Anda di halaman 1dari 54

NO.

Uraian

Satuan

A. Upah Tenaga Kerja


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Mandor
Tukang gali tanah
Kepala tukang batu
Tukang Batu
Laden tukang batu
Kepala tukang kayu
Tukang kayu
Laden Tukang Kayu
Kepala Tukang Besi
Tukang besi
Laden Tukang Besi
Kepala tukang cat
Tukang cat
Laden tukang cat
Penjaga malam
Buruh tak terlatih
Buruh lapangan agak terlatih
Buruh Lapangan terlatih
Tukang listrik
Tukang las
Tukang tebas
Tukang anyam

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

B. Bahan Bangunan
1
2
3
4
4
5
6
7

besi 8
besi 6
besi 4
besi 10
semen
Pasir Pasang
Pasir Urug
koral
papan bekisting
kayu bekisting
Atap Zimculome Collor ( sakura elang ) 2 susun
Atap Zimculome Collor ( Mega Roof ) 3 susun
Bak mandi Fibre 50 x 50 Segi empat kecil
Balok kayu Meranti Ukuran 5x10x400 cm

Btg = 11 m'
Btg = 11 m'
Btg = 11 m'
Btg = 11 m'
zak
rit
rit
rit
m3
btg
Lbr
Lbr
Bh
M3

Balok kayu Meranti Ukuran 6x12x400 cm


Balok kayu Meranti Ukuran 8 x12 x 400 cm
Bataco
keramik dinding wc
keramik lantai wc
closed jongkok INA
keramik lantai 40 x40
pipa 1/2"
pipa 3/4"
pipa 3"
flor drain
keran air
papan kayu 2/20 (kayu kuat I Benuas/ulin)
cat dasar
cat dinding
cat kayu platon
Minyak cat
engsel pintu
engsel jendela
grendel pintu
tarikan jendela
hak angin
kunci tanam jendela
kunci tanam pintu
bindrat
plamir

M3
M3
Bh
doz
doz
Bh
doz
btg
btg
btg
Bh
Bh
m3
klg
klg
klg
klg
ps
ps
Bh
Bh
ps
Bh
Bh
kg
kg

Harga Dasar

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

98,300.00
68,000.00
90,700.00
83,100.00
68,000.00
90,700.00
83,100.00
68,000.00
90,700.00
83,100.00
68,000.00
90,700.00
83,100.00
68,000.00
68,000.00
68,000.00
68,000.00
68,000.00
75,000.00
98,300.00
98,300.00
75,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,000.00
16,000.00
7,500.00
52,500.00
58,000.00
270,000.00
170,000.00
1,150,000.00
1,200,000.00
3,000.00
28,000.00
31,300.00
120,000.00

42500
Rp 287,500.00

Rp
Rp
Rp
Rp
Rp
Rp

2,500,000.00
2,000.00
49,000.00
49,000.00
120,000.00
51,000.00

Rp
Rp
Rp

15,000.00
10,000.00
2,500,000.00

Rp

16,000.00

DAFTAR ANALISA HARGA SATUAN PE


URAIAN

ANALISA
1. PEKERJAAN PENDAHULUAN
SNI 01.1.1

1 M1 Pembersihan perataan lahan


0.100
Tukang Tebas
Oh
0.050
Mandor
Oh

SNI 01.1.2

1 M2 Pembuatan Direksi Keet


1.700
Btg
Kayu dolken/galam 10-12 cm,4
0.210
Kayu Klas III
M
0.300
Paku Biasa
Kg
10.500
Semen Portland
Kg

SNI 01.2.1

0.030

M3

0.050
1.500
2.000
1.000
0.200
0.050

Koral Beton
Seng Gelombang bljs 20 cm
Tukang Kayu
Pembantu Tukang Kayu
Kepala Tukang Kayu
Mandor

1 M Pengukuran dan pasang bouwplank


0.005
Oh
Mandor
0.010
Oh
Kepala tukang kayu
0.100
Oh
Tukang kayu
0.100
Oh
Pembantu tukang kayu
3
0.012
Balok kayu kelas kuat III
M
0.007
0.020

SNI 01 3.2

M
lbr
Oh
Oh
Oh
Oh

Pasir Beton

M3
Kg

Papan bouwplank
Paku kayu

1 M2 Pembuatan gudang semen dan alat-alat los (kerja)


0.050
Oh
Mandor
0.200
Oh
Kepala tukang kayu
2.000
Oh
Tukang kayu
1.000
Oh
Pembantu tukang kayu
1.700
Btg
Kayu dolken dia. 8-10/400 cm
3
0.210
Papan kayu kelas II
M
0.300
Kg
Paku kayu
10.500
Kg
Semen PC
3
0.030
Pasir beton
M
0.050
1.500

M3
Lbr

Koral beton
Seng Gelombang bljs 20 cm

2. PEKERJAAN TANAH
SNI 02.6.1

1 M3 Galian tanah biasa sedalam 1 m


0.025
Oh
Mandor
0.750
Oh
Tukang gali tanah

SNI 02.6.2

1 M3 Galian tanah biasa sedalam 2 m


0.045
Oh
Mandor
0.900
Oh
Tukang gali tanah

SNI 02.6.9

1 M3 urugan tanah kembali


0.015
Oh
Mandor
0.300
Oh
Tukang gali tanah
3
0.400
Pasir urug
M

SNI 02.6.10

1 M3 Pemadatan tanah (per 20 cm)


0.050
Oh
Mandor
0.500
Oh
Tukang gali tanah

SNI 02.6.11

1 M3 Urugan pasir bawah pondasi


0.010
Oh
Mandor
0.300
Oh
Tukang gali tanah
3
1.200
Pasir urug
M

SNI 02.6.11

1 M3 Urugan pasir bawah lantai


0.010
Oh
Mandor
0.300
Oh
Tukang gali tanah
3
1.200
Pasir urug
M

3. PEKERJAAN PONDASI
SNI 03.6.1
1 M3 Pasang pondasi batu belah adukan 1 Pc : 3 Ps
0.075
Oh
Mandor
0.075
Oh
Kepala tukang batu
0.750
Oh
Tukang batu
1.500
Oh
Pembantu tukang batu
3
1.200
Batu belah 15/20 cm
M
20.200
Kg
Semen PC
3
0.485
Pasir pasang
M

SNI 03.6.9

1 M Pasang pondasi batu kosong ( aanstamping )


0.039
Oh
Mandor

SNI 07. 6. 5

0.039
0.390
0.780
1.200

Oh
Oh
Oh

0.432

M3

Kepala tukang batu


Tukang batu
Pembantu tukang batu
Batu belah 15/20 cm
Pasir urug

4. PEKERJAAN PEMBETONAN
1 M Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr
0.0800
Oh
Mandor
0.0250
Oh
Kepala Tukang Batu
0.2500
Oh
Tukang Batu
1.6500
Oh
Laden Tukang Batu
23.200
Kg
Semen Portland / Kg
3
0.5200
Pasir Beton
M
0.7800

SNI 07. 6. 1

Koral Beton

1 M Membuat Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr


0.0800
Oh
Mandor
0.0250
Oh
Kepala Tukang Batu
0.2500
Oh
Tukang Batu
1.6500
Oh
Laden Tukang Batu
23.2000
Kg
Semen Portland / Kg
3
0.5200
Pasir Beton
M
0.7800

M3

Koral Beton

SNI. 07. 6. 25

1 kg Pembesian dengan besi polos atau besi ulir 8mm


0.0003
Oh
Mandor
0.0007
Oh
Kepala Tukang Besi
0.0070
Oh
Tukang Besi
0.0070
Oh
Laden Tukang Besi
1.0500
Kg
Besi beton
0.0150
Kg
Kawat Beton

