LEMBARAN KERJA
Dimensi Tebal /
NO. JENIS PEKERJAAN Luas
Panjang Lebar Tinggi
18 270
Total 270 m'
18 270
Total 270 m'
18 6.075 m3
1,084.16 Kg
18 0.045125 m3
18 0.09025 m3
18 2.394 m3
1.197 m3
20.0625 m3
3009.375 Kg
2.00625 m3
4.0125 m3
83.46 m3
27.820 m3
53.625 m3
2,531.10 Kg
17.875 m3
35.75 m3
18 2.88 m3
330.12 Kg
14 2567.355 Kg
Total
Jumlah Vol Satuan
Vol
2972.7
12 207.4842 Kg
2 189.6699 Kg
1713.89 Kg
17 4333.725 Kg
REKAPITULASI RENCANA ANGGARAN BIAYA
JUMLAH 784,062,034.51
PPN 10 % 78,406,203.45
JUMLAH 862,468,237.97
DIBULATKAN 862,468,000.00
Terbilang :
file:///conversion/tmp/scratch/375412036.xlsx
NO. JENIS PEKERJAAN JUMLAH HARGA
Rp
file:///conversion/tmp/scratch/375412036.xlsx
RENCANA ANGGARAN BIAYA
A. Pekerjaan Pondasi
1 Pile Cap Type P1, Beton K-225 +bekisting + pembesian 6.08 m3 4,634,344.22
lengkap sesuai dengan Analisa
2 Sloof 600x400 mm, Beton K-225 +bekisting + pembesian 20.06 m3 5,705,534.38
lengkap sesuai dengan Analisa
3 Pondasi Batu Kali untuk Tangga, lengkap sesuai dengan m3
analisa
Sloof 150 x 300 mm untuk tangga, Beton K-225 +bekisting m3 5,705,534.38
+ pembesian lengkap sesuai dengan Analisa
1 53.63 m3 3,073,197.06
Beton K- 300, Pelat t = 15cm Lantai 1 dengan pembesian
JUMLAH I 61,830,000.00
247,335.02 - - -
63,212.95 - - -
JUMLAH II 144,273,152.97
Bahan
Tiang Pancang 250 x 250 mm m' 1.0000 160,000.00
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
1 Beton Raedymix K-300 m3 1.0000 1,650,000.00
2 Bekisting beton jepit, sloof, ring balok m3 1.0000 642,112.54
3 Pembesian Pile cap Kg 178.4626 12,771.90
4 Beton Lantai Kerja t = 5 cm Kg 0.0074 690,000.00
5 Pasir Urug t = 10 cm m3 0.0149 256,850.90
6 Galian Tanah m3 0.3941 90,667.27
7 Timbunan Tanah kembali m3 0.1970 92,648.18
Jumlah
Alat/Tenaga Kerja :
Jumlah
4 Pekerjaan Beton K-300, pelat lantai 1 + tulangan + bekisting, lengkap sesuai dengan analisa
No. Uraian Satuan koef. Harga Satuan
(Rp.)
Bahan
1 Beton Raedymix K-300 m3 1.0000 1,650,000.00
2 Bekisting ringan, beton untuk druiker ringan m3 1.0000 419,129.45
3 Pembesian Pelat Lantai Kg 47.2000 12,771.90
4 Beton Lantai Kerja t = 5 cm Kg 0.3333 690,000.00
5 Pasir Urug t = 10 cm m3 0.6667 256,850.90
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
1 Beton Raedymix K-225 m3 1.0000 1,650,000.00
2 Bekisting beton jepit, sloof, ring balok m3 1.0000 642,112.54
3 Pembesian Kolom Kg 114.6250 12,771.90
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
1 Baja HB.300.300.10.15 Kg 1.0500 21,557.10
Jumlah
Alat/Tenaga Kerja :
Jumlah
7 Pekerjaan Beton K-225, Ring Balok + tulangan + bekisting, lengkap sesuai dengan analisa
No. Uraian Satuan koef. Harga Satuan
(Rp.)
