Beton Rp - bh
Pipa Galvanis Rp - m'
Pipa Tanah Rp - bh
Plamir Rp - Kg
Plamuur Tembok Rp - Kg
Plastic Aerator Rp - Bh
Plint Keramik Artistik 10 x 10 cm Rp - bh
Plint Keramik Artistik 10 x 20 cm Rp - bh
Plint Keramik Artistik 5 x 20 cm Rp - bh
Plint Ubin PC Abu - abu 10 x 40 cm Rp - bh
Plint Ubin Granito 10 x 30 cm Rp - bh
Plint Ubin Granito 10 x 40 cm Rp - bh
Plint Ubin PC Abu - abu 15 x 20 cm Rp - bh
Plint Ubin PC Abu -abu 10 x 30 cm Rp - bh
Plint Ubin PC Warna 10 x 20 cm Rp - bh
Plint Ubin PC Warna 10 x 30 cm Rp - bh
Plint Ubin PC Warna 10 x 40 cm Rp - bh
Plint Ubin Teralux Kerang 10 x 30 cm Rp - bh
Plint Ubin Teralux Kerang 10 x 40 cm Rp - bh
Plint Ubin Teralux Marmer 10 x 30 cm Rp - bh
Plint Ubin Teralux Marmer 10 x 40 cm Rp - bh
Plint Ubin Teralux Marmer 10 x 60 cm Rp - bh
Plint Ubin Teraso 10 x 30 cm Rp - bh
Plint Ubin Teraso 10 x 40 cm Rp - bh
Plywood 4 mm Rp - lbr
Plywood 9 mm Rp - lbr
Porselen ( 11 x 11 ) cm Rp - bh
Porselen 10 x 20 cm warna Rp - Bh
Porselen 11 x 11 cm putih Rp - Bh
Porselen 11 x 11 cm warna Rp - Bh
Porselen 15 x 15 cm putih Rp - Bh
Porselen 15 x 15 cm warna Rp - Bh
Porselen 20 x 20 cm warna Rp - Bh
Profil Alluminium " T " Rp - m'
Ramset / Dinabolt Rp - bh
Rapidrant Rp - gln
Rel Pintu Dorong Rp - Bh
Residu Rp - Lt
Residu atau Ter Rp - Ltr
Rolling Door Rp - m2
Roof Light Fiberglass Rp - lbr
Sabun Rp - Kg
Seal tape Rp - bh
Semen Abu -abu Rp - Kg
Semen Merah Rp - Kg
Semen Nat Rp - Kg
Semen Portland Rp - Kg
Semen Tanam Asam Rp - Kg
Semen Warna Rp - Kg
Seng Gelombang 3" x 6" BJLS 28 Rp - Lbr
Seng Gelombang BJLS 32 Rp - lbr
Seng Plat Rp - lbr
Seng Plat 3 x 6 BJLS 24 Rp - Lbr
Seng Plat 3" x 6" BJLS 28 Rp - Lbr
Sisalation / Alluminium Foil Rp - m2
Soda Api Rp - Kg
Softboard 4' x 8' x 4mm Rp - lbr
Spring Knip Rp - Bh
Strorox - 100 Rp - Kg
Suncreen Allumunium Rp - m2
Tali Ijuk Rp - Kg
Teak Oil Rp - Ltr
Teakwood 4' x 8' x 4mm Rp - lbr
Terali Besi 2 x 3 Rp - m'
Ubin Abu -abu 20 x 20 cm Rp - bh
Ubin Abu -abu 30 x 30 cm Rp - bh
Ubin Abu -abu 40 x40 cm Rp - bh
Ubin Granito 30 x 30 cm Rp - bh
Ubin Granito 40 x 40 cm Rp - bh
Ubin Keramik 10 x 33 cm Rp - bh
Ubin Keramik 15 x 15 cm Rp - bh
Ubin Keramik 15 x 20 cm Rp - bh
Ubin Keramik 20 x 20 cm Rp - bh
Ubin Keramik 25 x 25 cm Rp - bh
Ubin Keramik 33 x 33 cm Rp - bh
Ubin Keramik 33 x 33 cm anti slip Rp - bh
Ubin Keramik 10 x 20 cm Rp - bh
Ubin Keramik Artistik 10 x 20 cm Rp - bh
Ubin Tahan Asam Rp - m2
Ubin Teralux Kerang 30 x 30 cm Rp - bh
Ubin Teralux Kerang 40 x 40 cm Rp - bh
Ubin Teralux Marmer 30 x 30 cm Rp - bh
Ubin Teralux Marmer 40 x 40 cm Rp - bh
Ubin Teralux Marmer 60 x 60 cm Rp - bh
Ubin Teraso 30 x 30 cm Rp - bh
Ubin Teraso 40 x 40 cm Rp - bh
Ubin Warna 20 x 20 cm Rp - bh
Ubin Warna 30 x 30 cm Rp - bh
Ubin Warna 40 x 40 cm Rp - bh
Underlyer, tebal 6 mm / Rubber Corrugated Rp - m2
Urinoir Rp - bh
Venetions Blinds Rp - m2
Vernis Rp - Ltr
Vinyl Asbes 30 x 30 cm Rp - Bh
Vinyl Karet 30 x 30 cm KL I Rp - Bh
Vinyl Karet 30 x 30 cm KL II Rp - Bh
Vinyl Motif Kembang ex DN Rp - Bh
Vinyl Wall Covering lebar 50 cm Rp - m2
Wall Paper Rp - m3
Water Drain + Asesories Rp - set
Waterstop lebar 150 mm Rp - m'
Waterstop lebar 200 mm Rp - m'
Waterstop lebar 230 mm Rp - m'
Waterstop lebar 250 mm Rp - m'
Waterstop lebar 300 mm Rp - m'
Waterstop lebar 320 mm Rp - m'
Pipa Galvanis D 4" Rp - m'
Pipa PVC D 1/2" Rp - m'
Pipa PVC tipe AW Ø ¾" Rp - m'
Pipa PVC tipe AW Ø 1½" Rp - m'
Pipa PVC tipe AW Ø 1" Rp - m'
Pipa PVC tipe AW Ø 2" Rp - m'
Pipa PVC tipe AW Ø 2½" Rp - m'
Pipa PVC tipe AW Ø 3" Rp - m'
Pipa PVC tipe AW Ø 4" Rp - m'