SNI. 07. 6. 25

1 kg Pembesian dengan besi polos atau besi ulir 10mm


0.0003
Oh
Mandor
0.0007
Oh
Kepala Tukang Besi
0.0070
Oh
Tukang Besi
0.0070
Oh
Laden Tukang Besi
1.0500
Kg
Besi beton
0.0150
Kg
Kawat Beton

SNI. 07. 6. 25

1 kg Pembesian dengan besi polos atau besi ulir 12 mm


0.0003
Oh
Mandor
0.0007
Oh
Kepala Tukang Besi

0.0070
0.0070
1.0500
0.0150
SNI. 07. 6. 25

Oh
Oh
Kg
Kg

Tukang Besi
Laden Tukang Besi
Besi beton
Kawat Beton

1 kg Pembesian dengan besi polos atau besi ulir 16mm


0.0003
Oh
Mandor
0.0007
Oh
Kepala Tukang Besi
0.0070
Oh
Tukang Besi
0.0070
Oh
Laden Tukang Besi
1.0500
Kg
Besi beton
0.0150
Kg
Kawat Beton

SNI 09.6.20

1 M Pasang bekisting untuk pondasi


0.026
Oh
Mandor
0.026
Oh
Kepala tukang kayu
0.260
Oh
Tukang kayu
0.520
Oh
Pembantu tukang kayu
3
0.040
Kayu papan bekisting
M
0.300
Kg
Paku kayu
0.100
Ltr
Minyak bekisting (olie)

SNI 09.6.20

1 M2 Pasang bekisting untuk Sloof


0.026
Oh
Mandor
0.026
Oh
Kepala tukang kayu
0.260
Oh
Tukang kayu
0.520
Oh
Pembantu tukang kayu
3
0.045
Kayu papan bekisting
M
0.300
Kg
Paku kayu
0.100
Ltr
Minyak bekisting (olie)

SNI 09.6.22

1 M2 Pasang bekisting untuk kolom


0.033
Oh
Mandor
0.033
Oh
Kepala tukang kayu
0.330
Oh
Tukang kayu
0.660
Oh
Pembantu tukang kayu
3
0.040
Kayu papan bekisting
M
0.400
Kg
Paku kayu
0.200
Ltr
Minyak bekisting (olie)
3
0.015
Balok kayu kelas kuat II
M
0.350
Lbr
Plywood tebal 9mm
2.000
Btg
Kayu dolken/galam dia. 8-10 cm pjg 4 m

SNI 09.6.23

1 M Pasang bekisting untuk balok

0.033
0.033
0.330
0.660
0.040
0.400
0.200
0.018
0.350
2.000

Oh
Oh
Oh
Oh
3

M
Kg
Ltr

M
Lbr
Btg

Mandor
Kepala tukang kayu
Tukang kayu
Pembantu tukang kayu
Kayu papan bekisting
Paku kayu
Minyak bekisting (olie)
Balok kayu kelas kuat II
Plywood tebal 9mm
Kayu dolken/galam dia. 8-10 cm pjg 4 m

SNI 09.6.24

1 M2 Pasang bekisting untuk lantai


0.033
Oh
Mandor
0.033
Oh
Kepala tukang kayu
0.330
Oh
Tukang kayu
0.660
Oh
Pembantu tukang kayu
3
0.040
Kayu papan bekisting
M
0.400
Kg
Paku kayu
0.200
Ltr
Minyak bekisting (olie)
3
0.015
Balok kayu kelas kuat II
M
0.350
Lbr
Plywood tebal 9mm
6.000
Btg
Kayu dolken/galam dia. 8-10 cm pjg 4 m

SNI 09.6.26

1 M2 Pasang bekisting untuk tangga


0.033
Oh
Mandor
0.033
Oh
Kepala tukang kayu
0.330
Oh
Tukang kayu
0.660
Oh
Pembantu tukang kayu
3
0.030
Kayu terentang (papan bekisting)
M
0.400
Kg
Paku kayu
0.150
Ltr
Minyak bekisting (olie)
3
0.015
Balok kayu kelas kuat II
M
0.350
Lbr
Plywood tebal 9mm
2.000
Btg
Kayu dolken/galam dia. 8-10 cm pjg 4 m

SNI 10.2.3

5. PEKERJAAN LANTAI
1 M2 Pasang lantai keramik 20 x 20 cm
0.035
Oh
Mandor
0.035
Oh
Kepala tukang batu
0.350
Oh
Tukang batu
0.700
Oh
Pembantu tukang batu
26.500
Bh
keramik 20 x 20 cm
10.000
Kg
Semen PC
3
0.045
Pasir pasang
M

1.500

Kg

Semen warna

SNI 10.2.3

1 M2 Pasang lantai keramik 40 x 40 cm


0.035
Oh
Mandor
0.035
Oh
Kepala tukang batu
0.350
Oh
Tukang batu
0.700
Oh
Pembantu tukang batu
26.500
Bh
keramik 20 x 20 cm
10.000
Kg
Semen PC
3
0.045
Pasir pasang
M
1.500
Kg
Semen warna

SNI 10.2.3

1 M Pasang lantai keramik 10 x 40 cm


0.035
Oh
Mandor
0.035
Oh
Kepala tukang batu
0.350
Oh
Tukang batu
0.700
Oh
Pembantu tukang batu
2.650
Bh
keramik 10 x 40 cm
10.000
Kg
Semen PC
3
0.045
Pasir pasang
M
1.500
Kg
Semen warna

SNI 10.19.4

1 M2 Pasang lantai keramik 15 x 20 cm


0.035
Oh
Mandor
0.035
Oh
Kepala tukang batu
0.350
Oh
Tukang batu
0.700
Oh
Pembantu tukang batu
26.500
Bh
keramik 15 x 20 cm
10.400
Kg
Semen PC
3
0.045
Pasir pasang
M
1.620
Kg
Semen warna

SNI 07.1.2

SNI 12.2.1

6. PEKERJAAN KUSEN PINTU,JENDELA DAN VENTILASI


1 M3 Pasang kusen pintu dan jendela kayu kelas kuat II (kayu lanan/meranti)
0.300
Oh
Mandor
2.100
Oh
Kepala tukang kayu
21.000
Oh
Tukang kayu
7.000
Oh
Pembantu tukang kayu
3
1.200
Balok kayu kelas kuat II
M
1.250
Kg
Paku kayu
1.000
Kg
Lem kayu

1 Bh Pasang engsel pintu

0.001
0.015
0.150
0.015
1.000

Oh
Oh
Oh
Oh
Bh

Mandor
Kepala tukang kayu
Tukang kayu
Pembantu tukang kayu
Engsel lokal "4"

SNI 12.2.1

1 Bh Pasang kunci tanam


0.003
Oh
Mandor
0.060
Oh
Kepala tukang kayu
0.600
Oh
Tukang kayu
0.060
Oh
Pembantu tukang kayu
1.000
Bh
Kunci tanam merk ISEO

SNI 12.11.2

1 M2 Pasang kaca polos/bening tebal3 mm


0.001
Oh
Mandor
0.015
Oh
Kepala tukang kayu
0.150
Oh
Tukang kayu
0.015
Oh
Pembantu tukang kayu
2
1.100
Kaca polos/bening tebal 3 mm
M

SNI 12.2.2

1 Bh Pasang engsel jendela


0.001
Oh
Mandor
0.010
Oh
Kepala tukang kayu
0.100
Oh
Tukang kayu
0.010
Oh
Pembantu tukang kayu
1.000
Bh
Engsel jendela "3"