Bahan
1 Beton Raedymix K-225 m3 1.0000 1,650,000.00
2 Bekisting beton jepit, sloof, ring balok m3 1.0000 642,112.54
3 Pembesian Ring Balok Kg 150.0000 12,771.90
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
1 Beton Raedymix K-225 m3 1.0000 1,650,000.00
2 Bekisting ringan, beton untuk druiker ringan m3 1.0000 419,129.45
3 Pembesian Tangga Kg 150.0000 12,771.90
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
1 Baja Profil L kg 1.0500 21,557.10
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
Jumlah
Alat/Tenaga Kerja :
Jumlah
Bahan
1 Besi Beton Kg 1.0000 11,199.18
Jumlah
Alat/Tenaga Kerja :
Jumlah
160,000.00
160,000.00
19,000.00
19,000.00
50,000.00
50,000.00
1,650,000.00
642,112.54
2,279,305.86
5,125.31
3,815.77
35,729.62
18,255.12
4,634,344.22
35,155.91
8,557.04
19,500.00
63,212.95
1,650,000.00
419,129.45
602,833.68
230,000.00
171,233.93
3,073,197.06
35,155.91
8,557.04
19,500.00
63,212.95
1,650,000.00
642,112.54
1,463,979.04
3,756,091.58
35,155.91
8,557.04
19,500.00
63,212.95
22,634.96
22,634.96
3,602.20
4,243.05
418.72
789.51
9,053.48
1,650,000.00
642,112.54
1,915,785.00
4,207,897.54
27,448.76
64,651.96
18,144.62
50,505.05
160,750.39
1,650,000.00
419,129.45
1,915,785.00
3,984,914.45
27,448.76
64,651.96
18,144.62
110,245.34
22,634.96
22,634.96
3,602.20
4,243.05
418.72
789.51
9,053.48
182,525.00
160,088.48
139,726.89
Err:509
Err:509
Err:509
Err:509
154,380.00
72,738.00
8,374.44
247,335.02
11,199.18
11,199.18
1,572.72
1,572.72
I Bahan
Pengadaan Tiang Pancang Beton 250 x 250 mm m'
Beton Ready mix B0 m3
Beton Ready mix K - 300 m3
Besi Beton U 39 Kg
Kawat beton Kg
Bekisting balok beton triplek tebal 15 mm m3
Bekisting berat pelat beton bertulang expose multiplek tebal 15 mm m3
Bekisting beton jepit, sloof, ring balok m3
Bekisting ringan, beton untuk druiker ringan m3
Bekisting ringan, expose multiplex tebal 9 mm m3
Galian tanah biasa, dalam 10 m s.d. 11 m m3
Galian tanah biasa, dalam 11 m s.d. 12 m m3
Galian tanah biasa, dalam 12 m s.d. 13 m m3
Galian tanah biasa, dalam s.d. 1 m m3
Galian tanah biasa, dalam 1 s/d 2 m m3
Galian tanah biasa, dalam 2 s/d 3 m m3
Galian tanah biasa, dalam 3 s/d 4 m m3
Galian tanah biasa, dalam 4 m s.d. 5 m m3
Galian tanah biasa, dalam 5 m s.d. 6 m m3
Galian tanah biasa, dalam 6 m s.d. 7 m m3
Galian tanah biasa, dalam 7 m s.d. 8 m m3
Galian tanah biasa, dalam 8 m s.d. 9 m m3
Galian tanah biasa, dalam 9 m s.d. 10 m m3
Galian tanah rata-rata 5-6 m m3
Pemancangan Tiang Pancang Beton 350 x 350 mm m'
Pasir Urug m3
Timbunan Tanah Kembali m3
Baja Struktur Profil Kg
Batu Kali m3
Semen Kg
II Alat
III Upah
Pekerja Oh
Tukang Oh
Mandor Oh
Kepala Tukang Oh
Upah (Baja Tulangan U 39) Kg
AH DAN ALAT
Harga Satuan
(Rp.)
160,000.00
690,000.00
1,650,000.00
11,199.18
1,542,415.45
2,122,589.63
642,112.54
419,129.45
344,828.90
251,152.72
290,140.90
329,129.09
73,761.81
90,667.27
107,859.09
85,553.69
104,668.96
115,356.36
141,779.09
171,751.81
173,176.36
212,164.54
115,356.36
50,000.00
256,850.90
92,648.18
21,557.10
173,833.33
1,177.12
Harga Satuan
(Rp.)
2,500,000.00
131,818.18
16,045.45
150,000.00
50,505.05
Harga Satuan
(Rp.)
102,920.00
121,230.00
157,901.00
139,574.00
1,572.72
Dia AREA DENSITY BERAT/M
8 50.26548 7850 0.395
10 78.53982 7850 0.617
12 113.0973 7850 0.888
13 132.7323 7850 1.042
16 201.0619 7850 1.578
19 283.5287 7850 2.226
22 380.1327 7850 2.984
25 490.8739 7850 3.853
26 530.9292 7850 4.168
28 615.7522 7850 4.834
32 804.2477 7850 6.313
PENULANGAN PELAT LANTAI 1
Type Kode DIA. DIMENSI (MM) PANJANG JUMLAH TOT.PANJANG UNIT BERAT
40 x dia.
Besi Besi A B C D (MM) (N) (M) (Kg/M')
S1 8 1000 1000 6 6.00 0.395
S2 8 1000 1000 6 6.00 0.395
4.72
0.10
47.20
BERAT
(Kg) U-39
4.93
4.93
4.93
4.93
19.72
0.13
151.69
BERAT
(Kg) U-39
19.36
19.36
19.36
19.36
77.44
0.43
178.46
BERAT
(Kg) U-39
38.72
38.72
34.72
34.72
146.88
Err:509
Err:509
BERAT
(Kg) U-39
11.93
6.41
18.34
0.16
114.63