SNI 12.4.1

1 Bh Pasang kait angin


0.001
Oh
Mandor
0.015
Oh
Kepala tukang kayu
0.150
Oh
Tukang kayu
0.015
Oh
Pembantu tukang kayu
1.000
Bh
Kait angin

SNI 12.6.1

1 Bh Pasang kunci selot


0.001
Oh
Mandor
0.020
Oh
Kepala tukang kayu
0.200
Oh
Tukang kayu
0.020
Oh
Pembantu tukang kayu
1.000
Bh
Kunci selot

SNI 12.7.1

1 Bh Pasang pegangan pintu


0.003
Oh
Mandor

0.050
0.500
0.050
1.000

Oh
Oh
Oh
Bh

Kepala tukang kayu


Tukang kayu
Pembantu tukang kayu
Pegangan pintu

SNI 11.6.7

1 M2 Pasang Pintu Panel Kayu


0.05
Mandor
Oh
0.25
Kepala Tukang Kayu
Oh
2.5
Tukang Kayu
Oh
1
Laden Tukang Kayu
Oh
0.04
Kayu Ulin, Balok
Bh

SNI 12.7.1a

1 Bh Pasang pegangan jendela


0.003
Oh
Mandor
0.050
Oh
Kepala tukang kayu
0.500
Oh
Tukang kayu
0.050
Oh
Pembantu tukang kayu
1.000
Bh
Pegangan jendela

SNI 04. 6. 10

7. PEKERJAAN DINDING DAN PLESTERAN


1 M2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 3 Ps
0.0150
Oh
Mandor
0.0100
Oh
Kepala tukang batu
0.1000
Oh
Tukang batu
0.3000
Oh
Pembantu tukang batu
15.0000
Bh
batako
11.5000
Kg
Semen PC
3
Pasir pasang
M
0.0430

SNI 06.6.3

1 M Plesteran camp
0.015
Oh
0.015
Oh
0.150
Oh
0.300
Oh
7.776
Kg
3
0.023
M

1 Pc : 3 Ps tebal 15 mm
Mandor
Kepala tukang batu
Tukang batu
Pembantu tukang batu
Semen PC
Pasir pasang

SNI 06.5

1 M Plesteran camp
0.015
Oh
0.015
Oh
0.150
Oh
0.300
Oh
7.776
Kg

1 Pc : 5 Ps tebal 15 mm
Mandor
Kepala tukang batu
Tukang batu
Pembantu tukang batu
Semen PC

0.038

SNI 08.17.4

SNI 08.1.4

SNI 13.8.1

SNI 13.10.2

SNI 06.12.2

Pasir pasang

8. PEKERJAAN PLAFOND
1 M Pasang rangka langit-lamgit 60 x 60 cm kayu kelas kuat II (kayu lanan/meranti)
0.011
Oh
Mandor
0.035
Oh
Kepala tukang kayu
0.350
Oh
Tukang kayu
0.210
Oh
Pembantu tukang kayu
3
0.017
Balok kayu kelas kuat II
M
0.115
Kg
Paku kayu

1 M Pasang langit-langit nusaboard


0.005
Oh
Mandor
0.010
Oh
Kepala tukang kayu
0.100
Oh
Tukang kayu
0.100
Oh
Pembantu tukang kayu
0.050
Kg
Paku nusaboard
0.347
Lbr
nusaboard

9. PEKERJAAN PENGECATAN
1 M2 Pengecatan bidang kayu baru: 1 lapis plamir, 1 lapis cat dasar dan 2 lapis cat penutup
0.003
Oh
Mandor
0.006
Oh
Kepala tukang cat
0.009
Oh
Tukang cat
0.070
Oh
Pembantu tukang cat
0.200
Kg
Cat meni
0.150
Kg
Plamir (dempul kayu) biasa
0.170
Kg
Cat dasar
0.260
Kg
Cat penutup merk TKS

1 M Pengecatan tembok baru: 1 lapis cat dasar dan 2 lapis cat penutup
0.003
Oh
Mandor
0.004
Oh
Kepala tukang cat
0.043
Oh
Tukang cat
0.028
Oh
Pembantu tukang cat
0.130
Kg
Cat dasar
0.230
Kg
Cat penutup merk vinilex

10. PEKERJAAN KUDA-KUDA DAN ATAP


1 M3 Pasang konstruksi kuda-kuda kayu kelas kuat II (kayu lanan/meranti)
OH
0.2000
Mandor
OH
1.2000
Kepala tukang kayu
OH
12.0000
Tukang kayu
OH
4.0000
Laden tukang kayu

1.1000
15.0000
0.8000

OH
M'
Kg

Balok kayu kelas kuat II


Besi strip
Paku kayu

SNI 6.6.31

1 M Rangka atap Kasau 5/7 dan Reng 3/4


OH
0.0050
Mandor
OH
0.0100
Kepala Tukang Kayu
OH
0.1000
Tukang Kayu
OH
0.1000
Laden Tukang Kayu
M3
0.0088
Balok Kayu Meranti
Kg
0.0600
Paku Ulin

SNI 08.6.32

1 M Pasang Atap Genteng Metal merk Mulitroof


OH
0.0010
Mandor
OH
0.0100
Kepala Tukang Kayu
OH
0.1000
Tukang Kayu
OH
0.2000
Laden Tukang Kayu
M2
1.6700
Genteng Metal

SNI 6.6.53

1 M Listplank 3x30 cm Papan meranti


OH
0.0050
Mandor
OH
0.0100
Kepala Tukang Kayu
OH
0.1000
Tukang Kayu
OH
0.1000
Laden Tukang Kayu
M3
0.0088
PapanMeranti
Kg
0.0600
Paku Ulin

SNI 11.2.1

SNI 10.17.1

11. PEKERJAAN KAMAR MANDI


Pasang 1 buah kloset jongkok berwarna Merk INA
0.160
Oh
Mandor
1.500
Oh
Kepala tukang batu
1.500
Oh
Tukang batu
1.000
Oh
Pembantu tukang batu
1.000
Bh
Kloset jongkok berwarna merk INA
6.000
Kg
Semen PC
3
0.010
Pasir pasang
M

Pasang 1 buah kran air diameter 3/4" atau 1/2"


0.005
Oh
Mandor
0.010
Oh
Kepala tukang batu
0.100
Oh
Tukang batu
0.010
Oh
Pembantu tukang batu
1.000
Bh
Krain air
0.500
Bh
Seal tape

SNI 6.27

SNI 11.6.1

SNI 10.19.4a

SNI 10. 6.42

SNI 10. 6.42

Pasang 1 m pipa pvc tipe AW diameter /4"


0.002
Oh
Mandor
0.010
Oh
Kepala tukang batu
0.100
Oh
Tukang batu
0.010
Oh
Pembantu tukang batu
1.200
Bh
Pipa PVC
0.500
Bh
Seal tape

Pasang 1 buah bak mandi fiber glass, volume 0,30 m (50 x 50) cm
0.110
Oh
Mandor
0.540
Oh
Kepala tukang batu
2.700
Oh
Tukang batu
1.800
Oh
Pembantu tukang batu
1.000
Bh
Bak Fiber
0.180
Perlengkapan 18% dari harga bak

1 M2 Pasang dinding keramik 20 x 20 cm


0.045
Oh
Mandor
0.045
Oh
Kepala tukang batu
0.450
Oh
Tukang batu
0.900
Oh
Pembantu tukang batu
26.500
Bh
Ubin keramik 20 x 20 cm
9.300
Kg
Semen PC
0.018
Pasir pasang
M3
1.940
Kg
Semen warna

12. PEKERJAAN SEPTICTANK DAN RESAPAN


Menggali galian 1 buah septictank
0.9000 Mandor
0.9000 Kepala Tukang Batu
4.5000 Tukang Batu
3.0000 Laden Tukang Batu
0.4000 Tukang gali

Menggali galian 1 buah Resapan


0.9000 Mandor
0.9000 Kepala Tukang Batu
4.5000 Tukang Batu
3.0000 Laden Tukang Batu
0.4000 Tukang gali
1.0000 Ijuk /kg
0.9990 Kerikil/m3
1.0000 Tanah urug

SNI 07. 6. 1

1 M Membuat Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr


0.0800
Oh
Mandor
0.0250
Oh
Kepala Tukang Batu
0.2500
Oh
Tukang Batu
1.6500
Oh
Laden Tukang Batu
23.2000
Kg
Semen Portland / Kg
3
0.5200
Pasir Beton
M
0.7800

SNI 07. 6. 5

Koral Beton

1 M Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr


0.0800
Oh
Mandor
0.0250
Oh
Kepala Tukang Batu
0.2500
Oh
Tukang Batu
1.6500
Oh
Laden Tukang Batu
23.200
Kg
Semen Portland / Kg
3
0.5200
Pasir Beton
M
0.7800

sloof per m3

M3

Koral Beton

DAFTAR ANALISA HARGA SATUAN PEKERJAAN


HARGA SATUAN

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

75,500.00
98,300.00

13,800.00
1,600,000.00
13,000.00
1,500.00
67,500.00
325,000.00
39,300.00
83,100.00
68,000.00
90,700.00
98,300.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
1,500,000.00

@ Rp.
@ Rp.

1,860,000.00
13,000.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
6,800.00
13,800.00
1,860,000.00
13,000.00
1,500.00
67,500.00

@ Rp.
@ Rp.

325,000.00
39,300.00

HARGA UPAH

Rp.
Rp.
Rp.

7,550.00
4,915.00
12,465.00

HARGA BAHAN

Rp.

JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

23,460.00
336,000.00
3,900.00
15,750.00
2,025.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,250.00
58,950.00

166,200.00
68,000.00
18,140.00
4,915.00
257,255.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

456,335.00

Rp.
Rp.
Rp.
Rp.

491.50
907.00
8,310.00
6,800.00
Rp.

18,000.00

Rp.
Rp.
Rp.

13,020.00
260.00
31,280.00

Rp.
Rp.
Rp.
Rp.
Rp.

23,460.00
390,600.00
3,900.00
15,750.00
2,025.00

Rp.
Rp.

16,250.00
58,950.00

Rp.

16,508.50

Rp.
Rp.
Rp.
Rp.

4,915.00
18,140.00
166,200.00
6,800.00

Rp.

Rp.

Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.

98,300.00
68,000.00

98,300.00
68,000.00

98,300.00
68,000.00
42,500.00

98,300.00
68,000.00

98,300.00
68,000.00
42,500.00

98,300.00
68,000.00
42,500.00

98,300.00
90,700.00
83,100.00
68,000.00
212,500.00
1,500.00
67,500.00

98,300.00

Rp.

196,055.00

Rp.

Rp.
Rp.
Rp.

2,457.50
51,000.00
53,457.50

Rp.

Rp.

Rp.
Rp.
Rp.

4,423.50
61,200.00
65,623.50

Rp.

Rp.

Rp.
Rp.

1,474.50
20,400.00

Rp.

21,874.50

Rp.
Rp.

Rp.
Rp.
Rp.

4,915.00
34,000.00
38,915.00

Rp.

Rp.
Rp.

983.00
20,400.00

Rp.

21,383.00

Rp.
Rp.

983.00
20,400.00

Rp.

21,383.00

Rp.
Rp.
Rp.
Rp.

7,372.50
6,802.50
62,325.00
102,000.00

Rp.

178,500.00

Rp.

3,833.70

510,935.00

17,000.00
17,000.00

Rp.

Rp.

Rp.

Rp.
Rp.

51,000.00
51,000.00

Rp.

Rp.
Rp.

51,000.00
51,000.00

Rp.

Rp.
Rp.
Rp.
Rp.

255,000.00
30,300.00
32,737.50
318,037.50

Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

90,700.00
83,100.00
68,000.00
212,500.00

@ Rp.

42,500.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
1,500.00
67,500.00

@ Rp.

287,500.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
1,500.00
67,500.00

@ Rp.

287,500.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
6,500.00
16,000.00

98,300.00
90,700.00
83,100.00
68,000.00
6,500.00
16,000.00

98,300.00
90,700.00

Rp.
Rp.
Rp.

3,537.30
32,409.00
53,040.00

Rp.

92,820.00

Rp.
Rp.
Rp.
Rp.

7,864.00
2,267.50
20,775.00
112,200.00

Rp.

143,106.50

Rp.
Rp.
Rp.
Rp.

7,864.00
2,267.50
20,775.00
112,200.00

Rp.

143,106.50

Rp.
Rp.
Rp.
Rp.

29.49
63.49
581.70
476.00

Rp.

1,150.68

Rp.
Rp.
Rp.
Rp.

29.49
63.49
581.70
476.00

Rp.

1,150.68

Rp.
Rp.

29.49
63.49

Rp.

255,000.00

Rp.
Rp.

18,360.00
273,360.00

Rp.
Rp.

34,800.00
35,100.00

Rp.
Rp.

224,250.00
294,150.00

Rp.
Rp.

34,800.00
35,100.00

Rp.
Rp.

224,250.00
69,900.00

Rp.

Rp.
Rp.
Rp.

6,825.00
240.00
7,065.00

Rp.

Rp.
Rp.
Rp.

6,825.00
240.00
7,065.00

Rp.

Rp.

Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

83,100.00
68,000.00
6,500.00
16,000.00

98,300.00
90,700.00
83,100.00
68,000.00
6,500.00
16,000.00

98,300.00
90,700.00
83,100.00
68,000.00
1,200,000.00
13,000.00
0.00

98,300.00
90,700.00
83,100.00
68,000.00
1,200,000.00
13,000.00
0.00

98,300.00
90,700.00
83,100.00
68,000.00
1,200,000.00
13,000.00
0.00
1,200,000.00
146,900.00
13,800.00

Rp.
Rp.

581.70
476.00

Rp.

1,150.68

Rp.
Rp.
Rp.
Rp.

29.49
63.49
581.70
476.00

Rp.

1,150.68

Rp.
Rp.
Rp.
Rp.

2,555.80
2,358.20
21,606.00
35,360.00

Rp.

61,880.00

Rp.
Rp.
Rp.
Rp.

2,555.80
2,358.20
21,606.00
35,360.00

Rp.

61,880.00

Rp.
Rp.
Rp.
Rp.

3,243.90
2,993.10
27,423.00
44,880.00

Rp.

78,540.00

Rp.
Rp.
Rp.

6,825.00
240.00
7,065.00

Rp.

Rp.
Rp.
Rp.

6,825.00
240.00
7,065.00

Rp.

Rp.
Rp.
Rp.
Rp.

48,000.00
3,900.00
0.00
51,900.00

Rp.

Rp.
Rp.
Rp.
Rp.

54,000.00
3,900.00
0.00
57,900.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,000.00
5,200.00
0.00
18,000.00
51,415.00
27,600.00
150,215.00

Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
1,200,000.00
13,000.00
0.00
1,200,000.00
146,900.00
13,800.00

98,300.00
90,700.00
83,100.00
68,000.00
1,200,000.00
13,000.00
0.00
1,200,000.00
146,900.00
13,800.00

98,300.00
90,700.00
83,100.00
68,000.00
1,200,000.00
13,000.00
0.00
1,200,000.00
146,900.00
13,800.00

98,300.00
90,700.00
83,100.00
68,000.00
12,500.00
1,500.00
67,500.00

Rp.
Rp.
Rp.
Rp.

3,243.90
2,993.10
27,423.00
44,880.00

Rp.

78,540.00

Rp.
Rp.
Rp.
Rp.

3,243.90
2,993.10
27,423.00
44,880.00

Rp.

78,540.00

Rp.
Rp.
Rp.
Rp.

3,243.90
2,993.10
27,423.00
44,880.00

Rp.

78,540.00

Rp.
Rp.
Rp.
Rp.

3,440.50
3,174.50
29,085.00
47,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,000.00
5,200.00
0.00
21,600.00
51,415.00
27,600.00
153,815.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,000.00
5,200.00
0.00
18,000.00
51,415.00
82,800.00
205,415.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

36,000.00
5,200.00
0.00
18,000.00
51,415.00
27,600.00
0.00
138,215.00

Rp.

Rp.
Rp.
Rp.

331,250.00
15,000.00
3,037.50

@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

12,500.00

98,300.00
90,700.00
83,100.00
68,000.00
12,500.00
1,500.00
67,500.00
12,500.00

98,300.00
90,700.00
83,100.00
68,000.00
12,500.00
1,500.00
67,500.00
12,500.00

98,300.00
90,700.00
83,100.00
68,000.00
2,350.00
1,500.00
67,500.00
12,500.00

as kuat II (kayu lanan/meranti)


@ Rp.
98,300.00
@ Rp.
90,700.00
@ Rp.
83,100.00
@ Rp.
68,000.00
@ Rp.
1,200,000.00
@ Rp.
13,000.00
@ Rp.
30,000.00

Rp.

83,300.00

Rp.
Rp.
Rp.
Rp.

3,440.50
3,174.50
29,085.00
47,600.00

Rp.

83,300.00

Rp.
Rp.
Rp.
Rp.

3,440.50
3,174.50
29,085.00
47,600.00

Rp.

83,300.00

Rp.
Rp.
Rp.
Rp.

3,440.50
3,174.50
29,085.00
47,600.00

Rp.

83,300.00

Rp.
Rp.
Rp.
Rp.

29,490.00
190,470.00
1,745,100.00
476,000.00

Rp.

2,441,060.00

Rp.
Rp.

18,750.00
368,037.50

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

331,250.00
15,000.00
3,037.50
18,750.00
368,037.50

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

33,125.00
15,000.00
3,037.50
18,750.00
69,912.50

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

62,275.00
15,600.00
3,037.50
20,250.00
101,162.50

Rp.

Rp.
Rp.
Rp.
Rp.

1,440,000.00
16,250.00
30,000.00
1,486,250.00

Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.

98,300.00
90,700.00
90,700.00
68,000.00
16,900.00

98,300.00
90,700.00
90,700.00
68,000.00
140,600.00

98,300.00
90,700.00
90,700.00
68,000.00
90,600.00

98,300.00
90,700.00
90,700.00
68,000.00
11,300.00

98,300.00
90,700.00
90,700.00
68,000.00
16,600.00

98,300.00
90,700.00
90,700.00
68,000.00
13,300.00

98,300.00

Rp.
Rp.
Rp.
Rp.

73.73
1,360.50
13,605.00
1,020.00

Rp.

16,059.23

Rp.
Rp.
Rp.
Rp.

294.90
5,442.00
54,420.00
4,080.00

Rp.

64,236.90

Rp.
Rp.
Rp.
Rp.

73.73
1,360.50
13,605.00
1,020.00

Rp.

16,059.23

Rp.
Rp.
Rp.
Rp.

49.15
907.00
9,070.00
680.00

Rp.

10,706.15

Rp.
Rp.
Rp.
Rp.

73.73
1,360.50
13,605.00
1,020.00

Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

16,900.00
16,900.00

Rp.

Rp.
Rp.

140,600.00
140,600.00

Rp.

Rp.
Rp.

99,660.00
99,660.00

Rp.

Rp.
Rp.

11,300.00
11,300.00

Rp.

16,059.23

Rp.
Rp.

16,600.00
16,600.00

Rp.

Rp.

98.30
1,814.00
18,140.00
1,360.00
13,300.00
34,712.30

Rp.
Rp.

13,300.00
13,300.00

Rp.

Rp.

245.75

@ Rp.
@ Rp.
@ Rp.
@ Rp.

90,700.00
90,700.00
68,000.00
43,800.00

98,300.00
90,700.00
90,700.00
68,000.00
502,500.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
90,700.00
68,000.00
9,000.00

98,300.00
90,700.00
83,100.00
68,000.00
1,600.00
1,500.00
67,500.00

98,300.00
90,700.00
83,100.00
68,000.00
1,500.00
67,500.00

98,300.00
90,700.00
83,100.00
68,000.00
1,500.00

Rp.
Rp.
Rp.

4,535.00
45,350.00
3,400.00

Rp.

53,530.75

Rp.
Rp.
Rp.
Rp.

4,915.00
22,675.00
226,750.00
68,000.00

Rp.

322,340.00

Rp.
Rp.
Rp.
Rp.

245.75
4,535.00
45,350.00
3,400.00

Rp.

53,530.75

Rp.
Rp.
Rp.
Rp.

1,474.50
907.00
8,310.00
20,400.00

Rp.

31,091.50

Rp.
Rp.
Rp.
Rp.

1,474.50
1,360.50
12,465.00
20,400.00

Rp.

35,700.00

Rp.
Rp.
Rp.
Rp.

1,474.50
1,360.50
12,465.00
20,400.00

Rp.
Rp.

43,800.00
43,800.00

Rp.

Rp.
Rp.

20,100.00
20,100.00

Rp.

Rp.
Rp.

9,000.00
9,000.00

Rp.

Rp.
Rp.
Rp.
Rp.

24,000.00
17,250.00
2,902.50
44,152.50

Rp.

Rp.
Rp.
Rp.

11,664.00
1,552.50
13,216.50

Rp.

Rp.

11,664.00

@ Rp.

67,500.00

kayu kelas kuat II (kayu lanan/meranti)


@ Rp.
98,300.00
@ Rp.
90,700.00
@ Rp.
83,100.00
@ Rp.
68,000.00
@ Rp.
1,200,000.00
@ Rp.
13,000.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
21,400.00
51,000.00

amir, 1 lapis cat dasar dan 2 lapis cat penutup


@ Rp.
98,300.00
@ Rp.
90,700.00
@ Rp.
90,700.00
@ Rp.
68,000.00
@ Rp.
30,000.00
@ Rp.
26,700.00
@ Rp.
27,600.00
@ Rp.
26,400.00

ar dan 2 lapis cat penutup


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

s kuat II (kayu lanan/meranti)


@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
90,700.00
68,000.00
27,600.00
16,300.00

98,300.00
90,700.00
83,100.00
68,000.00

Rp.

35,700.00

Rp.
Rp.
Rp.
Rp.

1,081.30
3,174.50
29,085.00
14,280.00

Rp.

100,448.00

Rp.
Rp.
Rp.
Rp.

491.50
907.00
8,310.00
6,800.00

Rp.

16,508.50

Rp.
Rp.
Rp.
Rp.

245.75
544.20
816.30
4,760.00

Rp.

6,366.25

Rp.
Rp.
Rp.
Rp.

327.34
390.01
3,900.10
1,904.00
3,588.00

Rp.

10,109.45

Rp.
Rp.
Rp.
Rp.

19,660.00
108,840.00
997,200.00
272,000.00

Rp.
Rp.

2,565.00
14,229.00

Rp.

Rp.
Rp.
Rp.

20,400.00
1,495.00
21,895.00

Rp.

Rp.
Rp.
Rp.

22,000.00
51,000.00
73,000.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

6,000.00
4,005.00
4,692.00
6,864.00
21,561.00

Rp.

Rp.
Rp.
Rp.

3,588.00
3,749.00
7,337.00

Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1,200,000.00
20,400.00
13,000.00

98,300.00
90,700.00
83,100.00
68,000.00
2989100
21900

98,300.00
90,700.00
83,100.00
68,000.00
28,000.00

98,300.00
90,700.00
83,100.00
68,000.00

Rp.

1,397,700.00

Rp.
Rp.
Rp.
Rp.

491.50
907.00
8,310.00
6,800.00

Rp.

16,508.50

Rp.
Rp.
Rp.
Rp.

98.30
907.00
8,310.00
13,600.00

Rp.

22,915.30

Rp.
Rp.
Rp.
Rp.

491.50
907.00
8,310.00
6,800.00

21900

98,300.00
90,700.00
83,100.00
68,000.00
139,600.00
1,500.00
67,500.00

98,300.00
90,700.00
83,100.00
68,000.00
20,200.00
2,000.00

Rp.

16,508.50

Rp.
Rp.
Rp.
Rp.

15,728.00
136,050.00
124,650.00
68,000.00

Rp.

344,428.00

Rp.
Rp.
Rp.
Rp.

491.50
907.00
8,310.00
680.00

Rp.
Rp.
Rp.
Rp.

1,320,000.00
306,000.00
10,400.00
1,636,400.00

Rp.

Rp.
Rp.
Rp.

26,304.08
1,314.00
27,618.08

Rp.

Rp.
Rp.

46,760.00
46,760.00

Rp.

Rp.
Rp.
Rp.

0.00
1,314.00
1,314.00

Rp.

Rp.
Rp.
Rp.
Rp.

139,600.00
9,000.00
675.00
149,275.00

Rp.

Rp.
Rp.

20,200.00
1,000.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
20,200.00
2,000.00

Rp.

10,388.50

Rp.
Rp.
Rp.
Rp.

491.50
907.00
8,310.00
680.00

Rp.

10,388.50

Rp.
Rp.
Rp.
Rp.

10,813.00
48,978.00
224,370.00
122,400.00
197,500.00

Rp.

21,200.00

Rp.

Rp.
Rp.
Rp.

24,240.00
1,000.00
25,240.00

Rp.

Rp.
Rp.
Rp.

197,500.00
6,399.00
203,899.00

Rp.

63,600.00
13,950.00
1,215.00
24,250.00
103,015.00

Rp.

0,30 m (50 x 50) cm


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
197,500.00
35,550.00

98,300.00
90,700.00
83,100.00
68,000.00
2,400.00
1,500.00
67,500.00
12,500.00

98,300.00
90,700.00
83,100.00
68,000.00
68,000.00

98,300.00
90,700.00
83,100.00
68,000.00
68,000.00
62,100.00
287,500.00
42,500.00

Rp.

604,061.00

Rp.
Rp.
Rp.
Rp.

4,423.50
4,081.50
37,395.00
61,200.00

Rp.

107,100.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

88,470.00
81,630.00
373,950.00
204,000.00
27,200.00
775,250.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

88,470.00
81,630.00
373,950.00
204,000.00
27,200.00

Rp.

62,100.00
287,212.50
42,500.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
1,500.00
67,500.00

@ Rp.

287,500.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

98,300.00
90,700.00
83,100.00
68,000.00
1,500.00
67,500.00

@ Rp.

287,500.00

Rp.

775,250.00

Rp.
Rp.
Rp.
Rp.

7,864.00
2,267.50
20,775.00
112,200.00

Rp.

143,106.50

Rp.
Rp.
Rp.
Rp.

7,864.00
2,267.50
20,775.00
112,200.00

Rp.

143,106.50

Rp.

391,812.50

Rp.
Rp.

34,800.00
35,100.00

Rp.

224,250.00
294,150.00

Rp.
Rp.

34,800.00
35,100.00

Rp.
Rp.

224,250.00
294,150.00

Rp.

Rp.

Rp.

Rp
Rp

3,897,147.31
70,148.65

JUMLAH

12,465.00

713,590.00

47,788.50

706,990.00

53,457.50

65,623.50

38,874.50

38,915.00

72,383.00

72,383.00

496,537.50

$
$
$
$
$
$

206,900,100.00
180,000,000.00
1,800,000.00
21,600,000.00
158,400,000.00
38,400,000.00

54,000,000.00

366,180.00

437,256.50

213,006.50

8,215.68

8,215.68

u
b

206,137.18
353,115.00

8,215.68

8,215.68

113,780.00

119,780.00

228,755.00

232,355.00

283,955.00

216,755.00

451,337.50

451,337.50

153,212.50

184,462.50

3,927,310.00

32,959.23

204,836.90

115,719.23

22,006.15

32,659.23

48,012.30

97,330.75

342,440.00

62,530.75

75,244.00

48,916.50

0.007666667
0.038333333

49,929.00

122,343.00

89,508.50

27,927.25

17,446.45

3,034,100.00

44,126.58

69,675.30

17,822.50

493,703.00

31,588.50

35,628.50

807,960.00

210,115.00

775,250.00

1,167,062.50

437,256.50

437,256.50

Rp
Rp

3,897,147.31
70,148.65

RENCANA ANGGARAN BIAYA


PROGRAM
KEGIATAN
TAHUN ANGGARAN

No.

Uraian Pekerjaan

1
I

2
PEKERJAAN PENDAHULUAN
Pembuatan Papan Nama Proyek
Pengukuran dan pemasangan bowplank
Pembersihan lokasi

Volume
4
1.00
40.60
1.00

SUB T
II
1
2

PEKERJAAN TANAH DAN PONDASI


Penimbunan/peninggian & pemadatan tanah di lokasi
a. Mengurug sirtu padat untuk perbaikan tanah
Pondasi beton footplat 80 x 80 x 100 cm (100 kg + bekisting)
a. Menggali tanah biasa sedalam 1m
b. Mengurug tanah kembali
c. Lantai kerja beton tumbuk 1pc:3ps:5kr
d. Bekisting untuk pondasi
e. Beton bertulang 100kg besi 1pc : 2ps : 4kr
Pek. Slof 15 x 20 cm (100kg + bekisting)
a. Bekisting untuk sloof
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr
Pek. Kolom 15 x 15 x 345 cm (100 + bekisting)
a. bekisting untuk kolom
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr
Pek. Ringbalk 15 x 20 cm (100kg + bekisting)
a. Bekisting untuk balok
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr
c. Plesteran 1pc : 5ps, tebal 15mm
d. Acian

142
12
11.08
1.2
5.76
0.92
16.27
1.22
10.35
0.78
21.97
1.65
16.48
16.48

SUB T
III

PEKERJAAN DINDING PINTU DAN JENDELA


1 Pek. Dinding dan gewel
a. Pas. Bataco 1pc : 5ps
b. Plesteran 1pc : 5ps tebal 15mm
c. Acian
2 Pek. Kusen, pintu dan jendela
a. Membuat dan memasang kusen pintu dan jendela,
kayu kelas kuat I
b. Membuat & memasang daun pintu panil, kayu kelas kuat I
Pintu PVC + kusen PVC (pintu WC)
d. Pintu harmonika tebal 1mm + asesoris lengkap terpasang
e. Pasang pagar BRC jadi T = 1m

119.49
238.97
238.97
0.06
5.21
1
17.18
9.4

3 Pek. Engsel, kunci dan kaca


a. Pasang engsel pintu
b. pasang kunci tanam standar
c. Pasang kunci tanam kamar mandi
d. Pasang 1 buah kaca bening 5mm

2
1
1
3

SUB T
IV

PEKERJAAN LANTAI, KERAMIK & HALAMAN DEPAN


1 Pek. Urugan bawah lantai & pemadatan/perataan
2 Pek. Lantai ruang & keramik WC
A. Pek. Lantai ruang
a. Beton tumbuk 1pc : 3ps : 5kr
b. Memasang keramik lantai ukuran 40x40 cm
c. Memasang plin keramik 10x40cm
B. Pek. Keramik WC
a. Memasang lantai keramik ukuran 20x20 cm
b. Memasang keramik lantai ukuran 25x20 cm
3 Pek. Perkerasan/ cor halaman depan t = 10cm
a. beton tumbuk 1pc : 3ps : 6kr
b. Plesteran 1pc:5ps tebal 15mm

18

7.2
57
34.34
2.64
5.46
5.43
45.29

SUB T
V

PEKERJAAN ATAP DAN LISTRIK


1 Pekerjaan rangka penutup atap
a. Pek. Rangka atap baja ringan zinc alum + atap metal
zincalum 2 susun lengkap terpasangn (termasuk nok dan
Jurai)
b. Lisplang uk. (3x30) kayu kelas I (kayu benuas)
2 Pekerjaan listrik
a. Instalasi titik lampu bang.beton
b. Lampu TL bambu 40 watt
c. Lampu SL 20 watt untuk gudang peralatan & lampu luar
d. Instalasi stop kontak bang beton

119.23

44.1
5
2
3
3

SUB T
VI

PEKERJAAN SANITASI
a. Septictank dan rembesan 2 m3
b. Memasang closed Jongkok porselen
c. memasang bak mandi fiberglass
d. Memasang floor drain
e. Memasang kran 3/4" atau 1/2"
f. Memasang pipa PVC tipe AW 3/4
g. Memasang pipa penyalur air limbah jenis pipa tanah 3"

1
1
1
1
1
20
3

SUB T
VII

PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding, kolom & balok beton
a. Pengecatan Tembok Dinding ( 1 plamir, 1 lapis cat dasar
2 lapis cat penutup)
2 Pek. Pengecatan seluruh kusen, pintu & lisplank
a. Pengecatan kilap kayu/besi ( 1 lapis cat dasar, 3 lapis cat
kilap penutup)

266.86

46.77

SUB T

Galian Tanah Biasa


Urugan Tanah Kembali
Urugan Pasir
Pasang Pondasi Batu Belah
Pasangan Batu Kosong

1.00
1.00
1.00
1.00
0.00

SUB T
PEKERJAAN PEMBETONAN
3
b. Sloof 15/20
Membuat Beton Bertulang
Pembesian dengan besi 8 mm
Pembesian dengan besi 6 mm
Pasang Bekisting untuk Sloof
c. Kolom
Membuat Beton Bertulang
Pembesian dengan besi 8 mm
Pembesian dengan besi 6 mm
Pasang Bekisting untuk Kolom
d. Balok
Membuat Beton Bertulang
Pembesian dengan besi 6 mm
Pembesian dengan besi 4 mm

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Pasang Bekisting untuk Balok


e. Plat teras
Membuat Beton Bertulang
Pembesian dengan besi 8 mm
Pembesian dengan besi 6
Pasang Bekisting untuk teras

1.00
1.00
1.00
1.00
1.00

SUB T
4

PEKERJAAN LANTAI
Pasang Lantai Keramik 30x30
Pasang Lantai Keramik 15x20
cor lantai
Urugan Pasir
spesi lantai
tanah urugan

1.00
1.00
1.00
1.00
1.00
1.00

SUB T
5

PEKERJAAN KUSEN PINTU,JENDELA DAN VENTILASI


Pasang Kusen Pintu dan Jendela Kayu Meranti
Pasang Pintu Panel Kayu
Pasang 1 Buah Engsel Pintu
Pasang 1 Buah Kunci
Pasang kaca, tebal 3 mm
Pasang 1 Buah Engsel Jendela

1.00
1.00
1.00
1.00
1.00
1.00

SUB T
6

PEKERJAAN DINDING DAN PLESTERAN


Pasangan batako
Plesteran 1 Pc : 3 Ps tebal 15 cm

PEKERJAAN PLAFOND
Langit-langit ( 60 x 120 cm ), tebal 4 mm
Pasang rangka Langit-langit ( 60 x 120 cm ), kayu lanan

PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu Baru 1 lapis plamir,
Pengecatan Bidang Tembok Baru 1 lapis plamir,

1.00
1.00

SUB T
1.00
1.00

SUB TO
1.00
1.00

SUB TO
9

PEKERJAAN KUDA-KUDA DAN ATAP


Pasang Konstruksi Atap Kayu Meranti
Pasang Atap Genteng Metal

1.00
1.00

SUB T
10

PEKERJAAN KAMAR MANDI


Memasang 1 Buah Kloset Jongkok Berwarna INA
Memasang 1 Buah Kran
Memasang 1 Buah Bak mandi

1.00
1.00
1.00

SUB T
12
20
21
22

PEKERJAAN INSTALASI LISTRIK DAN AIR


Paku Kayu
Pipa Saluran Air Kotor 4
Pipa Saluran Air Kotor 2
Pompa Air

1.00
1.00
1.00
1.00

SUB T
23
24
25

PEKERJAAN SEPTICTANK DAN RESAPAN


Menggali galian 1 buah septictank
Membuat Cor Beton Tumbuk / Spesi
Membuat Beton Bertulang

1.0
1.0
1.0

SUB TO
26

PEKERJAAN CARPORT
Cor beton tumbuk
TOTAL KESELURUHAN

1.00

ANA ANGGARAN BIAYA

Sat.

Harga
Satuan Bahan
(Rp)

Harga
Satuan Upah
(Rp)
6

5
bh
m
lok

Rp

16,508.50

Jumlah
Total Harga
(Rp)
7

Rp
Rp
Rp

31,280.00
-

Rp
Rp
Rp
Rp

200,000.00
1,940,213.10
300,000.00
2,440,213.10

SUB TOTAL I

m3

Rp

21,383.00

Rp

51,000.00

Rp

10,278,386.00

m3
m3
m3
m2
m3

Rp
Rp
Rp
Rp
Rp

53,457.50
21,383.00
143,106.50
61,880.00
206,137.18

Rp
Rp
Rp
Rp
Rp

51,000.00
294,150.00
51,900.00
353,115.00

Rp
Rp
Rp
Rp
Rp

641,490.00
802,003.64
524,707.80
655,372.80
514,512.01

m2
m3

Rp
Rp

61,880.00
206,137.18

Rp
Rp

57,900.00
353,115.00

Rp
Rp

1,948,820.60
682,287.66

m2
m3

Rp
Rp

78,540.00
206,137.18

Rp
Rp

150,215.00
353,115.00

Rp
Rp

2,367,614.25
436,216.70

m2
m3
m2
m2

Rp
Rp
Rp

78,540.00
206,137.18
35,700.00

Rp
Rp
Rp

153,815.00
353,115.00
13,216.50

Rp
Rp
Rp
Rp
Rp

5,104,839.35
922,766.10
806,143.92
25,685,160.82

Rp
Rp
Rp

44,152.50
13,216.50
13,216.50

Rp
Rp
Rp

8,990,905.56
11,689,576.01
11,689,576.01

Rp

382,050.00

Rp

382,050.00

Rp
Rp
Rp
Rp

270,000.00
750,000.00
44,152.50

Rp
Rp
Rp
Rp

2,000,000.00
270,000.00
12,885,000.00
707,293.60

SUB TOTAL II

m2
m2
m2

Rp
Rp
Rp

m3

Rp

m2
set
m2
m

Rp
Rp
Rp
Rp

31,091.50
35,700.00
35,700.00
31,091.50

bh
bh
bh
bh

Rp
16,059.23
Rp
64,236.90
Rp
64,236.90
Rp
16,059.23
SUB TOTAL III

Rp
Rp
Rp
Rp

16,900.00
140,600.00
140,600.00
99,660.00

Rp
Rp
Rp
Rp
Rp

65,918.45
204,836.90
204,836.90
347,157.68
49,437,151.10

m3

Rp

21,383.00

Rp

51,000.00

Rp

1,302,894.00

m3
m2
m

Rp
Rp
Rp

143,106.50
83,300.00
83,300.00

Rp
Rp
Rp

69,900.00
368,037.50
69,912.50

Rp
Rp
Rp

1,533,646.80
25,726,237.50
5,261,317.25

m2
m2

Rp
Rp

83,300.00
83,300.00

Rp
Rp

368,037.50
101,162.50

Rp
Rp

1,191,531.00
1,007,165.25

m3
m2

Rp
143,106.50
Rp
35,700.00
SUB TOTAL IV

Rp
Rp

69,900.00
13,216.50

Rp
Rp
Rp

1,156,625.30
2,215,428.29
39,394,845.38

m2

Rp

Rp

170,000.00

Rp

20,269,100.00

Rp

16,508.50

Rp

1,314.00

Rp

785,972.25

ttk
bh
bh
bh

Rp
Rp
Rp

15,000.00
15,000.00
15,000.00

Rp
Rp
Rp
Rp

15,000.00
35,000.00
25,000.00
200,000.00

Rp
Rp
Rp
Rp
Rp

150,000.00
100,000.00
120,000.00
600,000.00
22,025,072.25

SUB TOTAL V
bh
unit
unit
unit
unit
m
m

Rp
775,250.00
Rp
344,428.00
Rp
604,061.00
Rp
15,000.00
Rp
10,388.50
Rp
10,388.50
Rp
10,388.50
SUB TOTAL VI

Rp
Rp
Rp
Rp
Rp
Rp
Rp

391,812.50
149,275.00
203,899.00
15,000.00
21,200.00
25,240.00
25,240.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,167,062.50
493,703.00
807,960.00
30,000.00
31,588.50
712,570.00
106,885.50
3,349,769.50

m2

Rp

6,366.25

Rp

21,561.00

Rp

7,452,665.94

m2

Rp

10,109.45

Rp

7,337.00

Rp

815,970.42

Rp

8,268,636.35

SUB TOTAL I

Jumlah Biaya Pekerjaan


PPN 10%
Jumlah Total
Jumlah Total Pembulatan

M3
M3
M3
M3
M3

Rp
Rp
Rp

17,000.00
51,000.00
178,500.00

Rp
Rp
Rp
Rp

147,251,079.00
14,725,107.90
161,976,186.90
162,000,000.00

Rp
Rp
Rp
Rp
Rp

53,457.50
38,874.50
21,383.00
496,537.50
-

Rp
Rp
Rp
Rp
Rp
Rp

53,457.50
55,874.50
72,383.00
675,037.50
856,752.50

SUB TOTAL II

M3
kg
kg
M2

Rp
Rp
Rp
Rp

143,106.50
1,150.68
1,150.68
61,880.00

Rp
Rp
Rp
Rp

294,150.00
7,065.00
7,065.00
57,900.00

Rp
Rp
Rp
Rp

437,256.50
8,215.68
8,215.68
119,780.00

M3
kg
kg
M2

Rp
Rp
Rp
Rp

143,106.50
1,150.68
1,150.68
61,880.00

Rp
Rp
Rp
Rp

294,150.00
7,065.00
7,065.00
57,900.00

Rp
Rp
Rp
Rp

437,256.50
8,215.68
8,215.68
119,780.00

M3
kg
kg

Rp
Rp
Rp

143,106.50
1,150.68
1,150.68

Rp
Rp
Rp

294,150.00
7,065.00
7,065.00

Rp
Rp
Rp

437,256.50
8,215.68
8,215.68

M2

Rp

61,880.00

Rp

57,900.00

Rp

119,780.00

M3
kg
kg
M2

Rp
143,106.50
Rp
1,150.68
Rp
1,150.68
Rp
61,880.00
SUB TOTAL III

Rp
Rp
Rp
Rp

294,150.00
7,065.00
7,065.00
57,900.00

Rp
Rp
Rp
Rp
Rp

437,256.50
8,215.68
8,215.68
119,780.00
2,293,871.44

M2
M2
M3
M3
M3
M3

Rp
83,300.00
Rp
83,300.00
Rp
143,106.50
Rp
21,383.00
Rp
21,383.00
Rp
21,383.00
SUB TOTAL IV

Rp
Rp
Rp
Rp
Rp
Rp

368,037.50
101,162.50
69,900.00
51,000.00
51,000.00
51,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

451,337.50
184,462.50
213,006.50
72,383.00
72,383.00
72,383.00
1,065,955.50

M
M2
Buah
Buah
M2
Buah

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

1,486,250.00
20,100.00
16,900.00
140,600.00
99,660.00
11,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,927,310.00
342,440.00
32,959.23
204,836.90
115,719.23
22,006.15
4,645,271.50

2,441,060.00
322,340.00
16,059.23
64,236.90
16,059.23
10,706.15

SUB TOTAL V
M2
M2

Rp
31,091.50
Rp
35,700.00
SUB TOTAL VI

Rp
Rp

44,152.50
13,216.50

Rp
Rp
Rp

75,244.00
13,216.50
88,460.50

M2
M2

Rp
16,508.50
Rp
100,448.00
SUB TOTAL VII

Rp
Rp

73,000.00
21,895.00

Rp
Rp
Rp

89,508.50
122,343.00
211,851.50

M2
M2

Rp
6,366.25 Rp
Rp
10,109.45 Rp
SUB TOTAL VIII

21,561.00
7,337.00

Rp
Rp
Rp

27,927.25
17,446.45
45,373.70

M2
M2

#REF!
Rp
22,915.30
SUB TOTAL IX

Rp

#REF!
46,760.00

Rp
Rp
Rp

69,675.30
46,760.00
116,435.30

Buah
Buah
Buah

Rp
344,428.00
Rp
10,388.50
Rp
604,061.00
SUB TOTAL X

Rp
Rp
Rp

149,275.00
21,200.00
203,899.00

Rp
Rp
Rp
Rp

493,703.00
31,588.50
807,960.00
1,333,251.50

Kg
Buah
Buah
Buah

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

SUB TOTAL XI
M3
M3
M3

Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp

Rp
Rp

SUB TOTAL XII


M3

Rp

13,097,436.54

35.8455

573,467.86

573,467.86

72,383.00

211,851.50

133,834.20

Anda mungkin juga menyukai